02/06/1998 14:05   St. Johns: Portland Gen Elec 11.5kV Feeder 3 11.5 still out Plan Normally Out Customer Request None LGV 107653
08/11/1999 10:45   Port Angeles: Port Angeles WA 69kV Feeder 1 to Rayonier 69.0 still out Plan Normally Out Customer Request None OLY 117190
11/12/2000 18:30   Mackay: Salmon River Coop 69kV Feeder 1 69.0 still out Plan Normally Out Customer Request None IDF 123981
12/06/2000 15:03   Arco: Lost River Elec 69kV Feeder 1 by PacifiCorp (PACE) 69.0 still out Plan Normally Out Transferor Request Unknown IDF 124097
12/07/2000 12:15   Valhalla: Alcoa 13.8kV Feeder 4 13.8 still out Plan Normally Out Customer Request None WEN 129275
04/25/2001 11:13 09/12/2003 09:22 Longview: Longview Alum LLC 13.8kV Feeder J 13.8 1252689 Plan Normally Out BPA Request Unknown LGV 125710
04/25/2001 11:13 09/12/2003 09:22 Longview: Longview Alum LLC 13.8kV Feeder K 13.8 1252689 Plan Normally Out Customer Request None LGV 125757
04/25/2001 11:13 09/12/2003 09:22 Longview: Longview Alum LLC 13.8kV Feeder L 13.8 1252689 Plan Normally Out Customer Request None LGV 125758
04/25/2001 11:13 09/12/2003 09:22 Longview: Longview Alum LLC 13.8kV Feeder R 13.8 1252689 Plan Normally Out Customer Request None LGV 125759
05/10/2001 12:00   Valhalla: Alcoa 13.8kV Feeder 1 13.8 still out Plan Normally Out Customer Request Unknown WEN 125878
09/05/2002 06:50 01/21/2003 11:59 Conkelley: Col Falls Alum Co 13.8kV Feeder 1 13.8 199089 Plan Normally Out Customer Request Unknown KAL 133585
09/13/2002 12:49 10/24/2003 15:37 Bell: Kaiser Alum 13.8kV Feeder 4 13.8 584808 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble None SPK 133722
09/19/2002 07:15 03/19/2003 07:16 Valhalla: Alcoa 13.8kV Feeder 5 13.8 260701 Plan Normally Out BPA Request None WEN 133818
11/13/2002 00:22 01/21/2003 11:59 Conkelley: Col Falls Alum Co 13.8kV Feeder S2 13.8 100057 Plan Normally Out BPA Request None KAL 134520
12/11/2002 11:05 02/05/2003 13:02 Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD 115.0 80757 Plan Foreign Request Customer Request None SNO 134843
12/13/2002 15:35 02/14/2003 10:37 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 90422 Plan Normally Out BPA Request Unknown EUG 134897
01/01/2003 16:23 01/01/2003 17:15 Ocean Park: Pacific Co PUD 115kV Feeder 1 115.0 52 Auto Foreign Trouble Customer Trouble None LGV 135130
01/01/2003 16:52 01/01/2003 16:52 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown SPK 135131
01/01/2003 16:52 01/01/2003 16:52 Metaline Falls: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown SPK 135132
01/01/2003 16:52 01/01/2003 16:52 Spirit: Avista Corp 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown SPK 135133
01/02/2003 00:39 01/02/2003 05:37 Troy: Northern Lights 115kV Feeder 1 to Asarco 115.0 298 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown KAL 135134
01/02/2003 00:39 01/02/2003 03:14 Troy: Northern Lights 13.8kV Feeder 1 13.8 155 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown KAL 135135
01/02/2003 00:39 01/02/2003 00:39 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown KAL 135136
01/02/2003 00:39 01/02/2003 00:39 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SPK 135137
01/02/2003 00:39 01/02/2003 00:39 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SPK 135138
01/02/2003 00:39 01/02/2003 00:39 North Bench: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SPK 135139
01/02/2003 00:39 01/02/2003 00:39 Troy: City of Troy 13.8kV Feeder 1 13.8 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown KAL 135140
01/02/2003 00:39 01/02/2003 00:39 Troy: Northern Lights 13.8kV Feeder 2 13.8 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown KAL 135141
01/02/2003 00:39 01/02/2003 00:39 Yaak: Northern Lights 12.5kV Feeder 1 12.5 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown KAL 135142
01/02/2003 07:32 01/02/2003 14:56 Trentwood: Kaiser Alum 6.9kV Feeder 2 6.9 444 Plan Maintenance BPA Request None SPK 135148
01/02/2003 07:32 01/02/2003 14:56 Trentwood: Kaiser Alum 6.9kV Feeder 5 6.9 444 Plan Maintenance BPA Request None SPK 135149
01/02/2003 08:32 01/02/2003 08:33 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 1 Auto Unknown Unknown BPA Trouble Unknown SPK 135150
01/02/2003 08:32 01/02/2003 08:33 Metaline Falls: Pend Oreille PUD 115kV Feeder 1 115.0 1 Auto Unknown BPA Trouble Unknown SPK 135151
01/02/2003 08:32 01/02/2003 08:33 Spirit: Avista Corp 115kV Feeder 1 115.0 1 Auto Unknown BPA Trouble Unknown SPK 135152
01/02/2003 09:02 01/02/2003 10:06 Rainier: Clatskanie PUD 115kV Feeder 1 115.0 64 Auto Foreign Trouble Customer Trouble Unknown LGV 135153
01/02/2003 09:02 01/02/2003 10:06 Rainier: Columbia Rivr PUD 12.5kV Feeder 1 by Clatskanie PUD 12.5 64 Auto Foreign Trouble Transferor Trouble Unknown LGV 135154
01/02/2003 09:02 01/02/2003 10:06 Goble: Columbia Rivr PUD 115kV Feeder 1 115.0 64 Auto Foreign Trouble Customer Trouble Unknown LGV 135155
01/02/2003 09:04 01/02/2003 10:38 Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co 2.4 94 Plan Foreign Request Transferor Request None IDF 135156
01/02/2003 11:03 01/02/2003 13:43 Mapleton: Blachly-Lane Co 34.5kV Feeder 1 34.5 160 Plan Foreign Request Customer Request None EUG 135157
01/02/2003 15:23 01/02/2003 15:37 Aberdeen: Grays Harbor PUD 115kV Feeder 4 115.0 14 Plan Foreign Request Customer Request None OLY 135158
01/02/2003 20:27 01/03/2003 00:38 Henkle Street: Pacific Co PUD 115kV Feeder 1 115.0 251 Auto Unknown BPA Trouble None OLY 135159
01/02/2003 20:46 01/03/2003 04:10 Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Birch Creek 69.0 444 Plan Foreign Request Customer Request 1 TRI 135160
01/02/2003 23:40 01/03/2003 08:42 Sappho: Clallam Co PUD 69kV Feeder 1 69.0 542 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 135161
01/02/2003 23:48 01/03/2003 00:49 Pe Ell: Lewis Co PUD 115kV Feeder 1 115.0 61 Auto Tree blown BPA Trouble Unknown OLY 135162
01/02/2003 23:50 01/03/2003 02:45 Potlatch: Mason Co PUD 3 12.5kV Feeder 1 12.5 175 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 135252
01/03/2003 07:16 01/03/2003 15:37 Trentwood: Kaiser Alum 6.9kV Feeder 1 6.9 501 Plan Maintenance BPA Request None SPK 135174
01/03/2003 07:16 01/03/2003 15:37 Trentwood: Kaiser Alum 6.9kV Feeder 3 6.9 501 Plan Maintenance BPA Request None SPK 135175
01/03/2003 08:01 01/03/2003 14:43 Trentwood: Kaiser Alum 6.9kV Feeder 4 6.9 402 Plan Maintenance BPA Request None SPK 135176
01/03/2003 08:01 01/03/2003 14:43 Trentwood: Kaiser Alum 6.9kV Feeder 6 6.9 402 Plan Maintenance BPA Request None SPK 135177
01/04/2003 07:10 01/04/2003 07:10 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown Unknown Trouble Unknown KAL 135184
01/04/2003 07:10 01/04/2003 07:10 Trumbull Creek: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Unknown Unknown Unknown Trouble Unknown KAL 135185
01/06/2003 08:28 01/06/2003 08:33 Vansycle Ridge Wind Generating Plant: ESI Vansycle Part 69kV Feeder 1 69.0 5 Auto Terminal Equipment Failure BPA Trouble Unknown TRI 135195
01/06/2003 08:28 01/06/2003 08:33 Weston Mountain: Umatilla E Coop 69kV Feeder 1 69.0 5 Auto Terminal Equipment Failure BPA Trouble Unknown TRI 135196
01/06/2003 08:28 01/06/2003 08:33 Lagoon: Milton-Freewater 69kV Feeder 1 69.0 5 Auto Terminal Equipment Failure BPA Trouble Unknown TRI 135197
01/06/2003 08:28 01/06/2003 08:33 Mission: Umatilla E Coop 69kV Feeder 1 69.0 5 Auto Terminal Equipment Failure Line Material Failure BPA Trouble Unknown TRI 135198
01/06/2003 08:28 01/06/2003 08:37 Pendleton: PacifiCorp (PACW) 69kV Feeder 1 69.0 9 Auto Terminal Equipment Failure BPA Trouble Unknown TRI 135199
01/06/2003 08:28 01/06/2003 08:37 Pendleton: Umatilla E Coop 12.5kV Feeder 1 12.5 9 Auto Terminal Equipment Failure Line Material Failure BPA Trouble Unknown TRI 135200
01/06/2003 08:28 01/06/2003 08:33 Stateline: Columbia REA 69kV Feeder 1 69.0 5 Auto Terminal Equipment Failure Line Material Failure BPA Trouble Unknown TRI 135201
01/07/2003 06:44 01/08/2003 15:28 Sno-King: Snohomish Co PUD 115kV Feeder 3 115.0 1964 Plan Maintenance BPA Request None SNO 135208
01/07/2003 09:10 01/07/2003 13:00 Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) 115.0 230 Plan Maintenance BPA Request None TRI 135209
01/08/2003 07:54 01/08/2003 11:18 Cowlitz: Cowlitz Co PUD 115kV Feeder 1 115.0 204 Plan Maintenance BPA Request None LGV 135216
01/09/2003 00:05 01/09/2003 00:05 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Ice BPA Trouble Unknown TDA 135222
01/09/2003 09:14 01/09/2003 14:46 Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Birch Creek 69.0 332 Plan Foreign Request Customer Request 7 TRI 135223
01/09/2003 11:55 01/09/2003 11:58 Mabton: Benton REA 12.5kV Feeder 1 12.5 3 Auto Ice Ice BPA Trouble Unknown TRI 135224
01/09/2003 13:01 01/09/2003 13:01 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Ice BPA Trouble Unknown TDA 135225
01/09/2003 13:08 01/15/2003 07:37 Alcoa: Evergreen/Vanalco 13.8kV Feeder 3 13.8 8309 Plan Maintenance BPA Request None LGV 135226
01/10/2003 10:46 01/10/2003 13:00 Alvey: Lane Elec Coop 34.5kV Feeder 1 34.5 134 Plan Maintenance BPA Request 1 EUG 135240
01/13/2003 09:58 01/21/2003 11:17 Idahome: Raft River Elec 34.5kV Feeder 1 34.5 11599 Plan Foreign Request Customer Request None IDF 135253
01/13/2003 10:12 01/13/2003 16:16 Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ 14.4 364 Plan Foreign Request Transferor Request Unknown COV 135254
01/13/2003 10:41 01/13/2003 10:41 La Grande: Oregon Trail 69kV Feeder 1 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 3 TRI 135255
01/13/2003 10:42 01/16/2003 14:13 Tapteal: City of Richland 115kV Feeder 2 115.0 4531 Plan Foreign Request Customer Request None TRI 135256
01/14/2003 08:24 01/14/2003 13:16 Heyburn: Idaho Power Co 138kV Feeder 1 138.0 292 Plan Maintenance BPA Request None IDF 135262
01/14/2003 08:43 01/20/2003 08:09 Kalispell: Flathead E Coop 34.5kV Feeder 4 34.5 8606 Plan Foreign Request Customer Request None KAL 135263
01/15/2003 06:24 01/15/2003 07:15 Kalispell: Flathead E Coop 34.5kV Feeder 1 34.5 51 Auto Foreign Trouble Customer Trouble Unknown KAL 135273
01/15/2003 06:24 01/16/2003 07:43 Kalispell: Flathead E Coop 34.5kV Feeder 2 34.5 1519 Auto Foreign Trouble Customer Trouble Unknown KAL 135274
01/15/2003 06:24 01/15/2003 07:13 Kalispell: Flathead E Coop 34.5kV Feeder 3 34.5 49 Auto Foreign Trouble Customer Trouble Unknown KAL 135275
01/15/2003 06:24 01/15/2003 07:15 Kalispell: Flathead E Coop 34.5kV Feeder 5 34.5 51 Auto Foreign Trouble Customer Trouble Unknown KAL 135276
01/16/2003 07:32 01/22/2003 07:52 Adair: Consumers Power 69kV Feeder 1 69.0 8660 Plan Foreign Request Customer Request None SAL 135286
01/16/2003 09:03 01/16/2003 11:45 Intalco: Alcoa 13.8kV Feeder 2 13.8 162 Plan Switching BPA Request None SNO 135287
01/21/2003 08:39 01/21/2003 16:43 Wendson: Central Linc PUD 115kV Feeder 1 115.0 484 Plan Foreign Request Customer Request None EUG 135307
01/21/2003 10:57 01/21/2003 18:19 Pendleton: PacifiCorp (PACW) 69kV Feeder 1 69.0 442 Plan Foreign Request Customer Request None TRI 135308
01/21/2003 11:30 01/21/2003 17:39 Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Patawa Creek 69.0 369 Plan Foreign Request Customer Request None TRI 135309
01/21/2003 12:20 11/25/2003 09:50 Conkelley: Col Falls Alum Co 13.8kV Feeder 4 13.8 443370 Plan Foreign Request Customer Request None KAL 135310
01/22/2003 05:45 01/22/2003 15:12 Sno-King: Snohomish Co PUD 115kV Feeder 3 115.0 567 Plan Construction BPA Request None SNO 135311
01/22/2003 08:39 01/22/2003 14:06 Tacoma: Kaiser Alum 13.8kV Feeder 2 13.8 327 Plan Maintenance BPA Request None COV 135319
01/22/2003 08:39 01/22/2003 14:06 Tacoma: Kaiser Alum 13.8kV Feeder 3 13.8 327 Plan Maintenance BPA Request None COV 135320
01/22/2003 08:39 01/22/2003 14:06 Tacoma: Kaiser Alum 13.8kV Feeder 4 13.8 327 Plan Maintenance BPA Request None COV 135321
01/22/2003 08:39 01/22/2003 14:06 Tacoma: Kaiser Alum 13.8kV Feeder 1 13.8 327 Plan Maintenance BPA Request None COV 135322
01/22/2003 20:00 01/22/2003 23:45 Pendleton: Umatilla E Coop 12.5kV Feeder 1 12.5 225 Auto Foreign Trouble Foreign Utility Customer Trouble 1 TRI 135323
01/22/2003 20:15 01/22/2003 20:15 Goldendale: Klickitat Co PUD 115kV Feeder 1 115.0 0 Auto Unknown Ice BPA Trouble 4 TDA 135324
01/22/2003 20:15 01/22/2003 20:15 Goldendale: Klickitat Co PUD 69kV Feeder 1 69.0 0 Auto Unknown Ice BPA Trouble 4 TDA 135325
01/22/2003 20:15 01/22/2003 20:15 Lyle: Klickitat Co PUD 115kV Feeder 1 115.0 0 Auto Unknown Ice BPA Trouble 4 TDA 135326
01/22/2003 20:15 01/22/2003 20:15 Spearfish: Klickitat Co PUD 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble 4 TDA 135327
01/26/2003 11:18 01/26/2003 13:06 Spearfish: Klickitat Co PUD 115kV Feeder 1 115.0 108 Auto Line Material Failure BPA Trouble Unknown TDA 135345
01/26/2003 11:18 01/26/2003 13:06 Goldendale: Klickitat Co PUD 115kV Feeder 1 115.0 108 Auto Line Material Failure Wind BPA Trouble Unknown TDA 135346
01/26/2003 11:18 01/26/2003 13:26 Goldendale: Klickitat Co PUD 69kV Feeder 1 69.0 128 Auto Line Material Failure Wind BPA Trouble Unknown TDA 135347
01/26/2003 11:18 01/26/2003 13:06 Lyle: Klickitat Co PUD 115kV Feeder 1 115.0 108 Auto Line Material Failure Wind BPA Trouble Unknown TDA 135348
01/26/2003 18:51 01/26/2003 18:52 Greentimber: Fall River E Coop 115kV Feeder 1 115.0 1 Auto Ice Ice BPA Trouble Unknown IDF 135349
01/26/2003 18:51 01/26/2003 18:52 Macks Inn: Fall River E Coop 46kV Feeder 1 46.0 1 Auto Ice Ice BPA Trouble Unknown IDF 135350
01/26/2003 18:51 01/26/2003 18:52 Macks Inn: Fall River E Coop 46kV Feeder 2 46.0 1 Auto Ice Ice BPA Trouble Unknown IDF 135351
01/26/2003 18:51 01/27/2003 16:58 Madison: Fall River E Coop 46kV Feeder 1 46.0 1327 Auto Ice Ice BPA Trouble Unknown IDF 135352
01/26/2003 18:51 01/27/2003 16:58 Madison: Fall River E Coop 46kV Feeder 2 46.0 1327 Auto Ice Ice BPA Trouble Unknown IDF 135353
01/27/2003 09:51 01/27/2003 10:11 Dayton CREA: Columbia REA 24.9kV Feeder 1 by PacifiCorp (PACW) 24.9 20 Auto Foreign Trouble Foreign Utility Transferor Trouble Unknown TRI 135357
01/27/2003 11:43 01/29/2003 09:39 Pendleton: PacifiCorp (PACW) 69kV Feeder 1 69.0 2756 Plan Foreign Request Customer Request None TRI 135358
01/27/2003 12:10 01/29/2003 09:05 Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Patawa Creek 69.0 2695 Plan Foreign Request Customer Request None TRI 135359
01/28/2003 08:27 01/28/2003 14:07 Eugene: EWEB (Eugene OR) 115kV Feeder 1 to Bethel 115.0 340 Plan Foreign Request Customer Request Unknown EUG 135366
01/28/2003 08:36 01/28/2003 14:23 Wendson: Central Linc PUD 115kV Feeder 1 115.0 347 Plan Foreign Request Customer Request Unknown EUG 135367
01/28/2003 08:45 01/28/2003 13:39 Madison: Fall River E Coop 46kV Feeder 1 46.0 294 Plan Maintenance BPA Request Unknown IDF 135368
01/28/2003 08:45 01/28/2003 13:39 Madison: Fall River E Coop 46kV Feeder 2 46.0 294 Plan Maintenance BPA Request Unknown IDF 135369
01/29/2003 08:44 01/29/2003 08:44 Ariel: Cowlitz Co PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Transferor Trouble 3 LGV 135376
01/29/2003 10:01 01/29/2003 10:02 Ariel: Cowlitz Co PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 1 Plan Foreign Request Transferor Request 3 LGV 135377
01/30/2003 07:19 01/30/2003 15:50 Sifton: Clark Public Util 115kV Feeder 5 115.0 511 Plan Foreign Request Customer Request None LGV 135385
01/31/2003 03:50 01/31/2003 04:08 Targhee: Fall River E Coop 115kV Feeder 1 115.0 18 Auto Unknown BPA Trouble 3 IDF 135386
01/31/2003 03:50 01/31/2003 04:08 Targhee: Fall River E Coop 46kV Feeder N 46.0 18 Auto Unknown Tree BPA Trouble 4 IDF 135387
01/31/2003 03:50 01/31/2003 04:08 Victor FREC: Fall River E Coop 115kV Feeder 1 115.0 18 Auto Unknown Tree BPA Trouble Unknown IDF 135388
01/31/2003 09:24 01/31/2003 13:25 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 241 Plan Emergency BPA Request None KAL 135396
01/31/2003 10:09 01/31/2003 14:23 Goble: Columbia Rivr PUD 115kV Feeder 1 115.0 254 Plan Maintenance BPA Request None LGV 135397
02/03/2003 13:09 02/03/2003 13:09 Redmond: PacifiCorp (PACW) 230kV Feeder 1 230.0 0 Auto Foreign Trouble Customer Trouble 26 RED 135412
02/04/2003 08:01 02/04/2003 15:39 Snohomish: Snohomish Co PUD 115kV Feeder 9 115.0 458 Plan Foreign Request BPA Request None SNO 135416
02/04/2003 08:38 02/04/2003 15:11 Madison: Fall River E Coop 46kV Feeder 1 46.0 393 Plan Maintenance BPA Request None IDF 135417
02/04/2003 08:38 02/04/2003 15:11 Madison: Fall River E Coop 46kV Feeder 2 46.0 393 Plan Maintenance BPA Request None IDF 135418
02/04/2003 09:29 02/07/2003 15:29 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 4680 Plan Maintenance BPA Request None SAL 135419
02/04/2003 12:00 02/04/2003 13:11 Walton: Blachly-Lane Co 12.5kV Feeder 1 12.5 71 Plan Maintenance BPA Request Unknown EUG 135420
02/04/2003 13:11 02/05/2003 14:03 Walton: Blachly-Lane Co 12.5kV Feeder 1 12.5 1492 Plan Foreign Request Customer Request Unknown EUG 135421
02/04/2003 17:47 02/04/2003 17:47 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Foreign Utility Transferor Trouble Unknown SAL 135422
02/04/2003 17:47 02/04/2003 17:47 Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Foreign Utility Transferor Trouble Unknown SAL 135423
02/04/2003 17:47 02/04/2003 17:47 Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 0 Auto Foreign Trouble Foreign Utility Transferor Trouble Unknown SAL 135424
02/04/2003 17:47 02/04/2003 17:47 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Transferor Trouble Unknown SAL 135425
02/05/2003 08:16 02/05/2003 14:43 Snohomish: Snohomish Co PUD 115kV Feeder 9 115.0 387 Plan Foreign Request Customer Request None SNO 135431
02/06/2003 07:28 02/06/2003 09:05 Sno-King: Snohomish Co PUD 115kV Feeder 3 115.0 97 Plan Construction BPA Request None SNO 135439
02/06/2003 11:06 02/06/2003 11:20 Warner: PacifiCorp (PACW) 115kV Feeder 1 115.0 14 Plan Maintenance BPA Request None RED 135440
02/07/2003 08:05 02/07/2003 15:09 Intalco: Alcoa 13.8kV Feeder 2 13.8 424 Plan Maintenance BPA Request None SNO 135450
02/07/2003 12:44 02/07/2003 14:21 Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern 69.0 97 Plan Foreign Request Customer Request None OLY 135451
02/07/2003 14:22 02/07/2003 15:54 Happy Valley: Clallam Co PUD 69kV Feeder 1 69.0 92 Plan Foreign Request Customer Request None OLY 135452
02/09/2003 08:00 02/09/2003 13:44 Horse Heaven: Benton Co PUD 115kV Feeder 1 115.0 344 Plan Foreign Request Customer Request 4 TRI 135464
02/10/2003 09:34 02/28/2003 09:53 Aberdeen: Grays Harbor PUD 115kV Feeder 4 115.0 25939 Plan Foreign Request Customer Request None OLY 135467
02/10/2003 09:57 02/14/2003 14:07 Langlois: Coos-Curry Coop 12.5kV Feeder 1 12.5 6010 Plan Maintenance BPA Request None EUG 135468
02/10/2003 09:57 02/14/2003 14:07 Langlois: Bandon OR 12.5kV Feeder 1 12.5 6010 Plan Maintenance BPA Request None EUG 135469
02/11/2003 06:21 02/11/2003 09:20 Kalispell: Flathead E Coop 34.5kV Feeder 5 34.5 179 Plan Maintenance BPA Request None KAL 135477
02/11/2003 07:13 02/11/2003 07:13 Cochrane: Franklin Co PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown TRI 135478
02/11/2003 07:13 02/11/2003 07:13 Glade: Big Bend Coop 13.8kV Feeder 1 13.8 0 Auto Unknown Equipment/Miscellaneous Unknown Trouble Unknown TRI 135479
02/11/2003 07:13 02/11/2003 07:13 Glade: S Col Basin Ir Dt 13.8kV Feeder 1 13.8 0 Auto Unknown Equipment/Miscellaneous Unknown Trouble Unknown TRI 135480
02/11/2003 07:13 02/11/2003 07:13 North Pasco: Big Bend Coop 12.5kV Feeder 1 by Franklin Co PUD 12.5 0 Auto Unknown Unknown Trouble Unknown TRI 135481
02/11/2003 07:13 02/11/2003 07:13 North Pasco: Franklin Co PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown TRI 135482
02/11/2003 07:13 02/11/2003 07:13 Taylor Flats: Franklin Co PUD 12.5kV Feeder 1 12.5 0 Auto Unknown Equipment/Miscellaneous Unknown Trouble Unknown TRI 135483
02/11/2003 07:16 02/11/2003 12:31 Kalispell: Flathead E Coop 34.5kV Feeder 4 34.5 315 Plan Maintenance BPA Request None KAL 135484
02/11/2003 07:34 02/11/2003 14:18 Lexington: Cowlitz Co PUD 115kV Feeder 2 115.0 404 Plan Maintenance BPA Request None LGV 135485
02/11/2003 08:30 02/11/2003 15:55 Mesa: Big Bend Coop 13.8kV Feeder 1 13.8 445 Plan Foreign Request Customer Request Unknown TRI 135486
02/11/2003 09:08 02/11/2003 09:10 Intalco: Alcoa 13.8kV Feeder 2 13.8 2 Plan Switching BPA Request None SNO 135487
02/11/2003 09:13 02/11/2003 09:18 Cowlitz: Cowlitz Co PUD 115kV Feeder 1 115.0 5 Plan Foreign Request Customer Request None LGV 135488
02/11/2003 09:20 02/11/2003 09:23 Cowlitz: Cowlitz Co PUD 115kV Feeder 1 115.0 3 Plan Foreign Request Customer Request None LGV 135489
02/11/2003 13:15 02/11/2003 13:20 Cowlitz: Cowlitz Co PUD 115kV Feeder 2 115.0 5 Plan Foreign Request Customer Request None LGV 135490
02/11/2003 13:50 02/11/2003 13:51 Intalco: Alcoa 13.8kV Feeder 2 13.8 1 Plan Switching BPA Request None SNO 135491
02/12/2003 06:25 02/12/2003 13:35 Kalispell: Flathead E Coop 34.5kV Feeder 1 34.5 430 Plan Maintenance BPA Request None KAL 135502
02/12/2003 07:14 02/12/2003 15:23 Lexington: Cowlitz Co PUD 115kV Feeder 3 115.0 489 Plan Maintenance BPA Request None LGV 135503
02/12/2003 15:42 02/14/2003 15:13 Lexington: Cowlitz Co PUD 115kV Feeder 3 115.0 2851 Plan Foreign Request Customer Request None LGV 135504
02/13/2003 09:36 02/13/2003 13:34 Murray: Snohomish Co PUD 115kV Feeder 2 115.0 238 Plan Foreign Request Customer Request None SNO 135509
02/14/2003 04:55 02/14/2003 04:55 Burbank: Columbia REA 12.5kV Feeder 1 12.5 0 Auto Unknown Unknown BPA Trouble Unknown TRI 135519
02/14/2003 04:55 02/14/2003 04:55 Burbank: S Col Basin Ir Dt 12.5kV Feeder 1 12.5 0 Auto Unknown Unknown BPA Trouble Unknown TRI 135520
02/14/2003 04:55 02/14/2003 04:55 Joso: Columbia REA 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown TRI 135521
02/14/2003 04:55 02/14/2003 04:55 Nine Mile: FPL Energy Van 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble 26 TRI 135522
02/14/2003 10:37 02/14/2003 13:29 Green Valley: Douglas Elec Coop 69kV Feeder 1 69.0 172 Plan Maintenance BPA Request None EUG 135523
02/14/2003 13:29 02/20/2003 08:11 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 8322 Plan Normally Out BPA Request Unknown EUG 135524
02/14/2003 14:01 02/19/2003 13:27 Grandview: USBR Yakima 34.5kV Feeder 1 34.5 7166 Plan Maintenance BPA Request None TRI 135525
02/18/2003 07:51 02/20/2003 17:05 Alcoa: Clark Public Util 115kV Feeder 1 115.0 3434 Plan Foreign Request Customer Request None LGV 135542
02/18/2003 08:05 02/20/2003 15:33 Dixie: Idaho Power Co 24.9kV Feeder 1 24.9 3328 Plan Forced BPA Request None IDF 135543
02/18/2003 08:09 02/18/2003 15:13 The Dalles: USBR The Dalles 12.5kV Feeder 1 12.5 424 Plan Foreign Request Customer Request None TDA 135544
02/18/2003 08:18 02/18/2003 14:41 Redmond: PacifiCorp (PACW) 115kV Feeder 1 115.0 383 Plan Maintenance BPA Request None RED 135545
02/18/2003 08:40 02/18/2003 15:51 Warren: West Oregon Elec 34.5kV Feeder 1 34.5 431 Plan Maintenance BPA Request None LGV 135546
02/18/2003 08:42 02/18/2003 11:08 Henkle Street: Pacific Co PUD 115kV Feeder 1 115.0 146 Plan Maintenance BPA Request None OLY 135547
02/18/2003 09:50 02/18/2003 14:01 Mesa: Big Bend Coop 13.8kV Feeder 1 13.8 251 Plan Foreign Request Customer Request None TRI 135548
02/18/2003 09:58 02/18/2003 15:46 Tarbell: Columbia Rivr PUD 115kV Feeder 1 115.0 348 Plan Maintenance BPA Request None LGV 135549
02/19/2003 14:00 05/13/2003 08:53 Longview: Longview Alum LLC 13.8kV Feeder B 13.8 119153 Plan Construction BPA Request None LGV 135561
02/20/2003 04:23 02/20/2003 04:23 Latham: Emerald PUD 115kV Feeder 1 115.0 0 Auto Unknown Weather BPA Trouble Unknown EUG 135562
02/20/2003 04:23 02/20/2003 04:23 Green Valley: Douglas Elec Coop 69kV Feeder 1 69.0 0 Auto Unknown Weather BPA Trouble Unknown EUG 135568
02/20/2003 04:23 02/20/2003 04:23 Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) 34.5 0 Auto Unknown Weather BPA Trouble Unknown EUG 135569
02/20/2003 04:23 02/20/2003 04:23 Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) 34.5 0 Auto Unknown Weather BPA Trouble Unknown EUG 135570
02/20/2003 04:23 02/20/2003 04:23 Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton 69.0 0 Auto Unknown Weather BPA Trouble Unknown EUG 135571
02/20/2003 04:23 02/20/2003 04:23 Drain: Douglas Elec Coop 12.5kV Feeder 1 12.5 0 Auto Unknown Weather BPA Trouble Unknown EUG 135572
02/20/2003 04:23 02/20/2003 04:23 Drain: Drain OR 12.5kV Feeder 1 12.5 0 Auto Unknown Weather BPA Trouble Unknown EUG 135573
02/20/2003 08:11 02/20/2003 08:11 Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton 69.0 0 Auto Line Material Failure Weather BPA Trouble Unknown EUG 135574
02/20/2003 08:11 02/20/2003 08:11 Drain: Douglas Elec Coop 12.5kV Feeder 1 12.5 0 Auto Line Material Failure Weather BPA Trouble Unknown EUG 135575
02/20/2003 08:11 02/20/2003 08:11 Drain: Drain OR 12.5kV Feeder 1 12.5 0 Auto Line Material Failure Weather BPA Trouble Unknown EUG 135576
02/20/2003 08:11 02/20/2003 08:21 Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) 34.5 10 Auto Line Material Failure BPA Trouble Unknown EUG 135577
02/20/2003 08:11 02/20/2003 08:21 Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) 34.5 10 Auto Line Material Failure BPA Trouble Unknown EUG 135578
02/20/2003 08:11 02/20/2003 08:21 Latham: Emerald PUD 115kV Feeder 1 115.0 10 Auto Line Material Failure BPA Trouble Unknown EUG 135579
02/20/2003 08:11 02/20/2003 08:11 Green Valley: Douglas Elec Coop 69kV Feeder 1 69.0 0 Auto Line Material Failure Weather BPA Trouble Unknown EUG 135580
02/20/2003 08:32 02/20/2003 14:26 Alcoa: Evergreen/Vanalco 13.8kV Feeder 3 13.8 354 Plan Maintenance BPA Request None LGV 135581
02/20/2003 11:10 02/20/2003 11:11 Conkelley: Col Falls Alum Co 13.8kV Feeder S1 13.8 1 Plan Switching BPA Request None KAL 135582
02/20/2003 11:33 02/26/2003 08:49 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 8476 Plan Normally Out Customer Request None EUG 135583
02/21/2003 12:30 02/25/2003 14:47 Alcoa: Evergreen/Vanalco 13.8kV Feeder 3 13.8 5897 Plan Maintenance BPA Request None LGV 135615
02/22/2003 03:15 02/22/2003 03:15 East Grangeville: Idaho L+P Coop 13.8kV Feeder 1 by Avista Corp 13.8 0 Auto Foreign Trouble Transferor Trouble Unknown SPK 135598
02/24/2003 07:40 02/24/2003 07:52 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 12 Plan Switching BPA Request None SAL 135605
02/24/2003 08:51 02/25/2003 18:44 Alcoa: Clark Public Util 115kV Feeder 1 115.0 2033 Plan Foreign Request Customer Request None LGV 135606
02/24/2003 09:12 03/14/2003 08:52 Creston: Inland P+L 34.5kV Feeder 1 34.5 25900 Plan Construction BPA Request None SPK 135607
02/24/2003 09:12 03/14/2003 08:52 Creston: Inland P+L 12.5kV Feeder 1 12.5 25900 Plan Construction BPA Request None SPK 135625
02/24/2003 09:19 03/09/2003 17:01 Oregon City: Portland Gen Elec 57kV Feeder 1 57.0 19182 Plan Forced BPA Request None SAL 135608
02/24/2003 09:19 03/09/2003 17:01 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 19182 Plan Forced BPA Request None SAL 135609
02/25/2003 07:30 02/25/2003 14:52 The Dalles: USBR The Dalles 12.5kV Feeder 1 12.5 442 Plan Foreign Request Customer Request None TDA 135616
02/25/2003 07:51 02/25/2003 14:37 Grandview: Benton REA 115kV Feeder 1 115.0 406 Plan Maintenance BPA Request None TRI 135617
02/26/2003 08:35 02/28/2003 13:24 Grandview: USBR Yakima 34.5kV Feeder 1 34.5 3169 Plan Maintenance BPA Request None TRI 135626
02/26/2003 16:09 03/06/2003 09:11 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 11102 Plan Normally Out BPA Request None EUG 135627
03/03/2003 08:14 03/03/2003 08:43 Sun Harbor: Columbia REA 115kV Feeder 1 115.0 29 Auto Unknown Forced (Configuration) BPA Trouble 5 TRI 135670
03/03/2003 08:14 03/03/2003 08:43 Sun Harbor: Columbia REA 24.9kV Feeder 1 24.9 29 Auto Unknown Forced (Configuration) BPA Trouble Unknown TRI 135671
03/03/2003 18:50 03/03/2003 20:02 Ross: Clark Public Util 115kV Feeder 2 115.0 72 Auto Foreign Trouble Foreign Trouble Customer Trouble 69 LGV 135672
03/04/2003 07:32 03/07/2003 16:16 Clatsop: PacifiCorp (PACW) 115kV Feeder 1 115.0 4844 Plan Foreign Request Customer Request None LGV 135683
03/05/2003 08:18 03/05/2003 13:42 Snipes: Benton REA 12.5kV Feeder 1 12.5 324 Plan Maintenance BPA Request None TRI 135694
03/05/2003 08:20 03/05/2003 13:52 Snohomish: Snohomish Co PUD 115kV Feeder 2 115.0 332 Plan Foreign Request Customer Request None SNO 135695
03/06/2003 04:47 03/06/2003 04:50 Walla Walla: Columbia REA 12.5kV Feeder 1 12.5 3 Plan Switching BPA Request 3 TRI 135696
03/06/2003 04:47 03/06/2003 04:50 Milton: Milton-Freewater 69kV Feeder 1 69.0 3 Plan Switching BPA Request 14 TRI 135697
03/06/2003 13:53 07/14/2003 08:15 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 186802 Plan Normally Out BPA Request Unknown EUG 135714
03/07/2003 08:50 03/07/2003 11:31 Tapteal: City of Richland 115kV Feeder 1 115.0 161 Plan Foreign Request Customer Request None TRI 135723
03/09/2003 03:00 03/09/2003 03:55 Laclede: Northern Lights 13.8kV Feeder 1 13.8 55 Plan Foreign Request Customer Request Unknown SPK 135735
03/10/2003 07:55 03/10/2003 17:48 Grand Avenue: Clark Public Util 115kV Feeder 1 115.0 593 Plan Maintenance BPA Request None LGV 135737
03/10/2003 07:55 03/10/2003 17:48 Mac Heights: Clark Public Util 115kV Feeder 2 115.0 593 Plan Maintenance BPA Request None LGV 135738
03/11/2003 07:45 03/11/2003 15:56 Grand Avenue: Clark Public Util 115kV Feeder 1 115.0 491 Plan Maintenance BPA Request None LGV 135747
03/11/2003 07:45 03/11/2003 15:56 Mac Heights: Clark Public Util 115kV Feeder 2 115.0 491 Plan Maintenance BPA Request None LGV 135748
03/11/2003 08:52 03/13/2003 11:22 Hood River: Hood River Elec 12.5kV Feeder 1 12.5 3030 Plan Maintenance BPA Request None TDA 135749
03/11/2003 21:20 03/11/2003 21:24 Acton: Cascade Locks OR 13.8kV Feeder 1 13.8 4 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown LGV 135750
03/11/2003 21:20 03/11/2003 21:24 Cascade Locks: Cascade Locks OR 115kV Feeder 1 115.0 4 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown LGV 135751
03/11/2003 21:20 03/24/2003 15:00 Cascade Locks: Cascade Locks OR 13.8kV Feeder 1 13.8 18340 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown LGV 135752
03/11/2003 21:30 03/12/2003 06:33 Elma: McCleary WA 69kV Feeder 1 by Grays Harbor PUD 69.0 543 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 135820
03/12/2003 01:29 03/12/2003 04:45 Cascade Locks: Cascade Locks OR 115kV Feeder 1 115.0 196 Plan Foreign Request Customer Request Unknown LGV 135754
03/12/2003 13:21 03/12/2003 13:21 Duckabush: Mason Co PUD 1 12.5kV Feeder 1 12.5 0 Auto Foreign Trouble Customer Trouble Unknown OLY 135765
03/12/2003 13:56 03/12/2003 16:25 Sappho: Clallam Co PUD 69kV Feeder 2 69.0 149 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 135766
03/12/2003 16:03 03/12/2003 16:03 Duckabush: Mason Co PUD 1 12.5kV Feeder 1 12.5 0 Auto Foreign Trouble Customer Trouble Unknown OLY 135767
03/12/2003 20:54 03/12/2003 20:54 Duckabush: Mason Co PUD 1 12.5kV Feeder 1 12.5 0 Auto Foreign Trouble Customer Trouble Unknown OLY 135768
03/13/2003 04:19 03/13/2003 04:19 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Tree blown Tree blown BPA Trouble Unknown SAL 135780
03/13/2003 04:19 03/13/2003 05:39 Thatcher Junction: Forest Grove OR 115kV Feeder 1 115.0 80 Auto Tree blown Tree blown BPA Trouble Unknown SAL 135781
03/13/2003 04:19 03/13/2003 12:06 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 467 Auto Tree blown Tree blown BPA Trouble Unknown SAL 135782
03/13/2003 04:25 03/13/2003 04:25 Olney: West Oregon Elec 11.5kV Feeder 1 by PacifiCorp (PACW) 11.5 0 Auto Tree blown Tree blown BPA Trouble Unknown LGV 135783
03/13/2003 04:25 03/13/2003 05:14 Cathlamet: Wahkiakum Co PUD 12.5kV Feeder 1 12.5 49 Auto Tree blown Tree blown BPA Trouble Unknown LGV 135784
03/13/2003 04:25 03/13/2003 06:25 Clatskanie: Clatskanie PUD 115kV Feeder 1 115.0 120 Auto Tree blown Tree blown BPA Trouble Unknown LGV 135785
03/13/2003 04:25 03/13/2003 06:18 Delena: Clatskanie PUD 115kV Feeder 1 115.0 113 Auto Tree blown Tree blown BPA Trouble Unknown LGV 135786
03/13/2003 04:25 03/13/2003 04:59 Fern Hill: PacifiCorp (PACW) 115kV Feeder 1 115.0 34 Auto Tree blown Tree blown BPA Trouble Unknown LGV 135787
03/13/2003 04:25 03/13/2003 05:14 Grays River: Wahkiakum Co PUD 12.5kV Feeder 1 12.5 49 Auto Tree blown Tree blown BPA Trouble Unknown LGV 135788
03/13/2003 04:25 03/13/2003 04:30 Knappa Svensen: PacifiCorp (PACW) 115kV Feeder 1 115.0 5 Auto Tree blown BPA Trouble Unknown LGV 135789
03/13/2003 04:25 03/13/2003 06:25 Mist: West Oregon Elec 115kV Feeder 1 115.0 120 Auto Tree blown Tree blown BPA Trouble Unknown LGV 135790
03/13/2003 04:53 03/13/2003 04:53 Knappa Svensen: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble Unknown LGV 135791
03/13/2003 05:24 03/13/2003 05:30 Cathlamet: Wahkiakum Co PUD 12.5kV Feeder 1 12.5 6 Plan Switching BPA Request 5 LGV 135792
03/13/2003 05:24 03/13/2003 05:30 Grays River: Wahkiakum Co PUD 12.5kV Feeder 1 12.5 6 Plan Switching BPA Request Unknown LGV 135793
03/13/2003 06:23 03/13/2003 06:25 Cathlamet: Wahkiakum Co PUD 12.5kV Feeder 1 12.5 2 Plan Switching BPA Request Unknown LGV 135794
03/13/2003 06:23 03/13/2003 06:25 Grays River: Wahkiakum Co PUD 12.5kV Feeder 1 12.5 2 Plan Switching BPA Request Unknown LGV 135795
03/13/2003 08:53 03/13/2003 14:21 Eugene: Lane Elec Coop 34.5kV Feeder 1 34.5 328 Auto Foreign Trouble Foreign Trouble Customer Trouble 1 EUG 135796
03/13/2003 09:01 03/13/2003 11:00 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 119 Plan Foreign Request Customer Request Unknown SNO 135797
03/13/2003 09:01 03/13/2003 11:00 Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD 115.0 119 Plan Foreign Request Customer Request Unknown SNO 135798
03/13/2003 10:36 03/13/2003 10:36 Cheshire: Emerald PUD 115kV Feeder 1 115.0 0 Auto Wind BPA Trouble None EUG 135799
03/13/2003 10:36 03/13/2003 10:36 Cheshire: Emerald PUD 115kV Feeder 2 115.0 0 Auto Wind BPA Trouble None EUG 135800
03/13/2003 10:36 03/13/2003 10:36 Harrisburg: Consumers Power 115kV Feeder 1 to Greenberry 115.0 0 Auto Wind Unknown BPA Trouble None EUG 135801
03/13/2003 10:36 03/13/2003 10:36 Harrisburg: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Wind Unknown BPA Trouble None EUG 135802
03/13/2003 10:36 03/13/2003 10:36 Junction City BLC: Blachly-Lane Co 115kV Feeder 1 115.0 0 Auto Wind BPA Trouble None EUG 135803
03/13/2003 10:36 03/13/2003 10:36 Parker: Blachly-Lane Co 115kV Feeder 1 115.0 0 Auto Wind BPA Trouble None EUG 135804
03/13/2003 10:36 03/13/2003 10:36 Alderwood: Blachly-Lane Co 12.5kV Feeder 1 12.5 0 Auto Wind Unknown BPA Trouble None EUG 135805
03/15/2003 02:03 03/15/2003 03:22 Lynch Creek: Eatonville WA 12.5kV Feeder 1 by Tacoma Power 12.5 79 Auto Vehicle Vehicle BPA Trouble 3 COV 135821
03/15/2003 02:03 03/15/2003 03:22 Lynch Creek: Ohop Mutual Light 12.5kV Feeder 1 by Tacoma Power 12.5 79 Auto Vehicle Vehicle BPA Trouble 2 COV 135822
03/15/2003 02:03 03/15/2003 03:54 Haakenson: Elmhurst Mutual 115kV Feeder 1 by Tacoma Power 115.0 111 Auto Vehicle Vehicle BPA Trouble 6 COV 135823
03/15/2003 20:49 08/15/2003 12:00 Conkelley: Col Falls Alum Co 13.8kV Feeder S2 13.8 219731 Plan Foreign Request Customer Request None KAL 135840
03/17/2003 07:30 03/17/2003 15:11 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 461 Plan Foreign Request Customer Request None SNO 135849
03/17/2003 10:03 03/17/2003 13:59 Sagehill: Franklin Co PUD 12.5kV Feeder 1 12.5 236 Plan Foreign Request Customer Request None TRI 135850
03/17/2003 11:03 05/23/2003 08:19 Harrisburg: Consumers Power 115kV Feeder 1 to Greenberry 115.0 96256 Plan Foreign Request Customer Request None EUG 135851
03/17/2003 11:11 03/20/2003 13:36 Horse Heaven: Benton Co PUD 115kV Feeder 1 115.0 4465 Plan Maintenance BPA Request 9 TRI 135852
03/17/2003 11:15 03/20/2003 13:07 Silver Bow: Vigilante E Coop 69kV Feeder 1 69.0 4432 Plan Maintenance BPA Request None KAL 135853
03/18/2003 08:57 03/18/2003 08:57 Gaffney: Inland P+L 115kV Feeder 1 by Avista Corp 115.0 0 Auto Foreign Trouble Transferor Trouble Unknown SPK 135877
03/18/2003 08:57 03/18/2003 08:57 Ritzville: Big Bend Coop 24.9kV Feeder 1 by Avista Corp 24.9 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown TRI 135878
03/19/2003 06:01 03/19/2003 07:40 Gardiner: Central Linc PUD 13.8kV Feeder 1 13.8 99 Auto Improper Relaying Terminal Equipment Failure BPA Trouble 1 EUG 135892
03/19/2003 06:01 03/19/2003 07:40 Gardiner: Douglas Elec Coop 13.8kV Feeder 1 13.8 99 Auto Improper Relaying Terminal Equipment Failure BPA Trouble 1 EUG 135893
03/19/2003 06:01 03/19/2003 07:40 Gardiner: Douglas Elec Coop 13.8kV Feeder 2 13.8 99 Auto Improper Relaying BPA Trouble 1 EUG 135894
03/19/2003 09:00 03/19/2003 10:00 Cowlitz: Cowlitz Co PUD 115kV Feeder 1 115.0 60 Plan Construction BPA Request None LGV 135895
03/19/2003 09:02 03/21/2003 14:12 Adair: Consumers Power 69kV Feeder 1 69.0 3190 Plan Maintenance BPA Request None SAL 135896
03/19/2003 12:00 03/19/2003 12:15 Cowlitz: Cowlitz Co PUD 115kV Feeder 2 115.0 15 Plan Construction BPA Request None LGV 135897
03/20/2003 07:38 03/20/2003 07:38 Glade: Big Bend Coop 13.8kV Feeder 1 13.8 0 Plan Foreign Request Customer Request 2 TRI 135909
03/20/2003 14:53 03/20/2003 15:01 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 8 Plan Switching BPA Request 1 KAL 135910
03/20/2003 14:54 03/20/2003 16:00 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 66 Auto Tree blown Tree blown BPA Trouble Unknown SPK 135911
03/20/2003 14:54 03/20/2003 16:00 Metaline Falls: Pend Oreille PUD 115kV Feeder 1 115.0 66 Auto Tree blown BPA Trouble Unknown SPK 135912
03/20/2003 14:54 03/20/2003 16:00 Spirit: Avista Corp 115kV Feeder 1 115.0 66 Auto Tree blown BPA Trouble Unknown SPK 135913
03/20/2003 15:00 03/20/2003 18:04 Eagle Lake: S Col Basin Ir Dt 13.8kV Feeder 1 13.8 184 Auto Foreign Trouble Foreign Trouble Customer Trouble None TRI 135914
03/20/2003 16:00 03/20/2003 18:09 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 129 Plan Foreign Request Customer Request None SPK 135915
03/21/2003 23:53 03/22/2003 01:17 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 84 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 135928
03/21/2003 23:53 03/22/2003 01:04 Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 71 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 135929
03/21/2003 23:53 03/22/2003 00:02 Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 9 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 135930
03/21/2003 23:53 03/22/2003 00:04 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 11 Auto Foreign Trouble Transferor Trouble Unknown SAL 135931
03/22/2003 15:28 03/22/2003 19:09 Burnt Woods: Consumers Power 24.9kV Feeder 1 24.9 221 Auto Tree cut Tree cut BPA Trouble 1 EUG 135936
03/23/2003 16:26 03/23/2003 16:26 Scooteney: S Col Basin Ir Dt 34.5kV Feeder 1 34.5 0 Auto Unknown Forced (Configuration) BPA Trouble None TRI 135944
03/23/2003 16:26 03/23/2003 16:26 Ringold: Big Bend Coop 13.8kV Feeder 1 13.8 0 Auto Unknown Galloping Conductors BPA Trouble None TRI 135945
03/23/2003 16:26 03/23/2003 16:26 Ringold: Franklin Co PUD 13.8kV Feeder 1 13.8 0 Auto Unknown Galloping Conductors BPA Trouble None TRI 135946
03/23/2003 16:26 03/23/2003 16:26 Ringold: S Col Basin Ir Dt 13.8kV Feeder 1 13.8 0 Auto Unknown Galloping Conductors BPA Trouble None TRI 135947
03/23/2003 16:26 03/23/2003 16:26 Mesa: Big Bend Coop 13.8kV Feeder 1 13.8 0 Auto Unknown Galloping Conductors BPA Trouble None TRI 135948
03/23/2003 16:26 03/23/2003 16:26 Hatton: Big Bend Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Galloping Conductors BPA Trouble None TRI 135949
03/23/2003 16:26 03/23/2003 16:26 Connell: Franklin Co PUD 12.5kV Feeder 1 12.5 0 Auto Unknown Galloping Conductors BPA Trouble None TRI 135950
03/23/2003 16:26 03/23/2003 16:26 Scooteney: Big Bend Coop 34.5kV Feeder 2 34.5 0 Auto Unknown Forced (Configuration) BPA Trouble None TRI 135951
03/23/2003 16:26 03/23/2003 16:26 Scooteney: Big Bend Coop 13.8kV Feeder 1 13.8 0 Auto Unknown Forced (Configuration) BPA Trouble None TRI 135952
03/24/2003 07:31 06/13/2003 16:12 Valhalla: Alcoa 13.8kV Feeder 5 13.8 117101 Plan Normally Out Customer Request None WEN 135956
03/24/2003 08:38 03/24/2003 09:34 Pomeroy: Inland P+L 69kV Feeder 1 69.0 56 Plan Maintenance BPA Request Unknown SPK 135957
03/24/2003 09:16 03/27/2003 13:39 Silver Bow: Vigilante E Coop 69kV Feeder 1 69.0 4583 Plan Maintenance BPA Request 5 KAL 135958
03/24/2003 09:16 03/27/2003 13:39 Anaconda: NorthWestern Ener 115kV Feeder 2 115.0 4583 Plan Maintenance BPA Request None KAL 135959
03/25/2003 02:39 03/25/2003 16:59 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 860 Auto Equipment/Miscellaneous Terminal Equipment Failure BPA Trouble 5 SAL 135960
03/25/2003 02:39 03/25/2003 17:02 Tillamook: Tillamook PUD 115kV Feeder 1 to Trask Rv 115.0 863 Auto Equipment/Miscellaneous Terminal Equipment Failure BPA Trouble 3 SAL 135961
03/25/2003 02:39 03/25/2003 04:50 Tillamook: Tillamook PUD 115kV Feeder 2 115.0 131 Auto Equipment/Miscellaneous BPA Trouble 10 SAL 135962
03/25/2003 02:39 03/25/2003 04:50 Tillamook: Tillamook PUD 115kV Feeder 3 115.0 131 Auto Equipment/Miscellaneous BPA Trouble 10 SAL 135963
03/25/2003 22:30 03/25/2003 22:43 Redmond: PacifiCorp (PACW) 115kV Feeder 1 115.0 13 Plan Switching BPA Request None RED 135980
03/26/2003 06:57 03/26/2003 14:00 Lexington: Cowlitz Co PUD 115kV Feeder 4 115.0 423 Plan Maintenance BPA Request None LGV 135992
03/26/2003 16:50 03/26/2003 17:03 Redmond: PacifiCorp (PACW) 115kV Feeder 1 115.0 13 Plan Switching BPA Request None RED 135993
03/27/2003 10:29 03/27/2003 12:46 Harvalum: Golden NW Alum 23kV Feeder B 23.0 137 Plan Maintenance BPA Request None TDA 136006
03/27/2003 13:17 03/27/2003 15:03 Harvalum: Golden NW Alum 23kV Feeder A 23.0 106 Plan Maintenance BPA Request None TDA 136007
03/27/2003 15:23 03/27/2003 15:31 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 8 Plan Foreign Request Transferor Request None SAL 136008
03/27/2003 15:50 03/27/2003 15:50 Heglar: Raft River Elec 138kV Feeder 1 by Idaho Power Co 138.0 0 Auto Foreign Trouble Transferor Trouble Unknown IDF 136009
03/27/2003 15:50 03/27/2003 15:50 Raft: Raft River Elec 24.9kV Feeder 1 by Idaho Power Co 24.9 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown IDF 136010
03/28/2003 08:24 03/28/2003 15:03 Ross: Clark Public Util 115kV Feeder 2 115.0 399 Plan Foreign Request Customer Request None LGV 136018
03/28/2003 09:24 03/28/2003 14:47 Ross: Clark Public Util 115kV Feeder 1 115.0 323 Plan Maintenance BPA Request None LGV 136019
03/29/2003 06:11 03/29/2003 06:11 Narrows: Peninsula L Co 12.5kV Feeder 1 by Tacoma Power 12.5 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble 6 COV 136027
03/31/2003 08:20 03/31/2003 08:22 Foster Creek NVEC: Nespelem Valley 115kV Feeder 1 115.0 2 Plan Switching BPA Request Unknown WEN 136033
03/31/2003 11:15 04/04/2003 13:02 East Ellensburg: City of Ellensbrg 115kV Feeder 1 115.0 5867 Plan Maintenance BPA Request None WEN 136034
04/02/2003 04:53 04/02/2003 04:53 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 136051
04/02/2003 04:53 04/02/2003 04:53 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 136052
04/02/2003 09:59 04/02/2003 09:59 Troy: Northern Lights 13.8kV Feeder 2 13.8 0 Auto Unknown Unknown BPA Trouble Unknown KAL 136064
04/02/2003 09:59 04/02/2003 09:59 Yaak: Northern Lights 12.5kV Feeder 1 12.5 0 Auto Unknown Unknown BPA Trouble Unknown KAL 136065
04/02/2003 09:59 04/02/2003 09:59 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 0 Auto Unknown Weather BPA Trouble Unknown KAL 136066
04/02/2003 09:59 04/02/2003 09:59 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 0 Auto Unknown Weather BPA Trouble Unknown SPK 136067
04/02/2003 09:59 04/02/2003 09:59 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Unknown Weather BPA Trouble Unknown SPK 136068
04/02/2003 09:59 04/02/2003 09:59 North Bench: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Unknown Weather BPA Trouble Unknown SPK 136069
04/02/2003 09:59 04/02/2003 09:59 Troy: Northern Lights 115kV Feeder 1 to Asarco 115.0 0 Auto Unknown Unknown BPA Trouble Unknown KAL 136070
04/02/2003 09:59 04/02/2003 09:59 Troy: City of Troy 13.8kV Feeder 1 13.8 0 Auto Unknown Unknown BPA Trouble Unknown KAL 136071
04/02/2003 09:59 04/02/2003 09:59 Troy: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Unknown Unknown BPA Trouble Unknown KAL 136072
04/02/2003 10:16 04/02/2003 14:30 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 254 Plan Maintenance BPA Request Unknown RED 136073
04/03/2003 13:10 04/11/2003 11:01 Irby: Inland P+L 34.5kV Feeder 1 by Avista Corp 34.5 11331 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble None SPK 136089
04/03/2003 13:26 04/03/2003 13:29 Foster Creek NVEC: Nespelem Valley 115kV Feeder 1 115.0 3 Plan Switching BPA Request Unknown WEN 136090
04/03/2003 13:26   Foster Creek NVEC: Okanogan Co PUD 115kV Feeder 1 115.0 still out Plan Normally Out BPA Request Unknown WEN 138810
04/05/2003 09:06 04/05/2003 09:08 Dover Switching Station: Northern Lights 115kV Feeder 1 115.0 2 Plan Emergency BPA Request 3 SPK 136108
04/05/2003 09:06 04/05/2003 09:08 Laclede: Northern Lights 13.8kV Feeder 1 13.8 2 Plan Emergency BPA Request 3 SPK 136109
04/05/2003 09:06 04/05/2003 09:08 Priest River AVA: Avista Corp 115kV Feeder 1 115.0 2 Plan Emergency BPA Request 3 SPK 136110
04/05/2003 09:06 04/05/2003 09:08 Priest River: Northern Lights 34.5kV Feeder 1 34.5 2 Plan Emergency BPA Request 3 SPK 136111
04/05/2003 09:06 04/05/2003 09:08 Sandpoint: Northern Lights 13.8kV Feeder 1 13.8 2 Plan Emergency BPA Request 3 SPK 136112
04/07/2003 07:36 04/09/2003 15:37 East Ellensburg: City of Ellensbrg 115kV Feeder 1 115.0 3361 Plan Maintenance BPA Request Unknown WEN 136128
04/07/2003 08:19 04/07/2003 15:00 Sifton: Clark Public Util 115kV Feeder 5 115.0 401 Plan Maintenance BPA Request Unknown LGV 136129
04/08/2003 07:25 04/08/2003 07:25 Parker: Blachly-Lane Co 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown EUG 136145
04/08/2003 07:25 04/08/2003 07:25 Junction City BLC: Blachly-Lane Co 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown EUG 136146
04/08/2003 07:25 04/08/2003 07:25 Cheshire: Emerald PUD 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown EUG 136147
04/08/2003 07:25 04/08/2003 07:25 Cheshire: Emerald PUD 115kV Feeder 2 115.0 0 Auto Unknown BPA Trouble Unknown EUG 136148
04/08/2003 07:25 04/08/2003 07:25 Alderwood: Blachly-Lane Co 12.5kV Feeder 1 12.5 0 Auto Unknown Unknown BPA Trouble Unknown EUG 136149
04/08/2003 07:25 04/08/2003 07:25 Harrisburg: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Unknown Unknown BPA Trouble Unknown EUG 136150
04/08/2003 08:29 04/08/2003 14:55 Sifton: Clark Public Util 115kV Feeder 1 115.0 386 Plan Maintenance BPA Request Unknown LGV 136151
04/08/2003 08:29 04/08/2003 14:55 Sifton: Clark Public Util 115kV Feeder 2 115.0 386 Plan Maintenance BPA Request Unknown LGV 136152
04/08/2003 08:29 04/08/2003 14:55 Fishers Road: Clark Public Util 115kV Feeder 1 115.0 386 Plan Maintenance BPA Request None LGV 136153
04/09/2003 07:14 04/09/2003 14:07 Unity: United Elec Coop 12.5kV Feeder 1 12.5 413 Plan Maintenance BPA Request None IDF 136165
04/10/2003 08:42 04/10/2003 08:42 Bandon: Bandon OR 12.5kV Feeder 1 12.5 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown EUG 136176
04/10/2003 12:31 04/10/2003 13:49 Macks Inn: Fall River E Coop 46kV Feeder 2 46.0 78 Plan Foreign Request Customer Request 1 IDF 136177
04/10/2003 12:43 04/15/2003 08:14 Bandon: Bandon OR 12.5kV Feeder 1 12.5 6931 Plan Foreign Request Customer Request None EUG 136178
04/11/2003 07:53 04/11/2003 07:53 Targhee: Fall River E Coop 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown IDF 136188
04/11/2003 07:53 04/11/2003 07:53 Targhee: Fall River E Coop 46kV Feeder N 46.0 0 Auto Unknown Unknown BPA Trouble Unknown IDF 136189
04/11/2003 07:53 04/11/2003 07:53 Victor FREC: Fall River E Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown IDF 136190
04/12/2003 17:43 04/12/2003 17:43 Carson: Skamania Co PUD 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown LGV 136207
04/12/2003 17:43 04/12/2003 17:43 North Bonneville: Skamania Co PUD 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown LGV 136208
04/12/2003 17:43 04/12/2003 17:43 Stevenson: Skamania Co PUD 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown LGV 136209
04/12/2003 17:43 04/12/2003 17:43 Underwood: Skamania Co PUD 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown LGV 136210
04/12/2003 17:43 04/12/2003 18:45 Bald Mountain: PacifiCorp (PACW) 69kV Feeder 1 69.0 62 Auto Lightning BPA Trouble Unknown TDA 136211
04/12/2003 17:43 04/12/2003 18:45 Bald Mountain: Klickitat Co PUD 69kV Feeder 1 69.0 62 Auto Lightning BPA Trouble Unknown TDA 136212
04/12/2003 18:26 04/12/2003 18:26 Lion Mountain: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Weather BPA Trouble Unknown KAL 136213
04/14/2003 10:03 04/14/2003 10:03 Clymer: Puget Sound Energ 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown WEN 136233
04/14/2003 10:10 04/17/2003 12:10 Kalispell: Flathead E Coop 34.5kV Feeder 1 34.5 4440 Plan Maintenance BPA Request None KAL 136234
04/14/2003 10:10 04/17/2003 12:18 Kalispell: Flathead E Coop 34.5kV Feeder 2 34.5 4448 Plan Maintenance BPA Request None KAL 136235
04/14/2003 10:10 04/17/2003 12:15 Kalispell: Flathead E Coop 34.5kV Feeder 3 34.5 4445 Plan Maintenance BPA Request None KAL 136236
04/14/2003 10:10 04/21/2003 08:27 Kalispell: Flathead E Coop 34.5kV Feeder 4 34.5 9977 Plan Maintenance BPA Request None KAL 136237
04/14/2003 10:10 04/21/2003 13:43 Kalispell: Flathead E Coop 34.5kV Feeder 5 34.5 10293 Plan Maintenance BPA Request None KAL 136238
04/14/2003 10:10 04/14/2003 14:25 Alvey: EWEB (Eugene OR) 115kV Feeder 1 115.0 255 Plan Maintenance BPA Request None EUG 136239
04/15/2003 09:57 04/15/2003 09:57 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 136259
04/15/2003 09:57 04/15/2003 09:57 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 136260
04/16/2003 08:23 04/16/2003 08:23 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 136270
04/16/2003 08:23 04/16/2003 08:23 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 136271
04/17/2003 09:00 04/17/2003 09:04 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 4 Plan Foreign Request Customer Request Unknown SNO 136280
04/17/2003 09:00 04/17/2003 09:04 Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD 115.0 4 Plan Foreign Request Customer Request Unknown SNO 136281
04/17/2003 09:21 04/17/2003 09:27 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 6 Plan Foreign Request Customer Request Unknown SNO 136282
04/17/2003 09:21 04/17/2003 09:27 Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD 115.0 6 Plan Foreign Request Customer Request Unknown SNO 136283
04/17/2003 18:25 04/17/2003 18:25 Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Birch Creek 69.0 0 Auto Unknown Unknown Unknown Trouble 4 TRI 136284
04/18/2003 12:26 04/18/2003 15:25 Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Birch Creek 69.0 179 Plan Foreign Request Customer Request None TRI 136296
04/19/2003 08:09 04/19/2003 12:57 Gardiner: Douglas Elec Coop 13.8kV Feeder 1 13.8 288 Plan Foreign Request Customer Request Unknown EUG 136310
04/20/2003 03:16 04/20/2003 04:27 Gig Harbor: Peninsula L Co 115kV Feeder 1 by Tacoma Power 115.0 71 Auto Foreign Trouble Foreign Trouble Transferor Trouble 12 COV 136311
04/20/2003 03:16 04/20/2003 04:27 Lodholm: Peninsula L Co 115kV Feeder 1 by Tacoma Power 115.0 71 Auto Foreign Trouble Transferor Trouble Unknown COV 136312
04/20/2003 03:16 04/20/2003 04:27 Purdy: Peninsula L Co 115kV Feeder 1 by Tacoma Power 115.0 71 Auto Foreign Trouble Foreign Trouble Transferor Trouble 5 COV 136313
04/20/2003 03:16 04/20/2003 04:27 Vaughn: Peninsula L Co 115kV Feeder 1 by Tacoma Power 115.0 71 Auto Foreign Trouble Transferor Trouble 8 COV 136314
04/20/2003 03:16 04/20/2003 04:27 Lake Bay: Peninsula L Co 115kV Feeder 1 by Tacoma Power 115.0 71 Auto Foreign Trouble Transferor Trouble Unknown COV 136315
04/20/2003 03:16 04/20/2003 04:27 Narrows: Peninsula L Co 12.5kV Feeder 1 by Tacoma Power 12.5 71 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 136356
04/21/2003 08:07 04/25/2003 15:29 Intalco: Alcoa 13.8kV Feeder 2 13.8 6202 Plan Maintenance BPA Request None SNO 136326
04/21/2003 10:25 04/22/2003 14:30 Alvey: Lane Elec Coop 34.5kV Feeder 1 34.5 1685 Plan Maintenance BPA Request None EUG 136327
04/22/2003 08:00 04/22/2003 15:38 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 458 Plan Foreign Request Customer Request 41 SNO 136343
04/23/2003 07:54 04/23/2003 16:27 Sugar Mill: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) 46.0 513 Plan Maintenance BPA Request 1 IDF 136357
04/23/2003 08:07 04/23/2003 15:08 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 421 Plan Foreign Request Customer Request None SNO 136358
04/23/2003 08:46 04/24/2003 10:17 Alvey: Sprngfld Util Brd 115kV Feeder 1 to Springfield 115.0 1531 Plan Foreign Request Customer Request None EUG 136359
04/23/2003 09:08 04/24/2003 14:37 North Butte: Consumers Power 12.5kV Feeder 1 12.5 1769 Plan Maintenance BPA Request None EUG 136360
04/24/2003 08:00 04/24/2003 16:16 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 496 Plan Foreign Request BPA Request None SNO 136369
04/24/2003 08:26 04/24/2003 09:12 Fargo: Portland Gen Elec 115kV Feeder 1 115.0 46 Auto Line Material Failure Line Material Failure BPA Trouble 5 SAL 136370
04/24/2003 09:25 04/24/2003 14:24 Odessa: Inland P+L 34.5kV Feeder 1 by Avista Corp 34.5 299 Plan Maintenance BPA Request None SPK 136371
04/25/2003 07:27 04/25/2003 13:57 Chemawa: Portland Gen Elec 57kV Feeder 2 57.0 390 Plan Foreign Request Customer Request None SAL 136384
04/25/2003 08:05 04/25/2003 15:31 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 446 Plan Foreign Request Customer Request None SNO 136385
04/25/2003 15:57 04/25/2003 15:57 Lyle: Klickitat Co PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 136386
04/25/2003 15:57 04/25/2003 15:57 Spearfish: Klickitat Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown TDA 136387
04/25/2003 17:45 04/25/2003 17:45 De Moss: Wasco Elec Coop 69kV Feeder 1 to Klondike 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 2 TDA 136388
04/26/2003 06:20 04/26/2003 06:20 Clymer: Puget Sound Energ 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown WEN 136399
04/28/2003 08:11 04/28/2003 16:12 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 481 Plan Foreign Request Customer Request None SNO 136408
04/28/2003 17:32 04/28/2003 18:44 Hay Mill: Rupert ID 12.5kV Feeder 2 12.5 72 Auto Improper Relaying Lightning BPA Trouble Unknown IDF 136409
04/28/2003 18:42 04/28/2003 19:45 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 63 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SAL 136410
04/29/2003 08:03 04/29/2003 16:04 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 481 Plan Foreign Request Customer Request None SNO 136425
04/29/2003 16:29 04/29/2003 16:29 Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble None TDA 136426
04/29/2003 18:04 04/29/2003 18:04 Dalreed: PacifiCorp (PACW) 230kV Feeder 1 230.0 0 Auto Lightning BPA Trouble Unknown TRI 136427
04/29/2003 18:04 04/29/2003 18:04 Tumble Creek: Consumers Power 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136428
04/29/2003 19:18 04/29/2003 19:18 St. Johns: Portland Gen Elec 57kV Feeder 1 57.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 18 LGV 136429
04/29/2003 19:18 04/29/2003 19:18 St. Johns: Portland Gen Elec 57kV Feeder 3 57.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 25 LGV 136430
04/29/2003 19:21 04/29/2003 19:21 Ross: Clark Public Util 69kV Feeder 3 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 16 LGV 136431
04/29/2003 20:59 04/29/2003 20:59 Sifton: Clark Public Util 115kV Feeder 3 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 56 LGV 136432
04/30/2003 06:25 04/30/2003 06:25 Targhee: Fall River E Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown IDF 136446
04/30/2003 06:25 04/30/2003 06:25 Targhee: Fall River E Coop 46kV Feeder N 46.0 0 Auto Unknown Weather Unknown Trouble Unknown IDF 136447
04/30/2003 06:25 04/30/2003 06:25 Victor FREC: Fall River E Coop 115kV Feeder 1 115.0 0 Auto Unknown Weather Unknown Trouble Unknown IDF 136448
04/30/2003 08:06 04/30/2003 08:06 Adair: Consumers Power 69kV Feeder 1 69.0 0 Auto Unknown Unknown BPA Trouble Unknown SAL 136449
04/30/2003 08:06 04/30/2003 08:06 Monmouth: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Unknown BPA Trouble Unknown SAL 136450
04/30/2003 08:06 04/30/2003 08:06 Monmouth: Monmouth OR 12.5kV Feeder 1 12.5 0 Auto Unknown BPA Trouble Unknown SAL 136451
04/30/2003 08:06 04/30/2003 08:06 Monmouth: Monmouth OR 12.5kV Feeder 2 12.5 0 Auto Unknown BPA Trouble Unknown SAL 136452
04/30/2003 08:06 04/30/2003 08:06 Monmouth: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Unknown BPA Trouble Unknown SAL 136453
04/30/2003 09:45 05/02/2003 09:45 Grantsdale: Ravalli Elec Coop 12.5kV Feeder 1 by NorthWestern Ener 12.5 2880 Plan Maintenance BPA Request None KAL 136488
04/30/2003 10:34 04/30/2003 10:34 Diamond Lake: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 136454
04/30/2003 10:44 04/30/2003 11:01 Cascade Locks: Cascade Locks OR 115kV Feeder 1 115.0 17 Plan Maintenance BPA Request None LGV 136455
04/30/2003 10:44 04/30/2003 11:01 Cascade Locks: Cascade Locks OR 13.8kV Feeder 1 13.8 17 Plan Maintenance BPA Request None LGV 136456
05/01/2003 07:02 05/01/2003 19:01 Cascade Steel: McMinnville W&L 230kV Feeder 1 230.0 719 Plan Maintenance BPA Request None SAL 136465
05/01/2003 15:51 05/01/2003 15:51 Tonasket: Okanogan Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown WEN 136466
05/01/2003 15:51 05/01/2003 15:51 Tonasket: Okanogan Co PUD 115kV Feeder 2 115.0 0 Auto Lightning BPA Trouble Unknown WEN 136467
05/02/2003 07:48 05/02/2003 14:37 Trentwood: Kaiser Alum 6.9kV Feeder 5 6.9 409 Plan Maintenance BPA Request None SPK 136489
05/02/2003 07:48 05/02/2003 14:37 Trentwood: Kaiser Alum 6.9kV Feeder 2 6.9 409 Plan Maintenance BPA Request None SPK 136490
05/02/2003 08:00 05/02/2003 15:30 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 450 Plan Foreign Request BPA Request None SNO 136491
05/02/2003 15:00 05/08/2003 10:42 East Ellensburg: City of Ellensbrg 115kV Feeder 1 115.0 8382 Plan Maintenance BPA Request None WEN 136507
05/05/2003 10:19 05/05/2003 13:54 McMinnville: McMinnville W&L 115kV Feeder 2 115.0 215 Plan Foreign Request Customer Request None SAL 136508
05/05/2003 10:19 05/05/2003 13:58 McMinnville: McMinnville W&L 115kV Feeder 3 115.0 219 Plan Foreign Request Customer Request None SAL 136509
05/06/2003 07:00 05/06/2003 14:53 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 473 Plan Maintenance BPA Request None SAL 136523
05/08/2003 09:54 05/08/2003 09:54 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 136547
05/08/2003 09:54 05/08/2003 09:54 Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 136548
05/08/2003 09:54 05/08/2003 09:54 Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 136549
05/08/2003 09:54 05/08/2003 09:54 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Transferor Trouble Unknown SAL 136550
05/09/2003 07:36   Longview: Longview Alum LLC 13.8kV Feeder C 13.8 still out Plan Normally Out BPA Request None LGV 138929
05/09/2003 09:14 05/09/2003 12:49 Alvey: Lane Elec Coop 34.5kV Feeder 1 34.5 215 Plan Maintenance BPA Request 2 EUG 136565
05/11/2003 18:42 05/11/2003 18:42 Chambers: Inland P+L 115kV Feeder 1 by Avista Corp 115.0 0 Auto Foreign Trouble Transferor Trouble Unknown SPK 136575
05/12/2003 06:44 05/12/2003 07:33 Albany: US DOE Albany 12kV Feeder 1 12.0 49 Plan Foreign Request Customer Request Unknown EUG 136582
05/12/2003 10:07 05/12/2003 10:07 Beaver TLP: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown SAL 136583
05/12/2003 10:07 05/12/2003 10:07 Hebo: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown SAL 136584
05/12/2003 10:07 05/12/2003 10:07 Nestucca: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown SAL 136585
05/13/2003 10:00 05/13/2003 10:29 Gold Beach: Coos-Curry Coop 115kV Feeder 2 115.0 29 Plan Foreign Request Customer Request Unknown EUG 136605
05/14/2003 08:03 05/14/2003 15:15 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 432 Plan Foreign Request Customer Request None SNO 136614
05/14/2003 08:08 05/14/2003 11:35 Alcoa: Clark Public Util 115kV Feeder 1 115.0 207 Plan Maintenance BPA Request None LGV 136615
05/14/2003 08:30 05/14/2003 15:02 Sno-King: Snohomish Co PUD 115kV Feeder 5 115.0 392 Plan Foreign Request Customer Request None SNO 136616
05/14/2003 15:12 05/23/2003 10:08 Anaconda: NorthWestern Ener 115kV Feeder 2 115.0 12656 Plan Maintenance BPA Request None KAL 136636
05/14/2003 17:17 05/14/2003 17:17 Trumbull Creek: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136617
05/14/2003 17:17 05/14/2003 17:17 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136618
05/15/2003 08:07 05/15/2003 15:31 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 444 Plan Foreign Request Customer Request None SNO 136637
05/15/2003 08:10 05/16/2003 13:25 Harvalum: Golden NW Alum 23kV Feeder A 23.0 1755 Plan Maintenance BPA Request None TDA 136638
05/15/2003 08:32 05/15/2003 08:32 Fort Rock: Midstate E Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble 10 RED 136639
05/16/2003 08:04 05/16/2003 16:30 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 506 Plan Foreign Request Customer Request None SNO 136646
05/16/2003 18:35 05/16/2003 20:02 Snohomish: Snohomish Co PUD 115kV Feeder 1 115.0 87 Auto Foreign Trouble Foreign Trouble Customer Trouble 53 SNO 136647
05/17/2003 06:25 05/18/2003 16:16 Albany: US DOE Albany 12kV Feeder 1 12.0 2031 Plan Foreign Request Customer Request None EUG 136654
05/17/2003 07:46 05/17/2003 17:10 St. Johns: Portland Gen Elec 57kV Feeder 3 57.0 564 Plan Foreign Request Customer Request None LGV 136655
05/17/2003 15:35 08/25/2003 09:46 St. Johns: Portland Gen Elec 57kV Feeder 1 57.0 143651 Auto Foreign Utility Foreign Utility Customer Trouble None LGV 136656
05/17/2003 17:10 08/25/2003 09:46 St. Johns: Portland Gen Elec 57kV Feeder 3 57.0 143556 Auto Terminal Equipment Failure BPA Trouble Unknown LGV 136665
05/19/2003 07:56 05/19/2003 15:56 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 480 Plan Foreign Request Customer Request None SNO 136666
05/19/2003 08:05 05/19/2003 11:57 Hay Mill: Rupert ID 12.5kV Feeder 2 12.5 232 Plan Maintenance BPA Request None IDF 136667
05/19/2003 08:32 05/19/2003 15:07 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 395 Plan Maintenance BPA Request None SAL 136668
05/19/2003 08:51 05/19/2003 10:30 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 99 Plan Foreign Request Customer Request None SNO 136669
05/19/2003 09:10 05/19/2003 10:00 Redmond: PacifiCorp (PACW) 115kV Feeder 1 115.0 50 Plan Switching Customer Request None RED 136670
05/19/2003 09:28 07/18/2003 15:40 Cowlitz: Cowlitz Co PUD 115kV Feeder 2 115.0 86772 Plan Foreign Request Customer Request None LGV 136671
05/20/2003 06:50 05/20/2003 14:46 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 476 Plan Maintenance BPA Request None SAL 136687
05/20/2003 08:00 05/20/2003 14:36 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 396 Plan Foreign Request Customer Request None SNO 136688
05/20/2003 08:07 05/21/2003 09:38 Eugene: EWEB (Eugene OR) 115kV Feeder 3 115.0 1531 Plan Construction BPA Request None EUG 136689
05/20/2003 12:47 05/20/2003 12:58 Redmond: PacifiCorp (PACW) 115kV Feeder 1 115.0 11 Plan Foreign Request Customer Request None RED 136690
05/21/2003 05:18 05/21/2003 05:18 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 136706
05/21/2003 05:18 05/21/2003 05:18 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 136707
05/21/2003 08:01 05/21/2003 17:16 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 555 Plan Foreign Request Customer Request None SNO 136708
05/21/2003 08:10 05/21/2003 14:28 Burnt Woods: Consumers Power 24.9kV Feeder 1 24.9 378 Plan Maintenance BPA Request None EUG 136709
05/21/2003 08:15 05/22/2003 16:24 Ross: Clark Public Util 69kV Feeder 3 69.0 1929 Plan Foreign Request Customer Request None LGV 136710
05/22/2003 08:08 05/22/2003 16:06 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 478 Plan Foreign Request BPA Request None SNO 136721
05/23/2003 10:35 05/23/2003 10:37 Bald Mountain: PacifiCorp (PACW) 69kV Feeder 1 69.0 2 Plan Foreign Request Customer Request None TDA 136732
05/23/2003 12:32 05/23/2003 21:14 Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma 69.0 522 Auto Terminal Equipment Failure Improper Relaying BPA Trouble 3 OLY 136733
05/23/2003 12:32 05/23/2003 21:14 Silver Creek: Lewis Co PUD 69kV Feeder 1 to Lenrd Rd 69.0 522 Auto Terminal Equipment Failure Improper Relaying BPA Trouble None OLY 136734
05/24/2003 15:35 05/24/2003 15:35 Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Patawa Creek 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 14 TRI 136742
05/24/2003 16:33 05/24/2003 16:33 Lagoon: Milton-Freewater 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TRI 136743
05/24/2003 16:33 05/24/2003 16:33 Stateline: Columbia REA 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TRI 136744
05/24/2003 16:33 05/24/2003 16:33 Vansycle Ridge Wind Generating Plant: ESI Vansycle Part 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TRI 136745
05/24/2003 16:33 05/24/2003 16:33 Weston Mountain: Umatilla E Coop 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TRI 136746
05/24/2003 18:02 05/24/2003 18:02 Cochrane: Franklin Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown TRI 136747
05/24/2003 18:02 05/24/2003 18:02 Glade: Big Bend Coop 13.8kV Feeder 1 13.8 0 Auto Lightning BPA Trouble Unknown TRI 136748
05/24/2003 18:02 05/24/2003 18:02 Glade: S Col Basin Ir Dt 13.8kV Feeder 1 13.8 0 Auto Lightning BPA Trouble Unknown TRI 136749
05/24/2003 18:02 05/24/2003 18:02 North Pasco: Big Bend Coop 12.5kV Feeder 1 by Franklin Co PUD 12.5 0 Auto Lightning BPA Trouble Unknown TRI 136750
05/24/2003 18:02 05/24/2003 18:02 North Pasco: Franklin Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown TRI 136751
05/24/2003 18:02 05/24/2003 18:02 Taylor Flats: Franklin Co PUD 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown TRI 136752
05/24/2003 18:05 05/24/2003 18:05 Baxter: Big Bend Coop 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown TRI 136753
05/24/2003 18:05 05/24/2003 18:05 Cochrane: Franklin Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown TRI 136754
05/24/2003 18:05 05/24/2003 18:05 Glade: Big Bend Coop 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown TRI 136755
05/24/2003 18:05 05/24/2003 18:05 Glade: S Col Basin Ir Dt 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown TRI 136756
05/24/2003 18:05 05/24/2003 18:05 North Pasco: Big Bend Coop 12.5kV Feeder 1 by Franklin Co PUD 12.5 0 Auto Lightning BPA Trouble Unknown TRI 136757
05/24/2003 18:05 05/24/2003 18:05 North Pasco: Franklin Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown TRI 136758
05/24/2003 18:05 05/24/2003 18:05 Taylor Flats: Franklin Co PUD 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown TRI 136759
05/24/2003 18:09 05/24/2003 18:09 Franklin: Franklin Co PUD 115kV Feeder 1 to Angus 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 51 TRI 136760
05/24/2003 18:24 05/24/2003 18:24 La Grande: Oregon Trail 69kV Feeder 1 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 4 TRI 136761
05/24/2003 19:16 05/24/2003 19:16 Clayton: Inland P+L 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136762
05/24/2003 19:16 05/24/2003 19:16 Colbert: Avista Corp 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136763
05/24/2003 19:16 05/24/2003 19:16 Deer Park: Avista Corp 13.8kV Feeder 1 13.8 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136764
05/24/2003 19:16 05/24/2003 19:16 Deer Park: Avista Corp 13.8kV Feeder 2 13.8 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136765
05/24/2003 19:16 05/24/2003 19:16 Deer Park: Inland P+L 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble Unknown SPK 136766
05/24/2003 19:16 05/24/2003 19:16 Half Moon: Inland P+L 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136767
05/24/2003 19:16 05/24/2003 19:16 Loon Lake: Avista Corp 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136768
05/24/2003 19:16 05/25/2003 03:37 Milan: Avista Corp 115kV Feeder 1 115.0 501 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136769
05/24/2003 19:16 05/25/2003 03:37 Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp 13.8 501 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136770
05/24/2003 19:16 05/24/2003 22:00 Tum Tum: Inland P+L 115kV Feeder 1 115.0 164 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 136771
05/24/2003 20:05 05/24/2003 20:05 Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co 34.5 0 Auto Lightning BPA Trouble Unknown SPK 136772
05/24/2003 20:05 05/24/2003 20:05 Clarkston: Clearwater P Co 34.5kV Feeder 1 34.5 0 Auto Lightning BPA Trouble Unknown SPK 136773
05/24/2003 20:05 05/24/2003 20:05 Pomeroy: Inland P+L 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 136774
05/24/2003 20:05 05/24/2003 20:05 Pomeroy: Inland P+L 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136775
05/24/2003 20:15 05/24/2003 20:15 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136776
05/24/2003 20:15 05/24/2003 20:15 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136777
05/24/2003 20:15 05/24/2003 20:15 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136778
05/24/2003 20:15 05/24/2003 20:15 Samuels: Northern Lights 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136779
05/24/2003 20:15 05/24/2003 20:15 Selle: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136780
05/24/2003 20:22 05/24/2003 20:22 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136781
05/24/2003 20:22 05/24/2003 20:22 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136782
05/24/2003 20:22 05/24/2003 20:22 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136783
05/24/2003 20:22 05/24/2003 20:22 Samuels: Northern Lights 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136784
05/24/2003 20:22 05/24/2003 20:22 Selle: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136785
05/24/2003 20:27 05/24/2003 20:27 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136786
05/24/2003 20:27 05/24/2003 20:27 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136787
05/24/2003 20:27 05/24/2003 20:27 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136788
05/24/2003 20:27 05/24/2003 20:27 Samuels: Northern Lights 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136789
05/24/2003 20:27 05/24/2003 20:27 Selle: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136790
05/24/2003 20:35 05/24/2003 20:35 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136791
05/24/2003 20:35 05/24/2003 20:35 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136792
05/24/2003 20:35 05/24/2003 20:35 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136793
05/24/2003 20:35 05/24/2003 20:35 Samuels: Northern Lights 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136794
05/24/2003 20:35 05/24/2003 20:35 Selle: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136795
05/24/2003 20:38 05/24/2003 20:38 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Lightning Weather BPA Trouble Unknown SPK 136796
05/24/2003 20:38 05/24/2003 20:38 Metaline Falls: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 136797
05/24/2003 20:38 05/24/2003 20:38 Spirit: Avista Corp 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 136798
05/24/2003 20:47 05/24/2003 20:47 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136799
05/24/2003 20:47 05/24/2003 20:47 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136800
05/24/2003 20:47 05/24/2003 20:47 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136801
05/24/2003 20:47 05/24/2003 20:47 North Bench: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 136802
05/24/2003 20:47 05/24/2003 20:47 Troy: City of Troy 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136803
05/24/2003 20:47 05/24/2003 20:47 Troy: Northern Lights 115kV Feeder 1 to Asarco 115.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136804
05/24/2003 20:47 05/24/2003 20:47 Troy: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136805
05/24/2003 20:47 05/24/2003 20:47 Troy: Northern Lights 13.8kV Feeder 2 13.8 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136806
05/24/2003 20:47 05/24/2003 20:47 Yaak: Northern Lights 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136807
05/24/2003 20:47 05/24/2003 20:47 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Lightning Forced (Configuration) BPA Trouble Unknown SPK 136808
05/25/2003 15:30 05/25/2003 15:30 Dixon: Mission Vly Power 69kV Feeder 1 69.0 0 Auto Lightning Unknown BPA Trouble Unknown KAL 136825
05/25/2003 15:32 05/25/2003 15:32 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136826
05/25/2003 15:32 05/25/2003 15:32 Trumbull Creek: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 136827
05/25/2003 15:33 05/25/2003 15:33 Dixon: Mission Vly Power 69kV Feeder 1 69.0 0 Auto Lightning Unknown BPA Trouble Unknown KAL 136828
05/26/2003 07:25 05/27/2003 17:02 Hanford No.2 Construction: Energy Northwest 115kV Feeder 1 to CGS2 Backup 115.0 2017 Plan Foreign Request Customer Request None TRI 136837
05/27/2003 08:03 05/27/2003 12:28 Roy L Zimmerman: Centralia City Lt 69kV Feeder 1 69.0 265 Plan Maintenance BPA Request None OLY 136838
05/27/2003 09:50 05/27/2003 14:53 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 303 Plan Maintenance BPA Request None SAL 136839
05/27/2003 12:00 05/28/2003 19:56 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 1916 Plan Foreign Request Transferor Request None SAL 136840
05/28/2003 06:46 05/28/2003 15:14 Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) 46.0 508 Plan Maintenance BPA Request None IDF 136851
05/28/2003 07:46 05/28/2003 07:51 Dexter: Lane Elec Coop 115kV Feeder 1 115.0 5 Auto Arc while switching Arc while switching BPA Trouble Unknown EUG 136852
05/28/2003 07:46 05/28/2003 07:51 Pleasant Hill: Emerald PUD 115kV Feeder 1 115.0 5 Auto Arc while switching Arc while switching BPA Trouble Unknown EUG 136853
05/28/2003 08:20 05/28/2003 15:35 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 435 Plan Maintenance BPA Request None SAL 136854
05/28/2003 09:13 05/29/2003 14:09 Norway: Coos-Curry Coop 12.5kV Feeder 1 12.5 1736 Plan Maintenance BPA Request None EUG 136855
05/29/2003 07:44 05/29/2003 15:32 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 468 Plan Maintenance BPA Request None SAL 136875
05/29/2003 09:24 05/29/2003 12:01 Alvey: Lane Elec Coop 34.5kV Feeder 1 34.5 157 Plan Maintenance BPA Request None EUG 136876
05/29/2003 12:12 06/11/2003 12:35 Columbia Falls: Flathead E Coop 34.5kV Feeder 2 34.5 18743 Plan Foreign Request Customer Request None KAL 136897
05/30/2003 03:41 05/30/2003 03:41 Cedarville Junction: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) 69.0 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown RED 136898
05/30/2003 04:21 05/30/2003 04:21 Hideaway: Lane Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown EUG 136899
05/30/2003 05:23 05/30/2003 05:23 Adair: Consumers Power 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136900
05/30/2003 05:23 05/30/2003 05:23 Monmouth: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136901
05/30/2003 05:23 05/30/2003 05:23 Monmouth: Monmouth OR 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136902
05/30/2003 05:23 05/30/2003 05:23 Monmouth: Monmouth OR 12.5kV Feeder 2 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136903
05/30/2003 05:23 05/30/2003 05:23 Monmouth: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136904
05/30/2003 05:32 05/30/2003 05:32 Monmouth: Monmouth OR 12.5kV Feeder 2 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136905
05/30/2003 05:32 05/30/2003 05:32 Monmouth: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136906
05/30/2003 05:32 05/30/2003 05:32 Adair: Consumers Power 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136907
05/30/2003 05:32 05/30/2003 05:32 Monmouth: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136908
05/30/2003 05:32 05/30/2003 05:32 Monmouth: Monmouth OR 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136909
05/30/2003 05:33 05/30/2003 05:33 Adair: Consumers Power 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136910
05/30/2003 05:33 05/30/2003 05:33 Monmouth: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136911
05/30/2003 05:33 05/30/2003 05:33 Monmouth: Monmouth OR 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136912
05/30/2003 05:33 05/30/2003 05:33 Monmouth: Monmouth OR 12.5kV Feeder 2 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136913
05/30/2003 05:33 05/30/2003 05:33 Monmouth: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136914
05/30/2003 05:39 05/30/2003 05:39 Adair: Consumers Power 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136915
05/30/2003 05:39 05/30/2003 05:39 Monmouth: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136916
05/30/2003 05:39 05/30/2003 05:39 Monmouth: Monmouth OR 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136917
05/30/2003 05:39 05/30/2003 05:39 Monmouth: Monmouth OR 12.5kV Feeder 2 12.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136918
05/30/2003 05:39 05/30/2003 05:39 Monmouth: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 136919
05/30/2003 06:55 05/30/2003 06:55 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown RED 136920
05/30/2003 06:55 05/30/2003 06:55 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 136921
05/30/2003 07:45 05/30/2003 15:16 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 451 Plan Maintenance BPA Request None SAL 136922
05/30/2003 13:20 05/30/2003 13:20 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown RED 136923
05/30/2003 13:20 05/30/2003 13:20 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 136924
05/30/2003 21:10 05/30/2003 21:10 Madison: Fall River E Coop 46kV Feeder 1 46.0 0 Auto Lightning Forced (Configuration) BPA Trouble 4 IDF 136925
05/31/2003 06:12 05/31/2003 06:14 Ledbeder: Benton REA 115kV Feeder 1 115.0 2 Auto Unknown BPA Trouble Unknown TRI 136944
05/31/2003 06:12 05/31/2003 06:14 Horn Rapids: Benton REA 115kV Feeder 1 115.0 2 Auto Unknown BPA Trouble Unknown TRI 136945
05/31/2003 06:12 05/31/2003 06:14 Red Mountain: Benton Co PUD 115kV Feeder 1 115.0 2 Auto Unknown BPA Trouble Unknown TRI 136946
05/31/2003 13:37 05/31/2003 13:37 Targhee: Fall River E Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown IDF 136947
05/31/2003 13:37 05/31/2003 13:37 Targhee: Fall River E Coop 46kV Feeder N 46.0 0 Auto Unknown Lightning Unknown Trouble Unknown IDF 136948
05/31/2003 13:37 05/31/2003 13:37 Victor FREC: Fall River E Coop 115kV Feeder 1 115.0 0 Auto Unknown Lightning Unknown Trouble Unknown IDF 136949
06/01/2003 01:18 06/01/2003 02:14 Lynch Creek: Ohop Mutual Light 12.5kV Feeder 1 by Tacoma Power 12.5 56 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 136950
06/01/2003 01:18 06/01/2003 02:14 Franz Holmes: Elmhurst Mutual 115kV Feeder 1 by Tacoma Power 115.0 56 Auto Foreign Trouble Transferor Trouble Unknown COV 136951
06/01/2003 01:18 06/01/2003 04:12 Haakenson: Elmhurst Mutual 115kV Feeder 1 by Tacoma Power 115.0 174 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 136952
06/01/2003 01:18 06/01/2003 02:14 Lynch Creek: Eatonville WA 12.5kV Feeder 1 by Tacoma Power 12.5 56 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 136953
06/02/2003 04:14 06/02/2003 04:14 Cheshire: Emerald PUD 115kV Feeder 2 115.0 0 Auto Unknown Unknown Trouble Unknown EUG 136963
06/02/2003 04:14 06/02/2003 04:14 Harrisburg: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Unknown Malicious Unknown Trouble Unknown EUG 136964
06/02/2003 04:14 06/02/2003 04:14 Junction City BLC: Blachly-Lane Co 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown EUG 136965
06/02/2003 04:14 06/02/2003 04:14 Parker: Blachly-Lane Co 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown EUG 136966
06/02/2003 04:14 06/02/2003 04:14 Harrisburg: Consumers Power 115kV Feeder 1 to Greenberry 115.0 0 Auto Unknown Malicious Unknown Trouble Unknown EUG 136967
06/02/2003 04:14 06/02/2003 04:14 Alderwood: Blachly-Lane Co 12.5kV Feeder 1 12.5 0 Auto Unknown Malicious Unknown Trouble Unknown EUG 136968
06/02/2003 04:14 06/02/2003 04:14 Cheshire: Emerald PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown EUG 136969
06/02/2003 07:37 06/06/2003 15:15 Intalco: Alcoa 13.8kV Feeder 1 13.8 6218 Plan Maintenance BPA Request None SNO 136973
06/02/2003 08:51 06/02/2003 08:51 Irby: Inland P+L 34.5kV Feeder 1 by Avista Corp 34.5 0 Auto Foreign Trouble Transferor Trouble Unknown SPK 136974
06/02/2003 10:40 06/04/2003 09:46 Odessa: Inland P+L 34.5kV Feeder 1 by Avista Corp 34.5 2826 Plan Maintenance BPA Request None SPK 136975
06/03/2003 08:00 06/03/2003 15:01 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 421 Plan Foreign Request Customer Request Unknown SNO 136987
06/03/2003 08:49 06/06/2003 13:44 Noti Creek: Emerald PUD 115kV Feeder 1 115.0 4615 Plan Maintenance BPA Request Unknown EUG 136988
06/03/2003 10:41 06/05/2003 12:30 Anaconda: NorthWestern Ener 115kV Feeder 2 115.0 2989 Plan Maintenance BPA Request None KAL 136989
06/04/2003 17:08 06/06/2003 09:34 Intalco: Alcoa 13.8kV Feeder 6 13.8 2426 Plan Maintenance BPA Request None SNO 137000
06/05/2003 14:05 06/05/2003 14:14 Irby: Inland P+L 34.5kV Feeder 1 by Avista Corp 34.5 9 Plan Foreign Request Transferor Request 20 SPK 137018
06/06/2003 13:36 06/06/2003 14:48 Marcola: Emerald PUD 230kV Feeder 1 230.0 72 Auto Tree BPA Trouble Unknown EUG 137035
06/06/2003 13:36 06/06/2003 14:48 Marcola: Emerald PUD 230kV Feeder 2 230.0 72 Auto Tree BPA Trouble Unknown EUG 137036
06/06/2003 18:01 06/06/2003 18:01 Skookum: Mason Co PUD 3 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown OLY 137038
06/07/2003 08:11 06/09/2003 15:11 Chemawa: Portland Gen Elec 57kV Feeder 4 57.0 3300 Plan Maintenance BPA Request None SAL 137046
06/08/2003 15:22 06/08/2003 15:22 Stillwater: Lincoln Elec - MT 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137051
06/08/2003 15:22 06/08/2003 15:22 Trego: Lincoln Elec - MT 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137052
06/08/2003 15:22 06/08/2003 15:22 Trego: Lincoln Elec - MT 115kV Feeder 2 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137053
06/08/2003 16:42 06/08/2003 16:42 Lion Mountain: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137054
06/08/2003 16:43 06/08/2003 16:43 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137055
06/08/2003 16:43 06/08/2003 16:43 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137056
06/08/2003 16:43 06/08/2003 16:43 Samuels: Northern Lights 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137057
06/08/2003 16:43 06/08/2003 16:43 Selle: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137058
06/08/2003 16:43 06/08/2003 16:43 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137059
06/08/2003 16:50 06/08/2003 16:50 Dixon: Mission Vly Power 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137060
06/08/2003 16:51 06/08/2003 16:51 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137061
06/08/2003 16:51 06/08/2003 16:51 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137062
06/08/2003 16:51 06/08/2003 16:51 Samuels: Northern Lights 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137063
06/08/2003 16:51 06/08/2003 16:51 Selle: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 137064
06/08/2003 16:51 06/08/2003 16:52 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 1 Auto Lightning Lightning BPA Trouble Unknown SPK 137065
06/08/2003 19:23 06/08/2003 19:23 Elmo: Mission Vly Power 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137066
06/08/2003 20:48 06/08/2003 20:49 Dixon: Mission Vly Power 69kV Feeder 1 69.0 1 Auto Lightning Lightning BPA Trouble Unknown KAL 137067
06/08/2003 21:10 06/08/2003 21:11 Dixon: Mission Vly Power 69kV Feeder 1 69.0 1 Auto Lightning Lightning BPA Trouble Unknown KAL 137068
06/09/2003 08:43 06/09/2003 14:40 Trentwood: Kaiser Alum 6.9kV Feeder 1 6.9 357 Plan Maintenance BPA Request None SPK 137082
06/09/2003 09:18 06/09/2003 09:20 Intalco: Alcoa 13.8kV Feeder 2 13.8 2 Plan Switching Customer Request None SNO 137083
06/09/2003 09:28 06/13/2003 15:28 Gold Beach: Coos-Curry Coop 115kV Feeder 1 115.0 6120 Plan Foreign Request Customer Request None EUG 137084
06/09/2003 10:07 06/13/2003 13:45 Intalco: Alcoa 13.8kV Feeder 4 13.8 5978 Plan Maintenance BPA Request None SNO 137085
06/09/2003 16:47 06/09/2003 16:47 Clayton: Inland P+L 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble None SPK 137086
06/09/2003 16:47 06/09/2003 16:47 Colbert: Avista Corp 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble None SPK 137087
06/09/2003 16:47 06/09/2003 16:47 Deer Park: Avista Corp 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble None SPK 137088
06/09/2003 16:47 06/09/2003 16:47 Deer Park: Avista Corp 13.8kV Feeder 2 13.8 0 Auto Lightning Lightning BPA Trouble None SPK 137089
06/09/2003 16:47 06/09/2003 16:47 Deer Park: Inland P+L 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble None SPK 137090
06/09/2003 16:47 06/09/2003 16:47 Loon Lake: Avista Corp 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble None SPK 137091
06/09/2003 16:47 06/09/2003 16:47 Mead: Avista Corp 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble None SPK 137092
06/09/2003 16:47 06/09/2003 16:47 Milan: Avista Corp 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble None SPK 137093
06/09/2003 16:47 06/09/2003 16:47 Half Moon: Inland P+L 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble None SPK 137094
06/09/2003 16:47 06/09/2003 16:47 Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp 13.8 0 Auto Lightning Lightning BPA Trouble None SPK 137095
06/09/2003 16:47 06/09/2003 16:47 Tum Tum: Inland P+L 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble None SPK 137096
06/09/2003 17:37 06/09/2003 17:37 Clymer: Puget Sound Energ 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown WEN 137097
06/09/2003 17:37 06/09/2003 17:39 Rattlesnake BREA: Benton REA 115kV Feeder 1 115.0 2 Auto Lightning Forced (Configuration) BPA Trouble Unknown TRI 137098
06/10/2003 08:06 06/10/2003 11:21 Trentwood: Kaiser Alum 6.9kV Feeder 2 6.9 195 Plan Maintenance BPA Request None SPK 137114
06/10/2003 09:04 06/10/2003 12:21 Keller: Ferry Co PUD 34.5kV Feeder 1 34.5 197 Plan Foreign Request Other Customer Request Unknown SPK 137115
06/10/2003 09:19 06/10/2003 09:30 Newcomb: South Side Elec 12.5kV Feeder 1 12.5 11 Plan Foreign Request Customer Request None IDF 137116
06/10/2003 09:33 06/10/2003 09:40 The Dalles: USBR The Dalles 12.5kV Feeder 1 12.5 7 Plan Switching BPA Request 5 TDA 137117
06/10/2003 09:33 06/10/2003 09:39 The Dalles: Northrn Wasco PUD 12.5kV Feeder 2 12.5 6 Plan Switching BPA Request None TDA 137118
06/10/2003 11:18 06/10/2003 11:20 Lion Mountain: Flathead E Coop 230kV Feeder 1 230.0 2 Auto Lightning Lightning BPA Trouble Unknown KAL 137119
06/10/2003 12:42 06/10/2003 12:42 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Lightning Unknown BPA Trouble 50 SPK 137120
06/10/2003 12:42 06/10/2003 12:42 Metaline Falls: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 137121
06/10/2003 12:42 06/10/2003 12:42 Spirit: Avista Corp 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 137122
06/10/2003 17:58 06/10/2003 17:58 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137123
06/10/2003 17:58 06/10/2003 17:58 Trumbull Creek: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137124
06/10/2003 18:07 06/10/2003 18:07 Metaline Falls: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 137125
06/10/2003 18:07 06/10/2003 18:07 Spirit: Avista Corp 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble 1 SPK 137126
06/10/2003 18:07 06/10/2003 18:07 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Lightning Unknown BPA Trouble 52 SPK 137127
06/10/2003 19:35 06/10/2003 19:35 Lion Mountain: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137128
06/10/2003 19:55 06/10/2003 19:55 Lion Mountain: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137129
06/10/2003 20:03 06/10/2003 20:03 Lion Mountain: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137130
06/12/2003 09:03 06/12/2003 11:00 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 117 Plan Foreign Request BPA Request None SNO 137170
06/12/2003 09:03 06/12/2003 11:00 Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD 115.0 117 Plan Foreign Request BPA Request None SNO 137171
06/12/2003 11:46 06/12/2003 12:27 Fishers Road: Clark Public Util 115kV Feeder 1 115.0 41 Auto Foreign Trouble Foreign Trouble Customer Trouble 58 LGV 137172
06/13/2003 13:22 06/13/2003 13:22 Spar Canyon: Salmon River Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble 2 IDF 137183
06/13/2003 13:22 06/13/2003 13:22 Round Valley: Salmon River Coop 69kV Feeder 1 69.0 0 Auto Lightning Forced (Configuration) BPA Trouble 3 IDF 137184
06/13/2003 18:29 06/14/2003 01:29 East Omak: Okanogan Co PUD 115kV Feeder 1 to Okanogan 115.0 420 Plan Load Control Customer Request Unknown WEN 137185
06/15/2003 01:15 06/15/2003 03:08 Ringold: Big Bend Coop 13.8kV Feeder 1 13.8 113 Auto Foreign Trouble Foreign Trouble Customer Trouble 2 TRI 137201
06/15/2003 01:15 06/15/2003 03:08 Ringold: Franklin Co PUD 13.8kV Feeder 1 13.8 113 Auto Foreign Trouble Foreign Trouble Other Customer Trouble Unknown TRI 137202
