Bonneville Power Administration
Transmission Services
http://www.transmission.bpa.gov

TBL Home Page Skip Primary Navigation
Transmission Services Home Page
  BPA Home Triangle Bullet Point Transmission Services Triangle Bullet Point Planning & Projects Triangle Bullet Point Transmission Adequacy Guidelines Development

This is a spacer graphic Triangle bullet point Operations

This is a spacer graphic Triangle bullet point Network Planning and Studies

This is a spacer graphic Triangle bullet point Non-Wires Solutions

This is a spacer graphic Triangle bullet point Transmission Projects

This is a spacer graphic Triangle bullet point Wind Projects

This is a spacer graphic Triangle bullet point Environmental Management

This is a spacer graphic Triangle bullet point Public Involvement


Adjust your View!


  Link to USA.gov

Transmission Adequacy Guidelines Development



Transmission Adequacy Guidelines Development


One of the challenges facing the electric utility industry today is how to balance reliability, economic, environmental and the other public purpose objectives to optimize transmission and resources to meet the needs of the region. These critical issues must be addressed to move the Northwest electrical system into the 21st century. BPA is initiating the development of transmission adequacy standards because BPA needs to find a better way to determine how much transmission it needs, the solutions to be deployed, and the criteria to be applied to guide prudent investment decisions consistent with its obligations.

BPA is participating in a regional effort, hosted by the Northwest Power Pool, to develop guidelines that would would be voluntarily adopted by Northwest utilities by January 2006.