Daily Interruptions Report
Feb 14 2020 05:00 through Feb 15 2020 04:59

Data sorted by descending out datetime. Click here for spreadsheet

Customer Service Interruptions (3 outage(s))
Out Datetime In Datetime Name Voltage
(kV)
Duration
(minutes)
Outage
Type
Cause
Dispatch
Responsible
System
Dispatch
MW Intrpt O&M
District
Outage ID
02/14/2020 08:47 02/14/2020 10:16 Creswell: Emerald PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 89 Auto Machinery, Farming Transferor Unknown EUG 213584
02/13/2020 15:31 02/14/2020 14:31 Intalco: Alcoa 13.8kV Feeder 6 13.8 1380 Plan Construction BPA None SNO 213583
07/22/2019 12:07   McMinnville: McMinnville W&L 115kV Feeder 2 115.0 still out Plan Maintenance Customer None SAL 211724

Transmission Line Interruptions (17 outage(s))
Out Datetime In Datetime Name Voltage
(kV)
Duration
(minutes)
Outage
Type
Cause
Dispatch
Responsible
System
Dispatch
O&M
District(s)
Transmission
Owner
NERC TADS
Outage ID
02/14/2020 19:44   Meeker-North Woodland 115kV line 115.0 still out Auto Unknown BPA COWZ 213587
02/14/2020 16:05   Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 still out Plan Normally Out Foreign EUG PAC 213586
02/14/2020 08:47 02/14/2020 08:55 Alvey PACW-Goshen section of Alvey-Martin Creek No 1 115kV line 115.0 8 Auto Machinery, Farming Foreign EUG PAC 213585
02/14/2020 08:47 02/14/2020 10:16 Goshen-Creswell section of Alvey-Martin Creek No 1 115kV line 115.0 89 Auto Machinery, Farming Foreign EUG PAC 213585
02/14/2020 08:47 02/14/2020 15:59 Creswell-Village Green section of Alvey-Martin Creek No 1 115kV line 115.0 432 Auto Machinery, Farming Foreign EUG PAC 213585
02/11/2020 09:13   Paul-Centralia Thermal PH No 2 500kV line 500.0 still out Plan Maintenance Foreign OLY TAUC 213564
02/10/2020 07:40   Bakers Corner-Longview section of Lexington-Longview No 1 115kV line 115.0 still out Plan Construction BPA OLY LGV BPAT 213556
02/10/2020 07:34   Bakers Corner tap to Lexington-Longview No 1 115kV line 115.0 still out Plan Oper Plan/RTCA Reqd Action BPA OLY BPAT 213555
02/10/2020 06:39   Malin-Round Mountain No 2 500kV line 500.0 still out Plan Maintenance Foreign RED PAC 213554
02/03/2020 08:29   Ponderosa-Corral No 1 230kV line 230.0 still out Plan Maintenance BPA RED PAC 213504
02/03/2020 07:11   Tacoma-Covington No 2 230kV line 230.0 still out Plan Maintenance BPA COV BPAT 213502
02/03/2020 07:10   Christopher tap to Tacoma-Covington No 2 230kV line 230.0 still out Plan Maintenance BPA COV BPAT 213501
02/03/2020 04:51   Ostrander-Troutdale No 1 500kV line 500.0 still out Plan Emergency BPA LGV BPAT 213496
02/01/2020 10:58   Pateros-Twisp section of Brewster-Twisp 115kV line 115.0 still out Auto Weather Foreign WEN OCPUD 213494
01/22/2020 11:22   Detroit PH-Detroit No 1 230kV line 230.0 still out Plan Urgent Foreign SAL BPAT 213426
11/04/2019 08:24   Benton-South Othello section of Benton-Othello No 1 115kV line 115.0 still out Plan Construction Foreign TRI AVA 212676
09/30/2019 17:11 02/14/2020 11:00 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 196969 Plan Normally Out BPA EUG PAC 212309

Transformer Interruptions (bulk electric system only, 3 outage(s))
Out Datetime In Datetime Name Voltage
High (kV)
Voltage
Low (kV)
Duration
(minutes)
Outage
Type
Cause
Dispatch
Responsible
System
Dispatch
O&M
District
Transmission
Owner
NERC TADS
Outage ID
02/03/2020 04:51   Troutdale: 500/230kV Transformer 8 500.0 230.0 still out Plan Emergency BPA LGV BPAT 213497
10/28/2019 11:42   Olympia: 287/230kV Transformer 3 287.0 230.0 still out Plan Maintenance BPA OLY BPAT 212820
07/17/2017 05:00   Grand Coulee: 287/230kV Transformer 1 287.0 230.0 still out Plan Maintenance BPA WEN USBR 202882