06/16/2003 04:00 06/16/2003 04:00 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Unknown BPA Trouble Unknown TDA 137210
06/16/2003 07:18 06/16/2003 16:04 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 526 Plan Foreign Request Customer Request None SAL 137211
06/16/2003 07:37   Valhalla: Alcoa 13.8kV Feeder 5 13.8 still out Plan Normally Out Customer Request None WEN 137212
06/16/2003 12:18 08/21/2003 09:01 Gold Beach: Coos-Curry Coop 115kV Feeder 2 115.0 94843 Plan Foreign Request Customer Request None EUG 137213
06/17/2003 01:56 06/17/2003 02:34 Pleasant Hill: Emerald PUD 115kV Feeder 1 115.0 38 Plan Switching BPA Request Unknown EUG 137230
06/17/2003 09:20 06/17/2003 09:27 The Dalles: Northrn Wasco PUD 12.5kV Feeder 2 12.5 7 Plan Switching BPA Request None TDA 137231
06/17/2003 09:20 06/17/2003 09:27 The Dalles: USBR The Dalles 12.5kV Feeder 1 12.5 7 Plan Switching BPA Request Unknown TDA 137232
06/18/2003 08:58 06/18/2003 16:19 Redmond: PacifiCorp (PACW) 115kV Feeder 1 115.0 441 Plan Foreign Request BPA Request None RED 137247
06/18/2003 16:22 06/18/2003 16:22 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 137248
06/18/2003 16:22 06/18/2003 16:22 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown RED 137249
06/18/2003 19:31 06/18/2003 19:31 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137250
06/18/2003 19:31 06/18/2003 19:31 Trumbull Creek: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137251
06/19/2003 14:09 06/19/2003 14:09 Dixon: Mission Vly Power 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 137264
06/19/2003 14:54 06/19/2003 14:54 Elmo: Mission Vly Power 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137265
06/19/2003 19:45 06/19/2003 20:39 Camp: Avista Corp 230kV Feeder 1 230.0 54 Auto Lightning Unknown BPA Trouble Unknown KAL 137266
06/19/2003 19:45 06/19/2003 20:39 Camp: Northern Lights 13.8kV Feeder 1 by Avista Corp 13.8 54 Auto Lightning Unknown BPA Trouble Unknown KAL 137267
06/19/2003 19:45 06/19/2003 20:39 Trout Creek: Northern Lights 230kV Feeder 1 230.0 54 Auto Lightning BPA Trouble Unknown KAL 137268
06/19/2003 21:52 06/19/2003 21:52 Stillwater: Lincoln Elec - MT 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137269
06/19/2003 21:52 06/19/2003 21:52 Trego: Lincoln Elec - MT 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137270
06/19/2003 21:52 06/19/2003 21:52 Trego: Lincoln Elec - MT 115kV Feeder 2 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137271
06/20/2003 01:00 06/26/2003 13:33 Dixon: Mission Vly Power 69kV Feeder 1 69.0 9393 Auto Lightning Weather BPA Trouble None KAL 137272
06/20/2003 04:11 06/20/2003 04:11 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Lightning Unknown Trouble Unknown KAL 137273
06/20/2003 04:11 06/20/2003 04:11 Trumbull Creek: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Unknown Lightning Unknown Trouble Unknown KAL 137274
06/20/2003 08:41 06/20/2003 08:44 Camp: Avista Corp 230kV Feeder 1 230.0 3 Plan Switching BPA Request Unknown KAL 137292
06/20/2003 08:41 06/20/2003 08:44 Camp: Northern Lights 13.8kV Feeder 1 by Avista Corp 13.8 3 Plan Switching BPA Request Unknown KAL 137293
06/20/2003 08:41 06/20/2003 08:44 Trout Creek: Northern Lights 230kV Feeder 1 230.0 3 Plan Switching BPA Request Unknown KAL 137294
06/21/2003 14:45 06/21/2003 14:45 Elmo: Mission Vly Power 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown KAL 137304
06/23/2003 12:20 06/26/2003 14:58 Pomeroy: Inland P+L 115kV Feeder 1 115.0 4478 Plan Maintenance BPA Request Unknown SPK 137314
06/23/2003 12:20 06/26/2003 14:58 Pomeroy: Inland P+L 69kV Feeder 1 69.0 4478 Plan Maintenance BPA Request Unknown SPK 137315
06/24/2003 07:25 06/24/2003 14:45 Madison: Fall River E Coop 46kV Feeder 1 46.0 440 Plan Maintenance BPA Request None IDF 137339
06/26/2003 17:00 06/26/2003 17:00 Creswell: Emerald PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Transferor Trouble Unknown EUG 137364
06/26/2003 17:04 06/26/2003 17:26 Creswell: Emerald PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 22 Auto Foreign Trouble Transferor Trouble Unknown EUG 137365
06/26/2003 22:14 06/27/2003 03:27 East Grangeville: Idaho L+P Coop 13.8kV Feeder 1 by Avista Corp 13.8 313 Plan Maintenance BPA Request Unknown SPK 137366
06/27/2003 05:15 10/06/2003 03:02 Dixon: Mission Vly Power 69kV Feeder 1 69.0 145307 Auto Equipment/Miscellaneous Unknown BPA Trouble None KAL 137470
06/28/2003 17:48 06/28/2003 18:48 Parkdale: Hood River Elec 12.5kV Feeder 1 12.5 60 Plan Emergency BPA Request 4 TDA 137387
06/29/2003 15:03 06/29/2003 15:03 Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) 115.0 0 Auto Foreign Trouble Transferor Trouble Unknown TRI 137394
06/29/2003 23:26 06/29/2003 23:26 Kalispell: Flathead E Coop 34.5kV Feeder 1 34.5 0 Auto Lightning Lightning BPA Trouble 2 KAL 137395
06/29/2003 23:32 06/29/2003 23:32 Columbia Falls: Flathead E Coop 34.5kV Feeder 1 34.5 0 Auto Lightning Unknown BPA Trouble 3 KAL 137396
06/30/2003 06:31 06/30/2003 14:11 Trentwood: Kaiser Alum 6.9kV Feeder 5 6.9 460 Plan Foreign Request Customer Request None SPK 137405
06/30/2003 06:31 06/30/2003 14:11 Trentwood: Kaiser Alum 6.9kV Feeder 2 6.9 460 Plan Foreign Request Customer Request None SPK 137406
06/30/2003 09:16 06/30/2003 14:25 Intalco: Alcoa 13.8kV Feeder 3 13.8 309 Plan Maintenance BPA Request None SNO 137407
06/30/2003 10:40 06/30/2003 15:08 Kalispell: Flathead E Coop 34.5kV Feeder 4 34.5 268 Plan Foreign Request Customer Request None KAL 137408
06/30/2003 10:41 06/30/2003 15:11 Kalispell: Flathead E Coop 34.5kV Feeder 5 34.5 270 Plan Foreign Request Customer Request None KAL 137409
06/30/2003 10:42 06/30/2003 10:42 Macks Inn: Fall River E Coop 46kV Feeder 2 46.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 2 IDF 137410
06/30/2003 12:43 06/30/2003 13:47 Kalispell: Flathead E Coop 34.5kV Feeder 1 34.5 64 Plan Foreign Request Customer Request None KAL 137411
07/01/2003 06:13 07/01/2003 12:58 Intalco: Alcoa 13.8kV Feeder 2 13.8 405 Plan Maintenance BPA Request None SNO 137428
07/01/2003 06:27 07/01/2003 13:31 Trentwood: Kaiser Alum 6.9kV Feeder 1 6.9 424 Plan Foreign Request Customer Request None SPK 137429
07/01/2003 06:27 07/01/2003 13:31 Trentwood: Kaiser Alum 6.9kV Feeder 3 6.9 424 Plan Foreign Request Customer Request None SPK 137430
07/02/2003 06:45 07/02/2003 13:47 Trentwood: Kaiser Alum 6.9kV Feeder 4 6.9 422 Plan Foreign Request Customer Request None SPK 137447
07/02/2003 06:45 07/02/2003 13:17 Trentwood: Kaiser Alum 6.9kV Feeder 6 6.9 392 Plan Foreign Request Customer Request None SPK 137448
07/02/2003 07:36 07/02/2003 14:11 Intalco: Alcoa 13.8kV Feeder 1 13.8 395 Plan Maintenance BPA Request Unknown SNO 137449
07/02/2003 10:27 07/02/2003 14:10 Bald Mountain: PacifiCorp (PACW) 69kV Feeder 1 69.0 223 Plan Foreign Request Customer Request None TDA 137450
07/03/2003 01:42 07/03/2003 07:26 Sifton: Clark Public Util 115kV Feeder 2 115.0 344 Plan Foreign Request Customer Request None LGV 137471
07/03/2003 14:25 07/03/2003 14:25 Eagle Lake: S Col Basin Ir Dt 13.8kV Feeder 1 13.8 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TRI 137472
07/07/2003 08:36 07/10/2003 13:04 Narrows: Peninsula L Co 12.5kV Feeder 1 by Tacoma Power 12.5 4588 Plan Foreign Request Customer Request None COV 137490
07/07/2003 15:02 07/07/2003 15:05 Intalco: Alcoa 13.8kV Feeder 2 13.8 3 Plan Foreign Request Customer Request None SNO 137491
07/07/2003 19:58 07/07/2003 19:59 Chemawa: Portland Gen Elec 57kV Feeder 2 57.0 1 Auto Foreign Trouble Foreign Trouble Customer Trouble 7 SAL 137492
07/07/2003 21:27 07/07/2003 21:59 Taylor Flats: Franklin Co PUD 12.5kV Feeder 1 12.5 32 Plan Foreign Request Customer Request 5 TRI 137493
07/08/2003 00:06 07/08/2003 06:44 Chemawa: Portland Gen Elec 57kV Feeder 2 57.0 398 Plan Foreign Request Customer Request 8 SAL 137501
07/08/2003 07:26 07/08/2003 14:31 Burnt Woods: Consumers Power 24.9kV Feeder 1 24.9 425 Plan Construction BPA Request None EUG 137502
07/08/2003 08:08 07/08/2003 13:19 Intalco: Alcoa 13.8kV Feeder 6 13.8 311 Plan Maintenance BPA Request None SNO 137503
07/08/2003 12:15 07/08/2003 12:48 Fossil: Wasco Elec Coop 69kV Feeder 1 69.0 33 Plan Maintenance BPA Request None TDA 137504
07/09/2003 07:40 07/09/2003 09:56 Valhalla: Chelan Co PUD 115kV Feeder 1 115.0 136 Plan Foreign Request Customer Request None WEN 137513
07/09/2003 08:23 07/11/2003 16:43 Intalco: Alcoa 13.8kV Feeder 7 13.8 3380 Plan Maintenance BPA Request None SNO 137514
07/09/2003 13:22 07/09/2003 13:27 Palisades PH: Lower Valy Energy 12.5kV Feeder 1 by USBR GENERAL 12.5 5 Auto Foreign Trouble Foreign Utility Transferor Trouble None IDF 137515
07/10/2003 13:07 07/10/2003 14:55 Haakenson: Elmhurst Mutual 115kV Feeder 1 by Tacoma Power 115.0 108 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 137527
07/10/2003 13:07 07/10/2003 16:40 Lynch Creek: Eatonville WA 12.5kV Feeder 1 by Tacoma Power 12.5 213 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 137528
07/10/2003 13:07 07/10/2003 16:40 Lynch Creek: Ohop Mutual Light 12.5kV Feeder 1 by Tacoma Power 12.5 213 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 137529
07/10/2003 13:07 07/10/2003 14:55 Franz Holmes: Elmhurst Mutual 115kV Feeder 1 by Tacoma Power 115.0 108 Auto Foreign Trouble Transferor Trouble Unknown COV 137530
07/10/2003 13:07 07/10/2003 16:40 Alder Metering Point: Alder Light 24.9kV Feeder 1 by Lewis Co PUD 24.9 213 Auto Foreign Trouble Transferor Trouble Unknown OLY 137531
07/10/2003 13:07 07/10/2003 16:40 Elbe: Lewis Co PUD 115kV Feeder 1 by Tacoma Power 115.0 213 Plan Foreign Request Transferor Request Unknown OLY 137532
07/10/2003 18:11 07/10/2003 18:11 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown RED 137533
07/10/2003 18:11 07/10/2003 18:11 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown Unknown Trouble Unknown RED 137534
07/14/2003 14:11 07/18/2003 13:32 Intalco: Alcoa 13.8kV Feeder 5 13.8 5721 Plan Maintenance BPA Request None SNO 137565
07/14/2003 15:04 07/15/2003 07:16 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 972 Plan Normally Out BPA Request Unknown EUG 137566
07/15/2003 08:47 07/15/2003 14:17 Clatsop: PacifiCorp (PACW) 115kV Feeder 1 115.0 330 Plan Maintenance BPA Request None LGV 137584
07/15/2003 14:14 07/15/2003 16:01 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 107 Plan Normally Out BPA Request Unknown EUG 137585
07/15/2003 16:01 07/15/2003 16:01 Green Valley: Douglas Elec Coop 69kV Feeder 1 69.0 0 Auto Smoke Smoke BPA Trouble Unknown EUG 137586
07/15/2003 16:01 07/15/2003 16:10 Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) 34.5 9 Auto Smoke BPA Trouble Unknown EUG 137587
07/15/2003 16:01 07/15/2003 16:10 Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) 34.5 9 Auto Smoke BPA Trouble Unknown EUG 137588
07/15/2003 16:01 07/15/2003 16:01 Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton 69.0 0 Auto Power System Condition Smoke BPA Trouble Unknown EUG 137589
07/15/2003 16:01 07/15/2003 16:01 Drain: Douglas Elec Coop 12.5kV Feeder 1 12.5 0 Auto Power System Condition Smoke BPA Trouble Unknown EUG 137590
07/15/2003 16:01 07/15/2003 16:01 Drain: Drain OR 12.5kV Feeder 1 12.5 0 Auto Power System Condition Smoke BPA Trouble Unknown EUG 137591
07/15/2003 16:01 07/15/2003 16:10 Latham: Emerald PUD 115kV Feeder 1 115.0 9 Auto Smoke BPA Trouble Unknown EUG 137592
07/15/2003 19:27 08/03/2003 00:04 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 26197 Plan Normally Out BPA Request None EUG 137593
07/15/2003 22:17 07/15/2003 22:17 Camp: Avista Corp 230kV Feeder 1 230.0 0 Auto Lightning Weather BPA Trouble Unknown KAL 137594
07/15/2003 22:17 07/15/2003 22:17 Camp: Northern Lights 13.8kV Feeder 1 by Avista Corp 13.8 0 Auto Lightning Weather BPA Trouble Unknown KAL 137595
07/15/2003 22:17 07/15/2003 22:17 Trout Creek: Northern Lights 230kV Feeder 1 230.0 0 Auto Lightning BPA Trouble Unknown KAL 137596
07/16/2003 07:50 07/16/2003 07:50 Tarlett: Pacific Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble Unknown LGV 137623
07/17/2003 07:27 07/17/2003 07:30 Cascade Steel: McMinnville W&L 230kV Feeder 1 230.0 3 Plan Foreign Request Customer Request None SAL 137636
07/18/2003 14:47 07/18/2003 14:47 Chemawa: Portland Gen Elec 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 23 SAL 137651
07/18/2003 14:47 07/18/2003 14:47 Chemawa: Portland Gen Elec 57kV Feeder 4 57.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 33 SAL 137652
07/19/2003 04:04 07/19/2003 04:06 Troy: Northern Lights 115kV Feeder 1 to Asarco 115.0 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown KAL 137661
07/19/2003 04:04 07/19/2003 04:05 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 1 Auto Line Material Failure Line Material Failure BPA Trouble Unknown KAL 137662
07/19/2003 04:04 07/19/2003 04:06 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown SPK 137663
07/19/2003 04:04 07/19/2003 04:06 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown SPK 137664
07/19/2003 04:04 07/19/2003 04:06 North Bench: Northern Lights 13.8kV Feeder 1 13.8 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown SPK 137665
07/19/2003 04:04 07/19/2003 04:06 Troy: City of Troy 13.8kV Feeder 1 13.8 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown KAL 137666
07/19/2003 04:04 07/19/2003 04:06 Troy: Northern Lights 13.8kV Feeder 1 13.8 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown KAL 137667
07/19/2003 04:04 07/19/2003 04:06 Troy: Northern Lights 13.8kV Feeder 2 13.8 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown KAL 137668
07/19/2003 04:04 07/19/2003 04:06 Yaak: Northern Lights 12.5kV Feeder 1 12.5 2 Auto Line Material Failure Line Material Failure BPA Trouble Unknown KAL 137669
07/20/2003 07:33 07/20/2003 07:33 Rattlesnake BREA: Benton REA 115kV Feeder 1 115.0 0 Auto Unknown Bird droppings BPA Trouble 2 TRI 137677
07/20/2003 20:19 07/20/2003 20:19 Rattlesnake BREA: Benton REA 115kV Feeder 1 115.0 0 Auto Unknown Bird droppings BPA Trouble 1 TRI 137678
07/21/2003 07:35 07/23/2003 14:55 Longview: Cowlitz Co PUD 115kV Feeder 5 115.0 3320 Plan Fiber Optic Work BPA Request None LGV 137683
07/21/2003 08:44 07/21/2003 11:53 First Street: City of Richland 115kV Feeder 1 115.0 189 Plan Foreign Request Customer Request None TRI 137684
07/21/2003 22:26 07/21/2003 22:26 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Unknown Unknown Unknown Trouble Unknown TDA 137685
07/21/2003 22:26 07/21/2003 22:26 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Unknown Unknown Trouble Unknown TDA 137686
07/21/2003 22:26 07/21/2003 22:26 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Unknown Unknown Unknown Trouble Unknown TDA 137687
07/22/2003 05:02 07/22/2003 05:02 Fort Rock: Midstate E Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble 17 RED 137688
07/22/2003 09:11 07/22/2003 09:12 Intalco: Alcoa 13.8kV Feeder 2 13.8 1 Plan Switching Customer Request None SNO 137705
07/22/2003 09:51 07/22/2003 10:01 Geisel Monument: Coos-Curry Coop 115kV Feeder 1 115.0 10 Auto Forced (Configuration) BPA Trouble Unknown EUG 137706
07/22/2003 09:51 07/22/2003 10:01 Gold Beach: Coos-Curry Coop 115kV Feeder 1 115.0 10 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137707
07/22/2003 09:51 07/22/2003 10:01 Gold Beach: Coos-Curry Coop 115kV Feeder 3 115.0 10 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137708
07/22/2003 09:51 07/22/2003 09:52 Langlois: Bandon OR 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137709
07/22/2003 09:51 07/22/2003 09:52 Langlois: Coos-Curry Coop 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137710
07/22/2003 09:51 07/22/2003 09:52 Port Orford: Coos-Curry Coop 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137711
07/22/2003 09:51 07/22/2003 09:52 Two Mile Road: Bandon OR 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137712
07/22/2003 09:51 07/22/2003 09:52 Morrison: Coos-Curry Coop 115kV Feeder 1 115.0 1 Auto Forced (Configuration) BPA Trouble Unknown EUG 137713
07/22/2003 09:51 07/22/2003 09:52 Norway: Coos-Curry Coop 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137714
07/22/2003 09:51 07/22/2003 09:52 Norway: PacifiCorp (PACW) 115kV Feeder 1 115.0 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137715
07/22/2003 09:51 07/22/2003 09:52 Bandon: Bandon OR 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137716
07/22/2003 09:51 07/22/2003 09:52 Bandon: Coos-Curry Coop 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137717
07/22/2003 09:51 07/22/2003 09:52 Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 12.5 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137718
07/22/2003 09:51 07/22/2003 09:54 Lakeside CLP: Central Linc PUD 115kV Feeder 1 115.0 3 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137719
07/22/2003 09:51 07/22/2003 09:52 Glasgow: Central Linc PUD 115kV Feeder 1 115.0 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137720
07/22/2003 09:51 07/22/2003 09:52 Sumner: Coos-Curry Coop 115kV Feeder 1 115.0 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137721
07/22/2003 09:51 07/22/2003 09:52 Fairview CCEC: Coos-Curry Coop 115kV Feeder 1 115.0 1 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137722
07/22/2003 09:51 07/22/2003 09:52 Hauser CLP: Central Linc PUD 115kV Feeder 1 115.0 1 Auto Forced (Configuration) BPA Trouble Unknown EUG 137723
07/22/2003 09:51 07/22/2003 09:54 Reedsport: Central Linc PUD 115kV Feeder 1 115.0 3 Auto Forced (Configuration) BPA Trouble Unknown EUG 137724
07/22/2003 09:51 07/22/2003 09:54 Reedsport: Douglas Elec Coop 12.5kV Feeder 1 12.5 3 Auto Forced (Configuration) Human Element BPA Trouble Unknown EUG 137725
07/23/2003 05:02 07/23/2003 05:02 Hanford No.2 Construction: Energy Northwest 115kV Feeder 1 to CGS2 Backup 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown TRI 137748
07/23/2003 05:02 07/23/2003 05:02 Hanford No.2 Construction: Energy Northwest 115kV Feeder 1 to CGS2 E.O.F. 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown TRI 137749
07/23/2003 05:02 07/23/2003 05:02 Hanford No.2 Construction: Energy Northwest 13.8kV Feeder 1 13.8 0 Auto Unknown Unknown Unknown Trouble Unknown TRI 137750
07/23/2003 08:09 07/23/2003 08:32 Intalco: Alcoa 13.8kV Feeder 7 13.8 23 Plan Maintenance BPA Request None SNO 137751
07/23/2003 10:19 07/23/2003 10:37 Intalco: Alcoa 13.8kV Feeder 7 13.8 18 Plan Maintenance BPA Request None SNO 137752
07/23/2003 17:39 07/23/2003 19:32 Davis Creek: Surprise Valley 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 113 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown RED 137753
07/23/2003 17:39 07/23/2003 19:32 Cedarville Junction: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) 69.0 113 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown RED 137754
07/23/2003 17:39 07/23/2003 19:32 Austin Switchyard: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) 69.0 113 Auto Foreign Trouble Transferor Trouble Unknown RED 137755
07/23/2003 17:39 07/23/2003 19:32 Alturas: Surprise Valley 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 113 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown RED 137756
07/24/2003 14:58 07/24/2003 14:58 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown RED 137772
07/24/2003 14:58 07/24/2003 14:58 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 137773
07/24/2003 15:17 07/24/2003 15:17 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown RED 137774
07/24/2003 15:17 07/24/2003 15:17 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 137775
07/24/2003 16:08 07/24/2003 16:08 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown RED 137776
07/24/2003 16:08 07/24/2003 16:08 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 137777
07/25/2003 10:45 07/25/2003 10:45 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown RED 137792
07/25/2003 10:45 07/25/2003 10:45 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 137793
07/26/2003 10:41 07/26/2003 10:41 Chemawa: Portland Gen Elec 57kV Feeder 2 57.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 8 SAL 137810
07/28/2003 02:09 07/28/2003 02:09 Wren: Consumers Power 69kV Feeder 1 69.0 0 Auto Unknown Unknown BPA Trouble Unknown EUG 137822
07/28/2003 05:07 07/28/2003 05:07 Vansycle Ridge Wind Generating Plant: ESI Vansycle Part 69kV Feeder 1 69.0 0 Plan Switching BPA Request Unknown TRI 137829
07/28/2003 05:07 07/28/2003 05:07 Weston Mountain: Umatilla E Coop 69kV Feeder 1 69.0 0 Plan Switching BPA Request Unknown TRI 137830
07/28/2003 05:07 07/28/2003 05:07 Freewater CMF: Milton-Freewater 69kV Feeder 1 69.0 0 Plan Switching BPA Request Unknown TRI 137831
07/28/2003 05:07 07/28/2003 05:07 Lagoon: Milton-Freewater 69kV Feeder 1 69.0 0 Plan Switching BPA Request Unknown TRI 137832
07/28/2003 05:07 07/28/2003 05:07 Stateline: Columbia REA 69kV Feeder 1 69.0 0 Plan Switching BPA Request 6 TRI 137833
07/28/2003 05:07 07/28/2003 05:07 Milton: Milton-Freewater 69kV Feeder 1 69.0 0 Plan Switching BPA Request Unknown TRI 137834
07/28/2003 05:07 07/28/2003 05:07 Whitman: Columbia REA 69kV Feeder 1 69.0 0 Plan Switching BPA Request Unknown TRI 137835
07/28/2003 10:21 07/28/2003 14:41 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 260 Plan Foreign Request Customer Request None TDA 137836
07/28/2003 13:45 07/28/2003 13:52 Dayton CREA: Columbia REA 24.9kV Feeder 1 by PacifiCorp (PACW) 24.9 7 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown TRI 137837
07/29/2003 05:02 07/31/2003 20:46 Bremerton USN: US Navy 115kV Feeder 3 by Puget Sound Energ 115.0 3824 Plan Foreign Request Customer Request None OLY 138256
07/29/2003 19:00 07/30/2003 01:30 Lynch Creek: Eatonville WA 12.5kV Feeder 1 by Tacoma Power 12.5 390 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble 2 COV 137854
07/30/2003 12:13 07/30/2003 12:18 Intalco: Alcoa 13.8kV Feeder 2 13.8 5 Plan Switching Customer Request None SNO 137865
07/31/2003 02:07 07/31/2003 02:07 Gold Beach: Coos-Curry Coop 115kV Feeder 1 115.0 0 Auto Unknown Forced (Configuration) Unknown Trouble 15 EUG 137878
07/31/2003 02:07 07/31/2003 02:07 Gold Beach: Coos-Curry Coop 115kV Feeder 3 115.0 0 Auto Unknown Forced (Configuration) Unknown Trouble 3 EUG 137879
07/31/2003 02:07 07/31/2003 02:07 Geisel Monument: Coos-Curry Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble 1 EUG 137880
07/31/2003 08:03 07/31/2003 15:14 Usk: Pend Oreille PUD 230kV Feeder 1 230.0 431 Plan Maintenance BPA Request None SPK 137881
07/31/2003 08:12 07/31/2003 13:29 Intalco: Alcoa 13.8kV Feeder 4 13.8 317 Plan Maintenance BPA Request None SNO 137882
07/31/2003 10:04 07/31/2003 14:02 Newport IPL: Inland P+L 115kV Feeder 1 115.0 238 Plan Foreign Request Customer Request None SPK 137883
07/31/2003 10:34 07/31/2003 18:41 Dayton MCP3: Mason Co PUD 3 115kV Feeder 1 115.0 487 Auto Foreign Trouble Foreign Trouble Customer Trouble None OLY 137884
07/31/2003 11:59 07/31/2003 12:08 Alcoa: Evergreen/Vanalco 13.8kV Feeder 1 13.8 9 Auto Human Element Human Element BPA Trouble 1 LGV 137885
08/01/2003 09:00 08/01/2003 09:01 Pine Hollow: Wasco Elec Coop 12.5kV Feeder 1 by Northrn Wasco PUD 12.5 1 Plan Foreign Request Customer Request Unknown TDA 137904
08/02/2003 01:30 08/02/2003 01:30 Sappho: Clallam Co PUD 69kV Feeder 2 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 138427
08/02/2003 03:00 08/02/2003 06:35 Sappho: Clallam Co PUD 69kV Feeder 2 69.0 215 Plan Foreign Request Customer Request 2 OLY 137914
08/02/2003 21:30 08/03/2003 08:18 Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co 2.4 648 Auto Foreign Trouble Foreign Utility Transferor Trouble Unknown IDF 137920
08/03/2003 03:51 08/03/2003 03:51 Spar Canyon: Salmon River Coop 230kV Feeder 1 230.0 0 Auto Unknown Lightning Unknown Trouble 30 IDF 137921
08/03/2003 08:11 08/03/2003 14:08 Parker: Blachly-Lane Co 115kV Feeder 1 115.0 357 Plan Construction BPA Request Unknown EUG 137922
08/03/2003 15:57 08/03/2003 16:26 Winchester: Quincy Col B Ir D 13.8kV Feeder 1 by Grant Co PUD 13.8 29 Auto Foreign Trouble Customer Trouble Unknown TRI 137923
08/03/2003 16:08 08/03/2003 16:08 Ovando: Missoula E Coop 69kV Feeder 1 by NorthWestern Ener 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown KAL 137924
08/03/2003 16:28 08/03/2003 16:28 Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SPK 138218
08/03/2003 17:00 08/03/2003 17:01 Winchester: Quincy Col B Ir D 13.8kV Feeder 1 by Grant Co PUD 13.8 1 Plan Foreign Request Transferor Request Unknown TRI 137925
08/04/2003 02:16 08/15/2003 06:37 Anaconda: NorthWestern Ener 115kV Feeder 2 115.0 16101 Auto Forced (Configuration) Terminal Equipment Failure BPA Trouble 1 KAL 137937
08/04/2003 02:16 08/04/2003 04:08 Silver Bow: Vigilante E Coop 69kV Feeder 1 69.0 112 Auto Unknown Terminal Equipment Failure BPA Trouble 1 KAL 137938
08/04/2003 04:44 08/04/2003 05:01 Toledo: Consumers Power 69kV Feeder 1 69.0 17 Auto Unknown Improper Relaying BPA Trouble 2 EUG 137939
08/04/2003 07:14 08/04/2003 15:56 Ross: Clark Public Util 69kV Feeder 4 69.0 522 Plan Maintenance BPA Request Unknown LGV 137940
08/04/2003 07:57 08/06/2003 08:50 Chemawa: Portland Gen Elec 57kV Feeder 4 57.0 2933 Plan Maintenance BPA Request None SAL 137941
08/04/2003 09:42 08/28/2003 12:42 Adair: Consumers Power 69kV Feeder 1 69.0 34740 Plan Maintenance BPA Request None SAL 137942
08/04/2003 17:24 08/07/2003 08:05 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 3761 Plan Normally Out BPA Request Unknown EUG 137943
08/04/2003 19:03 08/04/2003 20:31 Alcoa: Evergreen/Vanalco 13.8kV Feeder 4A 13.8 88 Auto Foreign Trouble Foreign Trouble Customer Trouble None LGV 137944
08/05/2003 04:37 08/05/2003 04:37 Morrison: Coos-Curry Coop 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown EUG 137945
08/05/2003 04:37 08/05/2003 04:37 Norway: Coos-Curry Coop 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137946
08/05/2003 04:37 08/05/2003 04:37 Norway: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137947
08/05/2003 04:59 08/05/2003 04:59 Alvey: Lane Elec Coop 34.5kV Feeder 1 34.5 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 1 EUG 137948
08/05/2003 06:02 08/05/2003 06:02 Berrydale CLP: Central Linc PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137974
08/05/2003 06:49 08/05/2003 06:49 Wendson: Central Linc PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble 11 EUG 137975
08/05/2003 07:46 08/05/2003 07:46 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble 1 RED 137976
08/05/2003 07:46 08/05/2003 07:46 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble 1 RED 137977
08/05/2003 07:51 08/05/2003 07:51 Alderwood: Blachly-Lane Co 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137978
08/05/2003 07:51 08/05/2003 07:51 Cheshire: Emerald PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown EUG 137979
08/05/2003 07:51 08/05/2003 07:51 Cheshire: Emerald PUD 115kV Feeder 2 115.0 0 Auto Lightning BPA Trouble Unknown EUG 137980
08/05/2003 07:51 08/05/2003 07:51 Harrisburg: Consumers Power 115kV Feeder 1 to Greenberry 115.0 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137981
08/05/2003 07:51 08/05/2003 07:51 Halsey Mill: Emerald PUD 115kV Feeder 2 115.0 0 Auto Lightning BPA Trouble Unknown EUG 137982
08/05/2003 07:51 08/05/2003 07:51 Harrisburg: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137983
08/05/2003 07:51 08/05/2003 07:51 Junction City BLC: Blachly-Lane Co 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown EUG 137984
08/05/2003 07:52 08/05/2003 07:52 Froman: Consumers Power 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown EUG 137985
08/05/2003 07:52 08/05/2003 07:52 Lochner: Consumers Power 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137987
08/05/2003 08:14 08/05/2003 08:14 Wren: Consumers Power 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown EUG 137990
08/05/2003 08:15 08/05/2003 15:30 Selle: Northern Lights 13.8kV Feeder 1 13.8 435 Plan Maintenance BPA Request None SPK 137991
08/05/2003 08:20 08/05/2003 08:20 Eugene: EWEB (Eugene OR) 115kV Feeder 1 to Bethel 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 21 EUG 137992
08/05/2003 08:22 08/05/2003 08:27 Santiam: PacifiCorp (PACW) 69kV Feeder 1 69.0 5 Auto Foreign Trouble Foreign Utility Customer Trouble 45 SAL 137993
08/05/2003 08:41 08/11/2003 15:01 Big Eddy: Northrn Wasco PUD 115kV Feeder 1 115.0 9020 Plan Foreign Request Customer Request None TDA 137994
08/05/2003 10:52 08/05/2003 10:52 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 137995
08/05/2003 10:52 08/05/2003 10:52 Thatcher Junction: Forest Grove OR 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 137996
08/05/2003 10:52 08/05/2003 10:52 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 137997
08/05/2003 11:50 08/05/2003 11:50 Grand Avenue: Clark Public Util 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown LGV 137998
08/05/2003 11:50 08/05/2003 11:50 Mac Heights: Clark Public Util 115kV Feeder 2 115.0 0 Auto Lightning BPA Trouble Unknown LGV 137999
08/05/2003 11:50 08/05/2003 11:50 Sifton: Clark Public Util 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 41 LGV 138000
08/05/2003 11:53 08/05/2003 11:53 Ross: Clark Public Util 69kV Feeder 4 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 6 LGV 138001
08/05/2003 13:07 08/05/2003 13:07 Baker Creek: McMinnville W&L 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SAL 138002
08/05/2003 13:07 08/05/2003 13:07 Filbert: Forest Grove OR 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SAL 138003
08/05/2003 13:07 08/05/2003 13:07 Windishar: McMinnville W&L 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138004
08/05/2003 13:07 08/05/2003 13:07 McMinnville: McMinnville W&L 115kV Feeder 2 115.0 0 Auto Lightning BPA Trouble Unknown SAL 138005
08/05/2003 13:07 08/05/2003 13:07 McMinnville: McMinnville W&L 115kV Feeder 3 115.0 0 Auto Lightning BPA Trouble Unknown SAL 138006
08/05/2003 13:07 08/05/2003 13:10 Chemawa: Portland Gen Elec 57kV Feeder 1 57.0 3 Auto Foreign Trouble Foreign Trouble Customer Trouble 2 SAL 138007
08/05/2003 13:23 08/05/2003 13:23 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138008
08/05/2003 13:23 08/05/2003 13:23 Thatcher Junction: Forest Grove OR 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138009
08/05/2003 13:23 08/05/2003 13:23 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138010
08/05/2003 13:58 08/05/2003 13:58 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138011
08/05/2003 13:58 08/05/2003 13:58 Thatcher Junction: Forest Grove OR 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138012
08/05/2003 13:58 08/05/2003 13:58 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138013
08/05/2003 14:01 08/05/2003 14:01 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138014
08/05/2003 14:01 08/05/2003 14:01 Thatcher Junction: Forest Grove OR 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138015
08/05/2003 14:01 08/05/2003 14:01 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138016
08/05/2003 14:32 08/05/2003 14:32 Dutch Canyon: Columbia Rivr PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown LGV 138017
08/05/2003 14:32 08/05/2003 14:32 Tarbell: Columbia Rivr PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown LGV 138018
08/05/2003 14:32 08/05/2003 14:32 Warren: West Oregon Elec 34.5kV Feeder 1 34.5 0 Auto Lightning Lightning BPA Trouble Unknown LGV 138019
08/05/2003 15:30 08/05/2003 15:30 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble 4 TDA 138020
08/05/2003 15:30 08/05/2003 15:30 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble 1 TDA 138021
08/05/2003 15:30 08/05/2003 15:30 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble 1 TDA 138022
08/05/2003 15:32 08/05/2003 15:32 Goble: Columbia Rivr PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown LGV 138023
08/05/2003 15:32 08/05/2003 15:32 Rainier: Clatskanie PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown LGV 138024
08/05/2003 15:32 08/05/2003 15:32 Rainier: Columbia Rivr PUD 12.5kV Feeder 1 by Clatskanie PUD 12.5 0 Auto Lightning BPA Trouble Unknown LGV 138025
08/05/2003 15:43 08/05/2003 15:43 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble None TDA 138026
08/05/2003 15:43 08/05/2003 15:43 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble 1 TDA 138027
08/05/2003 15:43 08/05/2003 15:43 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble 1 TDA 138028
08/05/2003 15:56 08/05/2003 16:17 Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 115.0 21 Auto Lightning BPA Trouble 19 TDA 138029
08/05/2003 16:08 08/05/2003 19:38 De Moss: Wasco Elec Coop 69kV Feeder 1 to Klondike 69.0 210 Auto Foreign Trouble Foreign Utility Customer Trouble 2 TDA 138030
08/05/2003 16:25 08/05/2003 16:35 Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 115.0 10 Auto Lightning BPA Trouble None TDA 138031
08/05/2003 16:45 08/05/2003 16:45 Spearfish: Klickitat Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble 3 TDA 138032
08/05/2003 16:45 08/05/2003 16:45 Lyle: Klickitat Co PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138033
08/05/2003 16:47 08/05/2003 16:47 Plymouth: Benton REA 115kV Feeder 1 by Benton Co PUD 115.0 0 Auto Lightning BPA Trouble Unknown TRI 138034
08/05/2003 16:47 08/05/2003 16:47 Berrian: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown TRI 138035
08/05/2003 16:47 08/05/2003 16:47 H2F: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown TRI 138036
08/05/2003 16:47 08/05/2003 16:47 Nine Canyon: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown TRI 138037
08/05/2003 17:21 08/05/2003 21:29 Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 115.0 248 Auto Lightning BPA Trouble None TDA 138038
08/05/2003 18:01 08/05/2003 18:01 Horse Heaven: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble 73 TRI 138039
08/05/2003 18:07 08/05/2003 18:07 Alfalfa: USBIA Wapato 34.5kV Feeder 2 34.5 0 Auto Lightning Lightning BPA Trouble Unknown TRI 138125
08/05/2003 18:07 08/05/2003 18:07 Alfalfa: Benton REA 34.5kV Feeder 2 34.5 0 Auto Lightning Lightning BPA Trouble Unknown TRI 138126
08/05/2003 19:54 08/05/2003 19:54 Milton: Milton-Freewater 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TRI 138040
08/05/2003 19:54 08/05/2003 19:54 Whitman: Columbia REA 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TRI 138041
08/05/2003 21:05 08/06/2003 01:05 Santiam: Consumers Power 69kV Feeder 1 69.0 240 Auto Foreign Trouble Foreign Utility Customer Trouble 2 SAL 138042
08/06/2003 00:37 08/06/2003 02:13 Camp: Avista Corp 230kV Feeder 1 230.0 96 Auto Lightning Lightning BPA Trouble Unknown KAL 138043
08/06/2003 00:37 08/06/2003 02:13 Camp: Northern Lights 13.8kV Feeder 1 by Avista Corp 13.8 96 Auto Lightning Lightning BPA Trouble Unknown KAL 138044
08/06/2003 00:37 08/06/2003 02:13 Trout Creek: Northern Lights 230kV Feeder 1 230.0 96 Auto Lightning BPA Trouble Unknown KAL 138045
08/06/2003 01:30 08/06/2003 01:31 Santiam: Consumers Power 69kV Feeder 1 69.0 1 Plan Foreign Request Customer Request None SAL 138046
08/06/2003 01:32 08/06/2003 01:37 Santiam: Consumers Power 69kV Feeder 1 69.0 5 Plan Foreign Request Customer Request None SAL 138047
08/06/2003 05:59 08/06/2003 05:59 Selle: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138127
08/06/2003 05:59 08/06/2003 05:59 Samuels: Northern Lights 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138128
08/06/2003 05:59 08/06/2003 05:59 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138129
08/06/2003 05:59 08/06/2003 05:59 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138130
08/06/2003 05:59 08/06/2003 05:59 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138131
08/06/2003 19:56 08/06/2003 20:07 Mountain Avenue: City of Ashland 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 11 Auto Foreign Trouble Transferor Trouble Unknown EUG 138132
08/06/2003 21:48 08/06/2003 21:48 Tumble Creek: Consumers Power 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138133
08/06/2003 21:48 08/06/2003 21:48 Dalreed: PacifiCorp (PACW) 230kV Feeder 1 230.0 0 Auto Lightning BPA Trouble Unknown TRI 138134
08/06/2003 22:38 08/06/2003 22:38 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138135
08/06/2003 22:38 08/06/2003 22:38 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138136
08/06/2003 22:38 08/06/2003 22:38 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TDA 138137
08/07/2003 00:33 08/07/2003 00:33 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138138
08/07/2003 00:33 08/07/2003 00:33 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TDA 138139
08/07/2003 00:33 08/07/2003 00:33 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138140
08/07/2003 00:37 08/07/2003 00:37 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138141
08/07/2003 00:37 08/07/2003 00:37 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TDA 138142
08/07/2003 00:37 08/07/2003 00:37 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138143
08/07/2003 00:40 08/07/2003 00:40 De Moss: Wasco Elec Coop 69kV Feeder 2 to Rosebush 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown TDA 138144
08/07/2003 00:44 08/07/2003 00:44 De Moss: Wasco Elec Coop 69kV Feeder 2 to Rosebush 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown TDA 138145
08/07/2003 00:46 08/07/2003 00:46 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138146
08/07/2003 00:46 08/07/2003 00:46 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138147
08/07/2003 00:46 08/07/2003 00:46 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TDA 138148
08/07/2003 00:50 08/07/2003 00:50 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138149
08/07/2003 00:50 08/07/2003 00:50 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TDA 138150
08/07/2003 00:50 08/07/2003 00:50 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138151
08/07/2003 00:51 08/07/2003 00:51 De Moss: Wasco Elec Coop 69kV Feeder 2 to Rosebush 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown TDA 138152
08/07/2003 00:52 08/07/2003 00:52 Ione: Columbia Basin 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown TRI 138153
08/07/2003 00:52 08/07/2003 00:52 Sand Hollow: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TRI 138154
08/07/2003 00:53 08/07/2003 00:53 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138155
08/07/2003 00:53 08/07/2003 00:53 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TDA 138156
08/07/2003 00:53 08/07/2003 00:53 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138157
08/07/2003 00:54 08/07/2003 00:54 Condon: Columbia Basin 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138158
08/07/2003 00:54 08/07/2003 00:54 Condon Wind: SeaWest Power 69kV Feeder 1 69.0 0 Auto Lightning BPA Trouble Unknown TDA 138159
08/07/2003 00:54 08/07/2003 00:54 Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown TDA 138160
08/07/2003 01:02 08/07/2003 03:07 Alfalfa: Benton REA 34.5kV Feeder 1 34.5 125 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TRI 138161
08/07/2003 01:02 08/07/2003 03:07 Alfalfa: USBIA Wapato 34.5kV Feeder 1 34.5 125 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TRI 138162
08/07/2003 01:04 08/07/2003 01:04 De Moss: Wasco Elec Coop 69kV Feeder 1 to Klondike 69.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 19 TDA 138163
08/07/2003 01:15 08/07/2003 01:16 Dalreed: PacifiCorp (PACW) 230kV Feeder 1 230.0 1 Auto Lightning BPA Trouble Unknown TRI 138164
08/07/2003 01:15 08/07/2003 01:16 Tumble Creek: Consumers Power 24.9kV Feeder 1 24.9 1 Auto Lightning Lightning BPA Trouble Unknown SAL 138165
08/07/2003 01:19 08/07/2003 01:19 Horse Heaven: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 61 TRI 138166
08/07/2003 01:22 08/07/2003 01:23 Parkdale: Hood River Elec 12.5kV Feeder 1 12.5 1 Auto Lightning Lightning BPA Trouble Unknown TDA 138167
08/07/2003 02:55 08/07/2003 06:56 Muddy Ranch: Wasco Elec Coop 69kV Feeder 1 69.0 241 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TDA 138168
08/07/2003 02:55 08/07/2003 05:37 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 162 Auto Lightning BPA Trouble Unknown TDA 138169
08/07/2003 02:55 08/07/2003 06:28 Antelope WEC: Wasco Elec Coop 69kV Feeder 1 69.0 213 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TDA 138170
08/07/2003 02:55 08/07/2003 06:28 Bakeoven: Wasco Elec Coop 69kV Feeder 1 69.0 213 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TDA 138171
08/07/2003 02:55 08/07/2003 05:37 Fossil: Columbia Basin 69kV Feeder 1 69.0 162 Auto Lightning Lightning BPA Trouble Unknown TDA 138219
08/07/2003 03:50 08/07/2003 03:50 Dalreed: PacifiCorp (PACW) 230kV Feeder 1 230.0 0 Auto Lightning BPA Trouble Unknown TRI 138172
08/07/2003 03:50 08/07/2003 03:50 Tumble Creek: Consumers Power 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138173
08/07/2003 04:25 08/07/2003 04:25 Dalreed: PacifiCorp (PACW) 230kV Feeder 1 230.0 0 Auto Lightning BPA Trouble Unknown TRI 138174
08/07/2003 04:25 08/07/2003 04:25 Tumble Creek: Consumers Power 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown SAL 138175
08/07/2003 04:52 08/07/2003 04:52 Horse Heaven: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TRI 138176
08/07/2003 06:00 08/07/2003 06:00 Sullivan: Vera Water & Pwr 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 138220
08/07/2003 06:00 08/07/2003 06:00 Valley Way: Inland P+L 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 138221
08/07/2003 06:00 08/07/2003 06:00 Valley Way: Vera Water & Pwr 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 138222
08/07/2003 06:00 08/07/2003 06:00 Vera: Inland P+L 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 138223
08/07/2003 06:00 08/07/2003 06:00 Vera: Vera Water & Pwr 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown SPK 138224
08/07/2003 07:45 08/07/2003 17:15 Samuels: Northern Lights 115kV Feeder 1 115.0 570 Plan Maintenance BPA Request None SPK 138225
08/07/2003 14:28 08/08/2003 07:50 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 1042 Plan Normally Out BPA Request None EUG 138226
08/08/2003 14:11 08/11/2003 11:13 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 4142 Plan Normally Out BPA Request Unknown EUG 138239
08/10/2003 00:01 08/10/2003 05:05 Carson: Skamania Co PUD 12.5kV Feeder 1 12.5 304 Plan Maintenance BPA Request Unknown LGV 138257
08/11/2003 07:37 08/14/2003 13:30 Chemawa: Portland Gen Elec 57kV Feeder 3 57.0 4673 Plan Maintenance BPA Request None SAL 138264
08/11/2003 08:07 08/18/2003 09:25 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 10158 Plan Foreign Request Customer Request None SNO 138265
08/11/2003 09:34 08/11/2003 10:45 Creston: Inland P+L 34.5kV Feeder 1 34.5 71 Plan Maintenance BPA Request None SPK 138266
08/11/2003 09:34 08/11/2003 10:45 Creston: Inland P+L 12.5kV Feeder 1 12.5 71 Plan Maintenance BPA Request None SPK 138267
08/11/2003 09:43 08/11/2003 15:45 Warren: West Oregon Elec 34.5kV Feeder 1 34.5 362 Plan Foreign Request Customer Request None LGV 138268
08/11/2003 10:01 08/13/2003 15:04 Alvey: Sprngfld Util Brd 115kV Feeder 1 to Springfield 115.0 3183 Plan Foreign Request Customer Request Unknown EUG 138325
08/11/2003 14:52 08/12/2003 08:08 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 1036 Plan Normally Out BPA Request None EUG 138269
08/11/2003 15:31 08/11/2003 15:31 Targhee: Fall River E Coop 46kV Feeder N 46.0 0 Auto Lightning Lightning BPA Trouble 3 IDF 138270
08/11/2003 22:09 08/11/2003 22:09 Foster: PacifiCorp (PACW) 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown EUG 138271
08/11/2003 22:09 08/11/2003 22:09 North Butte: Consumers Power 12.5kV Feeder 1 12.5 0 Auto Unknown Unknown Unknown Trouble Unknown EUG 138272
08/12/2003 01:44 08/12/2003 01:44 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 138273
08/12/2003 01:44 08/12/2003 01:44 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 138274
08/12/2003 09:25 08/13/2003 13:35 Surprise Lake: Milton WA 12.5kV Feeder 1 by Tacoma Power 12.5 1690 Plan Foreign Request Customer Request None COV 138295
08/12/2003 09:52 08/12/2003 16:11 Warren: West Oregon Elec 34.5kV Feeder 1 34.5 379 Plan Foreign Request Customer Request None LGV 138296
08/12/2003 10:13   Conkelley: Col Falls Alum Co 13.8kV Feeder 1 13.8 still out Plan Maintenance BPA Request None KAL 138297
08/12/2003 10:13   Conkelley: Col Falls Alum Co 13.8kV Feeder 2 13.8 still out Plan Maintenance BPA Request None KAL 138298
08/12/2003 10:13   Conkelley: Col Falls Alum Co 13.8kV Feeder 3 13.8 still out Plan Maintenance BPA Request None KAL 138299
08/12/2003 14:22 11/06/2003 07:52 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 123510 Plan Normally Out BPA Request None EUG 138300
08/13/2003 01:50 08/13/2003 02:24 Pleasant Hill: Emerald PUD 115kV Feeder 1 115.0 34 Plan Switching BPA Request Unknown EUG 138301
08/13/2003 02:10 08/13/2003 06:02 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 232 Plan Foreign Request Customer Request Unknown SPK 138302
08/13/2003 02:10 08/13/2003 05:35 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 205 Plan Foreign Request Customer Request Unknown SPK 138303
08/13/2003 02:10 08/13/2003 05:35 North Bench: Northern Lights 13.8kV Feeder 1 13.8 205 Plan Foreign Request Customer Request Unknown SPK 138304
08/13/2003 02:10 08/13/2003 05:35 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 205 Plan Foreign Request Customer Request None SPK 138305
08/13/2003 08:22 08/13/2003 11:55 Longview: Cowlitz Co PUD 115kV Feeder 5 115.0 213 Plan Maintenance BPA Request None LGV 138326
08/14/2003 08:52 08/14/2003 15:33 Troutdale: Portland Gen Elec 230kV Feeder 1 230.0 401 Plan Maintenance BPA Request None LGV 138344
08/14/2003 09:38 08/29/2003 11:53 Milton: Milton-Freewater 69kV Feeder 1 69.0 21735 Plan Foreign Request Customer Request None TRI 138345
08/14/2003 18:00 08/14/2003 18:00 Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown SPK 138346
08/14/2003 18:00 08/14/2003 18:00 Metaline Falls: Pend Oreille PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 138347
08/14/2003 18:00 08/14/2003 18:00 Spirit: Avista Corp 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 138348
08/15/2003 12:00 08/30/2003 13:50 Conkelley: Col Falls Alum Co 13.8kV Feeder 5 13.8 21710 Plan Maintenance BPA Request None KAL 138561
08/16/2003 01:02 08/16/2003 02:54 Forest Grove: Forest Grove OR 115kV Feeder 2 115.0 112 Auto Foreign Trouble Foreign Trouble Customer Trouble 6 SAL 138382
08/16/2003 01:02 08/16/2003 02:50 Forest Grove: Portland Gen Elec 115kV Feeder 1 115.0 108 Auto Foreign Trouble Foreign Trouble Customer Trouble 41 SAL 138383
08/16/2003 01:02 08/16/2003 02:55 Forest Grove: Forest Grove OR 115kV Feeder 1 115.0 113 Auto Foreign Trouble Foreign Trouble Customer Trouble 7 SAL 138384
08/16/2003 02:16 08/16/2003 02:16 Foster Creek NVEC: Nespelem Valley 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown WEN 138385
08/16/2003 02:16 08/16/2003 02:16 Nilles Corner: Douglas Co PUD 115kV Feeder 1 115.0 0 Auto Lightning BPA Trouble Unknown WEN 138386
08/16/2003 15:56 08/16/2003 15:56 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown KAL 138387
08/16/2003 15:56 08/16/2003 15:56 Troy: City of Troy 13.8kV Feeder 1 13.8 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown KAL 138388
08/16/2003 15:56 08/16/2003 15:56 Troy: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown KAL 138389
08/16/2003 15:56 08/16/2003 15:56 Troy: Northern Lights 13.8kV Feeder 2 13.8 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown KAL 138390
08/16/2003 15:56 08/16/2003 15:56 Yaak: Northern Lights 12.5kV Feeder 1 12.5 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown KAL 138391
08/16/2003 15:56 08/16/2003 15:56 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown SPK 138392
08/16/2003 15:56 08/16/2003 15:56 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 0 Auto Bird or Animal Forced (Configuration) BPA Trouble Unknown SPK 138393
08/16/2003 15:56 08/16/2003 15:56 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown SPK 138394
08/16/2003 15:56 08/16/2003 15:56 North Bench: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown SPK 138395
08/16/2003 15:56 08/16/2003 15:56 Troy: Northern Lights 115kV Feeder 1 to Asarco 115.0 0 Auto Bird or Animal Bird or Animal BPA Trouble Unknown KAL 138396
08/16/2003 20:26 08/16/2003 20:27 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 1 Plan Switching BPA Request 9 KAL 138397
08/18/2003 08:16 08/18/2003 11:50 First Street: City of Richland 115kV Feeder 2 115.0 214 Plan Foreign Request Customer Request Unknown TRI 138408
08/19/2003 02:01 08/19/2003 02:36 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 35 Plan Foreign Request Customer Request None SPK 138428
08/19/2003 02:08 08/19/2003 02:37 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 29 Plan Foreign Request Customer Request None SPK 138429
08/19/2003 02:08 08/19/2003 02:37 North Bench: Northern Lights 13.8kV Feeder 1 13.8 29 Plan Foreign Request Customer Request None SPK 138430
08/19/2003 02:08 08/19/2003 02:37 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 29 Plan Foreign Request Customer Request None SPK 138431
08/19/2003 07:22 08/20/2003 08:28 Bandon: Bandon OR 12.5kV Feeder 1 12.5 1506 Plan Maintenance BPA Request None EUG 138432
08/19/2003 08:13 08/19/2003 11:33 McNary: PacifiCorp (PACW) 69kV Feeder 1 69.0 200 Plan Maintenance BPA Request None TRI 138433
08/19/2003 08:30 08/29/2003 15:53 Sno-King: Snohomish Co PUD 115kV Feeder 2 115.0 14843 Plan Foreign Request Customer Request None SNO 138434
08/19/2003 16:56 08/19/2003 20:54 Longview: Cowlitz Co PUD 69kV Feeder 1 69.0 238 Plan Forced BPA Request None LGV 138435
08/19/2003 16:56 08/19/2003 20:54 Longview: Cowlitz Co PUD 69kV Feeder 2 69.0 238 Plan Forced BPA Request None LGV 138436
08/19/2003 19:45 08/19/2003 22:54 East Grangeville: Idaho L+P Coop 13.8kV Feeder 1 by Avista Corp 13.8 189 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SPK 138453
08/20/2003 12:05 08/20/2003 15:01 Longview: Cowlitz Co PUD 69kV Feeder 1 69.0 176 Plan Maintenance BPA Request None LGV 138454
08/20/2003 12:05 08/20/2003 15:01 Longview: Cowlitz Co PUD 69kV Feeder 2 69.0 176 Plan Maintenance BPA Request None LGV 138455
08/21/2003 17:19 08/21/2003 17:19 Raft: Raft River Elec 24.9kV Feeder 1 by Idaho Power Co 24.9 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown IDF 138465
08/22/2003 14:45 08/22/2003 16:00 Silver Bow: Vigilante E Coop 69kV Feeder 1 69.0 75 Auto Forced (Configuration) Lightning BPA Trouble 2 KAL 138475
08/22/2003 14:45 08/25/2003 10:07 Anaconda: NorthWestern Ener 115kV Feeder 2 115.0 4042 Auto Forced (Configuration) Lightning BPA Trouble None KAL 138476
08/22/2003 15:47 08/22/2003 16:11 Port Angeles: Port Angeles WA 69kV Feeder 1 to Nippon 69.0 24 Auto Foreign Trouble Foreign Trouble Customer Trouble 14 OLY 138477
08/22/2003 18:49 08/22/2003 18:49 Spar Canyon: Salmon River Coop 230kV Feeder 1 230.0 0 Auto Unknown Foreign Utility Unknown Trouble 2 IDF 138478
08/22/2003 18:50 08/22/2003 18:50 Spar Canyon: Salmon River Coop 230kV Feeder 1 230.0 0 Auto Unknown Foreign Utility Unknown Trouble 1 IDF 138479
08/23/2003 05:53 08/23/2003 05:53 Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ 14.4 0 Auto Unknown Unknown Trouble Unknown COV 138480
08/23/2003 14:21 08/23/2003 14:25 Creston: Inland P+L 34.5kV Feeder 1 34.5 4 Auto Unknown Unknown Unknown Trouble Unknown SPK 138490
08/23/2003 14:21 08/23/2003 14:25 Creston: Inland P+L 12.5kV Feeder 1 12.5 4 Auto Unknown Unknown Unknown Trouble Unknown SPK 138491
08/23/2003 14:21 08/23/2003 14:25 Grand Coulee #2 Metering Point: Grant Co PUD 115kV Feeder 1 115.0 4 Auto Unknown Unknown Unknown Trouble Unknown SPK 138492
08/23/2003 14:21 08/23/2003 14:25 Wagner Lake: Inland P+L 34.5kV Feeder 1 by Avista Corp 34.5 4 Auto Unknown Unknown Unknown Trouble Unknown SPK 138493
08/23/2003 14:21 08/23/2003 14:25 Wilbur: Avista Corp 115kV Feeder 1 115.0 4 Auto Unknown Unknown Trouble Unknown SPK 138494
08/23/2003 21:34 08/24/2003 08:04 Lynch Creek: Eatonville WA 12.5kV Feeder 1 by Tacoma Power 12.5 630 Plan Maintenance BPA Request None COV 138495
08/23/2003 21:34 08/24/2003 08:04 Lynch Creek: Ohop Mutual Light 12.5kV Feeder 1 by Tacoma Power 12.5 630 Plan Maintenance BPA Request None COV 138496
08/24/2003 00:01 08/24/2003 05:28 Cape Horn: Skamania Co PUD 12.5kV Feeder 1 12.5 327 Plan Maintenance BPA Request None LGV 138502
08/24/2003 07:51 08/24/2003 16:48 Parker: Blachly-Lane Co 115kV Feeder 1 115.0 537 Plan Construction BPA Request None EUG 138503
08/25/2003 08:41 09/23/2003 09:07 Alvey: Sprngfld Util Brd 115kV Feeder 1 to 10th Street 115.0 41786 Plan Foreign Request Customer Request None EUG 138510
08/25/2003 12:51 08/25/2003 15:49 Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 115.0 178 Plan Forced BPA Request None TDA 138511
08/26/2003 08:01 08/26/2003 17:20 Albany: PacifiCorp (PACW) 115kV Feeder 1 115.0 559 Plan Construction BPA Request Unknown EUG 138538
08/26/2003 08:20 08/26/2003 09:04 Centralia: Centralia City Lt 69kV Feeder 1 69.0 44 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 138525
08/27/2003 05:03 08/27/2003 10:45 Sappho: Clallam Co PUD 69kV Feeder 2 69.0 342 Plan Foreign Request Customer Request Unknown OLY 138540
08/27/2003 05:03 08/27/2003 11:12 Sappho: Clallam Co PUD 69kV Feeder 1 69.0 369 Plan Foreign Request Customer Request None OLY 138541
08/28/2003 09:44 08/29/2003 14:38 Burnt Woods: Consumers Power 24.9kV Feeder 1 24.9 1734 Plan Maintenance BPA Request None EUG 138550
08/29/2003 12:44 09/03/2003 11:23 Conkelley: Col Falls Alum Co 13.8kV Feeder S2 13.8 7119 Plan Maintenance BPA Request None KAL 138562
09/01/2003 14:49 09/01/2003 14:50 Stillwater: Lincoln Elec - MT 115kV Feeder 1 115.0 1 Auto Unknown Unknown Trouble Unknown KAL 138587
09/01/2003 14:49 09/01/2003 14:50 Trego: Lincoln Elec - MT 115kV Feeder 1 115.0 1 Auto Unknown Unknown Trouble Unknown KAL 138588
09/01/2003 14:49 09/01/2003 14:50 Trego: Lincoln Elec - MT 115kV Feeder 2 115.0 1 Auto Unknown Unknown Trouble Unknown KAL 138589
09/02/2003 10:17 09/02/2003 14:13 Eugene: Lane Elec Coop 34.5kV Feeder 1 34.5 236 Plan Foreign Request Customer Request 1 EUG 138593
09/02/2003 19:39 09/03/2003 06:57 Cascade Locks: Cascade Locks OR 115kV Feeder 1 115.0 678 Plan Foreign Request Customer Request None LGV 138594
09/03/2003 01:26 09/03/2003 06:41 Cascade Locks: Cascade Locks OR 13.8kV Feeder 1 13.8 315 Plan Foreign Request Customer Request None LGV 138595
09/03/2003 07:28 09/04/2003 09:47 Conkelley: Col Falls Alum Co 13.8kV Feeder 5 13.8 1579 Plan Foreign Request Customer Request None KAL 138609
09/04/2003 09:50 09/04/2003 11:25 Reedsport: Central Linc PUD 115kV Feeder 1 115.0 95 Auto Tree cut BPA Trouble Unknown EUG 138626
09/04/2003 09:50 09/04/2003 11:25 Reedsport: Douglas Elec Coop 12.5kV Feeder 1 12.5 95 Auto Tree cut Tree cut BPA Trouble Unknown EUG 138627
09/04/2003 09:50 09/04/2003 10:13 Glasgow: Central Linc PUD 115kV Feeder 1 115.0 23 Auto Tree cut Tree cut BPA Trouble Unknown EUG 138628
09/04/2003 09:50 09/04/2003 11:25 Hauser CLP: Central Linc PUD 115kV Feeder 1 115.0 95 Auto Tree cut BPA Trouble None EUG 138629
09/04/2003 09:50 09/04/2003 11:25 Lakeside CLP: Central Linc PUD 115kV Feeder 1 115.0 95 Auto Tree cut Tree cut BPA Trouble Unknown EUG 138630
09/04/2003 09:50 09/04/2003 10:13 Sumner: Coos-Curry Coop 115kV Feeder 1 115.0 23 Auto Unknown Tree cut BPA Trouble Unknown EUG 138631
09/04/2003 09:50 09/04/2003 09:55 Morrison: Coos-Curry Coop 115kV Feeder 1 115.0 5 Auto Unknown BPA Trouble Unknown EUG 138632
09/04/2003 09:50 09/04/2003 09:55 Norway: Coos-Curry Coop 12.5kV Feeder 1 12.5 5 Auto Unknown Tree cut BPA Trouble Unknown EUG 138633
09/04/2003 09:50 09/04/2003 10:00 Fairview CCEC: Coos-Curry Coop 115kV Feeder 1 115.0 10 Auto Unknown Dispatcher BPA Trouble Unknown EUG 138634
09/04/2003 21:12 09/04/2003 21:12 Canby: Surprise Valley 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 138635
09/04/2003 21:16 09/04/2003 21:16 Canby: Surprise Valley 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 138636
09/04/2003 21:31 09/04/2003 21:31 Canby: Surprise Valley 69kV Feeder 1 69.0 0 Auto Lightning Lightning BPA Trouble Unknown RED 138637
09/05/2003 11:31 09/16/2003 08:54 Alvey: Sprngfld Util Brd 115kV Feeder 1 to Springfield 115.0 15683 Plan Foreign Request Customer Request None EUG 138665
09/06/2003 14:27 09/06/2003 14:27 Port Angeles: Port Angeles WA 69kV Feeder 2 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 8 OLY 138678
09/07/2003 08:53 09/07/2003 09:52 Surprise Lake: Milton WA 12.5kV Feeder 1 by Tacoma Power 12.5 59 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown COV 138684
09/07/2003 13:06 09/07/2003 13:06 Ovando: Missoula E Coop 69kV Feeder 1 by NorthWestern Ener 69.0 0 Auto Unknown Unknown Unknown Trouble Unknown KAL 138685
09/08/2003 02:08 09/08/2003 03:25 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 77 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown SPK 138686
09/08/2003 02:08 09/08/2003 03:25 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 77 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown SPK 138687
09/08/2003 02:08 09/08/2003 03:25 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 77 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown SPK 138688
09/08/2003 02:08 09/08/2003 03:25 Samuels: Northern Lights 115kV Feeder 1 115.0 77 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown SPK 138689
09/08/2003 02:08 09/08/2003 11:38 Selle: Northern Lights 13.8kV Feeder 1 13.8 570 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble None SPK 138690
09/08/2003 02:08 09/08/2003 03:28 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 80 Auto Terminal Equipment Failure Forced (Configuration) BPA Trouble Unknown SPK 138691
09/08/2003 02:08 09/08/2003 03:28 North Bench: Northern Lights 13.8kV Feeder 1 13.8 80 Auto Terminal Equipment Failure Forced (Configuration) BPA Trouble Unknown SPK 138692
09/08/2003 02:08 09/08/2003 03:28 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 80 Auto Terminal Equipment Failure Forced (Configuration) BPA Trouble Unknown SPK 138693
09/08/2003 04:54 09/08/2003 04:55 Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ 14.4 1 Auto Foreign Trouble Transferor Trouble Unknown COV 138694
09/08/2003 10:18 09/15/2003 09:52 Madison: Fall River E Coop 46kV Feeder 1 46.0 10054 Plan Maintenance BPA Request None IDF 138706
09/09/2003 04:40 09/09/2003 05:36 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 56 Plan Construction BPA Request None SAL 138731
09/09/2003 06:51 09/09/2003 06:57 Chambers: Inland P+L 115kV Feeder 1 by Avista Corp 115.0 6 Auto Foreign Trouble Transferor Trouble Unknown SPK 138732
09/09/2003 06:51 09/09/2003 06:51 Hangman: Inland P+L 115kV Feeder 1 by Avista Corp 115.0 0 Auto Foreign Trouble Transferor Trouble Unknown SPK 138733
09/09/2003 06:51 09/09/2003 07:28 Spangle: Inland P+L 13.8kV Feeder 1 by Avista Corp 13.8 37 Auto Foreign Trouble Transferor Trouble Unknown SPK 138734
09/09/2003 06:51 09/09/2003 07:28 Rosalia: Inland P+L 13.8kV Feeder 1 by Avista Corp 13.8 37 Auto Foreign Trouble Transferor Trouble Unknown TRI 138735
09/09/2003 08:31 09/24/2003 10:56 Monmouth: Monmouth OR 12.5kV Feeder 1 12.5 21745 Plan Foreign Request Customer Request None SAL 138736
09/09/2003 09:03 09/24/2003 10:56 Monmouth: Consumers Power 12.5kV Feeder 1 12.5 21713 Plan Foreign Request Customer Request None SAL 138737
09/10/2003 04:04 09/10/2003 04:04 Columbia Falls: Flathead E Coop 34.5kV Feeder 1 34.5 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 3 KAL 138738
09/11/2003 02:01 09/11/2003 03:46 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 105 Plan Foreign Request Customer Request 3 SPK 138751
09/11/2003 02:01 09/11/2003 03:46 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 105 Plan Foreign Request Other Customer Request Unknown SPK 138752
09/11/2003 02:01 09/11/2003 03:46 North Bench: Northern Lights 13.8kV Feeder 1 13.8 105 Plan Foreign Request Customer Request Unknown SPK 138753
09/11/2003 23:08 09/11/2003 23:08 Lion Mountain: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble 18 KAL 138768
09/12/2003 09:22   Longview: Longview Alum LLC 13.8kV Feeder B 13.8 still out Plan Foreign Request Customer Request Unknown LGV 138784
09/14/2003 00:20 09/14/2003 05:49 Centralia: Centralia City Lt 69kV Feeder 1 69.0 329 Plan Foreign Request Customer Request None OLY 138802
09/14/2003 09:00 09/14/2003 09:05 Outlook: PacifiCorp (PACW) 230kV Feeder 1 230.0 5 Plan Switching BPA Request None TRI 138803
09/15/2003 19:07 09/15/2003 19:07 Sifton: Clark Public Util 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 56 LGV 138811
09/15/2003 19:35 09/15/2003 20:14 Sifton: Clark Public Util 115kV Feeder 1 115.0 39 Plan Foreign Request Customer Request None LGV 138812
09/16/2003 07:52 09/17/2003 16:00 Bandon: Bandon OR 12.5kV Feeder 1 12.5 1928 Plan Maintenance BPA Request None EUG 138829
09/16/2003 08:52 09/16/2003 15:52 Sifton: Clark Public Util 115kV Feeder 3 115.0 420 Plan Maintenance BPA Request None LGV 138830
09/16/2003 13:33 09/17/2003 16:00 Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 12.5 1587 Plan Maintenance BPA Request None EUG 138831
09/16/2003 15:09 09/17/2003 16:00 Bandon: Coos-Curry Coop 12.5kV Feeder 1 12.5 1491 Plan Maintenance BPA Request None EUG 138832
09/16/2003 16:42 09/16/2003 17:26 Macks Inn: Fall River E Coop 46kV Feeder 2 46.0 44 Auto Foreign Trouble Foreign Trouble Customer Trouble 3 IDF 138833
09/16/2003 17:53 09/16/2003 17:53 Sullivan: Vera Water & Pwr 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 138834
09/16/2003 17:53 09/16/2003 17:53 Valley Way: Inland P+L 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 138835
09/16/2003 17:53 09/16/2003 17:53 Valley Way: Vera Water & Pwr 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 138836
09/16/2003 17:53 09/16/2003 17:53 Vera: Inland P+L 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 138837
09/16/2003 17:53 09/16/2003 17:53 Vera: Vera Water & Pwr 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 138838
09/17/2003 08:17 09/17/2003 15:08 Sifton: Clark Public Util 115kV Feeder 2 115.0 411 Plan Maintenance BPA Request None LGV 138851
09/18/2003 08:16 09/18/2003 15:42 Sifton: Clark Public Util 115kV Feeder 5 115.0 446 Plan Maintenance BPA Request None LGV 138860
09/18/2003 23:00 09/19/2003 03:15 Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp 69.0 255 Plan Foreign Request Customer Request Unknown SPK 138861
09/19/2003 13:00 09/20/2003 06:15 Longview: Cowlitz Co PUD 115kV Feeder 5 115.0 1035 Plan Foreign Request Customer Request None LGV 138871
09/19/2003 18:35 09/19/2003 18:36 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 1 Auto Lightning Forced (Configuration) BPA Trouble Unknown SPK 138872
09/19/2003 18:35 09/19/2003 18:35 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138873
09/19/2003 18:35 09/19/2003 18:35 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138874
09/19/2003 18:35 09/19/2003 18:35 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138875
09/19/2003 18:35 09/19/2003 18:35 North Bench: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown SPK 138876
09/19/2003 18:35 09/19/2003 18:35 Troy: City of Troy 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138877
09/19/2003 18:35 09/19/2003 18:35 Troy: Northern Lights 115kV Feeder 1 to Asarco 115.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138878
09/19/2003 18:35 09/19/2003 18:35 Troy: Northern Lights 13.8kV Feeder 1 13.8 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138879
09/19/2003 18:35 09/19/2003 18:35 Troy: Northern Lights 13.8kV Feeder 2 13.8 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138880
09/19/2003 18:35 09/19/2003 18:35 Yaak: Northern Lights 12.5kV Feeder 1 12.5 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138881
09/19/2003 19:01 09/19/2003 19:01 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138882
09/19/2003 19:01 09/19/2003 19:01 Trumbull Creek: Flathead E Coop 230kV Feeder 1 230.0 0 Auto Lightning Lightning BPA Trouble Unknown KAL 138883
09/20/2003 06:15 09/20/2003 18:08 Longview: Cowlitz Co PUD 115kV Feeder 5 115.0 713 Plan Construction BPA Request None LGV 138896
09/20/2003 18:08 09/22/2003 08:45 Longview: Cowlitz Co PUD 115kV Feeder 5 115.0 2317 Plan Foreign Request Customer Request None LGV 138897
09/22/2003 00:08 09/22/2003 05:02 Cedarville Junction: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) 69.0 294 Plan Maintenance BPA Request 1 RED 138913
09/22/2003 07:33 09/22/2003 20:47 Sifton: Clark Public Util 115kV Feeder 1 115.0 794 Plan Maintenance BPA Request None LGV 138930
09/22/2003 08:52 09/22/2003 19:30 Round Valley: Salmon River Coop 69kV Feeder 1 69.0 638 Plan Maintenance BPA Request None IDF 138931
09/22/2003 09:50 09/22/2003 18:55 Spar Canyon: Salmon River Coop 230kV Feeder 1 230.0 545 Plan Maintenance BPA Request None IDF 138932
09/22/2003 09:50 09/22/2003 18:58 Lost River: Lost River Elec 69kV Feeder 1 69.0 548 Plan Maintenance BPA Request None IDF 138933
09/22/2003 14:46 10/10/2003 05:10 Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls 115.0 25344 Plan Switching Other Customer Request None SPK 138934
09/23/2003 07:35 09/24/2003 10:05 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 1590 Plan Foreign Request Transferor Request None SAL 138944
09/24/2003 06:45 09/24/2003 06:45 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 138952
09/24/2003 06:45 09/24/2003 06:45 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 138953
09/24/2003 12:03 09/24/2003 12:34 Kalispell: Flathead E Coop 34.5kV Feeder 4 34.5 31 Plan Foreign Request Customer Request Unknown KAL 138954
09/24/2003 15:03 09/24/2003 15:04 Pine Hollow: Wasco Elec Coop 12.5kV Feeder 1 by Northrn Wasco PUD 12.5 1 Plan Foreign Request Customer Request Unknown TDA 138955
09/25/2003 02:01 09/25/2003 03:39 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 98 Plan Foreign Request Other Customer Request None SPK 138956
09/25/2003 02:01 09/25/2003 03:39 North Bench: Northern Lights 13.8kV Feeder 1 13.8 98 Plan Foreign Request Other Customer Request None SPK 138957
09/25/2003 02:01 09/25/2003 02:33 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 32 Plan Foreign Request Other Customer Request 1 SPK 138967
09/25/2003 03:15 09/25/2003 03:19 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 4 Plan Foreign Request Other Customer Request 1 SPK 138968
09/25/2003 07:44 09/25/2003 07:44 Columbia Falls: Flathead E Coop 34.5kV Feeder 2 34.5 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 6 KAL 138969
09/25/2003 09:33 10/24/2003 15:40 Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern 69.0 42127 Plan Foreign Request Customer Request None OLY 138970
09/26/2003 10:32 09/27/2003 01:00 Chambers: Inland P+L 115kV Feeder 1 by Avista Corp 115.0 868 Auto Foreign Trouble Transferor Trouble 2 SPK 138994
09/26/2003 10:38 10/03/2003 12:56 Oregon City: Portland Gen Elec 57kV Feeder 2 57.0 10218 Plan Foreign Request Customer Request None SAL 138995
09/26/2003 15:58 09/26/2003 15:58 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 4 SNO 138982
09/26/2003 16:00 09/26/2003 16:01 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 1 Auto Foreign Trouble Foreign Trouble Customer Trouble 4 SNO 138983
09/26/2003 16:01 09/26/2003 17:03 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 62 Auto Foreign Trouble Foreign Trouble Customer Trouble 4 SNO 138984
09/27/2003 00:00 09/27/2003 02:53 Cedarville Junction: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) 69.0 173 Plan Maintenance BPA Request 2 RED 138996
09/28/2003 00:52 09/28/2003 07:18 Tumble Creek: Consumers Power 24.9kV Feeder 1 24.9 386 Plan Maintenance BPA Request Unknown SAL 138997
09/28/2003 04:09 09/28/2003 05:09 Chemawa: Portland Gen Elec 57kV Feeder 4 57.0 60 Auto Foreign Trouble Foreign Trouble Customer Trouble 5 SAL 138998
09/28/2003 16:35 09/28/2003 16:43 Eugene: Lane Elec Coop 34.5kV Feeder 1 34.5 8 Auto Foreign Trouble Foreign Trouble Customer Trouble 1 EUG 138999
09/29/2003 07:35 10/02/2003 10:39 Chemawa: Portland Gen Elec 57kV Feeder 1 57.0 4504 Plan Maintenance BPA Request None SAL 139066
09/29/2003 08:01 09/29/2003 17:57 Salem: Salem Elec 115kV Feeder 1 115.0 596 Plan Switching Customer Request None SAL 139015
09/29/2003 08:24 09/29/2003 15:34 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 430 Plan Foreign Request Customer Request None SNO 139016
09/29/2003 12:27 10/01/2003 12:22 Gold Beach: Coos-Curry Coop 115kV Feeder 2 115.0 2875 Plan Foreign Request Customer Request None EUG 139017
09/29/2003 12:31 09/29/2003 12:35 Gold Beach: Coos-Curry Coop 115kV Feeder 3 115.0 4 Auto Substation Operations Substation Operations BPA Trouble 3 EUG 139018
09/29/2003 12:37 09/29/2003 12:39 Intalco: Alcoa 13.8kV Feeder 2 13.8 2 Plan Switching Customer Request None SNO 139019
09/29/2003 14:29 10/03/2003 09:20 Levey: Franklin Co PUD 115kV Feeder 1 115.0 5451 Plan Maintenance BPA Request Unknown TRI 139031
09/30/2003 07:53 09/30/2003 16:13 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 500 Plan Foreign Request Customer Request None SNO 139032
09/30/2003 18:32 09/30/2003 18:32 Bellingham: Whatcom Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 44 SNO 139033
10/01/2003 07:00 10/03/2003 10:27 Green Bluff: Inland P+L 115kV Feeder 1 115.0 3087 Plan Maintenance BPA Request None SPK 139046
10/01/2003 08:00 10/01/2003 15:57 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 477 Plan Foreign Request Customer Request None SNO 139047
10/01/2003 10:19 10/01/2003 16:18 Rainier: Clatskanie PUD 115kV Feeder 1 115.0 359 Plan Foreign Request Customer Request None LGV 139048
10/01/2003 10:19 10/01/2003 16:18 Rainier: Columbia Rivr PUD 12.5kV Feeder 1 by Clatskanie PUD 12.5 359 Plan Foreign Request Transferor Request None LGV 139049
10/01/2003 12:30 10/02/2003 10:50 Gold Beach: Coos-Curry Coop 115kV Feeder 1 115.0 1340 Plan Foreign Request Customer Request None EUG 139050
10/02/2003 08:58 10/02/2003 10:56 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 118 Plan Foreign Request Customer Request None SNO 139068
10/02/2003 08:58 10/02/2003 10:56 Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD 115.0 118 Plan Foreign Request Customer Request None SNO 139069
10/03/2003 06:41 10/03/2003 13:38 Jackson: Idaho Power Co 34.5kV Feeder 1 34.5 417 Auto Forced (Configuration) Forced (Configuration) BPA Trouble Unknown IDF 139084
10/03/2003 06:41 10/03/2003 13:38 Newcomb: South Side Elec 12.5kV Feeder 1 12.5 417 Auto Forced (Configuration) Forced (Configuration) BPA Trouble Unknown IDF 139085
10/03/2003 06:41 10/03/2003 08:03 East Hills: South Side Elec 12.5kV Feeder 1 12.5 82 Auto Forced (Configuration) Terminal Equipment Failure BPA Trouble 4 IDF 139086
10/03/2003 09:24 11/21/2003 14:00 McMinnville: McMinnville W&L 115kV Feeder 3 115.0 70896 Plan Foreign Request Customer Request Unknown SAL 139098
10/05/2003 04:00 10/05/2003 08:06 Elma: McCleary WA 69kV Feeder 1 by Grays Harbor PUD 69.0 246 Plan Foreign Request Customer Request None OLY 139099
10/06/2003 10:06 10/09/2003 11:50 Bonners Ferry: Northern Lights 13.8kV Feeder 1 13.8 4424 Plan Maintenance BPA Request None SPK 139105
10/06/2003 10:14 10/09/2003 11:52 Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 13.8 4418 Plan Maintenance BPA Request None SPK 139106
10/06/2003 12:18 10/06/2003 13:56 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 98 Plan Maintenance BPA Request None SAL 139107
10/06/2003 22:00 10/07/2003 07:50 Davis Creek: Surprise Valley 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 590 Plan Maintenance BPA Request Unknown RED 139108
10/07/2003 02:41 10/07/2003 04:15 Marengo: Big Bend Coop 24.9kV Feeder 1 by Avista Corp 24.9 94 Auto Foreign Trouble Transferor Trouble Unknown TRI 139109
10/07/2003 02:41 10/07/2003 03:32 Ralston: Big Bend Coop 115kV Feeder 1 by Avista Corp 115.0 51 Auto Foreign Trouble Transferor Trouble Unknown TRI 139110
10/07/2003 08:11 10/07/2003 13:38 Carmen PH: EWEB (Eugene OR) 115kV Feeder 1 115.0 327 Plan Foreign Request Customer Request Unknown EUG 139133
10/07/2003 08:30 10/07/2003 10:21 Plymouth: Benton REA 115kV Feeder 1 by Benton Co PUD 115.0 111 Auto Foreign Trouble Transferor Trouble Unknown TRI 139134
10/07/2003 08:30 10/07/2003 10:29 Nine Canyon: Benton Co PUD 115kV Feeder 1 115.0 119 Auto Foreign Trouble Customer Trouble Unknown TRI 139135
10/07/2003 08:30 10/07/2003 10:29 H2F: Benton Co PUD 115kV Feeder 1 115.0 119 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TRI 139136
10/07/2003 08:30 10/08/2003 01:00 Berrian: Benton Co PUD 115kV Feeder 1 115.0 990 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TRI 139137
10/07/2003 09:02 10/07/2003 14:20 Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma 69.0 318 Plan Foreign Request Customer Request None OLY 139138
10/07/2003 14:43 10/08/2003 14:15 Cowlitz: Cowlitz Co PUD 115kV Feeder 1 115.0 1412 Plan Foreign Request Customer Request None LGV 139155
10/08/2003 22:34 10/08/2003 22:34 Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble None OLY 139156
10/09/2003 03:57 10/09/2003 03:57 Rattlesnake BREA: Benton REA 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown TRI 139157
10/09/2003 03:57 10/09/2003 06:49 Roza: Kittitas Co PUD 34.5kV Feeder 1 by USBR GENERAL 34.5 172 Auto Unknown BPA Trouble Unknown TRI 139169
10/09/2003 03:57 10/09/2003 06:49 Roza: USBR Yakima 115kV Feeder 1 115.0 172 Auto Unknown Unknown BPA Trouble Unknown TRI 139170
10/09/2003 06:44 10/10/2003 19:59 Bellingham: Whatcom Co PUD 115kV Feeder 1 115.0 2235 Plan Fiber Optic Work BPA Request None SNO 139171
10/09/2003 12:53 10/09/2003 12:55 Parkdale: Hood River Elec 12.5kV Feeder 1 12.5 2 Auto Lightning Lightning BPA Trouble Unknown TDA 139172
10/10/2003 01:35 10/10/2003 04:34 North Bench: Bonners Ferry ID 13.8kV Feeder 1 13.8 179 Plan Foreign Request Other Customer Request None SPK 139173
10/10/2003 01:35 10/10/2003 04:34 North Bench: Northern Lights 13.8kV Feeder 1 13.8 179 Plan Foreign Request Other Customer Request None SPK 139174
10/10/2003 01:42 10/10/2003 01:45 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 3 Plan Foreign Request Other Customer Request None SPK 139175
10/10/2003 04:28 10/10/2003 04:34 Moyie: Bonners Ferry ID 115kV Feeder 1 115.0 6 Plan Foreign Request Other Customer Request None SPK 139176
10/10/2003 14:20 10/10/2003 14:20 Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) 34.5 0 Auto Unknown Unknown BPA Trouble Unknown EUG 139195
10/10/2003 14:20 10/10/2003 14:20 Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) 34.5 0 Auto Unknown Unknown BPA Trouble Unknown EUG 139196
10/10/2003 14:20 10/10/2003 14:20 Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton 69.0 0 Auto Unknown Unknown BPA Trouble Unknown EUG 139197
10/10/2003 14:20 10/10/2003 14:20 Drain: Douglas Elec Coop 12.5kV Feeder 1 12.5 0 Auto Unknown Unknown BPA Trouble Unknown EUG 139198
10/10/2003 14:20 10/10/2003 14:20 Green Valley: Douglas Elec Coop 69kV Feeder 1 69.0 0 Auto Unknown Unknown BPA Trouble Unknown EUG 139199
10/10/2003 14:20 10/10/2003 14:20 Latham: Emerald PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown EUG 139200
10/11/2003 07:57 10/11/2003 16:13 Hanford No.2 Construction: Energy Northwest 115kV Feeder 1 to CGS2 E.O.F. 115.0 496 Plan Foreign Request Customer Request None TRI 139212
10/12/2003 05:41 10/12/2003 05:41 Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ 14.4 0 Auto Unknown Unknown Trouble Unknown COV 139213
10/12/2003 14:12 10/12/2003 14:12 Sno-King: Snohomish Co PUD 115kV Feeder 3 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 41 SNO 139217
10/13/2003 07:28 10/13/2003 08:02 Alcoa: Evergreen/Vanalco 13.8kV Feeder 4A 13.8 34 Auto Unknown Unknown BPA Trouble 1 LGV 139224
10/14/2003 07:57 10/17/2003 08:08 Kalispell: Flathead E Coop 34.5kV Feeder 5 34.5 4331 Plan Maintenance BPA Request None KAL 139230
10/14/2003 08:16 10/14/2003 08:18 Mabton: Benton REA 12.5kV Feeder 1 12.5 2 Plan Switching BPA Request 2 TRI 139231
10/14/2003 10:15 10/14/2003 10:42 Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) 115.0 27 Auto Voltage Line Material Failure BPA Trouble Unknown TRI 139232
10/14/2003 11:10 10/24/2003 08:30 Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) 115.0 14240 Plan Maintenance BPA Request None TRI 139254
10/14/2003 11:28 10/14/2003 11:53 Fern Ridge: Lane Elec Coop 115kV Feeder 1 115.0 25 Plan Emergency Customer Request None EUG 139233
10/14/2003 11:28 10/14/2003 11:53 Mapleton: Blachly-Lane Co 34.5kV Feeder 1 34.5 25 Plan Emergency Customer Request Unknown EUG 139234
10/14/2003 11:28 10/14/2003 11:53 Mapleton: Central Linc PUD 12.5kV Feeder 1 12.5 25 Plan Emergency Customer Request Unknown EUG 139235
10/14/2003 11:28 10/14/2003 11:53 Noti Creek: Emerald PUD 115kV Feeder 1 115.0 25 Plan Emergency Customer Request Unknown EUG 139236
10/14/2003 11:28 10/14/2003 11:53 Rainbow Valley: Lane Elec Coop 115kV Feeder 1 115.0 25 Plan Emergency Customer Request Unknown EUG 139237
10/14/2003 11:28 10/14/2003 11:53 Walton: Blachly-Lane Co 12.5kV Feeder 1 12.5 25 Plan Emergency Customer Request Unknown EUG 139238
10/14/2003 18:00 10/14/2003 18:01 Mabton: Benton REA 12.5kV Feeder 1 12.5 1 Plan Switching BPA Request 2 TRI 139239
10/15/2003 04:57 10/15/2003 04:57 Horse Heaven: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 27 TRI 139240
10/15/2003 08:08 10/15/2003 08:55 Addy: Avista Corp 115kV Feeder 1 to Wheel Turn 115.0 47 Auto Foreign Trouble Customer Trouble Unknown SPK 139255
10/16/2003 06:48 10/16/2003 06:48 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown Unknown Trouble Unknown RED 139261
10/16/2003 06:48 10/16/2003 06:48 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown RED 139262
10/16/2003 07:57 10/16/2003 16:17 Lost River: Lost River Elec 69kV Feeder 1 69.0 500 Plan Maintenance BPA Request None IDF 139263
10/16/2003 08:26 10/16/2003 16:25 Round Valley: Salmon River Coop 69kV Feeder 1 69.0 479 Plan Maintenance BPA Request None IDF 139264
10/16/2003 08:34 10/16/2003 16:06 Spar Canyon: Salmon River Coop 230kV Feeder 1 230.0 452 Plan Maintenance BPA Request None IDF 139265
10/16/2003 09:42 10/16/2003 09:54 Oakridge: Lane Elec Coop 115kV Feeder 1 115.0 12 Auto Tree cut BPA Trouble 7 EUG 139266
10/16/2003 15:01 10/16/2003 15:05 Belfair: Mason Co PUD 3 115kV Feeder 1 115.0 4 Auto Foreign Trouble Foreign Trouble Customer Trouble None OLY 139267
10/16/2003 15:01 10/16/2003 15:05 Benson: Mason Co PUD 3 115kV Feeder 1 115.0 4 Auto Foreign Trouble Foreign Trouble Customer Trouble None OLY 139268
10/16/2003 19:53 10/16/2003 19:53 Chehalis: Lewis Co PUD 69kV Feeder 1 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 13 OLY 139269
10/18/2003 12:04 10/18/2003 21:06 Sappho: Clallam Co PUD 69kV Feeder 1 69.0 542 Auto Tree blown Forced (Configuration) BPA Trouble 8 OLY 139295
10/18/2003 12:04 10/18/2003 21:06 Sappho: Clallam Co PUD 69kV Feeder 2 69.0 542 Auto Tree blown Forced (Configuration) BPA Trouble 22 OLY 139296
10/18/2003 18:30 10/20/2003 14:25 Alcoa: Evergreen/Vanalco 13.8kV Feeder 4A 13.8 2635 Auto Foreign Trouble Foreign Trouble Customer Trouble 1 LGV 139297
10/19/2003 00:01 10/19/2003 04:20 Underwood: Skamania Co PUD 12.5kV Feeder 1 12.5 259 Plan Maintenance BPA Request None LGV 139298
10/19/2003 02:54 10/19/2003 03:59 Satsop Park: Grays Harbor PUD 115kV Feeder 1 115.0 65 Auto Tree blown Improper Relaying BPA Trouble Unknown OLY 139561
10/19/2003 05:18 10/19/2003 05:18 Fairmount: Clallam Co PUD 69kV Feeder 1 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 20 OLY 139308
10/20/2003 08:50 10/24/2003 12:30 Pomeroy: Inland P+L 69kV Feeder 1 69.0 5980 Plan Foreign Request Customer Request None SPK 139313
10/20/2003 11:15 10/20/2003 12:00 Bingen: Klickitat Co PUD 69kV Feeder 1 by PacifiCorp (PACW) 69.0 45 Auto Foreign Trouble Transferor Trouble Unknown TDA 139361
10/20/2003 14:15 10/20/2003 18:02 Sappho: Clallam Co PUD 69kV Feeder 1 69.0 227 Auto Tree blown Forced (Configuration) BPA Trouble 7 OLY 139314
10/20/2003 14:15 10/20/2003 18:02 Sappho: Clallam Co PUD 69kV Feeder 2 69.0 227 Auto Tree blown Forced (Configuration) BPA Trouble 13 OLY 139315
10/21/2003 06:28 10/23/2003 09:47 Conkelley: Col Falls Alum Co 13.8kV Feeder 5 13.8 3079 Plan Maintenance BPA Request None KAL 139334
10/21/2003 11:08 10/21/2003 19:54 Lexington: Cowlitz Co PUD 115kV Feeder 2 115.0 526 Auto Foreign Trouble Foreign Trouble Customer Trouble 26 LGV 139335
10/21/2003 12:46 10/21/2003 13:48 Beaver TLP: Tillamook PUD 115kV Feeder 1 115.0 62 Auto Tree cut Tree cut BPA Trouble Unknown SAL 139336
10/21/2003 12:46 10/21/2003 13:48 Hebo: Tillamook PUD 115kV Feeder 1 115.0 62 Auto Tree cut Tree cut BPA Trouble Unknown SAL 139337
10/21/2003 12:46 10/21/2003 13:48 Nestucca: Tillamook PUD 115kV Feeder 1 115.0 62 Auto Tree cut Tree cut BPA Trouble Unknown SAL 139338
10/21/2003 17:06 10/21/2003 17:06 Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ 14.4 0 Auto Foreign Trouble Transferor Trouble None COV 139339
10/22/2003 07:42 10/24/2003 14:31 Eugene: EWEB (Eugene OR) 115kV Feeder 3 115.0 3289 Plan Construction BPA Request Unknown EUG 139349
10/23/2003 06:47 10/23/2003 14:12 Kerr: NorthWestern Ener 115kV Feeder 1 115.0 445 Plan Foreign Request Customer Request None KAL 139362
10/23/2003 07:59 10/24/2003 15:48 Sifton: Clark Public Util 115kV Feeder 2 115.0 1909 Plan Foreign Request Customer Request None LGV 139363
10/24/2003 08:21 10/24/2003 08:22 Intalco: Alcoa 13.8kV Feeder 2 13.8 1 Plan Switching BPA Request None SNO 139370
10/24/2003 23:08 10/27/2003 15:55 East Omak: Okanogan Co PUD 115kV Feeder 1 to Okanogan 115.0 3947 Plan Load Control BPA Request None WEN 139372
10/27/2003 08:06 10/27/2003 08:08 Intalco: Alcoa 13.8kV Feeder 2 13.8 2 Plan Foreign Request Customer Request None SNO 139390
10/27/2003 11:16 11/06/2003 09:29 Silver Bow: Vigilante E Coop 69kV Feeder 1 69.0 14293 Plan Maintenance BPA Request None KAL 139391
10/27/2003 12:18 10/28/2003 10:05 Macks Inn: Fall River E Coop 46kV Feeder 1 46.0 1307 Plan Maintenance BPA Request None IDF 139392
10/28/2003 09:24 10/28/2003 09:24 Hedges: Benton Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble Unknown TRI 139409
10/28/2003 15:32 10/28/2003 15:32 Port of Morrow: Umatilla E Coop 115kV Feeder 1 115.0 0 Auto Unknown Wind BPA Trouble 12 TRI 139410
10/28/2003 15:38 10/28/2003 17:47 Fairmount: Clallam Co PUD 69kV Feeder 1 69.0 129 Auto Foreign Trouble Foreign Trouble Customer Trouble 29 OLY 139411
10/28/2003 15:38 10/28/2003 19:19 Port Townsend: Port Townsnd Corp 69kV Feeder 1 by Clallam Co PUD 69.0 221 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown OLY 139412
10/28/2003 17:08 10/28/2003 17:08 Snohomish: Snohomish Co PUD 115kV Feeder 5 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 33 SNO 139413
10/28/2003 17:08 10/28/2003 17:08 Murray: Snohomish Co PUD 115kV Feeder 3 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 16 SNO 139414
10/28/2003 17:14 10/28/2003 17:14 Snohomish: Snohomish Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 42 SNO 139415
10/28/2003 17:17 10/28/2003 17:17 Snohomish: Snohomish Co PUD 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 13 SNO 139416
10/28/2003 17:36 10/28/2003 17:36 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 30 SNO 139417
10/28/2003 17:37 10/28/2003 19:41 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 124 Auto Foreign Trouble Foreign Trouble Customer Trouble 30 SNO 139418
10/28/2003 19:16 10/28/2003 19:19 Fairmount: Clallam Co PUD 69kV Feeder 1 69.0 3 Plan Foreign Request Customer Request 1 OLY 139419
10/29/2003 07:12 10/29/2003 11:53 Valhalla: Chelan Co PUD 115kV Feeder 2 115.0 281 Plan Foreign Request Customer Request Unknown WEN 139432
10/29/2003 10:22 10/29/2003 10:23 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 1 Auto Tree blown Tree BPA Trouble 1 SAL 139433
10/29/2003 10:22 10/29/2003 10:24 Thatcher Junction: Forest Grove OR 115kV Feeder 1 115.0 2 Auto Tree blown Tree BPA Trouble 10 SAL 139434
10/29/2003 10:22 10/29/2003 15:39 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 317 Auto Tree blown Tree BPA Trouble None SAL 139435
10/30/2003 01:52 10/30/2003 02:44 Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co 34.5 52 Auto Unknown BPA Trouble Unknown SPK 139436
10/30/2003 01:52 10/30/2003 02:44 Clarkston: Clearwater P Co 34.5kV Feeder 1 34.5 52 Auto Unknown BPA Trouble Unknown SPK 139437
10/30/2003 01:52 10/30/2003 04:08 Pomeroy: Inland P+L 115kV Feeder 1 115.0 136 Auto Unknown BPA Trouble Unknown SPK 139438
10/30/2003 01:52 10/30/2003 04:08 Pomeroy: Inland P+L 69kV Feeder 1 69.0 136 Auto Unknown Line Material Failure BPA Trouble None SPK 139439
10/30/2003 05:46 10/30/2003 05:48 Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co 34.5 2 Plan Testing BPA Request Unknown SPK 139451
10/30/2003 05:46 10/30/2003 05:48 Clarkston: Clearwater P Co 34.5kV Feeder 1 34.5 2 Plan Testing BPA Request 2 SPK 139452
10/30/2003 14:03 10/30/2003 14:21 Intalco: Alcoa 13.8kV Feeder 2 13.8 18 Plan Switching BPA Request None SNO 139453
10/30/2003 14:20 10/30/2003 15:39 Acton: Cascade Locks OR 13.8kV Feeder 1 13.8 79 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown LGV 139454
10/31/2003 08:41 10/31/2003 15:58 Ross: Clark Public Util 115kV Feeder 1 115.0 437 Plan Foreign Request Customer Request None LGV 139461
11/03/2003 08:43 11/03/2003 15:17 Ross: Clark Public Util 115kV Feeder 1 115.0 394 Plan Foreign Request Customer Request None LGV 139475
11/04/2003 07:28 11/04/2003 10:42 Eugene: EWEB (Eugene OR) 115kV Feeder 1 to Bethel 115.0 194 Plan Construction BPA Request None EUG 139486
11/05/2003 08:10 11/05/2003 14:09 Sun Harbor: Columbia REA 24.9kV Feeder 1 24.9 359 Plan Maintenance BPA Request None TRI 139491
11/05/2003 12:21 11/06/2003 14:41 Ukiah: Columbia P Coop 69kV Feeder 1 by PacifiCorp (PACW) 69.0 1580 Plan Foreign Request Customer Request Unknown TRI 139492
11/06/2003 08:15 11/06/2003 10:08 Jackson: Idaho Power Co 34.5kV Feeder 1 34.5 113 Plan Maintenance BPA Request Unknown IDF 139495
11/06/2003 08:15 11/06/2003 10:08 Newcomb: South Side Elec 12.5kV Feeder 1 12.5 113 Plan Maintenance BPA Request None IDF 139496
11/06/2003 14:12 11/21/2003 07:57 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 21225 Plan Normally Out BPA Request None EUG 139497
11/07/2003 07:43 11/07/2003 14:39 Nilles Corner: Douglas Co PUD 115kV Feeder 1 115.0 416 Plan Foreign Request Customer Request None WEN 139506
11/07/2003 08:00 11/07/2003 14:37 Foster Creek NVEC: Nespelem Valley 115kV Feeder 1 115.0 397 Plan Maintenance BPA Request Unknown WEN 139507
11/10/2003 10:30 11/10/2003 10:30 Kalispell: Flathead E Coop 34.5kV Feeder 5 34.5 0 Auto Foreign Trouble Foreign Trouble Customer Trouble None KAL 139522
11/10/2003 16:42 11/14/2003 11:43 Silver Bow: Vigilante E Coop 69kV Feeder 1 69.0 5461 Plan Maintenance BPA Request None KAL 139523
11/11/2003 01:18 11/11/2003 01:18 Alcoa: Clark Public Util 115kV Feeder 1 115.0 0 Auto Foreign Trouble Foreign Utility Customer Trouble 20 LGV 139524
11/12/2003 08:53 11/12/2003 15:25 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 392 Plan Maintenance BPA Request None SAL 139536
11/13/2003 06:43 11/13/2003 13:45 Longview: Cowlitz Co PUD 69kV Feeder 2 69.0 422 Plan Maintenance BPA Request None LGV 139543
11/13/2003 06:43 11/13/2003 13:45 Longview: Cowlitz Co PUD 69kV Feeder 1 69.0 422 Plan Maintenance BPA Request None LGV 139544
11/13/2003 07:50 11/13/2003 13:51 Addy: Avista Corp 115kV Feeder 1 to Wheel Turn 115.0 361 Plan Maintenance BPA Request None SPK 139545
11/13/2003 08:38 11/13/2003 14:37 Cascade Steel: McMinnville W&L 230kV Feeder 1 230.0 359 Plan Maintenance BPA Request Unknown SAL 139546
11/14/2003 09:05 11/14/2003 14:46 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 341 Plan Maintenance BPA Request None SAL 139562
11/14/2003 09:43 12/03/2003 10:22 McMinnville: McMinnville W&L 115kV Feeder 2 115.0 27399 Plan Foreign Request Other Customer Request None SAL 139563
11/14/2003 10:51 11/21/2003 14:25 Hatton: Big Bend Coop 115kV Feeder 1 115.0 10294 Plan Maintenance BPA Request None TRI 139565
11/14/2003 14:31 11/14/2003 15:56 Outlook: PacifiCorp (PACW) 230kV Feeder 1 230.0 85 Plan Switching BPA Request None TRI 139566
11/14/2003 16:03 12/01/2003 10:55 Grandview: PacifiCorp (PACW) 115kV Feeder 1 115.0 24172 Plan Construction BPA Request None TRI 139567
11/15/2003 16:59 11/15/2003 17:17 Milton: Milton-Freewater 69kV Feeder 1 69.0 18 Auto Forced (Configuration) BPA Trouble Unknown TRI 139580
11/15/2003 16:59 11/15/2003 17:17 Whitman: Columbia REA 69kV Feeder 1 69.0 18 Auto Forced (Configuration) BPA Trouble Unknown TRI 139581
11/15/2003 16:59 11/15/2003 17:17 Lagoon: Milton-Freewater 69kV Feeder 1 69.0 18 Auto Forced (Configuration) BPA Trouble Unknown TRI 139582
11/15/2003 16:59 11/15/2003 17:17 Stateline: Columbia REA 69kV Feeder 1 69.0 18 Auto Forced (Configuration) Terminal Equipment Failure BPA Trouble Unknown TRI 139583
11/15/2003 16:59 11/15/2003 17:17 Vansycle Ridge Wind Generating Plant: ESI Vansycle Part 69kV Feeder 1 69.0 18 Auto Forced (Configuration) BPA Trouble Unknown TRI 139584
11/15/2003 16:59 11/15/2003 17:17 Weston Mountain: Umatilla E Coop 69kV Feeder 1 69.0 18 Auto Forced (Configuration) BPA Trouble Unknown TRI 139585
11/15/2003 22:00 11/15/2003 23:00 Sappho: Clallam Co PUD 69kV Feeder 1 69.0 60 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 139586
11/16/2003 00:02 11/16/2003 05:40 Connell: Franklin Co PUD 12.5kV Feeder 1 12.5 338 Plan Foreign Request Customer Request None TRI 139587
11/16/2003 00:22 11/16/2003 06:17 Scooteney: Big Bend Coop 34.5kV Feeder 2 34.5 355 Plan Maintenance BPA Request None TRI 139588
11/16/2003 00:22 11/16/2003 06:17 Scooteney: Big Bend Coop 13.8kV Feeder 1 13.8 355 Plan Maintenance BPA Request None TRI 139589
11/16/2003 00:22 11/16/2003 06:17 Scooteney: S Col Basin Ir Dt 34.5kV Feeder 1 34.5 355 Plan Maintenance BPA Request None TRI 139590
11/17/2003 08:52 11/20/2003 14:47 Intalco: Alcoa 13.8kV Feeder 1 13.8 4675 Plan Maintenance BPA Request None SNO 139603
11/18/2003 04:24 11/18/2003 04:25 Dayton MCP3: Mason Co PUD 3 115kV Feeder 1 115.0 1 Auto Unknown Weather BPA Trouble Unknown OLY 139619
