Daily Interruptions Report
Automatic and Planned Outages modified in iTOA Jun 15 2025 05:00 through Jun 16 2025 04:59 and non-Normally Out still out outages

Data sorted by descending out datetime. Click here for spreadsheet

Customer Service Interruptions (10 outage(s))
Out Datetime
(PPT)
In Datetime
(PPT)
Name Voltage
(kV)
Duration
(minutes)
Outage
Type
Cause Responsible
System
MW Intrpt O&M
District
OARS
Outage ID
06/09/2025 12:58   Alvey: Sprngfld Util Brd 115kV Feeder 1 to 10th Street 115.0 still out Plan Construction BPA Unknown EUG 230073
05/12/2025 03:06   Goldendale: Klickitat Co PUD 69kV Feeder 1 69.0 still out Plan Construction BPA Unknown TDA 229789
09/30/2024 14:42   Intalco: Alcoa 13.8kV Feeder 1 13.8 still out Plan Urgent Customer Unknown SNO 227477
09/30/2024 14:42   Intalco: Alcoa 13.8kV Feeder 2 13.8 still out Plan Urgent Customer Unknown SNO 227478
09/30/2024 14:42   Intalco: Alcoa 13.8kV Feeder 3 13.8 still out Plan Urgent Customer Unknown SNO 227479
09/30/2024 14:42   Intalco: Alcoa 13.8kV Feeder 5 13.8 still out Plan Urgent Customer Unknown SNO 227480
09/30/2024 14:42   Intalco: Alcoa 13.8kV Feeder 6 13.8 still out Plan Urgent Customer Unknown SNO 227481
09/30/2024 14:42   Intalco: Alcoa 13.8kV Feeder 7 13.8 still out Plan Urgent Customer Unknown SNO 227482
04/30/2023 19:09   Valhalla: Chelan Co PUD 115kV Feeder T1 115.0 still out Auto Unknown BPA Unknown WEN 224196
09/20/2022 10:11   Intalco: Alcoa 13.8kV Feeder 4 13.8 still out Auto Terminal Equipment Failure Customer Unknown SNO 223041

Transmission Line Interruptions (19 outage(s))
Out Datetime
(PPT)
In Datetime
(PPT)
Name Voltage
(kV)
Duration
(minutes)
Outage
Type
Cause Responsible
System
O&M
District(s)
Transmission
Owner
NERC TADS
OARS
Outage ID
06/15/2025 19:25 06/15/2025 19:25 Monroe-Custer No 2 500kV line 500.0 0 Auto Unknown BPA SNO BPAT 230129
06/15/2025 05:59   Schultz-Raver No 3 500kV line 500.0 still out Plan Voltage Control BPA WEN COV BPAT 230127
06/15/2025 05:59   Schultz-Raver No 4 500kV line 500.0 still out Plan Voltage Control BPA WEN COV BPAT 230128
06/09/2025 12:57   Alvey PACW-Goshen section of Alvey-Martin Creek No 1 115kV line 115.0 still out Plan Construction BPA EUG PAC 230072
06/09/2025 12:56   Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line 115.0 still out Plan Construction BPA EUG BPAT 230071
06/09/2025 09:37   Carlton-Windishar section of Carlton-McMinnville No 1 115kV line 115.0 still out Plan Construction BPA SAL BPAT 230068
06/09/2025 08:09   Garrison-Taft No 1 500kV line 500.0 still out Plan Maintenance BPA KAL SPK BPAT 230065
06/07/2025 21:49   Columbia Generating Station-Ashe No 1 500kV line 500.0 still out Plan Switching Foreign TRI BPAT 230044
06/02/2025 08:02   7th Ave-East Kelso 115kV line 115.0 still out Plan Maintenance Foreign LGV COWZ 229985
05/30/2025 07:51   Knappa-Fern Hill section of Driscoll-Astoria No 1 115kV line 115.0 still out Plan Construction BPA LGV BPAT 229965
05/28/2025 08:06   Noti Creek tap to Lane-Wendson No 1 115kV line 115.0 still out Plan Construction Foreign EUG BPAT 229942
05/28/2025 08:06   Fern Ridge-Noti Creek section of Lane-Wendson No 1 115kV line 115.0 still out Plan Construction Foreign EUG BPAT 229942
05/28/2025 08:06   Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 still out Plan Construction Foreign EUG BPAT 229942
05/19/2025 07:44   Midway-A-8 section of Midway-HEW No 2 230kV line 230.0 still out Plan Construction BPA TRI DOE-RL 229861
05/05/2025 07:35   Tacoma-TPWR Northeast No 2 230kV line 230.0 still out Plan Maintenance Foreign COV TPWR 229735
04/21/2025 08:05   Cardwell-Meeker 115kV line 115.0 still out Plan Construction Foreign LGV COWZ 229603
04/21/2025 08:00   Meeker-North Woodland 115kV line 115.0 still out Plan Construction Foreign COWZ 229600
08/29/2024 13:35   Boundary-Waneta No 1 230kV line 230.0 still out Plan Emergency BPA SPK FBC 227043
12/31/2020 18:27   Paul-Centralia Thermal PH No 1 500kV line 500.0 still out Plan Construction Foreign OLY TAUC 217071

Transformer Interruptions (4 outage(s))
Out Datetime
(PPT)
In Datetime
(PPT)
Name Voltage
High (kV)
Voltage
Low (kV)
Duration
(minutes)
Outage
Type
Cause Responsible
System
O&M
District
Transmission
Owner
NERC TADS
OARS
Outage ID
06/12/2025 18:17   Columbia: 230/115kV Transformer 1 230.0 115.0 still out Plan Construction BPA WEN BPAT 230107
06/09/2025 12:55   Alvey: 230/115kV Transformer 4 230.0 115.0 still out Plan Construction BPA EUG BPAT 230070
01/28/2023 16:08   Rocky Reach: 345/230kV Transformer 1 345.0 230.0 still out Plan Emergency BPA WEN BPAT 228044
01/28/2023 16:08   Maple Valley: 345/230kV Transformer 1 345.0 230.0 still out Plan Emergency BPA COV BPAT 228045