FERC-714 Annual Power System Reports

Annual reports to FERC including generation capabilities & peaks, control area loads & interconnections, scheduled and actual interchange, customer load peaks, and system load forecasts.

  1. BPA 2012 FERC-714 Power System Report (posted Jun-13)
  2. BPA 2011 FERC-714 Power System Report (posted Jun-12)
  3. BPA 2010 FERC-714 Power System Report (posted May-11)
  4. BPA 2009 FERC-714 Power System Report (posted May-10)
  5. BPA 2008 FERC-714 Power System Report (posted Apr-09)
  6. BPA 2007 FERC-714 Power System Report (posted May-08)
  7. BPA 2006 FERC-714 Power System Report (posted Jun-07)
  8. BPA 2005 FERC-714 Power System Report (as revised Nov-08)
  9. BPA 2004 FERC-714 Power System Report (posted May-05)
  10. BPA 2003 FERC-714 Power System Report (posted May-04)
  11. BPA 2002 FERC-714 Power System Report (posted May-03)
  12. BPA 2001 FERC-714 Power System Report (posted May-02)
  13. BPA 2000 FERC-714 Power System Report (posted May-01)
  14. BPA 1999 FERC-714 Power System Report (posted May-00)
  15. BPA 1998 FERC-714 Power System Report (posted May-99)