11/18/2003 20:35 11/18/2003 20:35 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown Unknown Trouble Unknown RED 139620
11/18/2003 20:35 11/18/2003 20:35 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble Unknown RED 139621
11/18/2003 22:25 11/19/2003 05:37 Alder Metering Point: Alder Light 24.9kV Feeder 1 by Lewis Co PUD 24.9 432 Auto Foreign Trouble Transferor Trouble 1 OLY 139622
11/19/2003 01:35 11/19/2003 04:06 Fairmount: Clallam Co PUD 69kV Feeder 1 69.0 151 Auto Foreign Trouble Foreign Trouble Customer Trouble 19 OLY 139623
11/19/2003 01:35 11/19/2003 04:06 Port Townsend: Port Townsnd Corp 69kV Feeder 1 by Clallam Co PUD 69.0 151 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown OLY 139624
11/19/2003 04:19 11/19/2003 04:19 Clayton: Inland P+L 115kV Feeder 1 115.0 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139625
11/19/2003 04:19 11/19/2003 04:19 Colbert: Avista Corp 115kV Feeder 1 115.0 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139626
11/19/2003 04:19 11/19/2003 04:19 Deer Park: Avista Corp 13.8kV Feeder 1 13.8 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139627
11/19/2003 04:19 11/19/2003 04:19 Deer Park: Avista Corp 13.8kV Feeder 2 13.8 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139628
11/19/2003 04:19 11/19/2003 04:19 Deer Park: Inland P+L 115kV Feeder 1 115.0 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139629
11/19/2003 04:19 11/19/2003 04:19 Half Moon: Inland P+L 115kV Feeder 1 115.0 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139630
11/19/2003 04:19 11/19/2003 04:19 Loon Lake: Avista Corp 115kV Feeder 1 115.0 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139631
11/19/2003 04:19 11/19/2003 04:19 Mead: Avista Corp 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown SPK 139632
11/19/2003 04:19 11/19/2003 04:19 Milan: Avista Corp 115kV Feeder 1 115.0 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139633
11/19/2003 04:19 11/19/2003 04:19 Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp 13.8 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139634
11/19/2003 04:19 11/19/2003 04:19 Tum Tum: Inland P+L 115kV Feeder 1 115.0 0 Auto Unknown Wind Unknown Trouble Unknown SPK 139635
11/19/2003 07:09 11/19/2003 07:09 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 32 SNO 139660
11/19/2003 07:51 11/19/2003 08:43 Snohomish: Snohomish Co PUD 115kV Feeder 1 115.0 52 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SNO 139661
11/19/2003 08:36 11/19/2003 10:03 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 87 Auto Foreign Trouble Foreign Trouble Customer Trouble 33 SNO 139662
11/19/2003 08:38 11/19/2003 08:38 Redmond: Central Elec Coop 69kV Feeder 2 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 6 RED 139663
11/19/2003 12:46 11/19/2003 15:48 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 182 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown RED 139664
11/20/2003 10:56 11/20/2003 14:11 Port Orford: Coos-Curry Coop 12.5kV Feeder 1 12.5 195 Plan Maintenance BPA Request None EUG 139669
11/21/2003 09:05 11/21/2003 11:23 Macks Inn: Fall River E Coop 46kV Feeder 2 46.0 138 Plan Foreign Request Customer Request None IDF 139681
11/21/2003 14:27 12/04/2003 08:17 Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 18350 Plan Normally Out BPA Request None EUG 139682
11/24/2003 07:07 11/24/2003 15:40 St. Johns: Portland Gen Elec 57kV Feeder 1 57.0 513 Plan Foreign Request Customer Request Unknown LGV 139700
11/24/2003 10:47 11/24/2003 14:09 Cowlitz: Cowlitz Co PUD 115kV Feeder 2 115.0 202 Plan Foreign Request Customer Request None LGV 139701
11/24/2003 13:40 11/24/2003 13:40 East Ellensburg: City of Ellensbrg 115kV Feeder 1 115.0 0 Auto Line Material Failure BPA Trouble Unknown WEN 139702
11/24/2003 13:40 11/24/2003 13:40 Jenkins: Kittitas Co PUD 115kV Feeder 1 115.0 0 Auto Line Material Failure Line Material Failure BPA Trouble Unknown WEN 139703
11/24/2003 13:46 11/24/2003 14:30 Jenkins: Kittitas Co PUD 115kV Feeder 1 115.0 44 Auto Line Material Failure Line Material Failure BPA Trouble Unknown WEN 139704
11/24/2003 13:46 11/24/2003 17:25 East Ellensburg: City of Ellensbrg 115kV Feeder 1 115.0 219 Auto Line Material Failure BPA Trouble None WEN 139705
11/25/2003 06:49 11/25/2003 16:50 St. Johns: Portland Gen Elec 57kV Feeder 1 57.0 601 Plan Foreign Request Customer Request Unknown LGV 139718
11/25/2003 11:08 11/25/2003 13:17 Cowlitz: Cowlitz Co PUD 115kV Feeder 1 115.0 129 Plan Foreign Request Customer Request None LGV 139719
11/26/2003 07:49 11/26/2003 14:10 St. Johns: Portland Gen Elec 57kV Feeder 1 57.0 381 Plan Foreign Request Customer Request None LGV 139726
11/27/2003 17:14 11/27/2003 17:14 Tanner: Tanner Elec 115kV Feeder 1 by Puget Sound Energ 115.0 0 Auto Foreign Trouble Transferor Trouble 4 COV 139729
11/27/2003 17:16 11/27/2003 17:16 Tanner: Tanner Elec 115kV Feeder 1 by Puget Sound Energ 115.0 0 Auto Foreign Trouble Transferor Trouble 4 COV 139730
11/27/2003 17:19 11/27/2003 17:19 Tanner: Tanner Elec 115kV Feeder 1 by Puget Sound Energ 115.0 0 Auto Foreign Trouble Transferor Trouble 4 COV 139731
11/28/2003 07:29 11/28/2003 07:29 Sappho: Clallam Co PUD 69kV Feeder 1 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 139737
11/28/2003 09:18 11/28/2003 10:07 Port Angeles: Port Angeles WA 69kV Feeder 1 69.0 49 Auto Foreign Trouble Foreign Trouble Customer Trouble 19 OLY 139738
11/28/2003 10:13 11/28/2003 10:16 Clatsop: PacifiCorp (PACW) 115kV Feeder 1 115.0 3 Auto Wind Tree blown BPA Trouble 53 LGV 139739
11/28/2003 12:09 11/28/2003 12:17 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 8 Auto Foreign Trouble Transferor Trouble Unknown SAL 139740
11/28/2003 12:09 11/28/2003 12:14 Clatsop: PacifiCorp (PACW) 115kV Feeder 1 115.0 5 Auto Foreign Trouble Customer Trouble 53 LGV 139741
11/28/2003 12:09 11/28/2003 12:17 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 8 Auto Foreign Trouble Transferor Trouble Unknown SAL 139742
11/28/2003 12:09 11/28/2003 12:17 Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 8 Auto Foreign Trouble Transferor Trouble Unknown SAL 139743
11/28/2003 12:09 11/28/2003 14:19 Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 130 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 139744
11/28/2003 12:53 11/28/2003 12:54 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 1 Auto Foreign Trouble Transferor Trouble Unknown SAL 139745
11/28/2003 12:53 11/28/2003 12:54 Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 1 Auto Foreign Trouble Transferor Trouble Unknown SAL 139746
11/28/2003 12:53 11/28/2003 12:54 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 1 Auto Foreign Trouble Transferor Trouble Unknown SAL 139747
11/29/2003 02:03 11/29/2003 03:29 Ione: Columbia Basin 12.5kV Feeder 1 12.5 86 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown TRI 139748
11/29/2003 02:03 11/29/2003 03:29 Sand Hollow: Columbia Basin 69kV Feeder 1 69.0 86 Auto Foreign Trouble Customer Trouble Unknown TRI 139749
11/29/2003 02:54 11/29/2003 02:54 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 139750
11/29/2003 02:54 11/29/2003 02:54 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 139751
11/29/2003 09:03 11/29/2003 09:03 Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD 115.0 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SNO 139760
11/29/2003 09:03 11/29/2003 09:03 Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD 115.0 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SNO 139761
11/29/2003 12:10 11/29/2003 13:46 Santiam: Consumers Power 69kV Feeder 1 69.0 96 Plan Emergency Customer Request 1 SAL 139762
11/30/2003 06:54 11/30/2003 06:54 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown BPA Trouble Unknown RED 139767
11/30/2003 06:54 11/30/2003 06:54 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown BPA Trouble Unknown RED 139768
11/30/2003 17:24 11/30/2003 18:43 Schrag: Big Bend Coop 115kV Feeder 1 by Grant Co PUD 115.0 79 Auto Foreign Trouble Transferor Trouble Unknown TRI 139769
12/01/2003 13:20 12/02/2003 13:17 Scooteney: S Col Basin Ir Dt 34.5kV Feeder 1 34.5 1437 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown TRI 139772
12/02/2003 08:35 12/04/2003 08:15 Columbia Falls: Flathead E Coop 34.5kV Feeder 1 34.5 2860 Plan Maintenance BPA Request None KAL 139780
12/02/2003 08:48 12/04/2003 07:52 Columbia Falls: Flathead E Coop 34.5kV Feeder 2 34.5 2824 Plan Maintenance BPA Request None KAL 139781
12/02/2003 21:49 12/03/2003 09:37 Alcoa: Evergreen/Vanalco 13.8kV Feeder 4A 13.8 708 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown LGV 139782
12/03/2003 06:24 12/03/2003 06:24 Tarbell: Columbia Rivr PUD 115kV Feeder 1 115.0 0 Auto Unknown Unknown Trouble Unknown LGV 139786
12/03/2003 06:24 12/03/2003 06:24 Warren: West Oregon Elec 34.5kV Feeder 1 34.5 0 Auto Unknown Tree blown Unknown Trouble Unknown LGV 139787
12/03/2003 06:24 12/03/2003 07:52 Dutch Canyon: Columbia Rivr PUD 115kV Feeder 1 115.0 88 Auto Tree BPA Trouble 8 LGV 139788
12/03/2003 09:50 12/03/2003 12:51 Hay Mill: Rupert ID 12.5kV Feeder 1 12.5 181 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown IDF 139789
12/03/2003 09:50 12/03/2003 12:51 Hay Mill: Rupert ID 12.5kV Feeder 2 12.5 181 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown IDF 139790
12/03/2003 09:50 12/03/2003 12:51 Hay Mill: United Elec Coop 12.5kV Feeder 1 12.5 181 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown IDF 139791
12/03/2003 10:15 12/05/2003 09:52 Intalco: Alcoa 13.8kV Feeder 1 13.8 2857 Plan Maintenance BPA Request None SNO 139792
12/04/2003 04:22 12/04/2003 04:38 Tanner: Tanner Elec 115kV Feeder 1 by Puget Sound Energ 115.0 16 Auto Foreign Trouble Transferor Trouble 3 COV 139793
12/04/2003 04:47 12/05/2003 12:15 Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ 14.4 1888 Auto Foreign Trouble Transferor Trouble Unknown COV 139794
12/04/2003 05:22 12/05/2003 14:15 Tanner: Tanner Elec 115kV Feeder 1 by Puget Sound Energ 115.0 1973 Auto Foreign Trouble Transferor Trouble 3 COV 139795
12/04/2003 07:48 12/04/2003 07:48 Sifton: Clark Public Util 115kV Feeder 2 115.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 11 LGV 139808
12/04/2003 08:14 12/04/2003 08:33 Hagen: Pacific Co PUD 115kV Feeder 1 115.0 19 Auto Foreign Trouble Customer Trouble None LGV 139809
12/04/2003 08:14 12/04/2003 08:33 Tarlett: Pacific Co PUD 115kV Feeder 1 115.0 19 Auto Foreign Trouble Customer Trouble None LGV 139810
12/04/2003 08:14 12/04/2003 08:33 Ocean Park: Pacific Co PUD 115kV Feeder 1 115.0 19 Auto Foreign Trouble Customer Trouble 3 LGV 139811
12/04/2003 08:35 12/04/2003 11:40 Snohomish: Snohomish Co PUD 115kV Feeder 6 115.0 185 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown SNO 139812
12/04/2003 09:08 12/04/2003 09:37 Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern 69.0 29 Auto Foreign Trouble Foreign Trouble Customer Trouble 17 OLY 139813
12/04/2003 09:38 12/04/2003 09:48 Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 10 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 139814
12/04/2003 09:38 12/04/2003 09:48 Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 10 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 139815
12/04/2003 09:38 12/04/2003 09:48 Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) 12.5 10 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SAL 139816
12/04/2003 09:38 12/04/2003 09:48 Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) 115.0 10 Auto Foreign Trouble Transferor Trouble Unknown SAL 139817
12/04/2003 12:15   Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland 69.0 still out Plan Normally Out Customer Request Unknown EUG 139818
12/04/2003 15:37 12/04/2003 15:37 Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 12.5 0 Auto Foreign Trouble Foreign Trouble Customer Trouble None EUG 139819
12/04/2003 15:38 12/04/2003 15:38 Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 12.5 0 Auto Foreign Trouble Foreign Trouble Customer Trouble None EUG 139820
12/05/2003 07:08 12/05/2003 07:09 Haskill: Flathead E Coop 24.9kV Feeder 1 24.9 1 Plan Switching BPA Request Unknown KAL 139832
12/06/2003 21:45 12/06/2003 21:45 Port Orford: Coos-Curry Coop 12.5kV Feeder 1 12.5 0 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown EUG 139842
12/06/2003 23:00 12/06/2003 23:00 Port Orford: Coos-Curry Coop 12.5kV Feeder 1 12.5 0 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown EUG 139843
12/07/2003 12:55 12/07/2003 12:55 Port Orford: Coos-Curry Coop 12.5kV Feeder 1 12.5 0 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown EUG 139844
12/07/2003 14:00 12/07/2003 14:00 Port Orford: Coos-Curry Coop 12.5kV Feeder 1 12.5 0 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown EUG 139845
12/07/2003 15:50 12/07/2003 19:11 Port Orford: Coos-Curry Coop 12.5kV Feeder 1 12.5 201 Auto Terminal Equipment Failure Terminal Equipment Failure BPA Trouble Unknown EUG 139846
12/08/2003 11:57 12/08/2003 11:59 Intalco: Alcoa 13.8kV Feeder 2 13.8 2 Plan Switching BPA Request None SNO 139847
12/09/2003 07:51 12/09/2003 10:52 Intalco: Alcoa 13.8kV Feeder 6 13.8 181 Plan Maintenance BPA Request None SNO 139852
12/09/2003 08:27 12/09/2003 08:55 Outlook: PacifiCorp (PACW) 230kV Feeder 1 230.0 28 Plan Switching BPA Request None TRI 139853
12/09/2003 08:34 12/09/2003 14:45 Lexington: Cowlitz Co PUD 115kV Feeder 2 115.0 371 Plan Foreign Request Customer Request None LGV 139854
12/09/2003 11:56 12/09/2003 13:26 Oxbow: Pacific Co PUD 115kV Feeder 1 115.0 90 Auto Tree cut BPA Trouble 3 LGV 139855
12/09/2003 12:23 12/09/2003 13:49 Intalco: Alcoa 13.8kV Feeder 7 13.8 86 Plan Maintenance BPA Request None SNO 139856
12/09/2003 12:47 12/09/2003 13:00 Outlook: PacifiCorp (PACW) 230kV Feeder 1 230.0 13 Plan Switching BPA Request None TRI 139857
12/10/2003 10:04 12/10/2003 16:37 Intalco: Alcoa 13.8kV Feeder 2 13.8 393 Plan Maintenance BPA Request None SNO 139866
12/10/2003 22:00 12/10/2003 23:58 Alcoa: Evergreen/Vanalco 13.8kV Feeder 3 13.8 118 Auto Forced (Configuration) Unknown BPA Trouble None LGV 139870
12/11/2003 07:45 12/11/2003 14:29 Kalispell: Flathead E Coop 34.5kV Feeder 4 34.5 404 Plan Construction BPA Request None KAL 139871
12/11/2003 07:56 12/12/2003 12:50 Kalispell: Flathead E Coop 34.5kV Feeder 5 34.5 1734 Plan Maintenance BPA Request None KAL 139872
12/11/2003 09:18 12/11/2003 16:11 Redmond: PacifiCorp (PACW) 115kV Feeder 1 115.0 413 Plan Maintenance BPA Request None RED 139873
12/12/2003 16:28 12/12/2003 17:00 Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 115.0 32 Plan Emergency BPA Request 7 KAL 139881
12/13/2003 00:30 12/13/2003 00:30 Sappho: Clallam Co PUD 69kV Feeder 2 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble Unknown OLY 139949
12/14/2003 20:17 12/14/2003 20:52 Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ 14.4 35 Auto Foreign Trouble Transferor Trouble Unknown COV 139894
12/16/2003 01:21 12/16/2003 01:21 St. Johns: Portland Gen Elec 57kV Feeder 3 57.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 25 LGV 139908
12/16/2003 06:31 12/16/2003 06:35 Potlatch: Mason Co PUD 1 34.5kV Feeder 1 34.5 4 Auto Unknown Tree BPA Trouble Unknown OLY 139909
12/16/2003 06:31 12/16/2003 06:35 Potlatch: Mason Co PUD 3 12.5kV Feeder 1 12.5 4 Auto Unknown Tree BPA Trouble Unknown OLY 139910
12/16/2003 06:31 12/16/2003 06:35 Duckabush: Mason Co PUD 1 12.5kV Feeder 1 12.5 4 Auto Unknown Tree BPA Trouble Unknown OLY 139911
12/16/2003 06:31 12/16/2003 06:31 Quilcene: Puget Sound Energ 115kV Feeder 1 115.0 0 Auto Unknown Tree BPA Trouble 2 OLY 139912
12/16/2003 10:07 12/16/2003 10:53 Fairmount: Clallam Co PUD 69kV Feeder 1 69.0 46 Auto Foreign Trouble Foreign Trouble Customer Trouble 3 OLY 139913
12/16/2003 10:07 12/16/2003 12:55 Port Townsend: Port Townsnd Corp 69kV Feeder 1 by Clallam Co PUD 69.0 168 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown OLY 139914
12/16/2003 12:56 12/16/2003 12:56 Lopez Island: Orcas P+L 69kV Feeder 3 by Puget Sound Energ 69.0 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SNO 139915
12/16/2003 12:56 12/16/2003 12:56 Lopez Island: Orcas P+L 69kV Feeder 4 by Puget Sound Energ 69.0 0 Auto Foreign Trouble Foreign Trouble Transferor Trouble Unknown SNO 139916
12/16/2003 13:17 12/16/2003 13:17 La Grande: Oregon Trail 69kV Feeder 1 69.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 4 TRI 139917
12/16/2003 22:57 12/17/2003 03:32 Troy: Northern Lights 13.8kV Feeder 2 13.8 275 Plan Maintenance BPA Request None KAL 139918
12/16/2003 23:00 12/17/2003 03:32 Troy: City of Troy 13.8kV Feeder 1 13.8 272 Plan Maintenance BPA Request 6 KAL 139919
12/16/2003 23:00 12/17/2003 03:32 Troy: Northern Lights 13.8kV Feeder 1 13.8 272 Plan Maintenance BPA Request Unknown KAL 139920
12/16/2003 23:05 12/17/2003 03:32 Troy: Northern Lights 115kV Feeder 1 to Asarco 115.0 267 Plan Maintenance BPA Request 8 KAL 139921
12/17/2003 08:07 12/19/2003 15:09 Big Eddy: Northrn Wasco PUD 115kV Feeder 1 115.0 3302 Plan Foreign Request Customer Request None TDA 139936
12/17/2003 13:08 12/19/2003 09:12 Alvey: Sprngfld Util Brd 115kV Feeder 1 to Springfield 115.0 2644 Plan Foreign Request Customer Request None EUG 139937
12/19/2003 16:47 12/19/2003 18:41 Cowlitz: Cowlitz Co PUD 115kV Feeder 1 115.0 114 Auto Foreign Trouble Foreign Trouble Customer Trouble 12 LGV 139950
12/22/2003 02:26 12/22/2003 07:40 Potlatch: Mason Co PUD 1 34.5kV Feeder 1 34.5 314 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown OLY 140209
12/22/2003 13:48 12/22/2003 13:48 Bangor: US Navy 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble 25 OLY 139961
12/26/2003 00:46 12/26/2003 08:50 West Wendover Metering Point: Wells Rural E Co 138kV Feeder 1 by Raft River Elec 138.0 484 Auto Foreign Trouble Transferor Trouble Unknown IDF 139975
12/26/2003 00:46 12/26/2003 08:50 Bridge: Raft River Elec 138kV Feeder 1 138.0 484 Auto Foreign Trouble Foreign Trouble Customer Trouble 25 IDF 139976
12/26/2003 01:06 12/26/2003 01:06 Hampton: Central Elec Coop 24.9kV Feeder 1 24.9 0 Auto Unknown Unknown Unknown Trouble None RED 139977
12/26/2003 01:06 12/26/2003 01:06 Riley: Harney Elec Coop 115kV Feeder 1 115.0 0 Auto Unknown Unknown Unknown Trouble None RED 139978
12/26/2003 08:54 12/26/2003 14:57 Bridge: Raft River Elec 138kV Feeder 1 138.0 363 Auto Foreign Trouble Foreign Trouble Customer Trouble 25 IDF 139979
12/26/2003 08:54 12/26/2003 15:11 West Wendover Metering Point: Wells Rural E Co 138kV Feeder 1 by Raft River Elec 138.0 377 Auto Foreign Trouble Transferor Trouble Unknown IDF 139980
12/28/2003 03:20 12/28/2003 03:20 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 139982
12/28/2003 04:30 12/28/2003 04:30 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 139983
12/28/2003 07:30 12/28/2003 07:30 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 139984
12/28/2003 07:45 12/28/2003 07:45 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 143977
12/28/2003 08:45 12/28/2003 08:45 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 143978
12/28/2003 09:20 12/28/2003 09:20 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 143979
12/28/2003 09:23 12/28/2003 09:23 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 139985
12/28/2003 09:45 12/28/2003 09:45 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 139986
12/28/2003 10:08 12/28/2003 10:08 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 139987
12/28/2003 10:15 12/28/2003 13:24 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 189 Auto Foreign Trouble Customer Trouble Unknown TDA 139988
12/28/2003 19:57 12/28/2003 19:59 Thatcher Junction: Forest Grove OR 115kV Feeder 1 115.0 2 Auto Unknown Tree blown BPA Trouble 14 SAL 139989
12/28/2003 19:57 12/29/2003 07:38 Timber: West Oregon Elec 34.5kV Feeder 1 34.5 701 Auto Tree Tree blown BPA Trouble 7 SAL 139990
12/28/2003 19:57 12/28/2003 19:58 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 1 Auto Unknown Tree blown BPA Trouble 1 SAL 139991
12/28/2003 21:17 12/28/2003 21:23 South Fork TLP: Tillamook PUD 115kV Feeder 1 115.0 6 Plan Testing BPA Request 1 SAL 139992
12/29/2003 05:24 12/29/2003 05:24 Chemawa: Portland Gen Elec 57kV Feeder 4 57.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 7 SAL 139995
12/29/2003 05:31 12/29/2003 05:31 Chemawa: Portland Gen Elec 57kV Feeder 4 57.0 0 Auto Foreign Trouble Foreign Trouble Customer Trouble 14 SAL 139996
12/29/2003 05:58 12/29/2003 09:40 Eugene: Lane Elec Coop 34.5kV Feeder 1 34.5 222 Auto Foreign Trouble Customer Trouble 2 EUG 139997
12/29/2003 06:24 12/29/2003 06:24 Salem: Salem Elec 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble 24 SAL 139998
12/29/2003 09:07 12/29/2003 10:37 Alvey: Lane Elec Coop 34.5kV Feeder 1 34.5 90 Auto Foreign Trouble Foreign Trouble Customer Trouble 5 EUG 139999
12/29/2003 10:06 12/29/2003 10:06 Salem: Salem Elec 115kV Feeder 1 115.0 0 Auto Foreign Trouble Customer Trouble 15 SAL 140000
12/29/2003 10:08 12/29/2003 10:08 Dalreed: PacifiCorp (PACW) 230kV Feeder 1 230.0 0 Auto Unknown BPA Trouble Unknown TRI 140001
12/29/2003 10:08 12/29/2003 10:08 Tumble Creek: Consumers Power 24.9kV Feeder 1 24.9 0 Auto Unknown Ice BPA Trouble Unknown SAL 140002
12/29/2003 13:45 12/29/2003 15:20 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 95 Auto Foreign Trouble Customer Trouble Unknown TDA 140003
12/29/2003 20:11 12/29/2003 22:13 Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp 69.0 122 Auto Foreign Trouble Foreign Utility Customer Trouble Unknown SPK 140004
12/30/2003 11:35 12/30/2003 11:35 Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek 69.0 0 Auto Foreign Trouble Customer Trouble Unknown TDA 140008
12/31/2003 16:34   Condon Wind: SeaWest Power 69kV Feeder 1 69.0 still out Auto TT Noise BPA Trouble None TDA 140010

Transmission Line Interruptions
Out Datetime In Datetime Name Voltage
(kV)
Line
Type
Gen
Flag
Length
(miles)
Duration
(minutes)
Outage
Type
Dispatcher Cause Field Cause District Outage
ID
01/01/1988 11:00   Ashe-Marion No 2 500kV line 500.0 L T 224.01 still out Plan Normally Out TRI TDA RED SAL 107973
01/01/1988 11:00   Slatt tap to Ashe-Marion No 2 500kV line 500.0 T 0.10 still out Plan Normally Out TRI 107973
01/20/1995 10:31   Satsop-Grays Harbor Public Development Authority No 1 230kV line 230.0 L 0.10 still out Plan Normally Out OLY 37162
04/03/1995 10:00   Bell-AVA Beacon No 2 115kV line 115.0 L 6.20 still out Plan Normally Out SPK 170232
06/13/1996 10:20   Alvey-Fairview No 1 230kV line 230.0 L T 97.46 still out Plan Normally Out EUG 47311
06/13/1996 10:20   Reston tap to Alvey-Fairview No 1 230kV line 230.0 T 0.04 still out Plan Normally Out EUG 47311
10/14/1999 15:19   Badger Canyon-Richland No 1 115kV line 115.0 L T 5.51 still out Plan Normally Out TRI 118239
10/14/1999 15:19   Vista tap to Badger Canyon-Richland No 1 115kV line 115.0 T 0.10 still out Plan Normally Out TRI 118239
12/28/1999 12:01 08/19/2003 09:42 Ice Harbor-Franklin No 2 115kV line 115.0 L T 9.07 1915001 Plan Normally Out TRI 119106
12/28/1999 12:01 08/19/2003 09:42 Martindale tap to Ice Harbor-Franklin No 2 115kV line 115.0 T 0.10 1915001 Plan Normally Out TRI 119106
07/14/2000 13:54 02/26/2003 09:51 Grand Coulee-Bell No 2 115kV line 115.0 L T 82.06 1377897 Plan Normally Out WEN SPK 121782
07/14/2000 13:54 02/26/2003 09:51 Wagner Lake tap to Wilbur tap to Grand Coulee-Bell No 2 115kV line 115.0 TT 10.70 1377897 Plan Normally Out SPK 121782
05/05/2001 15:00   Opportunity tap to Trentwood-Valley Way No 1 115kV line 115.0 T 0.10 still out Plan Normally Out SPK 125806
05/05/2001 15:00   Trentwood-Valley Way No 1 115kV line 115.0 L T 2.72 still out Plan Normally Out SPK 125806
09/13/2001 08:54 06/01/2003 04:12 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 901158 Plan Normally Out COV 128280
09/13/2001 08:54 06/01/2003 04:12 McCullough tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 2.18 901158 Plan Normally Out COV 128280
09/20/2001 14:59   Liberty Lake tap to Vera tap to Trentwood-Valley Way No 1 115kV line 115.0 TT 0.10 still out Plan Normally Out SPK 162814
09/20/2001 14:59   Trentwood-Valley Way No 1 115kV line 115.0 L T 2.72 still out Plan Normally Out SPK 162814
10/30/2001 10:33 02/26/2003 09:51 Grand Coulee-Bell No 2 115kV line 115.0 L T 82.06 696918 Plan Normally Out WEN SPK 129098
10/30/2001 10:33 02/26/2003 09:51 Wilbur tap to Grand Coulee-Bell No 2 115kV line 115.0 T 696918 Plan Normally Out SPK 129098
02/21/2002 12:09 07/28/2003 13:00 Sno-King tap-SCL Bothell section of Snohomish-Bothell No 2 230kV line 230.0 S 0.10 751671 Plan Normally Out SNO 130601
02/21/2002 12:09 07/28/2003 13:00 Snohomish-Bothell No 2 230kV line 230.0 L O 7.40 751671 Plan Normally Out SNO 130601
05/06/2002 02:53 05/30/2003 17:35 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 561042 Auto Foreign Trouble TRI 131451
05/17/2002 15:34   Chemawa-Salem Alumina No 1 115kV line 115.0 L T 3.30 still out Plan Normally Out SAL 131615
05/17/2002 15:34   University tap to Chemawa-Salem Alumina No 1 115kV line 115.0 T 9.00 still out Plan Normally Out SAL 131615
05/20/2002 07:08 02/26/2003 10:20 Springhill tap to Grand Coulee-Bell No 2 115kV line 115.0 T 0.10 406332 Plan Maintenance SPK 131673
05/20/2002 07:08 02/21/2003 15:24 Grand Coulee-Bell No 2 115kV line 115.0 L T 82.06 399436 Plan Construction WEN SPK 135599
05/20/2002 07:08 02/21/2003 15:24 Larene tap to Grand Coulee-Bell No 2 115kV line 115.0 T 0.10 399436 Plan Construction SPK 135599
07/22/2002 14:55   Canal-Second Lift No 2 34.5kV line 34.5 L T 1.00 still out Plan Normally Out IDF 132808
07/22/2002 14:55   Jackson tap to Canal-Second Lift No 2 34.5kV line 34.5 T 5.50 still out Plan Normally Out IDF 132808
07/25/2002 13:06 03/09/2003 14:18 West Burley-Burley section of West Burley-Heyburn No 1 138kV line 138.0 S 2.22 327012 Plan Normally Out IDF 132906
07/25/2002 13:06 03/09/2003 14:18 West Burley-Heyburn No 1 138kV line 138.0 L G 4.43 327012 Plan Normally Out IDF 132906
07/31/2002 18:39 01/21/2003 10:43 Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line 69.0 S 13.40 250144 Plan Normally Out TRI 133008
07/31/2002 18:39 01/21/2003 10:43 Walla Walla-Pendleton No 1 69kV line 69.0 L G 38.93 250144 Plan Normally Out TRI 133008
08/07/2002 13:18   Walla Walla-Pendleton No 1 69kV line 69.0 L T 38.93 still out Plan Normally Out TRI 133092
08/07/2002 13:18   Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS 0.48 still out Plan Normally Out TRI 133092
08/13/2002 14:11 03/19/2003 08:02 Ely-Highland section of Franklin-Badger Canyon No 2 115kV line 115.0 S 1.98 313611 Plan Normally Out TRI 133155
08/13/2002 14:11 03/19/2003 08:02 Franklin-Badger Canyon No 2 115kV line 115.0 L G 13.35 313611 Plan Normally Out TRI 133155
08/15/2002 11:37   Franklin-Badger Canyon No 2 115kV line 115.0 L T 13.35 still out Plan Normally Out TRI 133190
08/15/2002 11:37   Hedges tap to Franklin-Badger Canyon No 2 115kV line 115.0 T 0.33 still out Plan Normally Out TRI 133190
10/01/2002 14:16   Four Lakes tap to Sunset-East Colfax 115kV line 115.0 T 5.92 still out Plan Normally Out SPK 133974
10/01/2002 14:16   Sunset-East Colfax 115kV line 115.0 L T 52.65 still out Plan Normally Out SPK TRI 133974
10/03/2002 17:28 01/15/2003 08:31 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T 31.20 149283 Plan Normally Out RED 134020
10/03/2002 17:28 01/15/2003 08:31 Redmond-Harney No 1 115kV line 115.0 L T 125.40 149283 Plan Normally Out RED 134020
10/04/2002 22:27 03/07/2003 16:24 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 221457 Plan Construction TDA RED 134035
10/04/2002 22:27 03/07/2003 16:24 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 221457 Plan Construction TDA 134035
10/10/2002 11:06   Baker Creek-Walnut City section of Walnut City tap to Forest Grove-McMinnville No 1 115kV line 115.0 TS 1.20 still out Plan Normally Out SAL 134113
10/10/2002 11:06   Forest Grove-McMinnville No 1 115kV line 115.0 L T 23.72 still out Plan Normally Out SAL 134113
10/18/2002 12:12 06/27/2003 14:21 Tacoma-TPWR Northeast No 1 230kV line 230.0 L 0.10 363009 Plan Normally Out COV 134202
10/24/2002 14:25 03/20/2003 16:00 Colville-Boundary No 1 115kV line 115.0 L G 43.06 211835 Plan Normally Out SPK 134303
10/24/2002 14:25 03/20/2003 16:00 Metaline Falls-Boundary section of Colville-Boundary No 1 115kV line 115.0 S 8.91 211835 Plan Normally Out SPK 134303
11/04/2002 16:36 01/07/2003 08:43 Albany-Eugene No 1 115kV line 115.0 L G 39.80 91687 Plan Normally Out EUG 134407
11/04/2002 16:36 01/07/2003 08:43 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 91687 Plan Normally Out EUG 134407
11/06/2002 10:56 01/09/2003 19:00 Fidalgo-Lopez Island No 3 34.5kV line 34.5 L 8.57 92644 Plan Load Control SNO 134431
11/27/2002 15:26 06/09/2003 08:24 Bald Mountain tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 0.38 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 0.99 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 Bonneville PH 1-North Camas No 1 115kV line 115.0 L T 22.12 278878 Plan Normally Out LGV 134681
11/27/2002 15:26 06/09/2003 08:24 Carson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 1.24 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 15.35 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 North Bonneville Annex tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 0.10 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 5.30 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 Stevenson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 0.10 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 Stevenson-Carson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 3.60 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 T 25.00 278878 Plan Normally Out LGV TDA 134681
11/27/2002 15:26 06/09/2003 08:24 Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 0.10 278878 Plan Normally Out LGV TDA 134681
12/06/2002 16:05 02/27/2003 10:20 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 119175 Plan Normally Out TRI 134796
12/06/2002 16:05 02/27/2003 10:20 White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line 115.0 S 4.30 119175 Plan Normally Out TRI 134796
12/10/2002 08:47   Boardman tap to McNary-Santiam No 2 230kV line 230.0 T 0.28 still out Plan Normally Out TRI 134834
12/10/2002 08:47   McNary-Santiam No 2 230kV line 230.0 L T 200.43 still out Plan Normally Out TRI TDA RED SAL 134834
12/18/2002 16:16 01/06/2003 09:03 Benton-Scooteney No 1 115kV line 115.0 L G 20.32 26927 Plan Normally Out TRI 135004
12/18/2002 16:16 01/06/2003 09:03 Connell-Scooteney section of Benton-Scooteney No 1 115kV line 115.0 S 1.57 26927 Plan Normally Out TRI 135004
12/27/2002 03:34 01/01/2003 20:15 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 8201 Auto Wind Tree blown EUG 135143
12/27/2002 03:34 01/01/2003 20:15 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 8201 Auto Wind Tree blown EUG 135143
12/31/2002 08:00 01/08/2003 12:32 Allston-Astoria No 1 115kV line 115.0 L G 41.98 11792 Plan Foreign Request LGV 135163
12/31/2002 08:00 01/08/2003 12:32 Fern Hill-Astoria section of Allston-Astoria No 1 115kV line 115.0 S 3.95 11792 Plan Foreign Request LGV 135163
01/01/2003 00:21 01/01/2003 06:19 Buckley-Marion No 1 500kV line 500.0 L 99.33 358 Plan Voltage Control TDA RED SAL 135128
01/01/2003 01:15 01/02/2003 06:00 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1725 Plan Voltage Control RED 135129
01/01/2003 16:23 01/01/2003 17:15 Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line 115.0 S G 4.30 52 Auto Foreign Trouble Foreign Trouble LGV OLY 135144
01/01/2003 16:23 01/01/2003 17:15 Naselle-Hagen section of Naselle-Tarlett No 2 115kV line 115.0 S G 13.00 52 Auto Foreign Trouble Foreign Trouble LGV OLY 135144
01/01/2003 16:23 01/01/2003 17:15 Naselle-Tarlett No 2 115kV line 115.0 L 17.30 52 Auto Foreign Trouble Foreign Trouble LGV OLY 135144
01/01/2003 16:52 01/01/2003 16:52 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T 2.39 0 Auto Unknown Unknown SPK 135145
01/01/2003 16:52 01/01/2003 16:52 Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line 115.0 S 4.75 0 Auto Unknown Unknown SPK 135145
01/01/2003 16:52 01/01/2003 16:52 Colville-Boundary No 1 115kV line 115.0 L O 43.06 0 Auto Unknown Unknown SPK 135145
01/01/2003 16:52 01/01/2003 16:52 Colville-Spirit section of Colville-Boundary No 1 115kV line 115.0 S 17.42 0 Auto Unknown Unknown SPK 135145
01/01/2003 16:52 01/01/2003 16:52 Metaline Falls tap to Colville-Boundary No 1 115kV line 115.0 T 1.20 0 Auto Unknown Unknown SPK 135145
01/01/2003 16:52 01/01/2003 16:52 Spirit tap to Colville-Boundary No 1 115kV line 115.0 T 5.23 0 Auto Unknown Unknown SPK 135145
01/01/2003 16:52 01/01/2003 16:52 Spirit-Box Canyon section of Colville-Boundary No 1 115kV line 115.0 S 11.98 0 Auto Unknown Unknown SPK 135145
01/02/2003 00:39 01/02/2003 00:39 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 17.09 0 Auto Foreign Trouble Foreign Trouble KAL 135146
01/02/2003 00:39 01/02/2003 00:39 Libby-Bonners Ferry No 1 115kV line 115.0 L 59.58 0 Auto Foreign Trouble Foreign Trouble KAL SPK 135146
01/02/2003 00:39 01/02/2003 00:39 Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.27 0 Auto Foreign Trouble Foreign Trouble KAL 135146
01/02/2003 00:39 01/02/2003 00:39 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 6.23 0 Auto Foreign Trouble Foreign Trouble SPK 135146
01/02/2003 00:39 01/02/2003 00:39 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.41 0 Auto Foreign Trouble Foreign Trouble KAL 135146
01/02/2003 00:39 01/02/2003 00:39 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 11.58 0 Auto Foreign Trouble Foreign Trouble KAL SPK 135146
01/02/2003 02:05 01/02/2003 05:30 Buckley-Marion No 1 500kV line 500.0 L 99.33 205 Plan Voltage Control TDA RED SAL 135147
01/02/2003 05:54 01/02/2003 05:54 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 0 Auto Unknown Wind SAL 135164
01/02/2003 07:32 01/02/2003 14:55 Bell-Trentwood No 2 115kV line 115.0 L G 11.30 443 Plan Maintenance SPK 135165
01/02/2003 07:32 01/02/2003 14:55 Bigelow-Trentwood section of Bell-Trentwood No 2 115kV line 115.0 S 4.70 443 Plan Maintenance SPK 135165
01/02/2003 08:32 01/02/2003 08:33 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T 2.39 1 Auto Unknown Unknown SPK 135166
01/02/2003 08:32 01/02/2003 08:33 Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line 115.0 S 4.75 1 Auto Unknown Unknown SPK 135166
01/02/2003 08:32 01/02/2003 08:33 Colville-Boundary No 1 115kV line 115.0 L O 43.06 1 Auto Unknown Unknown SPK 135166
01/02/2003 08:32 01/02/2003 08:33 Colville-Spirit section of Colville-Boundary No 1 115kV line 115.0 S 17.42 1 Auto Unknown Unknown SPK 135166
01/02/2003 08:32 01/02/2003 08:33 Metaline Falls tap to Colville-Boundary No 1 115kV line 115.0 T 1.20 1 Auto Unknown Unknown SPK 135166
01/02/2003 08:32 01/02/2003 08:33 Spirit tap to Colville-Boundary No 1 115kV line 115.0 T 5.23 1 Auto Unknown Unknown SPK 135166
01/02/2003 08:32 01/02/2003 08:33 Spirit-Box Canyon section of Colville-Boundary No 1 115kV line 115.0 S 11.98 1 Auto Unknown Unknown SPK 135166
01/02/2003 09:02 01/02/2003 10:06 Goble-Rainier section of St Helens-Allston No 1 115kV line 115.0 S 5.30 64 Auto Foreign Trouble Foreign Trouble LGV 135167
01/02/2003 09:02 01/02/2003 10:06 Rainier-Allston section of St Helens-Allston No 1 115kV line 115.0 S 6.25 64 Auto Foreign Trouble Foreign Trouble LGV 135167
01/02/2003 09:02 01/02/2003 13:45 St Helens-Allston No 1 115kV line 115.0 L G 25.22 283 Auto Foreign Trouble Foreign Trouble LGV 135167
01/02/2003 09:02 01/02/2003 13:45 St Helens-Goble section of St Helens-Allston No 1 115kV line 115.0 S 13.67 283 Auto Foreign Trouble Foreign Trouble LGV 135167
01/02/2003 11:37 01/02/2003 11:37 Taft-Bell No 1 500kV line 500.0 L 96.44 0 Auto Unknown Unknown KAL SPK 135168
01/02/2003 20:27 01/03/2003 00:38 Raymond-Henkle St. No 1 115kV line 115.0 L 2.51 251 Auto Unknown Unknown OLY 135169
01/02/2003 23:48 01/03/2003 04:53 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 305 Auto Tree blown Tree blown OLY 135170
01/02/2003 23:48 01/03/2003 04:53 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 305 Auto Tree blown Tree blown OLY 135170
01/02/2003 23:48 01/02/2003 23:51 Holcomb tap to Chehalis-Raymond No 1 115kV line 115.0 T 0.01 3 Auto Tree blown Tree blown OLY 135170
01/02/2003 23:48 01/02/2003 23:51 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 3 Auto Tree blown Tree blown OLY 135170
01/02/2003 23:48 01/03/2003 00:49 Pe Ell tap to Chehalis-Raymond No 1 115kV line 115.0 T 0.10 61 Auto Tree blown Tree blown OLY 135170
01/02/2003 23:48 01/03/2003 00:49 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 61 Auto Tree blown Tree blown OLY 135170
01/03/2003 00:48 01/03/2003 00:49 Chehalis-Raymond No 1 115kV line 115.0 L O 45.44 1 Plan Testing OLY 135172
01/03/2003 00:48 01/03/2003 00:49 Holcomb tap to Chehalis-Raymond No 1 115kV line 115.0 T 0.01 1 Plan Testing OLY 135172
01/03/2003 00:48 01/03/2003 00:49 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 1 Plan Testing OLY 135172
01/03/2003 00:54 01/03/2003 05:46 Schultz-Raver No 1 500kV line 500.0 L 77.24 292 Plan Voltage Control WEN COV 135173
01/03/2003 07:03 01/03/2003 07:03 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 0 Auto Foreign Trouble Foreign Utility SPK 135179
01/03/2003 21:57 01/03/2003 21:57 Midway-Rocky Ford No 1 230kV line 230.0 L 47.57 0 Auto Unknown Unknown TRI WEN 135180
01/04/2003 00:08 01/04/2003 18:13 Garrison-Taft No 2 500kV line 500.0 L 159.38 1085 Plan Voltage Control KAL 135181
01/04/2003 00:16 01/04/2003 07:11 Schultz-Raver No 1 500kV line 500.0 L 77.24 415 Plan Voltage Control WEN COV 135182
01/04/2003 01:48 01/04/2003 06:45 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 297 Plan Voltage Control RED 135183
01/04/2003 07:10 01/04/2003 07:10 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.01 0 Auto Unknown Unknown KAL 135186
01/04/2003 07:10 01/04/2003 07:10 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S G 31.50 0 Auto Unknown Unknown KAL 135186
01/04/2003 07:10 01/04/2003 07:10 Libby-Conkelley No 1 230kV line 230.0 L 83.94 0 Auto Unknown Unknown KAL 135186
01/04/2003 07:10 01/04/2003 07:10 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S G 45.10 0 Auto Unknown Unknown KAL 135186
01/04/2003 07:10 01/04/2003 07:10 Trumbull Creek tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.10 0 Auto Unknown Unknown KAL 135186
01/04/2003 07:10 01/04/2003 07:10 Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line 230.0 S G 7.34 0 Auto Unknown Unknown KAL 135186
01/04/2003 07:10 01/04/2003 07:18 Libby PH-Libby No 2 230kV line 230.0 L 1.29 8 Auto RAS Initiated RAS Initiated KAL 135187
01/04/2003 18:14 01/05/2003 07:49 Garrison-Taft No 1 500kV line 500.0 L 159.38 815 Plan Voltage Control KAL 135188
01/05/2003 00:07 01/05/2003 08:11 Schultz-Raver No 1 500kV line 500.0 L 77.24 484 Plan Voltage Control WEN COV 135189
01/05/2003 03:56 01/05/2003 06:55 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 179 Plan Voltage Control RED 135190
01/05/2003 07:51 01/05/2003 20:22 Garrison-Taft No 2 500kV line 500.0 L 159.38 751 Plan Voltage Control KAL 135191
01/05/2003 20:24 01/06/2003 00:04 Garrison-Taft No 1 500kV line 500.0 L 159.38 220 Plan Voltage Control KAL 135192
01/06/2003 00:53 01/06/2003 05:34 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 281 Plan Voltage Control RED 135193
01/06/2003 05:58 01/06/2003 16:13 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 615 Plan Maintenance TDA 135194
01/06/2003 08:28 01/06/2003 08:33 Lagoon-Stateline section of Walla Walla-Pendleton No 1 69kV line 69.0 S 3.63 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:33 Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 5.47 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:33 Milton tap-Weston Mountain section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS 4.99 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:33 Milton-Lagoon section of Walla Walla-Pendleton No 1 69kV line 69.0 S 1.06 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:37 Mission-Pendleton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 6.67 9 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:33 Stateline tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 1.31 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:33 Stateline-Vansycle section of Walla Walla-Pendleton No 1 69kV line 69.0 S 4.62 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:33 Walla Walla-Milton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 9.55 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:37 Walla Walla-Pendleton No 1 69kV line 69.0 L O 38.93 9 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 08:28 01/06/2003 08:33 Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS T 0.48 5 Auto Terminal Equipment Failure Line Material Failure TRI 135202
01/06/2003 09:06 01/10/2003 15:53 Midway-Moxee No 1 115kV line 115.0 L G 33.98 6167 Plan Maintenance TRI WEN 135203
01/06/2003 09:06 01/10/2003 15:53 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S 16.61 6167 Plan Maintenance TRI WEN 135203
01/06/2003 09:11 01/17/2003 13:25 Midway-Benton No 1 115kV line 115.0 L T 28.75 16094 Plan Maintenance TRI 135204
01/06/2003 09:11 01/17/2003 13:25 Scooteney tap-Sagehill section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS 15.05 16094 Plan Maintenance TRI 135204
01/06/2003 09:39 01/10/2003 13:53 Eagle Lake tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT G 0.10 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Eagle Lake-Radar section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS G 1.92 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Midway-Benton No 1 115kV line 115.0 L 28.75 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Midway-Scooteney section of Midway-Benton No 1 115kV line 115.0 S G 13.90 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Radar USBR tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT G 1.94 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Radar-Scooteney section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS G 7.25 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Sagehill tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT G 3.20 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Sagehill-Eagle Lake section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS G 4.24 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Scooteney tap to Midway-Benton No 1 115kV line 115.0 T G 28.46 6014 Plan Maintenance TRI 135205
01/06/2003 09:39 01/10/2003 13:53 Scooteney-Benton section of Midway-Benton No 1 115kV line 115.0 S G 14.85 6014 Plan Maintenance TRI 135205
01/06/2003 09:40 01/06/2003 14:17 Mission-Pendleton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 6.67 277 Plan Maintenance TRI 135206
01/06/2003 09:40 01/06/2003 14:17 Walla Walla-Pendleton No 1 69kV line 69.0 L O 38.93 277 Plan Maintenance TRI 135206
01/06/2003 09:40 01/27/2003 13:58 Elmo-Kerr section of Kalispell-Kerr No 1 115kV line 115.0 S 12.80 30498 Plan Maintenance KAL 135210
01/06/2003 09:40 01/27/2003 13:58 Kalispell-Kerr No 1 115kV line 115.0 L G 41.39 30498 Plan Maintenance KAL 135210
01/06/2003 11:20 01/08/2003 17:04 Dworshak PH-Ahsahka section of Dworshak PH-Orofino No 1 115kV line 115.0 S 0.83 3224 Plan Foreign Request TRI SPK 135207
01/06/2003 11:20 01/08/2003 17:04 Dworshak PH-Orofino No 1 115kV line 115.0 L G 4.45 3224 Plan Foreign Request TRI SPK 135207
01/07/2003 07:21 01/07/2003 14:46 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 445 Plan Maintenance EUG 135211
01/07/2003 07:21 01/07/2003 14:46 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 445 Plan Maintenance EUG 135211
01/07/2003 07:39 01/09/2003 13:44 Heyburn-Adelaide No 1 138kV line 138.0 L G 12.35 3245 Plan Maintenance IDF 135212
01/07/2003 07:39 01/09/2003 13:44 Heyburn-Hay Mill section of Heyburn-Adelaide No 1 138kV line 138.0 S 4.51 3245 Plan Maintenance IDF 135212
01/07/2003 08:46 01/07/2003 16:22 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 456 Plan Foreign Request TRI 135213
01/07/2003 08:46 01/07/2003 16:22 McNary-Wallula 230kV line 230.0 L G 30.70 456 Plan Foreign Request TRI 135213
01/07/2003 08:51 01/10/2003 15:41 Albany-Eugene No 1 115kV line 115.0 L G 39.80 4730 Plan Maintenance EUG 135214
01/07/2003 08:51 01/10/2003 15:41 Albany-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 22.60 4730 Plan Maintenance EUG 135214
01/08/2003 06:51 01/08/2003 16:09 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 558 Plan Switching OLY 135217
01/08/2003 06:51 01/08/2003 16:09 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 558 Plan Switching OLY 135217
01/08/2003 07:38 01/08/2003 15:16 Chehalis-Raymond No 1 115kV line 115.0 L O 45.44 458 Plan Maintenance OLY 135218
01/08/2003 07:38 01/08/2003 15:16 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 458 Plan Maintenance OLY 135218
01/08/2003 07:42 01/08/2003 13:49 Unity-Heyburn No 1 138kV line 138.0 L 6.56 367 Plan Maintenance IDF 135219
01/08/2003 10:41 01/08/2003 11:49 Marion-Santiam No 1 500kV line 500.0 L 2.44 68 Plan Maintenance SAL 135220
01/09/2003 01:44 01/09/2003 05:37 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 233 Plan Voltage Control RED 135221
01/09/2003 05:42 01/09/2003 16:02 Longview-Cowlitz No 1 115kV line 115.0 L 3.61 620 Plan Emergency LGV 135227
01/09/2003 07:07 01/09/2003 16:17 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 550 Plan Maintenance OLY 135228
01/09/2003 07:07 01/09/2003 16:17 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 550 Plan Maintenance OLY 135228
01/09/2003 07:34 01/09/2003 13:46 East Hills-Unity section of Minidoka PH-Unity No 1 138kV line 138.0 S 5.97 372 Plan Maintenance IDF 135229
01/09/2003 07:34 01/09/2003 13:46 Minidoka PH-Unity No 1 138kV line 138.0 L G 24.91 372 Plan Maintenance IDF 135229
01/09/2003 07:49 01/13/2003 08:55 Chehalis-Covington No 1 230kV line 230.0 L T 69.40 5826 Plan PCS Cellular Work OLY COV 135230
01/09/2003 07:49 01/13/2003 08:55 Cowlitz tap to Chehalis-Covington No 1 230kV line 230.0 T 6.30 5826 Plan PCS Cellular Work COV 135230
01/09/2003 07:59 01/09/2003 15:25 Chehalis-Raymond No 1 115kV line 115.0 L O 45.44 446 Plan Forced OLY 135231
01/09/2003 07:59 01/09/2003 15:25 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 446 Plan Forced OLY 135231
01/09/2003 07:59 01/09/2003 15:25 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 446 Plan Forced OLY LGV 135232
01/09/2003 07:59 01/09/2003 15:25 Holcomb-Oxbow section of Holcomb-Naselle No 1 115kV line 115.0 S 1.48 446 Plan Forced OLY 135232
01/09/2003 08:55 01/09/2003 09:09 Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line 230.0 S 35.80 14 Plan Switching OLY COV 135233
01/09/2003 08:55 01/09/2003 09:09 Chehalis-Covington No 1 230kV line 230.0 L G 69.40 14 Plan Switching OLY COV 135233
01/09/2003 08:55 01/09/2003 09:09 TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line 230.0 S 23.30 14 Plan Switching COV 135233
01/09/2003 11:50 01/09/2003 16:21 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 271 Plan Maintenance TDA RED 135234
01/09/2003 11:50 01/09/2003 16:21 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 271 Plan Maintenance TDA 135234
01/09/2003 11:55 01/09/2003 11:58 Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line 230.0 S 71.70 3 Auto Ice Ice TDA TRI 135235
01/09/2003 11:55 01/09/2003 11:58 Big Eddy-Midway No 1 230kV line 230.0 L G 102.80 3 Auto Ice Ice TDA TRI 135235
01/09/2003 13:01 01/09/2003 13:01 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Ice Ice TDA 135236
01/09/2003 13:01 01/09/2003 13:01 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Ice Ice TDA 135236
01/09/2003 13:01 01/09/2003 13:01 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Ice Ice TDA 135236
01/09/2003 13:01 01/09/2003 13:01 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Ice Ice TDA 135236
01/09/2003 13:01 01/09/2003 13:01 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Ice Ice TDA 135236
01/09/2003 13:01 01/09/2003 13:01 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Ice Ice TDA 135236
01/09/2003 13:01 01/09/2003 13:01 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Ice Ice TDA 135236
01/09/2003 13:01 01/09/2003 13:01 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Ice Ice TDA 135236
01/09/2003 19:00 01/10/2003 11:48 Fidalgo-Lopez Island No 5 69kV line 69.0 L 8.49 1008 Plan Maintenance SNO 135237
01/10/2003 01:21 01/10/2003 01:31 Midway-Priest Rapids No 3 230kV line 230.0 L 7.20 10 Auto Foreign Trouble Foreign Trouble TRI 135238
01/10/2003 01:30 01/10/2003 05:35 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 245 Plan Voltage Control RED 135239
01/10/2003 07:38 01/10/2003 15:17 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 459 Plan Maintenance SAL 135241
01/10/2003 07:38 01/10/2003 15:17 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 459 Plan Maintenance SAL 135241
01/10/2003 11:05 01/24/2003 14:27 Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line 230.0 S 71.70 20362 Plan Emergency TDA TRI 135242
01/10/2003 11:05 01/24/2003 14:27 Big Eddy-Midway No 1 230kV line 230.0 L G 102.80 20362 Plan Emergency TDA TRI 135242
01/10/2003 11:48   Fidalgo-Lopez Island No 3 34.5kV line 34.5 L 8.57 still out Plan Normally Out SNO 135243
01/10/2003 15:50 01/21/2003 09:25 Albany-Eugene No 1 115kV line 115.0 L G 39.80 15455 Plan Normally Out EUG 135244
01/10/2003 15:50 01/21/2003 09:25 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 15455 Plan Normally Out EUG 135244
01/10/2003 23:42 01/10/2003 23:44 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 2 Plan Foreign Request WEN 135245
01/11/2003 01:36 01/11/2003 11:18 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 582 Plan Voltage Control RED 135246
01/11/2003 06:53 01/11/2003 06:53 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 135247
01/11/2003 06:53 01/11/2003 06:53 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 135247
01/11/2003 06:53 01/11/2003 06:53 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 135247
01/11/2003 15:43 01/11/2003 21:44 Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line 500.0 T 0.09 361 Auto Foreign Trouble Foreign Utility OLY 135248
01/11/2003 15:43 01/11/2003 21:44 Paul-Centralia Thermal PH No 1 500kV line 500.0 L T 0.78 361 Auto Foreign Trouble Foreign Utility OLY 135248
01/12/2003 00:54 01/13/2003 05:43 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1729 Plan Voltage Control RED 135249
01/12/2003 00:57 01/12/2003 07:45 Schultz-Raver No 1 500kV line 500.0 L 77.24 408 Plan Voltage Control WEN COV 135250
01/12/2003 06:23 01/12/2003 06:23 Slatt-John Day No 1 500kV line 500.0 L 30.32 0 Auto Unknown Unknown TRI TDA 135251
01/13/2003 08:25 01/17/2003 13:38 Midway-Benton No 1 115kV line 115.0 L G 28.75 6073 Plan Maintenance TRI 135257
01/13/2003 08:25 01/17/2003 13:38 Midway-Scooteney section of Midway-Benton No 1 115kV line 115.0 S 13.90 6073 Plan Maintenance TRI 135257
01/13/2003 08:25 01/17/2003 13:20 Scooteney-Benton section of Midway-Benton No 1 115kV line 115.0 S 14.85 6055 Plan Maintenance TRI 135257
01/13/2003 09:18 01/17/2003 12:26 Midway-Moxee No 1 115kV line 115.0 L G 33.98 5948 Plan Maintenance TRI WEN 135258
01/13/2003 09:18 01/17/2003 12:26 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S 16.61 5948 Plan Maintenance TRI WEN 135258
01/13/2003 09:33 01/16/2003 09:42 B-212-Bell section of Grand Coulee-Bell No 2 115kV line 115.0 S 4329 Plan Maintenance SPK 135259
01/13/2003 09:33 01/16/2003 09:42 Grand Coulee-Bell No 2 115kV line 115.0 L G 82.06 4329 Plan Maintenance WEN SPK 135259
01/13/2003 10:10 01/16/2003 14:33 Badger Canyon-Richland No 1 115kV line 115.0 L G 5.51 4583 Plan Foreign Request TRI 135260
01/13/2003 10:10 01/16/2003 14:33 Tapteal-Richland section of Badger Canyon-Richland No 1 115kV line 115.0 S 2.45 4583 Plan Foreign Request TRI 135260
01/14/2003 07:03 01/14/2003 16:24 Allston-Astoria No 1 115kV line 115.0 L G 41.98 561 Plan Maintenance LGV 135264
01/14/2003 07:03 01/14/2003 16:24 Naselle-Knappa section of Allston-Astoria No 1 115kV line 115.0 S 8.74 561 Plan Maintenance LGV 135264
01/14/2003 07:23 01/14/2003 16:14 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 531 Plan Maintenance OLY LGV 135265
01/14/2003 07:23 01/14/2003 16:14 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 531 Plan Maintenance OLY LGV 135265
01/14/2003 08:01 01/17/2003 20:22 Marion-Santiam No 1 500kV line 500.0 L 2.44 5061 Plan Maintenance SAL 135266
01/14/2003 08:10 01/14/2003 15:14 Foster tap-Lebanon section of Green Peter-Lebanon No 1 115kV line 115.0 S 11.78 424 Plan Maintenance EUG 135267
01/14/2003 08:10 01/14/2003 15:14 Green Peter-Lebanon No 1 115kV line 115.0 L G 18.09 424 Plan Maintenance EUG 135267
01/14/2003 10:22 01/14/2003 10:33 WNP 1-Ashe No 2 230kV line 230.0 L 2.26 11 Plan Foreign Request TRI 135268
01/14/2003 23:47 01/14/2003 23:49 Lower Monumental-Ashe No 1 500kV line 500.0 L 39.58 2 Auto Unknown Unknown TRI 135269
01/15/2003 01:59 01/15/2003 01:59 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 0 Auto Unknown Unknown RED 135270
01/15/2003 01:59 01/15/2003 02:05 Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line 500.0 S 18.26 6 Auto Improper Relaying Improper Relaying RED 135271
01/15/2003 01:59 01/15/2003 02:05 Grizzly-Summer Lake No 1 500kV line 500.0 L G 103.37 6 Auto Improper Relaying Improper Relaying RED 135271
01/15/2003 01:59 01/15/2003 02:12 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T 0.01 13 Auto Improper Relaying Improper Relaying RED 135271
01/15/2003 01:59 01/15/2003 02:05 Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line 500.0 S 85.11 6 Auto Improper Relaying Improper Relaying RED 135271
01/15/2003 03:04 01/15/2003 05:47 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 163 Plan Voltage Control RED 135272
01/15/2003 06:54 01/15/2003 17:24 Allston-Astoria No 1 115kV line 115.0 L G 41.98 630 Plan Maintenance LGV 135277
01/15/2003 06:54 01/15/2003 17:24 Naselle-Knappa section of Allston-Astoria No 1 115kV line 115.0 S 8.74 630 Plan Maintenance LGV 135277
01/15/2003 08:00 01/15/2003 08:26 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 26 Plan Switching RED 135278
01/15/2003 08:00 01/15/2003 08:26 Redmond-Harney No 1 115kV line 115.0 L G 125.40 26 Plan Switching RED 135278
01/15/2003 08:14 01/15/2003 14:57 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S 2.40 403 Plan Switching RED 135279
01/15/2003 08:14 01/15/2003 14:57 Redmond-Harney No 1 115kV line 115.0 L O 125.40 403 Plan Switching RED 135279
01/15/2003 08:41 01/15/2003 14:40 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 359 Plan Maintenance RED 135280
01/15/2003 09:12 01/15/2003 13:24 La Pine-Fort Rock No 1 115kV line 115.0 L 47.03 252 Plan Maintenance RED 135281
01/15/2003 09:53 01/15/2003 15:02 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 309 Plan Maintenance EUG 135282
01/15/2003 14:19 05/01/2003 10:10 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T 31.20 152331 Plan Normally Out RED 135283
01/15/2003 14:19 05/01/2003 10:10 Redmond-Harney No 1 115kV line 115.0 L T 125.40 152331 Plan Normally Out RED 135283
01/15/2003 14:24 01/15/2003 15:05 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 41 Plan Switching RED 135284
01/15/2003 14:24 01/15/2003 15:05 Redmond-Harney No 1 115kV line 115.0 L O 125.40 41 Plan Switching RED 135284
01/16/2003 01:34 01/16/2003 05:59 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 265 Plan Voltage Control RED 135285
01/16/2003 07:21 01/16/2003 16:10 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 529 Plan Maintenance OLY 135288
01/16/2003 07:21 01/16/2003 16:10 Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line 69.0 S 11.79 529 Plan Maintenance OLY 135288
01/16/2003 07:40 01/16/2003 15:21 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 461 Plan Maintenance EUG 135289
01/16/2003 07:40 01/16/2003 15:21 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 461 Plan Maintenance EUG 135289
01/16/2003 11:03 01/16/2003 14:09 Snohomish-Bothell No 1 230kV line 230.0 L 7.64 186 Plan Maintenance SNO 135290
01/17/2003 07:36 01/17/2003 15:00 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 444 Plan Maintenance EUG 135297
01/17/2003 07:36 01/17/2003 15:00 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 444 Plan Maintenance EUG 135297
01/17/2003 08:03 01/17/2003 12:52 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 289 Plan Maintenance SAL 135298
01/17/2003 08:03 01/17/2003 12:52 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 289 Plan Maintenance SAL 135298
01/17/2003 09:01 01/17/2003 13:47 Broadview-Garrison No 2 500kV line 500.0 L 224.71 286 Plan Maintenance KAL 135299
01/17/2003 13:26 01/27/2003 08:23 Midway-Benton No 1 115kV line 115.0 L T 28.75 14097 Plan Maintenance TRI 135300
01/17/2003 13:26 01/27/2003 08:23 Radar-Scooteney section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS 7.25 14097 Plan Maintenance TRI 135300
01/19/2003 01:08 01/19/2003 06:51 Schultz-Raver No 1 500kV line 500.0 L 77.24 343 Plan Voltage Control WEN COV 135301
01/19/2003 01:22 01/20/2003 05:46 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1704 Plan Voltage Control RED 135302
01/19/2003 21:54 01/19/2003 21:54 Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 18.26 0 Auto Unknown Unknown RED 135303
01/19/2003 21:54 01/19/2003 21:54 Grizzly-Summer Lake No 1 500kV line 500.0 L 103.37 0 Auto Unknown Unknown RED 135303
01/19/2003 21:54 01/19/2003 21:54 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T G 0.01 0 Auto Unknown Unknown RED 135303
01/19/2003 21:54 01/19/2003 21:54 Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 85.11 0 Auto Unknown Unknown RED 135303
01/20/2003 06:02 01/20/2003 06:05 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 3 Auto Foreign Trouble RED 135304
01/20/2003 06:02 01/20/2003 06:05 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 3 Auto Foreign Trouble IDF RED 135304
01/20/2003 06:02 01/20/2003 06:05 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 3 Auto Foreign Trouble IDF RED 135304
01/21/2003 06:01 01/22/2003 18:00 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 2159 Plan Construction TDA 135305
01/21/2003 06:01 01/22/2003 18:00 Big Eddy-Celilo No 3 230kV line 230.0 L 1.09 2159 Plan Construction TDA 135306
01/21/2003 06:01 01/22/2003 18:00 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 2159 Plan Construction TDA RED 135312
01/21/2003 06:01 01/22/2003 18:00 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 2159 Plan Construction TDA 135312
01/21/2003 06:01 01/22/2003 18:00 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 2159 Plan Construction TDA 135312
01/21/2003 06:01 01/22/2003 18:00 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 2159 Plan Construction TDA 135312
01/21/2003 06:01 01/22/2003 18:00 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 2159 Plan Construction TDA RED 135313
01/21/2003 06:01 01/22/2003 18:00 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 2159 Plan Construction TDA 135313
01/21/2003 06:01 01/22/2003 18:00 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 2159 Plan Construction TDA 135313
01/21/2003 06:01 01/22/2003 18:00 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 2159 Plan Construction TDA 135313
01/21/2003 06:01 01/31/2003 16:36 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 15035 Plan Maintenance TDA RED 135398
01/21/2003 06:01 01/31/2003 16:36 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 15035 Plan Maintenance TDA 135398
01/21/2003 07:21 01/21/2003 16:15 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 534 Plan Maintenance OLY 135314
01/21/2003 07:21 01/21/2003 16:15 Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line 69.0 S 11.79 534 Plan Maintenance OLY 135314
01/21/2003 09:05 01/21/2003 09:33 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 28 Plan Foreign Request TRI SPK 135315
01/21/2003 09:06 01/23/2003 15:27 Fairview-PACW Isthmus No 2 230kV line 230.0 L 11.90 3261 Plan Foreign Request EUG 135316
01/21/2003 19:18 01/27/2003 11:04 Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line 69.0 S 13.40 8146 Plan Normally Out TRI 135318
01/21/2003 19:18 01/27/2003 11:04 Walla Walla-Pendleton No 1 69kV line 69.0 L G 38.93 8146 Plan Normally Out TRI 135318
01/22/2003 07:27 01/22/2003 14:01 Lane-Wendson No 1 115kV line 115.0 L G 41.39 394 Plan Maintenance EUG 135328
01/22/2003 07:27 01/22/2003 14:01 Mapleton-Wendson section of Lane-Wendson No 1 115kV line 115.0 S 8.00 394 Plan Maintenance EUG 135328
01/22/2003 08:21 01/22/2003 11:49 Olympia-South Tacoma No 1 230kV line 230.0 L 36.94 208 Plan Maintenance OLY COV 135329
01/22/2003 12:00 01/22/2003 12:30 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 30 Plan Foreign Request TRI SPK 135330
01/22/2003 20:15 01/22/2003 20:15 Chenoweth-Goldendale No 1 115kV line 115.0 L 24.08 0 Auto Unknown Ice TDA 135331
01/22/2003 20:15 01/22/2003 20:15 Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line 115.0 S G 3.84 0 Auto Unknown Ice TDA 135331
01/22/2003 20:15 01/22/2003 20:15 E. E. Clouse tap to Chenoweth-Goldendale No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Ice TDA 135331
01/22/2003 20:15 01/22/2003 20:15 Spearfish tap to Chenoweth-Goldendale No 1 115kV line 115.0 T G 3.22 0 Auto Unknown Ice TDA 135331
01/22/2003 20:15 01/22/2003 20:15 Spearfish-Goldendale section of Chenoweth-Goldendale No 1 115kV line 115.0 S G 20.24 0 Auto Unknown Ice TDA 135331
01/23/2003 02:24 01/23/2003 05:19 Schultz-Raver No 1 500kV line 500.0 L 77.24 175 Plan Voltage Control WEN COV 135332
01/23/2003 07:44 01/23/2003 13:45 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 361 Plan Maintenance EUG 135333
01/23/2003 07:44 01/23/2003 13:45 Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line 115.0 S 21.50 361 Plan Maintenance EUG 135333
01/23/2003 08:12 01/23/2003 16:36 McNary-Cold Springs section of McNary-Wallula 230kV line 230.0 S 6.20 504 Plan Foreign Request TRI 135334
01/23/2003 08:12 01/23/2003 16:36 McNary-Wallula 230kV line 230.0 L G 30.70 504 Plan Foreign Request TRI 135334
01/24/2003 00:37 01/24/2003 05:55 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 318 Plan Voltage Control RED 135335
01/24/2003 07:33 01/24/2003 15:39 Cardwell-Cowlitz No 1 115kV line 115.0 L 7.65 486 Plan Maintenance LGV 135337
01/24/2003 08:03 01/24/2003 15:46 Monroe-Sammamish No 1 230kV line 230.0 L 27.18 463 Plan Foreign Request SNO COV 135338
01/24/2003 08:03 01/24/2003 15:46 Monroe-Sno-King tap section of Monroe-Sammamish No 1 230kV line 230.0 S G 8.90 463 Plan Foreign Request SNO 135338
01/24/2003 08:03 01/24/2003 15:46 Sno-King tap to Monroe-Sammamish No 1 230kV line 230.0 T G 12.84 463 Plan Foreign Request SNO 135338
01/24/2003 08:03 01/24/2003 15:46 Sno-King tap-Sammamish section of Monroe-Sammamish No 1 230kV line 230.0 S G 18.30 463 Plan Foreign Request SNO COV 135338
01/24/2003 08:14 01/24/2003 15:42 The Dalles-Chenoweth No 1 115kV line 115.0 L 2.03 448 Plan Maintenance TDA 135339
01/24/2003 11:30 01/24/2003 14:51 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 201 Auto Tree cut Tree cut OLY 135340
01/25/2003 00:14 01/25/2003 06:15 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 361 Plan Voltage Control RED 135341
01/25/2003 01:17 01/25/2003 07:13 Schultz-Raver No 1 500kV line 500.0 L 77.24 356 Plan Voltage Control WEN COV 135342
01/25/2003 22:17 01/27/2003 05:47 Grizzly-Malin PGE No 2 500kV line 500.0 L 178.50 1890 Plan Voltage Control RED 135343
01/26/2003 03:10 01/26/2003 09:48 Schultz-Raver No 1 500kV line 500.0 L 77.24 398 Plan Voltage Control WEN COV 135344
01/26/2003 11:18 01/27/2003 14:03 Chenoweth-Goldendale No 1 115kV line 115.0 L G 24.08 1605 Auto Line Material Failure Wind TDA 135354
01/26/2003 11:18 01/26/2003 13:06 Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line 115.0 S 3.84 108 Auto Line Material Failure Wind TDA 135354
01/26/2003 11:18 01/26/2003 13:06 Spearfish tap to Chenoweth-Goldendale No 1 115kV line 115.0 T 3.22 108 Auto Line Material Failure Wind TDA 135354
01/26/2003 11:18 01/27/2003 14:03 Spearfish-Goldendale section of Chenoweth-Goldendale No 1 115kV line 115.0 S 20.24 1605 Auto Line Material Failure Wind TDA 135354
01/26/2003 18:51 01/27/2003 16:58 Macks Inn-Madison No 1 115kV line 115.0 L 17.12 1327 Auto Ice Ice IDF 135355
01/26/2003 18:51 01/26/2003 18:52 Bear Gulch-Chick Creek section of Drummond-Macks Inn No 1 115kV line 115.0 S G 17.85 1 Auto Ice Ice IDF 135356
01/26/2003 18:51 01/26/2003 18:52 Chick Creek-Macks Inn section of Drummond-Macks Inn No 1 115kV line 115.0 S G 6.47 1 Auto Ice Ice IDF 135356
01/26/2003 18:51 01/26/2003 18:52 Drummond-Bear Gulch section of Drummond-Macks Inn No 1 115kV line 115.0 S G 13.44 1 Auto Ice Ice IDF 135356
01/26/2003 18:51 01/26/2003 18:52 Drummond-Macks Inn No 1 115kV line 115.0 L 37.76 1 Auto Ice Ice IDF 135356
01/27/2003 06:09 01/30/2003 15:24 Dworshak PH-Dworshak No 1 500kV line 500.0 L 3.67 4875 Plan Foreign Request TRI SPK 135360
01/27/2003 08:06 02/07/2003 13:34 Midway-Moxee No 1 115kV line 115.0 L G 33.98 16168 Plan Maintenance TRI WEN 135361
01/27/2003 08:06 02/07/2003 13:34 Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line 115.0 S 17.37 16168 Plan Maintenance WEN 135361
01/27/2003 08:27 02/14/2003 13:42 Midway-Benton No 1 115kV line 115.0 L T 28.75 26235 Plan Maintenance TRI 135362
01/27/2003 08:27 02/14/2003 13:42 Scooteney tap-Sagehill section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS 15.05 26235 Plan Maintenance TRI 135362
01/27/2003 08:35 02/14/2003 13:42 Eagle Lake tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT T 0.10 26227 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:42 Eagle Lake-Radar section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS T 1.92 26227 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:55 Midway-Benton No 1 115kV line 115.0 L G 28.75 26240 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:55 Midway-Scooteney section of Midway-Benton No 1 115kV line 115.0 S 13.90 26240 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:42 Radar USBR tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT T 1.94 26227 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:42 Radar-Scooteney section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS T 7.25 26227 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:42 Sagehill tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT T 3.20 26227 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:42 Sagehill-Eagle Lake section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS T 4.24 26227 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:42 Scooteney tap to Midway-Benton No 1 115kV line 115.0 T 28.46 26227 Plan Maintenance TRI 135363
01/27/2003 08:35 02/14/2003 13:42 Scooteney-Benton section of Midway-Benton No 1 115kV line 115.0 S 14.85 26227 Plan Maintenance TRI 135363
01/27/2003 09:05 01/27/2003 16:09 Cold Springs-Hat Rock section of McNary-Wallula 230kV line 230.0 S 6.50 424 Plan Foreign Request TRI 135364
01/27/2003 09:05 01/27/2003 16:09 McNary-Wallula 230kV line 230.0 L G 30.70 424 Plan Foreign Request TRI 135364
01/27/2003 10:21 01/27/2003 14:26 Cardwell-Cowlitz No 1 115kV line 115.0 L 7.65 245 Plan Construction LGV 135365
01/28/2003 07:22 01/28/2003 18:48 McNary-Ross No 1 345kV line 345.0 L 174.57 686 Plan Maintenance TRI TDA LGV 135370
01/28/2003 07:51 01/28/2003 17:41 McNary-Franklin No 2 230kV line 230.0 L 26.88 590 Plan Maintenance TRI 135371
01/28/2003 08:11 01/28/2003 17:11 McNary PH-McNary No 5 230kV line 230.0 L 1.28 540 Plan Maintenance TRI 135372
01/28/2003 08:45 01/28/2003 13:39 Macks Inn-Madison No 1 115kV line 115.0 L 17.12 294 Plan Maintenance IDF 135373
01/28/2003 08:52 01/28/2003 15:04 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 372 Plan Maintenance TDA RED 135374
01/28/2003 08:52 01/28/2003 15:04 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 372 Plan Maintenance TDA 135374
01/28/2003 12:24 01/28/2003 13:33 Shelton-Kitsap No 4 230kV line 230.0 L 30.29 69 Plan Maintenance OLY 135375
01/29/2003 08:44 01/29/2003 10:02 Ariel-PACW Merwin section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 0.80 78 Auto Foreign Trouble Foreign Trouble LGV 135378
01/29/2003 08:44 01/29/2003 08:44 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S G 15.50 0 Auto Foreign Trouble Foreign Trouble LGV 135378
01/29/2003 08:44 01/29/2003 10:02 Cardwell-PACW Merwin No 1 115kV line 115.0 L 16.30 78 Auto Foreign Trouble Foreign Trouble LGV 135378
01/29/2003 09:35 01/29/2003 15:27 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 352 Auto Malicious Malicious TRI WEN TDA LGV 135379
01/29/2003 10:03 01/29/2003 13:05 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 182 Plan Foreign Request LGV 135380
01/29/2003 10:03 01/29/2003 13:05 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 182 Plan Foreign Request LGV 135380
01/29/2003 10:41   Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line 69.0 S 13.40 still out Plan Normally Out TRI 135381
01/29/2003 10:41   Walla Walla-Pendleton No 1 69kV line 69.0 L G 38.93 still out Plan Normally Out TRI 135381
01/29/2003 13:01 01/29/2003 13:04 Rainier-Allston section of St Helens-Allston No 1 115kV line 115.0 S 6.25 3 Plan Maintenance LGV 135382
01/29/2003 13:01 01/29/2003 13:04 St Helens-Allston No 1 115kV line 115.0 L G 25.22 3 Plan Maintenance LGV 135382
01/29/2003 14:17 01/29/2003 14:17 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 0 Auto Foreign Trouble Foreign Utility SPK 135383
01/30/2003 02:40 01/30/2003 02:40 Lower Granite-Hatwai No 1 500kV line 500.0 L 32.87 0 Auto Unknown Wind SPK TRI 135384
01/30/2003 07:00 01/30/2003 20:07 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 787 Plan Maintenance TDA RED 135389
01/30/2003 07:00 01/30/2003 20:07 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 787 Plan Maintenance TDA 135389
01/30/2003 07:39 01/30/2003 15:22 Lexington-Longview No 1 115kV line 115.0 L G 9.43 463 Plan Maintenance LGV OLY 135390
01/30/2003 07:39 01/30/2003 15:22 Lexington-Pacific Way section of Lexington-Longview No 1 115kV line 115.0 S 6.15 463 Plan Maintenance LGV OLY 135390
01/30/2003 08:25 01/30/2003 11:55 Fairmount-Port Angeles No 1 230kV line 230.0 L 26.70 210 Plan Maintenance OLY 135391
01/31/2003 02:12 01/31/2003 05:29 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 197 Plan Voltage Control RED 135392
01/31/2003 03:39 01/31/2003 03:41 Swan Valley-Teton No 2 115kV line 115.0 L 35.41 2 Auto Unknown Tree blown IDF 135393
01/31/2003 03:42 01/31/2003 09:06 Swan Valley-Teton No 2 115kV line 115.0 L 35.41 324 Auto Wind Tree blown IDF 135394
01/31/2003 03:49 01/31/2003 04:09 Targhee-Drummond No 1 115kV line 115.0 L 26.80 20 Auto Wind Tree blown IDF 135399
01/31/2003 03:50 01/31/2003 10:22 Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line 115.0 S 17.48 392 Auto Wind Tree blown IDF 135400
01/31/2003 03:50 01/31/2003 10:22 Swan Valley-Teton No 1 115kV line 115.0 L G 35.47 392 Auto Wind Tree blown IDF 135400
01/31/2003 03:50 01/31/2003 04:08 Targhee tap to Swan Valley-Teton No 1 115kV line 115.0 T 10.94 18 Auto Wind Tree blown IDF 135400
01/31/2003 03:50 01/31/2003 04:09 Targhee-Teton section of Swan Valley-Teton No 1 115kV line 115.0 S 17.99 19 Auto Wind Tree blown IDF 135400
01/31/2003 07:45 01/31/2003 16:00 Foster tap-Lebanon section of Green Peter-Lebanon No 1 115kV line 115.0 S 11.78 495 Plan Maintenance EUG 135401
01/31/2003 07:45 01/31/2003 16:00 Green Peter-Lebanon No 1 115kV line 115.0 L G 18.09 495 Plan Maintenance EUG 135401
01/31/2003 08:00 01/31/2003 13:08 Fairmount-Port Angeles No 1 230kV line 230.0 L 26.70 308 Plan Maintenance OLY 135402
01/31/2003 08:06 01/31/2003 15:01 Salem-Albany No 1 115kV line 115.0 L 23.90 415 Plan Maintenance SAL EUG 135403
01/31/2003 08:09 01/31/2003 14:35 Goble-Rainier section of St Helens-Allston No 1 115kV line 115.0 S 5.30 386 Plan Maintenance LGV 135404
01/31/2003 08:09 01/31/2003 14:35 St Helens-Allston No 1 115kV line 115.0 L G 25.22 386 Plan Maintenance LGV 135404
01/31/2003 09:24 01/31/2003 13:25 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T 0.01 241 Plan Emergency KAL 135405
01/31/2003 09:24 01/31/2003 13:25 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S 31.50 241 Plan Emergency KAL 135405
01/31/2003 09:24 01/31/2003 13:25 Libby-Conkelley No 1 230kV line 230.0 L G 83.94 241 Plan Emergency KAL 135405
01/31/2003 09:24 01/31/2003 13:25 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S 45.10 241 Plan Emergency KAL 135405
01/31/2003 10:09 01/31/2003 14:23 St Helens-Allston No 1 115kV line 115.0 L O 25.22 254 Plan Maintenance LGV 135406
01/31/2003 10:09 01/31/2003 14:23 St Helens-Goble section of St Helens-Allston No 1 115kV line 115.0 S 13.67 254 Plan Maintenance LGV 135406
02/01/2003 03:18 02/01/2003 06:02 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 164 Plan Voltage Control RED 135407
02/01/2003 05:01 02/01/2003 05:01 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Unknown RED 135408
02/01/2003 05:01 02/01/2003 05:01 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Unknown IDF RED 135408
02/01/2003 05:01 02/01/2003 05:01 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Unknown IDF RED 135408
02/01/2003 05:10 02/01/2003 16:53 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S 10.53 703 Plan Foreign Request SAL 135409
02/01/2003 05:10 02/01/2003 16:53 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 703 Plan Foreign Request SAL 135409
02/01/2003 05:17 02/01/2003 16:42 Keeler-Forest Grove No 2 115kV line 115.0 L 10.51 685 Plan Foreign Request SAL 135410
02/03/2003 01:09 02/03/2003 05:34 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 265 Plan Voltage Control RED 135411
02/03/2003 06:00 02/06/2003 15:37 Westside AVA-Bell No 1 230kV line 230.0 L 9.40 4897 Plan Construction SPK 135413
02/03/2003 07:15 02/03/2003 15:15 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 480 Plan Maintenance OLY 135414
02/03/2003 08:26 02/03/2003 14:59 McNary PH-McNary No 1 230kV line 230.0 L 1.05 393 Plan Maintenance TRI 135415
02/04/2003 07:06 02/06/2003 13:56 McNary-Coyote Springs No 1 500kV line 500.0 L 19.44 3290 Plan Construction TRI 135426
02/04/2003 08:29 02/04/2003 15:09 St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line 115.0 S 12.82 400 Plan Maintenance LGV 135427
02/04/2003 08:29 02/04/2003 15:09 St Johns-St Helens No 1 115kV line 115.0 L G 23.27 400 Plan Maintenance LGV 135427
02/04/2003 08:38 02/04/2003 15:11 Macks Inn-Madison No 1 115kV line 115.0 L 17.12 393 Plan Maintenance IDF 135428
02/04/2003 10:22 02/07/2003 14:03 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 4541 Plan Maintenance SAL 135429
02/04/2003 10:22 02/07/2003 14:03 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 4541 Plan Maintenance SAL 135429
02/04/2003 17:47 02/04/2003 17:47 Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 8.60 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T G 0.10 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 10.90 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 2.50 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 11.60 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 12.80 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 8.60 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Tillamook-PACW Astoria No 1 115kV line 115.0 L 57.70 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/04/2003 17:47 02/04/2003 17:47 Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 2.70 0 Auto Foreign Trouble Foreign Trouble SAL 135430
02/05/2003 07:00 02/12/2003 08:59 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 10199 Plan Testing TDA RED 135433
02/05/2003 07:00 02/12/2003 08:59 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 10199 Plan Testing TDA 135433
02/05/2003 07:00 02/12/2003 08:59 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 10199 Plan Testing TDA 135433
02/05/2003 07:00 02/12/2003 08:59 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 10199 Plan Testing TDA 135433
02/05/2003 07:13 02/05/2003 14:16 Naselle-Hagen section of Naselle-Tarlett No 2 115kV line 115.0 S 13.00 423 Plan Maintenance LGV OLY 135434
02/05/2003 07:13 02/05/2003 14:16 Naselle-Tarlett No 2 115kV line 115.0 L G 17.30 423 Plan Maintenance LGV OLY 135434
02/05/2003 08:09 02/05/2003 15:08 St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line 115.0 S 12.82 419 Plan Maintenance LGV 135435
02/05/2003 08:09 02/05/2003 15:08 St Johns-St Helens No 1 115kV line 115.0 L G 23.27 419 Plan Maintenance LGV 135435
02/05/2003 08:28 02/05/2003 08:28 Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line 115.0 S 28.59 0 Plan Testing KAL 135436
02/05/2003 08:28 02/05/2003 08:28 Kalispell-Kerr No 1 115kV line 115.0 L G 41.39 0 Plan Testing KAL 135436
02/05/2003 08:50 02/05/2003 10:04 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 74 Plan Maintenance TDA 135437
02/05/2003 08:50 02/05/2003 10:04 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S 32.93 74 Plan Maintenance TDA 135437
02/06/2003 00:32 02/06/2003 05:35 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 303 Plan Voltage Control RED 135438
02/06/2003 07:30 02/06/2003 14:18 Naselle-Tarlett No 1 115kV line 115.0 L 15.86 408 Plan Maintenance LGV OLY 135441
02/06/2003 07:34 02/06/2003 13:34 Lane-Wendson No 1 115kV line 115.0 L G 41.39 360 Plan Maintenance EUG 135442
02/06/2003 07:34 02/06/2003 13:34 Mapleton-Wendson section of Lane-Wendson No 1 115kV line 115.0 S 8.00 360 Plan Maintenance EUG 135442
02/06/2003 07:55 02/06/2003 15:23 St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line 115.0 S 12.82 448 Plan Maintenance LGV 135443
02/06/2003 07:55 02/06/2003 15:23 St Johns-St Helens No 1 115kV line 115.0 L G 23.27 448 Plan Maintenance LGV 135443
02/06/2003 07:59 02/07/2003 15:27 B-212-Bell section of Grand Coulee-Bell No 2 115kV line 115.0 S 1888 Plan Maintenance SPK 135444
02/06/2003 07:59 02/07/2003 15:27 Grand Coulee-Bell No 2 115kV line 115.0 L G 82.06 1888 Plan Maintenance WEN SPK 135444
02/06/2003 08:22 02/06/2003 12:08 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 226 Plan Maintenance TDA 135445
02/06/2003 08:22 02/06/2003 12:08 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S 0.11 226 Plan Maintenance TDA 135445
02/06/2003 09:03 02/06/2003 13:37 Foster tap-Lebanon section of Green Peter-Lebanon No 1 115kV line 115.0 S 11.78 274 Plan Maintenance EUG 135446
02/06/2003 09:03 02/06/2003 13:37 Green Peter-Lebanon No 1 115kV line 115.0 L G 18.09 274 Plan Maintenance EUG 135446
02/06/2003 11:06 02/06/2003 11:20 Hilltop-Warner No 1 230kV line 230.0 L 8.77 14 Plan Maintenance RED 135447
02/06/2003 19:59 02/06/2003 20:12 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 13 Auto Foreign Trouble Foreign Utility WEN 135448
02/07/2003 00:43 02/07/2003 05:09 Grizzly-Malin PGE No 2 500kV line 500.0 L 178.50 266 Plan Voltage Control RED 135449
02/07/2003 07:58 02/07/2003 14:24 St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line 115.0 S 12.82 386 Plan Maintenance LGV 135453
02/07/2003 07:58 02/07/2003 14:24 St Johns-St Helens No 1 115kV line 115.0 L G 23.27 386 Plan Maintenance LGV 135453
02/07/2003 12:05 02/07/2003 12:32 Grizzly-Malin PGE No 2 500kV line 500.0 L 178.50 27 Plan Foreign Request RED 135454
02/07/2003 14:28 02/07/2003 17:32 Big Eddy-Chemawa No 1 230kV line 230.0 L 116.41 184 Plan Maintenance TDA LGV SAL 135455
02/07/2003 14:58 02/07/2003 15:44 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 46 Auto Foreign Trouble TDA RED 135456
02/07/2003 14:58 02/07/2003 15:44 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 46 Auto Foreign Trouble TDA 135456
02/07/2003 14:58 02/07/2003 15:44 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 46 Auto Foreign Trouble TDA 135456
02/07/2003 14:58 02/07/2003 15:44 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 46 Auto Foreign Trouble TDA 135456
02/07/2003 14:58 02/07/2003 15:44 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 46 Auto Foreign Trouble TDA 135456
02/07/2003 14:58 02/07/2003 15:44 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 46 Auto Foreign Trouble TDA 135456
02/07/2003 14:58 02/07/2003 15:44 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 46 Auto Foreign Trouble TDA RED 135457
02/07/2003 14:58 02/07/2003 15:44 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 46 Auto Foreign Trouble TDA 135457
02/07/2003 14:58 02/07/2003 15:08 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 10 Auto Foreign Trouble TDA 135458
02/08/2003 01:44 02/08/2003 07:02 Schultz-Raver No 1 500kV line 500.0 L 77.24 318 Plan Voltage Control WEN COV 135459
02/08/2003 04:51 02/08/2003 05:01 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 10 Plan Switching TDA RED 135460
02/08/2003 04:51 02/08/2003 05:01 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 10 Plan Switching TDA 135460
02/08/2003 04:51 02/08/2003 05:01 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 10 Plan Switching TDA 135460
02/08/2003 04:51 02/08/2003 05:01 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 10 Plan Switching TDA 135460
02/08/2003 04:51 02/08/2003 05:01 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 10 Plan Switching TDA 135460
02/08/2003 04:51 02/08/2003 05:01 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 10 Plan Switching TDA 135460
02/08/2003 22:02 02/08/2003 23:50 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 108 Plan Foreign Request TDA RED 135461
02/08/2003 22:02 02/08/2003 23:50 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 108 Plan Foreign Request TDA 135461
02/08/2003 22:02 02/08/2003 23:50 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 108 Plan Foreign Request TDA 135461
02/08/2003 22:02 02/08/2003 23:50 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 108 Plan Foreign Request TDA 135461
02/08/2003 22:02 02/08/2003 23:50 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 108 Plan Foreign Request TDA 135461
02/08/2003 22:02 02/08/2003 23:50 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 108 Plan Foreign Request TDA 135461
02/08/2003 22:02 02/08/2003 23:50 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 108 Plan Foreign Request TDA RED 135462
02/08/2003 22:02 02/08/2003 23:50 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 108 Plan Foreign Request TDA 135462
02/09/2003 02:25 02/09/2003 08:11 Schultz-Raver No 1 500kV line 500.0 L 77.24 346 Plan Voltage Control WEN COV 135463
02/09/2003 18:29 02/09/2003 18:58 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 29 Plan Switching TDA 135465
02/10/2003 00:15 02/10/2003 05:09 Schultz-Raver No 1 500kV line 500.0 L 77.24 294 Plan Voltage Control WEN COV 135466
02/10/2003 06:00 04/18/2003 17:25 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 97105 Plan Construction TDA RED 135470
02/10/2003 06:00 02/14/2003 13:38 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6218 Plan Construction TDA 135470
02/10/2003 06:00 04/18/2003 17:25 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 97105 Plan Construction TDA 135470
02/10/2003 06:00 02/14/2003 13:38 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6218 Plan Construction TDA 135470
02/10/2003 06:00 02/14/2003 13:38 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6218 Plan Construction TDA 135470
02/10/2003 06:00 02/14/2003 13:38 Big Eddy-Celilo No 3 230kV line 230.0 L 1.09 6218 Plan Construction TDA 135471
02/10/2003 09:06 02/10/2003 23:16 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 850 Plan Switching TDA 135472
02/10/2003 09:34 02/13/2003 14:17 Allston-Astoria No 1 115kV line 115.0 L G 41.98 4603 Plan Maintenance LGV 135473
02/10/2003 09:34 02/13/2003 14:17 Clatskanie-Mist section of Allston-Astoria No 1 115kV line 115.0 S 4.80 4603 Plan Maintenance LGV 135473
02/10/2003 19:15 02/10/2003 19:25 Chief Joseph PH-Chief Joseph No 5 500kV line 500.0 L 0.80 10 Plan Foreign Request WEN 135474
02/11/2003 01:45 02/11/2003 04:34 Schultz-Raver No 2 500kV line 500.0 L 77.24 169 Plan Voltage Control WEN COV 135475
02/11/2003 04:15 02/11/2003 04:57 Grand Coulee-Chief Joseph No 3 500kV line 500.0 L 31.81 42 Auto Equipment/Miscellaneous Terminal Equipment Failure WEN 135476
02/11/2003 07:13 02/11/2003 07:13 Benton-Franklin No 2 115kV line 115.0 L 21.03 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:13 02/11/2003 07:13 Benton-Glade section of Benton-Franklin No 2 115kV line 115.0 S G 11.94 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:13 02/11/2003 07:13 Glade tap to Benton-Franklin No 2 115kV line 115.0 T G 0.03 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:13 02/11/2003 07:13 Glade-Franklin section of Benton-Franklin No 2 115kV line 115.0 S G 9.09 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:13 02/11/2003 07:13 North Pasco tap to Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TT G 0.10 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:13 02/11/2003 07:13 North Pasco-Taylor Flats section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS G 7.10 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:13 02/11/2003 07:13 Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 T G 8.63 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:13 02/11/2003 07:13 Taylor Flats tap-North Pasco section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS G 1.52 0 Auto Unknown Unknown TRI 135492
02/11/2003 07:48 02/14/2003 10:50 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 4502 Plan Maintenance SAL 135493
02/11/2003 07:48 02/14/2003 10:50 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 4502 Plan Maintenance SAL 135493
02/11/2003 08:19 02/11/2003 13:02 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 283 Plan Maintenance OLY 135494
02/11/2003 08:42 02/21/2003 15:24 B-212-Bell section of Grand Coulee-Bell No 2 115kV line 115.0 S 14802 Plan Construction SPK 135495
02/11/2003 08:42 03/13/2003 14:42 Grand Coulee-B212 section of Grand Coulee-Bell No 2 115kV line 115.0 S 43560 Plan Construction WEN SPK 135495
02/11/2003 08:42 03/13/2003 14:42 Grand Coulee-Bell No 2 115kV line 115.0 L G 82.06 43560 Plan Construction WEN SPK 135495
02/11/2003 11:47 02/11/2003 16:05 Ice Harbor-Franklin No 1 115kV line 115.0 L 9.34 258 Plan Maintenance TRI 135496
02/11/2003 19:21 02/11/2003 19:30 Chief Joseph PH-Chief Joseph No 5 500kV line 500.0 L 0.80 9 Plan Switching WEN 135497
02/11/2003 22:14 02/11/2003 22:19 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 5 Auto Equipment/Miscellaneous Equipment/Miscellaneous TDA 135498
02/11/2003 22:14 02/11/2003 22:19 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 5 Auto Equipment/Miscellaneous TDA RED 135499
02/11/2003 22:14 02/11/2003 22:19 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5 Auto Equipment/Miscellaneous TDA 135499
02/11/2003 22:24 02/12/2003 08:59 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 635 Auto Equipment/Miscellaneous Equipment/Miscellaneous TDA 135500
02/12/2003 00:45 02/12/2003 04:48 Schultz-Raver No 1 500kV line 500.0 L 77.24 243 Plan Voltage Control WEN COV 135501
02/12/2003 07:30 02/12/2003 14:23 Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line 115.0 S 13.98 413 Plan Maintenance EUG 135505
02/12/2003 07:30 02/12/2003 14:23 Wendson-Tahkenitch No 1 115kV line 115.0 L G 20.34 413 Plan Maintenance EUG 135505
02/12/2003 07:36 02/12/2003 13:55 Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line 115.0 S 12.85 379 Plan Maintenance OLY 135506
02/12/2003 07:36 02/12/2003 13:55 Shelton-Fairmount No 1 115kV line 115.0 L G 60.23 379 Plan Maintenance OLY 135506
02/13/2003 01:13 02/13/2003 05:07 Schultz-Raver No 2 500kV line 500.0 L 77.24 234 Plan Voltage Control WEN COV 135507
02/13/2003 01:30 02/13/2003 01:30 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 135508
02/13/2003 01:30 02/13/2003 01:30 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 135508
02/13/2003 01:30 02/13/2003 01:30 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 135508
02/13/2003 07:07 02/13/2003 09:23 Minidoka PH-Canal section of Minidoka PH-Unity No 1 138kV line 138.0 S 12.52 136 Plan Maintenance IDF 135510
02/13/2003 07:07 02/13/2003 09:23 Minidoka PH-Unity No 1 138kV line 138.0 L G 24.91 136 Plan Maintenance IDF 135510
02/13/2003 07:22 02/13/2003 15:05 Lexington-Cardwell No 1 115kV line 115.0 L G 11.60 463 Plan Maintenance LGV OLY 135511
02/13/2003 07:22 02/13/2003 15:05 Lexington-Shawnee section of Lexington-Cardwell No 1 115kV line 115.0 S 1.30 463 Plan Maintenance LGV OLY 135511
02/13/2003 07:27 02/13/2003 15:28 Grand Coulee-Bell No 3 230kV line 230.0 L 82.92 481 Plan Maintenance WEN SPK 135512
02/13/2003 08:04 02/13/2003 12:58 Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line 115.0 S 13.98 294 Plan Maintenance EUG 135513
02/13/2003 08:04 02/13/2003 12:58 Wendson-Tahkenitch No 1 115kV line 115.0 L G 20.34 294 Plan Maintenance EUG 135513
02/13/2003 08:26 02/13/2003 14:06 Shelton-Fairmount No 3 230kV line 230.0 L 60.06 340 Plan Maintenance OLY 135514
02/13/2003 11:30 02/13/2003 14:33 Columbia-Valhalla No 2 115kV line 115.0 L 5.21 183 Plan Maintenance WEN 135515
02/13/2003 23:55 02/13/2003 23:55 Palisades-Goshen No 1 115kV line 115.0 L 51.71 0 Auto Unknown Unknown IDF 135516
02/14/2003 01:47 02/14/2003 04:51 Schultz-Raver No 1 500kV line 500.0 L 77.24 184 Plan Voltage Control WEN COV 135517
02/14/2003 04:55 02/14/2003 04:55 Burbank tap to Franklin-Walla Walla No 1 115kV line 115.0 T G 0.02 0 Auto Unknown Unknown TRI 135526
02/14/2003 04:55 02/14/2003 04:55 Burbank-Joso section of Franklin-Walla Walla No 1 115kV line 115.0 S G 9.79 0 Auto Unknown Unknown TRI 135526
02/14/2003 04:55 02/14/2003 04:55 Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line 115.0 S G 4.29 0 Auto Unknown Unknown TRI 135526
02/14/2003 04:55 02/14/2003 04:55 Franklin-Walla Walla No 1 115kV line 115.0 L 35.95 0 Auto Unknown Unknown TRI 135526
02/14/2003 04:55 02/14/2003 04:55 Joso tap to Franklin-Walla Walla No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown TRI 135526
02/14/2003 04:55 02/14/2003 04:55 Joso-Nine Mile section of Franklin-Walla Walla No 1 115kV line 115.0 S G 3.66 0 Auto Unknown Unknown TRI 135526
02/14/2003 04:55 02/14/2003 04:55 Nine Mile tap to Franklin-Walla Walla No 1 115kV line 115.0 T G 6.00 0 Auto Unknown Unknown TRI 135526
02/14/2003 04:55 02/14/2003 04:55 Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line 115.0 S G 18.21 0 Auto Unknown Unknown TRI 135526
02/14/2003 07:04 02/14/2003 12:40 Garrison-Taft No 1 500kV line 500.0 L 159.38 336 Plan Emergency KAL 135527
02/14/2003 07:50 02/14/2003 13:10 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 320 Plan Maintenance OLY 135528
02/14/2003 07:53 02/14/2003 13:26 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 333 Plan Maintenance EUG 135529
02/14/2003 09:00 02/14/2003 12:54 Chief Joseph-Monroe No 1 500kV line 500.0 L 121.60 234 Plan Emergency WEN SNO 135530
02/14/2003 13:02 02/14/2003 16:20 John Day-Marion No 1 500kV line 500.0 L 127.51 198 Plan Emergency TDA RED SAL 135531
02/14/2003 13:49 05/14/2003 08:14 Midway-Benton No 1 115kV line 115.0 L T 28.75 127765 Plan Switching TRI 135532
02/14/2003 13:49 05/14/2003 08:14 Radar-Scooteney section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS 7.25 127765 Plan Switching TRI 135532
02/15/2003 00:06 02/15/2003 06:16 Schultz-Raver No 2 500kV line 500.0 L 77.24 370 Plan Voltage Control WEN COV 135533
02/15/2003 00:08 02/15/2003 06:07 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 359 Plan Voltage Control RED 135534
02/16/2003 00:24 02/16/2003 06:48 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 384 Plan Voltage Control RED 135535
02/16/2003 02:13 02/16/2003 07:03 Schultz-Raver No 1 500kV line 500.0 L 77.24 290 Plan Voltage Control WEN COV 135536
02/16/2003 12:09 02/16/2003 12:09 Rogue-Gold Beach No 2 115kV line 115.0 L 5.49 0 Auto Foreign Trouble Foreign Utility EUG 135537
02/17/2003 00:03 02/17/2003 05:26 Schultz-Raver No 1 500kV line 500.0 L 77.24 323 Plan Voltage Control WEN COV 135538
02/17/2003 12:39 02/18/2003 10:32 Raymond-Cosmopolis No 1 115kV line 115.0 L 18.36 1313 Auto Tree cut Tree cut OLY 135539
02/18/2003 01:08 02/18/2003 05:25 Schultz-Raver No 1 500kV line 500.0 L 77.24 257 Plan Voltage Control WEN COV 135540
02/18/2003 05:04 02/18/2003 17:01 Monroe-Sammamish No 1 230kV line 230.0 L 27.18 717 Plan Construction SNO COV 135541
02/18/2003 05:04 02/18/2003 16:48 Monroe-Sno-King tap section of Monroe-Sammamish No 1 230kV line 230.0 S 8.90 704 Plan Construction SNO 135541
02/18/2003 05:04 02/18/2003 16:48 Sno-King tap to Monroe-Sammamish No 1 230kV line 230.0 T 12.84 704 Plan Construction SNO 135541
02/18/2003 05:04 02/18/2003 17:01 Sno-King tap-Sammamish section of Monroe-Sammamish No 1 230kV line 230.0 S 18.30 717 Plan Construction SNO COV 135541
02/18/2003 07:22 02/18/2003 15:08 Quilcene-Fairmount section of Shelton-Fairmount No 1 115kV line 115.0 S 11.04 466 Plan Maintenance OLY 135550
02/18/2003 07:22 02/18/2003 15:08 Shelton-Fairmount No 1 115kV line 115.0 L G 60.23 466 Plan Maintenance OLY 135550
02/18/2003 08:05 02/20/2003 13:22 Anderson Ranch-Mountain Home No 1 115kV line 115.0 L 17.88 3197 Plan Maintenance IDF 135551
02/18/2003 08:05 02/20/2003 13:22 Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line 115.0 T G 0.10 3197 Plan Maintenance IDF 135551
02/18/2003 08:06 02/18/2003 14:08 John Day-Marion No 1 500kV line 500.0 L 127.51 362 Plan Maintenance TDA RED SAL 135552
02/18/2003 08:38 02/18/2003 14:23 Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 L G 45.05 345 Plan Maintenance LGV 135553
02/18/2003 08:38 02/18/2003 14:23 Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 S 40.44 345 Plan Maintenance LGV 135553
02/18/2003 08:42 02/18/2003 11:08 Raymond-Henkle St. No 1 115kV line 115.0 L 2.51 146 Plan Maintenance OLY 135554
02/18/2003 08:54 02/18/2003 14:52 Marcola A500-Alvey section of Santiam-Alvey No 1&2 230kV line 230.0 S 15.05 358 Plan Maintenance EUG 135555
02/18/2003 08:54 02/18/2003 14:52 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 358 Plan Maintenance SAL EUG 135555
02/18/2003 10:04 02/18/2003 15:39 Dutch Canyon-Warren section of St Johns-St Helens No 1 115kV line 115.0 S 5.37 335 Plan Maintenance LGV 135556
02/18/2003 10:04 02/18/2003 15:39 St Johns-St Helens No 1 115kV line 115.0 L G 23.27 335 Plan Maintenance LGV 135556
02/18/2003 10:11 02/18/2003 14:37 St Johns-St Helens No 1 115kV line 115.0 L O 23.27 266 Plan Maintenance LGV 135557
02/18/2003 10:11 02/18/2003 14:37 Warren-St Helens section of St Johns-St Helens No 1 115kV line 115.0 S 5.08 266 Plan Maintenance LGV 135557
02/18/2003 23:22 02/19/2003 13:49 Garrison-Taft No 1 500kV line 500.0 L 159.38 867 Plan Voltage Control KAL 135558
02/19/2003 00:28 02/19/2003 05:17 Schultz-Raver No 1 500kV line 500.0 L 77.24 289 Plan Voltage Control WEN COV 135559
02/19/2003 01:26 02/19/2003 05:09 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 223 Plan Voltage Control RED 135560
02/19/2003 07:31 02/19/2003 14:27 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 416 Plan Maintenance OLY 135563
02/19/2003 07:31 02/19/2003 14:27 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 416 Plan Maintenance OLY 135563
02/19/2003 08:29 02/19/2003 12:10 Shelton-Fairmount No 3 230kV line 230.0 L 60.06 221 Plan Maintenance OLY 135564
02/19/2003 08:55 02/19/2003 12:52 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 237 Plan Maintenance SAL EUG 135565
02/19/2003 08:55 02/19/2003 12:52 Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line 230.0 S 46.81 237 Plan Maintenance SAL EUG 135565
02/19/2003 13:51 02/19/2003 16:02 Garrison-Taft No 2 500kV line 500.0 L 159.38 131 Plan Voltage Control KAL 135566
02/20/2003 01:12 02/20/2003 05:05 Schultz-Raver No 1 500kV line 500.0 L 77.24 233 Plan Voltage Control WEN COV 135567
02/20/2003 04:23 02/20/2003 04:23 Alvey-Fairview No 1 230kV line 230.0 L 97.46 0 Auto Unknown Weather EUG 135584
02/20/2003 04:23 02/20/2003 04:23 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S G 19.14 0 Auto Unknown Weather EUG 135584
02/20/2003 04:23 02/20/2003 04:23 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S G 50.95 0 Auto Unknown Weather EUG 135584
02/20/2003 04:23 02/20/2003 04:23 Martin Creek tap to Alvey-Fairview No 1 230kV line 230.0 T G 0.27 0 Auto Unknown Weather EUG 135584
02/20/2003 04:23 02/20/2003 04:23 Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line 230.0 S G 27.37 0 Auto Unknown Weather EUG 135584
02/20/2003 08:03 02/20/2003 13:18 John Day-Marion No 1 500kV line 500.0 L 127.51 315 Plan Maintenance TDA RED SAL 135585
02/20/2003 08:11 02/20/2003 08:21 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 10 Plan Normally Out EUG 135586
02/20/2003 08:11 02/20/2003 08:21 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 10 Plan Normally Out EUG 135586
02/20/2003 08:11 02/21/2003 14:51 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 1840 Auto Line Material Failure Weather EUG 135587
02/20/2003 08:11 02/21/2003 14:51 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 1840 Auto Line Material Failure Weather EUG 135587
02/20/2003 08:11 02/20/2003 08:11 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S 50.95 0 Auto Line Material Failure Weather EUG 135587
02/20/2003 08:11 02/20/2003 10:20 Martin Creek tap to Alvey-Fairview No 1 230kV line 230.0 T 0.27 129 Auto Line Material Failure Weather EUG 135587
02/20/2003 08:11 02/20/2003 10:20 Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line 230.0 S 27.37 129 Auto Line Material Failure Weather EUG 135587
02/20/2003 08:11 02/20/2003 10:33 Alvey-Martin Creek No 1 115kV line 115.0 L O 22.51 142 Auto Line Material Failure Forced (Configuration) EUG 135588
02/20/2003 08:11 02/20/2003 08:21 Dorena tap to Alvey-Martin Creek No 1 115kV line 115.0 T 4.67 10 Auto Line Material Failure Forced (Configuration) EUG 135588
02/20/2003 08:11 02/20/2003 08:21 Dorena-Latham section of Alvey-Martin Creek No 1 115kV line 115.0 S 3.71 10 Auto Line Material Failure Forced (Configuration) EUG 135588
02/20/2003 08:11 02/20/2003 08:21 Latham tap to Alvey-Martin Creek No 1 115kV line 115.0 T 2.06 10 Auto Line Material Failure Forced (Configuration) EUG 135588
02/20/2003 08:11 02/20/2003 10:33 Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.03 142 Auto Line Material Failure Forced (Configuration) EUG 135588
02/20/2003 08:11 02/20/2003 11:33 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 202 Auto Line Material Failure Forced (Configuration) EUG 135589
02/20/2003 08:22 02/20/2003 13:42 Shelton-Fairmount No 4 230kV line 230.0 L 60.05 320 Plan Maintenance OLY 135590
02/20/2003 08:33 02/20/2003 14:24 Ross-Alcoa No 3 230kV line 230.0 L 4.29 351 Plan Maintenance LGV 135591
02/20/2003 08:33 02/20/2003 14:26 Ross-Alcoa No 2&4 115kV line 115.0 L 8.23 353 Plan Maintenance LGV 135592
02/20/2003 10:34 06/26/2003 17:12 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 181778 Plan Normally Out EUG 135593
02/20/2003 10:34 06/26/2003 17:12 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 181778 Plan Normally Out EUG 135593
02/20/2003 11:04 02/20/2003 11:26 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 22 Plan Foreign Request TRI SPK 135594
02/20/2003 19:33 02/20/2003 19:54 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 21 Plan Foreign Request TRI SPK 135595
02/21/2003 01:27 02/21/2003 05:03 Schultz-Raver No 1 500kV line 500.0 L 77.24 216 Plan Voltage Control WEN COV 135596
02/21/2003 07:03 02/21/2003 14:28 Tacoma-Raver No 1&2 500kV line 500.0 L 33.06 445 Plan Maintenance COV 135600
02/21/2003 10:57 02/21/2003 11:24 PACW Merwin-St Johns No 1 115kV line 115.0 L G 31.10 27 Plan Foreign Request OLY 135601
02/21/2003 10:57 02/21/2003 11:24 PACW Merwin-View section of PACW Merwin-St Johns No 1 115kV line 115.0 S 4.20 27 Plan Foreign Request OLY 135601
02/21/2003 11:02 02/24/2003 15:05 Ostrander-McLoughlin No 1 230kV line 230.0 L 8.82 4563 Plan Emergency LGV 135602
02/21/2003 15:24 02/26/2003 10:20 Grand Coulee-Bell No 2 115kV line 115.0 L T 82.06 6896 Plan Construction WEN SPK 135639
02/21/2003 15:24 02/26/2003 10:20 Larene tap to Grand Coulee-Bell No 2 115kV line 115.0 T G 0.10 6896 Plan Construction SPK 135639
02/22/2003 00:55 02/22/2003 06:05 Schultz-Raver No 1 500kV line 500.0 L 77.24 310 Plan Voltage Control WEN COV 135603
02/23/2003 07:01 02/23/2003 16:08 Monroe-Sammamish No 1 230kV line 230.0 L O 27.18 547 Plan Construction SNO COV 135604
02/23/2003 07:01 02/23/2003 16:04 Monroe-Sno-King tap section of Monroe-Sammamish No 1 230kV line 230.0 S 8.90 543 Plan Construction SNO 135604
02/23/2003 07:01 02/23/2003 16:04 Sno-King tap to Monroe-Sammamish No 1 230kV line 230.0 T 12.84 543 Plan Construction SNO 135604
02/23/2003 07:01 02/23/2003 16:08 Sno-King tap-Sammamish section of Monroe-Sammamish No 1 230kV line 230.0 S 18.30 547 Plan Construction SNO COV 135604
02/24/2003 06:24 02/26/2003 16:18 Custer-Ingledow No 2 500kV line 500.0 L 22.65 3474 Plan Foreign Request SNO 135610
02/24/2003 07:02 02/28/2003 14:48 Lower Monumental-Ashe No 1 500kV line 500.0 L 39.58 6226 Plan Maintenance TRI 135611
02/24/2003 08:02 02/24/2003 17:06 Big Eddy-Chenoweth No 1 115kV line 115.0 L 6.50 544 Plan Maintenance TDA 135612
02/24/2003 08:11 02/28/2003 13:04 St Johns-Keeler No 2 115kV line 115.0 L 9.43 6053 Plan Maintenance LGV SAL 135613
02/24/2003 15:16 02/24/2003 15:47 Libby PH-Libby No 1 230kV line 230.0 L 1.35 31 Auto Foreign Trouble Foreign Trouble KAL 135614
02/25/2003 07:46 02/25/2003 07:55 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 9 Auto Forced (Configuration) Forced (Configuration) RED 135618
02/25/2003 07:58 02/25/2003 15:21 Big Eddy-Chenoweth No 1 115kV line 115.0 L 6.50 443 Plan Maintenance TDA 135619
02/25/2003 08:04 02/25/2003 13:19 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 315 Plan Maintenance SAL 135620
02/25/2003 08:04 02/25/2003 13:19 Oregon City-Fargo section of Oregon City-Chemawa No 2 115kV line 115.0 S 6.70 315 Plan Maintenance SAL 135620
02/25/2003 08:07 02/27/2003 12:47 Sno-King-Maple Valley No 2 230kV line 230.0 L 24.91 3160 Plan Construction SNO COV 135621
02/25/2003 09:28 02/27/2003 14:31 Albany-Eugene No 1 115kV line 115.0 L G 39.80 3183 Plan Construction EUG 135622
02/25/2003 09:28 02/27/2003 14:31 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 3183 Plan Construction EUG 135622
02/25/2003 10:14 02/25/2003 11:57 B-212-Bell section of Grand Coulee-Bell No 2 115kV line 115.0 S 103 Plan Testing SPK 135623
02/25/2003 10:14 02/25/2003 11:57 Grand Coulee-Bell No 2 115kV line 115.0 L O 82.06 103 Plan Testing WEN SPK 135623
02/25/2003 22:15 02/27/2003 10:00 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 2145 Plan Foreign Request OLY 135624
02/25/2003 22:15 02/27/2003 10:00 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 2145 Plan Foreign Request OLY 135624
02/26/2003 07:59 02/26/2003 14:39 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 400 Plan Maintenance SAL 135629
02/26/2003 07:59 02/26/2003 14:39 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 400 Plan Maintenance SAL 135629
02/26/2003 08:02 02/26/2003 15:07 Big Eddy-Chenoweth No 1 115kV line 115.0 L 6.50 425 Plan Maintenance TDA 135630
02/26/2003 08:14 02/26/2003 09:35 B-212-Bell section of Grand Coulee-Bell No 2 115kV line 115.0 S 81 Plan Maintenance SPK 135631
02/26/2003 08:14 02/26/2003 09:35 Grand Coulee-Bell No 2 115kV line 115.0 L O 82.06 81 Plan Maintenance WEN SPK 135631
02/26/2003 09:51 02/26/2003 15:22 Grand Coulee-Bell No 1 115kV line 115.0 L T 82.03 331 Plan Maintenance WEN SPK 135632
02/26/2003 09:51 02/26/2003 15:22 Wagner Lake tap to Wilbur tap to Grand Coulee-Bell No 1 115kV line 115.0 TT 10.70 331 Plan Maintenance SPK 135632
02/26/2003 09:51 02/26/2003 15:22 Wilbur tap to Grand Coulee-Bell No 1 115kV line 115.0 T 331 Plan Maintenance SPK 135632
02/26/2003 10:06 02/26/2003 10:21 Taft-Bell No 1 500kV line 500.0 L 96.44 15 Plan Maintenance KAL SPK 135633
02/26/2003 10:20 02/27/2003 08:35 Grand Coulee-Bell No 1 115kV line 115.0 L T 82.03 1335 Plan Normally Out WEN SPK 135634
02/26/2003 10:20 02/27/2003 07:23 Larene tap to Grand Coulee-Bell No 1 115kV line 115.0 T 0.10 1263 Plan Normally Out SPK 135634
02/26/2003 10:20 02/27/2003 08:35 Springhill tap to Grand Coulee-Bell No 1 115kV line 115.0 T 0.10 1335 Plan Normally Out SPK 135634
02/26/2003 10:48 02/26/2003 15:17 Grand Coulee-Bell No 1 115kV line 115.0 L 82.03 269 Plan Maintenance WEN SPK 135635
02/26/2003 12:26 02/26/2003 14:53 Ponderosa-Pilot Butte No 1 230kV line 230.0 L 21.85 147 Plan Foreign Request RED 135636
02/26/2003 13:42 02/26/2003 17:35 Cardwell-Cowlitz No 1 115kV line 115.0 L 7.65 233 Plan Maintenance LGV 135637
02/26/2003 15:22 03/05/2003 08:28 Grand Coulee-Bell No 2 115kV line 115.0 L T 82.06 9666 Plan Normally Out WEN SPK 135638
02/26/2003 15:22 03/05/2003 08:28 Wagner Lake tap to Wilbur tap to Grand Coulee-Bell No 2 115kV line 115.0 TT 10.70 9666 Plan Normally Out SPK 135638
02/26/2003 15:22 03/05/2003 08:28 Wilbur tap to Grand Coulee-Bell No 2 115kV line 115.0 T 9666 Plan Normally Out SPK 135638
02/27/2003 06:53 03/02/2003 18:23 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 5010 Plan Construction TDA RED 135640
02/27/2003 06:53 03/02/2003 18:23 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5010 Plan Construction TDA 135640
02/27/2003 06:53 03/02/2003 18:23 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5010 Plan Construction TDA 135640
02/27/2003 06:53 03/02/2003 18:23 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5010 Plan Construction TDA 135640
02/27/2003 07:02 02/27/2003 18:15 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 673 Plan Construction WEN 135641
02/27/2003 07:23 03/05/2003 07:29 Grand Coulee-Bell No 2 115kV line 115.0 L T 82.06 8646 Plan Construction WEN SPK 135642
02/27/2003 07:23 03/05/2003 07:29 Larene tap to Grand Coulee-Bell No 2 115kV line 115.0 T 0.10 8646 Plan Construction SPK 135642
02/27/2003 07:54 02/27/2003 14:14 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 380 Plan Maintenance SAL 135643
02/27/2003 07:54 02/27/2003 14:14 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 380 Plan Maintenance SAL 135643
02/27/2003 08:16 02/27/2003 15:21 Big Eddy-Chenoweth No 1 115kV line 115.0 L 6.50 425 Plan Maintenance TDA 135644
02/27/2003 08:35 03/05/2003 07:29 Grand Coulee-Bell No 2 115kV line 115.0 L T 82.06 8574 Plan Construction WEN SPK 135645
02/27/2003 08:35 03/05/2003 07:29 Springhill tap to Grand Coulee-Bell No 2 115kV line 115.0 T 0.10 8574 Plan Construction SPK 135645
02/27/2003 09:25 03/13/2003 14:42 B-212-Bell section of Grand Coulee-Bell No 2 115kV line 115.0 S 20477 Plan Construction SPK 135646
02/27/2003 09:25 03/13/2003 14:42 Grand Coulee-Bell No 2 115kV line 115.0 L O 82.06 20477 Plan Construction WEN SPK 135646
02/27/2003 10:00 02/27/2003 11:52 Rocky Reach-Columbia No 1 230kV line 230.0 L 20.94 112 Auto Improper Relaying Construction WEN 135647
02/27/2003 10:40 02/27/2003 13:52 First Street-Stevens Drive section of White Bluffs-Richland No 1 115kV line 115.0 S 2.68 192 Plan Foreign Request TRI 135648
02/27/2003 10:40 02/27/2003 13:52 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 192 Plan Foreign Request TRI 135648
02/27/2003 14:08 04/10/2003 07:58 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 60050 Plan Normally Out TRI 135649
02/27/2003 14:08 04/10/2003 07:58 White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line 115.0 S 4.30 60050 Plan Normally Out TRI 135649
02/27/2003 14:44 02/28/2003 15:14 Albany-Eugene No 1 115kV line 115.0 L G 39.80 1470 Plan Normally Out EUG 135650
02/27/2003 14:44 02/28/2003 15:14 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 1470 Plan Normally Out EUG 135650
02/27/2003 19:15 02/27/2003 19:19 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 4 Auto Foreign Trouble TRI 135651
02/27/2003 19:15 02/27/2003 19:19 McNary-Wallula 230kV line 230.0 L G 30.70 4 Auto Foreign Trouble TRI 135651
02/27/2003 19:30 02/27/2003 21:19 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 109 Auto Foreign Trouble TRI 135652
02/27/2003 19:30 02/27/2003 21:19 McNary-Wallula 230kV line 230.0 L G 30.70 109 Auto Foreign Trouble TRI 135652
02/28/2003 03:45 03/13/2003 21:47 Columbia Generating Station-Ashe No 1 500kV line 500.0 L 0.55 19802 Plan Foreign Request TRI 135653
02/28/2003 07:00 02/28/2003 17:59 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 659 Plan Construction WEN 135654
02/28/2003 07:36 02/28/2003 13:27 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 351 Plan Maintenance EUG 135655
02/28/2003 07:36 02/28/2003 13:27 Fairview-Norway section of Fairview-Bandon No 1 115kV line 115.0 S 12.59 351 Plan Maintenance EUG 135655
02/28/2003 08:08 02/28/2003 14:15 Salem-Albany No 1 115kV line 115.0 L 23.90 367 Plan Maintenance SAL EUG 135656
02/28/2003 08:20 02/28/2003 15:29 Monroe-Sammamish No 1 230kV line 230.0 L O 27.18 429 Plan Construction SNO COV 135657
02/28/2003 08:20 02/28/2003 15:18 Monroe-Sno-King tap section of Monroe-Sammamish No 1 230kV line 230.0 S 8.90 418 Plan Construction SNO 135657
02/28/2003 08:20 02/28/2003 15:18 Sno-King tap to Monroe-Sammamish No 1 230kV line 230.0 T 12.84 418 Plan Construction SNO 135657
02/28/2003 08:20 02/28/2003 15:29 Sno-King tap-Sammamish section of Monroe-Sammamish No 1 230kV line 230.0 S 18.30 429 Plan Construction SNO COV 135657
02/28/2003 08:30 02/28/2003 14:10 Big Eddy-Chenoweth No 1 115kV line 115.0 L 6.50 340 Plan Maintenance TDA 135658
02/28/2003 08:52 02/28/2003 15:07 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 375 Plan Maintenance TDA RED 135659
02/28/2003 08:52 02/28/2003 15:07 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 375 Plan Maintenance TDA RED 135659
02/28/2003 11:49 02/28/2003 12:41 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 52 Plan Testing TDA RED 135660
02/28/2003 11:49 02/28/2003 12:41 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 52 Plan Testing TDA 135660
02/28/2003 11:49 02/28/2003 12:41 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 52 Plan Testing TDA 135660
02/28/2003 11:49 02/28/2003 12:41 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 52 Plan Testing TDA 135660
02/28/2003 13:54 04/11/2003 14:27 Chief Joseph PH-Chief Joseph No 2 230kV line 230.0 L 1.03 60453 Plan Foreign Request WEN 135661
02/28/2003 15:18 03/17/2003 10:04 Albany-Eugene No 1 115kV line 115.0 L G 39.80 24166 Plan Switching EUG 135698
02/28/2003 15:18 03/17/2003 10:04 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 24166 Plan Switching EUG 135698
03/01/2003 01:46 03/01/2003 06:53 Schultz-Raver No 1 500kV line 500.0 L 77.24 307 Plan Voltage Control WEN COV 135662
03/01/2003 04:16 03/01/2003 06:13 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 117 Plan Voltage Control RED 135663
03/01/2003 07:03 03/01/2003 19:10 Calpine-McNary No 1 500kV line 500.0 L 14.52 727 Plan Foreign Request TRI 135664
03/01/2003 09:17 03/01/2003 09:17 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 0 Auto Unknown Weather IDF 135665
03/01/2003 14:02 03/01/2003 18:17 John Day-Marion No 1 500kV line 500.0 L 127.51 255 Plan Voltage Control TDA RED SAL 135666
03/01/2003 15:08 03/02/2003 07:27 Schultz-Raver No 1 500kV line 500.0 L 77.24 979 Plan Voltage Control WEN COV 135667
03/02/2003 02:06 03/02/2003 16:35 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 869 Plan Voltage Control RED 135668
03/03/2003 01:18 03/03/2003 14:44 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 806 Plan Voltage Control RED 135669
03/03/2003 06:18 03/03/2003 08:15 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 117 Auto Equipment/Miscellaneous TDA RED 135673
03/03/2003 06:18 03/03/2003 08:15 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 117 Auto Equipment/Miscellaneous TDA 135673
03/03/2003 06:18 03/03/2003 08:15 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 117 Auto Equipment/Miscellaneous TDA 135673
03/03/2003 06:18 03/03/2003 08:15 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 117 Auto Equipment/Miscellaneous TDA 135673
03/03/2003 08:04 03/28/2003 19:43 Chief Joseph-Snohomish No 3 345kV line 345.0 L 133.05 36699 Plan Maintenance WEN SNO 135674
03/03/2003 08:14 03/03/2003 08:43 Ice Harbor-Franklin No 2 115kV line 115.0 L 9.07 29 Auto Unknown Unknown TRI 135675
03/03/2003 08:14 03/03/2003 08:43 Ice Harbor-Sacajawea section of Ice Harbor-Franklin No 2 115kV line 115.0 S G 0.30 29 Auto Unknown Unknown TRI 135675
03/03/2003 08:14 03/03/2003 08:43 Martindale-Franklin section of Ice Harbor-Franklin No 2 115kV line 115.0 S G 5.20 29 Auto Unknown Unknown TRI 135675
03/03/2003 08:14 03/03/2003 08:43 Sacajawea tap to Ice Harbor-Franklin No 2 115kV line 115.0 T G 0.52 29 Auto Unknown Unknown TRI 135675
03/03/2003 08:14 03/03/2003 08:43 Sacajawea-Martindale section of Ice Harbor-Franklin No 2 115kV line 115.0 S G 3.57 29 Auto Unknown Unknown TRI 135675
03/03/2003 08:14 03/03/2003 08:43 Page tap to Sacajawea-Sun Harbor No 1 115kV line 115.0 T G 0.10 29 Auto Unknown Forced (Configuration) TRI 135676
03/03/2003 08:14 03/03/2003 08:43 Sacajawea-Sun Harbor No 1 115kV line 115.0 L 2.14 29 Auto Unknown Forced (Configuration) TRI 135676
03/03/2003 08:14 03/03/2003 08:43 Lower Monumental-McNary No 1 500kV line 500.0 L T 64.75 29 Auto Unknown TRI 135684
03/03/2003 08:14 03/03/2003 08:43 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 29 Auto Unknown TRI 135684
03/03/2003 08:23 03/03/2003 15:44 Big Eddy-Chenoweth No 2 230kV line 230.0 L 6.52 441 Plan Maintenance TDA 135677
03/03/2003 09:09 03/03/2003 15:13 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 364 Plan Maintenance TRI 135678
03/03/2003 09:09 03/03/2003 15:13 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 364 Plan Maintenance TRI 135678
03/03/2003 09:09 03/03/2003 15:12 Franklin-Walla Walla No 1 115kV line 115.0 L G 35.95 363 Plan Maintenance TRI 135679
03/03/2003 09:09 03/03/2003 15:12 Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line 115.0 S 18.21 363 Plan Maintenance TRI 135679
03/03/2003 09:50 03/03/2003 10:18 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 28 Plan Testing TDA 135680
03/03/2003 09:50 03/03/2003 10:18 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S 32.93 28 Plan Testing TDA 135680
03/03/2003 10:20 03/03/2003 11:12 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S 1.46 52 Plan Testing TDA 135681
03/03/2003 10:20 03/03/2003 11:12 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 52 Plan Testing TDA 135681
03/03/2003 11:40 03/03/2003 12:19 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 39 Plan Testing TDA 135682
03/03/2003 11:40 03/03/2003 12:19 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S 32.93 39 Plan Testing TDA 135682
03/04/2003 07:25 03/04/2003 16:07 Allston-Clatsop No 1 230kV line 230.0 L T 42.61 522 Plan Maintenance LGV 135685
03/04/2003 07:25 03/04/2003 16:07 Driscoll tap to Allston-Clatsop No 1 230kV line 230.0 T 0.22 522 Plan Maintenance LGV 135685
03/04/2003 07:40 03/07/2003 14:17 Allston-Clatsop No 1 230kV line 230.0 L G 42.61 4717 Plan Maintenance LGV 135686
03/04/2003 07:40 03/04/2003 16:02 Allston-Driscoll section of Allston-Clatsop No 1 230kV line 230.0 S 20.84 502 Plan Maintenance LGV 135686
03/04/2003 07:40 03/07/2003 14:17 Driscoll-Clatsop section of Allston-Clatsop No 1 230kV line 230.0 S 21.77 4717 Plan Maintenance LGV 135686
03/04/2003 08:04 03/04/2003 14:41 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 397 Plan Maintenance RED 135687
03/04/2003 08:04 03/04/2003 13:59 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 355 Plan Maintenance SAL EUG 135688
03/04/2003 08:04 03/04/2003 13:59 Salem-Albany No 2 115kV line 115.0 L G 27.85 355 Plan Maintenance SAL EUG 135688
03/04/2003 08:16 03/04/2003 13:52 Big Eddy-Chenoweth No 2 230kV line 230.0 L 6.52 336 Plan Maintenance TDA 135689
03/04/2003 09:33 03/04/2003 11:59 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 146 Plan Maintenance SAL EUG 135690
03/04/2003 09:33 03/04/2003 11:59 Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line 230.0 S 46.81 146 Plan Maintenance SAL EUG 135690
03/04/2003 12:04 03/04/2003 14:47 Marcola A500-Alvey section of Santiam-Alvey No 1&2 230kV line 230.0 S 15.05 163 Plan Maintenance EUG 135691
03/04/2003 12:04 03/04/2003 14:47 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 163 Plan Maintenance SAL EUG 135691
03/04/2003 22:59 03/05/2003 17:03 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1084 Plan Voltage Control RED 135692
03/05/2003 02:03 03/05/2003 05:44 Schultz-Raver No 1 500kV line 500.0 L 77.24 221 Plan Voltage Control WEN COV 135693
03/05/2003 07:18 03/05/2003 14:34 Grandview-Red Mountain No 1 115kV line 115.0 L G 22.80 436 Plan Maintenance TRI WEN 135699
03/05/2003 07:18 03/05/2003 14:34 Prosser-Snipes section of Grandview-Red Mountain No 1 115kV line 115.0 S 4.85 436 Plan Maintenance WEN 135699
03/05/2003 07:23 03/05/2003 15:31 Allston-Clatsop No 1 230kV line 230.0 L O 42.61 488 Plan Maintenance LGV 135700
03/05/2003 07:23 03/05/2003 15:31 Allston-Driscoll section of Allston-Clatsop No 1 230kV line 230.0 S 20.84 488 Plan Maintenance LGV 135700
03/05/2003 07:23 03/05/2003 15:31 Driscoll tap to Allston-Clatsop No 1 230kV line 230.0 T 0.22 488 Plan Maintenance LGV 135700
03/05/2003 07:29 03/10/2003 13:29 Grand Coulee-Bell No 1 115kV line 115.0 L T 82.03 7560 Plan Normally Out WEN SPK 135701
03/05/2003 07:29 03/10/2003 13:29 Larene tap to Grand Coulee-Bell No 1 115kV line 115.0 T 0.10 7560 Plan Normally Out SPK 135701
03/05/2003 07:29 03/10/2003 13:29 Springhill tap to Grand Coulee-Bell No 1 115kV line 115.0 T 0.10 7560 Plan Normally Out SPK 135701
03/05/2003 07:45 03/05/2003 13:02 Keeler-Oregon City No 2 115kV line 115.0 L 21.43 317 Plan Maintenance SAL LGV 135702
03/05/2003 07:47 03/05/2003 08:10 Bell-Bigelow section of Bell-Trentwood No 2 115kV line 115.0 S 6.60 23 Plan Construction SPK 135703
03/05/2003 07:47 03/05/2003 08:10 Bell-Trentwood No 2 115kV line 115.0 L G 11.30 23 Plan Construction SPK 135703
03/05/2003 08:12 03/06/2003 18:49 Rocky Reach-Columbia No 1 230kV line 230.0 L 20.94 2077 Plan Construction WEN 135704
03/05/2003 08:18 03/05/2003 13:42 Grandview-Red Mountain No 1 115kV line 115.0 L T 22.80 324 Plan Maintenance TRI WEN 135705
03/05/2003 08:18 03/05/2003 13:42 Snipes tap to Grandview-Red Mountain No 1 115kV line 115.0 T 0.10 324 Plan Maintenance WEN 135705
03/05/2003 08:30 03/05/2003 10:47 Lower Monumental-Ashe No 1 500kV line 500.0 L 39.58 137 Plan Maintenance TRI 135706
03/05/2003 08:30 03/05/2003 13:33 Grandview-Red Mountain No 1 115kV line 115.0 L O 22.80 303 Plan Maintenance TRI WEN 135707
03/05/2003 08:30 03/05/2003 13:33 Snipes-Chandler section of Grandview-Red Mountain No 1 115kV line 115.0 S 3.16 303 Plan Maintenance WEN 135707
03/05/2003 09:08 03/05/2003 12:06 Grand Coulee-Bell No 1 115kV line 115.0 L 82.03 178 Plan Construction WEN SPK 135708
03/06/2003 00:01 03/07/2003 15:07 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 2346 Plan Voltage Control RED 135709
03/06/2003 03:13 03/09/2003 14:42 Buckley-Marion No 1 500kV line 500.0 L 99.33 5009 Auto Line Material Failure Weather TDA RED SAL 135710
03/06/2003 04:47 03/06/2003 04:50 Milton tap to Walla Walla-Freewater No 1 69kV line 69.0 T G 3.70 3 Plan Switching TRI 135711
03/06/2003 04:47 03/06/2003 04:50 Walla Walla-Freewater No 1 69kV line 69.0 L 11.74 3 Plan Switching TRI 135711
03/06/2003 04:47 03/06/2003 04:50 Walla Walla-Whitman section of Walla Walla-Freewater No 1 69kV line 69.0 S G 3.80 3 Plan Switching TRI 135711
03/06/2003 04:47 03/06/2003 04:50 Whitman tap to Walla Walla-Freewater No 1 69kV line 69.0 T G 0.01 3 Plan Switching TRI 135711
03/06/2003 04:47 03/06/2003 04:50 Whitman-Freewater section of Walla Walla-Freewater No 1 69kV line 69.0 S G 7.94 3 Plan Switching TRI 135711
03/06/2003 04:47 03/06/2003 04:50 Lagoon-Stateline section of Walla Walla-Pendleton No 1 69kV line 69.0 S 3.63 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 5.47 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Milton tap-Weston Mountain section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS 4.99 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Milton-Lagoon section of Walla Walla-Pendleton No 1 69kV line 69.0 S 1.06 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Mission-Pendleton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 6.67 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Stateline tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 1.31 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Stateline-Vansycle section of Walla Walla-Pendleton No 1 69kV line 69.0 S 4.62 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Walla Walla-Milton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 9.55 3 Plan Switching TRI 135712
03/06/2003 04:47 03/06/2003 04:50 Walla Walla-Pendleton No 1 69kV line 69.0 L O 38.93 3 Plan Switching TRI 135712
03/06/2003 04:47 07/28/2003 05:07 Walla Walla-PACW Walla Walla No 1 69kV line 69.0 L 1.40 207320 Plan Switching TRI 135713
03/06/2003 07:07 03/07/2003 14:36 Chehalis-Centralia No 1 69kV line 69.0 L 11.05 1889 Plan Maintenance OLY 135715
03/06/2003 07:26 03/06/2003 15:06 Allston-Clatsop No 1 230kV line 230.0 L O 42.61 460 Plan Maintenance LGV 135716
03/06/2003 07:26 03/06/2003 15:06 Allston-Driscoll section of Allston-Clatsop No 1 230kV line 230.0 S 20.84 460 Plan Maintenance LGV 135716
03/06/2003 07:26 03/06/2003 15:06 Driscoll tap to Allston-Clatsop No 1 230kV line 230.0 T 0.22 460 Plan Maintenance LGV 135716
03/06/2003 08:24 03/06/2003 13:43 Ross-Alcoa No 3 230kV line 230.0 L 4.29 319 Plan Maintenance LGV 135717
03/06/2003 09:11 03/06/2003 13:53 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 282 Plan Maintenance EUG 135718
03/06/2003 12:41 03/06/2003 13:17 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 36 Plan Switching OLY 135719
03/06/2003 14:47 03/06/2003 14:47 Boardman-Tower Road No 1 115kV line 115.0 L 8.53 0 Auto Wind Wind TRI TDA 135720
03/06/2003 14:47 03/06/2003 14:47 Tower Road-Alkali No 1 115kV line 115.0 L 25.42 0 Auto Wind TRI TDA 135721
03/06/2003 21:18 03/06/2003 21:18 Ashe-Marion No 2 500kV line 500.0 L 224.01 0 Auto Unknown Unknown TRI TDA RED SAL 135722
03/07/2003 07:20 03/07/2003 14:18 Allston-Clatsop No 1 230kV line 230.0 L O 42.61 418 Plan Maintenance LGV 135724
03/07/2003 07:20 03/07/2003 14:17 Allston-Driscoll section of Allston-Clatsop No 1 230kV line 230.0 S 20.84 417 Plan Maintenance LGV 135724
03/07/2003 07:20 03/07/2003 14:18 Driscoll tap to Allston-Clatsop No 1 230kV line 230.0 T 0.22 418 Plan Maintenance LGV 135724
03/07/2003 08:26 03/07/2003 10:59 Grand Coulee-Bell No 1 115kV line 115.0 L 82.03 153 Plan Forced WEN SPK 135725
03/07/2003 08:29 03/07/2003 11:00 Bell-AVA Northeast No 3 115kV line 115.0 L 1.60 151 Plan Maintenance SPK 135726
03/07/2003 08:41 03/07/2003 11:35 Badger Canyon-Richland No 1 115kV line 115.0 L G 5.51 174 Plan Foreign Request TRI 135727
03/07/2003 08:41 03/07/2003 11:35 Badger Canyon-Vista section of Badger Canyon-Richland No 1 115kV line 115.0 S 0.97 174 Plan Foreign Request TRI 135727
03/07/2003 08:41 03/07/2003 11:35 Vista-Tapteal section of Badger Canyon-Richland No 1 115kV line 115.0 S 2.09 174 Plan Foreign Request TRI 135727
03/07/2003 08:50 03/07/2003 11:31 Badger Canyon-Richland No 1 115kV line 115.0 L T 5.51 161 Plan Foreign Request TRI 135728
03/07/2003 08:50 03/07/2003 11:31 Tapteal tap to Badger Canyon-Richland No 1 115kV line 115.0 T 0.10 161 Plan Foreign Request TRI 135728
03/07/2003 08:55 03/07/2003 10:54 Chehalis-Covington No 1 230kV line 230.0 L T 69.40 119 Plan Foreign Request OLY COV 135729
03/07/2003 08:55 03/07/2003 10:54 Cowlitz tap to Chehalis-Covington No 1 230kV line 230.0 T 6.30 119 Plan Foreign Request COV 135729
03/07/2003 10:57 03/07/2003 11:52 South Tacoma-Cowlitz No 1 230kV line 230.0 L 6.19 55 Plan Foreign Request COV 135730
03/08/2003 00:06 03/10/2003 06:06 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 3240 Plan Voltage Control RED 135731
03/08/2003 09:04 03/08/2003 09:04 Chief Joseph-Snohomish No 4 345kV line 345.0 L 133.07 0 Auto Unknown Unknown WEN SNO 135732
03/08/2003 09:37 03/08/2003 09:39 Chief Joseph-Snohomish No 4 345kV line 345.0 L 133.07 2 Auto Unknown Unknown WEN SNO 135733
03/08/2003 12:04 03/08/2003 12:06 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 2 Auto Unknown Unknown OLY COV WEN 135734
03/09/2003 14:35 03/10/2003 13:48 Burley-Riverton section of West Burley-Heyburn No 1 138kV line 138.0 S 1.59 1393 Plan Maintenance IDF 135746
03/09/2003 14:35 03/10/2003 13:48 West Burley-Heyburn No 1 138kV line 138.0 L 4.43 1393 Plan Maintenance IDF 135746
03/09/2003 17:39 03/09/2003 17:39 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 0 Auto Foreign Trouble Foreign Utility SPK 135736
03/10/2003 07:51 03/10/2003 14:42 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 411 Plan Maintenance OLY LGV 135739
03/10/2003 07:51 03/10/2003 14:42 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 411 Plan Maintenance OLY LGV 135739
03/10/2003 07:55 03/10/2003 17:48 Ross-Mill Plain section of Ross-Vancouver Shipyard No 1 115kV line 115.0 S 3.66 593 Plan Maintenance LGV 135740
03/10/2003 07:55 03/10/2003 17:48 Ross-Vancouver Shipyard No 1 115kV line 115.0 L G 4.73 593 Plan Maintenance LGV 135740
03/10/2003 08:01 03/10/2003 15:03 Buckley-Marion No 1 500kV line 500.0 L 99.33 422 Plan Maintenance TDA RED SAL 135741
03/10/2003 08:22 03/14/2003 13:58 Lower Monumental-Ashe No 1 500kV line 500.0 L 39.58 6096 Plan Maintenance TRI 135742
03/10/2003 09:52 03/10/2003 13:25 Grand Coulee-Bell No 1 115kV line 115.0 L 82.03 213 Plan Construction WEN SPK 135743
03/10/2003 14:05   West Burley-Burley section of West Burley-Heyburn No 1 138kV line 138.0 S 2.22 still out Plan Normally Out IDF 135744
03/10/2003 14:05   West Burley-Heyburn No 1 138kV line 138.0 L G 4.43 still out Plan Normally Out IDF 135744
03/10/2003 23:02 03/11/2003 05:45 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 403 Plan Voltage Control RED 135745
03/11/2003 07:42 03/14/2003 10:40 Hay Mill-Roe's Corner section of Heyburn-Adelaide No 1 138kV line 138.0 S 4.92 4498 Plan Maintenance IDF 135755
03/11/2003 07:42 03/14/2003 10:40 Heyburn-Adelaide No 1 138kV line 138.0 L G 12.35 4498 Plan Maintenance IDF 135755
03/11/2003 07:45 03/11/2003 14:42 Hood River-The Dalles No 1 115kV line 115.0 L 16.02 417 Plan Maintenance TDA 135756
03/11/2003 07:45 03/11/2003 15:56 Ross-Mill Plain section of Ross-Vancouver Shipyard No 1 115kV line 115.0 S 3.66 491 Plan Maintenance LGV 135757
03/11/2003 07:45 03/11/2003 15:56 Ross-Vancouver Shipyard No 1 115kV line 115.0 L G 4.73 491 Plan Maintenance LGV 135757
03/11/2003 07:52 03/11/2003 14:20 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 388 Plan Maintenance OLY LGV 135758
03/11/2003 07:52 03/11/2003 14:20 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 388 Plan Maintenance OLY LGV 135758
03/11/2003 08:04 03/11/2003 15:31 Buckley-Marion No 1 500kV line 500.0 L 99.33 447 Plan Maintenance TDA RED SAL 135759
03/11/2003 08:05 03/14/2003 13:36 Blackrock-Sunnyside Port section of Midway-Grandview No 1 115kV line 115.0 S 16.25 4651 Plan Maintenance WEN 135760
03/11/2003 08:05 03/14/2003 13:36 Midway-Grandview No 1 115kV line 115.0 L G 25.07 4651 Plan Maintenance TRI WEN 135760
03/11/2003 10:21 03/11/2003 10:55 Columbia-Ancient Lake section of Columbia-Wanapum No 2 230kV line 230.0 S 11.20 34 Plan Construction WEN 135761
03/11/2003 10:21 03/11/2003 10:55 Columbia-Wanapum No 2 230kV line 230.0 L G 30.90 34 Plan Construction WEN 135761
03/11/2003 10:23 03/11/2003 10:50 Taft-Bell No 1 500kV line 500.0 L 96.44 27 Plan Maintenance KAL SPK 135762
03/11/2003 21:20 03/11/2003 21:24 Acton tap to Bonneville PH 1-Hood River No 1 115kV line 115.0 T G 0.01 4 Auto Foreign Trouble Foreign Trouble TDA 135763
03/11/2003 21:20 03/11/2003 21:24 Acton-Cascade Locks section of Bonneville PH 1-Hood River No 1 115kV line 115.0 S G 5.61 4 Auto Foreign Trouble Foreign Trouble TDA 135763
03/11/2003 21:20 03/11/2003 21:24 Bonneville PH 1-Hood River No 1 115kV line 115.0 L 22.61 4 Auto Foreign Trouble Foreign Trouble LGV TDA 135763
03/11/2003 21:20 03/11/2003 21:24 Bonneville-Acton section of Bonneville PH 1-Hood River No 1 115kV line 115.0 S G 0.36 4 Auto Foreign Trouble Foreign Trouble LGV TDA 135763
03/11/2003 21:20 03/11/2003 21:24 Cascade Locks tap to Bonneville PH 1-Hood River No 1 115kV line 115.0 T G 0.07 4 Auto Foreign Trouble Foreign Trouble TDA 135763
03/11/2003 21:20 03/11/2003 21:24 Cascade Locks-Hood River section of Bonneville PH 1-Hood River No 1 115kV line 115.0 S G 16.64 4 Auto Foreign Trouble Foreign Trouble TDA 135763
03/11/2003 22:46 03/12/2003 05:56 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 430 Plan Voltage Control RED 135764
03/12/2003 05:58 03/12/2003 05:58 Targhee-Drummond No 1 115kV line 115.0 L 26.80 0 Auto Unknown Unknown IDF 135771
03/12/2003 07:26 03/12/2003 13:56 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 390 Plan Maintenance OLY 135772
03/12/2003 07:26 03/12/2003 13:56 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 390 Plan Maintenance OLY 135772
03/12/2003 08:01 03/12/2003 16:01 Chief Joseph PH-Chief Joseph No 1 230kV line 230.0 L 1.09 480 Plan Switching WEN 135773
03/12/2003 08:01 03/12/2003 15:59 Chief Joseph-East Omak No 1 230kV line 230.0 L 33.99 478 Plan Forced WEN 135774
03/12/2003 08:02 03/12/2003 16:45 Grand Coulee-Chief Joseph No 2 230kV line 230.0 L 32.59 523 Plan Switching WEN 135775
03/12/2003 08:19 03/12/2003 14:22 Buckley-Marion No 1 500kV line 500.0 L 99.33 363 Plan Maintenance TDA RED SAL 135776
03/12/2003 09:58 03/12/2003 10:19 Libby PH-Libby No 2 230kV line 230.0 L 1.29 21 Auto RAS Initiated RAS Initiated KAL 135777
03/12/2003 09:58 03/12/2003 10:13 Noxon-Libby No 1 230kV line 230.0 L 70.17 15 Auto Unknown Unknown KAL 135778
03/12/2003 23:50 03/13/2003 05:12 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 322 Plan Voltage Control RED 135779
03/13/2003 04:19 03/13/2003 05:39 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S 1.90 80 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 05:39 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S 10.53 80 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 11:49 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 450 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 04:19 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T 0.10 0 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 04:19 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 0 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 05:39 Thatcher Junction tap to Keeler-Tillamook No 1 115kV line 115.0 T 0.75 80 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 11:49 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S 8.04 450 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 12:06 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 467 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:19 03/13/2003 11:49 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S 12.20 450 Auto Tree blown Tree blown SAL 135806
03/13/2003 04:25 03/13/2003 20:35 Allston-Astoria No 1 115kV line 115.0 L G 41.98 970 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 06:18 Allston-Delena section of Allston-Astoria No 1 115kV line 115.0 S 3.31 113 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 05:14 Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 18.27 49 Auto Tree blown Tree blown LGV OLY 135807
03/13/2003 04:25 03/13/2003 06:25 Clatskanie-Mist section of Allston-Astoria No 1 115kV line 115.0 S 4.80 120 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 20:35 Delena-Clatskanie section of Allston-Astoria No 1 115kV line 115.0 S 6.66 970 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 04:59 Fern Hill-Astoria section of Allston-Astoria No 1 115kV line 115.0 S 3.95 34 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 05:14 Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 10.32 49 Auto Tree blown Tree blown LGV OLY 135807
03/13/2003 04:25 03/13/2003 04:59 Knappa-Fern Hill section of Allston-Astoria No 1 115kV line 115.0 S 6.62 34 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 06:25 Mist-Naselle section of Allston-Astoria No 1 115kV line 115.0 S 7.90 120 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 05:30 Naselle tap-Cathlamet section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 4.58 65 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:25 03/13/2003 06:30 Naselle-Knappa section of Allston-Astoria No 1 115kV line 115.0 S 8.74 125 Auto Tree blown Tree blown LGV 135807
03/13/2003 04:53 03/13/2003 04:59 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 6 Auto Foreign Trouble SAL 135808
03/13/2003 04:53 03/13/2003 04:59 Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.70 6 Auto Foreign Trouble SAL 135808
03/13/2003 04:53 03/13/2003 04:53 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 0 Auto Unknown Unknown SAL 135809
03/13/2003 05:24 03/13/2003 05:30 Allston-Astoria No 1 115kV line 115.0 L T 41.98 6 Plan Switching LGV 135810
03/13/2003 05:24 03/13/2003 05:30 Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 18.27 6 Plan Switching LGV OLY 135810
03/13/2003 05:24 03/13/2003 05:30 Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 10.32 6 Plan Switching LGV OLY 135810
03/13/2003 06:23 03/13/2003 06:25 Allston-Astoria No 1 115kV line 115.0 L T 41.98 2 Plan Switching LGV 135811
03/13/2003 06:23 03/13/2003 06:25 Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 18.27 2 Plan Switching LGV OLY 135811
03/13/2003 06:23 03/13/2003 06:25 Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 10.32 2 Plan Switching LGV OLY 135811
03/13/2003 06:23 03/13/2003 06:25 Naselle tap-Cathlamet section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 4.58 2 Plan Switching LGV 135811
03/13/2003 08:22 03/13/2003 14:51 Buckley-Marion No 1 500kV line 500.0 L 99.33 389 Plan Maintenance TDA RED SAL 135812
03/13/2003 09:01 03/13/2003 11:00 Jim Creek Service No 1 115kV line 115.0 L 9.57 119 Plan Foreign Request SNO 135813
03/13/2003 10:36 03/13/2003 10:36 Albany-Eugene No 1 115kV line 115.0 L O 39.80 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S G 17.09 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Alderwood tap to Albany-Eugene No 1 115kV line 115.0 T G 9.21 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Alderwood tap-Cheshire section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS G 1.40 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Alderwood-Junction City section of Albany-Eugene No 1 115kV line 115.0 S G 2.04 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Cheshire tap to Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TT G 0.01 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Cheshire-Alderwood section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS G 7.80 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Greenberry tap to Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TT G 19.00 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Greenberry-Harrisburg section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS G 0.02 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Halsey Mill tap to Albany-Eugene No 1 115kV line 115.0 T G 0.04 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 T G 0.04 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Harrisburg tap-Greenberry section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS G 0.02 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S G 8.28 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Junction City tap to Albany-Eugene No 1 115kV line 115.0 T G 0.05 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Junction City-Parker section of Albany-Eugene No 1 115kV line 115.0 S G 2.94 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Parker tap to Albany-Eugene No 1 115kV line 115.0 T G 0.10 0 Auto Wind Unknown EUG 135814
03/13/2003 10:36 03/13/2003 10:36 Parker-Eugene section of Albany-Eugene No 1 115kV line 115.0 S G 3.90 0 Auto Wind Unknown EUG 135814
03/13/2003 16:18 03/14/2003 08:15 Creston-Bell No 1 115kV line 115.0 L T 53.80 957 Plan Construction WEN SPK 135824
03/13/2003 16:18 03/14/2003 07:57 Larene tap to Creston-Bell No 1 115kV line 115.0 T 0.01 939 Plan Construction WEN 135824
03/13/2003 16:18 03/14/2003 08:15 Springhill tap to Creston-Bell No 1 115kV line 115.0 T 0.01 957 Plan Construction SPK 135824
03/13/2003 21:08 03/14/2003 14:24 Addy-AVA Kettle Falls No 1 115kV line 115.0 L 27.10 1036 Auto Foreign Trouble Foreign Utility SPK 135816
03/13/2003 22:47 03/14/2003 03:36 Columbia Generating Station-Ashe No 1 500kV line 500.0 L 0.55 289 Auto Foreign Trouble Foreign Utility TRI 135817
03/14/2003 00:11 03/14/2003 05:09 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 298 Plan Voltage Control RED 135818
03/14/2003 04:29 03/14/2003 04:30 Slatt-John Day No 1 500kV line 500.0 L 30.32 1 Auto Unknown Unknown TRI TDA 135819
03/14/2003 07:07 03/14/2003 07:07 Monroe-Sammamish No 1 230kV line 230.0 L 27.18 0 Auto Foreign Trouble Foreign Utility SNO COV 135825
03/14/2003 07:07 03/14/2003 07:07 Monroe-Sno-King tap section of Monroe-Sammamish No 1 230kV line 230.0 S G 8.90 0 Auto Foreign Trouble Foreign Utility SNO 135825
03/14/2003 07:07 03/14/2003 07:07 Sno-King tap to Monroe-Sammamish No 1 230kV line 230.0 T G 12.84 0 Auto Foreign Trouble Foreign Utility SNO 135825
03/14/2003 07:07 03/14/2003 07:07 Sno-King tap-Sammamish section of Monroe-Sammamish No 1 230kV line 230.0 S G 18.30 0 Auto Foreign Trouble Foreign Utility SNO COV 135825
03/14/2003 07:10 03/14/2003 13:47 Hungry Horse-Conkelley No 1 230kV line 230.0 L 8.26 397 Plan Maintenance KAL 135826
03/14/2003 07:24 03/14/2003 14:53 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 449 Plan Maintenance OLY 135827
03/14/2003 07:24 03/14/2003 14:53 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 449 Plan Maintenance OLY 135827
03/14/2003 08:12 03/14/2003 14:30 Buckley-Marion No 1 500kV line 500.0 L 99.33 378 Plan Maintenance TDA RED SAL 135829
03/14/2003 08:51 03/14/2003 08:55 Creston-Bell No 1 115kV line 115.0 L G 53.80 4 Plan Switching WEN SPK 135831
03/14/2003 08:51 03/14/2003 08:55 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 4 Plan Switching WEN 135831
03/14/2003 10:17 03/14/2003 10:45 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 28 Plan Switching WEN SPK 135833
03/14/2003 10:17 03/14/2003 10:45 Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line 115.0 S 10.21 28 Plan Switching WEN SPK 135833
03/14/2003 10:59 03/14/2003 11:07 B212-Wilbur section of Grand Coulee-Creston No 1 115kV line 115.0 S 16.47 8 Plan Switching WEN 135834
03/14/2003 10:59 03/14/2003 11:07 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 8 Plan Switching WEN SPK 135834
03/15/2003 00:17 03/15/2003 07:41 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 444 Plan Voltage Control RED 135835
03/15/2003 02:03 03/15/2003 03:22 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 79 Auto Vehicle Vehicle COV 135836
03/15/2003 02:03 03/15/2003 03:22 Franz Holmes tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 1.20 79 Auto Vehicle Vehicle COV 135836
03/15/2003 02:03 03/15/2003 03:22 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 79 Auto Vehicle Vehicle COV 135837
03/15/2003 02:03 03/15/2003 03:22 Lynch Creek tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 3.28 79 Auto Vehicle Vehicle COV OLY 135837
03/15/2003 04:04 03/15/2003 07:03 Schultz-Raver No 2 500kV line 500.0 L 77.24 179 Plan Voltage Control WEN COV 135838
03/15/2003 06:13 03/15/2003 21:27 Garrison-Taft No 2 500kV line 500.0 L 159.38 914 Plan Voltage Control KAL 135839
03/15/2003 07:45 03/15/2003 14:55 Hanford-John Day No 1 500kV line 500.0 L 97.27 430 Plan Maintenance TRI WEN TDA 135841
03/15/2003 15:21 03/16/2003 09:53 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1112 Plan Voltage Control RED 135842
03/15/2003 19:47 03/15/2003 19:47 Goshen-Drummond No 1 161kV line 161.0 L 72.75 0 Auto Unknown Unknown IDF 135843
03/15/2003 21:28 03/16/2003 10:17 Garrison-Taft No 1 500kV line 500.0 L 159.38 769 Plan Voltage Control KAL 135844
03/16/2003 00:51 03/16/2003 06:48 Buckley-Marion No 1 500kV line 500.0 L 99.33 357 Plan Voltage Control TDA RED SAL 135845
03/16/2003 01:13 03/16/2003 06:38 Schultz-Raver No 1 500kV line 500.0 L 77.24 325 Plan Voltage Control WEN COV 135846
03/16/2003 07:50 03/16/2003 08:52 Fairview-Rogue No 1 230kV line 230.0 L 65.28 62 Auto Unknown Unknown EUG 135847
03/16/2003 23:18 03/17/2003 05:34 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 376 Plan Voltage Control RED 135848
03/17/2003 07:09 03/17/2003 07:35 Bell-Addy No 1 115kV line 115.0 L G 51.18 26 Plan Switching SPK 135854
03/17/2003 07:09 03/17/2003 07:35 Bell-Colbert section of Bell-Addy No 1 115kV line 115.0 S 7.92 26 Plan Switching SPK 135854
03/17/2003 07:40 03/17/2003 16:56 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 556 Plan Maintenance OLY 135855
03/17/2003 07:40 03/17/2003 16:56 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 556 Plan Maintenance OLY 135855
03/17/2003 07:49 03/21/2003 14:54 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S 50.34 6185 Plan Construction SPK 135856
03/17/2003 07:49 03/21/2003 14:54 Bell-Boundary No 3 230kV line 230.0 L G 108.07 6185 Plan Construction SPK 135856
03/17/2003 07:55 03/18/2003 14:25 Alvey-Diamond Hill No 3 230kV line 230.0 L G 20.30 1830 Plan Foreign Request EUG 135857
03/17/2003 07:55 03/18/2003 14:25 Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line 230.0 S 9.60 1830 Plan Foreign Request EUG 135857
03/17/2003 08:00 03/19/2003 15:28 Schultz-Raver No 4 500kV line 500.0 L 77.43 3328 Plan Maintenance WEN COV 135858
03/17/2003 08:00 03/25/2003 08:55 McNary-Ross No 1 345kV line 345.0 L 174.57 11575 Plan Maintenance TRI TDA LGV 135859
03/17/2003 08:08 03/17/2003 08:22 Addy tap to Bell-Boundary No 3 230kV line 230.0 T 0.02 14 Plan Switching SPK 135860
03/17/2003 08:08 03/17/2003 08:22 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S 57.73 14 Plan Switching SPK 135860
03/17/2003 08:08 03/17/2003 08:22 Bell-Boundary No 3 230kV line 230.0 L O 108.07 14 Plan Switching SPK 135860
03/17/2003 08:17 03/28/2003 10:07 Bell-Addy No 1 115kV line 115.0 L G 51.18 15950 Plan Construction SPK 135861
03/17/2003 08:17 03/28/2003 10:07 Bell-Colbert section of Bell-Addy No 1 115kV line 115.0 S 7.92 15950 Plan Construction SPK 135861
03/17/2003 08:22 04/18/2003 06:23 Addy-Cusick No 1 230kV line 230.0 L 25.77 45901 Plan Normally Out SPK 135862
03/17/2003 08:38 03/21/2003 12:10 Blackrock-Sunnyside Port section of Midway-Grandview No 1 115kV line 115.0 S 16.25 5972 Plan Maintenance WEN 135863
03/17/2003 08:38 03/21/2003 12:10 Midway-Grandview No 1 115kV line 115.0 L G 25.07 5972 Plan Maintenance TRI WEN 135863
03/17/2003 08:46 03/20/2003 13:41 H2F-Nine Canyon section of McNary-Badger Canyon No 1 115kV line 115.0 S 12.58 4615 Plan Maintenance TRI 135864
03/17/2003 08:46 03/20/2003 13:41 McNary-Badger Canyon No 1 115kV line 115.0 L G 28.40 4615 Plan Maintenance TRI 135864
03/17/2003 08:53 03/17/2003 11:27 Satsop-Aberdeen No 2 230kV line 230.0 L 20.51 154 Plan Maintenance OLY 135865
03/17/2003 08:53 03/18/2003 15:53 Creston-Bell No 1 115kV line 115.0 L G 53.80 1860 Plan Maintenance WEN SPK 135866
03/17/2003 08:53 03/18/2003 15:53 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 1860 Plan Maintenance WEN 135866
03/17/2003 09:01 03/17/2003 09:40 Bell-Bigelow section of Bell-Trentwood No 2 115kV line 115.0 S 6.60 39 Plan Maintenance SPK 135867
03/17/2003 09:01 03/17/2003 09:40 Bell-Trentwood No 2 115kV line 115.0 L G 11.30 39 Plan Maintenance SPK 135867
03/17/2003 09:03 03/19/2003 11:17 Tacoma-TPWR Northeast No 2 230kV line 230.0 L 0.10 3014 Plan Foreign Request COV 135868
03/17/2003 09:41 03/17/2003 14:36 Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line 115.0 S 11.23 295 Plan Maintenance SPK 135869
03/17/2003 09:41 03/17/2003 14:36 Bell-Trentwood No 1 115kV line 115.0 L G 11.27 295 Plan Maintenance SPK 135869
03/17/2003 10:17 03/17/2003 11:45 Albany-Eugene No 1 115kV line 115.0 L G 39.80 88 Plan Normally Out EUG 135870
03/17/2003 10:17 03/17/2003 11:45 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 88 Plan Normally Out EUG 135870
03/17/2003 10:31 03/18/2003 15:00 Hay Mill-Roe's Corner section of Heyburn-Adelaide No 1 138kV line 138.0 S 4.92 1709 Plan Maintenance IDF 135871
03/17/2003 10:31 03/18/2003 15:00 Heyburn-Adelaide No 1 138kV line 138.0 L G 12.35 1709 Plan Maintenance IDF 135871
03/17/2003 11:03 05/23/2003 08:19 Albany-Eugene No 1 115kV line 115.0 L T 39.80 96256 Plan Foreign Request EUG 135872
03/17/2003 11:03 05/23/2003 08:19 Greenberry tap to Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TT 19.00 96256 Plan Foreign Request EUG 135872
03/17/2003 11:54 03/18/2003 03:38 Maple Valley-East Pine No 1 230kV line 230.0 L 14.08 944 Plan Foreign Request COV 135873
03/17/2003 13:18 03/20/2003 13:07 Anaconda-Silver Bow No 1 115kV line 115.0 L 12.69 4309 Plan Maintenance KAL 135874
03/17/2003 14:23 04/21/2003 08:08 Albany-Eugene No 1 115kV line 115.0 L G 39.80 49965 Plan Normally Out EUG 135875
03/17/2003 14:23 04/21/2003 08:08 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 49965 Plan Normally Out EUG 135875
03/18/2003 00:02 03/18/2003 05:02 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 300 Plan Voltage Control RED 135876
03/18/2003 07:21 03/20/2003 12:38 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 3197 Plan Maintenance RED 135879
03/18/2003 07:38 03/18/2003 16:41 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 543 Plan Maintenance OLY 135880
03/18/2003 07:38 03/18/2003 16:41 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 543 Plan Maintenance OLY 135880
03/18/2003 08:09 03/18/2003 14:42 Bell-AVA Beacon No 5 230kV line 230.0 L 6.00 393 Plan Foreign Request SPK 135881
03/18/2003 09:10 03/18/2003 11:55 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 165 Plan Maintenance TDA RED 135882
03/18/2003 09:10 03/18/2003 11:55 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 165 Plan Maintenance TDA 135882
03/18/2003 10:35 03/18/2003 10:48 Allston-PGE Beaver No 1 230kV line 230.0 L 9.20 13 Auto Construction Construction LGV 135883
03/18/2003 10:35 03/18/2003 10:40 Longview-Allston No 1 230kV line 230.0 L 4.59 5 Auto Construction Construction LGV 135884
03/18/2003 10:35 03/18/2003 10:43 Trojan-Allston No 1 230kV line 230.0 L 9.47 8 Auto Construction Construction LGV 135885
03/18/2003 10:35 03/18/2003 11:01 Allston-Driscoll No 1 230kV line 230.0 L 20.96 26 Auto Construction Construction LGV 135886
03/18/2003 10:35 03/18/2003 10:41 Longview-Allston No 2 230kV line 230.0 L 4.87 6 Auto Construction Construction LGV 135887
03/18/2003 11:21 03/18/2003 15:35 North Bonneville-Ross No 2 230kV line 230.0 L 35.99 254 Plan Emergency LGV 135888
03/18/2003 11:21 03/18/2003 15:35 North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line 230.0 S G 27.51 254 Plan Emergency LGV 135888
03/18/2003 11:21 03/18/2003 15:35 Sifton tap to North Bonneville-Ross No 2 230kV line 230.0 T G 1.20 254 Plan Emergency LGV 135888
03/18/2003 11:21 03/18/2003 15:35 Sifton-Ross section of North Bonneville-Ross No 2 230kV line 230.0 S G 8.48 254 Plan Emergency LGV 135888
03/18/2003 23:12 03/19/2003 11:22 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 730 Plan Maintenance TDA RED 135889
03/18/2003 23:12 03/19/2003 11:22 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 730 Plan Maintenance TDA 135889
03/18/2003 23:44 03/19/2003 04:10 John Day-Grizzly No 2 500kV line 500.0 L 88.59 266 Plan Voltage Control TDA RED 135890
03/19/2003 00:01 03/19/2003 05:07 John Day-Marion No 1 500kV line 500.0 L 127.51 306 Plan Voltage Control TDA RED SAL 135891
03/19/2003 06:01 03/19/2003 07:40 Tahkenitch-Gardiner No 1 115kV line 115.0 L 1.64 99 Auto Improper Relaying Terminal Equipment Failure EUG 135898
03/19/2003 07:36 03/19/2003 16:25 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 529 Plan Maintenance OLY 135899
03/19/2003 07:36 03/19/2003 16:25 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 529 Plan Maintenance OLY 135899
03/19/2003 07:53 03/21/2003 14:46 McKenzie tap to Rocky Reach-Columbia No 2 230kV line 230.0 T G 0.30 3293 Plan Maintenance WEN 135900
03/19/2003 07:53 03/21/2003 14:46 McKenzie-Columbia section of Rocky Reach-Columbia No 2 230kV line 230.0 S G 5.50 3293 Plan Maintenance WEN 135900
03/19/2003 07:53 03/21/2003 14:46 Rocky Reach-Columbia No 2 230kV line 230.0 L 21.30 3293 Plan Maintenance WEN 135900
03/19/2003 07:53 03/21/2003 14:46 Rocky Reach-McKenzie section of Rocky Reach-Columbia No 2 230kV line 230.0 S G 15.80 3293 Plan Maintenance WEN 135900
03/19/2003 07:57 03/19/2003 15:00 Alvey-Diamond Hill No 3 230kV line 230.0 L G 20.30 423 Plan Foreign Request EUG 135901
03/19/2003 07:57 03/19/2003 15:00 Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line 230.0 S 9.60 423 Plan Foreign Request EUG 135901
03/19/2003 07:57 03/19/2003 15:00 McKenzie-Diamond Hill section of Alvey-Diamond Hill No 3 230kV line 230.0 S 10.70 423 Plan Foreign Request EUG 135901
03/19/2003 08:16 03/20/2003 12:46 Lower Monumental-Ashe No 1 500kV line 500.0 L 39.58 1710 Plan Maintenance TRI 135902
03/19/2003 08:38 03/20/2003 14:25 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 1787 Plan Maintenance WEN SPK 135903
03/19/2003 08:38 03/20/2003 14:25 Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line 115.0 S 10.21 1787 Plan Maintenance WEN SPK 135903
03/19/2003 13:09 10/28/2003 12:48 Ely-Highland section of Franklin-Badger Canyon No 2 115kV line 115.0 S 1.98 321099 Plan Normally Out TRI 135904
03/19/2003 13:09 10/28/2003 12:48 Franklin-Badger Canyon No 2 115kV line 115.0 L G 13.35 321099 Plan Normally Out TRI 135904
03/19/2003 15:14 03/20/2003 13:58 Noxon-Libby No 1 230kV line 230.0 L 70.17 1364 Auto Malicious Malicious KAL 135905
03/19/2003 15:14 03/19/2003 17:17 Libby PH-Libby No 2 230kV line 230.0 L 1.29 123 Auto RAS Initiated RAS Initiated KAL 135906
03/19/2003 18:07 03/19/2003 18:15 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 8 Auto Human Element TDA RED 135907
03/19/2003 18:07 03/19/2003 18:15 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 8 Auto Human Element TDA 135907
03/19/2003 18:07 03/19/2003 18:15 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 8 Auto Human Element TDA 135907
03/19/2003 18:07 03/19/2003 18:15 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 8 Auto Human Element TDA 135907
03/19/2003 18:07 03/19/2003 18:15 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 8 Auto Human Element TDA 135907
03/20/2003 04:22 03/20/2003 04:22 Vantage-Schultz No 1 500kV line 500.0 L 34.65 0 Auto Unknown Unknown WEN 135908
03/20/2003 07:29 03/20/2003 07:29 Eugene-Lane No 1 115kV line 115.0 L 5.47 0 Auto Unknown Unknown EUG 135916
03/20/2003 07:50 03/20/2003 16:18 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 508 Plan Maintenance OLY 135917
03/20/2003 07:50 03/20/2003 16:18 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 508 Plan Maintenance OLY 135917
03/20/2003 09:06 03/21/2003 11:43 Little Goose-Lower Granite No 1 500kV line 500.0 L 32.80 1597 Plan Maintenance SPK TRI 135918
03/20/2003 10:07 03/20/2003 10:31 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 24 Plan Maintenance EUG 135919
03/20/2003 10:07 03/20/2003 10:31 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 24 Plan Maintenance EUG 135919
03/20/2003 10:44 03/20/2003 11:23 Dworshak PH-Dworshak No 1 500kV line 500.0 L 3.67 39 Plan Emergency TRI SPK 135920
03/20/2003 12:38 03/20/2003 12:38 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 0 Plan Maintenance RED 135921
03/20/2003 14:46 03/20/2003 15:01 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S 31.50 15 Plan Switching KAL 135922
03/20/2003 14:46 03/20/2003 15:01 Libby-Conkelley No 1 230kV line 230.0 L G 83.94 15 Plan Switching KAL 135922
03/20/2003 14:53 03/20/2003 16:40 Libby-Conkelley No 1 230kV line 230.0 L O 83.94 107 Plan Emergency KAL 135923
03/20/2003 14:53 03/20/2003 16:40 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S 45.10 107 Plan Emergency KAL 135923
03/20/2003 14:54 03/20/2003 16:00 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T 2.39 66 Auto Tree blown Tree blown SPK 135924
03/20/2003 14:54 03/20/2003 16:00 Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line 115.0 S 4.75 66 Auto Tree blown Tree blown SPK 135924
03/20/2003 14:54 03/20/2003 17:55 Colville-Boundary No 1 115kV line 115.0 L O 43.06 181 Auto Tree blown Tree blown SPK 135924
03/20/2003 14:54 03/20/2003 17:55 Colville-Spirit section of Colville-Boundary No 1 115kV line 115.0 S 17.42 181 Auto Tree blown Tree blown SPK 135924
03/20/2003 14:54 03/20/2003 16:00 Metaline Falls tap to Colville-Boundary No 1 115kV line 115.0 T 1.20 66 Auto Tree blown Tree blown SPK 135924
03/20/2003 14:54 03/20/2003 16:00 Spirit tap to Colville-Boundary No 1 115kV line 115.0 T 5.23 66 Auto Tree blown Tree blown SPK 135924
03/20/2003 14:54 03/20/2003 16:00 Spirit-Box Canyon section of Colville-Boundary No 1 115kV line 115.0 S 11.98 66 Auto Tree blown Tree blown SPK 135924
03/20/2003 16:00 03/20/2003 18:09 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T 2.39 129 Plan Foreign Request SPK 135925
03/20/2003 16:00 03/20/2003 18:09 Colville-Boundary No 1 115kV line 115.0 L T 43.06 129 Plan Foreign Request SPK 135925
03/20/2003 18:00   Colville-Boundary No 1 115kV line 115.0 L G 43.06 still out Plan Normally Out SPK 135926
03/20/2003 18:00   Metaline Falls-Boundary section of Colville-Boundary No 1 115kV line 115.0 S 8.91 still out Plan Normally Out SPK 135926
03/21/2003 01:15 03/21/2003 05:02 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 227 Plan Voltage Control RED 135927
03/21/2003 07:33 03/21/2003 15:14 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 461 Plan Maintenance SAL 135932
03/21/2003 07:33 03/21/2003 15:14 Oregon City-Fargo section of Oregon City-Chemawa No 2 115kV line 115.0 S 6.70 461 Plan Maintenance SAL 135932
03/21/2003 12:21 03/21/2003 12:21 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S G 29.39 0 Auto Unknown Unknown TDA 135933
03/21/2003 12:21 03/21/2003 12:21 Big Eddy-Redmond No 1 230kV line 230.0 L 97.46 0 Auto Unknown Unknown TDA RED 135933
03/21/2003 12:21 03/21/2003 12:21 Maupin tap to Big Eddy-Redmond No 1 230kV line 230.0 T G 0.10 0 Auto Unknown Unknown TDA 135933
03/21/2003 12:21 03/21/2003 12:21 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S G 68.07 0 Auto Unknown Unknown TDA RED 135933
03/21/2003 14:33 03/21/2003 14:37 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S 57.73 4 Plan Switching SPK 135934
03/21/2003 14:33 03/21/2003 14:37 Bell-Boundary No 3 230kV line 230.0 L O 108.07 4 Plan Switching SPK 135934
03/21/2003 23:53 03/22/2003 00:02 Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 9 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/22/2003 01:17 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T 0.10 84 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/27/2003 15:39 Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 10.90 8146 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/22/2003 01:04 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.50 71 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/22/2003 00:04 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 11.60 11 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/22/2003 00:02 Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 12.80 9 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/22/2003 01:17 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 84 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/27/2003 15:39 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 8146 Auto Foreign Trouble Foreign Trouble SAL 135935
03/21/2003 23:53 03/22/2003 00:02 Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.70 9 Auto Foreign Trouble Foreign Trouble SAL 135935
03/22/2003 11:08 03/22/2003 11:15 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S G 29.39 7 Auto Unknown Unknown TDA 135937
03/22/2003 11:08 03/22/2003 11:15 Big Eddy-Redmond No 1 230kV line 230.0 L 97.46 7 Auto Unknown Unknown TDA RED 135937
03/22/2003 11:08 03/22/2003 11:15 Maupin tap to Big Eddy-Redmond No 1 230kV line 230.0 T G 0.10 7 Auto Unknown Unknown TDA 135937
03/22/2003 11:08 03/22/2003 11:15 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S G 68.07 7 Auto Unknown Unknown TDA RED 135937
03/22/2003 11:08 03/22/2003 11:08 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Sympathetic Improper Relaying TDA 136005
03/22/2003 11:22 03/22/2003 11:22 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Sympathetic Improper Relaying TDA 136088
03/22/2003 11:23 03/22/2003 11:23 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S G 29.39 0 Auto Unknown Unknown TDA 135938
03/22/2003 11:23 03/22/2003 11:23 Big Eddy-Redmond No 1 230kV line 230.0 L 97.46 0 Auto Unknown Unknown TDA RED 135938
03/22/2003 11:23 03/22/2003 11:23 Maupin tap to Big Eddy-Redmond No 1 230kV line 230.0 T G 0.10 0 Auto Unknown Unknown TDA 135938
03/22/2003 11:23 03/22/2003 11:23 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S G 68.07 0 Auto Unknown Unknown TDA RED 135938
03/22/2003 15:28 03/22/2003 19:09 Albany-Burnt Woods No 1 115kV line 115.0 L 25.77 221 Auto Tree cut Tree cut EUG 135939
03/23/2003 00:02 03/23/2003 00:21 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 19 Auto Substation Operations TDA RED 135940
03/23/2003 00:02 03/23/2003 00:21 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135940
03/23/2003 00:02 03/23/2003 00:21 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135940
03/23/2003 00:02 03/23/2003 00:21 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135940
03/23/2003 00:02 03/23/2003 00:21 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135940
03/23/2003 00:02 03/23/2003 00:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 19 Auto Substation Operations TDA RED 135941
03/23/2003 00:02 03/23/2003 00:21 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135941
03/23/2003 00:02 03/23/2003 00:21 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135941
03/23/2003 00:02 03/23/2003 00:21 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135941
03/23/2003 00:02 03/23/2003 00:21 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135941
03/23/2003 00:02 03/23/2003 00:21 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 19 Auto Substation Operations TDA 135941
03/23/2003 00:22 03/23/2003 05:05 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 283 Plan Voltage Control RED 135942
03/23/2003 02:39 03/23/2003 02:39 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 135943
03/23/2003 02:39 03/23/2003 02:39 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 135943
03/23/2003 02:39 03/23/2003 02:39 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 135943
03/23/2003 16:26 03/23/2003 16:26 Benton-Ringold section of Benton-Scooteney No 1 115kV line 115.0 S G 7.84 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Benton-Scooteney No 1 115kV line 115.0 L O 20.32 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Connell tap to Benton-Scooteney No 1 115kV line 115.0 T G 7.65 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Connell tap-Hatton tap section of Connell tap to Benton-Scooteney No 1 115kV line 115.0 TS G 4.65 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Connell-Scooteney section of Benton-Scooteney No 1 115kV line 115.0 S G 1.57 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Hatton tap to Connell tap to Benton-Scooteney No 1 115kV line 115.0 TT G 15.35 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Hatton tap-Connell section of Connell tap to Benton-Scooteney No 1 115kV line 115.0 TS G 3.00 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Mesa-Connell section of Benton-Scooteney No 1 115kV line 115.0 S G 4.53 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:26 03/23/2003 16:26 Ringold-Mesa section of Benton-Scooteney No 1 115kV line 115.0 S G 6.38 0 Auto Unknown Galloping Conductors TRI 135953
03/23/2003 16:33 03/24/2003 00:57 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 504 Auto Terminal Equipment Failure TDA RED 135954
03/23/2003 16:33 03/24/2003 00:57 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 504 Auto Terminal Equipment Failure TDA 135954
03/23/2003 23:23 03/23/2003 23:39 Midway-Priest Rapids No 1 230kV line 230.0 L 7.00 16 Auto Foreign Trouble Foreign Utility TRI 135955
03/24/2003 07:42 03/24/2003 15:33 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 471 Plan Maintenance OLY 135964
03/24/2003 07:42 03/24/2003 15:33 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 471 Plan Maintenance OLY 135964
03/24/2003 07:46 03/24/2003 08:42 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 56 Auto Terminal Equipment Failure TDA RED 135965
03/24/2003 07:46 03/24/2003 08:42 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 56 Auto Terminal Equipment Failure TDA 135965
03/24/2003 07:46 03/24/2003 11:30 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 224 Auto Terminal Equipment Failure TDA 135965
03/24/2003 07:46 03/24/2003 11:30 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 224 Auto Terminal Equipment Failure TDA 135965
03/24/2003 07:46 03/24/2003 11:30 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 224 Auto Terminal Equipment Failure TDA 135965
03/24/2003 07:46 03/24/2003 08:22 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 36 Auto Forced (Configuration) TDA 135966
03/24/2003 07:48 03/24/2003 14:58 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 430 Plan Maintenance SPK 135967
03/24/2003 07:48 03/24/2003 14:58 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 430 Plan Maintenance SPK 135967
03/24/2003 07:48 03/24/2003 14:58 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 430 Plan Maintenance SPK 135967
03/24/2003 07:48 03/24/2003 14:58 Bell-Boundary No 3 230kV line 230.0 L 108.07 430 Plan Maintenance SPK 135967
03/24/2003 07:52 03/24/2003 14:59 Rainier-Allston section of St Helens-Allston No 1 115kV line 115.0 S 6.25 427 Plan Maintenance LGV 135968
03/24/2003 07:52 03/24/2003 14:59 St Helens-Allston No 1 115kV line 115.0 L G 25.22 427 Plan Maintenance LGV 135968
03/24/2003 08:05 03/24/2003 08:42 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 37 Plan Emergency TDA RED 135969
03/24/2003 08:05 03/24/2003 08:42 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 37 Plan Emergency TDA 135969
03/24/2003 08:05 03/24/2003 08:42 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 37 Plan Emergency TDA 135969
03/24/2003 08:05 03/24/2003 08:42 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 37 Plan Emergency TDA 135969
03/24/2003 08:05 03/24/2003 08:42 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 37 Plan Emergency TDA 135969
03/24/2003 08:05 03/24/2003 08:42 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 37 Plan Emergency TDA 135969
03/24/2003 08:24 03/24/2003 08:24 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 0 Auto Forced (Configuration) TDA 135970
03/24/2003 08:34 03/27/2003 13:38 Creston-Bell No 1 115kV line 115.0 L G 53.80 4624 Plan Construction WEN SPK 135971
03/24/2003 08:34 03/27/2003 13:38 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 4624 Plan Construction WEN 135971
03/24/2003 09:16 03/27/2003 13:39 Anaconda-Silver Bow No 1 115kV line 115.0 L 12.69 4583 Plan Maintenance KAL 135972
03/24/2003 10:05 03/24/2003 10:05 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 0 Auto Substation Operations Substation Operations KAL 135973
03/24/2003 10:45 03/28/2003 16:03 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 6078 Plan Maintenance SAL 135974
03/24/2003 18:51 03/24/2003 20:44 Chief Joseph-Sickler No 1 500kV line 500.0 L 45.02 113 Auto Forced (Configuration) Forced (Configuration) WEN 135975
03/24/2003 18:51 03/25/2003 15:17 Sickler-Schultz No 1 500kV line 500.0 L 38.43 1226 Auto Terminal Equipment Failure Terminal Equipment Failure WEN 135976
03/24/2003 18:51 03/24/2003 20:44 Sickler-Douglas Switchyard No 1 230kV line 230.0 L 0.58 113 Auto Forced (Configuration) Terminal Equipment Failure WEN 135977
03/25/2003 02:39 03/25/2003 16:59 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T 0.10 860 Auto Equipment/Miscellaneous SAL 135978
03/25/2003 02:39 03/25/2003 16:59 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 860 Auto Equipment/Miscellaneous SAL 135978
03/25/2003 02:39 03/25/2003 16:59 Tillamook-PACW Astoria No 1 115kV line 115.0 L O 57.70 860 Auto Equipment/Miscellaneous SAL 135978
03/25/2003 02:39 03/25/2003 16:59 Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line 115.0 S 14.45 860 Auto Equipment/Miscellaneous Terminal Equipment Failure SAL 135979
03/25/2003 02:39 03/25/2003 16:59 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 860 Auto Equipment/Miscellaneous Terminal Equipment Failure SAL 135979
03/25/2003 02:39 03/25/2003 04:50 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 131 Auto Equipment/Miscellaneous Terminal Equipment Failure SAL 135981
03/25/2003 02:39 03/25/2003 04:50 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 131 Auto Equipment/Miscellaneous Terminal Equipment Failure SAL 135981
03/25/2003 07:14 03/25/2003 18:55 Christopher tap to Tacoma-Covington No 2 230kV line 230.0 T 4.70 701 Plan Foreign Request COV 135982
03/25/2003 07:14 03/25/2003 18:45 Christopher-Covington section of Tacoma-Covington No 2 230kV line 230.0 S 5.85 691 Plan Foreign Request COV 135982
03/25/2003 07:14 03/25/2003 18:45 Tacoma-Christopher section of Tacoma-Covington No 2 230kV line 230.0 S 9.45 691 Plan Foreign Request COV 135982
03/25/2003 07:14 03/25/2003 18:45 Tacoma-Covington No 2 230kV line 230.0 L G 15.30 691 Plan Foreign Request COV 135982
03/25/2003 07:30 03/26/2003 15:08 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 1898 Plan Maintenance SPK 135983
03/25/2003 07:30 03/26/2003 15:08 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 1898 Plan Maintenance SPK 135983
03/25/2003 07:30 03/26/2003 15:08 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 1898 Plan Maintenance SPK 135983
03/25/2003 07:30 03/26/2003 15:08 Bell-Boundary No 3 230kV line 230.0 L 108.07 1898 Plan Maintenance SPK 135983
03/25/2003 07:45 03/25/2003 14:50 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 425 Plan Maintenance OLY 135984
03/25/2003 07:45 03/25/2003 14:50 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 425 Plan Maintenance OLY 135984
03/25/2003 08:00 03/25/2003 14:08 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 368 Plan Maintenance TDA RED 135985
03/25/2003 08:00 03/25/2003 14:08 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 368 Plan Maintenance TDA RED 135985
03/25/2003 08:39 03/25/2003 14:29 South Elma-Satsop Park No 1 115kV line 115.0 L 4.60 350 Plan Maintenance OLY 135986
03/25/2003 09:02 03/25/2003 09:06 Midway-Priest Rapids No 3 230kV line 230.0 L 7.20 4 Auto Foreign Trouble Foreign Utility TRI 135987
03/25/2003 14:08 03/25/2003 14:08 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S 29.39 0 Auto Equipment/Miscellaneous Terminal Equipment Failure TDA 135994
03/25/2003 14:08 03/26/2003 14:13 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 1445 Auto Equipment/Miscellaneous Terminal Equipment Failure TDA RED 135994
03/25/2003 14:08 03/25/2003 14:08 Maupin tap to Big Eddy-Redmond No 1 230kV line 230.0 T 0.10 0 Auto Equipment/Miscellaneous Terminal Equipment Failure TDA 135994
03/25/2003 14:08 03/26/2003 14:13 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 1445 Auto Equipment/Miscellaneous Terminal Equipment Failure TDA RED 135994
03/25/2003 15:11 03/25/2003 19:18 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 247 Plan Emergency TDA RED 135990
03/25/2003 15:11 03/25/2003 19:18 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 247 Plan Emergency TDA 135990
03/25/2003 15:11 03/25/2003 19:18 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 247 Plan Emergency TDA 135990
03/25/2003 15:11 03/25/2003 19:18 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 247 Plan Emergency TDA 135990
03/25/2003 15:11 03/25/2003 19:18 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 247 Plan Emergency TDA 135990
03/25/2003 15:11 03/25/2003 19:18 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 247 Plan Emergency TDA RED 135991
03/25/2003 15:11 03/25/2003 19:18 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 247 Plan Emergency TDA 135991
03/25/2003 15:11 03/25/2003 19:18 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 247 Plan Emergency TDA 135991
03/25/2003 15:11 03/25/2003 19:18 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 247 Plan Emergency TDA 135991
03/25/2003 15:11 03/25/2003 19:18 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 247 Plan Emergency TDA 135991
03/25/2003 15:11 03/25/2003 19:18 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 247 Plan Emergency TDA 135991
03/26/2003 07:03 03/27/2003 15:35 Lower Monumental-McNary No 1 500kV line 500.0 L T 64.75 1952 Plan Maintenance TRI 135995
03/26/2003 07:03 03/27/2003 15:35 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 1952 Plan Maintenance TRI 135995
03/26/2003 07:04 03/27/2003 15:32 Lower Monumental-McNary No 1 500kV line 500.0 L G 64.75 1948 Plan Maintenance TRI 135996
03/26/2003 07:04 03/27/2003 15:32 Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line 500.0 S 26.64 1948 Plan Maintenance TRI 135996
03/26/2003 07:04 03/27/2003 15:32 Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line 500.0 S 38.11 1948 Plan Maintenance TRI 135996
03/26/2003 07:41 03/26/2003 14:45 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 424 Plan Maintenance OLY 135997
03/26/2003 07:41 03/26/2003 14:45 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 424 Plan Maintenance OLY 135997
03/26/2003 08:20 03/26/2003 13:32 Ashe-White Bluffs No 1 230kV line 230.0 L 9.52 312 Plan Maintenance TRI 135998
03/26/2003 08:33 03/27/2003 11:43 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 1630 Plan Maintenance WEN TRI 135999
03/26/2003 08:33 03/27/2003 11:43 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 1630 Plan Maintenance WEN TRI 135999
03/26/2003 08:46 03/26/2003 10:52 Longview-Cowlitz No 1 115kV line 115.0 L 3.61 126 Plan Testing LGV 136000
03/26/2003 12:43 03/26/2003 12:43 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 0 Auto Unknown Unknown RED 136001
03/26/2003 13:09 03/26/2003 13:11 Little Goose-Lower Granite No 1 500kV line 500.0 L 32.80 2 Auto Imp Install/Design/Applica Imp Install/Design/Applica SPK TRI 136002
03/26/2003 13:58 03/26/2003 14:44 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 46 Auto Foreign Trouble TDA RED 136003
03/26/2003 13:58 03/26/2003 14:44 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 46 Auto Foreign Trouble TDA 136003
03/26/2003 13:58 03/26/2003 14:09 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 11 Auto Forced (Configuration) TDA RED 136004
03/26/2003 13:58 03/26/2003 14:09 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 11 Auto Forced (Configuration) TDA 136004
03/27/2003 07:42 03/27/2003 14:45 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 423 Plan Maintenance OLY 136012
03/27/2003 07:42 03/27/2003 14:45 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 423 Plan Maintenance OLY 136012
03/27/2003 08:13 03/27/2003 15:57 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 464 Plan Maintenance EUG 136013
03/27/2003 08:13 03/27/2003 15:57 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 464 Plan Maintenance EUG 136013
03/27/2003 08:17 03/27/2003 13:00 Salem-PACW Dallas No 1 115kV line 115.0 L 13.20 283 Plan Foreign Request SAL 136014
03/27/2003 13:21 03/27/2003 17:45 Benton-Othello No 1 115kV line 115.0 L G 37.00 264 Plan Foreign Request TRI SPK 136015
03/27/2003 13:21 03/27/2003 17:45 Benton-South Othello section of Benton-Othello No 1 115kV line 115.0 S 34.20 264 Plan Foreign Request TRI 136015
03/27/2003 15:23 03/27/2003 15:31 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T 0.10 8 Plan Foreign Request SAL 136016
03/27/2003 15:23 03/27/2003 15:31 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 8 Plan Foreign Request SAL 136016
03/27/2003 15:23 03/27/2003 15:31 Tillamook-PACW Astoria No 1 115kV line 115.0 L O 57.70 8 Plan Foreign Request SAL 136016
03/27/2003 17:33 03/27/2003 19:48 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 135 Auto Foreign Trouble OLY 136017
03/27/2003 17:33 03/27/2003 19:48 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 135 Auto Foreign Trouble OLY 136017
03/28/2003 05:07 03/28/2003 05:07 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 0 Auto Unknown Unknown OLY 136020
03/28/2003 08:28 03/28/2003 15:08 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 400 Plan Maintenance OLY 136021
03/28/2003 08:28 03/28/2003 15:08 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 400 Plan Maintenance OLY 136021
03/28/2003 09:24 03/28/2003 14:38 Ross-Alcoa No 2&4 115kV line 115.0 L 8.23 314 Plan Maintenance LGV 136022
03/28/2003 09:24 03/28/2003 14:55 Ross-Mill Plain section of Ross-Vancouver Shipyard No 1 115kV line 115.0 S 3.66 331 Plan Maintenance LGV 136023
03/28/2003 09:24 03/28/2003 14:55 Ross-Vancouver Shipyard No 1 115kV line 115.0 L G 4.73 331 Plan Maintenance LGV 136023
03/28/2003 09:32 03/28/2003 11:56 Shelton-Fairmount No 3 230kV line 230.0 L 60.06 144 Plan Maintenance OLY 136024
03/28/2003 16:08 03/29/2003 08:19 Garrison-Taft No 2 500kV line 500.0 L 159.38 971 Plan Voltage Control KAL 136025
03/29/2003 03:11 03/29/2003 03:14 Broadview-Garrison No 1 500kV line 500.0 L 224.71 3 Auto Foreign Trouble Foreign Trouble KAL 136026
03/29/2003 14:20 03/30/2003 08:21 Garrison-Taft No 1 500kV line 500.0 L 159.38 1081 Plan Voltage Control KAL 136028
03/30/2003 02:45 03/30/2003 03:19 Covington-Duwamish No 1 230kV line 230.0 L 15.82 34 Plan Emergency COV 136029
03/30/2003 05:33 03/30/2003 05:33 John Day-Grizzly No 1 500kV line 500.0 L 88.41 0 Auto Unknown Unknown TDA RED 136030
03/30/2003 08:23 03/30/2003 20:36 Garrison-Taft No 2 500kV line 500.0 L 159.38 733 Plan Voltage Control KAL 136031
03/30/2003 13:29 03/30/2003 20:00 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 391 Plan Emergency TDA RED 136032
03/30/2003 13:29 03/30/2003 20:00 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 391 Plan Emergency TDA 136032
03/30/2003 13:29 03/30/2003 20:00 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 391 Plan Emergency TDA 136032
03/30/2003 13:29 03/30/2003 20:00 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 391 Plan Emergency TDA 136032
03/30/2003 13:29 03/30/2003 20:00 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 391 Plan Emergency TDA 136032
03/31/2003 06:26 03/31/2003 18:32 Garrison-Taft No 2 500kV line 500.0 L 159.38 726 Plan Voltage Control KAL 136035
03/31/2003 07:03 03/31/2003 17:10 Murray-Custer No 1 230kV line 230.0 L G 63.39 607 Plan Maintenance SNO 136036
03/31/2003 07:03 03/31/2003 17:10 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 607 Plan Maintenance SNO 136036
03/31/2003 07:03 03/31/2003 17:10 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 607 Plan Maintenance SNO 136036
03/31/2003 07:03 03/31/2003 17:10 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 607 Plan Maintenance SNO 136036
03/31/2003 07:16 03/31/2003 15:17 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 481 Plan Maintenance OLY 136037
03/31/2003 07:16 03/31/2003 15:17 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 481 Plan Maintenance OLY 136037
03/31/2003 07:26 04/01/2003 17:06 Grand Coulee-Bell No 3 230kV line 230.0 L 82.92 2020 Plan Foreign Request WEN SPK 136038
03/31/2003 07:40 03/31/2003 15:05 Diamond Lake-Albeni Falls section of Sacheen-Albeni Falls No 1 115kV line 115.0 S 8.20 445 Plan Maintenance SPK 136039
03/31/2003 07:40 03/31/2003 15:05 Sacheen-Albeni Falls No 1 115kV line 115.0 L G 13.72 445 Plan Maintenance SPK 136039
03/31/2003 08:01 04/04/2003 17:17 Covington-Creston SCL No 1 230kV line 230.0 L 13.40 6316 Plan Foreign Request COV 136040
03/31/2003 08:07 03/31/2003 08:07 White Bluffs-451B No 1 115kV line 115.0 L 6.19 0 Plan Foreign Request TRI 136041
03/31/2003 08:09 03/31/2003 08:09 Benton-451B No 1 115kV line 115.0 L G 4.75 0 Plan Foreign Request TRI 136042
03/31/2003 08:09 03/31/2003 08:09 Hanford 2 Construction-451B section of Benton-451B No 1 115kV line 115.0 S 2.97 0 Plan Foreign Request TRI 136042
03/31/2003 08:21 03/31/2003 14:31 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 370 Plan Maintenance RED 136043
03/31/2003 08:21 03/31/2003 14:31 Redmond-Harney No 1 115kV line 115.0 L G 125.40 370 Plan Maintenance RED 136043
03/31/2003 08:29 04/03/2003 12:31 Grand Coulee-Foster Creek No 1 115kV line 115.0 L G 32.57 4562 Plan Maintenance WEN 136044
03/31/2003 08:29 04/03/2003 12:31 Nilles Corner-East Omak section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S 11.29 4562 Plan Maintenance WEN 136044
03/31/2003 09:23 04/03/2003 12:13 East Omak-Foster Creek section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S 1.05 4490 Plan Maintenance WEN 136045
03/31/2003 09:23 04/03/2003 12:13 Grand Coulee-Foster Creek No 1 115kV line 115.0 L O 32.57 4490 Plan Maintenance WEN 136045
03/31/2003 09:30 04/03/2003 12:31 East Omak tap to Grand Coulee-Foster Creek No 1 115kV line 115.0 T 34.24 4501 Plan Maintenance WEN 136046
03/31/2003 09:30 04/03/2003 12:31 Grand Coulee-Foster Creek No 1 115kV line 115.0 L T 32.57 4501 Plan Maintenance WEN 136046
03/31/2003 11:26 03/31/2003 13:57 Columbia-Ellensburg No 1 115kV line 115.0 L G 34.98 151 Plan Maintenance WEN 136047
03/31/2003 11:26 04/04/2003 13:02 East Ellensburg tap to Columbia-Ellensburg No 1 115kV line 115.0 T 3.21 5856 Plan Maintenance WEN 136047
03/31/2003 11:26 03/31/2003 13:57 East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 1.09 151 Plan Maintenance WEN 136047
03/31/2003 14:36 03/31/2003 15:09 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 33 Plan Maintenance EUG 136048
03/31/2003 14:36 03/31/2003 15:09 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 33 Plan Maintenance EUG 136048
03/31/2003 17:49 03/31/2003 18:43 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 54 Plan Maintenance EUG 136049
03/31/2003 17:49 03/31/2003 18:43 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 54 Plan Maintenance EUG 136049
04/01/2003 01:24 04/01/2003 04:53 Schultz-Raver No 1 500kV line 500.0 L 77.24 209 Plan Voltage Control WEN COV 136050
04/01/2003 06:53 04/02/2003 16:44 Trojan-Allston No 1 230kV line 230.0 L 9.47 2031 Plan Foreign Request LGV 136053
04/01/2003 07:00 04/01/2003 17:25 Murray-Custer No 1 230kV line 230.0 L G 63.39 625 Plan Maintenance SNO 136054
04/01/2003 07:00 04/01/2003 17:25 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 625 Plan Maintenance SNO 136054
04/01/2003 07:00 04/01/2003 17:40 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 640 Plan Maintenance SNO 136054
04/01/2003 07:00 04/01/2003 17:25 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 625 Plan Maintenance SNO 136054
04/01/2003 07:23 04/01/2003 15:12 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 469 Plan Maintenance OLY 136055
04/01/2003 07:23 04/01/2003 15:12 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 469 Plan Maintenance OLY 136055
04/01/2003 07:35 04/01/2003 13:52 Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 4.43 377 Plan Maintenance SPK 136056
04/01/2003 07:35 04/01/2003 13:52 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 377 Plan Maintenance SPK 136056
04/01/2003 07:40 04/01/2003 14:44 Chehalis-Mayfield No 1 230kV line 230.0 L G 21.37 424 Plan Maintenance OLY 136057
04/01/2003 07:40 04/01/2003 14:44 Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line 230.0 S 20.20 424 Plan Maintenance OLY 136057
04/01/2003 07:42 04/01/2003 12:30 Allston-Clatsop No 1 230kV line 230.0 L T 42.61 288 Plan Maintenance LGV 136058
04/01/2003 07:42 04/01/2003 12:30 Driscoll tap to Allston-Clatsop No 1 230kV line 230.0 T 0.22 288 Plan Maintenance LGV 136058
04/01/2003 07:44 04/01/2003 17:23 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 579 Plan Maintenance SAL 136059
04/01/2003 07:44 04/01/2003 17:23 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 579 Plan Maintenance SAL 136059
04/01/2003 08:09 04/03/2003 13:43 Midway-HEW No 1 230kV line 230.0 L 28.36 3214 Plan Foreign Request TRI 136060
04/01/2003 08:15 04/01/2003 14:37 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 382 Plan Maintenance RED 136061
04/01/2003 08:15 04/01/2003 14:37 Redmond-Harney No 1 115kV line 115.0 L G 125.40 382 Plan Maintenance RED 136061
04/02/2003 03:06 04/02/2003 05:41 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 155 Plan Voltage Control RED 136062
04/02/2003 04:53 04/02/2003 04:53 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 136063
04/02/2003 04:53 04/02/2003 04:53 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136063
04/02/2003 04:53 04/02/2003 04:53 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 136063
04/02/2003 04:53 04/02/2003 04:53 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 136063
04/02/2003 04:53 04/02/2003 04:53 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 136063
04/02/2003 04:53 04/02/2003 04:53 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136063
04/02/2003 04:53 04/02/2003 04:53 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 136063
04/02/2003 07:01 04/02/2003 16:52 Murray-Custer No 1 230kV line 230.0 L G 63.39 591 Plan Maintenance SNO 136074
04/02/2003 07:01 04/02/2003 16:52 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 591 Plan Maintenance SNO 136074
04/02/2003 07:01 04/02/2003 16:54 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 593 Plan Maintenance SNO 136074
04/02/2003 07:01 04/02/2003 16:52 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 591 Plan Maintenance SNO 136074
04/02/2003 07:18 04/02/2003 15:11 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 473 Plan Maintenance OLY 136075
04/02/2003 07:18 04/02/2003 15:11 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 473 Plan Maintenance OLY 136075
04/02/2003 07:36 04/02/2003 16:49 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 553 Plan Maintenance OLY COV WEN 136076
04/02/2003 07:53 04/02/2003 16:09 Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line 115.0 S 14.45 496 Plan Maintenance SAL 136077
04/02/2003 07:53 04/02/2003 16:09 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 496 Plan Maintenance SAL 136077
04/02/2003 08:08 04/03/2003 14:03 Schultz-Raver No 3 500kV line 500.0 L 77.47 1795 Plan Maintenance WEN COV 136078
04/02/2003 08:09 04/02/2003 12:48 Allston-Driscoll No 1 230kV line 230.0 L 20.96 279 Plan Maintenance LGV 136079
04/02/2003 08:12 04/02/2003 15:02 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 410 Plan Maintenance RED 136080
04/02/2003 08:12 04/02/2003 15:02 Redmond-Harney No 1 115kV line 115.0 L G 125.40 410 Plan Maintenance RED 136080
04/02/2003 08:32 04/02/2003 13:29 Creston-Bell No 1 115kV line 115.0 L G 53.80 297 Plan Maintenance WEN SPK 136081
04/02/2003 08:32 04/02/2003 13:29 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 297 Plan Maintenance SPK 136081
04/02/2003 08:32 04/02/2003 13:29 Springhill tap to Creston-Bell No 1 115kV line 115.0 T 0.01 297 Plan Maintenance SPK 136081
04/02/2003 08:32 04/02/2003 13:29 Springhill-Bell section of Creston-Bell No 1 115kV line 115.0 S 9.92 297 Plan Maintenance SPK 136081
04/02/2003 09:59 04/02/2003 09:59 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 17.09 0 Auto Unknown Unknown KAL 136082
04/02/2003 09:59 04/02/2003 09:59 Libby-Bonners Ferry No 1 115kV line 115.0 L 59.58 0 Auto Unknown Unknown KAL SPK 136082
04/02/2003 09:59 04/02/2003 09:59 Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.27 0 Auto Unknown Unknown KAL 136082
04/02/2003 09:59 04/02/2003 09:59 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 6.23 0 Auto Unknown Unknown SPK 136082
04/02/2003 09:59 04/02/2003 09:59 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.41 0 Auto Unknown Unknown KAL 136082
04/02/2003 09:59 04/02/2003 09:59 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 11.58 0 Auto Unknown Unknown KAL SPK 136082
04/02/2003 13:39 04/02/2003 13:51 Creston-Bell No 1 115kV line 115.0 L G 53.80 12 Plan Testing WEN SPK 136083
04/02/2003 13:39 04/02/2003 13:51 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 12 Plan Testing WEN 136083
04/02/2003 21:49 04/02/2003 22:13 Palisades-Snake River No 1 115kV line 115.0 L 17.50 24 Auto Foreign Trouble Foreign Utility IDF 136084
04/02/2003 21:49 04/02/2003 22:10 Palisades-Goshen No 1 115kV line 115.0 L 51.71 21 Auto Foreign Trouble Foreign Utility IDF 136085
04/02/2003 21:49 04/02/2003 22:07 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 18 Auto Foreign Trouble Foreign Utility IDF 136086
04/02/2003 23:49 04/03/2003 16:06 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 977 Plan Voltage Control RED 136087
04/03/2003 07:02 04/03/2003 16:34 Murray-Custer No 1 230kV line 230.0 L G 63.39 572 Plan Maintenance SNO 136091
04/03/2003 07:02 04/03/2003 16:34 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 572 Plan Maintenance SNO 136091
04/03/2003 07:02 04/03/2003 16:34 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 572 Plan Maintenance SNO 136091
04/03/2003 07:02 04/03/2003 16:34 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 572 Plan Maintenance SNO 136091
04/03/2003 07:25 04/03/2003 15:15 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 470 Plan Maintenance OLY 136092
04/03/2003 07:25 04/03/2003 15:15 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 470 Plan Maintenance OLY 136092
04/03/2003 07:50 04/04/2003 18:14 Trojan-Allston No 2 230kV line 230.0 L 9.40 2064 Plan Foreign Request LGV 136093
04/03/2003 07:59 04/03/2003 14:41 Bell-Usk No 1 230kV line 230.0 L 47.48 402 Plan Construction SPK 136094
04/03/2003 08:13 04/03/2003 15:02 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 409 Plan Maintenance RED 136095
04/03/2003 08:13 04/03/2003 15:02 Redmond-Harney No 1 115kV line 115.0 L G 125.40 409 Plan Maintenance RED 136095
04/03/2003 11:28 04/08/2003 11:12 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 7124 Auto Terminal Equipment Failure TDA RED 136096
04/03/2003 11:28 04/08/2003 11:12 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 7124 Auto Terminal Equipment Failure TDA 136096
04/03/2003 11:28 04/03/2003 17:15 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 347 Auto Terminal Equipment Failure TDA 136096
04/03/2003 11:28 04/03/2003 17:15 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 347 Auto Terminal Equipment Failure TDA 136096
04/03/2003 11:28 04/03/2003 17:15 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 347 Auto Terminal Equipment Failure TDA 136096
04/04/2003 00:23 04/04/2003 15:09 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 886 Plan Voltage Control RED 136097
04/04/2003 07:15 04/04/2003 14:50 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 455 Plan Maintenance OLY 136113
04/04/2003 07:15 04/04/2003 14:50 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 455 Plan Maintenance OLY 136113
04/04/2003 07:45 04/04/2003 12:34 Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line 115.0 S 14.45 289 Plan Maintenance SAL 136114
04/04/2003 07:45 04/04/2003 12:34 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 289 Plan Maintenance SAL 136114
04/04/2003 07:51 04/04/2003 14:47 Dutch Canyon-Warren section of St Johns-St Helens No 1 115kV line 115.0 S 5.37 416 Plan Maintenance LGV 136115
04/04/2003 07:51 04/04/2003 14:47 St Johns-St Helens No 1 115kV line 115.0 L G 23.27 416 Plan Maintenance LGV 136115
04/04/2003 11:58 04/04/2003 13:23 Columbia-Ellensburg No 1 115kV line 115.0 L G 34.98 85 Plan Switching WEN 136116
04/04/2003 11:58 04/04/2003 13:23 East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 1.09 85 Plan Switching WEN 136116
04/04/2003 11:58 04/04/2003 13:02 Jenkins-East Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 10.22 64 Plan Switching WEN 136116
04/05/2003 00:30 04/05/2003 00:41 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 11 Auto Forced (Configuration) TDA RED 136099
04/05/2003 00:30 04/05/2003 00:41 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 11 Auto Forced (Configuration) TDA 136099
04/05/2003 00:30 04/05/2003 00:41 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 11 Auto Forced (Configuration) TDA 136099
04/05/2003 00:30 04/05/2003 00:41 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 11 Auto Forced (Configuration) TDA 136099
04/05/2003 00:30 04/05/2003 02:07 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 97 Auto Terminal Equipment Failure TDA RED 136100
04/05/2003 00:30 04/05/2003 02:07 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 97 Auto Terminal Equipment Failure TDA 136100
04/05/2003 00:30 04/05/2003 01:58 Big Eddy 500/230kV Tie No 2 500kV line 500.0 L 0.41 88 Auto Terminal Equipment Failure TDA 136101
04/05/2003 05:05 04/05/2003 19:04 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 839 Plan Maintenance TDA RED 136102
04/05/2003 05:05 04/05/2003 19:04 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 839 Plan Maintenance TDA 136102
04/05/2003 05:05 04/05/2003 19:04 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 839 Plan Maintenance TDA 136102
04/05/2003 05:05 04/05/2003 19:04 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 839 Plan Maintenance TDA 136102
04/05/2003 05:05 04/05/2003 19:04 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 839 Plan Maintenance TDA 136102
04/05/2003 05:05 04/05/2003 19:04 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 839 Plan Maintenance TDA RED 136103
04/05/2003 05:05 04/05/2003 19:04 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 839 Plan Maintenance TDA 136103
04/05/2003 05:05 04/05/2003 19:04 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 839 Plan Maintenance TDA 136103
04/05/2003 05:05 04/05/2003 19:04 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 839 Plan Maintenance TDA 136103
04/05/2003 05:05 04/05/2003 19:04 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 839 Plan Maintenance TDA 136103
04/05/2003 05:05 04/05/2003 19:04 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 839 Plan Maintenance TDA 136103
04/05/2003 05:05 04/05/2003 18:59 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 834 Plan Maintenance TDA 136104
04/05/2003 05:07 04/05/2003 19:02 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 835 Plan Maintenance TDA 136105
04/05/2003 05:19 04/05/2003 18:27 Big Eddy-Celilo No 3 230kV line 230.0 L 1.09 788 Plan Maintenance TDA 136106
04/05/2003 07:00 04/05/2003 13:55 John Day-Marion No 1 500kV line 500.0 L 127.51 415 Plan Maintenance TDA RED SAL 136117
04/05/2003 07:49 04/05/2003 19:25 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 696 Plan Maintenance TDA 136118
04/05/2003 09:03 04/05/2003 12:36 Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 4.43 213 Plan Emergency SPK 136119
04/05/2003 09:03 04/05/2003 12:36 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 213 Plan Emergency SPK 136119
04/05/2003 09:06 04/05/2003 09:08 Albeni Falls-Sand Creek No 1 115kV line 115.0 L O 29.67 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Dover tap to Sandpoint tap to Albeni Falls-Sand Creek No 1 115kV line 115.0 TT 9.96 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Laclede tap to Albeni Falls-Sand Creek No 1 115kV line 115.0 T 0.10 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Laclede-Sandpoint section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 9.77 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Priest River AVA tap to Albeni Falls-Sand Creek No 1 115kV line 115.0 T 0.10 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Priest River AVA-Priest River section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 1.93 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Priest River tap to Albeni Falls-Sand Creek No 1 115kV line 115.0 T 3.05 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Priest River-Laclede section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 6.28 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Sandpoint tap to Albeni Falls-Sand Creek No 1 115kV line 115.0 T 0.10 2 Plan Emergency SPK 136120
04/05/2003 09:06 04/05/2003 09:08 Sandpoint-Sand Creek section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 7.26 2 Plan Emergency SPK 136120
04/06/2003 04:07 04/06/2003 18:17 Schultz-Raver No 1 500kV line 500.0 L 77.24 850 Plan Voltage Control WEN COV 136121
04/06/2003 05:00 04/06/2003 19:41 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 881 Plan Maintenance TDA RED 136122
04/06/2003 05:00 04/06/2003 19:41 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 881 Plan Maintenance TDA 136122
04/06/2003 05:00 04/06/2003 19:41 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 881 Plan Maintenance TDA 136122
04/06/2003 05:00 04/06/2003 19:41 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 881 Plan Maintenance TDA 136122
04/06/2003 05:00 04/06/2003 19:41 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 881 Plan Maintenance TDA 136122
04/06/2003 05:00 04/06/2003 19:41 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 881 Plan Maintenance TDA RED 136123
04/06/2003 05:00 04/06/2003 19:41 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 881 Plan Maintenance TDA 136123
04/06/2003 05:00 04/06/2003 19:41 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 881 Plan Maintenance TDA 136123
04/06/2003 05:00 04/06/2003 19:45 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 885 Plan Maintenance TDA 136124
04/06/2003 05:00 04/06/2003 18:45 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 825 Plan Switching TDA 136125
04/06/2003 13:13 04/06/2003 19:55 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 402 Plan Maintenance TDA RED 136126
04/06/2003 13:13 04/06/2003 19:55 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 402 Plan Maintenance TDA 136126
04/06/2003 13:13 04/06/2003 19:55 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 402 Plan Maintenance TDA 136126
04/06/2003 13:13 04/06/2003 19:55 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 402 Plan Maintenance TDA 136126
04/07/2003 02:18 04/07/2003 05:04 Schultz-Raver No 1 500kV line 500.0 L 77.24 166 Plan Voltage Control WEN COV 136127
04/07/2003 07:02 04/07/2003 17:50 Murray-Custer No 1 230kV line 230.0 L G 63.39 648 Plan Maintenance SNO 136130
04/07/2003 07:02 04/07/2003 17:50 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 648 Plan Maintenance SNO 136130
04/07/2003 07:02 04/07/2003 18:04 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 662 Plan Maintenance SNO 136130
04/07/2003 07:02 04/07/2003 17:50 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 648 Plan Maintenance SNO 136130
04/07/2003 07:05 04/11/2003 17:33 Covington-Creston SCL No 1 230kV line 230.0 L 13.40 6388 Plan Foreign Request COV 136131
04/07/2003 07:31 04/07/2003 14:56 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 445 Plan Maintenance OLY 136132
04/07/2003 08:03 04/07/2003 15:13 Ashe-Marion No 2 500kV line 500.0 L 224.01 430 Plan Maintenance TRI TDA RED SAL 136133
04/07/2003 08:11 04/07/2003 14:18 Midway-HEW No 1 230kV line 230.0 L 28.36 367 Plan Foreign Request TRI 136134
04/07/2003 08:19 04/07/2003 15:00 North Camas-Sifton No 1 115kV line 115.0 L 7.68 401 Plan Maintenance LGV 136135
04/07/2003 08:19 04/07/2003 14:58 North Bonneville-Ross No 2 230kV line 230.0 L T 35.99 399 Plan Maintenance LGV 136136
04/07/2003 08:19 04/07/2003 14:58 Sifton tap to North Bonneville-Ross No 2 230kV line 230.0 T 1.20 399 Plan Maintenance LGV 136136
04/07/2003 08:20 04/07/2003 14:57 North Bonneville-Ross No 1 230kV line 230.0 L T 36.32 397 Plan Maintenance LGV 136137
04/07/2003 08:20 04/07/2003 14:57 Sifton tap to North Bonneville-Ross No 1 230kV line 230.0 T 1.24 397 Plan Maintenance LGV 136137
04/07/2003 08:38 04/09/2003 15:37 Columbia-Ellensburg No 1 115kV line 115.0 L G 34.98 3299 Plan Maintenance WEN 136138
04/07/2003 08:38 04/09/2003 15:37 East Ellensburg tap to Columbia-Ellensburg No 1 115kV line 115.0 T 3.21 3299 Plan Maintenance WEN 136138
04/07/2003 08:38 04/09/2003 15:37 East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 1.09 3299 Plan Maintenance WEN 136138
04/07/2003 08:58 04/09/2003 15:37 Columbia-Ellensburg No 1 115kV line 115.0 L O 34.98 3279 Plan Maintenance WEN 136139
04/07/2003 08:58 04/09/2003 15:37 Jenkins-East Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 10.22 3279 Plan Maintenance WEN 136139
04/07/2003 09:07 04/10/2003 13:59 Broadview-Garrison No 1 500kV line 500.0 L 224.71 4612 Plan Maintenance KAL 136140
04/07/2003 13:49 04/07/2003 13:51 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 2 Auto Foreign Trouble TDA RED 136141
04/07/2003 13:49 04/07/2003 13:51 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 2 Auto Foreign Trouble TDA 136141
04/07/2003 13:49 04/07/2003 13:51 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 2 Auto Forced (Configuration) TDA RED 136142
04/07/2003 13:49 04/07/2003 13:51 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 2 Auto Forced (Configuration) TDA 136142
04/08/2003 02:10 04/08/2003 05:20 John Day-Marion No 1 500kV line 500.0 L 127.51 190 Plan Voltage Control TDA RED SAL 136143
04/08/2003 05:58 04/10/2003 16:41 Grizzly-PGE Round Butte No 1 500kV line 500.0 L 15.60 3523 Plan Foreign Request RED 136144
04/08/2003 07:02 04/08/2003 18:07 Murray-Custer No 1 230kV line 230.0 L G 63.39 665 Plan Maintenance SNO 136154
04/08/2003 07:02 04/08/2003 18:07 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 665 Plan Maintenance SNO 136154
04/08/2003 07:02 04/08/2003 18:22 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 680 Plan Maintenance SNO 136154
04/08/2003 07:02 04/08/2003 18:07 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 665 Plan Maintenance SNO 136154
04/08/2003 07:25 04/08/2003 07:25 Albany-Eugene No 1 115kV line 115.0 L O 39.80 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Alderwood tap to Albany-Eugene No 1 115kV line 115.0 T 9.21 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Alderwood tap-Cheshire section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS 1.40 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Alderwood-Junction City section of Albany-Eugene No 1 115kV line 115.0 S 2.04 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Cheshire tap to Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TT 0.01 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Cheshire-Alderwood section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS 7.80 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Greenberry tap to Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TT T 19.00 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Greenberry-Harrisburg section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS T 0.02 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 T 0.04 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Harrisburg tap-Greenberry section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS T 0.02 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Junction City tap to Albany-Eugene No 1 115kV line 115.0 T 0.05 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Junction City-Parker section of Albany-Eugene No 1 115kV line 115.0 S 2.94 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Parker tap to Albany-Eugene No 1 115kV line 115.0 T 0.10 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:25 04/08/2003 07:25 Parker-Eugene section of Albany-Eugene No 1 115kV line 115.0 S 3.90 0 Auto Unknown Unknown EUG 136155
04/08/2003 07:28 04/08/2003 15:55 Lexington-Longview No 1 115kV line 115.0 L G 9.43 507 Plan Maintenance LGV OLY 136156
04/08/2003 07:28 04/08/2003 15:55 Lexington-Pacific Way section of Lexington-Longview No 1 115kV line 115.0 S 6.15 507 Plan Maintenance LGV OLY 136156
04/08/2003 07:30 04/08/2003 15:02 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 452 Plan Maintenance OLY 136157
04/08/2003 07:30 04/08/2003 15:02 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 452 Plan Maintenance OLY 136157
04/08/2003 07:40 04/08/2003 08:02 Sickler-Douglas Switchyard No 1 230kV line 230.0 L 0.58 22 Plan Maintenance WEN 136158
04/08/2003 07:58 04/09/2003 15:10 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 1872 Plan Maintenance SAL 136159
04/08/2003 07:58 04/09/2003 15:10 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 1872 Plan Maintenance SAL 136159
04/08/2003 08:12 04/08/2003 14:35 Ashe-Marion No 2 500kV line 500.0 L 224.01 383 Plan Maintenance TRI TDA RED SAL 136160
04/08/2003 08:29 04/08/2003 14:55 Sifton-Fishers Road No 1 115kV line 115.0 L 2.21 386 Plan Maintenance LGV 136161
04/08/2003 08:30 04/08/2003 14:53 Sifton-Ross No 1 115kV line 115.0 L 8.49 383 Plan Maintenance LGV 136162
04/08/2003 09:28 04/09/2003 14:15 Hilltop-Warner No 1 230kV line 230.0 L 8.77 1727 Plan Maintenance RED 136163
04/08/2003 18:12 04/08/2003 20:34 Garrison-Taft No 1 500kV line 500.0 L 159.38 142 Plan Voltage Control KAL 136164
04/09/2003 06:56 04/09/2003 16:47 Murray-Custer No 1 230kV line 230.0 L G 63.39 591 Plan Maintenance SNO 136166
04/09/2003 06:56 04/09/2003 16:47 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 591 Plan Maintenance SNO 136166
04/09/2003 06:56 04/09/2003 17:00 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 604 Plan Maintenance SNO 136166
04/09/2003 06:56 04/09/2003 16:47 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 591 Plan Maintenance SNO 136166
04/09/2003 07:22 04/09/2003 13:07 Bell-Addy No 1 115kV line 115.0 L G 51.18 345 Plan Maintenance SPK 136175
04/09/2003 07:22 04/09/2003 13:07 Mead-Colbert section of Bell-Addy No 1 115kV line 115.0 S 4.95 345 Plan Maintenance SPK 136175
04/09/2003 07:29 04/09/2003 14:34 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 425 Plan Maintenance OLY 136167
04/09/2003 07:29 04/09/2003 14:34 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 425 Plan Maintenance OLY 136167
04/09/2003 07:46 04/09/2003 14:27 Lexington-Longview No 1 115kV line 115.0 L G 9.43 401 Plan Maintenance LGV OLY 136168
04/09/2003 07:46 04/09/2003 14:27 Lexington-Pacific Way section of Lexington-Longview No 1 115kV line 115.0 S 6.15 401 Plan Maintenance LGV OLY 136168
04/09/2003 09:28 04/09/2003 09:28 Goshen-Drummond No 1 161kV line 161.0 L 72.75 0 Auto Unknown Unknown IDF 136169
04/09/2003 12:10 04/09/2003 12:15 Palisades-Snake River No 1 115kV line 115.0 L 17.50 5 Auto Foreign Trouble Foreign Utility IDF 136170
04/09/2003 12:10 04/09/2003 12:15 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 5 Auto Foreign Trouble Foreign Utility IDF 136171
04/09/2003 12:10 04/09/2003 12:15 Palisades-Goshen No 1 115kV line 115.0 L 51.71 5 Auto Foreign Trouble Foreign Utility IDF 136172
04/09/2003 15:04 04/09/2003 15:52 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 48 Plan Construction EUG 136173
04/09/2003 15:04 04/09/2003 15:52 Fairview-Norway section of Fairview-Bandon No 1 115kV line 115.0 S 12.59 48 Plan Construction EUG 136173
04/09/2003 16:46 04/09/2003 17:30 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 44 Plan Emergency TDA RED 136174
04/09/2003 16:46 04/09/2003 17:30 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 44 Plan Emergency TDA 136174
04/10/2003 07:01 04/10/2003 08:59 Murray-Custer No 1 230kV line 230.0 L G 63.39 118 Plan Maintenance SNO 136179
04/10/2003 07:01 04/10/2003 08:59 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 118 Plan Maintenance SNO 136179
04/10/2003 07:01 04/10/2003 08:59 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 118 Plan Maintenance SNO 136179
04/10/2003 07:01 04/10/2003 08:59 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 118 Plan Maintenance SNO 136179
04/10/2003 07:14 04/10/2003 08:21 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 67 Plan Foreign Request TRI SPK 136180
04/10/2003 08:02 04/10/2003 17:23 Klamath Cogen-Meridian No 1 500kV line 500.0 L 57.99 561 Plan Foreign Request RED 136181
04/10/2003 08:05 04/10/2003 14:50 Ashe-Marion No 2 500kV line 500.0 L 224.01 405 Plan Maintenance TRI TDA RED SAL 136182
04/10/2003 08:10 04/10/2003 13:21 First Street-Stevens Drive section of White Bluffs-Richland No 1 115kV line 115.0 S 2.68 311 Plan Foreign Request TRI 136183
04/10/2003 08:10 04/10/2003 13:21 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 311 Plan Foreign Request TRI 136183
04/10/2003 08:13 04/11/2003 11:59 Franklin-Badger Canyon No 2 115kV line 115.0 L O 13.35 1666 Plan Maintenance TRI 136184
04/10/2003 08:13 04/11/2003 11:59 Kennewick-Ely section of Franklin-Badger Canyon No 2 115kV line 115.0 S 1.70 1666 Plan Maintenance TRI 136184
04/10/2003 09:37 04/10/2003 10:12 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 35 Plan Foreign Request TRI SPK 136185
04/11/2003 03:21 04/12/2003 20:08 Big Eddy-McLoughlin No 1&2 230kV line 230.0 L 117.77 2447 Plan Foreign Request TDA LGV 136195
04/11/2003 03:21 04/11/2003 12:39 McLoughlin-Pearl section of McLoughlin-Sherwood No 1 230kV line 230.0 S 11.67 558 Plan Foreign Request LGV SAL 136196
04/11/2003 03:21 04/11/2003 12:39 McLoughlin-Sherwood No 1 230kV line 230.0 L G 16.24 558 Plan Foreign Request LGV SAL 136196
04/11/2003 03:29 04/12/2003 20:17 Ostrander-McLoughlin No 1 230kV line 230.0 L 8.82 2448 Plan Foreign Request LGV 136186
04/11/2003 04:36 04/11/2003 04:36 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 136187
04/11/2003 04:36 04/11/2003 04:36 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 136187
04/11/2003 04:36 04/11/2003 04:36 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 136187
04/11/2003 07:06 04/11/2003 19:13 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 727 Plan Testing TDA RED 136197
04/11/2003 07:06 04/11/2003 19:13 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 727 Plan Testing TDA 136197
04/11/2003 07:06 04/11/2003 19:13 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 727 Plan Testing TDA 136197
04/11/2003 07:06 04/11/2003 19:13 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 727 Plan Testing TDA 136197
04/11/2003 07:53 04/11/2003 07:53 Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line 115.0 S G 17.48 0 Auto Unknown Unknown IDF 136198
04/11/2003 07:53 04/11/2003 07:53 Swan Valley-Teton No 1 115kV line 115.0 L 35.47 0 Auto Unknown Unknown IDF 136198
04/11/2003 07:53 04/11/2003 07:53 Targhee tap to Swan Valley-Teton No 1 115kV line 115.0 T G 10.94 0 Auto Unknown Unknown IDF 136198
04/11/2003 07:53 04/11/2003 07:53 Targhee-Teton section of Swan Valley-Teton No 1 115kV line 115.0 S G 17.99 0 Auto Unknown Unknown IDF 136198
04/11/2003 07:54 04/11/2003 14:19 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 385 Plan Maintenance OLY 136199
04/11/2003 07:54 04/11/2003 14:19 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 385 Plan Maintenance OLY 136199
04/11/2003 08:04 04/11/2003 14:35 Ashe-Marion No 2 500kV line 500.0 L 224.01 391 Plan Maintenance TRI TDA RED SAL 136200
04/11/2003 08:09 04/11/2003 15:38 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 449 Plan Maintenance WEN 136201
04/11/2003 08:10 04/11/2003 14:38 Chehalis-Mayfield No 1 230kV line 230.0 L G 21.37 388 Plan Maintenance OLY 136202
04/11/2003 08:10 04/11/2003 14:38 Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line 230.0 S 20.20 388 Plan Maintenance OLY 136202
04/11/2003 08:46 04/11/2003 11:46 Trojan-Allston No 1 230kV line 230.0 L 9.47 180 Plan Maintenance LGV 136203
04/11/2003 08:50 04/11/2003 13:32 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 282 Plan Maintenance TDA RED 136204
04/11/2003 08:50 04/11/2003 13:32 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 282 Plan Maintenance TDA 136204
04/12/2003 00:50 04/12/2003 01:20 Grand Coulee-Hanford No 1 500kV line 500.0 L 96.03 30 Auto Foreign Trouble Foreign Trouble WEN TRI 136205
04/12/2003 01:52 04/12/2003 06:45 Schultz-Raver No 2 500kV line 500.0 L 77.24 293 Plan Voltage Control WEN COV 136206
04/12/2003 06:19 04/12/2003 19:16 Garrison-Taft No 2 500kV line 500.0 L 159.38 777 Plan Voltage Control KAL 136214
04/12/2003 07:05 04/12/2003 19:33 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 748 Plan Testing TDA RED 136215
04/12/2003 07:05 04/12/2003 19:33 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 748 Plan Testing TDA 136215
04/12/2003 07:05 04/12/2003 19:33 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 748 Plan Testing TDA 136215
04/12/2003 07:05 04/12/2003 19:33 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 748 Plan Testing TDA 136215
04/12/2003 16:47 04/12/2003 16:47 Ostrander-Troutdale No 1 500kV line 500.0 L 23.82 0 Auto Lightning Lightning LGV 136216
04/12/2003 16:47 04/12/2003 16:47 Big Eddy-Ostrander No 1 500kV line 500.0 L 70.56 0 Auto Forced (Configuration) TDA LGV 136217
04/12/2003 17:28 04/12/2003 17:28 Marion-Lane No 1 500kV line 500.0 L 68.97 0 Auto Lightning Lightning SAL EUG 136218
04/12/2003 17:43 04/12/2003 17:43 Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT G 0.38 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS G 0.99 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 L 45.05 0 Auto Lightning Lightning LGV 136219
04/12/2003 17:43 04/12/2003 17:43 Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 S G 0.93 0 Auto Lightning Lightning LGV 136219
04/12/2003 17:43 04/12/2003 17:43 Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT G 1.24 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS G 15.35 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT G 0.10 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS G 5.30 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT G 0.10 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS G 3.60 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 T 25.00 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS G 0.10 0 Auto Lightning Lightning LGV TDA 136219
04/12/2003 17:43 04/12/2003 17:43 Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 S G 40.44 0 Auto Lightning Lightning LGV 136219
04/12/2003 17:46 04/12/2003 20:08 McLoughlin-Pearl section of McLoughlin-Sherwood No 1 230kV line 230.0 S 11.67 142 Plan Foreign Request LGV SAL 136220
04/12/2003 17:46 04/12/2003 20:08 McLoughlin-Sherwood No 1 230kV line 230.0 L G 16.24 142 Plan Foreign Request LGV SAL 136220
04/12/2003 18:26 04/12/2003 18:26 Flathead-Hot Springs No 1 230kV line 230.0 L 56.45 0 Auto Lightning Lightning KAL 136221
04/12/2003 18:26 04/12/2003 18:26 Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line 230.0 S G 13.50 0 Auto Lightning Lightning KAL 136221
04/12/2003 18:26 04/12/2003 18:26 Lion Mountain tap to Flathead-Hot Springs No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 136221
04/12/2003 18:26 04/12/2003 18:26 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S G 42.95 0 Auto Lightning Lightning KAL 136221
04/12/2003 18:26 04/12/2003 18:29 Libby PH-Libby No 2 230kV line 230.0 L 1.29 3 Auto RAS Initiated RAS Initiated KAL 136222
04/13/2003 01:14 04/13/2003 09:52 Schultz-Raver No 1 500kV line 500.0 L 77.24 518 Plan Voltage Control WEN COV 136223
04/13/2003 02:15 04/13/2003 06:57 Marion-Lane No 1 500kV line 500.0 L 68.97 282 Plan Voltage Control SAL EUG 136224
04/13/2003 04:55 04/13/2003 04:55 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 136225
04/13/2003 05:00 04/13/2003 05:00 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 136226
04/13/2003 05:00 04/13/2003 05:00 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 136226
04/13/2003 05:00 04/13/2003 05:00 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 136226
04/13/2003 05:26 04/13/2003 05:29 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 3 Auto Unknown Unknown WEN 136227
04/13/2003 07:15 04/13/2003 21:30 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 855 Plan Testing TDA RED 136228
04/13/2003 07:15 04/13/2003 21:30 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 855 Plan Testing TDA 136228
04/13/2003 07:15 04/13/2003 21:30 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 855 Plan Testing TDA 136228
04/13/2003 07:15 04/13/2003 21:30 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 855 Plan Testing TDA 136228
04/13/2003 15:13 04/13/2003 15:13 Marion-Lane No 1 500kV line 500.0 L 68.97 0 Auto Lightning Lightning SAL EUG 136229
04/13/2003 16:31 04/13/2003 16:31 Raver-Paul No 1 500kV line 500.0 L 69.31 0 Auto Unknown Lightning COV OLY 136240
04/13/2003 16:46 04/13/2003 16:46 Schultz-Raver No 1 500kV line 500.0 L 77.24 0 Auto Lightning Lightning WEN COV 136230
04/13/2003 16:46 04/13/2003 16:46 Covington-Creston SCL No 1 230kV line 230.0 L 13.40 0 Auto Lightning Lightning COV 136241
04/13/2003 18:52 04/13/2003 18:52 John Day-Marion No 1 500kV line 500.0 L 127.51 0 Auto Lightning Lightning TDA RED SAL 136231
04/14/2003 06:00 04/14/2003 18:10 McNary-Coyote Springs No 1 500kV line 500.0 L 19.44 730 Plan Construction TRI 136232
04/14/2003 07:03 04/17/2003 18:11 Taft-Bell No 1 500kV line 500.0 L 96.44 4988 Plan Forced KAL SPK 136242
04/14/2003 07:03 04/17/2003 18:11 Bell-Lancaster No 1 230kV line 230.0 L 23.52 4988 Plan Maintenance SPK 136243
04/14/2003 07:04 04/20/2003 16:17 Bell-AVA Beacon No 4 230kV line 230.0 L 5.90 9193 Plan Construction SPK 136244
04/14/2003 07:18 04/17/2003 18:12 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S 50.34 4974 Plan Maintenance SPK 136245
04/14/2003 07:18 04/17/2003 18:12 Bell-Boundary No 3 230kV line 230.0 L G 108.07 4974 Plan Maintenance SPK 136245
04/14/2003 07:23 04/17/2003 18:12 Grand Coulee-Bell No 3 230kV line 230.0 L 82.92 4969 Plan Maintenance WEN SPK 136246
04/14/2003 07:34 04/14/2003 14:38 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 424 Plan Maintenance OLY 136247
04/14/2003 07:34 04/14/2003 14:38 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 424 Plan Maintenance OLY 136247
04/14/2003 07:39 04/14/2003 17:24 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 585 Plan Maintenance OLY 136248
04/14/2003 07:39 04/14/2003 17:24 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 585 Plan Maintenance OLY 136248
04/14/2003 08:00 04/14/2003 14:04 McNary-Badger Canyon No 1 115kV line 115.0 L G 28.40 364 Plan Maintenance TRI 136249
04/14/2003 08:00 04/14/2003 14:04 Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line 115.0 S 10.81 364 Plan Maintenance TRI 136249
04/14/2003 08:02 04/15/2003 11:12 Satsop-Aberdeen No 2 230kV line 230.0 L 20.51 1630 Plan Maintenance OLY 136250
04/14/2003 08:04 04/15/2003 00:04 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 960 Plan Testing TDA RED 136251
04/14/2003 08:04 04/15/2003 00:04 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 960 Plan Testing TDA 136251
04/14/2003 08:04 04/15/2003 00:04 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 960 Plan Testing TDA 136251
04/14/2003 08:04 04/15/2003 00:04 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 960 Plan Testing TDA 136251
04/14/2003 08:04 04/14/2003 17:34 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 570 Plan Maintenance RED 136252
04/14/2003 08:14 04/15/2003 10:45 Snohomish-Beverly Park No 3 115kV line 115.0 L 4.59 1591 Plan Foreign Request SNO 136253
04/14/2003 08:16 04/14/2003 14:13 Allston-Astoria No 1 115kV line 115.0 L G 41.98 357 Plan Maintenance LGV 136254
04/14/2003 08:16 04/14/2003 14:13 Allston-Delena section of Allston-Astoria No 1 115kV line 115.0 S 3.31 357 Plan Maintenance LGV 136254
04/14/2003 09:21 04/15/2003 18:05 Broadview-Garrison No 1 500kV line 500.0 L 224.71 1964 Plan Maintenance KAL 136255
04/14/2003 10:03 04/14/2003 10:03 Clymer tap to Ellensburg-Moxee No 1 115kV line 115.0 T 0.02 0 Auto Unknown Bird or Animal WEN TRI 136256
04/14/2003 10:03 04/14/2003 10:03 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 0 Auto Unknown Bird or Animal WEN TRI 136256
04/14/2003 10:03 04/14/2003 10:03 Ellensburg-Clymer section of Ellensburg-Moxee No 1 115kV line 115.0 S 1.38 0 Auto Unknown Bird or Animal WEN 136256
04/14/2003 10:03 04/14/2003 10:03 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 0 Auto Unknown Bird or Animal WEN TRI 136256
04/14/2003 13:00 04/14/2003 17:01 Lookout Point-Alvey No 2 115kV line 115.0 L G 15.84 241 Plan Maintenance EUG 136257
04/14/2003 13:00 04/14/2003 17:01 Lookout Point-Mt. Vernon section of Lookout Point-Alvey No 2 115kV line 115.0 S 14.10 241 Plan Maintenance EUG 136257
04/15/2003 07:30 04/15/2003 14:25 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 415 Plan Maintenance OLY 136262
04/15/2003 07:30 04/15/2003 14:25 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 415 Plan Maintenance OLY 136262
04/15/2003 07:41 04/15/2003 15:55 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 494 Plan Maintenance OLY 136263
04/15/2003 07:41 04/15/2003 15:55 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 494 Plan Maintenance OLY 136263
04/15/2003 08:03 04/15/2003 15:47 Ashe-Marion No 2 500kV line 500.0 L 224.01 464 Plan Maintenance TRI TDA RED SAL 136264
04/15/2003 08:07 04/15/2003 12:48 McNary-Badger Canyon No 1 115kV line 115.0 L G 28.40 281 Plan Maintenance TRI 136265
04/15/2003 08:07 04/15/2003 12:48 Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line 115.0 S 10.81 281 Plan Maintenance TRI 136265
04/15/2003 08:08 04/15/2003 14:42 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 394 Plan Maintenance RED 136266
04/15/2003 08:20 04/15/2003 21:02 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 762 Plan Testing TDA RED 136267
04/15/2003 08:20 04/15/2003 21:02 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 762 Plan Testing TDA 136267
04/15/2003 08:20 04/15/2003 21:02 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 762 Plan Testing TDA 136267
04/15/2003 08:20 04/15/2003 21:02 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 762 Plan Testing TDA 136267
04/15/2003 09:07 04/15/2003 13:39 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 272 Plan Maintenance WEN TRI 136268
04/15/2003 09:07 04/15/2003 13:39 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 272 Plan Maintenance WEN TRI 136268
04/15/2003 09:57 04/15/2003 09:57 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 136269
04/15/2003 09:57 04/15/2003 09:57 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136269
04/15/2003 09:57 04/15/2003 09:57 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 136269
04/15/2003 09:57 04/15/2003 09:57 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 136269
04/15/2003 09:57 04/15/2003 09:57 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 136269
04/15/2003 09:57 04/15/2003 09:57 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136269
04/15/2003 09:57 04/15/2003 09:57 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 136269
04/16/2003 06:01 04/17/2003 11:52 Broadview-Garrison No 2 500kV line 500.0 L 224.71 1791 Plan Maintenance KAL 136272
04/16/2003 07:02 04/16/2003 16:27 Chief Joseph-Snohomish No 3 345kV line 345.0 L 133.05 565 Plan Maintenance WEN SNO 136273
04/16/2003 07:38 04/16/2003 16:08 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 510 Plan Maintenance OLY 136274
04/16/2003 07:38 04/16/2003 16:08 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 510 Plan Maintenance OLY 136274
04/16/2003 08:03 04/16/2003 15:21 Ashe-Marion No 2 500kV line 500.0 L 224.01 438 Plan Maintenance TRI TDA RED SAL 136275
04/16/2003 08:08 04/16/2003 15:17 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 429 Plan Maintenance RED 136276
04/16/2003 08:13 04/17/2003 13:14 Badger Canyon-Richland No 1 115kV line 115.0 L G 5.51 1741 Plan Maintenance TRI 136277
04/16/2003 08:13 04/17/2003 13:14 Badger Canyon-Vista section of Badger Canyon-Richland No 1 115kV line 115.0 S 0.97 1741 Plan Maintenance TRI 136277
04/16/2003 08:23 04/16/2003 08:23 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 136278
04/16/2003 08:23 04/16/2003 08:23 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136278
04/16/2003 08:23 04/16/2003 08:23 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 136278
04/16/2003 08:23 04/16/2003 08:23 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 136278
04/16/2003 08:23 04/16/2003 08:23 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 136278
04/16/2003 08:23 04/16/2003 08:23 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136278
04/16/2003 08:23 04/16/2003 08:23 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 136278
04/16/2003 08:40 04/17/2003 11:04 Franklin-Walla Walla No 1 115kV line 115.0 L G 35.95 1584 Plan Maintenance TRI 136279
04/16/2003 08:40 04/17/2003 11:04 Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line 115.0 S 18.21 1584 Plan Maintenance TRI 136279
04/17/2003 07:03 04/17/2003 12:59 Salem-PGE Bethel No 1 115kV line 115.0 L 14.40 356 Plan Foreign Request SAL 136285
04/17/2003 07:33 04/17/2003 16:06 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 513 Plan Maintenance OLY 136286
04/17/2003 07:33 04/17/2003 16:06 Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line 69.0 S 11.79 513 Plan Maintenance OLY 136286
04/17/2003 07:46 04/17/2003 13:26 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 340 Plan Forced OLY 136287
04/17/2003 07:47 04/17/2003 13:35 Satsop-Aberdeen No 2 230kV line 230.0 L 20.51 348 Plan Forced OLY 136288
04/17/2003 07:47 04/17/2003 13:35 Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line 115.0 T 14.58 348 Plan Forced OLY 136289
04/17/2003 07:47 04/17/2003 13:35 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 348 Plan Forced OLY 136289
04/17/2003 07:47 04/17/2003 13:35 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 348 Plan Forced OLY 136289
04/17/2003 08:01 04/17/2003 14:52 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 411 Plan Maintenance RED 136290
04/17/2003 08:07 04/17/2003 14:26 Ashe-Marion No 2 500kV line 500.0 L 224.01 379 Plan Maintenance TRI TDA RED SAL 136291
04/17/2003 08:49 04/18/2003 13:27 La Grande-IPC Brownlee No 1 230kV line 230.0 L T 79.30 1718 Plan Foreign Request TRI 136292
04/17/2003 08:49 04/18/2003 13:27 Quartz tap to La Grande-IPC Brownlee No 1 230kV line 230.0 T 10.30 1718 Plan Foreign Request TRI 136292
04/17/2003 09:00 04/17/2003 09:04 Jim Creek Service No 1 115kV line 115.0 L 9.57 4 Plan Foreign Request SNO 136293
04/17/2003 09:21 04/17/2003 09:27 Jim Creek Service No 1 115kV line 115.0 L 9.57 6 Plan Foreign Request SNO 136294
04/17/2003 11:01 04/17/2003 18:08 Captain Jack-Olinda No 1 500kV line 500.0 L 148.86 427 Plan Foreign Request RED 136295
04/18/2003 06:10 04/18/2003 08:10 Addy tap to Bell-Boundary No 3 230kV line 230.0 T 0.02 120 Auto Equipment/Miscellaneous Voltage SPK 136297
04/18/2003 06:10 04/18/2003 11:44 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S 57.73 334 Auto Equipment/Miscellaneous Voltage SPK 136297
04/18/2003 06:10 04/18/2003 08:10 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S 50.34 120 Auto Equipment/Miscellaneous Voltage SPK 136297
04/18/2003 06:10 04/18/2003 11:44 Bell-Boundary No 3 230kV line 230.0 L G 108.07 334 Auto Equipment/Miscellaneous Voltage SPK 136297
04/18/2003 07:13 04/19/2003 19:37 Maple Valley-Massachusetts No 1 230kV line 230.0 L 12.14 2184 Plan Foreign Request COV 136298
04/18/2003 07:31 04/18/2003 14:34 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 423 Plan Maintenance OLY 136299
04/18/2003 07:31 04/18/2003 14:34 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 423 Plan Maintenance OLY 136299
04/18/2003 08:03 04/18/2003 14:53 Ashe-Marion No 2 500kV line 500.0 L 224.01 410 Plan Maintenance TRI TDA RED SAL 136300
04/18/2003 08:30 04/18/2003 15:08 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 398 Plan Maintenance RED 136301
04/18/2003 08:32 04/18/2003 10:21 Boundary-Waneta No 1 230kV line 230.0 L 16.50 109 Auto RAS Initiated RAS Initiated SPK 136302
04/18/2003 09:15 04/18/2003 09:15 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 0 Plan Testing TDA RED 136303
04/18/2003 09:15 04/18/2003 09:15 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 0 Plan Testing TDA 136303
04/18/2003 09:15 04/18/2003 09:15 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 0 Plan Testing TDA 136303
04/18/2003 09:15 04/18/2003 09:15 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 0 Plan Testing TDA 136303
04/18/2003 09:20 04/18/2003 11:44 Addy tap to Bell-Boundary No 3 230kV line 230.0 T 0.02 144 Plan Maintenance SPK 136304
04/18/2003 09:20 04/18/2003 11:44 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S 50.34 144 Plan Maintenance SPK 136304
04/18/2003 09:20 04/18/2003 11:44 Bell-Boundary No 3 230kV line 230.0 L O 108.07 144 Plan Maintenance SPK 136304
04/18/2003 12:00 09/05/2003 15:57 Addy-Cusick No 1 230kV line 230.0 L 25.77 201837 Plan Normally Out SPK 136305
04/18/2003 12:58 04/22/2003 18:34 Boundary-Nelway No 1 230kV line 230.0 L 2.40 6096 Plan Foreign Request SPK 136306
04/18/2003 23:26 05/02/2003 03:21 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 18955 Plan Foreign Request OLY 136307
04/19/2003 02:14 04/19/2003 05:53 John Day-Marion No 1 500kV line 500.0 L 127.51 219 Plan Voltage Control TDA RED SAL 136308
04/19/2003 02:52 04/19/2003 17:49 Garrison-Taft No 1 500kV line 500.0 L 159.38 897 Plan Voltage Control KAL 136309
04/19/2003 07:01 04/19/2003 18:44 Pearl-Keeler No 1 500kV line 500.0 L 18.33 703 Plan Construction SAL 136316
04/19/2003 17:50 04/20/2003 16:10 Garrison-Taft No 2 500kV line 500.0 L 159.38 1340 Plan Voltage Control KAL 136317
04/20/2003 00:47 04/20/2003 09:15 John Day-Marion No 1 500kV line 500.0 L 127.51 508 Plan Voltage Control TDA RED SAL 136318
04/20/2003 02:16 04/20/2003 06:12 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 236 Plan Voltage Control RED 136319
04/20/2003 17:27 04/20/2003 20:40 Chief Joseph PH-Chief Joseph No 2 230kV line 230.0 L 1.03 193 Auto Foreign Trouble Foreign Utility WEN 136320
04/20/2003 19:16 04/21/2003 15:05 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 1189 Plan Emergency WEN 136321
04/20/2003 22:22 04/21/2003 09:16 Garrison-Taft No 1 500kV line 500.0 L 159.38 654 Plan Voltage Control KAL 136322
04/20/2003 23:28 04/21/2003 05:07 John Day-Marion No 1 500kV line 500.0 L 127.51 339 Plan Voltage Control TDA RED SAL 136323
04/21/2003 00:18 04/21/2003 14:25 Coyote Springs-Slatt No 1 500kV line 500.0 L 28.09 847 Auto Equipment/Miscellaneous Terminal Equipment Failure TRI TDA 136324
04/21/2003 00:34 04/21/2003 05:32 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 298 Plan Voltage Control RED 136325
04/21/2003 07:30 04/21/2003 14:27 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 417 Plan Maintenance OLY 136328
04/21/2003 07:30 04/21/2003 14:27 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 417 Plan Maintenance OLY 136328
04/21/2003 08:08 04/21/2003 16:54 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 526 Plan Maintenance RED 136329
04/21/2003 08:08 04/30/2003 15:01 Carlton-McMinnville No 1 115kV line 115.0 L G 5.35 13373 Plan Maintenance SAL 136330
04/21/2003 08:08 04/30/2003 15:01 Carlton-Windishar section of Carlton-McMinnville No 1 115kV line 115.0 S 3.87 13373 Plan Maintenance SAL 136330
04/21/2003 08:16 04/21/2003 14:56 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 400 Plan Maintenance RED 136331
04/21/2003 08:32 04/21/2003 14:22 Allston-Astoria No 1 115kV line 115.0 L T 41.98 350 Plan Maintenance LGV 136332
04/21/2003 08:32 04/21/2003 14:22 Naselle tap-Cathlamet section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 4.58 350 Plan Maintenance LGV 136332
04/21/2003 08:45 04/21/2003 14:26 Albany-Eugene No 1 115kV line 115.0 L G 39.80 341 Plan Maintenance EUG 136333
04/21/2003 08:45 04/21/2003 14:26 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 341 Plan Maintenance EUG 136333
04/21/2003 10:05 05/02/2003 13:12 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 16027 Plan Maintenance SAL 136334
04/21/2003 10:07 05/02/2003 13:45 Carlton tap to Forest Grove-McMinnville No 1 115kV line 115.0 T 0.03 16058 Plan Maintenance SAL 136335
04/21/2003 10:07 05/02/2003 13:45 Forest Grove-McMinnville No 1 115kV line 115.0 L T 23.72 16058 Plan Maintenance SAL 136335
04/21/2003 10:15 04/27/2003 08:16 Broadview-Garrison No 2 500kV line 500.0 L 224.71 8521 Plan Foreign Request KAL 136336
04/21/2003 10:37 05/02/2003 13:12 Carlton-Cascade Steel section of Carlton-Sherwood No 1 230kV line 230.0 S 8.94 15995 Plan Maintenance SAL 136337
04/21/2003 10:37 05/02/2003 13:12 Carlton-Sherwood No 1 230kV line 230.0 L G 17.92 15995 Plan Maintenance SAL 136337
04/21/2003 12:24 04/21/2003 12:24 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 136338
04/21/2003 12:24 04/21/2003 12:24 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136338
04/21/2003 12:24 04/21/2003 12:24 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136338
04/21/2003 12:24 04/21/2003 12:24 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136338
04/21/2003 12:24 04/21/2003 12:24 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136338
04/21/2003 12:24 04/21/2003 12:24 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136338
04/21/2003 14:38 06/23/2003 07:58 Albany-Eugene No 1 115kV line 115.0 L G 39.80 90320 Plan Normally Out EUG 136339
04/21/2003 14:38 06/23/2003 07:58 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 90320 Plan Normally Out EUG 136339
04/22/2003 00:09 04/22/2003 05:06 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 297 Plan Voltage Control RED 136340
04/22/2003 00:17 04/22/2003 05:45 John Day-Marion No 1 500kV line 500.0 L 127.51 328 Plan Voltage Control TDA RED SAL 136341
04/22/2003 08:00 04/22/2003 15:25 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 445 Plan Maintenance RED 136344
04/22/2003 08:04 04/22/2003 14:14 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 370 Plan Maintenance RED 136345
04/22/2003 08:31 04/24/2003 13:39 Creston-Bell No 1 115kV line 115.0 L G 53.80 3188 Plan Maintenance WEN SPK 136346
04/22/2003 08:31 04/24/2003 13:39 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 3188 Plan Maintenance SPK 136346
04/22/2003 08:48 04/24/2003 13:39 Creston-Bell No 1 115kV line 115.0 L O 53.80 3171 Plan Maintenance WEN SPK 136347
04/22/2003 08:48 04/24/2003 13:39 Springhill-Bell section of Creston-Bell No 1 115kV line 115.0 S 9.92 3171 Plan Maintenance SPK 136347
04/22/2003 23:49 04/22/2003 23:51 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 2 Auto Unknown TDA RED 136348
04/22/2003 23:49 04/22/2003 23:51 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 2 Auto Unknown TDA 136348
04/22/2003 23:49 04/22/2003 23:51 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 2 Auto Unknown TDA 136348
04/22/2003 23:49 04/22/2003 23:51 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 2 Auto Unknown TDA 136348
04/22/2003 23:49 04/22/2003 23:51 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 2 Auto Unknown TDA 136348
04/22/2003 23:58 04/23/2003 05:21 John Day-Marion No 1 500kV line 500.0 L 127.51 323 Plan Voltage Control TDA RED SAL 136349
04/23/2003 00:02 04/23/2003 05:10 Schultz-Raver No 2 500kV line 500.0 L 77.24 308 Plan Voltage Control WEN COV 136350
04/23/2003 00:50 04/23/2003 04:56 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 246 Plan Voltage Control RED 136351
04/23/2003 01:08 04/23/2003 01:09 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 1 Plan Testing TDA RED 136352
04/23/2003 01:08 04/23/2003 01:09 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 1 Plan Testing TDA 136352
04/23/2003 01:08 04/23/2003 01:09 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 1 Plan Testing TDA 136352
04/23/2003 01:08 04/23/2003 01:09 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 1 Plan Testing TDA 136352
04/23/2003 01:08 04/23/2003 01:09 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 1 Plan Testing TDA 136352
04/23/2003 01:19 04/23/2003 01:22 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 3 Plan Testing TDA RED 136353
04/23/2003 01:19 04/23/2003 01:22 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 3 Plan Testing TDA 136353
04/23/2003 01:19 04/23/2003 01:22 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 3 Plan Testing TDA 136353
04/23/2003 01:19 04/23/2003 01:22 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 3 Plan Testing TDA 136353
04/23/2003 01:19 04/23/2003 01:22 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 3 Plan Testing TDA 136353
04/23/2003 03:45 04/23/2003 05:36 Schultz-Raver No 1 500kV line 500.0 L 77.24 111 Plan Voltage Control WEN COV 136354
04/23/2003 04:02 04/23/2003 04:07 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 5 Plan Testing TDA RED 136355
04/23/2003 04:02 04/23/2003 04:07 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5 Plan Testing TDA 136355
04/23/2003 04:02 04/23/2003 04:07 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5 Plan Testing TDA 136355
04/23/2003 04:02 04/23/2003 04:07 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5 Plan Testing TDA 136355
04/23/2003 04:02 04/23/2003 04:07 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5 Plan Testing TDA 136355
04/23/2003 07:09 04/23/2003 13:33 Midway-Priest Rapids No 3 230kV line 230.0 L 7.20 384 Plan Foreign Request TRI 136361
04/23/2003 08:01 04/23/2003 14:59 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 418 Plan Maintenance RED 136362
04/23/2003 08:20 04/23/2003 15:22 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 422 Plan Foreign Request RED 136363
04/23/2003 09:07 04/23/2003 11:14 Creston-Bell No 1 115kV line 115.0 L T 53.80 127 Plan Foreign Request WEN SPK 136364
04/23/2003 09:07 04/23/2003 11:14 Larene tap to Creston-Bell No 1 115kV line 115.0 T 0.01 127 Plan Foreign Request WEN 136364
04/23/2003 23:13 04/24/2003 05:00 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 347 Plan Voltage Control RED 136365
04/23/2003 23:38 04/24/2003 05:38 Schultz-Raver No 2 500kV line 500.0 L 77.24 360 Plan Voltage Control WEN COV 136366
04/23/2003 23:43 04/24/2003 05:47 John Day-Marion No 1 500kV line 500.0 L 127.51 364 Plan Voltage Control TDA RED SAL 136367
04/24/2003 00:53 04/24/2003 05:22 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 269 Plan Voltage Control TRI WEN TDA LGV 136368
04/24/2003 07:30 04/24/2003 14:32 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 422 Plan Maintenance EUG 136373
04/24/2003 07:30 04/24/2003 14:32 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S 10.26 422 Plan Maintenance EUG 136373
04/24/2003 08:03 04/24/2003 12:44 Trojan-Allston No 1 230kV line 230.0 L 9.47 281 Plan Maintenance LGV 136374
04/24/2003 08:04 04/25/2003 19:40 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 2136 Plan Foreign Request RED 136375
04/24/2003 08:04 04/24/2003 14:38 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 394 Plan Maintenance RED 136376
04/24/2003 08:26 04/24/2003 09:12 Fargo tap to Oregon City-Chemawa No 2 115kV line 115.0 T 0.01 46 Auto Line Material Failure Line Material Failure SAL 136377
04/24/2003 08:26 04/24/2003 13:26 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 300 Auto Line Material Failure Line Material Failure SAL 136377
04/24/2003 08:26 04/24/2003 13:26 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 300 Auto Line Material Failure Line Material Failure SAL 136377
04/24/2003 08:26 04/24/2003 09:12 Oregon City-Fargo section of Oregon City-Chemawa No 2 115kV line 115.0 S 6.70 46 Auto Line Material Failure Line Material Failure SAL 136377
04/24/2003 17:32 04/24/2003 17:32 John Day-Marion No 1 500kV line 500.0 L 127.51 0 Auto Lightning Lightning TDA RED SAL 136378
04/24/2003 23:16 04/25/2003 05:30 John Day-Marion No 1 500kV line 500.0 L 127.51 374 Plan Voltage Control TDA RED SAL 136379
04/24/2003 23:52 04/24/2003 23:55 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 3 Plan Testing TDA RED 136380
04/24/2003 23:52 04/24/2003 23:55 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 3 Plan Testing TDA 136380
04/24/2003 23:52 04/24/2003 23:55 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 3 Plan Testing TDA 136380
04/24/2003 23:52 04/24/2003 23:55 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 3 Plan Testing TDA 136380
04/24/2003 23:52 04/24/2003 23:55 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 3 Plan Testing TDA 136380
04/25/2003 00:21 04/25/2003 05:05 John Day-Grizzly No 1 500kV line 500.0 L 88.41 284 Plan Voltage Control TDA RED 136381
04/25/2003 01:52 04/25/2003 02:06 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 14 Auto Foreign Trouble TDA RED 136382
04/25/2003 01:52 04/25/2003 02:06 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 14 Auto Foreign Trouble TDA 136382
04/25/2003 03:32 04/25/2003 03:32 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 136383
04/25/2003 03:32 04/25/2003 03:32 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 136383
04/25/2003 03:32 04/25/2003 03:32 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 136383
04/25/2003 07:20 05/09/2003 19:02 Maple Valley-Massachusetts No 1 230kV line 230.0 L 12.14 20862 Plan Foreign Request COV 136389
04/25/2003 07:36 04/25/2003 13:19 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 343 Plan Maintenance RED 136390
04/25/2003 08:58 04/25/2003 14:01 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 303 Plan Maintenance OLY 136391
04/25/2003 15:19 04/25/2003 15:19 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S G 29.39 0 Auto Lightning Lightning TDA 136392
04/25/2003 15:19 04/25/2003 15:19 Big Eddy-Redmond No 1 230kV line 230.0 L 97.46 0 Auto Lightning Lightning TDA RED 136392
04/25/2003 15:19 04/25/2003 15:19 Maupin tap to Big Eddy-Redmond No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning TDA 136392
04/25/2003 15:19 04/25/2003 15:19 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S G 68.07 0 Auto Lightning Lightning TDA RED 136392
04/25/2003 15:19 04/25/2003 15:19 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Lightning Arc while switching TDA 136424
04/25/2003 15:57 04/25/2003 15:57 Chenoweth-Goldendale No 1 115kV line 115.0 L G 24.08 0 Auto Lightning Lightning TDA 136393
04/25/2003 15:57 04/25/2003 15:57 Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line 115.0 S 3.84 0 Auto Lightning Lightning TDA 136393
04/25/2003 15:57 04/25/2003 15:57 Spearfish tap to Chenoweth-Goldendale No 1 115kV line 115.0 T 3.22 0 Auto Lightning Lightning TDA 136393
04/25/2003 15:57 04/25/2003 16:06 McNary-Ross No 1 345kV line 345.0 L 174.57 9 Auto Lightning Weather TRI TDA LGV 136394
04/25/2003 17:03 04/25/2003 19:25 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 142 Plan Foreign Request SAL 136395
04/25/2003 17:03 04/25/2003 19:25 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 142 Plan Foreign Request SAL 136395
04/25/2003 17:40 04/25/2003 17:40 Slatt-John Day No 1 500kV line 500.0 L 30.32 0 Auto Lightning Lightning TRI TDA 136396
04/25/2003 17:55 04/25/2003 17:55 Horse Heaven-Harvalum No 1 230kV line 230.0 L 57.18 0 Auto Lightning Lightning TRI TDA 136397
04/25/2003 18:11 04/25/2003 18:14 Mossyrock-Chehalis No 1 230kV line 230.0 L 27.26 3 Auto Lightning Lightning OLY 136398
04/26/2003 06:20 04/26/2003 07:06 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 46 Auto Unknown Bird or Animal WEN TRI 136400
04/26/2003 06:20 04/26/2003 06:20 Ellensburg-Clymer section of Ellensburg-Moxee No 1 115kV line 115.0 S 1.38 0 Auto Unknown Bird or Animal WEN 136400
04/26/2003 06:20 04/26/2003 07:06 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 46 Auto Unknown Bird or Animal WEN TRI 136400
04/26/2003 06:44 04/26/2003 13:05 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 381 Plan Foreign Request RED 136401
04/26/2003 11:03 04/26/2003 11:29 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 26 Plan Testing TDA RED 136402
04/26/2003 11:03 04/26/2003 11:29 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 26 Plan Testing TDA 136402
04/26/2003 11:03 04/26/2003 11:29 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 26 Plan Testing TDA 136402
04/26/2003 11:03 04/26/2003 11:29 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 26 Plan Testing TDA 136402
04/26/2003 11:03 04/26/2003 11:29 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 26 Plan Testing TDA 136402
04/26/2003 11:03 04/26/2003 11:29 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 26 Plan Testing TDA 136402
04/26/2003 14:21 04/26/2003 14:21 Tacoma-TPWR Cowlitz No 1 230kV line 230.0 L 6.00 0 Auto TT Noise TT Noise COV 136403
04/26/2003 14:23 04/26/2003 14:23 Tacoma-TPWR Cowlitz No 2 230kV line 230.0 L 6.00 0 Auto TT Noise TT Noise COV 136404
04/26/2003 18:07 04/27/2003 09:16 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 909 Plan Voltage Control TRI WEN TDA LGV 136405
04/28/2003 00:15 04/28/2003 05:07 Ashe-Marion No 2 500kV line 500.0 L 224.01 292 Plan Voltage Control TRI TDA RED SAL 136406
04/28/2003 03:18 06/04/2003 09:50 Chief Joseph PH-Chief Joseph No 1 230kV line 230.0 L 1.09 53672 Plan Foreign Request WEN 136407
04/28/2003 07:24 05/02/2003 08:38 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 5834 Plan Maintenance OLY 136411
04/28/2003 07:35 04/28/2003 14:37 Bell-Bigelow section of Bell-Trentwood No 2 115kV line 115.0 S 6.60 422 Plan Maintenance SPK 136412
04/28/2003 07:35 04/28/2003 14:37 Bell-Trentwood No 2 115kV line 115.0 L G 11.30 422 Plan Maintenance SPK 136412
04/28/2003 07:45 05/02/2003 14:45 Chenoweth-Goldendale No 1 115kV line 115.0 L G 24.08 6180 Plan Maintenance TDA 136413
04/28/2003 07:45 05/02/2003 14:45 Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line 115.0 S 3.84 6180 Plan Maintenance TDA 136413
04/28/2003 09:02 04/28/2003 15:34 Bonneville PH 1-North Bonneville No 2 230kV line 230.0 L 0.83 392 Plan Maintenance LGV 136414
04/28/2003 09:06 04/28/2003 13:43 Toledo-Wendson No 1 230kV line 230.0 L 49.64 277 Plan Maintenance EUG 136415
04/28/2003 14:06 04/28/2003 19:44 Boundary-Nelway No 1 230kV line 230.0 L 2.40 338 Plan Foreign Request SPK 136416
04/28/2003 15:05 04/28/2003 15:05 Fairview-Rogue No 1 230kV line 230.0 L 65.28 0 Auto Lightning Lightning EUG 136417
04/28/2003 17:32 04/28/2003 17:32 Adelaide-Minidoka PH No 1 138kV line 138.0 L 11.90 0 Auto Foreign Trouble Foreign Trouble IDF 136418
04/28/2003 17:32 04/28/2003 17:35 Heyburn-Adelaide No 1 138kV line 138.0 L G 12.35 3 Auto Improper Relaying Lightning IDF 136419
04/28/2003 17:32 04/28/2003 17:35 Heyburn-Hay Mill section of Heyburn-Adelaide No 1 138kV line 138.0 S 4.51 3 Auto Improper Relaying Lightning IDF 136419
04/29/2003 00:10 04/29/2003 15:00 John Day-Marion No 1 500kV line 500.0 L 127.51 890 Plan Voltage Control TDA RED SAL 136420
04/29/2003 01:11 04/29/2003 04:54 John Day-Grizzly No 1 500kV line 500.0 L 88.41 223 Plan Voltage Control TDA RED 136421
04/29/2003 02:14 04/29/2003 05:48 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 214 Plan Voltage Control RED 136422
04/29/2003 05:08 04/29/2003 12:15 Broadview-Garrison No 1 500kV line 500.0 L 224.71 427 Plan Maintenance KAL 136423
04/29/2003 07:28 04/29/2003 14:50 Toledo-Wendson No 1 230kV line 230.0 L 49.64 442 Plan Maintenance EUG 136433
04/29/2003 08:09 04/29/2003 14:08 Thayer Drive-Richland section of White Bluffs-Richland No 1 115kV line 115.0 S 1.38 359 Plan Maintenance TRI 136434
04/29/2003 08:09 04/29/2003 14:08 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 359 Plan Maintenance TRI 136434
04/29/2003 08:09 04/29/2003 14:07 Ledbeder-Richland section of Red Mountain-Richland No 1 115kV line 115.0 S 3.20 358 Plan Maintenance TRI 136435
04/29/2003 08:09 04/29/2003 14:07 Red Mountain-Richland No 1 115kV line 115.0 L G 6.00 358 Plan Maintenance TRI 136435
04/29/2003 08:09 04/29/2003 14:08 Badger Canyon-Richland No 1 115kV line 115.0 L G 5.51 359 Plan Maintenance TRI 136436
04/29/2003 08:09 04/29/2003 14:08 Tapteal-Richland section of Badger Canyon-Richland No 1 115kV line 115.0 S 2.45 359 Plan Maintenance TRI 136436
04/29/2003 08:13 04/29/2003 12:43 Bell-Trentwood No 2 115kV line 115.0 L G 11.30 270 Plan Maintenance SPK 136437
04/29/2003 08:13 04/29/2003 12:43 Bigelow-Trentwood section of Bell-Trentwood No 2 115kV line 115.0 S 4.70 270 Plan Maintenance SPK 136437
04/29/2003 08:41 04/29/2003 14:06 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 325 Plan Maintenance WEN TRI 136438
04/29/2003 08:41 04/29/2003 14:06 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 325 Plan Maintenance WEN TRI 136438
04/29/2003 15:30 04/29/2003 15:30 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S G 29.39 0 Auto Lightning Lightning TDA 136439
04/29/2003 15:30 04/29/2003 15:30 Big Eddy-Redmond No 1 230kV line 230.0 L 97.46 0 Auto Lightning Lightning TDA RED 136439
04/29/2003 15:30 04/29/2003 15:30 Maupin tap to Big Eddy-Redmond No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning TDA 136439
04/29/2003 15:30 04/29/2003 15:30 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S G 68.07 0 Auto Lightning Lightning TDA RED 136439
04/29/2003 15:30 04/29/2003 15:30 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Lightning Arc while switching TDA 136445
04/29/2003 16:29 04/29/2003 16:29 Big Eddy-De Moss No 1 115kV line 115.0 L T 23.98 0 Auto Foreign Trouble Foreign Utility TDA 136440
04/29/2003 16:29 04/29/2003 16:29 Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line 115.0 T 9.25 0 Auto Foreign Trouble Foreign Utility TDA 136440
04/29/2003 18:04 04/29/2003 18:04 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T 0 Auto Lightning Lightning TDA 136441
04/29/2003 18:04 04/29/2003 18:04 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S 136.53 0 Auto Lightning Lightning TDA RED 136441
04/29/2003 18:04 04/29/2003 18:05 McNary-Dalreed section of McNary-Santiam No 2 230kV line 230.0 S 35.95 1 Auto Lightning Lightning TRI TDA 136441
04/29/2003 18:04 04/29/2003 18:05 McNary-Santiam No 2 230kV line 230.0 L G 200.43 1 Auto Lightning Lightning TRI TDA RED SAL 136441
04/29/2003 18:04 04/29/2003 18:04 Tumble Creek tap to McNary-Santiam No 2 230kV line 230.0 T 0.10 0 Auto Lightning Lightning SAL 136441
04/29/2003 18:04 04/29/2003 18:04 Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line 230.0 S 27.95 0 Auto Lightning Lightning SAL 136441
04/30/2003 00:43 04/30/2003 05:17 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 274 Plan Voltage Control TRI WEN TDA LGV 136442
04/30/2003 02:01 04/30/2003 04:17 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 136 Plan Voltage Control RED 136443
04/30/2003 04:47 04/30/2003 04:53 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 6 Auto Equipment/Miscellaneous TDA RED 136444
04/30/2003 04:47 04/30/2003 04:53 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6 Auto Equipment/Miscellaneous TDA 136444
04/30/2003 04:47 04/30/2003 04:53 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6 Auto Equipment/Miscellaneous TDA 136444
04/30/2003 04:47 04/30/2003 04:53 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6 Auto Equipment/Miscellaneous TDA 136444
04/30/2003 04:47 04/30/2003 04:53 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6 Auto Equipment/Miscellaneous TDA 136444
04/30/2003 04:47 04/30/2003 04:53 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 6 Auto Equipment/Miscellaneous TDA 136444
04/30/2003 06:25 04/30/2003 06:25 Targhee-Drummond No 1 115kV line 115.0 L 26.80 0 Auto Unknown Power System Condition IDF 136457
04/30/2003 06:25 04/30/2003 06:25 Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line 115.0 S G 17.48 0 Auto Unknown Weather IDF 136458
04/30/2003 06:25 04/30/2003 06:25 Swan Valley-Teton No 1 115kV line 115.0 L 35.47 0 Auto Unknown Weather IDF 136458
04/30/2003 06:25 04/30/2003 06:25 Targhee tap to Swan Valley-Teton No 1 115kV line 115.0 T G 10.94 0 Auto Unknown Weather IDF 136458
04/30/2003 06:25 04/30/2003 06:25 Targhee-Teton section of Swan Valley-Teton No 1 115kV line 115.0 S G 17.99 0 Auto Unknown Weather IDF 136458
04/30/2003 07:22 04/30/2003 16:06 Toledo-Wendson No 1 230kV line 230.0 L 49.64 524 Plan Maintenance EUG 136459
04/30/2003 08:02 04/30/2003 14:17 John Day-Marion No 1 500kV line 500.0 L 127.51 375 Plan Maintenance TDA RED SAL 136460
04/30/2003 08:06 04/30/2003 08:06 Adair tap to Salem-Albany No 2 115kV line 115.0 T G 1.01 0 Auto Unknown Unknown SAL 136461
04/30/2003 08:06 04/30/2003 08:06 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S G 7.45 0 Auto Unknown Unknown SAL EUG 136461
04/30/2003 08:06 04/30/2003 08:06 Monmouth-Adair section of Salem-Albany No 2 115kV line 115.0 S G 11.30 0 Auto Unknown Unknown SAL 136461
04/30/2003 08:06 04/30/2003 08:06 Salem-Albany No 2 115kV line 115.0 L 27.85 0 Auto Unknown Unknown SAL EUG 136461
04/30/2003 08:06 04/30/2003 08:06 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S G 9.10 0 Auto Unknown Unknown SAL 136461
04/30/2003 10:34 04/30/2003 10:36 Diamond Lake tap to Sacheen-Albeni Falls No 1 115kV line 115.0 T G 2.20 2 Auto Unknown Unknown SPK 136462
04/30/2003 10:34 04/30/2003 10:36 Diamond Lake-Albeni Falls section of Sacheen-Albeni Falls No 1 115kV line 115.0 S G 8.20 2 Auto Unknown Unknown SPK 136462
04/30/2003 10:34 04/30/2003 10:36 Sacheen-Albeni Falls No 1 115kV line 115.0 L 13.72 2 Auto Unknown Unknown SPK 136462
04/30/2003 10:34 04/30/2003 10:36 Sacheen-Diamond Lake section of Sacheen-Albeni Falls No 1 115kV line 115.0 S G 5.52 2 Auto Unknown Unknown SPK 136462
05/01/2003 00:06 05/01/2003 13:37 John Day-Marion No 1 500kV line 500.0 L 127.51 811 Plan Voltage Control TDA RED SAL 136463
05/01/2003 02:08 05/01/2003 05:32 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 204 Plan Voltage Control RED 136464
05/01/2003 07:48 05/01/2003 19:01 Carlton-Sherwood No 1 230kV line 230.0 L O 17.92 673 Plan Maintenance SAL 136468
05/01/2003 07:48 05/01/2003 19:01 Cascade Steel tap to Carlton-Sherwood No 1 230kV line 230.0 T 12.67 673 Plan Maintenance SAL 136468
05/01/2003 07:48 05/01/2003 19:01 Cascade Steel-Sherwood section of Carlton-Sherwood No 1 230kV line 230.0 S 8.98 673 Plan Maintenance SAL 136468
05/01/2003 08:43 05/02/2003 13:45 Badger Canyon-Richland No 1 115kV line 115.0 L G 5.51 1742 Plan Maintenance TRI 136469
05/01/2003 08:43 05/02/2003 13:45 Badger Canyon-Vista section of Badger Canyon-Richland No 1 115kV line 115.0 S 0.97 1742 Plan Maintenance TRI 136469
05/01/2003 08:43 05/02/2003 13:45 Vista-Tapteal section of Badger Canyon-Richland No 1 115kV line 115.0 S 2.09 1742 Plan Maintenance TRI 136469
05/01/2003 09:35 05/02/2003 14:57 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S 2.40 1762 Plan Foreign Request RED 136470
05/01/2003 09:35 05/01/2003 10:10 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 35 Plan Foreign Request RED 136470
05/01/2003 09:35 05/02/2003 14:57 Redmond-Harney No 1 115kV line 115.0 L G 125.40 1762 Plan Foreign Request RED 136470
05/01/2003 09:46 05/01/2003 11:40 Ahsahka-Orofino section of Dworshak PH-Orofino No 1 115kV line 115.0 S 3.62 114 Plan Foreign Request SPK 136471
05/01/2003 09:46 05/01/2003 11:40 Dworshak PH-Orofino No 1 115kV line 115.0 L G 4.45 114 Plan Foreign Request TRI SPK 136471
05/01/2003 12:35 05/01/2003 13:11 The Dalles PH-Big Eddy No 5 230kV line 230.0 L 0.92 36 Auto Foreign Utility Foreign Utility TDA 136472
05/01/2003 15:51 05/01/2003 15:51 East Omak-Oroville No 1 115kV line 115.0 L 39.01 0 Auto Lightning Lightning WEN 136473
05/01/2003 15:51 05/01/2003 15:51 East Omak-Tonasket section of East Omak-Oroville No 1 115kV line 115.0 S G 20.20 0 Auto Lightning Lightning WEN 136473
05/01/2003 15:51 05/01/2003 15:51 East Omak-Tonasket No 2 115kV line 115.0 L 20.31 0 Auto Lightning Lightning WEN 136474
05/01/2003 16:44 05/01/2003 16:49 Grand Coulee-Chief Joseph No 2 230kV line 230.0 L 32.59 5 Auto Lightning Lightning WEN 136475
05/01/2003 16:44 05/01/2003 18:50 Grand Coulee Switchyard 230-500kV Tie No 1 500kV line 500.0 L 1.25 126 Auto Lightning WEN 136476
05/01/2003 16:47 05/02/2003 12:04 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 1157 Auto Lightning Line Material Failure OLY COV WEN 136477
05/01/2003 16:50 05/01/2003 16:50 Vantage-Schultz No 1 500kV line 500.0 L 34.65 0 Auto Lightning Lightning WEN 136478
05/01/2003 16:58 05/01/2003 17:00 Rocky Reach-Maple Valley No 1 345kV line 345.0 L 128.87 2 Auto Lightning Lightning WEN COV 136479
05/01/2003 17:01 05/01/2003 17:04 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 3 Auto Lightning Lightning WEN 136480
05/01/2003 17:01 05/01/2003 17:03 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 2 Auto Lightning Lightning WEN 136481
05/01/2003 17:02 05/01/2003 17:02 Vantage-Schultz No 1 500kV line 500.0 L 34.65 0 Auto Lightning Lightning WEN 136482
05/01/2003 22:04 05/02/2003 01:50 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 226 Plan Testing TDA RED 136483
05/01/2003 22:04 05/02/2003 01:50 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 226 Plan Testing TDA 136483
05/01/2003 22:49 05/02/2003 05:56 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 427 Plan Voltage Control RED 136484
05/01/2003 23:38 05/02/2003 05:47 John Day-Marion No 1 500kV line 500.0 L 127.51 369 Plan Voltage Control TDA RED SAL 136485
05/02/2003 02:48 05/02/2003 02:48 Bell-Boundary No 1 230kV line 230.0 L 91.66 0 Auto Lightning Lightning SPK 136486
05/02/2003 02:48 05/02/2003 02:48 Bell-Sacheen section of Bell-Boundary No 1 230kV line 230.0 S G 31.60 0 Auto Lightning Lightning SPK 136486
05/02/2003 02:48 05/02/2003 02:52 Sacheen tap to Bell-Boundary No 1 230kV line 230.0 T 0.70 4 Auto Lightning Lightning SPK 136486
05/02/2003 02:48 05/02/2003 02:48 Sacheen-Boundary section of Bell-Boundary No 1 230kV line 230.0 S G 60.06 0 Auto Lightning Lightning SPK 136486
05/02/2003 02:48 05/02/2003 02:48 Bell-Usk No 1 230kV line 230.0 L 47.48 0 Auto Lightning Lightning SPK 136487
05/02/2003 08:53 05/02/2003 19:06 Lancaster-Noxon No 1 230kV line 230.0 L 72.72 613 Auto Lightning Lightning SPK KAL 136492
05/02/2003 09:37 05/02/2003 14:40 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 303 Auto Foreign Trouble Foreign Trouble OLY 136493
05/02/2003 09:54 05/16/2003 08:06 Coyote Springs-PGE No 1 500kV line 500.0 L 0.06 20052 Plan Foreign Request TRI 136494
05/02/2003 13:39 05/05/2003 15:34 Carlton-McMinnville No 1 115kV line 115.0 L G 5.35 4435 Plan Maintenance SAL 136495
05/02/2003 13:39 05/05/2003 15:34 Carlton-Windishar section of Carlton-McMinnville No 1 115kV line 115.0 S 3.87 4435 Plan Maintenance SAL 136495
05/02/2003 14:36 05/02/2003 14:57 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 21 Plan Switching RED 136496
05/02/2003 14:36 05/02/2003 14:57 Redmond-Harney No 1 115kV line 115.0 L O 125.40 21 Plan Switching RED 136496
05/02/2003 14:36 05/12/2003 13:17 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T 31.20 14321 Plan Normally Out RED 136497
05/02/2003 14:36 05/12/2003 13:17 Redmond-Harney No 1 115kV line 115.0 L T 125.40 14321 Plan Normally Out RED 136497
05/02/2003 14:48 05/05/2003 07:45 Chenoweth-Goldendale No 1 115kV line 115.0 L G 24.08 3897 Plan Normally Out TDA 136498
05/02/2003 14:48 05/05/2003 07:45 Spearfish-Goldendale section of Chenoweth-Goldendale No 1 115kV line 115.0 S 20.24 3897 Plan Normally Out TDA 136498
05/02/2003 23:49 05/04/2003 07:54 John Day-Marion No 1 500kV line 500.0 L 127.51 1925 Plan Voltage Control TDA RED SAL 136499
05/03/2003 01:03 05/03/2003 05:48 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 285 Plan Voltage Control RED 136500
05/03/2003 06:58 05/04/2003 18:17 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 2119 Plan Foreign Request RED 136501
05/03/2003 15:16 05/04/2003 07:30 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 974 Plan Foreign Request OLY 136502
05/04/2003 00:39 05/25/2003 11:16 Columbia Generating Station-Ashe No 1 500kV line 500.0 L 0.55 30877 Plan Foreign Request TRI 136503
05/04/2003 02:38 05/04/2003 06:48 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 250 Plan Voltage Control RED 136504
05/04/2003 15:06 05/05/2003 05:30 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 864 Plan Voltage Control TRI WEN TDA LGV 136505
05/05/2003 05:55 05/08/2003 15:47 Hungry Horse-Columbia Falls No 1 230kV line 230.0 L 7.58 4912 Plan Foreign Request KAL 136510
05/05/2003 06:00 05/05/2003 18:48 McNary-Coyote Springs No 1 500kV line 500.0 L 19.44 768 Plan Construction TRI 136506
05/05/2003 06:33 05/05/2003 07:42 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 69 Plan Switching TDA RED 136511
05/05/2003 06:33 05/05/2003 07:42 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 69 Plan Switching TDA 136511
05/05/2003 07:41 05/08/2003 10:42 Columbia-Ellensburg No 1 115kV line 115.0 L G 34.98 4501 Plan Maintenance WEN 136512
05/05/2003 07:41 05/08/2003 10:10 East Ellensburg tap to Columbia-Ellensburg No 1 115kV line 115.0 T 3.21 4469 Plan Maintenance WEN 136512
05/05/2003 07:41 05/08/2003 10:10 East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 1.09 4469 Plan Maintenance WEN 136512
05/05/2003 07:41 05/08/2003 10:42 Jenkins-East Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 10.22 4501 Plan Maintenance WEN 136512
05/05/2003 07:46 05/09/2003 11:59 Chenoweth-Goldendale No 1 115kV line 115.0 L G 24.08 6013 Plan Maintenance TDA 136513
05/05/2003 07:46 05/09/2003 11:59 Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line 115.0 S 3.84 6013 Plan Maintenance TDA 136513
05/05/2003 07:53 05/05/2003 15:13 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 440 Plan Maintenance EUG 136514
05/05/2003 07:53 05/05/2003 15:13 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 440 Plan Maintenance EUG 136514
05/05/2003 07:53 05/05/2003 15:16 Filbert-Carlton section of Forest Grove-McMinnville No 1 115kV line 115.0 S 17.74 443 Plan Maintenance SAL 136515
05/05/2003 07:53 05/05/2003 15:16 Forest Grove-McMinnville No 1 115kV line 115.0 L G 23.72 443 Plan Maintenance SAL 136515
05/05/2003 08:00 05/05/2003 15:06 Sno-King-Maple Valley No 1 230kV line 230.0 L 24.84 426 Plan Construction SNO COV 136516
05/05/2003 08:10 05/29/2003 17:22 Garrison-Taft No 2 500kV line 500.0 L 159.38 35112 Plan Construction KAL 136517
05/05/2003 08:12 05/05/2003 14:46 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 394 Plan Maintenance RED 136518
05/05/2003 09:55 05/09/2003 14:31 Creston-Bell No 1 115kV line 115.0 L G 53.80 6036 Plan Maintenance WEN SPK 136519
05/05/2003 09:55 05/09/2003 14:31 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 6036 Plan Maintenance SPK 136519
05/05/2003 16:24 05/09/2003 14:01 Forest Grove-McMinnville No 1 115kV line 115.0 L G 23.72 5617 Plan Maintenance SAL 136520
05/05/2003 16:24 05/09/2003 14:01 Walnut City-McMinnville section of Forest Grove-McMinnville No 1 115kV line 115.0 S 2.18 5617 Plan Maintenance SAL 136520
05/05/2003 23:57 05/06/2003 05:54 John Day-Marion No 1 500kV line 500.0 L 127.51 357 Plan Voltage Control TDA RED SAL 136521
05/06/2003 01:31 05/06/2003 05:32 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 241 Plan Voltage Control RED 136522
05/06/2003 07:38 05/06/2003 14:34 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 416 Plan Maintenance OLY 136525
05/06/2003 07:38 05/06/2003 14:34 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 416 Plan Maintenance OLY 136525
05/06/2003 07:54 05/06/2003 13:49 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 355 Plan Maintenance RED 136526
05/06/2003 07:57 05/06/2003 15:17 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 440 Plan Maintenance EUG 136527
05/06/2003 07:57 05/06/2003 15:17 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 440 Plan Maintenance EUG 136527
05/06/2003 08:01 05/06/2003 14:22 Olympia-South Tacoma No 1 230kV line 230.0 L 36.94 381 Plan Maintenance OLY COV 136528
05/06/2003 11:58 05/06/2003 16:12 Bell-Addy No 1 115kV line 115.0 L G 51.18 254 Plan Switching SPK 136529
05/06/2003 11:58 05/06/2003 16:12 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S 22.34 254 Plan Switching SPK 136529
05/06/2003 12:00 05/06/2003 16:12 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 252 Plan Switching SPK 136530
05/06/2003 12:00 05/06/2003 16:12 Addy-Colville No 1 115kV line 115.0 L 15.22 252 Plan Switching SPK 136531
05/06/2003 23:51 05/07/2003 05:04 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 313 Plan Voltage Control RED 136532
05/07/2003 00:20 05/07/2003 05:57 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 337 Plan Voltage Control TRI WEN TDA LGV 136533
05/07/2003 04:58 05/07/2003 05:04 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 6 Auto Human Element TDA RED 136536
05/07/2003 04:58 05/07/2003 05:04 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 6 Auto Human Element TDA 136536
05/07/2003 04:58 05/07/2003 05:04 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 6 Auto Human Element TDA 136536
05/07/2003 04:58 05/07/2003 05:04 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 6 Auto Human Element TDA 136536
05/07/2003 04:58 05/07/2003 05:04 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 6 Auto Human Element TDA 136536
05/07/2003 04:58 05/07/2003 05:04 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 6 Auto Forced (Configuration) TDA RED 136537
05/07/2003 04:58 05/07/2003 05:04 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 6 Auto Forced (Configuration) TDA 136537
05/07/2003 05:04 05/07/2003 07:44 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 160 Auto Human Element TDA RED 136538
05/07/2003 05:04 05/07/2003 07:44 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 160 Auto Human Element TDA 136538
05/07/2003 05:04 05/07/2003 07:44 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 160 Auto Human Element TDA 136538
05/07/2003 05:04 05/07/2003 07:44 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 160 Auto Human Element TDA 136538
05/07/2003 05:04 05/07/2003 07:44 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 160 Auto Human Element TDA 136538
05/07/2003 05:04 05/07/2003 07:44 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 160 Auto Human Element TDA 136538
05/07/2003 07:01 05/07/2003 16:17 Paul-Olympia No 1 500kV line 500.0 L 20.24 556 Plan Maintenance OLY 136539
05/07/2003 07:07 05/07/2003 14:56 Tacoma-Covington No 4 230kV line 230.0 L 15.10 469 Plan Maintenance COV 136540
05/07/2003 07:24 05/07/2003 14:42 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 438 Plan Maintenance SAL 136541
05/07/2003 07:24 05/07/2003 14:42 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 438 Plan Maintenance SAL 136541
05/07/2003 07:45 05/07/2003 14:07 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 382 Plan Maintenance RED 136542
05/07/2003 08:03 05/07/2003 15:41 Addy-AVA Kettle Falls No 1 115kV line 115.0 L 27.10 458 Plan Maintenance SPK 136543
05/07/2003 08:21 05/07/2003 15:04 Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line 115.0 S 14.02 403 Plan Maintenance EUG 136544
05/07/2003 08:21 05/07/2003 15:04 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 403 Plan Maintenance EUG 136544
05/07/2003 23:00 05/08/2003 05:40 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 400 Plan Voltage Control RED 136545
05/08/2003 01:17 05/08/2003 05:22 John Day-Marion No 1 500kV line 500.0 L 127.51 245 Plan Voltage Control TDA RED SAL 136546
05/08/2003 07:23 05/08/2003 14:39 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 436 Plan Maintenance SAL 136551
05/08/2003 07:23 05/08/2003 14:39 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 436 Plan Maintenance SAL 136551
05/08/2003 07:30 05/08/2003 13:54 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 384 Plan Maintenance OLY 136552
05/08/2003 07:30 05/08/2003 13:54 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 384 Plan Maintenance OLY 136552
05/08/2003 07:43 05/08/2003 14:53 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 430 Plan Maintenance RED 136553
05/08/2003 08:01 05/08/2003 15:26 Bell-AVA Beacon No 5 230kV line 230.0 L 6.00 445 Plan Foreign Request SPK 136554
05/08/2003 08:09 05/08/2003 11:08 Bell-Addy No 1 115kV line 115.0 L G 51.18 179 Plan Maintenance SPK 136555
05/08/2003 08:09 05/08/2003 11:08 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S 22.34 179 Plan Maintenance SPK 136555
05/08/2003 08:22 05/08/2003 15:45 Sno-King-Maple Valley No 1 230kV line 230.0 L 24.84 443 Plan Maintenance SNO COV 136556
05/08/2003 08:48 05/08/2003 13:07 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S 18.43 259 Plan Maintenance TDA 136557
05/08/2003 08:48 05/08/2003 13:07 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 259 Plan Maintenance TDA 136557
05/08/2003 09:54 05/08/2003 09:54 Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 8.60 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T G 0.10 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 10.90 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 2.50 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 11.60 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 12.80 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 8.60 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Tillamook-PACW Astoria No 1 115kV line 115.0 L 57.70 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 09:54 05/08/2003 09:54 Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line 115.0 S G 2.70 0 Auto Foreign Trouble Foreign Trouble SAL 136558
05/08/2003 10:14 05/08/2003 10:15 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 1 Auto Construction Construction EUG 136559
05/08/2003 10:14 05/08/2003 10:15 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 1 Auto Construction Construction EUG 136559
05/08/2003 10:18 05/09/2003 12:49 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 1591 Plan Emergency EUG 136560
05/08/2003 10:18 05/09/2003 12:49 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 1591 Plan Emergency EUG 136560
05/08/2003 10:49 05/08/2003 16:11 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 322 Plan Maintenance SPK 136561
05/08/2003 23:11 05/09/2003 05:17 John Day-Marion No 1 500kV line 500.0 L 127.51 366 Plan Voltage Control TDA RED SAL 136562
05/09/2003 00:01 05/09/2003 05:43 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 342 Plan Voltage Control RED 136563
05/09/2003 06:00 05/09/2003 19:21 Raver-Paul No 1 500kV line 500.0 L 69.31 801 Plan Maintenance COV OLY 136564
05/09/2003 07:35 05/09/2003 13:02 Salem-Albany No 2 115kV line 115.0 L G 27.85 327 Plan Maintenance SAL EUG 136566
05/09/2003 07:35 05/09/2003 13:02 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 327 Plan Maintenance SAL 136566
05/09/2003 07:59 05/09/2003 13:59 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 360 Plan Maintenance EUG 136567
05/09/2003 08:55 05/09/2003 12:17 Fossil-Maupin 69kV line 69.0 L G 56.93 202 Plan Maintenance TDA 136568
05/09/2003 08:55 05/09/2003 12:17 Fossil-Muddy Ranch section of Fossil-Maupin 69kV line 69.0 S 14.77 202 Plan Maintenance TDA 136568
05/09/2003 12:01   Chenoweth-Goldendale No 1 115kV line 115.0 L G 24.08 still out Plan Normally Out TDA 136569
05/09/2003 12:01   Spearfish-Goldendale section of Chenoweth-Goldendale No 1 115kV line 115.0 S 20.24 still out Plan Normally Out TDA 136569
05/09/2003 18:13 05/09/2003 21:17 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 184 Plan Voltage Control RED 136570
05/09/2003 22:47 05/10/2003 07:58 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 551 Plan Voltage Control RED 136571
05/10/2003 00:32 05/12/2003 06:08 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 3216 Plan Voltage Control TRI WEN TDA LGV 136572
05/11/2003 00:01 05/11/2003 07:54 John Day-Marion No 1 500kV line 500.0 L 127.51 473 Plan Voltage Control TDA RED SAL 136573
05/11/2003 00:06 05/11/2003 15:48 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 942 Plan Voltage Control RED 136574
05/11/2003 12:55 05/11/2003 12:55 Covington-Columbia No 3 230kV line 230.0 L 110.00 0 Auto Unknown Unknown COV WEN 136576
05/11/2003 13:52 05/11/2003 13:52 Goshen-Drummond No 1 161kV line 161.0 L 72.75 0 Auto Lightning Weather IDF 136577
05/11/2003 23:56 05/12/2003 06:04 John Day-Marion No 1 500kV line 500.0 L 127.51 368 Plan Voltage Control TDA RED SAL 136578
05/12/2003 00:05 05/12/2003 05:58 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 353 Plan Voltage Control RED 136579
05/12/2003 01:19 05/15/2003 15:52 Schultz-Raver No 1 500kV line 500.0 L 77.24 5193 Plan Maintenance WEN COV 136580
05/12/2003 04:00 05/12/2003 04:02 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 2 Plan Switching TDA RED 136581
05/12/2003 04:00 05/12/2003 04:02 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 2 Plan Switching TDA 136581
05/12/2003 04:00 05/12/2003 04:02 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 2 Plan Switching TDA 136581
05/12/2003 04:00 05/12/2003 04:02 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 2 Plan Switching TDA 136581
05/12/2003 04:00 05/12/2003 04:02 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 2 Plan Switching TDA 136581
05/12/2003 04:00 05/12/2003 04:02 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 2 Plan Switching TDA 136581
05/12/2003 04:55 05/19/2003 16:04 Maple Valley-Massachusetts No 1 230kV line 230.0 L 12.14 10749 Plan Foreign Request COV 136586
05/12/2003 07:00 05/13/2003 12:31 Columbia-Grand Coulee No 1 230kV line 230.0 L 72.61 1771 Plan Foreign Request WEN 136587
05/12/2003 07:23 05/12/2003 16:07 Buckley-Marion No 1 500kV line 500.0 L 99.33 524 Plan Maintenance TDA RED SAL 136588
05/12/2003 07:31 05/14/2003 08:09 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 2918 Plan Maintenance OLY 136589
05/12/2003 07:35 05/12/2003 14:12 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 397 Plan Maintenance EUG 136590
05/12/2003 07:35 05/12/2003 14:12 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 397 Plan Maintenance EUG 136590
05/12/2003 08:10 05/12/2003 13:33 Hood River-The Dalles No 1 115kV line 115.0 L 16.02 323 Plan Maintenance TDA 136591
05/12/2003 08:39 05/12/2003 10:26 Franklin-Walla Walla No 1 115kV line 115.0 L G 35.95 107 Plan Maintenance TRI 136592
05/12/2003 08:39 05/12/2003 10:26 Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line 115.0 S 18.21 107 Plan Maintenance TRI 136592
05/12/2003 08:50 05/12/2003 15:43 Bell-AVA Beacon No 4 230kV line 230.0 L 5.90 413 Plan Maintenance SPK 136593
05/12/2003 09:02 05/13/2003 08:09 Longview-Allston No 3 230kV line 230.0 L 4.29 1387 Plan Construction LGV 136594
05/12/2003 09:35 05/12/2003 11:39 Columbia-Ellensburg No 1 115kV line 115.0 L G 34.98 124 Plan Maintenance WEN 136595
05/12/2003 09:35 05/12/2003 11:39 East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 1.09 124 Plan Maintenance WEN 136595
05/12/2003 10:07 05/12/2003 10:07 Beaver tap to Boyer-Tillamook No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown SAL 136596
05/12/2003 10:07 05/12/2003 10:07 Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line 115.0 S G 14.45 0 Auto Unknown Unknown SAL 136596
05/12/2003 10:07 05/12/2003 10:07 Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line 115.0 S G 12.44 0 Auto Unknown Unknown SAL 136596
05/12/2003 10:07 05/12/2003 10:07 Boyer-Tillamook No 1 115kV line 115.0 L 31.91 0 Auto Unknown Unknown SAL 136596
05/12/2003 10:07 05/12/2003 10:07 Hebo tap to Boyer-Tillamook No 1 115kV line 115.0 T G 0.04 0 Auto Unknown Unknown SAL 136596
05/12/2003 10:07 05/12/2003 10:07 Hebo-Beaver section of Boyer-Tillamook No 1 115kV line 115.0 S G 4.53 0 Auto Unknown Unknown SAL 136596
05/12/2003 10:07 05/12/2003 10:07 Nestucca-Hebo section of Boyer-Tillamook No 1 115kV line 115.0 S G 0.49 0 Auto Unknown Unknown SAL 136596
05/12/2003 13:01 05/12/2003 13:17 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S 54.70 16 Plan Switching RED 136597
05/12/2003 13:01 05/12/2003 13:17 Redmond-Harney No 1 115kV line 115.0 L G 125.40 16 Plan Switching RED 136597
05/12/2003 13:04 05/12/2003 13:19 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S 2.40 15 Plan Switching RED 136598
05/12/2003 13:04 05/12/2003 13:19 Redmond-Harney No 1 115kV line 115.0 L O 125.40 15 Plan Switching RED 136598
05/12/2003 14:15 05/12/2003 15:29 La Pine-Fort Rock No 1 115kV line 115.0 L 47.03 74 Plan Maintenance RED 136599
05/12/2003 14:22 05/12/2003 14:22 Potholes-Sand Dunes No 1 230kV line 230.0 L 14.00 0 Auto Lightning Lightning WEN 136600
05/12/2003 15:26 05/12/2003 16:59 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 93 Plan Maintenance WEN TRI 136601
05/12/2003 15:26 05/12/2003 16:59 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 93 Plan Maintenance WEN TRI 136601
05/12/2003 15:34   Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T 31.20 still out Plan Normally Out RED 140641
05/12/2003 15:34   Redmond-Harney No 1 115kV line 115.0 L T 125.40 still out Plan Normally Out RED 140641
05/12/2003 23:00 05/13/2003 05:55 John Day-Marion No 1 500kV line 500.0 L 127.51 415 Plan Voltage Control TDA RED SAL 136602
05/12/2003 23:00 05/12/2003 23:21 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 21 Plan Switching TDA RED 136603
05/12/2003 23:00 05/12/2003 23:21 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 21 Plan Switching TDA 136603
05/12/2003 23:00 05/12/2003 23:21 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 21 Plan Switching TDA 136603
05/12/2003 23:00 05/12/2003 23:21 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 21 Plan Switching TDA 136603
05/12/2003 23:00 05/12/2003 23:21 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 21 Plan Switching TDA 136603
05/12/2003 23:00 05/12/2003 23:21 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 21 Plan Switching TDA 136603
05/13/2003 00:20 05/13/2003 05:27 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 307 Plan Voltage Control RED 136604
05/13/2003 07:21 05/13/2003 14:27 Buckley-Marion No 1 500kV line 500.0 L 99.33 426 Plan Maintenance TDA RED SAL 136606
05/13/2003 07:30 05/13/2003 14:43 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 433 Plan Maintenance EUG 136607
05/13/2003 07:30 05/13/2003 14:43 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 433 Plan Maintenance EUG 136607
05/13/2003 07:38 05/15/2003 12:21 Bell-AVA Beacon No 5 230kV line 230.0 L 6.00 3163 Plan Foreign Request SPK 136608
05/13/2003 08:43 05/13/2003 15:20 Libby PH-Libby No 1 230kV line 230.0 L 1.35 397 Plan Foreign Request KAL 136609
05/13/2003 11:13 05/13/2003 14:31 Coyote Springs-Slatt No 1 500kV line 500.0 L 28.09 198 Plan Forced TRI TDA 136610
05/14/2003 00:02 05/14/2003 05:12 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 310 Plan Voltage Control TRI WEN TDA LGV 136611
05/14/2003 01:38 05/14/2003 05:57 John Day-Marion No 1 500kV line 500.0 L 127.51 259 Plan Voltage Control TDA RED SAL 136612
05/14/2003 03:54 05/14/2003 03:58 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 4 Plan Switching TDA RED 136613
05/14/2003 03:54 05/14/2003 03:58 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 4 Plan Switching TDA 136613
05/14/2003 03:54 05/14/2003 03:58 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 4 Plan Switching TDA 136613
05/14/2003 03:54 05/14/2003 03:58 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 4 Plan Switching TDA 136613
05/14/2003 03:54 05/14/2003 03:58 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 4 Plan Switching TDA 136613
05/14/2003 03:54 05/14/2003 03:58 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 4 Plan Switching TDA 136613
05/14/2003 07:22 05/14/2003 14:53 Buckley-Marion No 1 500kV line 500.0 L 99.33 451 Plan Maintenance TDA RED SAL 136619
05/14/2003 07:28 05/14/2003 11:59 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 271 Plan Maintenance EUG 136620
05/14/2003 07:28 05/14/2003 11:59 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 271 Plan Maintenance EUG 136620
05/14/2003 07:34 05/16/2003 09:03 Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line 115.0 S 12.85 2969 Plan Maintenance OLY 136621
05/14/2003 07:34 05/16/2003 09:03 Shelton-Fairmount No 1 115kV line 115.0 L G 60.23 2969 Plan Maintenance OLY 136621
05/14/2003 08:08 05/14/2003 12:55 Bonneville PH 1-Hood River No 1 115kV line 115.0 L O 22.61 287 Plan Maintenance LGV TDA 136622
05/14/2003 08:08 05/14/2003 12:55 Cascade Locks-Hood River section of Bonneville PH 1-Hood River No 1 115kV line 115.0 S 16.64 287 Plan Maintenance TDA 136622
05/14/2003 08:43 05/16/2003 13:12 Midway-Benton No 1 115kV line 115.0 L G 28.75 3149 Plan Maintenance TRI 136623
05/14/2003 08:43 05/16/2003 13:12 Midway-Scooteney section of Midway-Benton No 1 115kV line 115.0 S 13.90 3149 Plan Maintenance TRI 136623
05/14/2003 08:55 05/23/2003 10:26 Midway-Benton No 1 115kV line 115.0 L T 28.75 13051 Plan Maintenance TRI 136624
05/14/2003 08:55 05/23/2003 10:26 Scooteney tap-Sagehill section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS 15.05 13051 Plan Maintenance TRI 136624
05/14/2003 09:01 05/16/2003 13:21 Midway-Benton No 1 115kV line 115.0 L O 28.75 3140 Plan Maintenance TRI 136625
05/14/2003 09:01 05/16/2003 13:21 Scooteney-Benton section of Midway-Benton No 1 115kV line 115.0 S 14.85 3140 Plan Maintenance TRI 136625
05/14/2003 11:12 05/15/2003 14:42 Lane-Wendson No 1 115kV line 115.0 L G 41.39 1650 Plan Emergency EUG 136626
05/14/2003 11:12 05/15/2003 14:42 Mapleton-Wendson section of Lane-Wendson No 1 115kV line 115.0 S 8.00 1650 Plan Emergency EUG 136626
05/14/2003 14:08 05/15/2003 22:34 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 1946 Auto Terminal Equipment Failure TDA RED 136657
05/14/2003 14:08 05/14/2003 14:33 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 25 Auto Terminal Equipment Failure TDA 136657
05/14/2003 14:08 05/15/2003 22:34 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 1946 Auto Terminal Equipment Failure TDA 136657
05/14/2003 14:08 05/14/2003 14:33 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 25 Auto Terminal Equipment Failure TDA 136657
05/14/2003 14:08 05/14/2003 14:33 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 25 Auto Terminal Equipment Failure TDA 136657
05/14/2003 17:17 05/14/2003 17:23 Libby PH-Libby No 2 230kV line 230.0 L 1.29 6 Auto RAS Initiated RAS Initiated KAL 136628
05/14/2003 17:17 05/14/2003 17:17 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.01 0 Auto Lightning Lightning KAL 136629
05/14/2003 17:17 05/14/2003 17:17 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S G 31.50 0 Auto Lightning Lightning KAL 136629
05/14/2003 17:17 05/14/2003 17:17 Libby-Conkelley No 1 230kV line 230.0 L 83.94 0 Auto Lightning Lightning KAL 136629
05/14/2003 17:17 05/14/2003 17:17 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S G 45.10 0 Auto Lightning Lightning KAL 136629
05/14/2003 17:17 05/14/2003 17:17 Trumbull Creek tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 136629
05/14/2003 17:17 05/14/2003 17:17 Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line 230.0 S G 7.34 0 Auto Lightning Lightning KAL 136629
05/14/2003 21:44 05/14/2003 21:48 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 4 Auto Human Element TDA RED 136630
05/14/2003 21:44 05/14/2003 21:48 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Auto Human Element TDA 136630
05/14/2003 21:45 05/14/2003 21:48 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 3 Auto Human Element TDA RED 136631
05/14/2003 21:45 05/14/2003 21:48 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 3 Auto Human Element TDA 136631
05/14/2003 21:45 05/14/2003 21:48 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 3 Auto Human Element TDA 136631
05/14/2003 21:45 05/14/2003 21:48 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 3 Auto Human Element TDA 136631
05/14/2003 22:24 05/14/2003 22:24 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Plan Switching TDA RED 136632
05/14/2003 22:24 05/14/2003 22:24 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Plan Switching TDA 136632
05/14/2003 22:24 05/14/2003 22:24 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Plan Switching TDA 136632
05/14/2003 22:24 05/14/2003 22:24 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Plan Switching TDA 136632
05/14/2003 22:24 05/14/2003 22:24 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Plan Switching TDA 136632
05/14/2003 22:24 05/14/2003 22:24 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Plan Switching TDA 136632
05/15/2003 00:57 05/15/2003 05:52 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 295 Plan Voltage Control RED 136633
05/15/2003 05:15 05/15/2003 05:18 Lower Monumental-Ashe No 1 500kV line 500.0 L 39.58 3 Auto Unknown Unknown TRI 136634
05/15/2003 05:15 05/15/2003 05:18 Ashe-Slatt No 1 500kV line 500.0 L 72.24 3 Auto Forced (Configuration) Forced (Configuration) TRI TDA 136635
05/15/2003 07:25 05/15/2003 14:39 Buckley-Marion No 1 500kV line 500.0 L 99.33 434 Plan Maintenance TDA RED SAL 136640
05/15/2003 08:15 05/15/2003 20:13 Sno-King-Maple Valley No 1 230kV line 230.0 L 24.84 718 Plan Construction SNO COV 136641
05/15/2003 08:32 05/15/2003 08:32 La Pine-Fort Rock No 1 115kV line 115.0 L 47.03 0 Auto Unknown Unknown RED 136642
05/15/2003 18:46 05/15/2003 18:58 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 12 Auto Foreign Trouble TDA RED 136643
05/15/2003 18:46 05/15/2003 18:58 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 12 Auto Foreign Trouble TDA 136643
05/15/2003 18:46 05/15/2003 18:50 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 4 Auto Foreign Trouble TDA 136643
05/15/2003 18:46 05/15/2003 18:50 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 4 Auto Foreign Trouble TDA 136643
05/15/2003 20:02 05/15/2003 20:31 PACW Merwin-St Johns No 1 115kV line 115.0 L G 31.10 29 Plan Foreign Request OLY 136644
05/15/2003 20:02 05/15/2003 20:31 View-St Johns section of PACW Merwin-St Johns No 1 115kV line 115.0 S 26.90 29 Plan Foreign Request OLY 136644
05/16/2003 00:04 05/16/2003 13:57 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 833 Plan Foreign Request OLY 136645
05/16/2003 00:04 05/16/2003 13:57 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 833 Plan Foreign Request OLY 136645
05/16/2003 07:07 05/16/2003 14:59 Raver-Covington No 1 500kV line 500.0 L 10.28 472 Plan Maintenance COV 136648
05/16/2003 07:18 05/16/2003 14:35 Buckley-Marion No 1 500kV line 500.0 L 99.33 437 Plan Maintenance TDA RED SAL 136649
05/16/2003 07:51 05/16/2003 13:56 Albany-Lebanon No 1 115kV line 115.0 L G 17.01 365 Plan Maintenance EUG 136650
05/16/2003 07:51 05/16/2003 13:56 Albany-Lochner section of Albany-Lebanon No 1 115kV line 115.0 S 2.43 365 Plan Maintenance EUG 136650
05/16/2003 07:55 05/16/2003 14:26 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 391 Plan Maintenance EUG 136651
05/16/2003 07:55 05/16/2003 14:26 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 391 Plan Maintenance EUG 136651
05/16/2003 08:51 07/23/2003 14:14 Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 L G 45.05 98243 Plan Maintenance LGV 137099
05/16/2003 08:51 07/23/2003 14:14 Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 S 40.44 98243 Plan Maintenance LGV 137099
05/17/2003 00:03 05/17/2003 07:13 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 430 Plan Voltage Control RED 136652
05/17/2003 02:23 05/17/2003 08:02 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 339 Plan Voltage Control TRI WEN TDA LGV 136653
05/17/2003 15:31 05/17/2003 15:31 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 0 Auto Lightning Unknown SPK 136686
05/17/2003 15:31 05/17/2003 15:31 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 0 Auto Lightning Unknown SPK 136686
05/17/2003 15:31 05/17/2003 15:31 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 0 Auto Lightning Unknown SPK 136686
05/17/2003 15:31 05/17/2003 15:31 Bell-Boundary No 3 230kV line 230.0 L 108.07 0 Auto Lightning Unknown SPK 136686
05/17/2003 16:46 05/17/2003 16:49 Raver-Covington No 1 500kV line 500.0 L 10.28 3 Auto Lightning Lightning COV 136659
05/18/2003 00:10 05/18/2003 06:13 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 363 Plan Voltage Control TRI WEN TDA LGV 136660
05/18/2003 00:23 05/18/2003 20:00 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1177 Plan Voltage Control RED 136661
05/18/2003 14:14 05/18/2003 14:14 Garrison-Taft No 1 500kV line 500.0 L 159.38 0 Auto Lightning Weather KAL 136662
05/18/2003 23:38 05/19/2003 05:09 Ashe-Marion No 2 500kV line 500.0 L 224.01 331 Plan Voltage Control TRI TDA RED SAL 136663
05/19/2003 00:29 05/19/2003 19:38 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1149 Plan Maintenance RED 136664
05/19/2003 07:14 05/19/2003 17:02 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 588 Plan Maintenance RED 136672
05/19/2003 07:33 05/22/2003 08:57 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 4404 Plan Maintenance EUG 136673
05/19/2003 07:33 05/22/2003 08:57 Fairview-Norway section of Fairview-Bandon No 1 115kV line 115.0 S 12.59 4404 Plan Maintenance EUG 136673
05/19/2003 07:41 05/19/2003 15:47 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 486 Plan Maintenance OLY 136674
05/19/2003 07:41 05/19/2003 15:47 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 486 Plan Maintenance OLY 136674
05/19/2003 07:45 05/19/2003 15:29 Station X-Station H No 1 115kV line 115.0 L 0.26 464 Plan Construction OLY 136675
05/19/2003 07:58 05/23/2003 10:26 Eagle Lake tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT G 0.10 5908 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 10:26 Eagle Lake-Radar section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS G 1.92 5908 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 11:31 Midway-Benton No 1 115kV line 115.0 L 28.75 5973 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 11:31 Midway-Scooteney section of Midway-Benton No 1 115kV line 115.0 S 13.90 5973 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 10:26 Radar USBR tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT G 1.94 5908 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 10:26 Radar-Scooteney section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS G 7.25 5908 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 10:26 Sagehill tap to Scooteney tap to Midway-Benton No 1 115kV line 115.0 TT G 3.20 5908 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 10:26 Sagehill-Eagle Lake section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS G 4.24 5908 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 10:26 Scooteney tap to Midway-Benton No 1 115kV line 115.0 T 28.46 5908 Plan Maintenance TRI 136676
05/19/2003 07:58 05/23/2003 10:26 Scooteney-Benton section of Midway-Benton No 1 115kV line 115.0 S 14.85 5908 Plan Maintenance TRI 136676
05/19/2003 08:02 05/19/2003 16:46 Covington-Maple Valley No 2 230kV line 230.0 L 16.22 524 Plan Maintenance COV 136677
05/19/2003 08:07 05/19/2003 14:26 Lane-Wendson No 2 230kV line 230.0 L 41.03 379 Plan Maintenance EUG 136678
05/19/2003 08:13 05/19/2003 14:41 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 388 Plan Maintenance OLY 136679
05/19/2003 08:13 05/19/2003 14:41 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 388 Plan Maintenance OLY 136679
05/19/2003 08:23 05/22/2003 09:41 Creston-Bell No 1 115kV line 115.0 L G 53.80 4398 Plan Maintenance WEN SPK 136680
05/19/2003 08:23 05/22/2003 09:41 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 4398 Plan Maintenance SPK 136680
05/19/2003 08:38 05/22/2003 13:51 McNary-Franklin No 2 230kV line 230.0 L 26.88 4633 Plan Maintenance TRI 136722
05/19/2003 09:03 05/22/2003 10:13 Chehalis-Centralia No 1 69kV line 69.0 L 11.05 4390 Plan Maintenance OLY 136681
05/19/2003 09:19 05/21/2003 14:55 Allston-Astoria No 1 115kV line 115.0 L G 41.98 3216 Plan Maintenance LGV 136682
05/19/2003 09:19 05/21/2003 14:55 Mist-Naselle section of Allston-Astoria No 1 115kV line 115.0 S 7.90 3216 Plan Maintenance LGV 136682
05/19/2003 23:44 05/20/2003 06:15 John Day-Marion No 1 500kV line 500.0 L 127.51 391 Plan Voltage Control TDA RED SAL 136683
05/20/2003 03:04 05/20/2003 03:04 Lower Monumental-McNary No 1 500kV line 500.0 L 64.75 0 Auto Unknown Lightning TRI 136684
05/20/2003 03:04 05/20/2003 03:04 Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line 500.0 S G 26.64 0 Auto Unknown Lightning TRI 136684
05/20/2003 03:04 05/20/2003 03:04 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T G 6.07 0 Auto Unknown Lightning TRI 136684
05/20/2003 03:04 05/20/2003 03:04 Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line 500.0 S G 38.11 0 Auto Unknown Lightning TRI 136684
05/20/2003 03:21 05/20/2003 05:31 Marion-Lane No 1 500kV line 500.0 L 68.97 130 Plan Voltage Control SAL EUG 136685
05/20/2003 06:25 05/20/2003 06:25 Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 18.26 0 Auto Unknown Unknown RED 136691
05/20/2003 06:25 05/20/2003 06:25 Grizzly-Summer Lake No 1 500kV line 500.0 L 103.37 0 Auto Unknown Unknown RED 136691
05/20/2003 06:25 05/20/2003 06:25 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T G 0.01 0 Auto Unknown Unknown RED 136691
05/20/2003 06:25 05/20/2003 06:25 Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 85.11 0 Auto Unknown Unknown RED 136691
05/20/2003 07:02 05/21/2003 19:40 Covington-White River No 1 230kV line 230.0 L 9.55 2198 Plan Maintenance COV 136692
05/20/2003 07:35 05/20/2003 17:21 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 586 Plan Maintenance RED 136693
05/20/2003 07:37 05/20/2003 16:25 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 528 Plan Maintenance OLY 136694
05/20/2003 07:37 05/20/2003 16:25 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 528 Plan Maintenance OLY 136694
05/20/2003 07:47 05/20/2003 13:32 B408-Jenkins section of Columbia-Ellensburg No 1 115kV line 115.0 S 23.63 345 Plan Maintenance WEN 136695
05/20/2003 07:47 05/20/2003 13:32 Columbia-Ellensburg No 1 115kV line 115.0 L G 34.98 345 Plan Maintenance WEN 136695
05/20/2003 07:54 05/20/2003 15:26 Kitsap-Station X No 1 115kV line 115.0 L 3.63 452 Plan Maintenance OLY 136696
05/20/2003 08:05 05/20/2003 14:22 Lane-Wendson No 2 230kV line 230.0 L 41.03 377 Plan Maintenance EUG 136697
05/20/2003 08:07 05/21/2003 09:38 Eugene-Lane No 1 115kV line 115.0 L 5.47 1531 Plan Construction EUG 136698
05/20/2003 09:01 05/20/2003 11:17 Snohomish-Beverly Park No 4 115kV line 115.0 L 5.00 136 Plan Foreign Request SNO 136699
05/20/2003 11:11 05/23/2003 14:15 Frederickson-South Tacoma No 1 230kV line 230.0 L 0.50 4504 Plan Foreign Request SNO COV 136700
05/20/2003 22:52 05/21/2003 06:07 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 435 Plan Voltage Control RED 136701
05/20/2003 22:52 05/20/2003 22:58 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 6 Auto Terminal Equipment Failure Terminal Equipment Failure RED 136702
05/21/2003 00:05 05/21/2003 05:42 Ashe-Marion No 2 500kV line 500.0 L 224.01 337 Plan Voltage Control TRI TDA RED SAL 136703
05/21/2003 02:09 05/21/2003 05:13 John Day-Grizzly No 1 500kV line 500.0 L 88.41 184 Plan Voltage Control TDA RED 136704
05/21/2003 02:31 05/21/2003 02:31 Vantage-Schultz No 1 500kV line 500.0 L 34.65 0 Auto Unknown Weather WEN 136705
05/21/2003 05:18 05/21/2003 05:18 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 136711
05/21/2003 05:18 05/21/2003 05:18 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 136711
05/21/2003 05:18 05/21/2003 05:18 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136711
05/21/2003 05:18 05/21/2003 05:18 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 136711
05/21/2003 05:18 05/21/2003 05:18 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 136711
05/21/2003 05:18 05/21/2003 05:18 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 136711
05/21/2003 05:18 05/21/2003 05:18 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 136711
05/21/2003 05:18 05/21/2003 05:18 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 136711
05/21/2003 06:08 05/21/2003 06:42 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 34 Plan Voltage Control RED 136712
05/21/2003 07:07 05/21/2003 17:31 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 624 Plan Maintenance RED 136713
05/21/2003 07:37 05/21/2003 15:19 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 462 Plan Maintenance OLY 136714
05/21/2003 07:37 05/21/2003 15:19 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 462 Plan Maintenance OLY 136714
05/21/2003 07:46 05/21/2003 15:04 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 438 Plan Maintenance SAL 136715
05/21/2003 07:46 05/21/2003 15:04 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 438 Plan Maintenance SAL 136715
05/21/2003 08:06 05/21/2003 12:54 Sno-King-Maple Valley No 2 230kV line 230.0 L 24.91 288 Plan Maintenance SNO COV 136716
05/21/2003 08:10 05/21/2003 14:28 Albany-Burnt Woods No 1 115kV line 115.0 L 25.77 378 Plan Maintenance EUG 136717
05/21/2003 23:13 05/22/2003 06:07 John Day-Marion No 1 500kV line 500.0 L 127.51 414 Plan Voltage Control TDA RED SAL 136718
05/21/2003 23:24 05/24/2003 10:27 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 3543 Plan Foreign Request OLY 136719
05/22/2003 00:39 05/22/2003 05:35 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 296 Plan Voltage Control RED 136720
05/22/2003 07:03 05/22/2003 14:48 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 465 Plan Maintenance RED 136723
05/22/2003 07:45 05/22/2003 15:56 Napavine-Allston No 1 500kV line 500.0 L 37.41 491 Plan Maintenance OLY LGV 136724
05/22/2003 07:47 05/22/2003 15:18 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 451 Plan Maintenance OLY 136725
05/22/2003 07:47 05/22/2003 15:18 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 451 Plan Maintenance OLY 136725
05/22/2003 07:55 05/22/2003 15:01 Salem-Albany No 1 115kV line 115.0 L 23.90 426 Plan Maintenance SAL EUG 136726
05/22/2003 08:44 05/22/2003 14:36 Covington-Maple Valley No 2 230kV line 230.0 L 16.22 352 Plan Construction COV 136727
05/22/2003 09:35 05/22/2003 14:26 Blue River-Thurston section of Cougar-Thurston No 1 115kV line 115.0 S 34.24 291 Plan Maintenance EUG 136728
05/22/2003 09:35 05/22/2003 14:26 Cougar-Thurston No 1 115kV line 115.0 L G 39.99 291 Plan Maintenance EUG 136728
05/22/2003 14:00 05/22/2003 14:07 Lower Monumental-McNary No 1 500kV line 500.0 L 64.75 7 Plan Construction TRI 136729
05/22/2003 14:00 05/22/2003 14:07 Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line 500.0 S G 26.64 7 Plan Construction TRI 136729
05/22/2003 14:00 05/22/2003 14:07 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T G 6.07 7 Plan Construction TRI 136729
05/22/2003 14:00 05/22/2003 14:07 Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line 500.0 S G 38.11 7 Plan Construction TRI 136729
05/22/2003 23:59 05/23/2003 06:01 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 362 Plan Voltage Control RED 136730
05/23/2003 01:02 05/23/2003 05:51 John Day-Marion No 1 500kV line 500.0 L 127.51 289 Plan Voltage Control TDA RED SAL 136731
05/23/2003 07:00 05/23/2003 13:45 Covington-White River No 1 230kV line 230.0 L 9.55 405 Plan Maintenance COV 136735
05/23/2003 07:45 05/23/2003 11:38 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 233 Plan Maintenance OLY 136736
05/23/2003 07:45 05/23/2003 11:38 Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line 115.0 S 14.91 233 Plan Maintenance OLY 136736
05/23/2003 08:00 05/23/2003 16:18 Salem-Albany No 1 115kV line 115.0 L 23.90 498 Plan Maintenance SAL EUG 136737
05/23/2003 11:26 11/16/2003 06:13 Midway-Benton No 1 115kV line 115.0 L T 28.75 254627 Plan Maintenance TRI 136738
05/23/2003 11:26 11/16/2003 06:13 Radar-Scooteney section of Scooteney tap to Midway-Benton No 1 115kV line 115.0 TS 7.25 254627 Plan Maintenance TRI 136738
05/23/2003 12:32 05/23/2003 14:22 Chehalis-Mayfield No 1 230kV line 230.0 L G 21.37 110 Auto Terminal Equipment Failure Improper Relaying OLY 136739
05/23/2003 12:32 05/23/2003 14:22 Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line 230.0 S 20.20 110 Auto Terminal Equipment Failure Improper Relaying OLY 136739
05/23/2003 12:32 05/23/2003 21:01 Silver Creek tap to Chehalis-Mayfield No 1 230kV line 230.0 T 0.10 509 Auto Terminal Equipment Failure Improper Relaying OLY 136739
05/23/2003 12:32 05/23/2003 14:22 Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line 230.0 S 1.17 110 Auto Terminal Equipment Failure Improper Relaying OLY 136739
05/24/2003 00:12 05/24/2003 07:31 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 439 Plan Voltage Control RED 136740
05/24/2003 02:21 05/24/2003 07:09 John Day-Marion No 1 500kV line 500.0 L 127.51 288 Plan Voltage Control TDA RED SAL 136741
05/24/2003 16:00 05/24/2003 16:00 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Unknown Unknown TDA 137015
05/24/2003 16:33 05/24/2003 16:33 Lagoon-Stateline section of Walla Walla-Pendleton No 1 69kV line 69.0 S 3.63 0 Auto Lightning Lightning TRI 136809
05/24/2003 16:33 05/24/2003 16:33 Milton tap-Weston Mountain section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS 4.99 0 Auto Lightning Lightning TRI 136809
05/24/2003 16:33 05/24/2003 16:33 Milton-Lagoon section of Walla Walla-Pendleton No 1 69kV line 69.0 S 1.06 0 Auto Lightning Lightning TRI 136809
05/24/2003 16:33 05/24/2003 16:33 Stateline tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 1.31 0 Auto Lightning Lightning TRI 136809
05/24/2003 16:33 05/24/2003 16:33 Stateline-Vansycle section of Walla Walla-Pendleton No 1 69kV line 69.0 S 4.62 0 Auto Lightning Lightning TRI 136809
05/24/2003 16:33 05/24/2003 16:33 Walla Walla-Milton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 9.55 0 Auto Lightning Lightning TRI 136809
05/24/2003 16:33 05/24/2003 16:33 Walla Walla-Pendleton No 1 69kV line 69.0 L O 38.93 0 Auto Lightning Lightning TRI 136809
05/24/2003 18:02 05/24/2003 18:02 Benton-Franklin No 2 115kV line 115.0 L 21.03 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:02 05/24/2003 18:02 Benton-Glade section of Benton-Franklin No 2 115kV line 115.0 S G 11.94 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:02 05/24/2003 18:02 Glade tap to Benton-Franklin No 2 115kV line 115.0 T G 0.03 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:02 05/24/2003 18:02 Glade-Franklin section of Benton-Franklin No 2 115kV line 115.0 S G 9.09 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:02 05/24/2003 18:02 North Pasco tap to Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TT G 0.10 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:02 05/24/2003 18:02 North Pasco-Taylor Flats section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS G 7.10 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:02 05/24/2003 18:02 Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 T G 8.63 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:02 05/24/2003 18:02 Taylor Flats tap-North Pasco section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS G 1.52 0 Auto Lightning Lightning TRI 136810
05/24/2003 18:05 05/24/2003 18:05 Baxter tap to Benton-Franklin No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning TRI 136811
05/24/2003 18:05 05/24/2003 18:05 Baxter-Franklin section of Benton-Franklin No 1 115kV line 115.0 S G 15.96 0 Auto Lightning Lightning TRI 136811
05/24/2003 18:05 05/24/2003 18:05 Benton-Baxter section of Benton-Franklin No 1 115kV line 115.0 S G 5.07 0 Auto Lightning Lightning TRI 136811
05/24/2003 18:05 05/24/2003 18:05 Benton-Franklin No 1 115kV line 115.0 L 21.03 0 Auto Lightning Lightning TRI 136811
05/24/2003 18:05 05/24/2003 18:05 Benton-Franklin No 2 115kV line 115.0 L 21.03 0 Auto Lightning Lightning TRI 136812
05/24/2003 18:05 05/24/2003 18:05 Benton-Glade section of Benton-Franklin No 2 115kV line 115.0 S G 11.94 0 Auto Lightning Lightning TRI 136812
05/24/2003 18:05 05/24/2003 18:05 Glade tap to Benton-Franklin No 2 115kV line 115.0 T G 0.03 0 Auto Lightning Lightning TRI 136812
05/24/2003 18:05 05/24/2003 18:05 Glade-Franklin section of Benton-Franklin No 2 115kV line 115.0 S G 9.09 0 Auto Lightning Lightning TRI 136812
05/24/2003 18:05 05/24/2003 18:05 North Pasco tap to Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TT G 0.10 0 Auto Lightning Lightning TRI 136812
05/24/2003 18:05 05/24/2003 18:05 North Pasco-Taylor Flats section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS G 7.10 0 Auto Lightning Lightning TRI 136812
05/24/2003 18:05 05/24/2003 18:05 Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 T G 8.63 0 Auto Lightning Lightning TRI 136812
05/24/2003 18:05 05/24/2003 18:05 Taylor Flats tap-North Pasco section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS G 1.52 0 Auto Lightning Lightning TRI 136812
05/24/2003 19:16 05/24/2003 19:16 Bell-Addy No 1 115kV line 115.0 L 51.18 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Bell-Mead section of Bell-Addy No 1 115kV line 115.0 S G 2.95 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Clayton tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Clayton-Loon Lake section of Bell-Addy No 1 115kV line 115.0 S G 6.27 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Colbert tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Colbert-Half Moon section of Bell-Addy No 1 115kV line 115.0 S G 0.04 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Deer Park tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Deer Park-Clayton section of Bell-Addy No 1 115kV line 115.0 S G 5.19 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Half Moon tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Half Moon-Tum Tum section of Bell-Addy No 1 115kV line 115.0 S G 1.75 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Loon Lake tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S G 22.34 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Mead tap to Bell-Addy No 1 115kV line 115.0 T G 0.18 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Mead-Colbert section of Bell-Addy No 1 115kV line 115.0 S G 4.95 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Milan tap to Bell-Addy No 1 115kV line 115.0 T G 8.22 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Milan-Deer Park section of Bell-Addy No 1 115kV line 115.0 S G 1.97 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Tum Tum tap to Bell-Addy No 1 115kV line 115.0 T G 10.50 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 19:16 05/24/2003 19:16 Tum Tum-Milan section of Bell-Addy No 1 115kV line 115.0 S G 5.72 0 Auto Foreign Trouble Foreign Utility SPK 136813
05/24/2003 20:05 05/24/2003 20:05 Clarkston tap to Walla Walla-North Lewiston No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning TRI 136814
05/24/2003 20:05 05/24/2003 20:05 Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S G 3.71 0 Auto Lightning Lightning TRI 136814
05/24/2003 20:05 05/24/2003 20:05 Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning TRI 136814
05/24/2003 20:05 05/24/2003 20:05 Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S G 24.00 0 Auto Lightning Lightning TRI 136814
05/24/2003 20:05 05/24/2003 20:05 Walla Walla-North Lewiston No 1 115kV line 115.0 L 80.80 0 Auto Lightning Lightning TRI 136814
05/24/2003 20:05 05/24/2003 20:05 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S G 53.10 0 Auto Lightning Lightning TRI 136814
05/24/2003 20:15 05/24/2003 20:15 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136815
05/24/2003 20:15 05/24/2003 20:15 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 19.40 0 Auto Lightning Lightning SPK 136815
05/24/2003 20:15 05/24/2003 20:15 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L 52.68 0 Auto Lightning Lightning SPK 136815
05/24/2003 20:15 05/24/2003 20:15 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 1.30 0 Auto Lightning Lightning SPK 136815
05/24/2003 20:15 05/24/2003 20:15 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136815
05/24/2003 20:15 05/24/2003 20:15 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 5.80 0 Auto Lightning Lightning SPK 136815
05/24/2003 20:22 05/24/2003 20:22 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136816
05/24/2003 20:22 05/24/2003 20:22 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 19.40 0 Auto Lightning Lightning SPK 136816
05/24/2003 20:22 05/24/2003 20:22 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L 52.68 0 Auto Lightning Lightning SPK 136816
05/24/2003 20:22 05/24/2003 20:22 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 1.30 0 Auto Lightning Lightning SPK 136816
05/24/2003 20:22 05/24/2003 20:22 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136816
05/24/2003 20:22 05/24/2003 20:22 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 5.80 0 Auto Lightning Lightning SPK 136816
05/24/2003 20:27 05/24/2003 20:27 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136817
05/24/2003 20:27 05/24/2003 20:27 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 19.40 0 Auto Lightning Lightning SPK 136817
05/24/2003 20:27 05/24/2003 20:27 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L 52.68 0 Auto Lightning Lightning SPK 136817
05/24/2003 20:27 05/24/2003 20:27 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 1.30 0 Auto Lightning Lightning SPK 136817
05/24/2003 20:27 05/24/2003 20:27 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136817
05/24/2003 20:27 05/24/2003 20:27 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 5.80 0 Auto Lightning Lightning SPK 136817
05/24/2003 20:35 05/24/2003 20:35 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136818
05/24/2003 20:35 05/24/2003 20:35 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 19.40 0 Auto Lightning Lightning SPK 136818
05/24/2003 20:35 05/24/2003 20:35 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L 52.68 0 Auto Lightning Lightning SPK 136818
05/24/2003 20:35 05/24/2003 20:35 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 1.30 0 Auto Lightning Lightning SPK 136818
05/24/2003 20:35 05/24/2003 20:35 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 136818
05/24/2003 20:35 05/24/2003 20:35 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 5.80 0 Auto Lightning Lightning SPK 136818
05/24/2003 20:38 05/24/2003 20:38 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T 2.39 0 Auto Lightning Weather SPK 136819
05/24/2003 20:38 05/24/2003 20:38 Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line 115.0 S 4.75 0 Auto Lightning Weather SPK 136819
05/24/2003 20:38 05/24/2003 20:38 Colville-Boundary No 1 115kV line 115.0 L O 43.06 0 Auto Lightning Weather SPK 136819
05/24/2003 20:38 05/24/2003 20:38 Colville-Spirit section of Colville-Boundary No 1 115kV line 115.0 S 17.42 0 Auto Lightning Weather SPK 136819
05/24/2003 20:38 05/24/2003 20:38 Metaline Falls tap to Colville-Boundary No 1 115kV line 115.0 T 1.20 0 Auto Lightning Weather SPK 136819
05/24/2003 20:38 05/24/2003 20:38 Spirit tap to Colville-Boundary No 1 115kV line 115.0 T 5.23 0 Auto Lightning Weather SPK 136819
05/24/2003 20:38 05/24/2003 20:38 Spirit-Box Canyon section of Colville-Boundary No 1 115kV line 115.0 S 11.98 0 Auto Lightning Weather SPK 136819
05/24/2003 20:47 05/24/2003 20:47 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 17.09 0 Auto Lightning Lightning KAL 136820
05/24/2003 20:47 05/24/2003 20:47 Libby-Bonners Ferry No 1 115kV line 115.0 L 59.58 0 Auto Lightning Lightning KAL SPK 136820
05/24/2003 20:47 05/24/2003 20:47 Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.27 0 Auto Lightning Lightning KAL 136820
05/24/2003 20:47 05/24/2003 20:47 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 6.23 0 Auto Lightning Lightning SPK 136820
05/24/2003 20:47 05/24/2003 20:47 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.41 0 Auto Lightning Lightning KAL 136820
05/24/2003 20:47 05/24/2003 20:47 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 11.58 0 Auto Lightning Lightning KAL SPK 136820
05/24/2003 23:20 05/25/2003 08:54 John Day-Marion No 1 500kV line 500.0 L 127.51 574 Plan Voltage Control TDA RED SAL 136821
05/25/2003 00:01 05/25/2003 13:18 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 797 Plan Voltage Control RED 136822
05/25/2003 01:27 05/25/2003 08:03 Schultz-Raver No 1 500kV line 500.0 L 77.24 396 Plan Voltage Control WEN COV 136823
05/25/2003 01:45 05/25/2003 06:38 Marion-Lane No 1 500kV line 500.0 L 68.97 293 Plan Voltage Control SAL EUG 136824
05/25/2003 15:30 05/25/2003 15:31 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning KAL 136829
05/25/2003 15:30 05/25/2003 15:31 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 1 Auto Lightning Lightning KAL 136829
05/25/2003 15:30 05/25/2003 15:31 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 1 Auto Lightning Lightning KAL 136829
05/25/2003 15:30 05/25/2003 15:31 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 1 Auto Lightning Lightning KAL 136829
05/25/2003 15:32 05/25/2003 15:32 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.01 0 Auto Lightning Lightning KAL 136830
05/25/2003 15:32 05/25/2003 15:32 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S G 31.50 0 Auto Lightning Lightning KAL 136830
05/25/2003 15:32 05/25/2003 15:32 Libby-Conkelley No 1 230kV line 230.0 L 83.94 0 Auto Lightning Lightning KAL 136830
05/25/2003 15:32 05/25/2003 15:32 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S G 45.10 0 Auto Lightning Lightning KAL 136830
05/25/2003 15:32 05/25/2003 15:32 Trumbull Creek tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 136830
05/25/2003 15:32 05/25/2003 15:32 Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line 230.0 S G 7.34 0 Auto Lightning Lightning KAL 136830
05/25/2003 15:32 05/25/2003 15:33 Libby PH-Libby No 2 230kV line 230.0 L 1.29 1 Auto RAS Initiated RAS Initiated KAL 136831
05/25/2003 15:33 05/25/2003 15:34 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning KAL 136832
05/25/2003 15:33 05/25/2003 15:34 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 1 Auto Lightning Lightning KAL 136832
05/25/2003 15:33 05/25/2003 15:34 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 1 Auto Lightning Lightning KAL 136832
05/25/2003 15:33 05/25/2003 15:34 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 1 Auto Lightning Lightning KAL 136832
05/25/2003 23:18 05/26/2003 08:07 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 529 Plan Voltage Control RED 136833
05/26/2003 00:16 05/27/2003 05:25 John Day-Marion No 1 500kV line 500.0 L 127.51 1749 Plan Voltage Control TDA RED SAL 136834
05/26/2003 14:58 05/26/2003 14:58 Little Goose-Lower Granite No 2 500kV line 500.0 L 32.82 0 Auto Unknown Unknown SPK TRI 136835
05/27/2003 02:46 05/27/2003 05:11 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 145 Plan Voltage Control RED 136836
05/27/2003 06:10 05/28/2003 20:36 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.50 2306 Plan Foreign Request SAL 136841
05/27/2003 06:10 05/28/2003 20:36 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 2306 Plan Foreign Request SAL 136841
05/27/2003 07:41 05/27/2003 19:21 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 700 Plan Maintenance WEN 136842
05/27/2003 08:03 05/29/2003 08:09 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 2886 Plan Maintenance OLY 136843
05/27/2003 08:03 05/29/2003 08:09 Fords Prairie-Centralia section of Chehalis-Centralia No 2 69kV line 69.0 S 3.13 2886 Plan Maintenance OLY 136843
05/27/2003 08:03 05/27/2003 12:28 Zimmerman tap to Chehalis-Centralia No 2 69kV line 69.0 T 0.10 265 Plan Maintenance OLY 136843
05/27/2003 08:04 05/27/2003 15:30 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 446 Plan Maintenance RED 136844
05/27/2003 08:11 05/28/2003 14:15 Bell-AVA Beacon No 4 230kV line 230.0 L 5.90 1804 Plan Foreign Request SPK 136845
05/27/2003 08:40 05/27/2003 13:49 Snohomish-Beverly Park No 4 115kV line 115.0 L 5.00 309 Plan Foreign Request SNO 136846
05/27/2003 09:50 05/27/2003 14:53 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 303 Plan Maintenance SAL 136847
05/27/2003 09:50 05/27/2003 14:53 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 303 Plan Maintenance SAL 136847
05/27/2003 14:08 05/28/2003 19:56 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 11.60 1788 Plan Foreign Request SAL 136856
05/27/2003 14:08 05/28/2003 19:56 Tillamook-PACW Astoria No 1 115kV line 115.0 L O 57.70 1788 Plan Foreign Request SAL 136856
05/27/2003 21:00 05/28/2003 01:14 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 254 Plan Maintenance TDA RED 136848
05/27/2003 21:00 05/28/2003 01:14 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 254 Plan Maintenance TDA 136848
05/28/2003 01:05 05/28/2003 05:04 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 239 Plan Voltage Control RED 136849
05/28/2003 05:02 05/28/2003 05:21 Lower Granite-Hatwai No 1 500kV line 500.0 L 32.87 19 Plan Maintenance SPK TRI 136850
05/28/2003 06:14 05/28/2003 13:01 Lower Granite-Hatwai No 1 500kV line 500.0 L 32.87 407 Plan Maintenance SPK TRI 136857
05/28/2003 07:04 05/28/2003 15:07 Goshen-Eagle Rock No 1 161kV line 161.0 L T 11.60 483 Plan Maintenance IDF 136858
05/28/2003 07:04 05/28/2003 15:07 Westside tap to Goshen-Eagle Rock No 1 161kV line 161.0 T 0.10 483 Plan Maintenance IDF 136858
05/28/2003 07:08 05/28/2003 14:32 Lane-Wendson No 1 115kV line 115.0 L G 41.39 444 Plan Maintenance EUG 136859
05/28/2003 07:08 05/28/2003 14:32 Mapleton-Wendson section of Lane-Wendson No 1 115kV line 115.0 S 8.00 444 Plan Maintenance EUG 136859
05/28/2003 07:23 05/28/2003 15:44 Westside-Gem State section of Westside-Sugar Mill No 1 161kV line 161.0 S 7.00 501 Plan Maintenance IDF 136860
05/28/2003 07:23 05/28/2003 15:44 Westside-Sugar Mill No 1 161kV line 161.0 L G 12.50 501 Plan Maintenance IDF 136860
05/28/2003 07:30 05/28/2003 18:49 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 679 Plan Construction WEN 136861
05/28/2003 07:46 05/28/2003 07:51 Dexter tap to Lookout Point-Alvey No 1 115kV line 115.0 T 0.76 5 Auto Arc while switching Arc while switching EUG 136862
05/28/2003 07:46 05/28/2003 07:51 Lookout Point-Alvey No 1 115kV line 115.0 L G 15.77 5 Auto Arc while switching Arc while switching EUG 136862
05/28/2003 07:46 05/28/2003 07:51 Lookout Point-Dexter section of Lookout Point-Alvey No 1 115kV line 115.0 S 2.37 5 Auto Arc while switching Arc while switching EUG 136862
05/28/2003 07:46 05/28/2003 07:51 Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.66 5 Auto Arc while switching Arc while switching EUG 136862
05/28/2003 07:46 05/30/2003 09:24 Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.74 2978 Plan Maintenance EUG 136863
05/28/2003 07:46 05/30/2003 09:24 Lookout Point-Alvey No 1 115kV line 115.0 L O 15.77 2978 Plan Maintenance EUG 136863
05/28/2003 08:04 05/28/2003 17:41 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 577 Plan Maintenance RED 136864
05/28/2003 08:20 05/28/2003 13:39 Targhee-Drummond No 1 115kV line 115.0 L 26.80 319 Plan Maintenance IDF 136865
05/28/2003 08:20 05/28/2003 15:35 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 435 Plan Maintenance SAL 136866
05/28/2003 08:20 05/28/2003 15:35 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 435 Plan Maintenance SAL 136866
05/28/2003 09:14 05/28/2003 09:15 Covington-White River No 2 230kV line 230.0 L 9.25 1 Plan Foreign Request COV 136867
05/28/2003 09:17 05/28/2003 09:18 Covington-White River No 2 230kV line 230.0 L 9.25 1 Plan Foreign Request COV 136868
05/28/2003 09:40 05/28/2003 12:15 Detroit PH-Detroit No 1 230kV line 230.0 L 0.48 155 Plan Foreign Request SAL 136869
05/28/2003 09:42 05/28/2003 09:44 Covington-White River No 1 230kV line 230.0 L 9.55 2 Plan Foreign Request COV 136870
05/28/2003 09:45 05/28/2003 09:47 Covington-White River No 1 230kV line 230.0 L 9.55 2 Plan Foreign Request COV 136871
05/28/2003 09:52 05/28/2003 09:53 South Tacoma-White River No 1 230kV line 230.0 L 14.95 1 Plan Foreign Request COV 136872
05/28/2003 09:54 05/28/2003 09:55 South Tacoma-White River No 1 230kV line 230.0 L 14.95 1 Plan Foreign Request COV 136873
05/28/2003 16:44 05/29/2003 03:20 Columbia Generating Station-Ashe No 1 500kV line 500.0 L 0.55 636 Plan Foreign Request TRI 136874
05/29/2003 06:55 06/01/2003 11:00 Columbia Generating Station-Ashe No 2 230kV line 230.0 L 0.49 4565 Plan Foreign Request TRI 136878
05/29/2003 07:00 05/29/2003 11:43 Covington-Maple Valley No 2 230kV line 230.0 L 16.22 283 Plan Maintenance COV 136879
05/29/2003 07:16 05/29/2003 10:07 Westside-Gem State section of Westside-Sugar Mill No 1 161kV line 161.0 S 7.00 171 Plan Maintenance IDF 136880
05/29/2003 07:16 05/29/2003 10:07 Westside-Sugar Mill No 1 161kV line 161.0 L G 12.50 171 Plan Maintenance IDF 136880
05/29/2003 07:44 05/29/2003 15:32 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 468 Plan Maintenance SAL 136881
05/29/2003 07:44 05/29/2003 15:32 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 468 Plan Maintenance SAL 136881
05/29/2003 09:08 05/29/2003 10:02 Chehalis-Centralia No 1 69kV line 69.0 L 11.05 54 Plan Maintenance OLY 136882
05/29/2003 10:09 05/29/2003 14:08 Goshen-Eagle Rock No 1 161kV line 161.0 L T 11.60 239 Plan Maintenance IDF 136883
05/29/2003 10:09 05/29/2003 14:08 Westside tap to Goshen-Eagle Rock No 1 161kV line 161.0 T 0.10 239 Plan Maintenance IDF 136883
05/29/2003 16:29 05/29/2003 16:29 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 0 Auto Foreign Trouble Foreign Trouble IDF 136884
05/29/2003 16:56 05/29/2003 16:56 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Unknown TDA RED 136885
05/29/2003 16:56 05/29/2003 16:56 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 136885
05/29/2003 16:56 05/29/2003 16:56 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 136885
05/29/2003 16:56 05/29/2003 16:56 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 136885
05/29/2003 16:56 05/29/2003 16:56 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 136885
05/29/2003 16:56 05/29/2003 16:56 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 136885
05/29/2003 17:01 05/30/2003 12:35 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 1174 Plan Emergency KAL SPK 136886
05/29/2003 17:01 05/30/2003 12:35 Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.27 1174 Plan Emergency KAL 136886
05/29/2003 17:04 05/29/2003 17:17 Chief Joseph PH-Chief Joseph No 5 500kV line 500.0 L 0.80 13 Auto RAS Initiated RAS Initiated WEN 136887
05/29/2003 17:04 05/29/2003 17:18 Chief Joseph PH-Chief Joseph No 4 230kV line 230.0 L 0.90 14 Auto RAS Initiated RAS Initiated WEN 136888
05/29/2003 17:04 05/29/2003 17:30 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 26 Auto RAS Initiated Unknown TDA 136889
05/29/2003 17:04 05/29/2003 18:11 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 67 Auto Foreign Trouble TDA RED 136890
05/29/2003 17:04 05/29/2003 18:11 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 67 Auto Foreign Trouble TDA 136890
05/29/2003 17:04 05/29/2003 18:11 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 67 Auto Foreign Trouble TDA 136890
05/29/2003 17:04 05/29/2003 18:11 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 67 Auto Foreign Trouble TDA 136890
05/29/2003 17:04 05/29/2003 18:11 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 67 Auto Foreign Trouble TDA 136890
05/29/2003 17:04 05/29/2003 18:11 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 67 Auto Foreign Trouble TDA 136890
05/29/2003 17:05 05/29/2003 18:09 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 64 Auto Terminal Equipment Failure TDA RED 136891
05/29/2003 17:05 05/29/2003 18:09 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 64 Auto Terminal Equipment Failure TDA 136891
05/29/2003 21:21 05/29/2003 21:21 La Grande-IPC Brownlee No 1 230kV line 230.0 L 79.30 0 Auto Foreign Trouble Foreign Utility TRI 136892
05/29/2003 21:21 05/29/2003 21:21 Quartz tap to La Grande-IPC Brownlee No 1 230kV line 230.0 T G 10.30 0 Auto Foreign Trouble Foreign Utility TRI 136892
05/29/2003 22:00 05/30/2003 02:03 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 243 Plan Maintenance TDA RED 136893
05/29/2003 22:00 05/30/2003 02:03 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 243 Plan Maintenance TDA 136893
05/30/2003 00:16 05/30/2003 07:52 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 456 Auto Foreign Trouble Foreign Trouble OLY 136894
05/30/2003 00:16 05/30/2003 07:52 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 456 Auto Foreign Trouble Foreign Trouble OLY 136894
05/30/2003 02:07 05/30/2003 02:11 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 4 Plan Switching TDA RED 136895
05/30/2003 02:07 05/30/2003 02:11 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Plan Switching TDA 136895
05/30/2003 02:07 05/30/2003 02:11 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Plan Switching TDA 136895
05/30/2003 02:07 05/30/2003 02:11 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Plan Switching TDA 136895
05/30/2003 02:07 05/30/2003 02:11 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Plan Switching TDA 136895
05/30/2003 04:21 05/30/2003 04:21 Hawkins-Alvey No 1 115kV line 115.0 L 7.78 0 Auto Lightning Lightning EUG 136926
05/30/2003 04:21 05/30/2003 04:21 Hawkins-Hideaway section of Hawkins-Alvey No 1 115kV line 115.0 S G 5.32 0 Auto Lightning Lightning EUG 136926
05/30/2003 04:21 05/30/2003 04:21 Hideaway-Alvey section of Hawkins-Alvey No 1 115kV line 115.0 S G 2.46 0 Auto Lightning Lightning EUG 136926
05/30/2003 04:55 05/30/2003 04:55 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Auto Lightning TDA RED 136896
05/30/2003 04:55 05/30/2003 04:55 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Lightning TDA 136896
05/30/2003 04:55 05/30/2003 04:55 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Lightning TDA 136896
05/30/2003 04:55 05/30/2003 04:55 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Lightning TDA 136896
05/30/2003 04:55 05/30/2003 04:55 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Lightning TDA 136896
05/30/2003 04:55 05/30/2003 04:55 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Lightning TDA 136896
05/30/2003 05:23 05/30/2003 05:23 Adair tap to Salem-Albany No 2 115kV line 115.0 T G 1.01 0 Auto Lightning Lightning SAL 136927
05/30/2003 05:23 05/30/2003 05:23 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S G 7.45 0 Auto Lightning Lightning SAL EUG 136927
05/30/2003 05:23 05/30/2003 05:23 Monmouth-Adair section of Salem-Albany No 2 115kV line 115.0 S G 11.30 0 Auto Lightning Lightning SAL 136927
05/30/2003 05:23 05/30/2003 05:23 Salem-Albany No 2 115kV line 115.0 L 27.85 0 Auto Lightning Lightning SAL EUG 136927
05/30/2003 05:23 05/30/2003 05:23 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S G 9.10 0 Auto Lightning Lightning SAL 136927
05/30/2003 05:32 05/30/2003 05:32 Adair tap to Salem-Albany No 2 115kV line 115.0 T G 1.01 0 Auto Lightning Lightning SAL 136928
05/30/2003 05:32 05/30/2003 05:32 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S G 7.45 0 Auto Lightning Lightning SAL EUG 136928
05/30/2003 05:32 05/30/2003 05:32 Monmouth-Adair section of Salem-Albany No 2 115kV line 115.0 S G 11.30 0 Auto Lightning Lightning SAL 136928
05/30/2003 05:32 05/30/2003 05:32 Salem-Albany No 2 115kV line 115.0 L 27.85 0 Auto Lightning Lightning SAL EUG 136928
05/30/2003 05:32 05/30/2003 05:32 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S G 9.10 0 Auto Lightning Lightning SAL 136928
05/30/2003 05:33 05/30/2003 05:33 Adair tap to Salem-Albany No 2 115kV line 115.0 T G 1.01 0 Auto Lightning Lightning SAL 136929
05/30/2003 05:33 05/30/2003 05:33 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S G 7.45 0 Auto Lightning Lightning SAL EUG 136929
05/30/2003 05:33 05/30/2003 05:33 Monmouth-Adair section of Salem-Albany No 2 115kV line 115.0 S G 11.30 0 Auto Lightning Lightning SAL 136929
05/30/2003 05:33 05/30/2003 05:33 Salem-Albany No 2 115kV line 115.0 L 27.85 0 Auto Lightning Lightning SAL EUG 136929
05/30/2003 05:33 05/30/2003 05:33 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S G 9.10 0 Auto Lightning Lightning SAL 136929
05/30/2003 05:39 05/30/2003 05:39 Adair tap to Salem-Albany No 2 115kV line 115.0 T G 1.01 0 Auto Lightning Lightning SAL 136930
05/30/2003 05:39 05/30/2003 05:39 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S G 7.45 0 Auto Lightning Lightning SAL EUG 136930
05/30/2003 05:39 05/30/2003 05:39 Monmouth-Adair section of Salem-Albany No 2 115kV line 115.0 S G 11.30 0 Auto Lightning Lightning SAL 136930
05/30/2003 05:39 05/30/2003 05:39 Salem-Albany No 2 115kV line 115.0 L 27.85 0 Auto Lightning Lightning SAL EUG 136930
05/30/2003 05:39 05/30/2003 05:39 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S G 9.10 0 Auto Lightning Lightning SAL 136930
05/30/2003 06:05 05/30/2003 13:58 Station H-Station FG No 1 115kV line 115.0 L 1.08 473 Plan Foreign Request OLY 136931
05/30/2003 06:41 05/30/2003 06:59 Black Canyon-Emmett No 1 69kV line 69.0 L 4.50 18 Auto Foreign Trouble IDF 136932
05/30/2003 06:55 05/30/2003 06:55 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 136933
05/30/2003 06:55 05/30/2003 06:55 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 136933
05/30/2003 06:55 05/30/2003 06:55 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 136933
05/30/2003 06:55 05/30/2003 06:55 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 136933
05/30/2003 06:55 05/30/2003 06:55 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 136933
05/30/2003 06:55 05/30/2003 06:55 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 136933
05/30/2003 06:55 05/30/2003 06:55 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 136933
05/30/2003 06:55 05/30/2003 06:55 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 136933
05/30/2003 07:02 05/30/2003 12:50 Garrison-Taft No 1 500kV line 500.0 L 159.38 348 Plan Maintenance KAL 136934
05/30/2003 07:13 05/30/2003 15:37 Alvey-Diamond Hill No 3 230kV line 230.0 L 20.30 504 Plan Maintenance EUG 136935
05/30/2003 07:13 05/30/2003 15:37 Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line 230.0 S G 9.60 504 Plan Maintenance EUG 136935
05/30/2003 07:13 05/30/2003 15:37 McKenzie-Diamond Hill section of Alvey-Diamond Hill No 3 230kV line 230.0 S G 10.70 504 Plan Maintenance EUG 136935
05/30/2003 07:29 05/30/2003 11:14 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 225 Plan Fiber Optic Work EUG 136936
05/30/2003 07:29 05/30/2003 11:14 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S 2.31 225 Plan Fiber Optic Work EUG 136936
05/30/2003 07:45 05/30/2003 15:16 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 451 Plan Maintenance SAL 136937
05/30/2003 07:45 05/30/2003 15:16 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 451 Plan Maintenance SAL 136937
05/30/2003 07:47 05/30/2003 07:51 Black Canyon-Emmett No 1 69kV line 69.0 L 4.50 4 Auto Foreign Trouble IDF 136938
05/30/2003 13:20 05/30/2003 13:20 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 136939
05/30/2003 13:20 05/30/2003 13:20 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 136939
05/30/2003 13:20 05/30/2003 13:20 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 136939
05/30/2003 13:20 05/30/2003 13:20 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 136939
05/30/2003 13:20 05/30/2003 13:20 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 136939
05/30/2003 13:20 05/30/2003 13:20 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 136939
05/30/2003 13:20 05/30/2003 13:20 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 136939
05/30/2003 13:20 05/30/2003 13:20 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 136939
05/30/2003 21:10 05/30/2003 21:10 Macks Inn-Madison No 1 115kV line 115.0 L 17.12 0 Auto Lightning Lightning IDF 136940
05/31/2003 01:12 05/31/2003 05:48 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 276 Plan Voltage Control RED 136941
05/31/2003 01:21 05/31/2003 08:11 John Day-Marion No 1 500kV line 500.0 L 127.51 410 Plan Voltage Control TDA RED SAL 136942
05/31/2003 05:45 06/26/2003 10:19 Slatt-PGE Boardman No 1 500kV line 500.0 L 17.83 37714 Plan Foreign Request TRI 136943
05/31/2003 06:12 05/31/2003 06:14 Horn Rapids tap to Red Mountain-White Bluffs No 1 115kV line 115.0 T G 0.10 2 Auto Unknown Bird or Animal TRI 136954
05/31/2003 06:12 05/31/2003 06:14 Horn Rapids-White Bluffs section of Red Mountain-White Bluffs No 1 115kV line 115.0 S G 5.76 2 Auto Unknown Bird or Animal TRI 136954
05/31/2003 06:12 05/31/2003 06:14 Red Mountain-Horn Rapids section of Red Mountain-White Bluffs No 1 115kV line 115.0 S G 4.05 2 Auto Unknown Bird or Animal TRI 136954
05/31/2003 06:12 05/31/2003 06:14 Red Mountain-White Bluffs No 1 115kV line 115.0 L 9.81 2 Auto Unknown Bird or Animal TRI 136954
05/31/2003 06:12 05/31/2003 06:15 Benton City-Red Mountain section of Grandview-Red Mountain No 1 115kV line 115.0 S 4.46 3 Auto Unknown Bird or Animal TRI 136955
05/31/2003 06:12 05/31/2003 06:15 Grandview-Red Mountain No 1 115kV line 115.0 L G 22.80 3 Auto Unknown Bird or Animal TRI WEN 136955
05/31/2003 06:12 05/31/2003 06:14 Ledbeder tap to Red Mountain-Richland No 1 115kV line 115.0 T G 0.10 2 Auto Unknown Bird or Animal TRI 136956
05/31/2003 06:12 05/31/2003 06:14 Ledbeder-Richland section of Red Mountain-Richland No 1 115kV line 115.0 S G 3.20 2 Auto Unknown Bird or Animal TRI 136956
05/31/2003 06:12 05/31/2003 06:14 Red Mountain-Ledbeder section of Red Mountain-Richland No 1 115kV line 115.0 S G 2.91 2 Auto Unknown Bird or Animal TRI 136956
05/31/2003 06:12 05/31/2003 06:14 Red Mountain-Richland No 1 115kV line 115.0 L 6.00 2 Auto Unknown Bird or Animal TRI 136956
05/31/2003 13:37 05/31/2003 13:37 Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line 115.0 S G 17.48 0 Auto Unknown Lightning IDF 136957
05/31/2003 13:37 05/31/2003 13:37 Swan Valley-Teton No 1 115kV line 115.0 L 35.47 0 Auto Unknown Lightning IDF 136957
05/31/2003 13:37 05/31/2003 13:37 Targhee tap to Swan Valley-Teton No 1 115kV line 115.0 T G 10.94 0 Auto Unknown Lightning IDF 136957
05/31/2003 13:37 05/31/2003 13:37 Targhee-Teton section of Swan Valley-Teton No 1 115kV line 115.0 S G 17.99 0 Auto Unknown Lightning IDF 136957
05/31/2003 18:27 05/31/2003 18:29 Bell-Boundary No 1 230kV line 230.0 L 91.66 2 Auto Lightning Lightning SPK 136958
05/31/2003 18:27 05/31/2003 18:29 Bell-Sacheen section of Bell-Boundary No 1 230kV line 230.0 S G 31.60 2 Auto Lightning Lightning SPK 136958
05/31/2003 18:27 05/31/2003 18:29 Sacheen tap to Bell-Boundary No 1 230kV line 230.0 T G 0.70 2 Auto Lightning Lightning SPK 136958
05/31/2003 18:27 05/31/2003 18:29 Sacheen-Boundary section of Bell-Boundary No 1 230kV line 230.0 S G 60.06 2 Auto Lightning Lightning SPK 136958
05/31/2003 18:27 05/31/2003 20:00 Boundary-Waneta No 1 230kV line 230.0 L 16.50 93 Auto RAS Initiated RAS Initiated SPK 136959
05/31/2003 20:47 05/31/2003 20:47 Lancaster-Noxon No 1 230kV line 230.0 L 72.72 0 Auto Lightning Lightning SPK KAL 136960
06/01/2003 00:04 06/01/2003 08:29 Buckley-Marion No 1 500kV line 500.0 L 99.33 505 Plan Voltage Control TDA RED SAL 136961
06/01/2003 02:10 06/01/2003 14:08 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 718 Plan Voltage Control RED 136962
06/01/2003 23:39 06/02/2003 05:33 Buckley-Marion No 1 500kV line 500.0 L 99.33 354 Plan Voltage Control TDA RED SAL 136970
06/02/2003 00:17 06/02/2003 06:20 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 363 Plan Voltage Control RED 136971
06/02/2003 04:14 06/02/2003 04:14 Albany-Eugene No 1 115kV line 115.0 L O 39.80 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Alderwood tap to Albany-Eugene No 1 115kV line 115.0 T 9.21 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Alderwood tap-Cheshire section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS T 1.40 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Alderwood-Junction City section of Albany-Eugene No 1 115kV line 115.0 S 2.04 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Cheshire tap to Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TT T 0.01 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Cheshire-Alderwood section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS T 7.80 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Greenberry tap to Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TT T 19.00 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Greenberry-Harrisburg section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS T 0.02 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 T 0.04 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Harrisburg tap-Greenberry section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS T 0.02 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Junction City tap to Albany-Eugene No 1 115kV line 115.0 T 0.05 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Junction City-Parker section of Albany-Eugene No 1 115kV line 115.0 S 2.94 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Parker tap to Albany-Eugene No 1 115kV line 115.0 T 0.10 0 Auto Unknown Malicious EUG 136972
06/02/2003 04:14 06/02/2003 04:14 Parker-Eugene section of Albany-Eugene No 1 115kV line 115.0 S 3.90 0 Auto Unknown Malicious EUG 136972
06/02/2003 06:45 06/02/2003 16:46 Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line 230.0 S 15.65 601 Plan Construction COV 136976
06/02/2003 06:45 06/02/2003 16:46 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 601 Plan Construction COV 136976
06/02/2003 07:01 06/20/2003 11:38 Grand Coulee-Chief Joseph No 1 230kV line 230.0 L 32.73 26197 Plan Maintenance WEN 136977
06/02/2003 08:19 06/02/2003 16:19 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 480 Plan Maintenance IDF 136978
06/02/2003 08:50 06/06/2003 13:53 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 6063 Plan Maintenance TRI 136979
06/02/2003 08:50 06/06/2003 13:53 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 6063 Plan Maintenance TRI 136979
06/02/2003 09:12 07/08/2003 08:35 Midway-HEW No 1 230kV line 230.0 L 28.36 51803 Plan Foreign Request TRI 137019
06/02/2003 09:25 06/06/2003 13:43 Creston-Bell No 1 115kV line 115.0 L G 53.80 6018 Plan Maintenance WEN SPK 136980
06/02/2003 09:25 06/06/2003 13:43 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 6018 Plan Maintenance SPK 136980
06/02/2003 13:27 06/10/2003 09:44 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 11297 Plan Normally Out COV 136981
06/02/2003 13:27 06/10/2003 09:44 McCullough tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 2.18 11297 Plan Normally Out COV 136981
06/03/2003 02:08 06/03/2003 03:25 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 77 Auto Foreign Trouble Foreign Trouble OLY 136982
06/03/2003 02:08 06/03/2003 03:25 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 77 Auto Foreign Trouble Foreign Trouble OLY 136982
06/03/2003 02:19 06/03/2003 05:28 Schultz-Raver No 2 500kV line 500.0 L 77.24 189 Plan Voltage Control WEN COV 136983
06/03/2003 02:32 06/03/2003 05:50 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 198 Plan Voltage Control RED 136984
06/03/2003 02:33 06/17/2003 00:28 Boundary-Nelway No 1 230kV line 230.0 L 2.40 20035 Plan Foreign Request SPK 136985
06/03/2003 03:30 06/03/2003 04:44 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 74 Auto Foreign Trouble Foreign Trouble OLY 136986
06/03/2003 03:30 06/03/2003 04:44 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 74 Auto Foreign Trouble Foreign Trouble OLY 136986
06/03/2003 07:56 06/06/2003 13:38 B971-Walton section of Lane-Wendson No 1 115kV line 115.0 S 7.68 4662 Plan Maintenance EUG 136990
06/03/2003 07:56 06/06/2003 13:38 Lane-Wendson No 1 115kV line 115.0 L G 41.39 4662 Plan Maintenance EUG 136990
06/03/2003 08:05 06/03/2003 15:41 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 456 Plan Maintenance SAL 136991
06/03/2003 08:05 06/03/2003 15:41 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 456 Plan Maintenance SAL 136991
06/03/2003 08:07 06/06/2003 17:19 Grizzly-Summer Lake No 1 500kV line 500.0 L T 103.37 4872 Plan Maintenance RED 136992
06/03/2003 08:07 06/06/2003 17:19 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T 0.01 4872 Plan Maintenance RED 136992
06/03/2003 08:30 06/03/2003 11:56 Potholes-Grand Coulee No 1 230kV line 230.0 L 65.66 206 Plan Maintenance WEN SPK 136993
06/03/2003 09:07 06/03/2003 09:08 La Grande-IPC Brownlee No 1 230kV line 230.0 L 79.30 1 Plan Foreign Request TRI 136994
06/03/2003 09:07 06/03/2003 09:08 Quartz tap to La Grande-IPC Brownlee No 1 230kV line 230.0 T G 10.30 1 Plan Foreign Request TRI 136994
06/03/2003 09:30 06/06/2003 13:38 B972-B971 section of Lane-Wendson No 1 115kV line 115.0 S 1.90 4568 Plan Maintenance EUG 136995
06/03/2003 09:30 06/06/2003 13:38 Lane-Wendson No 1 115kV line 115.0 L O 41.39 4568 Plan Maintenance EUG 136995
06/03/2003 10:26 06/03/2003 13:32 Fidalgo-Lopez Island No 5 69kV line 69.0 L 8.49 186 Plan Maintenance SNO 136996
06/03/2003 12:01 06/03/2003 14:18 Midway-Potholes No 1 230kV line 230.0 L 36.87 137 Plan Maintenance TRI WEN 136997
06/03/2003 13:41 06/03/2003 14:16 North Bonneville-Troutdale No 2 230kV line 230.0 L 27.77 35 Plan Testing LGV 136998
06/04/2003 04:09 06/04/2003 04:09 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 136999
06/04/2003 04:09 06/04/2003 04:09 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136999
06/04/2003 04:09 06/04/2003 04:09 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136999
06/04/2003 04:09 06/04/2003 04:09 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136999
06/04/2003 04:09 06/04/2003 04:09 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136999
06/04/2003 04:09 06/04/2003 04:09 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 136999
06/04/2003 07:10 06/27/2003 15:39 Columbia Generating Station-Ashe No 1 500kV line 500.0 L 0.55 33629 Plan Foreign Request TRI 137001
06/04/2003 07:59 06/04/2003 15:59 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 480 Plan Maintenance SAL 137002
06/04/2003 07:59 06/04/2003 15:59 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 480 Plan Maintenance SAL 137002
06/04/2003 08:01 06/04/2003 15:58 Raver-Covington No 2 500kV line 500.0 L 10.33 477 Plan Maintenance COV 137003
06/04/2003 08:26 06/04/2003 12:04 Potholes-Sand Dunes No 1 230kV line 230.0 L 14.00 218 Plan Maintenance WEN 137004
06/04/2003 08:56 06/04/2003 14:47 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 351 Auto Foreign Trouble TRI 137005
06/04/2003 09:59 06/04/2003 10:07 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 8 Auto Human Element TDA RED 137006
06/04/2003 09:59 06/04/2003 10:07 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 8 Auto Human Element TDA 137006
06/04/2003 10:02 06/04/2003 12:41 Fidalgo-Lopez Island No 5 69kV line 69.0 L 8.49 159 Plan Maintenance SNO 137007
06/04/2003 17:37 06/04/2003 17:51 Boundary PH SCL-Boundary No 5 230kV line 230.0 L 0.50 14 Auto RAS Initiated SPK 137008
06/04/2003 17:37 06/04/2003 17:41 Boundary PH SCL-Boundary No 6 230kV line 230.0 L 0.50 4 Auto RAS Initiated SPK 137009
06/04/2003 17:37 06/04/2003 18:14 Boundary-Waneta No 1 230kV line 230.0 L 16.50 37 Auto RAS Initiated RAS Initiated SPK 137010
06/04/2003 18:27 06/04/2003 19:10 Boundary PH SCL-Boundary No 6 230kV line 230.0 L 0.50 43 Auto RAS Initiated SPK 137011
06/04/2003 18:27 06/04/2003 18:32 Boundary PH SCL-Boundary No 5 230kV line 230.0 L 0.50 5 Auto RAS Initiated SPK 137012
06/05/2003 00:12 06/05/2003 01:10 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 58 Plan Testing WEN 137013
06/05/2003 01:23 06/05/2003 06:07 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 284 Plan Voltage Control RED 137014
06/05/2003 06:31 06/05/2003 06:45 Ross-Lexington No 1 230kV line 230.0 L 41.21 14 Plan Foreign Request LGV 137020
06/05/2003 06:31 06/05/2003 06:45 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 14 Plan Foreign Request LGV 137020
06/05/2003 06:31 06/05/2003 06:45 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 14 Plan Foreign Request LGV 137020
06/05/2003 06:31 06/05/2003 06:45 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 14 Plan Foreign Request LGV 137020
06/05/2003 06:57 06/05/2003 16:53 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 596 Plan Maintenance IDF 137021
06/05/2003 07:16 06/05/2003 15:38 Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line 230.0 S 15.65 502 Plan Construction COV 137022
06/05/2003 07:16 06/05/2003 15:38 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 502 Plan Construction COV 137022
06/05/2003 07:52 06/05/2003 15:39 Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line 115.0 S 12.44 467 Plan Maintenance SAL 137023
06/05/2003 07:52 06/05/2003 15:39 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 467 Plan Maintenance SAL 137023
06/05/2003 08:41 06/05/2003 13:39 Ashe-White Bluffs No 1 230kV line 230.0 L 9.52 298 Plan Maintenance TRI 137024
06/05/2003 09:40 06/05/2003 15:13 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 333 Plan Maintenance OLY 137025
06/05/2003 11:47 06/05/2003 12:03 Ross-Lexington No 1 230kV line 230.0 L 41.21 16 Plan Foreign Request LGV 137026
06/05/2003 11:47 06/05/2003 12:03 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 16 Plan Foreign Request LGV 137026
06/05/2003 11:47 06/05/2003 12:03 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 16 Plan Foreign Request LGV 137026
06/05/2003 11:47 06/05/2003 12:03 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 16 Plan Foreign Request LGV 137026
06/05/2003 12:15 06/05/2003 12:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 6 Auto Terminal Equipment Failure TDA RED 137027
06/05/2003 12:15 06/05/2003 12:21 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Terminal Equipment Failure TDA 137027
06/05/2003 12:15 06/05/2003 12:21 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Terminal Equipment Failure TDA 137027
06/05/2003 12:15 06/05/2003 18:42 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 387 Auto Terminal Equipment Failure TDA 137027
06/05/2003 12:15 06/05/2003 12:21 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Terminal Equipment Failure TDA 137027
06/05/2003 12:15 06/05/2003 12:21 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Terminal Equipment Failure TDA 137027
06/05/2003 12:32 06/05/2003 12:32 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 137028
06/05/2003 12:32 06/05/2003 12:32 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137028
06/05/2003 12:32 06/05/2003 12:32 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137028
06/05/2003 12:32 06/05/2003 12:32 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137028
06/05/2003 12:32 06/05/2003 12:32 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137028
06/05/2003 12:32 06/05/2003 12:32 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137028
06/05/2003 18:20 06/05/2003 18:21 Raver-Covington No 1 500kV line 500.0 L 10.28 1 Plan Emergency COV 137029
06/05/2003 21:00 06/05/2003 21:15 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 15 Plan Testing WEN 137030
06/06/2003 00:39 06/06/2003 00:45 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 6 Auto Staged Test Staged Test WEN 137031
06/06/2003 01:02 06/06/2003 05:56 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 294 Plan Voltage Control RED 137032
06/06/2003 02:44 06/06/2003 05:23 Marion-Lane No 1 500kV line 500.0 L 68.97 159 Plan Voltage Control SAL EUG 137033
06/06/2003 02:59 06/06/2003 02:59 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 137034
06/06/2003 02:59 06/06/2003 02:59 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 137034
06/06/2003 02:59 06/06/2003 02:59 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 137034
06/06/2003 07:36 06/06/2003 13:39 Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line 115.0 S 12.44 363 Plan Maintenance SAL 137039
06/06/2003 07:36 06/06/2003 13:39 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 363 Plan Maintenance SAL 137039
06/06/2003 08:11 06/06/2003 09:16 Ledbeder-Richland section of Red Mountain-Richland No 1 115kV line 115.0 S 3.20 65 Plan Maintenance TRI 137040
06/06/2003 08:11 06/06/2003 09:16 Red Mountain-Richland No 1 115kV line 115.0 L G 6.00 65 Plan Maintenance TRI 137040
06/06/2003 13:36 06/06/2003 14:48 Marcola A500-Alvey section of Santiam-Alvey No 1&2 230kV line 230.0 S 15.05 72 Auto Tree Tree EUG 137041
06/06/2003 13:36 06/06/2003 14:48 Marcola tap to Santiam-Alvey No 1&2 230kV line 230.0 T 0.10 72 Auto Tree Tree EUG 137041
06/06/2003 13:36 06/06/2003 14:48 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 72 Auto Tree Tree SAL EUG 137041
06/06/2003 13:36 06/06/2003 17:08 Santiam-Alvey No 1&2 230kV line 230.0 L O 118.50 212 Plan Maintenance SAL EUG 137042
06/06/2003 13:36 06/06/2003 17:08 Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line 230.0 S 46.81 212 Plan Maintenance SAL EUG 137042
06/06/2003 18:01 06/06/2003 18:01 Olympia-Shelton No 2 115kV line 115.0 L 19.73 0 Auto Unknown Unknown OLY 137043
06/06/2003 18:01 06/06/2003 18:01 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S G 12.77 0 Auto Unknown Unknown OLY 137043
06/06/2003 18:01 06/06/2003 18:01 Skookum-Shelton section of Olympia-Shelton No 2 115kV line 115.0 S G 6.96 0 Auto Unknown Unknown OLY 137043
06/07/2003 01:59 06/07/2003 06:03 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 244 Plan Voltage Control RED 137044
06/07/2003 04:07 06/07/2003 07:08 Marion-Lane No 1 500kV line 500.0 L 68.97 181 Plan Voltage Control SAL EUG 137045
06/07/2003 06:57 06/07/2003 17:57 Maple Valley-Duwamish No 1 230kV line 230.0 L 7.68 660 Plan Foreign Request COV 137047
06/08/2003 00:01 06/09/2003 08:45 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 1964 Plan Foreign Request OLY 137048
06/08/2003 01:53 06/08/2003 09:50 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 477 Plan Voltage Control RED 137049
06/08/2003 03:58 06/08/2003 07:53 Schultz-Raver No 1 500kV line 500.0 L 77.24 235 Plan Voltage Control WEN COV 137050
06/08/2003 07:50 06/08/2003 16:14 Maple Valley-Duwamish No 1 230kV line 230.0 L 7.68 504 Plan Foreign Request COV 137069
06/08/2003 15:22 06/08/2003 15:22 Columbia Falls-Stillwater section of Columbia Falls-Trego No 1 115kV line 115.0 S G 18.58 0 Auto Lightning Lightning KAL 137070
06/08/2003 15:22 06/08/2003 15:22 Columbia Falls-Trego No 1 115kV line 115.0 L 45.96 0 Auto Lightning Lightning KAL 137070
06/08/2003 15:22 06/08/2003 15:22 Stillwater tap to Columbia Falls-Trego No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning KAL 137070
06/08/2003 15:22 06/08/2003 15:22 Stillwater-Trego section of Columbia Falls-Trego No 1 115kV line 115.0 S G 27.38 0 Auto Lightning Lightning KAL 137070
06/08/2003 16:42 06/08/2003 16:45 Libby PH-Libby No 2 230kV line 230.0 L 1.29 3 Auto RAS Initiated RAS Initiated KAL 137071
06/08/2003 16:42 06/08/2003 16:42 Flathead-Hot Springs No 1 230kV line 230.0 L 56.45 0 Auto Lightning Lightning KAL 137072
06/08/2003 16:42 06/08/2003 16:42 Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line 230.0 S G 13.50 0 Auto Lightning Lightning KAL 137072
06/08/2003 16:42 06/08/2003 16:42 Lion Mountain tap to Flathead-Hot Springs No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 137072
06/08/2003 16:42 06/08/2003 16:42 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S G 42.95 0 Auto Lightning Lightning KAL 137072
06/08/2003 16:43 06/08/2003 16:43 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137073
06/08/2003 16:43 06/08/2003 16:43 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 19.40 0 Auto Lightning Lightning SPK 137073
06/08/2003 16:43 06/08/2003 16:43 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L 52.68 0 Auto Lightning Lightning SPK 137073
06/08/2003 16:43 06/08/2003 16:43 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 1.30 0 Auto Lightning Lightning SPK 137073
06/08/2003 16:43 06/08/2003 16:43 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137073
06/08/2003 16:43 06/08/2003 16:43 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 5.80 0 Auto Lightning Lightning SPK 137073
06/08/2003 16:50 06/08/2003 16:51 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning KAL 137074
06/08/2003 16:50 06/08/2003 16:51 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 1 Auto Lightning Lightning KAL 137074
06/08/2003 16:50 06/08/2003 16:51 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 1 Auto Lightning Lightning KAL 137074
06/08/2003 16:50 06/08/2003 16:51 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 1 Auto Lightning Lightning KAL 137074
06/08/2003 16:51 06/08/2003 16:51 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137075
06/08/2003 16:51 06/08/2003 16:51 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 19.40 0 Auto Lightning Lightning SPK 137075
06/08/2003 16:51 06/08/2003 16:51 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L 52.68 0 Auto Lightning Lightning SPK 137075
06/08/2003 16:51 06/08/2003 16:51 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 1.30 0 Auto Lightning Lightning SPK 137075
06/08/2003 16:51 06/08/2003 16:51 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137075
06/08/2003 16:51 06/08/2003 16:51 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 5.80 0 Auto Lightning Lightning SPK 137075
06/08/2003 19:23 06/08/2003 19:23 Elmo tap to Kalispell-Kerr No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning KAL 137076
06/08/2003 19:23 06/08/2003 19:23 Elmo-Kerr section of Kalispell-Kerr No 1 115kV line 115.0 S G 12.80 0 Auto Lightning Lightning KAL 137076
06/08/2003 19:23 06/08/2003 19:23 Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line 115.0 S G 28.59 0 Auto Lightning Lightning KAL 137076
06/08/2003 19:23 06/08/2003 19:23 Kalispell-Kerr No 1 115kV line 115.0 L 41.39 0 Auto Lightning Lightning KAL 137076
06/08/2003 20:48 06/08/2003 20:49 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning KAL 137077
06/08/2003 20:48 06/08/2003 20:49 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 1 Auto Lightning Lightning KAL 137077
06/08/2003 20:48 06/08/2003 20:49 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 1 Auto Lightning Lightning KAL 137077
06/08/2003 20:48 06/08/2003 20:49 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 1 Auto Lightning Lightning KAL 137077
06/08/2003 21:10 06/08/2003 21:11 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning KAL 137078
06/08/2003 21:10 06/08/2003 21:11 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 1 Auto Lightning Lightning KAL 137078
06/08/2003 21:10 06/08/2003 21:11 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 1 Auto Lightning Lightning KAL 137078
06/08/2003 21:10 06/08/2003 21:11 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 1 Auto Lightning Lightning KAL 137078
06/09/2003 00:38 06/09/2003 06:08 John Day-Marion No 1 500kV line 500.0 L 127.51 330 Plan Voltage Control TDA RED SAL 137079
06/09/2003 02:48 06/09/2003 05:10 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 142 Plan Voltage Control RED 137080
06/09/2003 04:19 06/09/2003 04:19 Goshen-Drummond No 1 161kV line 161.0 L 72.75 0 Auto Lightning Lightning IDF 137081
06/09/2003 07:02 06/09/2003 16:36 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 574 Plan Maintenance IDF 137100
06/09/2003 07:13 06/09/2003 13:54 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S 25.06 401 Plan Maintenance KAL 137101
06/09/2003 07:13 06/09/2003 13:54 Hot Springs-Rattlesnake No 1 230kV line 230.0 L G 58.91 401 Plan Maintenance KAL 137101
06/09/2003 07:16 06/11/2003 14:27 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 3311 Plan Maintenance OLY 137102
06/09/2003 08:01 06/12/2003 14:06 White Bluffs-451B No 1 115kV line 115.0 L 6.19 4685 Plan Maintenance TRI 137103
06/09/2003 08:24 07/25/2003 11:12 Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT 0.38 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS 0.99 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 L T 45.05 66408 Plan Switching LGV 137104
06/09/2003 08:24 07/25/2003 11:12 Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT 1.24 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS 15.35 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT 0.10 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS 5.30 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT 0.10 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS 3.60 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 T 25.00 66408 Plan Switching LGV TDA 137104
06/09/2003 08:24 07/25/2003 11:12 Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TS 0.10 66408 Plan Switching LGV TDA 137104
06/09/2003 09:01 06/13/2003 10:11 Bonneville PH 1-North Camas No 1 115kV line 115.0 L T 22.12 5830 Plan Normally Out LGV 137105
06/09/2003 09:01 06/13/2003 10:11 Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 15.35 5830 Plan Normally Out LGV TDA 137105
06/09/2003 09:28 06/09/2003 09:33 Rogue-Gold Beach No 1 115kV line 115.0 L 5.47 5 Plan Switching EUG 137106
06/09/2003 14:02 06/09/2003 16:31 Longview-Cowlitz No 1 115kV line 115.0 L 3.61 149 Plan Emergency LGV 137107
06/09/2003 16:47 06/09/2003 16:47 Bell-Addy No 1 115kV line 115.0 L 51.18 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Bell-Mead section of Bell-Addy No 1 115kV line 115.0 S G 2.95 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Clayton tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Clayton-Loon Lake section of Bell-Addy No 1 115kV line 115.0 S G 6.27 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Colbert tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Colbert-Half Moon section of Bell-Addy No 1 115kV line 115.0 S G 0.04 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Deer Park tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Deer Park-Clayton section of Bell-Addy No 1 115kV line 115.0 S G 5.19 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Half Moon tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Half Moon-Tum Tum section of Bell-Addy No 1 115kV line 115.0 S G 1.75 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Loon Lake tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S G 22.34 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Mead tap to Bell-Addy No 1 115kV line 115.0 T G 0.18 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Mead-Colbert section of Bell-Addy No 1 115kV line 115.0 S G 4.95 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Milan tap to Bell-Addy No 1 115kV line 115.0 T G 8.22 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Milan-Deer Park section of Bell-Addy No 1 115kV line 115.0 S G 1.97 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Tum Tum tap to Bell-Addy No 1 115kV line 115.0 T G 10.50 0 Auto Lightning Lightning SPK 137108
06/09/2003 16:47 06/09/2003 16:47 Tum Tum-Milan section of Bell-Addy No 1 115kV line 115.0 S G 5.72 0 Auto Lightning Lightning SPK 137108
06/09/2003 17:37 06/09/2003 17:39 Midway-Moxee No 1 115kV line 115.0 L 33.98 2 Auto Lightning Forced (Configuration) TRI WEN 137109
06/09/2003 17:37 06/09/2003 17:39 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S G 16.61 2 Auto Lightning Forced (Configuration) TRI WEN 137109
06/09/2003 17:37 06/09/2003 17:39 Rattlesnake tap to Midway-Moxee No 1 115kV line 115.0 T G 0.01 2 Auto Lightning Forced (Configuration) WEN 137109
06/09/2003 17:37 06/09/2003 17:39 Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line 115.0 S G 17.37 2 Auto Lightning Forced (Configuration) WEN 137109
06/09/2003 17:37 06/09/2003 17:37 Clymer tap to Ellensburg-Moxee No 1 115kV line 115.0 T 0.02 0 Auto Lightning Lightning WEN TRI 137110
06/09/2003 17:37 06/09/2003 17:40 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 3 Auto Lightning Lightning WEN TRI 137110
06/09/2003 17:37 06/09/2003 17:37 Ellensburg-Clymer section of Ellensburg-Moxee No 1 115kV line 115.0 S 1.38 0 Auto Lightning Lightning WEN 137110
06/09/2003 17:37 06/09/2003 17:40 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 3 Auto Lightning Lightning WEN TRI 137110
06/09/2003 23:23 06/09/2003 23:23 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 0 Auto Lightning Lightning KAL 137111
06/10/2003 01:28 06/10/2003 05:20 John Day-Marion No 1 500kV line 500.0 L 127.51 232 Plan Voltage Control TDA RED SAL 137112
06/10/2003 03:51 06/10/2003 05:39 Schultz-Raver No 1 500kV line 500.0 L 77.24 108 Plan Voltage Control WEN COV 137113
06/10/2003 06:42 06/10/2003 16:32 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 590 Plan Maintenance IDF 137131
06/10/2003 06:52 06/10/2003 12:58 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S 25.06 366 Plan Maintenance KAL 137132
06/10/2003 06:52 06/10/2003 12:58 Hot Springs-Rattlesnake No 1 230kV line 230.0 L G 58.91 366 Plan Maintenance KAL 137132
06/10/2003 07:18 06/10/2003 19:05 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 707 Plan Construction EUG 137133
06/10/2003 07:18 06/10/2003 19:05 Bandon-Two Mile section of Bandon-Rogue No 1 115kV line 115.0 S 4.40 707 Plan Construction EUG 137133
06/10/2003 07:35 06/10/2003 18:56 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 681 Plan Construction EUG 137134
06/10/2003 07:35 06/10/2003 18:56 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S 2.31 681 Plan Construction EUG 137134
06/10/2003 07:53 06/10/2003 08:57 Grand Ronde-Boyer No 1 115kV line 115.0 L 5.62 64 Plan Maintenance SAL 137135
06/10/2003 08:12 06/10/2003 15:12 Lane-Wendson No 1 115kV line 115.0 L G 41.39 420 Plan Maintenance EUG 137136
06/10/2003 08:12 06/10/2003 15:12 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 420 Plan Maintenance EUG 137136
06/10/2003 08:13 06/10/2003 14:34 Eugene-Bertelsen No 1 115kV line 115.0 L 2.28 381 Plan Maintenance EUG 137137
06/10/2003 08:29 06/10/2003 13:09 Covington-Maple Valley No 2 230kV line 230.0 L 16.22 280 Plan Maintenance COV 137138
06/10/2003 08:58 06/10/2003 12:26 Grand Coulee-Okanogan No 2 115kV line 115.0 L G 41.05 208 Plan Foreign Request WEN 137139
06/10/2003 08:58 06/10/2003 12:26 Keller-Nespelem section of Grand Coulee-Okanogan No 2 115kV line 115.0 S 5.30 208 Plan Foreign Request WEN 137139
06/10/2003 09:04 06/10/2003 12:21 Grand Coulee-Keller section of Grand Coulee-Okanogan No 2 115kV line 115.0 S 1.25 197 Plan Foreign Request WEN 137140
06/10/2003 09:04 06/10/2003 12:21 Grand Coulee-Okanogan No 2 115kV line 115.0 L O 41.05 197 Plan Foreign Request WEN 137140
06/10/2003 09:04 06/10/2003 12:21 Keller tap to Grand Coulee-Okanogan No 2 115kV line 115.0 T 20.14 197 Plan Foreign Request WEN 137140
06/10/2003 11:18 06/10/2003 11:20 Flathead-Hot Springs No 1 230kV line 230.0 L 56.45 2 Auto Lightning Lightning KAL 137141
06/10/2003 11:18 06/10/2003 11:20 Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line 230.0 S G 13.50 2 Auto Lightning Lightning KAL 137141
06/10/2003 11:18 06/10/2003 11:20 Lion Mountain tap to Flathead-Hot Springs No 1 230kV line 230.0 T G 0.10 2 Auto Lightning Lightning KAL 137141
06/10/2003 11:18 06/10/2003 11:20 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S G 42.95 2 Auto Lightning Lightning KAL 137141
06/10/2003 11:18 06/10/2003 11:22 Libby PH-Libby No 2 230kV line 230.0 L 1.29 4 Auto RAS Initiated RAS Initiated KAL 137142
06/10/2003 11:51 06/10/2003 11:51 Hot Springs-NWE Ovando No 1 230kV line 230.0 L 89.70 0 Auto Lightning Lightning KAL 137143
06/10/2003 12:22 06/10/2003 12:22 Noxon-Libby No 1 230kV line 230.0 L 70.17 0 Auto Lightning Lightning KAL 137144
06/10/2003 12:42 06/10/2003 12:42 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T G 2.39 0 Auto Lightning Unknown SPK 137145
06/10/2003 12:42 06/10/2003 12:42 Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line 115.0 S G 4.75 0 Auto Lightning Unknown SPK 137145
06/10/2003 12:42 06/10/2003 12:42 Colville-Boundary No 1 115kV line 115.0 L O 43.06 0 Auto Lightning Unknown SPK 137145
06/10/2003 12:42 06/10/2003 12:42 Colville-Spirit section of Colville-Boundary No 1 115kV line 115.0 S G 17.42 0 Auto Lightning Unknown SPK 137145
06/10/2003 12:42 06/10/2003 12:42 Metaline Falls tap to Colville-Boundary No 1 115kV line 115.0 T G 1.20 0 Auto Lightning Unknown SPK 137145
06/10/2003 12:42 06/10/2003 12:42 Spirit tap to Colville-Boundary No 1 115kV line 115.0 T G 5.23 0 Auto Lightning Unknown SPK 137145
06/10/2003 12:42 06/10/2003 12:42 Spirit-Box Canyon section of Colville-Boundary No 1 115kV line 115.0 S G 11.98 0 Auto Lightning Unknown SPK 137145
06/10/2003 13:30 06/10/2003 13:37 Grand Coulee-Westside AVA No 1 230kV line 230.0 L 77.32 7 Auto Lightning WEN SPK 137146
06/10/2003 14:38 06/10/2003 14:38 Santiam-Chemawa No 1 230kV line 230.0 L 24.40 0 Auto Unknown Unknown SAL 137147
06/10/2003 17:58 06/10/2003 17:58 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.01 0 Auto Lightning Lightning KAL 137148
06/10/2003 17:58 06/10/2003 17:58 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S G 31.50 0 Auto Lightning Lightning KAL 137148
06/10/2003 17:58 06/10/2003 17:58 Libby-Conkelley No 1 230kV line 230.0 L 83.94 0 Auto Lightning Lightning KAL 137148
06/10/2003 17:58 06/10/2003 17:58 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S G 45.10 0 Auto Lightning Lightning KAL 137148
06/10/2003 17:58 06/10/2003 17:58 Trumbull Creek tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 137148
06/10/2003 17:58 06/10/2003 17:58 Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line 230.0 S G 7.34 0 Auto Lightning Lightning KAL 137148
06/10/2003 17:58 06/10/2003 17:58 Noxon-Libby No 1 230kV line 230.0 L 70.17 0 Auto Lightning Lightning KAL 137149
06/10/2003 17:58 06/10/2003 18:02 Libby PH-Libby No 2 230kV line 230.0 L 1.29 4 Auto RAS Initiated RAS Initiated KAL 137150
06/10/2003 18:07 06/10/2003 18:07 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T 2.39 0 Auto Lightning Unknown SPK 137151
06/10/2003 18:07 06/10/2003 18:07 Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line 115.0 S 4.75 0 Auto Lightning Unknown SPK 137151
06/10/2003 18:07 06/10/2003 18:07 Colville-Boundary No 1 115kV line 115.0 L O 43.06 0 Auto Lightning Unknown SPK 137151
06/10/2003 18:07 06/10/2003 18:07 Colville-Spirit section of Colville-Boundary No 1 115kV line 115.0 S 17.42 0 Auto Lightning Unknown SPK 137151
06/10/2003 18:07 06/10/2003 18:07 Metaline Falls tap to Colville-Boundary No 1 115kV line 115.0 T 1.20 0 Auto Lightning Unknown SPK 137151
06/10/2003 18:07 06/10/2003 18:07 Spirit tap to Colville-Boundary No 1 115kV line 115.0 T 5.23 0 Auto Lightning Unknown SPK 137151
06/10/2003 18:07 06/10/2003 18:07 Spirit-Box Canyon section of Colville-Boundary No 1 115kV line 115.0 S 11.98 0 Auto Lightning Unknown SPK 137151
06/10/2003 19:35 06/10/2003 19:35 Flathead-Hot Springs No 1 230kV line 230.0 L 56.45 0 Auto Lightning Lightning KAL 137152
06/10/2003 19:35 06/10/2003 19:35 Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line 230.0 S G 13.50 0 Auto Lightning Lightning KAL 137152
06/10/2003 19:35 06/10/2003 19:35 Lion Mountain tap to Flathead-Hot Springs No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 137152
06/10/2003 19:35 06/10/2003 19:35 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S G 42.95 0 Auto Lightning Lightning KAL 137152
06/10/2003 19:35 06/10/2003 19:38 Libby PH-Libby No 2 230kV line 230.0 L 1.29 3 Auto RAS Initiated RAS Initiated KAL 137153
06/10/2003 19:55 06/10/2003 19:55 Flathead-Hot Springs No 1 230kV line 230.0 L 56.45 0 Auto Lightning Lightning KAL 137154
06/10/2003 19:55 06/10/2003 19:55 Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line 230.0 S G 13.50 0 Auto Lightning Lightning KAL 137154
06/10/2003 19:55 06/10/2003 19:55 Lion Mountain tap to Flathead-Hot Springs No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 137154
06/10/2003 19:55 06/10/2003 19:55 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S G 42.95 0 Auto Lightning Lightning KAL 137154
06/10/2003 19:55 06/10/2003 19:57 Libby PH-Libby No 2 230kV line 230.0 L 1.29 2 Auto RAS Initiated RAS Initiated KAL 137155
06/10/2003 20:03 06/10/2003 20:03 Flathead-Hot Springs No 1 230kV line 230.0 L 56.45 0 Auto Lightning Lightning KAL 137156
06/10/2003 20:03 06/10/2003 20:03 Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line 230.0 S G 13.50 0 Auto Lightning Lightning KAL 137156
06/10/2003 20:03 06/10/2003 20:03 Lion Mountain tap to Flathead-Hot Springs No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 137156
06/10/2003 20:03 06/10/2003 20:03 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S G 42.95 0 Auto Lightning Lightning KAL 137156
06/10/2003 20:03 06/10/2003 20:05 Libby PH-Libby No 2 230kV line 230.0 L 1.29 2 Auto RAS Initiated RAS Initiated KAL 137157
06/11/2003 05:11 06/12/2003 08:44 Potholes-Grand Coulee No 1 230kV line 230.0 L 65.66 1653 Plan Foreign Request WEN SPK 137158
06/11/2003 05:11 06/12/2003 07:13 Columbia-Grand Coulee No 1 230kV line 230.0 L 72.61 1562 Plan Foreign Request WEN 137159
06/11/2003 07:12 06/11/2003 14:27 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S 25.06 435 Plan Maintenance KAL 137160
06/11/2003 07:12 06/11/2003 14:27 Hot Springs-Rattlesnake No 1 230kV line 230.0 L G 58.91 435 Plan Maintenance KAL 137160
06/11/2003 07:42 06/11/2003 15:32 Lane-Wendson No 1 115kV line 115.0 L G 41.39 470 Plan Maintenance EUG 137161
06/11/2003 07:42 06/11/2003 15:32 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 470 Plan Maintenance EUG 137161
06/11/2003 07:45 06/11/2003 15:16 Grand Ronde-Boyer No 1 115kV line 115.0 L 5.62 451 Plan Maintenance SAL 137162
06/11/2003 08:00 06/11/2003 15:13 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 433 Plan Maintenance EUG 137163
06/11/2003 08:00 06/11/2003 15:13 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S 10.26 433 Plan Maintenance EUG 137163
06/11/2003 09:01 06/11/2003 15:11 Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 L O 45.05 370 Plan Maintenance LGV 137164
06/11/2003 09:01 06/11/2003 15:11 Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 S 0.93 370 Plan Maintenance LGV 137164
06/11/2003 09:25 06/11/2003 16:36 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 431 Plan Maintenance IDF 137165
06/11/2003 18:36 06/11/2003 18:59 Lancaster-Rathdrum Power No 1 230kV line 230.0 L 0.02 23 Auto Foreign Trouble Foreign Utility SPK 137166
06/11/2003 20:18 06/11/2003 20:59 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 41 Auto Foreign Trouble TRI 137167
06/12/2003 01:48 06/12/2003 12:53 Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line 230.0 S 15.65 665 Auto Foreign Trouble Foreign Trouble COV 137168
06/12/2003 01:48 06/12/2003 12:53 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 665 Auto Foreign Trouble Foreign Trouble COV 137168
06/12/2003 02:33 06/12/2003 05:09 John Day-Marion No 1 500kV line 500.0 L 127.51 156 Plan Voltage Control TDA RED SAL 137169
06/12/2003 06:45 06/12/2003 16:00 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 555 Plan Maintenance IDF 137174
06/12/2003 07:13 06/12/2003 13:28 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S 25.06 375 Plan Maintenance KAL 137175
06/12/2003 07:13 06/12/2003 13:28 Hot Springs-Rattlesnake No 1 230kV line 230.0 L G 58.91 375 Plan Maintenance KAL 137175
06/12/2003 07:18 06/12/2003 15:40 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 502 Plan Foreign Request RED 137176
06/12/2003 07:41 06/12/2003 14:47 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 426 Plan Maintenance EUG 137177
06/12/2003 07:41 06/12/2003 14:47 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S 10.26 426 Plan Maintenance EUG 137177
06/12/2003 07:44 06/12/2003 12:33 Midway-Priest Rapids No 2 230kV line 230.0 L 7.50 289 Plan Foreign Request TRI 137178
06/12/2003 07:48 06/12/2003 15:32 Salem-Albany No 2 115kV line 115.0 L G 27.85 464 Plan Maintenance SAL EUG 137179
06/12/2003 07:48 06/12/2003 15:32 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 464 Plan Maintenance SAL 137179
06/12/2003 08:04 06/12/2003 15:57 Lane-Wendson No 1 115kV line 115.0 L G 41.39 473 Plan Maintenance EUG 137180
06/12/2003 08:04 06/12/2003 15:57 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 473 Plan Maintenance EUG 137180
06/12/2003 09:03 06/12/2003 11:00 Jim Creek Service No 1 115kV line 115.0 L 9.57 117 Plan Foreign Request SNO 137181
06/12/2003 11:46 06/12/2003 12:27 Sifton-Fishers Road No 1 115kV line 115.0 L 2.21 41 Auto Foreign Trouble Foreign Trouble LGV 137182
06/13/2003 07:10 06/13/2003 15:51 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 521 Plan Foreign Request RED 137186
06/13/2003 07:37 06/13/2003 14:16 Salem-Albany No 2 115kV line 115.0 L G 27.85 399 Plan Maintenance SAL EUG 137187
06/13/2003 07:37 06/13/2003 14:16 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 399 Plan Maintenance SAL 137187
06/13/2003 08:05 06/14/2003 02:19 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 1094 Plan Maintenance RED 137188
06/13/2003 08:06 06/13/2003 15:05 Lane-Wendson No 1 115kV line 115.0 L G 41.39 419 Plan Maintenance EUG 137189
06/13/2003 08:06 06/13/2003 15:05 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 419 Plan Maintenance EUG 137189
06/13/2003 09:31 06/13/2003 09:31 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Unknown TDA RED 137190
06/13/2003 09:31 06/13/2003 09:31 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137190
06/13/2003 09:31 06/13/2003 09:31 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137190
06/13/2003 09:31 06/13/2003 09:31 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137190
06/13/2003 09:31 06/13/2003 09:31 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137190
06/13/2003 09:31 06/13/2003 09:31 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137190
06/13/2003 13:22 06/13/2003 13:22 Lost River-Spar Canyon No 1 230kV line 230.0 L 53.19 0 Auto Lightning Lightning IDF 137191
06/13/2003 13:22 06/13/2003 13:22 Spar Canyon-Round Valley No 1 230kV line 230.0 L 11.92 0 Auto Lightning Forced (Configuration) IDF 137192
06/13/2003 15:14 06/13/2003 15:28 Rogue-Gold Beach No 2 115kV line 115.0 L 5.49 14 Plan Switching EUG 137193
06/13/2003 16:46 06/13/2003 16:46 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 0 Auto Lightning Lightning SPK 137194
06/13/2003 17:46 06/14/2003 03:25 Grand Coulee-Chief Joseph No 2 230kV line 230.0 L 32.59 579 Auto Lightning Lightning WEN 137195
06/13/2003 17:46 06/13/2003 21:17 Grand Coulee Switchyard 230-500kV Tie No 1 500kV line 500.0 L 1.25 211 Auto Foreign Trouble WEN 137196
06/13/2003 18:21 06/13/2003 18:21 Lancaster-Noxon No 1 230kV line 230.0 L 72.72 0 Auto Lightning Lightning SPK KAL 137197
06/14/2003 00:01 06/15/2003 05:59 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 1798 Plan Foreign Request OLY 137198
06/14/2003 01:45 06/14/2003 14:48 John Day-Marion No 1 500kV line 500.0 L 127.51 783 Plan Voltage Control TDA RED SAL 137199
06/14/2003 02:33 06/14/2003 06:54 Schultz-Raver No 1 500kV line 500.0 L 77.24 261 Plan Voltage Control WEN COV 137200
06/14/2003 05:39 06/14/2003 18:30 McKenzie tap to Rocky Reach-Columbia No 2 230kV line 230.0 T G 0.30 771 Plan Foreign Request WEN 137203
06/14/2003 05:39 06/14/2003 18:30 McKenzie-Columbia section of Rocky Reach-Columbia No 2 230kV line 230.0 S G 5.50 771 Plan Foreign Request WEN 137203
06/14/2003 05:39 06/14/2003 18:30 Rocky Reach-Columbia No 2 230kV line 230.0 L 21.30 771 Plan Foreign Request WEN 137203
06/14/2003 05:39 06/14/2003 18:30 Rocky Reach-McKenzie section of Rocky Reach-Columbia No 2 230kV line 230.0 S G 15.80 771 Plan Foreign Request WEN 137203
06/14/2003 18:35 06/14/2003 18:35 Canal-Second Lift No 2 34.5kV line 34.5 L G 1.00 0 Auto Unknown Line Material Failure IDF 137451
06/14/2003 18:35 06/14/2003 18:35 Jackson-Second Lift section of Canal-Second Lift No 2 34.5kV line 34.5 S 1.00 0 Auto Unknown Line Material Failure IDF 137451
06/15/2003 00:09 06/15/2003 09:57 Buckley-Marion No 1 500kV line 500.0 L 99.33 588 Plan Voltage Control TDA RED SAL 137204
06/15/2003 01:13 06/15/2003 10:03 Schultz-Raver No 2 500kV line 500.0 L 77.24 530 Plan Voltage Control WEN COV 137205
06/15/2003 05:59 06/15/2003 07:05 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 66 Plan Voltage Control RED 137206
06/15/2003 16:59 06/15/2003 16:59 Targhee-Drummond No 1 115kV line 115.0 L 26.80 0 Auto Lightning Lightning IDF 137207
06/16/2003 00:17 06/16/2003 05:42 Schultz-Raver No 2 500kV line 500.0 L 77.24 325 Plan Voltage Control WEN COV 137208
06/16/2003 01:14 06/16/2003 06:10 John Day-Marion No 1 500kV line 500.0 L 127.51 296 Plan Voltage Control TDA RED SAL 137209
06/16/2003 04:54 06/17/2003 14:04 Dworshak PH-Ahsahka section of Dworshak PH-Orofino No 1 115kV line 115.0 S 0.83 1990 Plan Foreign Request TRI SPK 137214
06/16/2003 04:54 06/17/2003 14:04 Dworshak PH-Orofino No 1 115kV line 115.0 L G 4.45 1990 Plan Foreign Request TRI SPK 137214
06/16/2003 06:55 06/16/2003 16:07 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 552 Plan Maintenance IDF 137215
06/16/2003 07:31 06/16/2003 15:27 Salem-Albany No 1 115kV line 115.0 L 23.90 476 Plan Maintenance SAL EUG 137216
06/16/2003 07:31 06/16/2003 08:11 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 40 Plan Maintenance OLY COV WEN 137217
06/16/2003 07:33 06/16/2003 17:12 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 579 Plan Foreign Request RED 137218
06/16/2003 07:42 06/16/2003 14:42 Albany-Lebanon No 1 115kV line 115.0 L G 17.01 420 Plan Maintenance EUG 137219
06/16/2003 07:42 06/16/2003 14:42 Albany-Lochner section of Albany-Lebanon No 1 115kV line 115.0 S 2.43 420 Plan Maintenance EUG 137219
06/16/2003 07:59 06/16/2003 10:27 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 148 Plan Maintenance EUG 137220
06/16/2003 07:59 06/16/2003 10:27 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S 10.26 148 Plan Maintenance EUG 137220
06/16/2003 07:59 06/16/2003 15:16 Lane-Wendson No 1 115kV line 115.0 L G 41.39 437 Plan Maintenance EUG 137221
06/16/2003 07:59 06/16/2003 15:16 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 437 Plan Maintenance EUG 137221
06/16/2003 08:26 06/18/2003 13:56 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 3210 Plan Maintenance OLY 137222
06/16/2003 08:51 06/27/2003 16:35 McNary-Horse Heaven No 1 230kV line 230.0 L 16.84 16304 Plan Maintenance TRI 137223
06/16/2003 09:37 06/17/2003 13:09 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 1652 Plan Maintenance WEN TRI 137224
06/16/2003 09:37 06/17/2003 13:09 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 1652 Plan Maintenance WEN TRI 137224
06/16/2003 12:10 06/16/2003 16:43 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 273 Plan Maintenance OLY 137225
06/16/2003 12:10 06/16/2003 16:43 Olympia-Skookum section of Olympia-Shelton No 2 115kV line 115.0 S 12.77 273 Plan Maintenance OLY 137225
06/16/2003 12:18 06/16/2003 12:25 Rogue-Gold Beach No 2 115kV line 115.0 L 5.49 7 Plan Switching EUG 137226
06/16/2003 14:38 06/16/2003 15:19 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 41 Plan Maintenance OLY COV WEN 137227
06/17/2003 01:56 06/18/2003 11:47 Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.74 2031 Plan Maintenance EUG 137233
06/17/2003 01:56 06/18/2003 11:47 Lookout Point-Alvey No 1 115kV line 115.0 L G 15.77 2031 Plan Maintenance EUG 137233
06/17/2003 01:56 06/17/2003 02:34 Lookout Point-Alvey No 1 115kV line 115.0 L O 15.77 38 Plan Switching EUG 137234
06/17/2003 01:56 06/17/2003 02:34 Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.66 38 Plan Switching EUG 137234
06/17/2003 02:37 06/17/2003 02:37 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137228
06/17/2003 05:59 06/17/2003 15:51 Rattlesnake-Garrison No 1 230kV line 230.0 L 60.94 592 Plan Maintenance KAL 137235
06/17/2003 06:34 06/17/2003 15:20 Columbia Falls-Kalispell No 1 115kV line 115.0 L 10.80 526 Plan Maintenance KAL 137236
06/17/2003 07:15 06/19/2003 16:56 Chehalis-Covington No 1 230kV line 230.0 L T 69.40 3461 Plan Maintenance OLY COV 137237
06/17/2003 07:15 06/19/2003 16:56 Cowlitz tap to Chehalis-Covington No 1 230kV line 230.0 T 6.30 3461 Plan Maintenance COV 137237
06/17/2003 07:16 06/17/2003 16:56 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 580 Plan Foreign Request RED 137238
06/17/2003 07:39 06/17/2003 14:48 Albany-Lebanon No 1 115kV line 115.0 L G 17.01 429 Plan Maintenance EUG 137239
06/17/2003 07:39 06/17/2003 14:48 Albany-Lochner section of Albany-Lebanon No 1 115kV line 115.0 S 2.43 429 Plan Maintenance EUG 137239
06/17/2003 07:47 06/17/2003 15:43 Salem-Albany No 1 115kV line 115.0 L 23.90 476 Plan Maintenance SAL EUG 137240
06/17/2003 07:54 06/17/2003 15:52 Chehalis-Mayfield No 1 230kV line 230.0 L 21.37 478 Plan Maintenance OLY 137241
06/17/2003 07:54 06/17/2003 15:52 Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line 230.0 S G 20.20 478 Plan Maintenance OLY 137241
06/17/2003 07:54 06/17/2003 15:52 Silver Creek tap to Chehalis-Mayfield No 1 230kV line 230.0 T G 0.10 478 Plan Maintenance OLY 137241
06/17/2003 07:54 06/17/2003 15:52 Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line 230.0 S G 1.17 478 Plan Maintenance OLY 137241
06/17/2003 08:01 06/17/2003 09:47 Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line 115.0 S 17.48 106 Plan Maintenance IDF 137242
06/17/2003 08:01 06/17/2003 09:47 Swan Valley-Teton No 1 115kV line 115.0 L G 35.47 106 Plan Maintenance IDF 137242
06/17/2003 08:30 06/19/2003 16:55 Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line 230.0 S 35.80 3385 Plan Maintenance OLY COV 137243
06/17/2003 08:30 06/19/2003 16:55 Chehalis-Covington No 1 230kV line 230.0 L G 69.40 3385 Plan Maintenance OLY COV 137243
06/17/2003 08:30 06/19/2003 16:55 TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line 230.0 S 23.30 3385 Plan Maintenance COV 137243
06/17/2003 10:11 06/17/2003 15:03 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 292 Plan Maintenance IDF 137244
06/17/2003 10:34 06/17/2003 14:06 Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line 500.0 T 0.09 212 Plan Foreign Request OLY 137245
06/17/2003 10:34 06/17/2003 14:06 Paul-Centralia Thermal PH No 1 500kV line 500.0 L T 0.78 212 Plan Foreign Request OLY 137245
06/17/2003 12:00 06/17/2003 13:37 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 97 Plan Maintenance TDA RED 137246
06/17/2003 12:00 06/17/2003 13:37 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 97 Plan Maintenance TDA 137246
06/17/2003 16:24 06/17/2003 16:24 Canal-Second Lift No 2 34.5kV line 34.5 L G 1.00 0 Auto Unknown Line Material Failure IDF 137452
06/17/2003 16:24 06/17/2003 16:24 Jackson-Second Lift section of Canal-Second Lift No 2 34.5kV line 34.5 S 1.00 0 Auto Unknown Line Material Failure IDF 137452
06/18/2003 06:42 06/18/2003 16:02 Rattlesnake-Garrison No 1 230kV line 230.0 L 60.94 560 Plan Maintenance KAL 137252
06/18/2003 07:22 06/18/2003 16:50 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 568 Plan Foreign Request RED 137253
06/18/2003 07:45 06/18/2003 13:42 Custer-Intalco No 1 230kV line 230.0 L 6.70 357 Plan Maintenance SNO 137254
06/18/2003 09:06 06/18/2003 09:06 Maple Valley-Duwamish No 1 230kV line 230.0 L 7.68 0 Auto Foreign Trouble Foreign Trouble COV 137255
06/18/2003 09:06 06/18/2003 09:06 Covington-Duwamish No 1 230kV line 230.0 L 15.82 0 Auto Foreign Trouble Foreign Trouble COV 137256
06/18/2003 09:22 06/18/2003 09:22 Grand Coulee-Keller section of Grand Coulee-Okanogan No 2 115kV line 115.0 S 1.25 0 Auto Foreign Utility WEN 137257
06/18/2003 09:22 06/18/2003 09:22 Grand Coulee-Okanogan No 2 115kV line 115.0 L G 41.05 0 Auto Foreign Utility WEN 137257
06/18/2003 09:24 06/18/2003 09:27 Grand Coulee-Keller section of Grand Coulee-Okanogan No 2 115kV line 115.0 S 1.25 3 Auto Foreign Utility WEN 137258
06/18/2003 09:24 06/18/2003 09:27 Grand Coulee-Okanogan No 2 115kV line 115.0 L G 41.05 3 Auto Foreign Utility WEN 137258
06/18/2003 16:22 06/18/2003 16:22 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 137259
06/18/2003 16:22 06/18/2003 16:22 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 137259
06/18/2003 16:22 06/18/2003 16:22 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137259
06/18/2003 16:22 06/18/2003 16:22 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 137259
06/18/2003 16:22 06/18/2003 16:22 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 137259
06/18/2003 16:22 06/18/2003 16:22 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 137259
06/18/2003 16:22 06/18/2003 16:22 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137259
06/18/2003 16:22 06/18/2003 16:22 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 137259
06/18/2003 19:31 06/18/2003 19:31 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.01 0 Auto Lightning Lightning KAL 137260
06/18/2003 19:31 06/18/2003 19:31 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S G 31.50 0 Auto Lightning Lightning KAL 137260
06/18/2003 19:31 06/18/2003 19:31 Libby-Conkelley No 1 230kV line 230.0 L 83.94 0 Auto Lightning Lightning KAL 137260
06/18/2003 19:31 06/18/2003 19:31 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S G 45.10 0 Auto Lightning Lightning KAL 137260
06/18/2003 19:31 06/18/2003 19:31 Trumbull Creek tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 137260
06/18/2003 19:31 06/18/2003 19:31 Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line 230.0 S G 7.34 0 Auto Lightning Lightning KAL 137260
06/18/2003 19:31 06/18/2003 19:39 Libby PH-Libby No 2 230kV line 230.0 L 1.29 8 Auto RAS Initiated RAS Initiated KAL 137261
06/19/2003 01:18 06/19/2003 05:36 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 258 Plan Voltage Control RED 137262
06/19/2003 03:26 06/19/2003 06:02 John Day-Marion No 1 500kV line 500.0 L 127.51 156 Plan Voltage Control TDA RED SAL 137263
06/19/2003 06:39 06/19/2003 10:02 Roundup-LaGrande No 1 230kV line 230.0 L 45.02 203 Plan Maintenance TRI 137275
06/19/2003 07:17 06/19/2003 17:07 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 590 Plan Maintenance IDF 137276
06/19/2003 07:19 06/19/2003 16:26 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 547 Plan Foreign Request RED 137277
06/19/2003 07:49 06/19/2003 14:18 A539-Albany section of Santiam-Albany No 1 230kV line 230.0 S G 28.41 389 Plan Maintenance EUG 137278
06/19/2003 07:49 06/19/2003 14:18 Santiam-A539 section of Santiam-Albany No 1 230kV line 230.0 S G 0.13 389 Plan Maintenance SAL EUG 137278
06/19/2003 07:49 06/19/2003 14:18 Santiam-Albany No 1 230kV line 230.0 L 28.54 389 Plan Maintenance SAL EUG 137278
06/19/2003 12:24 06/20/2003 15:23 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 1619 Plan Maintenance EUG 137279
06/19/2003 14:09 06/19/2003 14:11 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 2 Auto Lightning Lightning KAL 137280
06/19/2003 14:09 06/19/2003 14:11 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 2 Auto Lightning Lightning KAL 137280
06/19/2003 14:09 06/19/2003 14:11 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 2 Auto Lightning Lightning KAL 137280
06/19/2003 14:09 06/19/2003 14:11 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 2 Auto Lightning Lightning KAL 137280
06/19/2003 14:39 06/19/2003 14:41 Rattlesnake-Garrison No 1 230kV line 230.0 L 60.94 2 Auto Lightning Lightning KAL 137281
06/19/2003 14:46 06/19/2003 14:46 Rattlesnake-Garrison No 1 230kV line 230.0 L 60.94 0 Auto Lightning Lightning KAL 137282
06/19/2003 14:51 06/19/2003 14:55 John Day-Big Eddy No 2 500kV line 500.0 L 18.96 4 Auto Improper Relaying Maintenance TDA 137283
06/19/2003 14:54 06/19/2003 14:54 Elmo tap to Kalispell-Kerr No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning KAL 137284
06/19/2003 14:54 06/19/2003 14:54 Elmo-Kerr section of Kalispell-Kerr No 1 115kV line 115.0 S G 12.80 0 Auto Lightning Lightning KAL 137284
06/19/2003 14:54 06/19/2003 14:54 Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line 115.0 S G 28.59 0 Auto Lightning Lightning KAL 137284
06/19/2003 14:54 06/19/2003 14:54 Kalispell-Kerr No 1 115kV line 115.0 L 41.39 0 Auto Lightning Lightning KAL 137284
06/19/2003 19:41 06/19/2003 19:41 Malin-Round Mountain No 2 500kV line 500.0 L 94.40 0 Auto Lightning Lightning RED 137285
06/19/2003 19:45 06/19/2003 20:39 Camp-Trout Creek section of Noxon-Hot Springs No 1 230kV line 230.0 S 10.90 54 Auto Lightning Unknown KAL 137286
06/19/2003 19:45 06/19/2003 20:39 Noxon-Camp section of Noxon-Hot Springs No 1 230kV line 230.0 S 0.20 54 Auto Lightning Unknown KAL 137286
06/19/2003 19:45 06/20/2003 08:44 Noxon-Hot Springs No 1 230kV line 230.0 L G 68.28 779 Auto Lightning Unknown KAL 137286
06/19/2003 19:45 06/20/2003 08:44 Trout Creek-Hot Springs section of Noxon-Hot Springs No 1 230kV line 230.0 S 57.18 779 Auto Lightning Unknown KAL 137286
06/19/2003 21:11 06/19/2003 21:11 Noxon-Libby No 1 230kV line 230.0 L 70.17 0 Auto Lightning Lightning KAL 137287
06/19/2003 21:52 06/19/2003 21:52 Columbia Falls-Stillwater section of Columbia Falls-Trego No 1 115kV line 115.0 S G 18.58 0 Auto Lightning Lightning KAL 137288
06/19/2003 21:52 06/19/2003 21:52 Columbia Falls-Trego No 1 115kV line 115.0 L 45.96 0 Auto Lightning Lightning KAL 137288
06/19/2003 21:52 06/19/2003 21:52 Stillwater tap to Columbia Falls-Trego No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning KAL 137288
06/19/2003 21:52 06/19/2003 21:52 Stillwater-Trego section of Columbia Falls-Trego No 1 115kV line 115.0 S G 27.38 0 Auto Lightning Lightning KAL 137288
06/20/2003 02:14 06/20/2003 05:12 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 178 Plan Voltage Control RED 137289
06/20/2003 04:11 06/20/2003 04:11 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.01 0 Auto Unknown Lightning KAL 137290
06/20/2003 04:11 06/20/2003 04:11 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S G 31.50 0 Auto Unknown Lightning KAL 137290
06/20/2003 04:11 06/20/2003 04:11 Libby-Conkelley No 1 230kV line 230.0 L 83.94 0 Auto Unknown Lightning KAL 137290
06/20/2003 04:11 06/20/2003 04:11 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S G 45.10 0 Auto Unknown Lightning KAL 137290
06/20/2003 04:11 06/20/2003 04:11 Trumbull Creek tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.10 0 Auto Unknown Lightning KAL 137290
06/20/2003 04:11 06/20/2003 04:11 Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line 230.0 S G 7.34 0 Auto Unknown Lightning KAL 137290
06/20/2003 04:11 06/20/2003 04:11 Libby PH-Libby No 2 230kV line 230.0 L 1.29 0 Auto RAS Initiated RAS Initiated KAL 137291
06/20/2003 07:56 06/20/2003 15:08 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S 10.53 432 Plan Maintenance SAL 137295
06/20/2003 07:56 06/20/2003 15:08 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 432 Plan Maintenance SAL 137295
06/20/2003 08:30 06/20/2003 12:11 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 221 Plan Foreign Request TRI 137296
06/20/2003 08:41 06/20/2003 08:44 Camp-Trout Creek section of Noxon-Hot Springs No 1 230kV line 230.0 S 10.90 3 Plan Switching KAL 137297
06/20/2003 08:41 06/20/2003 08:44 Noxon-Camp section of Noxon-Hot Springs No 1 230kV line 230.0 S 0.20 3 Plan Switching KAL 137297
06/20/2003 08:41 06/20/2003 08:44 Noxon-Hot Springs No 1 230kV line 230.0 L O 68.28 3 Plan Switching KAL 137297
06/20/2003 09:01 07/10/2003 14:55 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 29154 Plan Normally Out COV 137316
06/20/2003 09:01 07/10/2003 14:55 McCullough tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 2.18 29154 Plan Normally Out COV 137316
06/20/2003 09:07 06/20/2003 09:07 Garrison-Taft No 1 500kV line 500.0 L 159.38 0 Auto Lightning Lightning KAL 137298
06/20/2003 09:07 06/20/2003 09:07 Garrison-Taft No 2 500kV line 500.0 L 159.38 0 Auto Lightning Lightning KAL 137299
06/20/2003 09:07 06/20/2003 09:09 Broadview-Garrison No 1 500kV line 500.0 L 224.71 2 Plan Forced KAL 137300
06/20/2003 15:11 06/20/2003 20:39 Hines-Harney No 1 115kV line 115.0 L 3.40 328 Auto Foreign Trouble RED 137301
06/21/2003 01:05 06/21/2003 07:07 John Day-Marion No 1 500kV line 500.0 L 127.51 362 Plan Voltage Control TDA RED SAL 137302
06/21/2003 03:02 06/21/2003 06:47 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 225 Plan Voltage Control RED 137303
06/21/2003 14:45 06/21/2003 14:45 Elmo tap to Kalispell-Kerr No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning KAL 137305
06/21/2003 14:45 06/21/2003 14:45 Elmo-Kerr section of Kalispell-Kerr No 1 115kV line 115.0 S G 12.80 0 Auto Lightning Lightning KAL 137305
06/21/2003 14:45 06/21/2003 14:45 Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line 115.0 S G 28.59 0 Auto Lightning Lightning KAL 137305
06/21/2003 14:45 06/21/2003 14:45 Kalispell-Kerr No 1 115kV line 115.0 L 41.39 0 Auto Lightning Lightning KAL 137305
06/21/2003 23:39 06/23/2003 05:54 John Day-Marion No 1 500kV line 500.0 L 127.51 1815 Plan Voltage Control TDA RED SAL 137306
06/22/2003 00:01 06/22/2003 23:18 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 1397 Plan Foreign Request OLY 137307
06/22/2003 00:14 06/22/2003 00:14 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137308
06/22/2003 01:18 06/22/2003 09:59 Schultz-Raver No 2 500kV line 500.0 L 77.24 521 Plan Voltage Control WEN COV 137309
06/22/2003 01:53 06/22/2003 09:09 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 436 Plan Voltage Control RED 137310
06/22/2003 07:17 06/22/2003 16:58 Hines-Harney No 1 115kV line 115.0 L 3.40 581 Plan Construction RED 137311
06/22/2003 21:07 06/22/2003 21:07 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Auto Unknown TDA RED 137312
06/22/2003 21:07 06/22/2003 21:07 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Unknown TDA 137312
06/22/2003 21:07 06/22/2003 21:07 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Unknown TDA 137312
06/22/2003 21:07 06/22/2003 21:07 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Unknown TDA 137312
06/22/2003 21:07 06/22/2003 21:07 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Unknown TDA 137312
06/22/2003 21:07 06/22/2003 21:07 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Unknown TDA 137312
06/22/2003 21:07 06/22/2003 21:07 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Unknown TDA RED 137313
06/22/2003 21:07 06/22/2003 21:07 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137313
06/22/2003 21:07 06/22/2003 21:07 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137313
06/22/2003 21:07 06/22/2003 21:07 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137313
06/22/2003 21:07 06/22/2003 21:07 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137313
06/22/2003 21:07 06/22/2003 21:07 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Unknown TDA 137313
06/23/2003 07:11 06/27/2003 14:05 Elmo-Kerr section of Kalispell-Kerr No 1 115kV line 115.0 S 12.80 6174 Plan Maintenance KAL 137317
06/23/2003 07:11 06/27/2003 14:05 Kalispell-Kerr No 1 115kV line 115.0 L G 41.39 6174 Plan Maintenance KAL 137317
06/23/2003 07:36 07/02/2003 14:55 Grand Coulee-Chief Joseph No 2 230kV line 230.0 L 32.59 13399 Plan Maintenance WEN 137318
06/23/2003 07:42 06/23/2003 15:35 Mossyrock-Chehalis No 1 230kV line 230.0 L 27.26 473 Plan Maintenance OLY 137319
06/23/2003 07:55 06/23/2003 14:08 Lane-Wendson No 1 115kV line 115.0 L G 41.39 373 Plan Maintenance EUG 137320
06/23/2003 07:55 06/23/2003 14:08 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 373 Plan Maintenance EUG 137320
06/23/2003 08:06 06/23/2003 14:00 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 354 Plan Maintenance SAL 137321
06/23/2003 08:15 06/23/2003 15:56 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 461 Plan Maintenance IDF 137322
06/23/2003 08:24 06/27/2003 14:27 Creston-Bell No 1 115kV line 115.0 L G 53.80 6123 Plan Maintenance WEN SPK 137323
06/23/2003 08:24 06/27/2003 14:27 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 6123 Plan Maintenance SPK 137323
06/23/2003 08:25 06/23/2003 15:46 Albany-Eugene No 1 115kV line 115.0 L G 39.80 441 Plan Maintenance EUG 137324
06/23/2003 08:25 06/23/2003 15:46 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 441 Plan Maintenance EUG 137324
06/23/2003 08:28 06/27/2003 15:14 Ostrander-Pearl No 1 500kV line 500.0 L 19.48 6166 Plan Construction LGV SAL 137325
06/23/2003 08:29 06/23/2003 16:57 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 508 Plan Maintenance TDA RED 137326
06/23/2003 08:29 06/23/2003 16:57 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 508 Plan Maintenance TDA RED 137326
06/23/2003 08:45 06/23/2003 14:15 Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line 115.0 S 12.85 330 Plan Maintenance OLY 137327
06/23/2003 08:45 06/23/2003 14:15 Shelton-Fairmount No 1 115kV line 115.0 L G 60.23 330 Plan Maintenance OLY 137327
06/23/2003 09:15 06/23/2003 11:52 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 157 Auto Foreign Trouble Foreign Trouble OLY 137328
06/23/2003 10:30 06/24/2003 16:01 Fairview-Rogue No 1 230kV line 230.0 L 65.28 1771 Plan Maintenance EUG 137329
06/23/2003 12:20 06/26/2003 14:58 Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line 115.0 T 0.10 4478 Plan Maintenance TRI 137330
06/23/2003 12:20 06/26/2003 14:58 Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 24.00 4478 Plan Maintenance TRI 137330
06/23/2003 12:20 06/26/2003 14:58 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 4478 Plan Maintenance TRI 137330
06/23/2003 12:20 06/26/2003 14:58 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 4478 Plan Maintenance TRI 137330
06/23/2003 13:48 06/23/2003 17:15 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 207 Auto Foreign Trouble Foreign Trouble OLY 137331
06/23/2003 16:05 06/24/2003 15:38 Albany-Eugene No 1 115kV line 115.0 L G 39.80 1413 Plan Normally Out EUG 137332
06/23/2003 16:05 06/24/2003 15:38 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 1413 Plan Normally Out EUG 137332
06/23/2003 17:12 06/23/2003 17:53 The Dalles PH-Big Eddy No 4 230kV line 230.0 L 0.91 41 Auto Foreign Trouble Foreign Utility TDA 137333
06/23/2003 23:57 06/24/2003 01:08 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 71 Auto Foreign Trouble Foreign Trouble OLY 137334
06/24/2003 01:34 06/24/2003 01:34 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137335
06/24/2003 02:13 06/24/2003 05:12 Marion-Lane No 1 500kV line 500.0 L 68.97 179 Plan Voltage Control SAL EUG 137336
06/24/2003 02:41 06/24/2003 05:55 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 194 Plan Voltage Control RED 137337
06/24/2003 05:45 06/24/2003 15:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 576 Plan Maintenance TDA RED 137338
06/24/2003 05:45 06/24/2003 15:21 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 576 Plan Maintenance TDA 137338
06/24/2003 07:03 06/24/2003 14:21 Wendson-Tahkenitch No 2 230kV line 230.0 L 19.99 438 Plan Maintenance EUG 137340
06/24/2003 07:25 06/24/2003 15:24 Mossyrock-Chehalis No 1 230kV line 230.0 L 27.26 479 Plan Maintenance OLY 137341
06/24/2003 08:00 06/24/2003 14:30 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 390 Plan Maintenance IDF 137342
06/24/2003 08:05 06/24/2003 14:39 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 394 Plan Maintenance SAL 137343
06/24/2003 08:19 06/24/2003 14:24 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 365 Plan Maintenance SAL EUG 137344
06/24/2003 08:19 06/24/2003 14:24 Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line 230.0 S 46.81 365 Plan Maintenance SAL EUG 137344
06/24/2003 08:43 06/24/2003 14:16 Potlatch-Duckabush section of Shelton-Fairmount No 1 115kV line 115.0 S 23.01 333 Plan Maintenance OLY 137345
06/24/2003 08:43 06/24/2003 14:16 Shelton-Fairmount No 1 115kV line 115.0 L G 60.23 333 Plan Maintenance OLY 137345
06/24/2003 08:45 06/24/2003 16:24 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 459 Plan Maintenance TDA RED 137346
06/24/2003 08:45 06/24/2003 16:24 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 459 Plan Maintenance TDA RED 137346
06/24/2003 08:52 06/24/2003 17:00 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 488 Plan Maintenance LGV 137347
06/24/2003 08:52 06/24/2003 17:00 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 488 Plan Maintenance LGV 137347
06/24/2003 10:50 06/24/2003 11:47 Chief Joseph PH-Chief Joseph No 2 230kV line 230.0 L 1.03 57 Auto Foreign Trouble Foreign Utility WEN 137348
06/24/2003 16:13 06/24/2003 18:36 Albany-Eugene No 1 115kV line 115.0 L G 39.80 143 Plan Maintenance EUG 137349
06/24/2003 16:13 06/24/2003 18:36 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 143 Plan Maintenance EUG 137349
06/24/2003 17:35 06/24/2003 21:03 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 208 Auto Foreign Trouble Foreign Trouble OLY 137350
06/24/2003 19:03 07/01/2003 07:28 Albany-Eugene No 1 115kV line 115.0 L G 39.80 9385 Plan Normally Out EUG 137351
06/24/2003 19:03 07/01/2003 07:28 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 9385 Plan Normally Out EUG 137351
06/25/2003 00:28 06/25/2003 05:50 Buckley-Marion No 1 500kV line 500.0 L 99.33 322 Plan Voltage Control TDA RED SAL 137352
06/25/2003 02:12 06/25/2003 04:13 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 121 Plan Voltage Control RED 137353
06/25/2003 07:35 06/25/2003 08:51 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 76 Plan Maintenance TDA RED 137354
06/25/2003 07:35 06/25/2003 08:51 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 76 Plan Maintenance TDA 137354
06/25/2003 07:47 06/27/2003 13:43 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 3236 Plan Foreign Request LGV 137355
06/25/2003 07:47 06/27/2003 13:43 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 3236 Plan Foreign Request LGV 137355
06/25/2003 08:00 06/25/2003 14:30 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 390 Plan Maintenance SAL 137356
06/25/2003 08:17 06/25/2003 16:47 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 510 Plan Maintenance TDA RED 137357
06/25/2003 08:17 06/25/2003 16:47 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 510 Plan Maintenance TDA RED 137357
06/25/2003 08:24 06/25/2003 15:12 Marcola A500-Alvey section of Santiam-Alvey No 1&2 230kV line 230.0 S 15.05 408 Plan Maintenance EUG 137358
06/25/2003 08:24 06/25/2003 15:12 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 408 Plan Maintenance SAL EUG 137358
06/25/2003 09:32 06/25/2003 17:26 Midway-Priest Rapids No 2 230kV line 230.0 L 7.50 474 Plan Foreign Request TRI 137359
06/25/2003 10:16 06/25/2003 12:02 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 106 Plan Testing EUG 137360
06/25/2003 10:16 06/25/2003 12:02 Bandon-Two Mile section of Bandon-Rogue No 1 115kV line 115.0 S 4.40 106 Plan Testing EUG 137360
06/25/2003 23:39 06/25/2003 23:39 Broadview-Garrison No 2 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137361
06/26/2003 02:24 06/26/2003 05:50 John Day-Marion No 1 500kV line 500.0 L 127.51 206 Plan Voltage Control TDA RED SAL 137362
06/26/2003 04:52 06/26/2003 05:11 John Day PH-John Day No 3 500kV line 500.0 L 3.48 19 Auto Unknown Bird or Animal TDA 137363
06/26/2003 06:01 06/26/2003 06:01 Ancient Lake tap to Columbia-Wanapum No 2 230kV line 230.0 T G 4.30 0 Auto Foreign Trouble Foreign Utility WEN 137367
06/26/2003 06:01 06/26/2003 06:01 Ancient Lake-Wanapum section of Columbia-Wanapum No 2 230kV line 230.0 S G 19.70 0 Auto Foreign Trouble Foreign Utility WEN 137367
06/26/2003 06:01 06/26/2003 06:01 Columbia-Ancient Lake section of Columbia-Wanapum No 2 230kV line 230.0 S G 11.20 0 Auto Foreign Trouble Foreign Utility WEN 137367
06/26/2003 06:01 06/26/2003 06:01 Columbia-Wanapum No 2 230kV line 230.0 L 30.90 0 Auto Foreign Trouble Foreign Utility WEN 137367
06/26/2003 08:01 06/26/2003 14:56 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 415 Plan Maintenance SAL 137368
06/26/2003 08:12 06/26/2003 14:35 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 383 Plan Maintenance SAL EUG 137369
06/26/2003 08:12 06/26/2003 14:35 Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line 230.0 S 46.81 383 Plan Maintenance SAL EUG 137369
06/26/2003 08:16 06/26/2003 13:47 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 331 Plan Maintenance IDF 137370
06/26/2003 08:19 06/26/2003 15:00 Raymond-Cosmopolis No 1 115kV line 115.0 L 18.36 401 Plan Maintenance OLY 137371
06/26/2003 08:30 06/26/2003 14:51 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 381 Plan Maintenance TDA RED 137372
06/26/2003 08:30 06/26/2003 14:51 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 381 Plan Maintenance TDA RED 137372
06/26/2003 10:29 06/26/2003 13:34 Flathead-Hot Springs No 1 230kV line 230.0 L G 56.45 185 Plan Forced KAL 137373
06/26/2003 10:29 06/26/2003 13:34 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S 42.95 185 Plan Forced KAL 137373
06/26/2003 10:31 06/26/2003 11:16 Palisades-Snake River No 1 115kV line 115.0 L 17.50 45 Auto Foreign Trouble Foreign Utility IDF 137374
06/26/2003 10:31 06/26/2003 10:49 Palisades-Goshen No 1 115kV line 115.0 L 51.71 18 Auto Foreign Trouble Foreign Utility IDF 137375
06/26/2003 12:33 06/26/2003 12:33 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 137376
06/26/2003 12:33 06/26/2003 12:33 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137376
06/26/2003 12:33 06/26/2003 12:33 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137376
06/26/2003 12:33 06/26/2003 12:33 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137376
06/26/2003 12:33 06/26/2003 12:33 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137376
06/26/2003 12:33 06/26/2003 12:33 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137376
06/26/2003 13:23 06/26/2003 13:39 The Dalles PH-Big Eddy No 6 230kV line 230.0 L 0.95 16 Auto Foreign Trouble Foreign Utility TDA 137377
06/26/2003 17:00 06/26/2003 17:00 Alvey PACW-Goshen section of Alvey-Martin Creek No 1 115kV line 115.0 S 2.39 0 Auto Foreign Trouble Foreign Trouble EUG 137378
06/26/2003 17:00 06/26/2003 17:00 Alvey-Martin Creek No 1 115kV line 115.0 L O 22.51 0 Auto Foreign Trouble Foreign Trouble EUG 137378
06/26/2003 17:00 06/26/2003 17:00 Creswell-Village Green section of Alvey-Martin Creek No 1 115kV line 115.0 S 10.13 0 Auto Foreign Trouble Foreign Trouble EUG 137378
06/26/2003 17:00 06/26/2003 17:00 Goshen-Creswell section of Alvey-Martin Creek No 1 115kV line 115.0 S 3.36 0 Auto Foreign Trouble Foreign Trouble EUG 137378
06/26/2003 17:04 06/26/2003 17:08 Alvey PACW-Goshen section of Alvey-Martin Creek No 1 115kV line 115.0 S 2.39 4 Auto Foreign Trouble Foreign Trouble EUG 137379
06/26/2003 17:04 06/26/2003 22:27 Alvey-Martin Creek No 1 115kV line 115.0 L O 22.51 323 Auto Foreign Trouble Foreign Trouble EUG 137379
06/26/2003 17:04 06/26/2003 22:27 Creswell-Village Green section of Alvey-Martin Creek No 1 115kV line 115.0 S 10.13 323 Auto Foreign Trouble Foreign Trouble EUG 137379
06/26/2003 17:04 06/26/2003 17:26 Goshen-Creswell section of Alvey-Martin Creek No 1 115kV line 115.0 S 3.36 22 Auto Foreign Trouble Foreign Trouble EUG 137379
06/26/2003 22:27 07/14/2003 08:33 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 25086 Plan Normally Out EUG 137380
06/26/2003 22:27 07/14/2003 08:33 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 25086 Plan Normally Out EUG 137380
06/27/2003 01:55 06/27/2003 06:10 Buckley-Marion No 1 500kV line 500.0 L 99.33 255 Plan Voltage Control TDA RED SAL 137381
06/27/2003 07:54 06/27/2003 13:55 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 361 Plan Maintenance SAL 137382
06/27/2003 08:22 06/27/2003 14:12 Raymond-Cosmopolis No 1 115kV line 115.0 L 18.36 350 Plan Maintenance OLY 137383
06/27/2003 08:24 06/27/2003 15:19 Albany-Lebanon No 1 115kV line 115.0 L G 17.01 415 Plan Maintenance EUG 137384
06/27/2003 08:24 06/27/2003 15:19 Froman-Lebanon section of Albany-Lebanon No 1 115kV line 115.0 S 11.26 415 Plan Maintenance EUG 137384
06/28/2003 01:23 06/28/2003 03:29 Columbia Generating Station-Ashe No 1 500kV line 500.0 L 0.55 126 Plan Foreign Request TRI 137385
06/28/2003 02:21 06/28/2003 07:55 Buckley-Marion No 1 500kV line 500.0 L 99.33 334 Plan Voltage Control TDA RED SAL 137386
06/28/2003 15:59 06/29/2003 01:50 Libby PH-Libby No 2 230kV line 230.0 L 1.29 591 Auto RAS Initiated RAS Initiated KAL 137388
06/28/2003 15:59 06/29/2003 01:42 Noxon-Libby No 1 230kV line 230.0 L 70.17 583 Auto Malicious Malicious KAL 137389
06/28/2003 17:48 06/28/2003 19:00 Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line 230.0 S 23.44 72 Plan Emergency TDA 137390
06/28/2003 17:48 06/28/2003 19:00 Big Eddy-Troutdale No 1 230kV line 230.0 L G 77.43 72 Plan Emergency TDA LGV 137390
06/28/2003 17:48 06/28/2003 18:47 Parkdale tap to Big Eddy-Troutdale No 1 230kV line 230.0 T 0.10 59 Plan Emergency TDA 137390
06/28/2003 17:48 06/28/2003 18:47 Parkdale-Troutdale section of Big Eddy-Troutdale No 1 230kV line 230.0 S 53.99 59 Plan Emergency TDA LGV 137390
06/28/2003 20:08 06/28/2003 21:11 Grand Coulee-Bell No 3 230kV line 230.0 L 82.92 63 Plan Foreign Request WEN SPK 137391
06/29/2003 00:04 06/29/2003 05:19 Raver-Paul No 1 500kV line 500.0 L 69.31 315 Plan Maintenance COV OLY 137392
06/29/2003 05:47 06/29/2003 09:45 Buckley-Marion No 1 500kV line 500.0 L 99.33 238 Plan Voltage Control TDA RED SAL 137393
06/29/2003 09:40 06/29/2003 09:40 Maupin-Tygh Valley No 1 69kV line 69.0 L 3.26 0 Auto Lightning Lightning TDA 137427
06/29/2003 15:03 06/29/2003 15:03 McNary-Coyote Springs No 1 500kV line 500.0 L 19.44 0 Auto Lightning Lightning TRI 137397
06/29/2003 15:03 06/29/2003 16:19 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 76 Auto Foreign Trouble TRI 137398
06/29/2003 15:03 06/29/2003 15:03 Cold Springs-Hat Rock section of McNary-Wallula 230kV line 230.0 S G 6.50 0 Auto Foreign Trouble Foreign Trouble TRI 137399
06/29/2003 15:03 06/29/2003 15:03 Hat Rock tap to McNary-Wallula 230kV line 230.0 T G 0.43 0 Auto Foreign Trouble Foreign Trouble TRI 137399
06/29/2003 15:03 06/29/2003 15:03 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S G 18.00 0 Auto Foreign Trouble Foreign Trouble TRI 137399
06/29/2003 15:03 06/29/2003 15:03 McNary-Cold Springs section of McNary-Wallula 230kV line 230.0 S G 6.20 0 Auto Foreign Trouble Foreign Trouble TRI 137399
06/29/2003 15:03 06/29/2003 15:03 McNary-Wallula 230kV line 230.0 L 30.70 0 Auto Foreign Trouble Foreign Trouble TRI 137399
06/29/2003 15:17 06/29/2003 15:17 McNary-Franklin No 2 230kV line 230.0 L 26.88 0 Auto Lightning Lightning TRI 137400
06/29/2003 16:05 06/29/2003 16:05 Murray-Custer No 1 230kV line 230.0 L 63.39 0 Auto Lightning Lightning SNO 137401
06/29/2003 16:05 06/29/2003 16:05 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S G 25.67 0 Auto Lightning Lightning SNO 137401
06/29/2003 16:05 06/29/2003 16:05 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T G 0.17 0 Auto Lightning Lightning SNO 137401
06/29/2003 16:05 06/29/2003 16:05 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S G 37.72 0 Auto Lightning Lightning SNO 137401
06/30/2003 00:38 06/30/2003 05:55 Buckley-Marion No 1 500kV line 500.0 L 99.33 317 Plan Voltage Control TDA RED SAL 137402
06/30/2003 04:33 06/30/2003 11:21 Longview-Chehalis 1&3 No 1 230kV line 230.0 L 34.94 408 Plan Maintenance LGV OLY 137403
06/30/2003 04:33 06/30/2003 11:21 Longview-Chehalis 1&3 No 3 230kV line 230.0 L 31.13 408 Plan Maintenance LGV OLY 137404
06/30/2003 06:34 06/30/2003 12:45 Murray-Custer No 1 230kV line 230.0 L T 63.39 371 Plan Maintenance SNO 137412
06/30/2003 06:34 06/30/2003 12:45 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 371 Plan Maintenance SNO 137412
06/30/2003 07:09 06/30/2003 12:32 Murray-Custer No 1 230kV line 230.0 L G 63.39 323 Plan Maintenance SNO 137413
06/30/2003 07:09 06/30/2003 12:32 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 323 Plan Maintenance SNO 137413
06/30/2003 07:09 06/30/2003 12:32 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 323 Plan Maintenance SNO 137413
06/30/2003 07:34 08/07/2003 10:08 Maple Valley-Massachusetts No 1 230kV line 230.0 L 12.14 54874 Plan Foreign Request COV 137414
06/30/2003 07:35 06/30/2003 14:09 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 394 Plan Maintenance IDF 137415
06/30/2003 07:49 06/30/2003 12:50 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 301 Plan Maintenance OLY 137416
06/30/2003 07:49 06/30/2003 12:50 Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line 69.0 S 11.79 301 Plan Maintenance OLY 137416
06/30/2003 07:50 06/30/2003 14:53 Salem-Albany No 2 115kV line 115.0 L G 27.85 423 Plan Maintenance SAL EUG 137417
06/30/2003 07:50 06/30/2003 14:53 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 423 Plan Maintenance SAL 137417
06/30/2003 08:02 06/30/2003 14:57 Albany-Lebanon No 1 115kV line 115.0 L G 17.01 415 Plan Maintenance EUG 137418
06/30/2003 08:02 06/30/2003 14:57 Froman-Lebanon section of Albany-Lebanon No 1 115kV line 115.0 S 11.26 415 Plan Maintenance EUG 137418
06/30/2003 08:05 07/02/2003 12:29 Elmo-Kerr section of Kalispell-Kerr No 1 115kV line 115.0 S 12.80 3144 Plan Maintenance KAL 137419
06/30/2003 08:05 07/02/2003 12:29 Kalispell-Kerr No 1 115kV line 115.0 L G 41.39 3144 Plan Maintenance KAL 137419
06/30/2003 08:09 06/30/2003 15:07 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 418 Plan Maintenance EUG 137420
06/30/2003 08:09 06/30/2003 15:07 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 418 Plan Maintenance EUG 137420
06/30/2003 09:19 07/03/2003 07:19 Columbia Generating Station-Ashe No 1 500kV line 500.0 L 0.55 4200 Auto Foreign Trouble Foreign Utility TRI 137421
06/30/2003 09:31 07/01/2003 09:28 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 1437 Plan Foreign Request TRI 137431
06/30/2003 09:31 07/01/2003 09:28 McNary-Wallula 230kV line 230.0 L G 30.70 1437 Plan Foreign Request TRI 137431
06/30/2003 10:06 07/18/2003 09:55 Tacoma-TPWR Northeast No 3 230kV line 230.0 L 0.10 25909 Plan Foreign Request COV 137422
07/01/2003 00:08 07/01/2003 06:07 Buckley-Marion No 1 500kV line 500.0 L 99.33 359 Plan Voltage Control TDA RED SAL 137423
07/01/2003 00:41 07/01/2003 05:43 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 302 Plan Voltage Control TRI WEN TDA LGV 137424
07/01/2003 02:57 07/01/2003 05:57 Schultz-Raver No 1 500kV line 500.0 L 77.24 180 Plan Voltage Control WEN COV 137425
07/01/2003 05:00 07/01/2003 05:45 Sno-King-Maple Valley No 2 230kV line 230.0 L 24.91 45 Plan Construction SNO COV 137426
07/01/2003 06:13 07/01/2003 14:00 Custer-Intalco No 1 230kV line 230.0 L 6.70 467 Plan Maintenance SNO 137432
07/01/2003 07:07 07/01/2003 17:20 Murray-Custer No 1 230kV line 230.0 L T 63.39 613 Plan Maintenance SNO 137433
07/01/2003 07:07 07/01/2003 17:20 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T 0.17 613 Plan Maintenance SNO 137433
07/01/2003 07:10 07/01/2003 17:03 Murray-Custer No 1 230kV line 230.0 L G 63.39 593 Plan Maintenance SNO 137434
07/01/2003 07:10 07/01/2003 17:03 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S 25.67 593 Plan Maintenance SNO 137434
07/01/2003 07:10 07/01/2003 17:03 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S 37.72 593 Plan Maintenance SNO 137434
07/01/2003 07:29 07/01/2003 13:35 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 366 Plan Maintenance IDF 137435
07/01/2003 07:51 07/01/2003 16:03 Salem-Albany No 2 115kV line 115.0 L G 27.85 492 Plan Maintenance SAL EUG 137436
07/01/2003 07:51 07/01/2003 16:03 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 492 Plan Maintenance SAL 137436
07/01/2003 07:52 07/01/2003 15:08 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 436 Plan Maintenance EUG 137437
07/01/2003 07:52 07/01/2003 15:08 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 436 Plan Maintenance EUG 137437
07/01/2003 08:06 07/01/2003 13:40 Albany-Eugene No 1 115kV line 115.0 L G 39.80 334 Plan Maintenance EUG 137438
07/01/2003 08:06 07/01/2003 13:40 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 334 Plan Maintenance EUG 137438
07/01/2003 08:16 07/01/2003 12:01 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 225 Plan Maintenance OLY 137439
07/01/2003 08:16 07/01/2003 12:01 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 225 Plan Maintenance OLY 137439
07/01/2003 09:12 07/01/2003 09:14 Pearl-Marion No 1 500kV line 500.0 L 39.38 2 Plan Testing SAL 137440
07/01/2003 10:08 07/01/2003 16:26 Lane-Wendson No 2 230kV line 230.0 L 41.03 378 Plan Maintenance EUG 137441
07/01/2003 10:18 07/01/2003 16:20 Marion-Lane No 1 500kV line 500.0 L 68.97 362 Plan Maintenance SAL EUG 137442
07/01/2003 14:39 07/08/2003 06:49 Albany-Eugene No 1 115kV line 115.0 L G 39.80 9610 Plan Normally Out EUG 137443
07/01/2003 14:39 07/08/2003 06:49 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 9610 Plan Normally Out EUG 137443
07/02/2003 01:04 07/02/2003 05:07 John Day-Marion No 1 500kV line 500.0 L 127.51 243 Plan Voltage Control TDA RED SAL 137444
07/02/2003 01:58 07/02/2003 05:20 Schultz-Raver No 1 500kV line 500.0 L 77.24 202 Plan Voltage Control WEN COV 137445
07/02/2003 02:01 07/02/2003 05:47 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 226 Plan Voltage Control RED 137446
07/02/2003 06:04 07/02/2003 20:02 Taft-Hot Springs No 1 500kV line 500.0 L 53.83 838 Plan Construction KAL 137453
07/02/2003 06:58 07/02/2003 08:06 Bonneville PH 1-Hood River No 1 115kV line 115.0 L O 22.61 68 Plan Foreign Request LGV TDA 137454
07/02/2003 06:58 07/02/2003 08:06 Bonneville-Acton section of Bonneville PH 1-Hood River No 1 115kV line 115.0 S 0.36 68 Plan Foreign Request LGV TDA 137454
07/02/2003 07:26 07/02/2003 14:53 Wendson-Tahkenitch No 2 230kV line 230.0 L 19.99 447 Plan Maintenance EUG 137455
07/02/2003 07:35 07/02/2003 13:38 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 363 Plan Maintenance IDF 137456
07/02/2003 07:36 07/02/2003 14:11 Custer-Intalco No 2 230kV line 230.0 L 7.15 395 Plan Maintenance SNO 137457
07/02/2003 07:42 07/02/2003 14:47 Salem-Albany No 2 115kV line 115.0 L G 27.85 425 Plan Maintenance SAL EUG 137458
07/02/2003 07:42 07/02/2003 14:47 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 425 Plan Maintenance SAL 137458
07/02/2003 07:42 07/02/2003 15:20 Cardwell-Cowlitz No 1 115kV line 115.0 L 7.65 458 Plan Maintenance LGV 137459
07/02/2003 07:57 07/02/2003 08:13 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 16 Auto Sympathetic TDA RED 137460
07/02/2003 07:57 07/02/2003 08:13 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 16 Auto Sympathetic TDA 137460
07/02/2003 07:57 07/02/2003 08:13 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 16 Auto Unknown TDA RED 137461
07/02/2003 07:57 07/02/2003 08:13 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 16 Auto Unknown TDA 137461
07/02/2003 08:12 07/02/2003 14:03 Lane-Wendson No 1 115kV line 115.0 L G 41.39 351 Plan Maintenance EUG 137462
07/02/2003 08:12 07/02/2003 14:03 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 351 Plan Maintenance EUG 137462
07/02/2003 08:52 07/02/2003 08:52 Canal-Second Lift No 2 34.5kV line 34.5 L G 1.00 0 Auto Unknown Line Material Failure IDF 137463
07/02/2003 08:52 07/02/2003 08:52 Jackson-Second Lift section of Canal-Second Lift No 2 34.5kV line 34.5 S 1.00 0 Auto Unknown Line Material Failure IDF 137463
07/02/2003 09:01 07/02/2003 18:56 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 595 Plan Foreign Request TRI 137464
07/02/2003 09:01 07/02/2003 18:56 McNary-Wallula 230kV line 230.0 L G 30.70 595 Plan Foreign Request TRI 137464
07/02/2003 09:11 07/02/2003 09:11 Malin-Round Mountain No 2 500kV line 500.0 L 94.40 0 Auto Foreign Trouble Foreign Trouble RED 137465
07/02/2003 14:22 07/08/2003 07:37 Canal-Second Lift No 2 34.5kV line 34.5 L G 1.00 8235 Plan Maintenance IDF 137467
07/02/2003 14:22 07/08/2003 07:37 Jackson-Second Lift section of Canal-Second Lift No 2 34.5kV line 34.5 S 1.00 8235 Plan Maintenance IDF 137467
07/03/2003 01:11 07/03/2003 05:52 John Day-Marion No 1 500kV line 500.0 L 127.51 281 Plan Voltage Control TDA RED SAL 137468
07/03/2003 01:39 07/03/2003 06:11 Schultz-Raver No 1 500kV line 500.0 L 77.24 272 Plan Voltage Control WEN COV 137469
07/03/2003 06:52 07/03/2003 14:49 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 477 Plan Maintenance OLY 137474
07/03/2003 06:52 07/03/2003 14:49 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 477 Plan Maintenance OLY 137474
07/03/2003 07:08 07/03/2003 11:11 Olympia-PSE No 2 115kV line 115.0 L 2.40 243 Plan Maintenance OLY 137475
07/03/2003 07:39 07/03/2003 15:12 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 453 Plan Maintenance SAL 137476
07/03/2003 07:39 07/03/2003 15:12 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 453 Plan Maintenance SAL 137476
07/03/2003 07:41 07/03/2003 15:00 Lookout Point-Alvey No 2 115kV line 115.0 L G 15.84 439 Plan Maintenance EUG 137477
07/03/2003 07:41 07/03/2003 15:00 Lookout Point-Mt. Vernon section of Lookout Point-Alvey No 2 115kV line 115.0 S 14.10 439 Plan Maintenance EUG 137477
07/03/2003 11:11 07/03/2003 15:41 Olympia-PSE No 1 115kV line 115.0 L 2.40 270 Plan Maintenance OLY 137478
07/04/2003 01:33 07/04/2003 09:14 Schultz-Raver No 2 500kV line 500.0 L 77.24 461 Plan Voltage Control WEN COV 137479
07/04/2003 02:29 07/05/2003 09:45 Buckley-Marion No 1 500kV line 500.0 L 99.33 1876 Plan Voltage Control TDA RED SAL 137480
07/05/2003 00:49 07/07/2003 05:51 Schultz-Raver No 1 500kV line 500.0 L 77.24 3182 Plan Voltage Control WEN COV 137481
07/05/2003 02:45 07/05/2003 08:41 Marion-Lane No 1 500kV line 500.0 L 68.97 356 Plan Voltage Control SAL EUG 137482
07/05/2003 14:16 07/05/2003 14:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 5 Auto Terminal Equipment Failure TDA RED 137483
07/05/2003 14:16 07/05/2003 14:21 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5 Auto Terminal Equipment Failure TDA 137483
07/05/2003 14:16 07/05/2003 14:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 5 Auto Forced (Configuration) TDA RED 137484
07/05/2003 14:16 07/05/2003 14:21 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 5 Auto Forced (Configuration) TDA 137484
07/06/2003 00:07 07/06/2003 10:13 John Day-Marion No 1 500kV line 500.0 L 127.51 606 Plan Voltage Control TDA RED SAL 137485
07/06/2003 01:39 07/06/2003 05:08 Garrison-Taft No 2 500kV line 500.0 L 159.38 209 Plan Voltage Control KAL 137486
07/06/2003 02:19 07/06/2003 08:19 Marion-Lane No 1 500kV line 500.0 L 68.97 360 Plan Voltage Control SAL EUG 137487
07/07/2003 00:24 08/18/2003 07:21 Marion-Lane No 1 500kV line 500.0 L 68.97 60897 Plan Maintenance SAL EUG 137488
07/07/2003 02:10 07/07/2003 02:10 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137489
07/07/2003 06:59 07/25/2003 17:17 Rocky Reach-Maple Valley No 1 345kV line 345.0 L 128.87 26538 Plan Maintenance WEN COV 137494
07/07/2003 08:24 07/07/2003 16:04 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 460 Plan Maintenance TDA RED 137495
07/07/2003 08:24 07/07/2003 16:04 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 460 Plan Maintenance TDA RED 137495
07/07/2003 08:28 07/07/2003 15:46 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 438 Plan Maintenance EUG 137496
07/07/2003 08:42 07/08/2003 11:32 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 1610 Plan Maintenance SAL 137497
07/07/2003 08:42 07/08/2003 11:32 Hebo-Beaver section of Boyer-Tillamook No 1 115kV line 115.0 S 4.53 1610 Plan Maintenance SAL 137497
07/07/2003 08:51 07/08/2003 17:40 Goose Lake-Okanogan section of Grand Coulee-Okanogan No 2 115kV line 115.0 S 20.00 1969 Plan Maintenance WEN 137498
07/07/2003 08:51 07/08/2003 17:40 Grand Coulee-Okanogan No 2 115kV line 115.0 L G 41.05 1969 Plan Maintenance WEN 137498
07/07/2003 09:12 07/11/2003 13:03 Fidalgo-Lopez Island No 5 69kV line 69.0 L 8.49 5991 Plan Maintenance SNO 137499
07/07/2003 10:15 07/08/2003 13:34 Toledo-Wendson No 1 230kV line 230.0 L 49.64 1639 Plan Maintenance EUG 137500
07/07/2003 12:00 07/08/2003 07:37 Canal-Jackson section of Canal-Second Lift No 2 34.5kV line 34.5 S G 0.00 1177 Plan Maintenance IDF 137525
07/07/2003 12:00 07/08/2003 07:37 Canal-Second Lift No 2 34.5kV line 34.5 L O 1.00 1177 Plan Maintenance IDF 137525
07/08/2003 06:54 07/08/2003 14:32 Albany-Eugene No 1 115kV line 115.0 L G 39.80 458 Plan Construction EUG 137505
07/08/2003 06:54 07/08/2003 14:32 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 458 Plan Construction EUG 137505
07/08/2003 07:26 07/08/2003 14:31 Albany-Burnt Woods No 1 115kV line 115.0 L 25.77 425 Plan Construction EUG 137506
07/08/2003 07:37   Canal-Second Lift No 1 34.5kV line 34.5 L G 1.00 still out Plan Normally Out IDF 137507
07/08/2003 07:37   Jackson-Second Lift section of Canal-Second Lift No 1 34.5kV line 34.5 S 1.00 still out Plan Normally Out IDF 137507
07/08/2003 08:33 07/08/2003 15:25 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 412 Plan Maintenance TDA RED 137508
07/08/2003 08:33 07/08/2003 15:25 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 412 Plan Maintenance TDA RED 137508
07/08/2003 08:35 07/08/2003 14:25 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 350 Plan Maintenance EUG 137509
07/08/2003 08:38 07/08/2003 19:14 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 636 Plan Foreign Request TRI 137510
07/08/2003 08:38 07/08/2003 19:14 McNary-Wallula 230kV line 230.0 L G 30.70 636 Plan Foreign Request TRI 137510
07/08/2003 11:34 07/10/2003 15:33 Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line 115.0 S 14.45 3119 Plan Maintenance SAL 137511
07/08/2003 11:34 07/10/2003 15:33 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 3119 Plan Maintenance SAL 137511
07/08/2003 12:15 07/08/2003 12:48 Fossil-Maupin 69kV line 69.0 L G 56.93 33 Plan Maintenance TDA 137512
07/08/2003 12:15 07/08/2003 12:48 Fossil-Muddy Ranch section of Fossil-Maupin 69kV line 69.0 S 14.77 33 Plan Maintenance TDA 137512
07/09/2003 06:54 07/09/2003 14:06 McLoughlin-Pearl section of McLoughlin-Sherwood No 1 230kV line 230.0 S G 11.67 432 Plan Foreign Request LGV SAL 137516
07/09/2003 06:54 07/09/2003 14:06 McLoughlin-Sherwood No 1 230kV line 230.0 L 16.24 432 Plan Foreign Request LGV SAL 137516
07/09/2003 06:54 07/09/2003 14:06 Pearl tap to McLoughlin-Sherwood No 1 230kV line 230.0 T G 0.26 432 Plan Foreign Request LGV SAL 137516
07/09/2003 06:54 07/09/2003 14:06 Pearl-Sherwood section of McLoughlin-Sherwood No 1 230kV line 230.0 S G 4.57 432 Plan Foreign Request SAL 137516
07/09/2003 07:48 07/09/2003 08:22 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 34 Plan Maintenance IDF 137517
07/09/2003 07:50 07/09/2003 16:43 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 533 Plan Foreign Request TRI 137518
07/09/2003 07:50 07/09/2003 16:43 McNary-Wallula 230kV line 230.0 L G 30.70 533 Plan Foreign Request TRI 137518
07/09/2003 08:19 07/09/2003 16:00 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 461 Plan Maintenance TDA RED 137519
07/09/2003 08:19 07/09/2003 16:00 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 461 Plan Maintenance TDA RED 137519
07/09/2003 09:30 07/10/2003 16:22 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 1852 Plan Maintenance EUG 137535
07/09/2003 09:30 07/10/2003 16:22 Langlois-Port Orford section of Bandon-Rogue No 1 115kV line 115.0 S 10.00 1852 Plan Maintenance EUG 137535
07/09/2003 11:18 07/09/2003 12:27 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 69 Auto Terminal Equipment Failure TDA RED 137520
07/09/2003 11:18 07/09/2003 12:27 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 69 Auto Terminal Equipment Failure TDA 137520
07/09/2003 13:22 07/09/2003 13:27 Palisades-Goshen No 1 115kV line 115.0 L 51.71 5 Auto Foreign Trouble Foreign Utility IDF 137521
07/09/2003 13:22 07/09/2003 13:28 Palisades-Snake River No 1 115kV line 115.0 L 17.50 6 Auto Foreign Trouble Foreign Utility IDF 137522
07/09/2003 13:22 07/09/2003 13:28 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 6 Auto Foreign Trouble Foreign Utility IDF 137523
07/10/2003 04:05 07/10/2003 04:05 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137524
07/10/2003 07:19 07/10/2003 14:03 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 404 Plan Maintenance IDF 137536
07/10/2003 07:43 07/10/2003 14:47 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 424 Plan Maintenance EUG 137537
07/10/2003 07:43 07/10/2003 14:47 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 424 Plan Maintenance EUG 137537
07/10/2003 07:50 07/10/2003 16:30 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 520 Plan Foreign Request TRI 137538
07/10/2003 07:50 07/10/2003 16:30 McNary-Wallula 230kV line 230.0 L G 30.70 520 Plan Foreign Request TRI 137538
07/10/2003 07:58 07/11/2003 11:07 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 1629 Plan Maintenance EUG 137539
07/10/2003 07:58 07/11/2003 11:07 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 1629 Plan Maintenance EUG 137539
07/10/2003 08:15 07/10/2003 13:54 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 339 Plan Maintenance TDA RED 137540
07/10/2003 08:15 07/10/2003 13:54 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 339 Plan Maintenance TDA RED 137540
07/10/2003 09:50 07/10/2003 09:58 Palisades-Goshen No 1 115kV line 115.0 L 51.71 8 Auto Unknown Unknown IDF 137541
07/10/2003 10:50 07/10/2003 13:49 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S 1.46 179 Plan Switching TDA 137542
07/10/2003 10:50 07/10/2003 13:49 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 179 Plan Switching TDA 137542
07/10/2003 12:44 07/10/2003 18:36 Palisades-Goshen No 1 115kV line 115.0 L 51.71 352 Plan Emergency IDF 137543
07/10/2003 13:07 07/10/2003 14:55 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 108 Auto Foreign Trouble Foreign Trouble COV 137544
07/10/2003 13:07 07/10/2003 14:55 Franz Holmes tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 1.20 108 Auto Foreign Trouble Foreign Trouble COV 137544
07/10/2003 13:07 07/10/2003 16:40 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 213 Auto Foreign Trouble Foreign Trouble COV 137545
07/10/2003 13:07 07/10/2003 16:40 Lynch Creek tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 3.28 213 Auto Foreign Trouble Foreign Trouble COV OLY 137545
07/10/2003 13:07 07/10/2003 16:40 Alder-LaGrande No 1&2 115kV line 115.0 L T 213 Plan Foreign Request OLY COV 137546
07/10/2003 13:07 07/10/2003 16:40 Elbe tap to Alder-LaGrande No 1&2 115kV line 115.0 T 6.74 213 Plan Foreign Request OLY 137546
07/10/2003 18:11 07/10/2003 18:11 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 137547
07/10/2003 18:11 07/10/2003 18:11 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 137547
07/10/2003 18:11 07/10/2003 18:11 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 137547
07/10/2003 18:11 07/10/2003 18:11 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 137547
07/10/2003 18:11 07/10/2003 18:11 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 137547
07/10/2003 18:11 07/10/2003 18:11 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 137547
07/10/2003 18:11 07/10/2003 18:11 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 137547
07/10/2003 18:11 07/10/2003 18:11 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 137547
07/10/2003 20:37 07/10/2003 20:37 Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 18.26 0 Auto Unknown Unknown RED 137548
07/10/2003 20:37 07/10/2003 20:37 Grizzly-Summer Lake No 1 500kV line 500.0 L 103.37 0 Auto Unknown Unknown RED 137548
07/10/2003 20:37 07/10/2003 20:37 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T G 0.01 0 Auto Unknown Unknown RED 137548
07/10/2003 20:37 07/10/2003 20:37 Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 85.11 0 Auto Unknown Unknown RED 137548
07/10/2003 20:37 07/10/2003 20:37 Ponderosa-PACW Bank No 1 230kV line 230.0 L 0.10 0 Auto Unknown RED 137549
07/11/2003 06:41 07/11/2003 13:30 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 409 Plan Maintenance TDA RED 137550
07/11/2003 06:41 07/11/2003 13:30 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 409 Plan Maintenance TDA 137550
07/11/2003 07:34 07/11/2003 15:26 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 472 Plan Maintenance SAL 137551
07/11/2003 07:34 07/11/2003 15:26 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 472 Plan Maintenance SAL 137551
07/11/2003 07:39 07/11/2003 15:18 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 459 Plan Maintenance EUG 137552
07/11/2003 07:39 07/11/2003 15:18 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 459 Plan Maintenance EUG 137552
07/11/2003 08:20 07/11/2003 13:36 Hawkins-Alvey No 1 115kV line 115.0 L G 7.78 316 Plan Maintenance EUG 137553
07/11/2003 08:20 07/11/2003 13:36 Hawkins-Hideaway section of Hawkins-Alvey No 1 115kV line 115.0 S 5.32 316 Plan Maintenance EUG 137553
07/11/2003 10:58   Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 still out Plan Normally Out COV 137554
07/11/2003 10:58   McCullough tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 2.18 still out Plan Normally Out COV 137554
07/11/2003 12:41 07/11/2003 13:34 Captain Jack-Malin No 2 500kV line 500.0 L 6.90 53 Auto Foreign Trouble Foreign Trouble RED 137555
07/12/2003 05:18 07/12/2003 05:18 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137556
07/12/2003 08:00 07/12/2003 21:17 Hot Springs-NWE Ovando No 1 230kV line 230.0 L 89.70 797 Plan Foreign Request KAL 137557
07/12/2003 11:28 07/12/2003 11:28 Palisades-Goshen No 1 115kV line 115.0 L 51.71 0 Auto Unknown Unknown IDF 137558
07/12/2003 16:04 07/12/2003 17:57 Addy-AVA Gifford No 1 115kV line 115.0 L 20.70 113 Auto Foreign Trouble Foreign Utility SPK 137559
07/12/2003 20:28 07/12/2003 20:30 Broadview-Garrison No 1 500kV line 500.0 L 224.71 2 Auto Foreign Trouble Foreign Trouble KAL 137560
07/13/2003 02:23 07/13/2003 07:46 John Day-Marion No 1 500kV line 500.0 L 127.51 323 Plan Voltage Control TDA RED SAL 137561
07/13/2003 02:34 07/13/2003 09:12 Schultz-Raver No 1 500kV line 500.0 L 77.24 398 Plan Voltage Control WEN COV 137562
07/13/2003 20:11 07/15/2003 16:26 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 2655 Plan Foreign Request OLY 137563
07/13/2003 20:11 07/15/2003 16:26 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 2655 Plan Foreign Request OLY 137563
07/14/2003 01:40 07/14/2003 05:09 Schultz-Raver No 1 500kV line 500.0 L 77.24 209 Plan Voltage Control WEN COV 137564
07/14/2003 07:53 07/18/2003 16:24 Wendson-Tahkenitch No 2 230kV line 230.0 L 19.99 6271 Plan Maintenance EUG 137567
07/14/2003 07:53 07/14/2003 15:16 Palisades-Goshen No 1 115kV line 115.0 L 51.71 443 Plan Maintenance IDF 137568
07/14/2003 07:59 07/14/2003 15:03 Salem-Albany No 2 115kV line 115.0 L G 27.85 424 Plan Maintenance SAL EUG 137569
07/14/2003 07:59 07/14/2003 15:03 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 424 Plan Maintenance SAL 137569
07/14/2003 08:15 07/14/2003 12:19 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 244 Auto Foreign Trouble Foreign Trouble RED 137570
07/14/2003 08:15 07/14/2003 15:04 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 409 Plan Switching EUG 137571
07/14/2003 08:17 07/14/2003 15:15 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 418 Plan Maintenance TDA RED 137572
07/14/2003 08:17 07/14/2003 15:15 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 418 Plan Maintenance TDA RED 137572
07/14/2003 08:25 07/14/2003 08:38 Ross-Lexington No 1 230kV line 230.0 L G 41.21 13 Plan Switching LGV 137573
07/14/2003 08:25 07/14/2003 08:38 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S 21.36 13 Plan Switching LGV 137573
07/14/2003 08:26 07/14/2003 15:50 Lexington-Longview No 2 230kV line 230.0 L 9.38 444 Plan Fiber Optic Work LGV OLY 137574
07/14/2003 08:36 07/14/2003 15:08 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 392 Plan Switching EUG 137575
07/14/2003 08:36 07/14/2003 15:08 Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.03 392 Plan Switching EUG 137575
07/14/2003 08:39 07/14/2003 13:39 Creston-Bell No 1 115kV line 115.0 L G 53.80 300 Plan Maintenance WEN SPK 137576
07/14/2003 08:39 07/14/2003 13:39 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 300 Plan Maintenance SPK 137576
07/14/2003 08:44 07/14/2003 14:35 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 351 Plan Maintenance EUG 137577
07/14/2003 08:44 07/14/2003 14:35 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 351 Plan Maintenance EUG 137577
07/14/2003 08:44 07/14/2003 14:57 Martin Creek tap to Alvey-Fairview No 1 230kV line 230.0 T 0.27 373 Plan Maintenance EUG 137577
07/14/2003 09:39 07/16/2003 14:22 Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 24.00 3163 Plan Maintenance TRI 137578
07/14/2003 09:39 07/16/2003 14:22 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 3163 Plan Maintenance TRI 137578
07/14/2003 10:53 07/14/2003 10:55 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 2 Plan Maintenance EUG 137579
07/14/2003 10:53 07/14/2003 10:55 Langlois-Port Orford section of Bandon-Rogue No 1 115kV line 115.0 S 10.00 2 Plan Maintenance EUG 137579
07/14/2003 14:41 07/14/2003 14:41 Ashe-Slatt No 1 500kV line 500.0 L 72.24 0 Auto Fire Fire TRI TDA 137580
07/14/2003 15:10 07/15/2003 07:19 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 969 Plan Normally Out EUG 137581
07/14/2003 15:10 07/15/2003 07:19 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 969 Plan Normally Out EUG 137581
07/14/2003 15:23 07/14/2003 15:32 Ross-Lexington No 1 230kV line 230.0 L G 41.21 9 Plan Switching LGV 137582
07/14/2003 15:23 07/14/2003 15:32 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S 21.36 9 Plan Switching LGV 137582
07/15/2003 06:16 07/15/2003 19:13 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 777 Plan Foreign Request TRI SPK 137583
07/15/2003 07:03 07/15/2003 14:29 Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 4.43 446 Plan Maintenance SPK 137597
07/15/2003 07:03 07/15/2003 14:29 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 446 Plan Maintenance SPK 137597
07/15/2003 07:16 07/15/2003 14:18 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 422 Plan Switching EUG 137598
07/15/2003 07:19 07/15/2003 14:22 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 423 Plan Switching EUG 137599
07/15/2003 07:19 07/15/2003 14:22 Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.03 423 Plan Switching EUG 137599
07/15/2003 07:24 07/15/2003 14:10 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 406 Plan Maintenance EUG 137600
07/15/2003 07:24 07/15/2003 13:27 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 363 Plan Maintenance EUG 137600
07/15/2003 07:24 07/15/2003 13:36 Martin Creek tap to Alvey-Fairview No 1 230kV line 230.0 T 0.27 372 Plan Maintenance EUG 137600
07/15/2003 07:24 07/15/2003 14:10 Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line 230.0 S 27.37 406 Plan Maintenance EUG 137600
07/15/2003 07:26 07/15/2003 07:37 Broadview-Garrison No 1 500kV line 500.0 L 224.71 11 Plan Switching KAL 137601
07/15/2003 07:42 07/15/2003 18:05 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 623 Plan Maintenance WEN 137602
07/15/2003 07:45 07/15/2003 07:58 Ross-Lexington No 1 230kV line 230.0 L G 41.21 13 Plan Switching LGV 137603
07/15/2003 07:45 07/15/2003 07:58 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S 21.36 13 Plan Switching LGV 137603
07/15/2003 07:45 07/15/2003 17:36 Lexington-Longview No 2 230kV line 230.0 L 9.38 591 Plan Fiber Optic Work LGV OLY 137604
07/15/2003 07:58 07/15/2003 14:51 Salem-Albany No 2 115kV line 115.0 L G 27.85 413 Plan Maintenance SAL EUG 137605
07/15/2003 07:58 07/15/2003 14:51 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 413 Plan Maintenance SAL 137605
07/15/2003 08:04 07/15/2003 14:09 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 365 Plan Maintenance IDF 137606
07/15/2003 08:31 07/15/2003 16:39 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 488 Plan Maintenance TDA RED 137607
07/15/2003 08:31 07/15/2003 16:39 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 488 Plan Maintenance TDA RED 137607
07/15/2003 09:09 07/15/2003 09:09 Dixonville-Meridian No 1 500kV line 500.0 L 77.12 0 Auto Foreign Trouble EUG 137608
07/15/2003 09:09 07/15/2003 09:18 Klamath Cogen-Meridian No 1 500kV line 500.0 L 57.99 9 Auto Foreign Trouble RED 137609
07/15/2003 10:24 07/15/2003 11:14 Lexington-Longview No 1 115kV line 115.0 L G 9.43 50 Plan Load Control LGV OLY 137610
07/15/2003 10:24 07/15/2003 11:14 Lexington-Pacific Way section of Lexington-Longview No 1 115kV line 115.0 S 6.15 50 Plan Load Control LGV OLY 137610
07/15/2003 11:15 07/15/2003 11:15 Cardwell-Cowlitz No 1 115kV line 115.0 L 7.65 0 Plan Load Control LGV 137611
07/15/2003 11:18 07/15/2003 17:22 Longview-Cowlitz No 1 115kV line 115.0 L 3.61 364 Plan Load Control LGV 137612
07/15/2003 11:41 07/15/2003 15:05 Cardwell-Cowlitz No 1 115kV line 115.0 L 7.65 204 Plan Load Control LGV 137613
07/15/2003 11:50 07/15/2003 12:15 Broadview-Garrison No 1 500kV line 500.0 L 224.71 25 Plan Switching KAL 137614
07/15/2003 14:29 07/15/2003 16:10 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 101 Plan Normally Out EUG 137615
07/15/2003 14:29 07/15/2003 16:10 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 101 Plan Normally Out EUG 137615
07/15/2003 16:01 07/15/2003 18:29 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 148 Auto Smoke Smoke EUG 137616
07/15/2003 16:01 07/15/2003 17:10 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 69 Auto Smoke Smoke EUG 137616
07/15/2003 16:01 07/15/2003 16:01 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S 50.95 0 Auto Smoke Smoke EUG 137616
07/15/2003 16:01 07/15/2003 17:10 Martin Creek tap to Alvey-Fairview No 1 230kV line 230.0 T 0.27 69 Auto Smoke Smoke EUG 137616
07/15/2003 16:01 07/15/2003 18:29 Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line 230.0 S 27.37 148 Auto Smoke Smoke EUG 137616
07/15/2003 16:01 07/15/2003 17:22 Alvey-Martin Creek No 1 115kV line 115.0 L O 22.51 81 Auto Smoke Forced (Configuration) EUG 137617
07/15/2003 16:01 07/15/2003 16:10 Dorena tap to Alvey-Martin Creek No 1 115kV line 115.0 T 4.67 9 Auto Smoke Forced (Configuration) EUG 137617
07/15/2003 16:01 07/15/2003 16:10 Dorena-Latham section of Alvey-Martin Creek No 1 115kV line 115.0 S 3.71 9 Auto Smoke Forced (Configuration) EUG 137617
07/15/2003 16:01 07/15/2003 16:10 Latham tap to Alvey-Martin Creek No 1 115kV line 115.0 T 2.06 9 Auto Smoke Forced (Configuration) EUG 137617
07/15/2003 16:01 07/15/2003 17:22 Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.03 81 Auto Smoke Forced (Configuration) EUG 137617
07/15/2003 16:01 07/15/2003 19:26 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 205 Auto Smoke Forced (Configuration) EUG 137618
07/15/2003 17:23 07/15/2003 17:33 Ross-Lexington No 1 230kV line 230.0 L G 41.21 10 Plan Switching LGV 137619
07/15/2003 17:23 07/15/2003 17:33 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S 21.36 10 Plan Switching LGV 137619
07/15/2003 17:23 08/03/2003 00:07 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 26324 Plan Normally Out EUG 137620
07/15/2003 17:23 08/03/2003 00:07 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 26324 Plan Normally Out EUG 137620
07/15/2003 22:17 07/15/2003 22:17 Camp-Trout Creek section of Noxon-Hot Springs No 1 230kV line 230.0 S G 10.90 0 Auto Lightning Weather KAL 137621
07/15/2003 22:17 07/15/2003 22:17 Noxon-Camp section of Noxon-Hot Springs No 1 230kV line 230.0 S G 0.20 0 Auto Lightning Weather KAL 137621
07/15/2003 22:17 07/15/2003 22:17 Noxon-Hot Springs No 1 230kV line 230.0 L 68.28 0 Auto Lightning Weather KAL 137621
07/15/2003 22:17 07/15/2003 22:17 Trout Creek-Hot Springs section of Noxon-Hot Springs No 1 230kV line 230.0 S G 57.18 0 Auto Lightning Weather KAL 137621
07/16/2003 06:16 07/16/2003 09:36 Garrison-Taft No 2 500kV line 500.0 L 159.38 200 Plan Voltage Control KAL 137622
07/16/2003 06:58 07/30/2003 18:43 Longview-Cowlitz No 1 115kV line 115.0 L 3.61 20865 Plan Construction LGV 137624
07/16/2003 07:06 07/16/2003 14:21 Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 4.43 435 Plan Maintenance SPK 137625
07/16/2003 07:06 07/16/2003 14:21 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 435 Plan Maintenance SPK 137625
07/16/2003 07:16 07/16/2003 14:17 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 421 Plan Maintenance IDF 137626
07/16/2003 07:23 07/16/2003 07:23 Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 18.26 0 Auto Unknown Unknown RED 137627
07/16/2003 07:23 07/16/2003 07:23 Grizzly-Summer Lake No 1 500kV line 500.0 L 103.37 0 Auto Unknown Unknown RED 137627
07/16/2003 07:23 07/16/2003 07:23 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T G 0.01 0 Auto Unknown Unknown RED 137627
07/16/2003 07:23 07/16/2003 07:23 Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line 500.0 S G 85.11 0 Auto Unknown Unknown RED 137627
07/16/2003 07:50 07/16/2003 07:50 Naselle-Tarlett No 1 115kV line 115.0 L 15.86 0 Auto Foreign Trouble Foreign Trouble LGV OLY 137628
07/16/2003 07:55 07/16/2003 14:43 Salem-Albany No 2 115kV line 115.0 L G 27.85 408 Plan Maintenance SAL EUG 137629
07/16/2003 07:55 07/16/2003 14:43 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 408 Plan Maintenance SAL 137629
07/16/2003 07:57 07/16/2003 14:19 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 382 Plan Maintenance EUG 137630
07/16/2003 07:57 07/16/2003 14:19 Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line 230.0 S 27.37 382 Plan Maintenance EUG 137630
07/16/2003 08:00 07/16/2003 08:57 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 57 Plan Maintenance TDA RED 137631
07/16/2003 08:00 07/16/2003 08:57 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 57 Plan Maintenance TDA 137631
07/16/2003 08:00 07/16/2003 10:29 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 149 Plan Maintenance TDA RED 137632
07/16/2003 08:00 07/16/2003 10:29 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 149 Plan Maintenance TDA 137632
07/16/2003 08:29 07/16/2003 16:01 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 452 Plan Maintenance TDA RED 137633
07/16/2003 08:29 07/16/2003 16:01 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 452 Plan Maintenance TDA RED 137633
07/16/2003 08:37 07/16/2003 17:13 Lexington-Longview No 2 230kV line 230.0 L 9.38 516 Plan Fiber Optic Work LGV OLY 137634
07/17/2003 02:56 07/17/2003 03:11 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 15 Plan Foreign Request TRI 137635
07/17/2003 07:06 07/17/2003 13:59 Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 4.43 413 Plan Maintenance SPK 137637
07/17/2003 07:06 07/17/2003 13:59 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 413 Plan Maintenance SPK 137637
07/17/2003 07:15 07/17/2003 14:30 Palisades-Goshen No 1 115kV line 115.0 L 51.71 435 Plan Maintenance IDF 137638
07/17/2003 07:27 07/17/2003 07:30 Carlton-Cascade Steel section of Carlton-Sherwood No 1 230kV line 230.0 S G 8.94 3 Plan Foreign Request SAL 137639
07/17/2003 07:27 07/17/2003 07:30 Carlton-Sherwood No 1 230kV line 230.0 L 17.92 3 Plan Foreign Request SAL 137639
07/17/2003 07:27 07/17/2003 07:30 Cascade Steel tap to Carlton-Sherwood No 1 230kV line 230.0 T G 12.67 3 Plan Foreign Request SAL 137639
07/17/2003 07:27 07/17/2003 07:30 Cascade Steel-Sherwood section of Carlton-Sherwood No 1 230kV line 230.0 S G 8.98 3 Plan Foreign Request SAL 137639
07/17/2003 07:28 07/17/2003 07:30 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 2 Plan Foreign Request SAL 137640
07/17/2003 07:31 07/17/2003 12:23 Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 3.71 292 Plan Maintenance TRI 137641
07/17/2003 07:31 07/17/2003 12:23 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 292 Plan Maintenance TRI 137641
07/17/2003 07:57 07/17/2003 15:53 Lexington-Longview No 2 230kV line 230.0 L 9.38 476 Plan Fiber Optic Work LGV OLY 137642
07/17/2003 08:02 07/17/2003 14:09 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 367 Plan Maintenance SAL EUG 137643
07/17/2003 08:02 07/17/2003 14:09 Salem-Albany No 2 115kV line 115.0 L G 27.85 367 Plan Maintenance SAL EUG 137643
07/17/2003 08:07 07/17/2003 14:56 Hawkins-Alvey No 1 115kV line 115.0 L G 7.78 409 Plan Maintenance EUG 137644
07/17/2003 08:07 07/17/2003 14:56 Hawkins-Hideaway section of Hawkins-Alvey No 1 115kV line 115.0 S 5.32 409 Plan Maintenance EUG 137644
07/17/2003 08:22 07/17/2003 16:12 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 470 Plan Maintenance EUG 137645
07/17/2003 08:22 07/17/2003 16:12 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S 50.95 470 Plan Maintenance EUG 137645
07/17/2003 08:35 07/17/2003 15:27 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 412 Plan Maintenance TDA RED 137646
07/17/2003 08:35 07/17/2003 15:27 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 412 Plan Maintenance TDA RED 137646
07/17/2003 12:44 07/17/2003 13:00 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 16 Plan Foreign Request TRI 137647
07/17/2003 13:55 07/17/2003 14:14 Longview-Allston No 2 230kV line 230.0 L 4.87 19 Plan Emergency LGV 137648
07/18/2003 01:33 07/18/2003 01:33 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 137649
07/18/2003 01:33 07/18/2003 01:33 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 137649
07/18/2003 01:33 07/18/2003 01:33 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 137649
07/18/2003 01:56 07/18/2003 06:06 Schultz-Raver No 1 500kV line 500.0 L 77.24 250 Plan Voltage Control WEN COV 137650
07/18/2003 07:08 07/18/2003 11:58 Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 4.43 290 Plan Maintenance SPK 137653
07/18/2003 07:08 07/18/2003 11:58 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 290 Plan Maintenance SPK 137653
07/18/2003 08:00 07/18/2003 14:31 Monmouth-Adair section of Salem-Albany No 2 115kV line 115.0 S 11.30 391 Plan Maintenance SAL 137654
07/18/2003 08:00 07/18/2003 14:31 Salem-Albany No 2 115kV line 115.0 L G 27.85 391 Plan Maintenance SAL EUG 137654
07/18/2003 08:10 07/18/2003 14:33 Lexington-Longview No 2 230kV line 230.0 L 9.38 383 Plan Fiber Optic Work LGV OLY 137655
07/18/2003 08:26 07/18/2003 14:50 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 384 Plan Maintenance EUG 137656
07/18/2003 08:26 07/18/2003 14:50 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S 50.95 384 Plan Maintenance EUG 137656
07/18/2003 09:55 08/19/2003 08:39 Tacoma-TPWR Northeast No 1 230kV line 230.0 L 0.10 46004 Plan Normally Out COV 137657
07/18/2003 19:11 07/18/2003 19:19 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 8 Plan Switching TDA RED 137658
07/18/2003 19:11 07/18/2003 19:19 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 8 Plan Switching TDA 137658
07/18/2003 19:11 07/18/2003 19:19 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 8 Plan Switching TDA 137658
07/18/2003 19:11 07/18/2003 19:19 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 8 Plan Switching TDA 137658
07/18/2003 19:11 07/19/2003 06:00 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 649 Plan Testing TDA RED 137659
07/18/2003 19:11 07/19/2003 06:00 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 649 Plan Testing TDA 137659
07/19/2003 02:12 07/19/2003 08:40 Schultz-Raver No 1 500kV line 500.0 L 77.24 388 Plan Voltage Control WEN COV 137660
07/19/2003 03:53 07/19/2003 06:11 John Day-Grizzly No 1 500kV line 500.0 L 88.41 138 Plan Voltage Control TDA RED 137670
07/19/2003 04:04 07/19/2003 11:54 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 470 Auto Line Material Failure Line Material Failure KAL 137671
07/19/2003 04:04 07/19/2003 11:54 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 470 Auto Line Material Failure Line Material Failure KAL SPK 137671
07/19/2003 04:04 07/19/2003 04:05 Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.27 1 Auto Line Material Failure Line Material Failure KAL 137671
07/19/2003 04:04 07/19/2003 04:06 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 2 Auto Line Material Failure Line Material Failure SPK 137671
07/19/2003 04:04 07/19/2003 04:06 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.41 2 Auto Line Material Failure Line Material Failure KAL 137671
07/19/2003 04:04 07/19/2003 04:06 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 2 Auto Line Material Failure Line Material Failure KAL SPK 137671
07/19/2003 19:10 07/19/2003 19:14 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 4 Plan Switching TDA RED 137672
07/19/2003 19:10 07/19/2003 19:14 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Plan Switching TDA 137672
07/19/2003 19:10 07/19/2003 19:14 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Plan Switching TDA 137672
07/19/2003 19:10 07/19/2003 19:14 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 4 Plan Switching TDA 137672
07/19/2003 19:10 07/20/2003 05:00 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 590 Plan Construction TDA RED 137673
07/19/2003 19:10 07/20/2003 05:00 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 590 Plan Construction TDA 137673
07/20/2003 03:00 07/20/2003 23:26 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 1226 Plan Foreign Request OLY 137674
07/20/2003 03:08 07/20/2003 10:05 Schultz-Raver No 1 500kV line 500.0 L 77.24 417 Plan Voltage Control WEN COV 137675
07/20/2003 06:10 07/20/2003 10:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 251 Plan Maintenance TDA RED 137679
07/20/2003 06:10 07/20/2003 10:21 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 251 Plan Maintenance TDA 137679
07/20/2003 06:21 07/21/2003 22:04 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 2383 Auto Terminal Equipment Failure TDA RED 137676
07/20/2003 06:21 07/21/2003 22:04 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 2383 Auto Terminal Equipment Failure TDA 137676
07/20/2003 07:33 07/20/2003 07:33 Midway-Moxee No 1 115kV line 115.0 L 33.98 0 Auto Unknown Bird droppings TRI WEN 137680
07/20/2003 07:33 07/20/2003 07:33 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S G 16.61 0 Auto Unknown Bird droppings TRI WEN 137680
07/20/2003 07:33 07/20/2003 07:33 Rattlesnake tap to Midway-Moxee No 1 115kV line 115.0 T G 0.01 0 Auto Unknown Bird droppings WEN 137680
07/20/2003 07:33 07/20/2003 07:33 Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line 115.0 S G 17.37 0 Auto Unknown Bird droppings WEN 137680
07/20/2003 08:25 07/20/2003 10:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 116 Plan Maintenance TDA RED 137681
07/20/2003 08:25 07/20/2003 10:21 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 116 Plan Maintenance TDA 137681
07/20/2003 08:25 07/20/2003 10:21 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 116 Plan Maintenance TDA 137681
07/20/2003 08:25 07/20/2003 10:21 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 116 Plan Maintenance TDA 137681
07/20/2003 20:19 07/20/2003 20:19 Midway-Moxee No 1 115kV line 115.0 L 33.98 0 Auto Unknown Bird droppings TRI WEN 137682
07/20/2003 20:19 07/20/2003 20:19 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S G 16.61 0 Auto Unknown Bird droppings TRI WEN 137682
07/20/2003 20:19 07/20/2003 20:19 Rattlesnake tap to Midway-Moxee No 1 115kV line 115.0 T G 0.01 0 Auto Unknown Bird droppings WEN 137682
07/20/2003 20:19 07/20/2003 20:19 Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line 115.0 S G 17.37 0 Auto Unknown Bird droppings WEN 137682
07/21/2003 05:38 07/21/2003 13:30 Lexington-Longview No 2 230kV line 230.0 L 9.38 472 Plan Fiber Optic Work LGV OLY 137689
07/21/2003 05:46 08/08/2003 11:34 Dixonville PACW-Reston No 1 230kV line 230.0 L 17.40 26268 Plan Foreign Request EUG 137690
07/21/2003 06:20 07/21/2003 14:41 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 501 Plan Maintenance TDA RED 137691
07/21/2003 06:20 07/21/2003 14:41 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 501 Plan Maintenance TDA 137691
07/21/2003 06:35 07/21/2003 16:38 John Day PH-John Day No 4 500kV line 500.0 L 3.48 603 Plan Foreign Request TDA 137692
07/21/2003 07:17 07/21/2003 15:14 Palisades-Goshen No 1 115kV line 115.0 L 51.71 477 Plan Maintenance IDF 137693
07/21/2003 07:39 07/21/2003 16:48 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 549 Plan Maintenance OLY 137694
07/21/2003 07:39 07/21/2003 16:48 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 549 Plan Maintenance OLY 137694
07/21/2003 08:06 07/23/2003 14:14 Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 L O 45.05 3248 Plan Maintenance LGV 137695
07/21/2003 08:06 07/23/2003 14:14 Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 S 0.93 3248 Plan Maintenance LGV 137695
07/21/2003 08:13 07/21/2003 14:01 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 348 Plan Maintenance SAL EUG 137696
07/21/2003 08:13 07/21/2003 14:01 Salem-Albany No 2 115kV line 115.0 L G 27.85 348 Plan Maintenance SAL EUG 137696
07/21/2003 08:32 07/21/2003 15:31 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 419 Plan Maintenance TDA RED 137697
07/21/2003 08:32 07/21/2003 15:31 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 419 Plan Maintenance TDA RED 137697
07/21/2003 08:44 07/21/2003 11:53 First Street-Stevens Drive section of White Bluffs-Richland No 1 115kV line 115.0 S 2.68 189 Plan Foreign Request TRI 137698
07/21/2003 08:44 07/21/2003 11:53 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 189 Plan Foreign Request TRI 137698
07/21/2003 09:08 07/21/2003 16:13 Fairview-PACW Coquille No 1 115kV line 115.0 L 6.00 425 Plan Foreign Request EUG 137699
07/21/2003 09:11 07/21/2003 15:12 Bell-AVA Beacon No 1 115kV line 115.0 L 6.60 361 Plan Foreign Request SPK 137700
07/21/2003 10:08 07/25/2003 11:25 Midway-HEW No 1 230kV line 230.0 L 28.36 5837 Plan Foreign Request TRI 137757
07/21/2003 12:13 08/18/2003 07:35 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 40042 Plan Normally Out TRI 137701
07/21/2003 12:13 08/18/2003 07:35 White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line 115.0 S 4.30 40042 Plan Normally Out TRI 137701
07/21/2003 22:26 07/21/2003 22:26 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Unknown Unknown TDA 137702
07/21/2003 22:26 07/21/2003 22:26 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Unknown Unknown TDA 137702
07/21/2003 22:26 07/21/2003 22:26 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Unknown Unknown TDA 137702
07/21/2003 22:26 07/21/2003 22:26 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Unknown Unknown TDA 137702
07/21/2003 22:26 07/21/2003 22:26 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Unknown Unknown TDA 137702
07/21/2003 22:26 07/21/2003 22:26 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Unknown Unknown TDA 137702
07/21/2003 22:26 07/21/2003 22:26 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Unknown Unknown TDA 137702
07/21/2003 22:26 07/21/2003 22:26 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Unknown Unknown TDA 137702
07/22/2003 02:39 07/22/2003 02:39 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 137703
07/22/2003 02:39 07/22/2003 02:39 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137703
07/22/2003 02:39 07/22/2003 02:39 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137703
07/22/2003 02:39 07/22/2003 02:39 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137703
07/22/2003 02:39 07/22/2003 02:39 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137703
07/22/2003 02:39 07/22/2003 02:39 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137703
07/22/2003 05:02 07/22/2003 05:02 La Pine-Fort Rock No 1 115kV line 115.0 L 47.03 0 Auto Unknown Unknown RED 137704
07/22/2003 05:21 07/22/2003 13:36 Lexington-Longview No 2 230kV line 230.0 L 9.38 495 Plan Fiber Optic Work LGV OLY 137727
07/22/2003 06:33 07/22/2003 14:54 Palisades-Goshen No 1 115kV line 115.0 L 51.71 501 Plan Maintenance IDF 137728
07/22/2003 07:04 07/23/2003 17:12 Tacoma-TPWR Cowlitz No 2 230kV line 230.0 L 6.00 2048 Plan Foreign Request COV 137729
07/22/2003 07:36 07/22/2003 13:35 Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line 115.0 S 13.98 359 Plan Maintenance EUG 137730
07/22/2003 07:36 07/22/2003 13:35 Wendson-Tahkenitch No 1 115kV line 115.0 L G 20.34 359 Plan Maintenance EUG 137730
07/22/2003 07:36 07/22/2003 14:44 Marcola A500-Alvey section of Santiam-Alvey No 1&2 230kV line 230.0 S 15.05 428 Plan Maintenance EUG 137731
07/22/2003 07:36 07/22/2003 14:44 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 428 Plan Maintenance SAL EUG 137731
07/22/2003 07:37 07/22/2003 16:26 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 529 Plan Maintenance OLY 137732
07/22/2003 07:37 07/22/2003 16:26 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 529 Plan Maintenance OLY 137732
07/22/2003 08:24 07/22/2003 14:52 Albany-Eugene No 1 115kV line 115.0 L G 39.80 388 Plan Maintenance EUG 137733
07/22/2003 08:24 07/22/2003 14:52 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 388 Plan Maintenance EUG 137733
07/22/2003 08:32 07/22/2003 15:38 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 426 Plan Maintenance TDA RED 137734
07/22/2003 08:32 07/22/2003 15:38 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 426 Plan Maintenance TDA RED 137734
07/22/2003 08:42 07/22/2003 10:01 Fairview-Rogue No 1 230kV line 230.0 L 65.28 79 Plan Maintenance EUG 137735
07/22/2003 08:44 07/22/2003 13:49 Fairview-PACW Isthmus No 2 230kV line 230.0 L 11.90 305 Plan Maintenance EUG 137736
07/22/2003 09:04 07/22/2003 14:20 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 316 Plan Maintenance SAL EUG 137737
07/22/2003 09:04 07/22/2003 14:20 Salem-Albany No 2 115kV line 115.0 L G 27.85 316 Plan Maintenance SAL EUG 137737
07/22/2003 09:51 07/22/2003 09:52 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 1 Auto Substation Operations Human Element EUG 137738
07/22/2003 09:51 07/22/2003 09:52 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S 50.95 1 Auto Substation Operations Human Element EUG 137738
07/22/2003 09:51 07/22/2003 10:22 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 31 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 09:52 Bandon-Two Mile section of Bandon-Rogue No 1 115kV line 115.0 S 4.40 1 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 10:01 Geisel Monument tap to Bandon-Rogue No 1 115kV line 115.0 T 0.10 10 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 10:01 Geisel Monument-Rogue section of Bandon-Rogue No 1 115kV line 115.0 S 0.40 10 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 09:52 Langlois tap to Bandon-Rogue No 1 115kV line 115.0 T 0.28 1 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 09:52 Langlois-Port Orford section of Bandon-Rogue No 1 115kV line 115.0 S 10.00 1 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 09:52 Port Orford tap to Bandon-Rogue No 1 115kV line 115.0 T 0.10 1 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 10:22 Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line 115.0 S 21.50 31 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 09:52 Two Mile tap to Bandon-Rogue No 1 115kV line 115.0 T 0.02 1 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 09:52 Two Mile-Langlois section of Bandon-Rogue No 1 115kV line 115.0 S 9.70 1 Auto Forced (Configuration) Human Element EUG 137739
07/22/2003 09:51 07/22/2003 09:52 Fairview-Bandon No 1 115kV line 115.0 L 25.16 1 Auto Forced (Configuration) Human Element EUG 137740
07/22/2003 09:51 07/22/2003 09:52 Fairview-Norway section of Fairview-Bandon No 1 115kV line 115.0 S G 12.59 1 Auto Forced (Configuration) Human Element EUG 137740
07/22/2003 09:51 07/22/2003 09:52 Morrison tap to Fairview-Bandon No 1 115kV line 115.0 T G 0.10 1 Auto Forced (Configuration) Human Element EUG 137740
07/22/2003 09:51 07/22/2003 09:52 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S G 2.31 1 Auto Forced (Configuration) Human Element EUG 137740
07/22/2003 09:51 07/22/2003 09:52 Norway tap to Fairview-Bandon No 1 115kV line 115.0 T G 0.01 1 Auto Forced (Configuration) Human Element EUG 137740
07/22/2003 09:51 07/22/2003 09:52 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S G 10.26 1 Auto Forced (Configuration) Human Element EUG 137740
07/22/2003 09:51 07/22/2003 09:52 Fairview-Bandon No 2 115kV line 115.0 L 19.73 1 Auto Forced (Configuration) Human Element EUG 137741
07/22/2003 09:51 07/22/2003 09:52 Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line 115.0 S 14.02 1 Auto Forced (Configuration) Human Element EUG 137742
07/22/2003 09:51 07/22/2003 09:52 Hauser tap to Reedsport-Fairview No 1 115kV line 115.0 T 1.27 1 Auto Forced (Configuration) Human Element EUG 137742
07/22/2003 09:51 07/22/2003 09:52 Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line 115.0 S 5.81 1 Auto Forced (Configuration) Human Element EUG 137742
07/22/2003 09:51 07/22/2003 09:54 Lakeside-Hauser section of Reedsport-Fairview No 1 115kV line 115.0 S 3.94 3 Auto Forced (Configuration) Human Element EUG 137742
07/22/2003 09:51 07/22/2003 09:54 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 3 Auto Forced (Configuration) Human Element EUG 137742
07/22/2003 09:51 07/22/2003 09:54 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 3 Auto Forced (Configuration) Human Element EUG 137742
07/22/2003 09:51 07/22/2003 09:52 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 1 Auto Forced (Configuration) Human Element EUG 137742
07/22/2003 09:51 07/22/2003 09:54 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 3 Auto Forced (Configuration) Improper Relaying EUG 137743
07/22/2003 15:07 07/23/2003 07:59 Albany-Eugene No 1 115kV line 115.0 L G 39.80 1012 Plan Normally Out EUG 137744
07/22/2003 15:07 07/23/2003 07:59 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 1012 Plan Normally Out EUG 137744
07/22/2003 15:11 07/22/2003 15:56 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 45 Plan Maintenance EUG 137745
07/22/2003 15:11 07/22/2003 15:56 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S 2.31 45 Plan Maintenance EUG 137745
07/22/2003 21:01 07/23/2003 01:44 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 283 Plan Testing WEN 137746
07/23/2003 01:53 07/23/2003 01:53 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 0 Plan Testing WEN 137747
07/23/2003 05:02 07/23/2003 05:02 Benton-451B No 1 115kV line 115.0 L 4.75 0 Auto Unknown Unknown TRI 137758
07/23/2003 05:02 07/23/2003 05:02 Benton-Hanford 2 Construction section of Benton-451B No 1 115kV line 115.0 S G 1.78 0 Auto Unknown Unknown TRI 137758
07/23/2003 05:02 07/23/2003 05:02 Hanford 2 Construction-451B section of Benton-451B No 1 115kV line 115.0 S G 2.97 0 Auto Unknown Unknown TRI 137758
07/23/2003 05:02 07/23/2003 05:02 Hanford No 2 Construction tap to Benton-451B No 1 115kV line 115.0 T G 1.94 0 Auto Unknown Unknown TRI 137758
07/23/2003 05:20 07/23/2003 13:19 Lexington-Longview No 2 230kV line 230.0 L 9.38 479 Plan Fiber Optic Work LGV OLY 137759
07/23/2003 06:52 07/23/2003 15:27 Palisades-Goshen No 1 115kV line 115.0 L 51.71 515 Plan Maintenance IDF 137760
07/23/2003 07:38 07/23/2003 15:42 Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line 115.0 S 13.98 484 Plan Maintenance EUG 137761
07/23/2003 07:38 07/23/2003 15:42 Wendson-Tahkenitch No 1 115kV line 115.0 L G 20.34 484 Plan Maintenance EUG 137761
07/23/2003 07:39 07/23/2003 16:21 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 522 Plan Maintenance OLY 137762
07/23/2003 07:39 07/23/2003 16:21 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 522 Plan Maintenance OLY 137762
07/23/2003 08:05 07/23/2003 14:48 Albany-Eugene No 1 115kV line 115.0 L G 39.80 403 Plan Maintenance EUG 137763
07/23/2003 08:05 07/23/2003 14:48 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 403 Plan Maintenance EUG 137763
07/23/2003 08:18 07/23/2003 15:05 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 407 Plan Maintenance SAL EUG 137764
07/23/2003 08:18 07/23/2003 15:05 Salem-Albany No 2 115kV line 115.0 L G 27.85 407 Plan Maintenance SAL EUG 137764
07/23/2003 08:35 07/23/2003 13:55 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 320 Plan Maintenance TDA RED 137765
07/23/2003 08:35 07/23/2003 13:55 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 320 Plan Maintenance TDA RED 137765
07/23/2003 08:39 07/23/2003 15:49 Alvey-Diamond Hill No 3 230kV line 230.0 L G 20.30 430 Plan Maintenance EUG 137766
07/23/2003 08:39 07/23/2003 15:49 Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line 230.0 S 9.60 430 Plan Maintenance EUG 137766
07/23/2003 09:22 07/23/2003 09:22 Ashe-Marion No 2 500kV line 500.0 L 224.01 0 Auto Unknown Unknown TRI TDA RED SAL 137767
07/23/2003 13:51 07/23/2003 19:33 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 342 Plan Maintenance OLY 137768
07/23/2003 13:51 07/23/2003 19:33 Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line 69.0 S 11.79 342 Plan Maintenance OLY 137768
07/23/2003 15:23 07/24/2003 07:57 Albany-Eugene No 1 115kV line 115.0 L G 39.80 994 Plan Normally Out EUG 137769
07/23/2003 15:23 07/24/2003 07:57 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 994 Plan Normally Out EUG 137769
07/23/2003 15:42 07/23/2003 17:10 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 88 Plan Maintenance EUG 137770
07/23/2003 15:42 07/23/2003 17:10 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S 2.31 88 Plan Maintenance EUG 137770
07/23/2003 17:39 07/23/2003 20:33 Hilltop-Warner No 1 230kV line 230.0 L 8.77 174 Auto Lightning Lightning RED 137771
07/24/2003 05:09 07/24/2003 13:24 Lexington-Longview No 2 230kV line 230.0 L 9.38 495 Plan Maintenance LGV OLY 137778
07/24/2003 06:53 07/24/2003 15:24 Palisades-Goshen No 1 115kV line 115.0 L 51.71 511 Plan Maintenance IDF 137779
07/24/2003 07:39 07/24/2003 15:22 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 463 Plan Maintenance OLY 137780
07/24/2003 07:39 07/24/2003 15:22 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 463 Plan Maintenance OLY 137780
07/24/2003 08:03 07/24/2003 09:56 Albany-Eugene No 1 115kV line 115.0 L G 39.80 113 Plan Maintenance EUG 137781
07/24/2003 08:03 07/24/2003 09:56 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 113 Plan Maintenance EUG 137781
07/24/2003 08:10 07/24/2003 14:48 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 398 Plan Maintenance SAL EUG 137782
07/24/2003 08:10 07/24/2003 14:48 Salem-Albany No 2 115kV line 115.0 L G 27.85 398 Plan Maintenance SAL EUG 137782
07/24/2003 09:23 07/25/2003 13:23 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 1680 Plan Emergency RED 137783
07/24/2003 10:07 07/24/2003 12:23 Albany-Eugene No 1 115kV line 115.0 L G 39.80 136 Plan Normally Out EUG 137784
07/24/2003 10:07 07/24/2003 12:23 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 136 Plan Normally Out EUG 137784
07/24/2003 12:52 07/24/2003 13:06 Albany-Eugene No 1 115kV line 115.0 L G 39.80 14 Plan Testing EUG 137785
07/24/2003 12:52 07/24/2003 13:06 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 14 Plan Testing EUG 137785
07/24/2003 13:45 07/25/2003 07:54 Albany-Eugene No 1 115kV line 115.0 L G 39.80 1089 Plan Normally Out EUG 137786
07/24/2003 13:45 07/25/2003 07:54 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 1089 Plan Normally Out EUG 137786
07/24/2003 14:56 07/24/2003 14:56 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 137787
07/24/2003 14:56 07/24/2003 14:56 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137787
07/24/2003 14:56 07/24/2003 14:56 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137787
07/24/2003 14:56 07/24/2003 14:56 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137787
07/24/2003 14:56 07/24/2003 14:56 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137787
07/24/2003 14:56 07/24/2003 14:56 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137787
07/24/2003 14:58 07/24/2003 14:58 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 137788
07/24/2003 14:58 07/24/2003 14:58 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 137788
07/24/2003 14:58 07/24/2003 14:58 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137788
07/24/2003 14:58 07/24/2003 14:58 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 137788
07/24/2003 14:58 07/24/2003 14:58 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 137788
07/24/2003 14:58 07/24/2003 14:58 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 137788
07/24/2003 14:58 07/24/2003 14:58 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137788
07/24/2003 14:58 07/24/2003 14:58 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 137788
07/24/2003 15:17 07/24/2003 15:17 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 137789
07/24/2003 15:17 07/24/2003 15:17 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 137789
07/24/2003 15:17 07/24/2003 15:17 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137789
07/24/2003 15:17 07/24/2003 15:17 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 137789
07/24/2003 15:17 07/24/2003 15:17 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 137789
07/24/2003 15:17 07/24/2003 15:17 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 137789
07/24/2003 15:17 07/24/2003 15:17 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137789
07/24/2003 15:17 07/24/2003 15:17 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 137789
07/24/2003 16:08 07/24/2003 16:08 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 137790
07/24/2003 16:08 07/24/2003 16:08 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 137790
07/24/2003 16:08 07/24/2003 16:08 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137790
07/24/2003 16:08 07/24/2003 16:08 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 137790
07/24/2003 16:08 07/24/2003 16:08 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 137790
07/24/2003 16:08 07/24/2003 16:08 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 137790
07/24/2003 16:08 07/24/2003 16:08 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137790
07/24/2003 16:08 07/24/2003 16:08 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 137790
07/24/2003 22:23 07/25/2003 14:52 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 989 Plan Maintenance RED 137791
07/25/2003 05:12 07/25/2003 13:14 Lexington-Longview No 2 230kV line 230.0 L 9.38 482 Plan Fiber Optic Work LGV OLY 137794
07/25/2003 07:58 07/25/2003 14:40 Albany-Eugene No 1 115kV line 115.0 L G 39.80 402 Plan Maintenance EUG 137795
07/25/2003 07:58 07/25/2003 14:40 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 402 Plan Maintenance EUG 137795
07/25/2003 08:02 07/25/2003 14:20 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 378 Plan Maintenance SAL EUG 137796
07/25/2003 08:02 07/25/2003 14:20 Salem-Albany No 2 115kV line 115.0 L G 27.85 378 Plan Maintenance SAL EUG 137796
07/25/2003 08:22 07/25/2003 13:16 Midway-Moxee No 1 115kV line 115.0 L G 33.98 294 Plan Maintenance TRI WEN 137797
07/25/2003 08:22 07/25/2003 13:16 Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line 115.0 S 17.37 294 Plan Maintenance WEN 137797
07/25/2003 10:45 07/25/2003 10:45 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 137798
07/25/2003 10:45 07/25/2003 10:45 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 137798
07/25/2003 10:45 07/25/2003 10:45 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137798
07/25/2003 10:45 07/25/2003 10:45 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 137798
07/25/2003 10:45 07/25/2003 10:45 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 137798
07/25/2003 10:45 07/25/2003 10:45 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 137798
07/25/2003 10:45 07/25/2003 10:45 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 137798
07/25/2003 10:45 07/25/2003 10:45 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 137798
07/25/2003 11:14   Bald Mountain tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 0.38 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 0.99 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   Bonneville PH 1-North Camas No 1 115kV line 115.0 L T 22.12 still out Plan Normally Out LGV 137799
07/25/2003 11:14   Carson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 1.24 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 15.35 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   North Bonneville Annex tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 0.10 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 5.30 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   Stevenson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TT 0.10 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   Stevenson-Carson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 3.60 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 T 25.00 still out Plan Normally Out LGV TDA 137799
07/25/2003 11:14   Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line 115.0 TS 0.10 still out Plan Normally Out LGV TDA 137799
07/25/2003 15:04 07/28/2003 07:35 Albany-Eugene No 1 115kV line 115.0 L G 39.80 3871 Plan Normally Out EUG 137800
07/25/2003 15:04 07/28/2003 07:35 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 3871 Plan Normally Out EUG 137800
07/26/2003 01:23 07/26/2003 08:47 Schultz-Raver No 1 500kV line 500.0 L 77.24 444 Plan Voltage Control WEN COV 137801
07/26/2003 02:48 07/26/2003 02:48 Broadview-Garrison No 2 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 137802
07/26/2003 04:00 07/26/2003 13:05 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 545 Plan Maintenance TDA RED 137803
07/26/2003 04:00 07/26/2003 13:05 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137803
07/26/2003 04:00 07/26/2003 13:05 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137803
07/26/2003 04:00 07/26/2003 13:05 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137803
07/26/2003 04:00 07/26/2003 13:05 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137803
07/26/2003 04:00 07/26/2003 13:05 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137803
07/26/2003 04:00 07/26/2003 13:05 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 545 Plan Maintenance TDA RED 137804
07/26/2003 04:00 07/26/2003 13:05 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137804
07/26/2003 04:00 07/26/2003 13:05 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137804
07/26/2003 04:00 07/26/2003 13:05 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137804
07/26/2003 04:00 07/26/2003 13:05 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137804
07/26/2003 04:00 07/26/2003 13:05 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 545 Plan Maintenance TDA 137804
07/26/2003 04:00 07/26/2003 16:59 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 779 Plan Switching TDA 137805
07/26/2003 04:00 07/26/2003 13:05 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 545 Plan Switching TDA 137806
07/26/2003 04:04 07/26/2003 13:05 Big Eddy-Celilo No 3 230kV line 230.0 L 1.09 541 Plan Switching TDA 137807
07/26/2003 04:04 07/26/2003 13:05 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 541 Plan Switching TDA 137808
07/26/2003 04:53 07/26/2003 14:53 Lexington-Longview No 2 230kV line 230.0 L 9.38 600 Plan Fiber Optic Work LGV OLY 137809
07/26/2003 13:05 07/26/2003 17:00 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 235 Plan Maintenance TDA RED 137811
07/26/2003 13:05 07/26/2003 17:00 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 235 Plan Maintenance TDA 137811
07/26/2003 13:32 07/26/2003 17:38 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 246 Auto Equipment/Miscellaneous TDA RED 137812
07/26/2003 13:32 07/26/2003 17:38 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 246 Auto Equipment/Miscellaneous TDA 137812
07/26/2003 18:10 07/26/2003 18:10 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 137813
07/26/2003 18:10 07/26/2003 18:10 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137813
07/26/2003 18:10 07/26/2003 18:10 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137813
07/26/2003 18:10 07/26/2003 18:10 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137813
07/26/2003 18:10 07/26/2003 18:10 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137813
07/26/2003 18:10 07/26/2003 18:10 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137813
07/26/2003 20:58 07/26/2003 20:58 Captain Jack-Olinda No 1 500kV line 500.0 L 148.86 0 Auto Foreign Trouble Foreign Trouble RED 137814
07/27/2003 00:01 07/27/2003 00:15 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 14 Auto Terminal Equipment Failure TDA RED 137815
07/27/2003 00:01 07/27/2003 00:15 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 14 Auto Terminal Equipment Failure TDA 137815
07/27/2003 00:01 07/27/2003 00:15 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 14 Auto Terminal Equipment Failure TDA 137815
07/27/2003 00:01 07/27/2003 00:15 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 14 Auto Terminal Equipment Failure TDA 137815
07/27/2003 00:01 07/27/2003 00:15 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 14 Auto Terminal Equipment Failure TDA 137815
07/27/2003 00:01 07/27/2003 13:04 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 783 Auto Equipment/Miscellaneous TDA RED 137823
07/27/2003 00:01 07/27/2003 13:04 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 783 Auto Equipment/Miscellaneous TDA 137823
07/27/2003 00:02 07/27/2003 00:31 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 29 Auto Terminal Equipment Failure Terminal Equipment Failure TDA 137816
07/27/2003 01:43 07/27/2003 10:49 Schultz-Raver No 1 500kV line 500.0 L 77.24 546 Plan Voltage Control WEN COV 137817
07/27/2003 04:00 07/27/2003 13:04 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 544 Plan Maintenance TDA RED 137818
07/27/2003 04:00 07/27/2003 13:04 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137818
07/27/2003 04:00 07/27/2003 13:04 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137818
07/27/2003 04:00 07/27/2003 13:04 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137818
07/27/2003 04:00 07/27/2003 13:04 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137818
07/27/2003 04:00 07/27/2003 13:04 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 544 Plan Maintenance TDA RED 137819
07/27/2003 04:00 07/27/2003 13:04 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137819
07/27/2003 04:00 07/27/2003 13:04 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137819
07/27/2003 04:00 07/27/2003 13:04 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137819
07/27/2003 04:00 07/27/2003 13:04 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137819
07/27/2003 04:00 07/27/2003 13:04 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 544 Plan Maintenance TDA 137819
07/27/2003 04:07 07/27/2003 13:04 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 537 Plan Switching TDA 137820
07/27/2003 04:09 07/27/2003 12:56 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 527 Plan Switching TDA 137821
07/27/2003 06:35 07/27/2003 06:38 Black Canyon-Emmett No 1 69kV line 69.0 L 4.50 3 Auto Foreign Trouble IDF 137824
07/27/2003 14:59 07/27/2003 15:09 Captain Jack-Olinda No 1 500kV line 500.0 L 148.86 10 Auto Foreign Trouble Foreign Trouble RED 137825
07/28/2003 00:39 07/28/2003 00:41 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 2 Auto Unknown Unknown OLY COV WEN 137826
07/28/2003 02:09 07/28/2003 02:09 Santiam-Toledo No 1 230kV line 230.0 L 67.62 0 Auto Unknown Lightning SAL EUG 137827
07/28/2003 02:09 07/28/2003 02:09 Santiam-Wren section of Santiam-Toledo No 1 230kV line 230.0 S G 41.94 0 Auto Unknown Lightning SAL EUG 137827
07/28/2003 02:09 07/28/2003 02:09 Wren tap to Santiam-Toledo No 1 230kV line 230.0 T G 0.10 0 Auto Unknown Lightning EUG 137827
07/28/2003 02:09 07/28/2003 02:09 Wren-Toledo section of Santiam-Toledo No 1 230kV line 230.0 S G 25.68 0 Auto Unknown Lightning EUG 137827
07/28/2003 02:54 07/31/2003 13:50 Schultz-Raver No 2 500kV line 500.0 L 77.24 4976 Plan Maintenance WEN COV 137828
07/28/2003 04:28 07/30/2003 17:12 Franklin-Walla Walla No 1 115kV line 115.0 L G 35.95 3644 Plan Forced TRI 137838
07/28/2003 04:28 07/30/2003 17:12 Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line 115.0 S 18.21 3644 Plan Forced TRI 137838
07/28/2003 05:07 07/28/2003 05:07 Lagoon-Stateline section of Walla Walla-Pendleton No 1 69kV line 69.0 S 3.63 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 5.47 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Milton tap-Weston Mountain section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS 4.99 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Milton-Lagoon section of Walla Walla-Pendleton No 1 69kV line 69.0 S 1.06 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Stateline tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 1.31 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Stateline-Vansycle section of Walla Walla-Pendleton No 1 69kV line 69.0 S 4.62 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Walla Walla-Milton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 9.55 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Walla Walla-Pendleton No 1 69kV line 69.0 L O 38.93 0 Plan Switching TRI 137839
07/28/2003 05:07 07/28/2003 05:07 Milton tap to Walla Walla-Freewater No 1 69kV line 69.0 T 3.70 0 Plan Maintenance TRI 137840
07/28/2003 05:07 07/28/2003 05:07 Walla Walla-Freewater No 1 69kV line 69.0 L G 11.74 0 Plan Maintenance TRI 137840
07/28/2003 05:07 07/28/2003 05:07 Walla Walla-Whitman section of Walla Walla-Freewater No 1 69kV line 69.0 S 3.80 0 Plan Maintenance TRI 137840
07/28/2003 05:07 07/28/2003 05:07 Whitman tap to Walla Walla-Freewater No 1 69kV line 69.0 T 0.01 0 Plan Maintenance TRI 137840
07/28/2003 05:07 07/28/2003 05:07 Whitman-Freewater section of Walla Walla-Freewater No 1 69kV line 69.0 S 7.94 0 Plan Maintenance TRI 137840
07/28/2003 06:03 07/30/2003 17:12 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 3549 Plan Forced TRI 137841
07/28/2003 06:03 07/30/2003 17:12 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 3549 Plan Forced TRI 137841
07/28/2003 06:09 07/28/2003 13:00 Snohomish-Bothell No 2 230kV line 230.0 L O 7.40 411 Plan Foreign Request SNO 137842
07/28/2003 06:09 07/28/2003 13:00 Snohomish-Sno-King tap section of Snohomish-Bothell No 2 230kV line 230.0 S 7.30 411 Plan Foreign Request SNO 137842
07/28/2003 06:10 08/01/2003 14:40 Bothell-Sno-King No 1 230kV line 230.0 L 3.68 6270 Plan Foreign Request SNO 137843
07/28/2003 07:06 07/28/2003 14:17 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 431 Plan Maintenance OLY LGV 137844
07/28/2003 07:06 07/28/2003 14:17 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 431 Plan Maintenance OLY LGV 137844
07/28/2003 07:31 07/29/2003 14:23 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 1852 Plan Maintenance IDF 137845
07/28/2003 07:37 07/28/2003 16:36 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 539 Plan Maintenance OLY 137846
07/28/2003 07:37 07/28/2003 16:36 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 539 Plan Maintenance OLY 137846
07/28/2003 08:01 07/28/2003 14:14 Albany-Eugene No 1 115kV line 115.0 L G 39.80 373 Plan Maintenance EUG 137847
07/28/2003 08:01 07/28/2003 14:14 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 373 Plan Maintenance EUG 137847
07/28/2003 08:32 07/31/2003 09:50 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 4398 Plan Maintenance EUG 137848
07/28/2003 08:32 07/31/2003 09:50 Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line 115.0 S 21.50 4398 Plan Maintenance EUG 137848
07/28/2003 10:21 07/28/2003 14:41 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T 0.01 260 Plan Foreign Request TDA 137849
07/28/2003 10:21 07/28/2003 14:41 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S 1.46 260 Plan Foreign Request TDA 137849
07/28/2003 10:21 07/28/2003 14:41 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 260 Plan Foreign Request TDA 137849
07/28/2003 10:21 07/28/2003 14:41 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S 32.93 260 Plan Foreign Request TDA 137849
07/28/2003 13:47 07/28/2003 13:54 Mossyrock-Chehalis No 1 230kV line 230.0 L 27.26 7 Auto Foreign Trouble Foreign Trouble OLY 137850
07/28/2003 14:31 07/31/2003 08:04 Albany-Eugene No 1 115kV line 115.0 L G 39.80 3933 Plan Normally Out EUG 137851
07/28/2003 14:31 07/31/2003 08:04 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 3933 Plan Normally Out EUG 137851
07/29/2003 02:02 07/29/2003 05:59 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 237 Plan Voltage Control RED 137852
07/29/2003 03:04 07/29/2003 03:06 Potholes-Grand Coulee No 1 230kV line 230.0 L 65.66 2 Auto Unknown Unknown WEN SPK 137853
07/29/2003 05:15 07/29/2003 06:15 Longview-Allston No 4 115kV line 115.0 L G 4.64 60 Plan Load Control LGV 137855
07/29/2003 05:15 07/29/2003 06:15 Longview-Donald Nys section of Longview-Allston No 4 115kV line 115.0 S 3.63 60 Plan Load Control LGV 137855
07/29/2003 06:58 07/29/2003 16:51 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 593 Plan Maintenance OLY LGV 137856
07/29/2003 06:58 07/29/2003 16:51 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 593 Plan Maintenance OLY LGV 137856
07/29/2003 07:07 07/29/2003 15:14 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 487 Plan Maintenance KAL SPK 137857
07/29/2003 07:07 07/29/2003 15:14 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 487 Plan Maintenance KAL SPK 137857
07/29/2003 07:39 08/01/2003 10:23 Allston-Astoria No 1 115kV line 115.0 L G 41.98 4484 Plan Foreign Request LGV 137858
07/29/2003 07:39 08/01/2003 10:23 Fern Hill-Astoria section of Allston-Astoria No 1 115kV line 115.0 S 3.95 4484 Plan Foreign Request LGV 137858
07/29/2003 07:41 07/29/2003 16:17 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 516 Plan Maintenance OLY 137859
07/29/2003 07:41 07/29/2003 16:17 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 516 Plan Maintenance OLY 137859
07/29/2003 08:15 07/29/2003 14:40 Hills Creek-Lookout Point No 1 115kV line 115.0 L G 24.80 385 Plan Maintenance EUG 137860
07/29/2003 08:15 07/29/2003 14:40 Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line 115.0 S 20.00 385 Plan Maintenance EUG 137860
07/29/2003 08:48 07/29/2003 11:14 Noxon-Libby No 1 230kV line 230.0 L 70.17 146 Plan Foreign Request KAL 137861
07/29/2003 10:06 07/29/2003 12:08 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 122 Plan Testing EUG 137862
07/29/2003 10:06 07/29/2003 12:08 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S 2.31 122 Plan Testing EUG 137862
07/29/2003 12:09 07/29/2003 13:13 Fairview-Bandon No 2 115kV line 115.0 L 19.73 64 Plan Testing EUG 137863
07/30/2003 00:24 07/30/2003 00:24 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 137864
07/30/2003 00:24 07/30/2003 00:24 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 137864
07/30/2003 00:24 07/30/2003 00:24 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 137864
07/30/2003 07:06 07/30/2003 15:11 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 485 Plan Maintenance KAL SPK 137866
07/30/2003 07:06 07/30/2003 15:11 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 485 Plan Maintenance KAL SPK 137866
07/30/2003 07:07 07/30/2003 14:20 South Tacoma-White River No 1 230kV line 230.0 L 14.95 433 Plan Maintenance COV 137867
07/30/2003 07:34 07/30/2003 15:03 Kitsap-South Bremerton No 1 115kV line 115.0 L 0.70 449 Plan Foreign Request OLY 137868
07/30/2003 07:36 07/30/2003 17:13 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 577 Plan Maintenance OLY 137869
07/30/2003 07:36 07/30/2003 17:13 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 577 Plan Maintenance OLY 137869
07/30/2003 08:15 07/30/2003 14:11 Hills Creek-Lookout Point No 1 115kV line 115.0 L G 24.80 356 Plan Maintenance EUG 137870
07/30/2003 08:15 07/30/2003 14:11 Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line 115.0 S 20.00 356 Plan Maintenance EUG 137870
07/30/2003 13:54 07/30/2003 16:11 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 137 Plan Maintenance TDA RED 137871
07/30/2003 13:54 07/30/2003 16:11 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 137 Plan Maintenance TDA 137871
07/30/2003 15:29 07/30/2003 18:02 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 153 Auto Foreign Trouble Foreign Trouble TRI SPK 137872
07/30/2003 15:57 07/30/2003 16:27 John Day PH-John Day No 2 500kV line 500.0 L 3.48 30 Auto Terminal Equipment Failure Terminal Equipment Failure TDA 137873
07/30/2003 16:58 07/30/2003 17:25 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 27 Auto Unknown TDA RED 137874
07/30/2003 16:58 07/30/2003 17:25 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 27 Auto Unknown TDA 137874
07/30/2003 16:58 07/30/2003 17:23 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 25 Auto Unknown TDA 137874
07/30/2003 16:58 07/30/2003 17:24 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 26 Auto Unknown TDA 137874
07/30/2003 16:58 07/30/2003 16:58 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 137875
07/30/2003 16:58 07/30/2003 16:58 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137875
07/30/2003 16:58 07/30/2003 16:58 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 137875
07/30/2003 18:26 08/18/2003 11:48 John Day PH-John Day No 2 500kV line 500.0 L 3.48 26962 Plan Maintenance TDA 137876
07/31/2003 02:07 07/31/2003 02:07 Fairview-Rogue No 1 230kV line 230.0 L 65.28 0 Auto Unknown Unknown EUG 137886
07/31/2003 02:07 07/31/2003 02:07 Rogue-Gold Beach No 1 115kV line 115.0 L 5.47 0 Auto Unknown Forced (Configuration) EUG 137887
07/31/2003 02:07 07/31/2003 02:07 Rogue-Gold Beach No 2 115kV line 115.0 L 5.49 0 Auto Unknown Forced (Configuration) EUG 137888
07/31/2003 02:07 07/31/2003 02:07 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 0 Auto Unknown Forced (Configuration) EUG 137889
07/31/2003 02:07 07/31/2003 02:07 Geisel Monument tap to Bandon-Rogue No 1 115kV line 115.0 T 0.10 0 Auto Unknown Forced (Configuration) EUG 137889
07/31/2003 02:07 07/31/2003 02:07 Geisel Monument-Rogue section of Bandon-Rogue No 1 115kV line 115.0 S 0.40 0 Auto Unknown Forced (Configuration) EUG 137889
07/31/2003 03:38 07/31/2003 03:40 Grizzly-Malin PGE No 2 500kV line 500.0 L 178.50 2 Auto Foreign Trouble Foreign Trouble RED 137877
07/31/2003 07:35 07/31/2003 16:53 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 558 Plan Maintenance OLY 137890
07/31/2003 07:35 07/31/2003 16:53 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 558 Plan Maintenance OLY 137890
07/31/2003 08:17 08/01/2003 16:23 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 1926 Plan Maintenance SAL 137891
07/31/2003 08:17 08/01/2003 16:23 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 1926 Plan Maintenance SAL 137891
07/31/2003 08:32 07/31/2003 13:59 Albany-Eugene No 1 115kV line 115.0 L G 39.80 327 Plan Testing EUG 137892
07/31/2003 08:32 07/31/2003 13:59 Alderwood-Junction City section of Albany-Eugene No 1 115kV line 115.0 S 2.04 327 Plan Testing EUG 137892
07/31/2003 09:12 07/31/2003 14:37 Blue River-Thurston section of Cougar-Thurston No 1 115kV line 115.0 S 34.24 325 Plan Maintenance EUG 137893
07/31/2003 09:12 07/31/2003 14:37 Cougar-Thurston No 1 115kV line 115.0 L G 39.99 325 Plan Maintenance EUG 137893
07/31/2003 10:18 07/31/2003 14:33 Albeni Falls-Newport section of Albeni Falls-Pine Street No 1 115kV line 115.0 S G 2.11 255 Plan Foreign Request SPK 137894
07/31/2003 10:18 07/31/2003 14:33 Albeni Falls-Pine Street No 1 115kV line 115.0 L 2.27 255 Plan Foreign Request SPK 137894
07/31/2003 10:18 07/31/2003 14:33 Newport-Pine Street section of Albeni Falls-Pine Street No 1 115kV line 115.0 S G 0.16 255 Plan Foreign Request SPK 137894
07/31/2003 10:34 07/31/2003 18:41 Dayton-Shelton section of Olympia-Shelton No 1 115kV line 115.0 S 1.78 487 Auto Foreign Trouble Foreign Trouble OLY 137895
07/31/2003 10:34 07/31/2003 18:41 Olympia-Dayton section of Olympia-Shelton No 1 115kV line 115.0 S 17.95 487 Auto Foreign Trouble Foreign Trouble OLY 137895
07/31/2003 10:34 07/31/2003 18:41 Olympia-Shelton No 1 115kV line 115.0 L G 19.73 487 Auto Foreign Trouble Foreign Trouble OLY 137895
07/31/2003 11:56 07/31/2003 13:58 Garrison-Taft No 1 500kV line 500.0 L 159.38 122 Plan Forced KAL 137896
07/31/2003 12:33 07/31/2003 13:11 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 38 Plan Load Control LGV 137897
07/31/2003 12:33 07/31/2003 13:11 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 38 Plan Load Control LGV 137897
07/31/2003 13:08 07/31/2003 14:56 Bell-Addy No 1 115kV line 115.0 L G 51.18 108 Plan Maintenance SPK 137898
07/31/2003 13:08 07/31/2003 14:56 Mead-Colbert section of Bell-Addy No 1 115kV line 115.0 S 4.95 108 Plan Maintenance SPK 137898
07/31/2003 13:11 07/31/2003 17:57 John Day PH-John Day No 3 500kV line 500.0 L 3.48 286 Plan Maintenance TDA 137899
07/31/2003 14:27 08/01/2003 07:52 Albany-Eugene No 1 115kV line 115.0 L G 39.80 1045 Plan Normally Out EUG 137900
07/31/2003 14:27 08/01/2003 07:52 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 1045 Plan Normally Out EUG 137900
07/31/2003 15:25 07/31/2003 15:48 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 23 Auto Foreign Trouble TDA RED 137901
07/31/2003 15:25 07/31/2003 15:48 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 23 Auto Foreign Trouble TDA 137901
07/31/2003 15:25 07/31/2003 15:48 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 23 Auto Foreign Trouble TDA 137901
07/31/2003 15:25 07/31/2003 15:48 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 23 Auto Foreign Trouble TDA 137901
07/31/2003 15:25 07/31/2003 15:48 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 23 Auto Foreign Trouble TDA 137901
07/31/2003 15:25 07/31/2003 15:48 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 23 Auto Foreign Trouble TDA 137901
08/01/2003 00:49 08/01/2003 05:53 John Day-Marion No 1 500kV line 500.0 L 127.51 304 Plan Voltage Control TDA RED SAL 137902
08/01/2003 04:55 08/01/2003 04:57 Vantage-Schultz No 1 500kV line 500.0 L 34.65 2 Auto Unknown Unknown WEN 137903
08/01/2003 08:25 08/01/2003 13:53 Albany-Eugene No 1 115kV line 115.0 L G 39.80 328 Plan Maintenance EUG 137905
08/01/2003 08:25 08/01/2003 13:53 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 328 Plan Maintenance EUG 137905
08/01/2003 10:49 08/01/2003 13:22 Vantage-Wanapum No 3 230kV line 230.0 L 1.50 153 Plan Foreign Request WEN 137906
08/01/2003 14:22 08/03/2003 06:43 Albany-Eugene No 1 115kV line 115.0 L G 39.80 2421 Plan Normally Out EUG 137907
08/01/2003 14:22 08/03/2003 06:43 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 2421 Plan Normally Out EUG 137907
08/02/2003 01:35 08/02/2003 05:55 Schultz-Raver No 1 500kV line 500.0 L 77.24 260 Plan Voltage Control WEN COV 137908
08/02/2003 04:00 08/02/2003 11:54 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 474 Plan Foreign Request TDA RED 137910
08/02/2003 04:00 08/02/2003 11:54 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 474 Plan Foreign Request TDA 137910
08/02/2003 04:00 08/02/2003 11:54 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 474 Plan Foreign Request TDA 137910
08/02/2003 04:00 08/02/2003 11:54 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 474 Plan Foreign Request TDA 137910
08/02/2003 04:00 08/02/2003 11:54 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 474 Plan Foreign Request TDA 137910
08/02/2003 04:00 08/02/2003 11:54 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 474 Plan Foreign Request TDA 137910
08/02/2003 04:00 08/02/2003 11:54 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 474 Plan Foreign Request TDA RED 137911
08/02/2003 04:00 08/02/2003 11:54 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 474 Plan Foreign Request TDA 137911
08/02/2003 04:00 08/02/2003 11:54 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 474 Plan Foreign Request TDA 137911
08/02/2003 04:00 08/02/2003 11:54 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 474 Plan Foreign Request TDA 137911
08/02/2003 04:00 08/02/2003 11:54 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 474 Plan Foreign Request TDA 137911
08/02/2003 04:00 08/02/2003 11:54 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 474 Plan Foreign Request TDA 137911
08/02/2003 04:34 08/02/2003 13:24 Big Eddy-Celilo No 3 230kV line 230.0 L 1.09 530 Plan Switching TDA 137912
08/02/2003 05:48 08/02/2003 09:54 Creston-Bell No 1 115kV line 115.0 L G 53.80 246 Plan Emergency WEN SPK 137915
08/02/2003 05:48 08/02/2003 09:54 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 246 Plan Emergency WEN 137915
08/02/2003 06:01 08/02/2003 18:02 Chief Joseph-Monroe No 1 500kV line 500.0 L 121.60 721 Plan Maintenance WEN SNO 137913
08/03/2003 00:05 08/03/2003 01:39 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 94 Plan Switching EUG 137926
08/03/2003 00:08 08/04/2003 15:59 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 2391 Plan Switching EUG 137927
08/03/2003 00:08 08/04/2003 15:59 Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.03 2391 Plan Switching EUG 137927
08/03/2003 00:09 08/04/2003 16:20 Alvey-Fairview No 1 230kV line 230.0 L T 97.46 2411 Plan Switching EUG 137928
08/03/2003 00:09 08/04/2003 16:20 Martin Creek tap to Alvey-Fairview No 1 230kV line 230.0 T 0.27 2411 Plan Switching EUG 137928
08/03/2003 00:29 08/03/2003 07:59 John Day-Marion No 1 500kV line 500.0 L 127.51 450 Plan Voltage Control TDA RED SAL 137916
08/03/2003 01:44 08/03/2003 07:20 Schultz-Raver No 1 500kV line 500.0 L 77.24 336 Plan Voltage Control WEN COV 137917
08/03/2003 03:51 08/03/2003 03:51 Lost River-Spar Canyon No 1 230kV line 230.0 L 53.19 0 Auto Unknown Lightning IDF 137929
08/03/2003 04:00 08/03/2003 12:18 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 498 Plan Maintenance TDA RED 137918
08/03/2003 04:00 08/03/2003 12:18 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 498 Plan Maintenance TDA 137918
08/03/2003 04:00 08/03/2003 12:18 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 498 Plan Maintenance TDA 137918
08/03/2003 04:00 08/03/2003 12:18 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 498 Plan Maintenance TDA 137918
08/03/2003 04:00 08/03/2003 12:18 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 498 Plan Maintenance TDA 137918
08/03/2003 04:00 08/03/2003 12:18 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 498 Plan Maintenance TDA 137918
08/03/2003 04:28 08/03/2003 12:53 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 505 Plan Switching TDA 137919
08/03/2003 06:01 08/03/2003 17:33 Chief Joseph-Monroe No 1 500kV line 500.0 L 121.60 692 Plan Maintenance WEN SNO 137930
08/03/2003 07:49 08/03/2003 14:08 Albany-Eugene No 1 115kV line 115.0 L G 39.80 379 Plan Construction EUG 137931
08/03/2003 07:49 08/03/2003 14:08 Parker-Eugene section of Albany-Eugene No 1 115kV line 115.0 S 3.90 379 Plan Construction EUG 137931
08/03/2003 08:11 08/24/2003 16:48 Albany-Eugene No 1 115kV line 115.0 L O 39.80 30757 Plan Construction EUG 137932
08/03/2003 08:11 08/24/2003 16:48 Junction City-Parker section of Albany-Eugene No 1 115kV line 115.0 S 2.94 30757 Plan Construction EUG 137932
08/03/2003 08:11 08/03/2003 14:08 Parker tap to Albany-Eugene No 1 115kV line 115.0 T 0.10 357 Plan Construction EUG 137932
08/03/2003 15:57 08/03/2003 16:26 Columbia-Rocky Ford No 1 115kV line 115.0 L 30.40 29 Auto Foreign Trouble Foreign Trouble WEN 137933
08/03/2003 17:00 08/03/2003 17:01 Columbia-Rocky Ford No 1 115kV line 115.0 L 30.40 1 Plan Foreign Request WEN 137934
08/03/2003 18:50 09/24/2003 13:23 Bonneville PH 1-North Bonneville No 2 230kV line 230.0 L 0.83 74553 Plan Foreign Request LGV 137935
08/04/2003 00:03 08/04/2003 05:36 John Day-Marion No 1 500kV line 500.0 L 127.51 333 Plan Voltage Control TDA RED SAL 137936
08/04/2003 01:04 08/04/2003 06:00 Schultz-Raver No 1 500kV line 500.0 L 77.24 296 Plan Voltage Control WEN COV 137949
08/04/2003 02:16 08/15/2003 08:39 Anaconda-Silver Bow No 1 115kV line 115.0 L 12.69 16223 Auto Forced (Configuration) Terminal Equipment Failure KAL 137950
08/04/2003 02:16 08/04/2003 06:39 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 263 Auto Forced (Configuration) Terminal Equipment Failure KAL 137951
08/04/2003 02:16 08/04/2003 06:40 Anaconda-NWE Mill Creek No 1 230kV line 230.0 L 0.40 264 Auto Forced (Configuration) Terminal Equipment Failure KAL 137952
08/04/2003 04:44 08/04/2003 04:48 Alvey-Lane No 1 230kV line 230.0 L 13.41 4 Auto Unknown Terminal Equipment Failure EUG 137953
08/04/2003 04:44 08/04/2003 04:49 Lane-Wendson No 2 230kV line 230.0 L 41.03 5 Auto Unknown Unknown EUG 137954
08/04/2003 07:01 08/08/2003 11:09 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 6008 Plan Maintenance OLY 137955
08/04/2003 07:04 08/04/2003 15:21 Longview-Allston No 2 230kV line 230.0 L 4.87 497 Plan Maintenance LGV 137956
08/04/2003 07:21 08/04/2003 16:48 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 567 Plan Maintenance RED 137957
08/04/2003 07:57 08/04/2003 12:26 Creston-Bell No 1 115kV line 115.0 L G 53.80 269 Plan Switching WEN SPK 137958
08/04/2003 07:57 08/04/2003 12:26 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 269 Plan Switching WEN 137958
08/04/2003 07:57 08/04/2003 12:26 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 269 Plan Switching WEN SPK 137959
08/04/2003 07:57 08/04/2003 12:26 Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line 115.0 S 10.21 269 Plan Switching WEN SPK 137959
08/04/2003 08:04 08/14/2003 17:44 Taft-Hot Springs No 1 500kV line 500.0 L 53.83 14980 Plan Maintenance KAL 137960
08/04/2003 08:14 08/04/2003 17:23 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 549 Plan Maintenance EUG 137961
08/04/2003 08:18 08/04/2003 15:09 Swan Valley-Teton No 2 115kV line 115.0 L 35.41 411 Plan Maintenance IDF 137962
08/04/2003 09:01 08/07/2003 13:33 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 4592 Plan Maintenance TRI 137963
08/04/2003 09:01 08/07/2003 13:33 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 4592 Plan Maintenance TRI 137963
08/04/2003 16:27 08/04/2003 16:31 Redmond-PGE Round Butte No 1 230kV line 230.0 L 23.60 4 Auto Lightning Lightning RED 137964
08/04/2003 16:30 08/14/2003 07:42 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 13872 Plan Normally Out EUG 137965
08/04/2003 16:30 08/14/2003 07:42 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 13872 Plan Normally Out EUG 137965
08/04/2003 19:21 08/04/2003 19:21 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Lightning RED 137966
08/04/2003 19:21 08/04/2003 19:21 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Lightning IDF RED 137966
08/04/2003 19:21 08/04/2003 19:21 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Lightning IDF RED 137966
08/04/2003 19:29 08/04/2003 19:29 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Lightning RED 137967
08/04/2003 19:29 08/04/2003 19:29 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Lightning IDF RED 137967
08/04/2003 19:29 08/04/2003 19:29 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Lightning IDF RED 137967
08/04/2003 19:39 08/04/2003 19:39 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Foreign Trouble Foreign Trouble TDA 138658
08/04/2003 23:27 08/05/2003 06:55 Schultz-Raver No 1 500kV line 500.0 L 77.24 448 Plan Voltage Control WEN COV 137968
08/04/2003 23:28 08/05/2003 05:45 Schultz-Raver No 2 500kV line 500.0 L 77.24 377 Plan Voltage Control WEN COV 137969
08/05/2003 00:01 08/05/2003 06:02 John Day-Marion No 1 500kV line 500.0 L 127.51 361 Plan Voltage Control TDA RED SAL 137970
08/05/2003 04:37 08/05/2003 04:37 Fairview-Bandon No 1 115kV line 115.0 L 25.16 0 Auto Lightning Lightning EUG 137971
08/05/2003 04:37 08/05/2003 04:37 Fairview-Norway section of Fairview-Bandon No 1 115kV line 115.0 S G 12.59 0 Auto Lightning Lightning EUG 137971
08/05/2003 04:37 08/05/2003 04:37 Morrison tap to Fairview-Bandon No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning EUG 137971
08/05/2003 04:37 08/05/2003 04:37 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S G 2.31 0 Auto Lightning Lightning EUG 137971
08/05/2003 04:37 08/05/2003 04:37 Norway tap to Fairview-Bandon No 1 115kV line 115.0 T G 0.01 0 Auto Lightning Lightning EUG 137971
08/05/2003 04:37 08/05/2003 04:37 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S G 10.26 0 Auto Lightning Lightning EUG 137971
08/05/2003 04:55 08/05/2003 05:21 Ross-Lexington No 1 230kV line 230.0 L 41.21 26 Plan Foreign Request LGV 137972
08/05/2003 04:55 08/05/2003 05:21 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 26 Plan Foreign Request LGV 137972
08/05/2003 04:55 08/05/2003 05:21 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 26 Plan Foreign Request LGV 137972
08/05/2003 04:55 08/05/2003 05:21 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 26 Plan Foreign Request LGV 137972
08/05/2003 05:05 08/05/2003 14:16 Longview-Allston No 2 230kV line 230.0 L 4.87 551 Plan Maintenance LGV 137973
08/05/2003 06:02 08/05/2003 06:02 Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line 115.0 S G 13.98 0 Auto Lightning Lightning EUG 138048
08/05/2003 06:02 08/05/2003 06:02 Wendson-Berrydale section of Wendson-Tahkenitch No 1 115kV line 115.0 S G 6.36 0 Auto Lightning Lightning EUG 138048
08/05/2003 06:02 08/05/2003 06:02 Wendson-Tahkenitch No 1 115kV line 115.0 L 20.34 0 Auto Lightning Lightning EUG 138048
08/05/2003 07:30 08/08/2003 08:41 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 4391 Plan Foreign Request SAL 138049
08/05/2003 07:30 08/08/2003 08:41 Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.70 4391 Plan Foreign Request SAL 138049
08/05/2003 07:32 08/06/2003 14:12 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 1840 Plan Maintenance IDF 138050
08/05/2003 07:46 08/05/2003 07:46 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Lightning Lightning RED 138051
08/05/2003 07:46 08/05/2003 07:46 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Lightning Lightning RED 138051
08/05/2003 07:46 08/05/2003 07:46 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 138051
08/05/2003 07:46 08/05/2003 07:46 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Lightning Lightning RED 138051
08/05/2003 07:46 08/05/2003 07:46 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Lightning Lightning RED 138051
08/05/2003 07:46 08/05/2003 07:46 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Lightning Lightning RED 138051
08/05/2003 07:46 08/05/2003 07:46 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning RED 138051
08/05/2003 07:46 08/05/2003 07:46 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Lightning Lightning RED 138051
08/05/2003 07:51 08/05/2003 07:51 Albany-Eugene No 1 115kV line 115.0 L O 39.80 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Alderwood tap to Albany-Eugene No 1 115kV line 115.0 T 9.21 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Alderwood tap-Cheshire section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS 1.40 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Alderwood-Junction City section of Albany-Eugene No 1 115kV line 115.0 S 2.04 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Cheshire tap to Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TT 0.01 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Cheshire-Alderwood section of Alderwood tap to Albany-Eugene No 1 115kV line 115.0 TS 7.80 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Greenberry tap to Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TT 19.00 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Greenberry-Harrisburg section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS 0.02 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Halsey Mill tap to Albany-Eugene No 1 115kV line 115.0 T 0.04 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 T 0.04 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Harrisburg tap-Greenberry section of Harrisburg tap to Albany-Eugene No 1 115kV line 115.0 TS 0.02 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line 115.0 S 8.28 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:51 08/05/2003 07:51 Junction City tap to Albany-Eugene No 1 115kV line 115.0 T 0.05 0 Auto Lightning Lightning EUG 138052
08/05/2003 07:52 08/05/2003 07:52 Albany-Lebanon No 1 115kV line 115.0 L 17.01 0 Auto Lightning Lightning EUG 138053
08/05/2003 07:52 08/05/2003 07:52 Albany-Lochner section of Albany-Lebanon No 1 115kV line 115.0 S G 2.43 0 Auto Lightning Lightning EUG 138053
08/05/2003 07:52 08/05/2003 07:52 Froman tap to Albany-Lebanon No 1 115kV line 115.0 T G 0.04 0 Auto Lightning Lightning EUG 138053
08/05/2003 07:52 08/05/2003 07:52 Froman-Lebanon section of Albany-Lebanon No 1 115kV line 115.0 S G 11.26 0 Auto Lightning Lightning EUG 138053
08/05/2003 07:52 08/05/2003 07:52 Lochner-Froman section of Albany-Lebanon No 1 115kV line 115.0 S G 3.32 0 Auto Lightning Lightning EUG 138053
08/05/2003 08:13 08/05/2003 16:45 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S 136.53 512 Plan Maintenance TDA RED 138055
08/05/2003 08:13 08/05/2003 16:45 McNary-Santiam No 2 230kV line 230.0 L G 200.43 512 Plan Maintenance TRI TDA RED SAL 138055
08/05/2003 08:14 08/05/2003 08:14 Santiam-Toledo No 1 230kV line 230.0 L 67.62 0 Auto Lightning Lightning SAL EUG 138056
08/05/2003 08:14 08/05/2003 08:14 Santiam-Wren section of Santiam-Toledo No 1 230kV line 230.0 S G 41.94 0 Auto Lightning Lightning SAL EUG 138056
08/05/2003 08:14 08/05/2003 08:14 Wren tap to Santiam-Toledo No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning EUG 138056
08/05/2003 08:14 08/05/2003 08:14 Wren-Toledo section of Santiam-Toledo No 1 230kV line 230.0 S G 25.68 0 Auto Lightning Lightning EUG 138056
08/05/2003 08:18 08/05/2003 08:18 Eugene-Lane No 1 115kV line 115.0 L 5.47 0 Auto Lightning Lightning EUG 138057
08/05/2003 08:20 08/05/2003 08:20 Eugene-Lane No 1 115kV line 115.0 L 5.47 0 Auto Lightning Lightning EUG 138058
08/05/2003 08:33 08/05/2003 16:56 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T 503 Plan Maintenance TDA 138059
08/05/2003 08:33 08/05/2003 16:56 McNary-Santiam No 2 230kV line 230.0 L T 200.43 503 Plan Maintenance TRI TDA RED SAL 138059
08/05/2003 08:38 08/05/2003 08:38 Salem-PACW Dallas No 1 115kV line 115.0 L 13.20 0 Auto Foreign Trouble Foreign Trouble SAL 138060
08/05/2003 08:40 08/06/2003 14:01 Creston-Bell No 1 115kV line 115.0 L G 53.80 1761 Plan Maintenance WEN SPK 138061
08/05/2003 08:40 08/06/2003 14:01 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 1761 Plan Maintenance SPK 138061
08/05/2003 08:49 08/05/2003 14:58 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L G 52.68 369 Plan Maintenance SPK 138062
08/05/2003 08:49 08/05/2003 14:31 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 1.30 342 Plan Maintenance SPK 138062
08/05/2003 08:49 08/05/2003 15:35 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T 0.10 406 Plan Maintenance SPK 138062
08/05/2003 08:49 08/05/2003 14:58 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 5.80 369 Plan Maintenance SPK 138062
08/05/2003 09:27 08/05/2003 09:27 Toledo-Wendson No 1 230kV line 230.0 L 49.64 0 Auto Lightning Lightning EUG 138063
08/05/2003 10:14 08/05/2003 16:07 Columbia-Ancient Lake section of Columbia-Wanapum No 2 230kV line 230.0 S 11.20 353 Plan Maintenance WEN 138064
08/05/2003 10:14 08/05/2003 16:07 Columbia-Wanapum No 2 230kV line 230.0 L G 30.90 353 Plan Maintenance WEN 138064
08/05/2003 10:52 08/05/2003 10:52 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S G 1.90 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S G 10.53 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 Keeler-Tillamook No 1 115kV line 115.0 L 57.81 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S G 25.14 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 Thatcher Junction tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.75 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S G 8.04 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T G 11.21 0 Auto Lightning Lightning SAL 138065
08/05/2003 10:52 08/05/2003 10:52 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S G 12.20 0 Auto Lightning Lightning SAL 138065
08/05/2003 11:28 08/05/2003 11:29 Ross-Lexington No 1 230kV line 230.0 L 41.21 1 Auto Lightning Lightning LGV 138066
08/05/2003 11:28 08/05/2003 11:29 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 1 Auto Lightning Lightning LGV 138066
08/05/2003 11:28 08/05/2003 11:29 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 1 Auto Lightning Lightning LGV 138066
08/05/2003 11:28 08/05/2003 11:29 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 1 Auto Lightning Lightning LGV 138066
08/05/2003 11:38 08/05/2003 11:38 Ross-Lexington No 1 230kV line 230.0 L 41.21 0 Auto Lightning Lightning LGV 138067
08/05/2003 11:38 08/05/2003 11:38 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 0 Auto Lightning Lightning LGV 138067
08/05/2003 11:38 08/05/2003 11:38 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 0 Auto Lightning Lightning LGV 138067
08/05/2003 11:38 08/05/2003 11:38 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 0 Auto Lightning Lightning LGV 138067
08/05/2003 11:50 08/05/2003 11:50 Grand Avenue tap to Ross-Vancouver Shipyard No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning LGV 138068
08/05/2003 11:50 08/05/2003 11:50 Mill Plain tap to Ross-Vancouver Shipyard No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning LGV 138068
08/05/2003 11:50 08/05/2003 11:50 Mill Plain-Vancouver Shipyard section of Ross-Vancouver Shipyard No 1 115kV line 115.0 S G 1.06 0 Auto Lightning Lightning LGV 138068
08/05/2003 11:50 08/05/2003 11:50 Ross-Mill Plain section of Ross-Vancouver Shipyard No 1 115kV line 115.0 S G 3.66 0 Auto Lightning Lightning LGV 138068
08/05/2003 11:50 08/05/2003 11:50 Ross-Vancouver Shipyard No 1 115kV line 115.0 L 4.73 0 Auto Lightning Lightning LGV 138068
08/05/2003 11:57 08/05/2003 14:18 Carrolls-Cardwell section of Lexington-Cardwell No 1 115kV line 115.0 S 3.60 141 Auto Lightning Lightning OLY 138069
08/05/2003 11:57 08/05/2003 11:57 East Kelso-South Kelso section of Lexington-Cardwell No 1 115kV line 115.0 S 1.50 0 Auto Lightning Lightning OLY 138069
08/05/2003 11:57 08/05/2003 14:18 Lexington-Cardwell No 1 115kV line 115.0 L G 11.60 141 Auto Lightning Lightning LGV OLY 138069
08/05/2003 11:57 08/05/2003 11:57 Lexington-Shawnee section of Lexington-Cardwell No 1 115kV line 115.0 S 1.30 0 Auto Lightning Lightning LGV OLY 138069
08/05/2003 11:57 08/05/2003 11:57 Shawnee-East Kelso section of Lexington-Cardwell No 1 115kV line 115.0 S 1.70 0 Auto Lightning Lightning OLY 138069
08/05/2003 11:57 08/05/2003 11:57 South Kelso-Carrolls section of Lexington-Cardwell No 1 115kV line 115.0 S 3.50 0 Auto Lightning Lightning OLY 138069
08/05/2003 12:06 08/05/2003 12:07 Ross-Lexington No 1 230kV line 230.0 L 41.21 1 Auto Lightning Lightning LGV 138070
08/05/2003 12:06 08/05/2003 12:07 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 1 Auto Lightning Lightning LGV 138070
08/05/2003 12:06 08/05/2003 12:07 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 1 Auto Lightning Lightning LGV 138070
08/05/2003 12:06 08/05/2003 12:07 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 1 Auto Lightning Lightning LGV 138070
08/05/2003 12:14 08/05/2003 12:14 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 0 Auto Lightning Lightning SAL 138071
08/05/2003 12:21 08/05/2003 12:21 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 0 Auto Lightning Lightning SAL 138072
08/05/2003 12:49 08/05/2003 13:30 Ross-Lexington No 1 230kV line 230.0 L 41.21 41 Plan Foreign Request LGV 138073
08/05/2003 12:49 08/05/2003 13:30 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 41 Plan Foreign Request LGV 138073
08/05/2003 12:49 08/05/2003 13:30 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 41 Plan Foreign Request LGV 138073
08/05/2003 12:49 08/05/2003 13:30 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 41 Plan Foreign Request LGV 138073
08/05/2003 13:07 08/05/2003 13:07 Baker Creek tap to Walnut City tap to Forest Grove-McMinnville No 1 115kV line 115.0 TT G 0.10 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Carlton tap to Forest Grove-McMinnville No 1 115kV line 115.0 T G 0.03 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Carlton-Walnut City section of Forest Grove-McMinnville No 1 115kV line 115.0 S G 3.03 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Filbert tap to Forest Grove-McMinnville No 1 115kV line 115.0 T G 0.72 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Filbert-Carlton section of Forest Grove-McMinnville No 1 115kV line 115.0 S G 17.74 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Forest Grove-Filbert section of Forest Grove-McMinnville No 1 115kV line 115.0 S G 0.77 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Forest Grove-McMinnville No 1 115kV line 115.0 L 23.72 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Walnut City tap to Forest Grove-McMinnville No 1 115kV line 115.0 T G 5.63 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Walnut City tap-Baker Creek section of Walnut City tap to Forest Grove-McMinnville No 1 115kV line 115.0 TS G 4.43 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Walnut City-McMinnville section of Forest Grove-McMinnville No 1 115kV line 115.0 S G 2.18 0 Auto Lightning Lightning SAL 138074
08/05/2003 13:07 08/05/2003 13:07 Carlton-McMinnville No 1 115kV line 115.0 L 5.35 0 Auto Lightning Lightning SAL 138075
08/05/2003 13:07 08/05/2003 13:07 Carlton-Windishar section of Carlton-McMinnville No 1 115kV line 115.0 S G 3.87 0 Auto Lightning Lightning SAL 138075
08/05/2003 13:07 08/05/2003 13:07 Windishar tap to Carlton-McMinnville No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SAL 138075
08/05/2003 13:07 08/05/2003 13:07 Windishar-McMinnville section of Carlton-McMinnville No 1 115kV line 115.0 S G 1.48 0 Auto Lightning Lightning SAL 138075
08/05/2003 13:10 08/05/2003 13:18 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 8 Auto Foreign Trouble Foreign Trouble TRI SPK 138076
08/05/2003 13:15 08/05/2003 13:15 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 0 Auto Lightning Lightning SAL 138077
08/05/2003 13:20 08/05/2003 13:28 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 8 Auto Foreign Trouble Foreign Trouble TRI SPK 138078
08/05/2003 13:23 08/05/2003 13:23 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S G 1.90 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S G 10.53 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 Keeler-Tillamook No 1 115kV line 115.0 L 57.81 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S G 25.14 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 Thatcher Junction tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.75 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S G 8.04 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T G 11.21 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:23 08/05/2003 13:23 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S G 12.20 0 Auto Lightning Lightning SAL 138079
08/05/2003 13:58 08/05/2003 13:58 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S G 1.90 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S G 10.53 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 Keeler-Tillamook No 1 115kV line 115.0 L 57.81 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S G 25.14 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 Thatcher Junction tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.75 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S G 8.04 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T G 11.21 0 Auto Lightning Lightning SAL 138080
08/05/2003 13:58 08/05/2003 13:58 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S G 12.20 0 Auto Lightning Lightning SAL 138080
08/05/2003 14:01 08/05/2003 14:01 Keeler-Forest Grove No 2 115kV line 115.0 L 10.51 0 Auto Lightning Lightning SAL 138081
08/05/2003 14:01 08/05/2003 14:01 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S G 1.90 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S G 10.53 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 Keeler-Tillamook No 1 115kV line 115.0 L 57.81 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S G 25.14 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 Thatcher Junction tap to Keeler-Tillamook No 1 115kV line 115.0 T G 0.75 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S G 8.04 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T G 11.21 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:01 08/05/2003 14:01 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S G 12.20 0 Auto Lightning Lightning SAL 138082
08/05/2003 14:32 08/05/2003 14:32 Dutch Canyon-Warren section of St Johns-St Helens No 1 115kV line 115.0 S G 5.37 0 Auto Lightning Lightning LGV 138083
08/05/2003 14:32 08/05/2003 14:32 St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line 115.0 S G 12.82 0 Auto Lightning Lightning LGV 138083
08/05/2003 14:32 08/05/2003 14:32 St Johns-St Helens No 1 115kV line 115.0 L 23.27 0 Auto Lightning Lightning LGV 138083
08/05/2003 14:32 08/05/2003 14:32 Warren-St Helens section of St Johns-St Helens No 1 115kV line 115.0 S G 5.08 0 Auto Lightning Lightning LGV 138083
08/05/2003 14:34 08/05/2003 14:34 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Foreign Trouble Foreign Trouble TDA 138659
08/05/2003 14:51 08/05/2003 14:51 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Foreign Trouble Foreign Trouble TDA 138660
08/05/2003 15:11 08/05/2003 15:11 Lancaster-Noxon No 1 230kV line 230.0 L 72.72 0 Auto Lightning Lightning SPK KAL 138084
08/05/2003 15:13 08/05/2003 15:20 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 7 Auto Foreign Trouble Foreign Trouble TRI SPK 138085
08/05/2003 15:29 08/05/2003 15:29 Ashe-Marion No 2 500kV line 500.0 L 224.01 0 Auto Lightning Lightning TRI TDA RED SAL 138086
08/05/2003 15:29 08/05/2003 15:41 Chief Joseph PH-Chief Joseph No 4 230kV line 230.0 L 0.90 12 Auto RAS Initiated Unknown WEN 138087
08/05/2003 15:29 08/05/2003 16:53 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 84 Auto RAS Initiated RAS Initiated WEN 138088
08/05/2003 15:29 08/05/2003 15:32 Buckley-Marion No 1 500kV line 500.0 L 99.33 3 Auto Lightning Lightning TDA RED SAL 138089
08/05/2003 15:30 08/05/2003 15:30 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:30 08/05/2003 15:30 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:30 08/05/2003 15:30 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:30 08/05/2003 15:30 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:30 08/05/2003 15:30 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:30 08/05/2003 15:30 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:30 08/05/2003 15:30 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:30 08/05/2003 15:30 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138090
08/05/2003 15:32 08/05/2003 15:32 Goble-Rainier section of St Helens-Allston No 1 115kV line 115.0 S G 5.30 0 Auto Lightning Lightning LGV 138091
08/05/2003 15:32 08/05/2003 15:32 Rainier-Allston section of St Helens-Allston No 1 115kV line 115.0 S G 6.25 0 Auto Lightning Lightning LGV 138091
08/05/2003 15:32 08/05/2003 15:32 St Helens-Allston No 1 115kV line 115.0 L 25.22 0 Auto Lightning Lightning LGV 138091
08/05/2003 15:32 08/05/2003 15:32 St Helens-Goble section of St Helens-Allston No 1 115kV line 115.0 S G 13.67 0 Auto Lightning Lightning LGV 138091
08/05/2003 15:43 08/05/2003 15:43 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:43 08/05/2003 15:43 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:43 08/05/2003 15:43 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:43 08/05/2003 15:43 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:43 08/05/2003 15:43 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:43 08/05/2003 15:43 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:43 08/05/2003 15:43 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:43 08/05/2003 15:43 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138092
08/05/2003 15:56 08/05/2003 15:56 Big Eddy-De Moss No 1 115kV line 115.0 L G 23.98 0 Auto Lightning Lightning TDA 138093
08/05/2003 15:56 08/05/2003 15:56 Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line 115.0 S 23.97 0 Auto Lightning Lightning TDA 138093
08/05/2003 15:56 08/05/2003 16:17 Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line 115.0 T 9.25 21 Auto Lightning Lightning TDA 138093
08/05/2003 15:56 08/05/2003 15:56 Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line 115.0 S 0.01 0 Auto Lightning Lightning TDA 138093
08/05/2003 16:00 08/05/2003 16:00 John Day-Grizzly No 1 500kV line 500.0 L 88.41 0 Auto Lightning Lightning TDA RED 138094
08/05/2003 16:01 08/05/2003 16:01 John Day-Grizzly No 1 500kV line 500.0 L 88.41 0 Auto Lightning Lightning TDA RED 138095
08/05/2003 16:03 08/05/2003 19:35 Monroe-Custer No 1 500kV line 500.0 L 86.83 212 Plan Maintenance SNO 138096
08/05/2003 16:20 08/05/2003 16:20 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 0 Auto Lightning Lightning KAL 138097
08/05/2003 16:25 08/05/2003 16:25 Big Eddy-De Moss No 1 115kV line 115.0 L G 23.98 0 Auto Lightning Lightning TDA 138098
08/05/2003 16:25 08/05/2003 16:25 Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line 115.0 S 23.97 0 Auto Lightning Lightning TDA 138098
08/05/2003 16:25 08/05/2003 16:35 Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line 115.0 T 9.25 10 Auto Lightning Lightning TDA 138098
08/05/2003 16:25 08/05/2003 16:25 Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line 115.0 S 0.01 0 Auto Lightning Lightning TDA 138098
08/05/2003 16:27 08/05/2003 16:28 Slatt-John Day No 1 500kV line 500.0 L 30.32 1 Auto Lightning Lightning TRI TDA 138099
08/05/2003 16:39 08/05/2003 16:39 Garrison-Taft No 2 500kV line 500.0 L 159.38 0 Auto Lightning Tree blown KAL 138100
08/05/2003 16:45 08/05/2003 16:45 Chenoweth-Goldendale No 1 115kV line 115.0 L O 24.08 0 Auto Lightning Lightning TDA 138101
08/05/2003 16:45 08/05/2003 16:45 Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line 115.0 S 3.84 0 Auto Lightning Lightning TDA 138101
08/05/2003 16:45 08/05/2003 16:45 Spearfish tap to Chenoweth-Goldendale No 1 115kV line 115.0 T 3.22 0 Auto Lightning Lightning TDA 138101
08/05/2003 16:47 08/05/2003 16:47 B-1345-B-1605 section of McNary-Badger Canyon No 1 115kV line 115.0 S G 0.34 0 Auto Lightning Lightning TRI 138102
08/05/2003 16:47 08/05/2003 16:47 B-1605-B-1014 section of McNary-Badger Canyon No 1 115kV line 115.0 S G 2.14 0 Auto Lightning Lightning TRI 138102
08/05/2003 16:47 08/05/2003 16:47 H2F-Nine Canyon section of McNary-Badger Canyon No 1 115kV line 115.0 S G 12.58 0 Auto Lightning Lightning TRI 138102
08/05/2003 16:47 08/05/2003 16:47 McNary-B-1345 section of McNary-Badger Canyon No 1 115kV line 115.0 S G 2.53 0 Auto Lightning Lightning TRI 138102
08/05/2003 16:47 08/05/2003 16:47 McNary-Badger Canyon No 1 115kV line 115.0 L 28.40 0 Auto Lightning Lightning TRI 138102
08/05/2003 16:47 08/05/2003 16:47 Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line 115.0 S G 10.81 0 Auto Lightning Lightning TRI 138102
08/05/2003 16:50 08/05/2003 16:50 Garrison-Taft No 2 500kV line 500.0 L 159.38 0 Auto Lightning Lightning KAL 138103
08/05/2003 16:55 08/05/2003 16:55 John Day-Marion No 1 500kV line 500.0 L 127.51 0 Auto Lightning Lightning TDA RED SAL 138104
08/05/2003 17:06 08/05/2003 17:06 Horse Heaven-Harvalum No 1 230kV line 230.0 L 57.18 0 Auto Lightning Lightning TRI TDA 138105
08/05/2003 17:21 08/05/2003 21:29 Big Eddy-De Moss No 1 115kV line 115.0 L G 23.98 248 Auto Lightning Lightning TDA 138106
08/05/2003 17:21 08/05/2003 21:11 Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line 115.0 S 23.97 230 Auto Lightning Lightning TDA 138106
08/05/2003 17:21 08/05/2003 21:29 Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line 115.0 T 9.25 248 Auto Lightning Lightning TDA 138106
08/05/2003 17:21 08/05/2003 21:29 Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line 115.0 S 0.01 248 Auto Lightning Lightning TDA 138106
08/05/2003 18:32 08/05/2003 18:34 McNary-Roundup No 1 230kV line 230.0 L 38.43 2 Auto Lightning Lightning TRI 138107
08/05/2003 19:01 08/05/2003 19:01 Roundup-LaGrande No 1 230kV line 230.0 L 45.02 0 Auto Lightning Lightning TRI 138108
08/05/2003 19:05 08/06/2003 01:27 Roundup-LaGrande No 1 230kV line 230.0 L 45.02 382 Auto Lightning Lightning TRI 138109
08/05/2003 19:54 08/05/2003 19:54 Milton tap to Walla Walla-Freewater No 1 69kV line 69.0 T G 3.70 0 Auto Lightning Lightning TRI 138110
08/05/2003 19:54 08/05/2003 19:54 Walla Walla-Freewater No 1 69kV line 69.0 L 11.74 0 Auto Lightning Lightning TRI 138110
08/05/2003 19:54 08/05/2003 19:54 Walla Walla-Whitman section of Walla Walla-Freewater No 1 69kV line 69.0 S G 3.80 0 Auto Lightning Lightning TRI 138110
08/05/2003 19:54 08/05/2003 19:54 Whitman tap to Walla Walla-Freewater No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TRI 138110
08/05/2003 19:54 08/05/2003 19:54 Whitman-Freewater section of Walla Walla-Freewater No 1 69kV line 69.0 S G 7.94 0 Auto Lightning Lightning TRI 138110
08/05/2003 20:00 08/05/2003 20:02 Rocky Reach-Maple Valley No 1 345kV line 345.0 L 128.87 2 Auto Foreign Utility Foreign Utility WEN COV 138111
08/05/2003 20:00 08/05/2003 20:01 Echo Lake-Monroe No 1 500kV line 500.0 L 29.98 1 Auto Lightning Lightning COV SNO 138112
08/05/2003 22:19 08/05/2003 22:32 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 13 Plan Foreign Request WEN 138113
08/05/2003 23:39 08/06/2003 06:03 Schultz-Raver No 1 500kV line 500.0 L 77.24 384 Plan Voltage Control WEN COV 138114
08/05/2003 23:41 08/05/2003 23:41 Taft-Bell No 1 500kV line 500.0 L 96.44 0 Auto Lightning Lightning KAL SPK 138115
08/06/2003 00:15 08/06/2003 06:07 John Day-Marion No 1 500kV line 500.0 L 127.51 352 Plan Voltage Control TDA RED SAL 138116
08/06/2003 00:37 08/06/2003 02:13 Camp-Trout Creek section of Noxon-Hot Springs No 1 230kV line 230.0 S 10.90 96 Auto Lightning Lightning KAL 138117
08/06/2003 00:37 08/06/2003 02:13 Noxon-Camp section of Noxon-Hot Springs No 1 230kV line 230.0 S 0.20 96 Auto Lightning Lightning KAL 138117
08/06/2003 00:37 08/06/2003 07:19 Noxon-Hot Springs No 1 230kV line 230.0 L G 68.28 402 Auto Lightning Lightning KAL 138117
08/06/2003 00:37 08/06/2003 07:19 Trout Creek-Hot Springs section of Noxon-Hot Springs No 1 230kV line 230.0 S 57.18 402 Auto Lightning Lightning KAL 138117
08/06/2003 00:53 08/06/2003 05:36 Schultz-Raver No 2 500kV line 500.0 L 77.24 283 Plan Voltage Control WEN COV 138118
08/06/2003 04:32 08/06/2003 04:35 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 3 Auto Lightning Lightning SPK 138119
08/06/2003 04:32 08/06/2003 04:35 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 3 Auto Lightning Lightning SPK 138119
08/06/2003 04:32 08/06/2003 04:35 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 3 Auto Lightning Lightning SPK 138119
08/06/2003 04:32 08/06/2003 04:35 Bell-Boundary No 3 230kV line 230.0 L 108.07 3 Auto Lightning Lightning SPK 138119
08/06/2003 04:32 08/06/2003 04:32 Bell-Usk No 1 230kV line 230.0 L 47.48 0 Auto Lightning Improper Relaying SPK 138120
08/06/2003 04:34 08/06/2003 04:37 Bell-Usk No 1 230kV line 230.0 L 47.48 3 Auto Lightning Lightning SPK 138121
08/06/2003 04:45 08/06/2003 05:15 Ross-Lexington No 1 230kV line 230.0 L 41.21 30 Plan Foreign Request LGV 138122
08/06/2003 04:45 08/06/2003 05:15 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 30 Plan Foreign Request LGV 138122
08/06/2003 04:45 08/06/2003 05:15 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 30 Plan Foreign Request LGV 138122
08/06/2003 04:45 08/06/2003 05:15 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 30 Plan Foreign Request LGV 138122
08/06/2003 05:03 08/06/2003 14:20 Longview-Allston No 2 230kV line 230.0 L 4.87 557 Plan Maintenance LGV 138123
08/06/2003 05:55 08/18/2003 15:17 Bothell-Sno-King No 1 230kV line 230.0 L 3.68 17842 Plan Foreign Request SNO 138124
08/06/2003 05:59 08/06/2003 05:59 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 138177
08/06/2003 05:59 08/06/2003 05:59 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 19.40 0 Auto Lightning Lightning SPK 138177
08/06/2003 05:59 08/06/2003 05:59 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L 52.68 0 Auto Lightning Lightning SPK 138177
08/06/2003 05:59 08/06/2003 05:59 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 1.30 0 Auto Lightning Lightning SPK 138177
08/06/2003 05:59 08/06/2003 05:59 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T G 0.10 0 Auto Lightning Lightning SPK 138177
08/06/2003 05:59 08/06/2003 05:59 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S G 5.80 0 Auto Lightning Lightning SPK 138177
08/06/2003 07:29 08/06/2003 07:29 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 0 Auto Lightning Lightning SPK 138178
08/06/2003 07:29 08/06/2003 07:29 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 0 Auto Lightning Lightning SPK 138178
08/06/2003 07:29 08/06/2003 07:29 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 0 Auto Lightning Lightning SPK 138178
08/06/2003 07:29 08/06/2003 07:29 Bell-Boundary No 3 230kV line 230.0 L 108.07 0 Auto Lightning Lightning SPK 138178
08/06/2003 07:49 08/06/2003 14:43 Station FG-Bremerton No 1 115kV line 115.0 L 0.47 414 Plan Foreign Request OLY 138240
08/06/2003 08:01 08/06/2003 15:41 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S 136.53 460 Plan Maintenance TDA RED 138179
08/06/2003 08:01 08/06/2003 15:41 McNary-Santiam No 2 230kV line 230.0 L G 200.43 460 Plan Maintenance TRI TDA RED SAL 138179
08/06/2003 08:15 08/06/2003 15:49 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T 454 Plan Maintenance TDA 138180
08/06/2003 08:15 08/06/2003 15:49 McNary-Santiam No 2 230kV line 230.0 L T 200.43 454 Plan Maintenance TRI TDA RED SAL 138180
08/06/2003 08:37 08/06/2003 08:37 Hatwai-AVA Moscow No 3 230kV line 230.0 L 18.10 0 Auto Foreign Trouble Foreign Trouble SPK 138181
08/06/2003 08:49 08/07/2003 14:32 St Johns-Keeler No 2 115kV line 115.0 L 9.43 1783 Plan Forced LGV SAL 138182
08/06/2003 11:24 08/06/2003 11:46 Ross-Lexington No 1 230kV line 230.0 L 41.21 22 Plan Foreign Request LGV 138183
08/06/2003 11:24 08/06/2003 11:46 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 22 Plan Foreign Request LGV 138183
08/06/2003 11:24 08/06/2003 11:46 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 22 Plan Foreign Request LGV 138183
08/06/2003 11:24 08/06/2003 11:46 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 22 Plan Foreign Request LGV 138183
08/06/2003 14:06 08/07/2003 00:34 Hatwai-AVA Moscow No 3 230kV line 230.0 L 18.10 628 Auto Foreign Trouble Foreign Trouble SPK 138184
08/06/2003 14:17 08/06/2003 14:19 John Day-Marion No 1 500kV line 500.0 L 127.51 2 Auto Unknown Smoke TDA RED SAL 138185
08/06/2003 14:17 08/06/2003 14:20 Buckley-Marion No 1 500kV line 500.0 L 99.33 3 Auto Unknown Improper Relaying TDA RED SAL 138186
08/06/2003 21:26 08/06/2003 21:26 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Foreign Trouble Foreign Trouble TDA 138661
08/06/2003 21:48 08/06/2003 21:48 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T G 0 Auto Lightning Lightning TDA 138187
08/06/2003 21:48 08/06/2003 21:48 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S G 136.53 0 Auto Lightning Lightning TDA RED 138187
08/06/2003 21:48 08/06/2003 21:48 McNary-Dalreed section of McNary-Santiam No 2 230kV line 230.0 S G 35.95 0 Auto Lightning Lightning TRI TDA 138187
08/06/2003 21:48 08/06/2003 21:48 McNary-Santiam No 2 230kV line 230.0 L 200.43 0 Auto Lightning Lightning TRI TDA RED SAL 138187
08/06/2003 21:48 08/06/2003 21:48 Tumble Creek tap to McNary-Santiam No 2 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning SAL 138187
08/06/2003 21:48 08/06/2003 21:48 Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line 230.0 S G 27.95 0 Auto Lightning Lightning SAL 138187
08/06/2003 22:31 08/06/2003 22:31 Palisades-Goshen No 1 115kV line 115.0 L 51.71 0 Auto Unknown Unknown IDF 138188
08/06/2003 22:38 08/06/2003 22:38 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138189
08/06/2003 22:38 08/06/2003 22:38 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138189
08/06/2003 22:38 08/06/2003 22:38 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138189
08/06/2003 22:38 08/06/2003 22:38 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138189
08/06/2003 22:38 08/06/2003 22:38 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138189
08/06/2003 22:38 08/06/2003 22:38 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138189
08/06/2003 22:38 08/06/2003 22:38 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138189
08/06/2003 22:38 08/06/2003 22:38 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138189
08/06/2003 23:14 08/06/2003 23:14 Slatt-John Day No 1 500kV line 500.0 L 30.32 0 Auto Lightning Lightning TRI TDA 138190
08/06/2003 23:20 08/06/2003 23:20 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 0 Auto Lightning Lightning RED 138191
08/06/2003 23:37 08/07/2003 06:47 Schultz-Raver No 1 500kV line 500.0 L 77.24 430 Plan Voltage Control WEN COV 138192
08/07/2003 00:04 08/07/2003 00:04 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Foreign Trouble Foreign Trouble TDA 138662
08/07/2003 00:06 08/07/2003 00:06 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Foreign Trouble Foreign Trouble TDA 138663
08/07/2003 00:17 08/07/2003 00:17 Fossil-Maupin 69kV line 69.0 L 56.93 0 Auto Foreign Trouble Foreign Trouble TDA 138664
08/07/2003 00:25 08/07/2003 00:26 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S G 29.39 1 Auto Lightning Lightning TDA 138193
08/07/2003 00:25 08/07/2003 00:26 Big Eddy-Redmond No 1 230kV line 230.0 L 97.46 1 Auto Lightning Lightning TDA RED 138193
08/07/2003 00:25 08/07/2003 00:26 Maupin tap to Big Eddy-Redmond No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning TDA 138193
08/07/2003 00:25 08/07/2003 00:26 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S G 68.07 1 Auto Lightning Lightning TDA RED 138193
08/07/2003 00:33 08/07/2003 00:33 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:33 08/07/2003 00:33 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:33 08/07/2003 00:33 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:33 08/07/2003 00:33 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:33 08/07/2003 00:33 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:33 08/07/2003 00:33 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:33 08/07/2003 00:33 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:33 08/07/2003 00:33 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138194
08/07/2003 00:37 08/07/2003 00:37 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:37 08/07/2003 00:37 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:37 08/07/2003 00:37 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:37 08/07/2003 00:37 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:37 08/07/2003 00:37 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:37 08/07/2003 00:37 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:37 08/07/2003 00:37 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:37 08/07/2003 00:37 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138195
08/07/2003 00:46 08/07/2003 00:46 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:46 08/07/2003 00:46 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:46 08/07/2003 00:46 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:46 08/07/2003 00:46 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:46 08/07/2003 00:46 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:46 08/07/2003 00:46 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:46 08/07/2003 00:46 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:46 08/07/2003 00:46 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138196
08/07/2003 00:50 08/07/2003 00:50 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:50 08/07/2003 00:50 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:50 08/07/2003 00:50 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:50 08/07/2003 00:50 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:50 08/07/2003 00:50 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:50 08/07/2003 00:50 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:50 08/07/2003 00:50 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:50 08/07/2003 00:50 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138197
08/07/2003 00:51 08/07/2003 00:51 Buckley-Marion No 1 500kV line 500.0 L 99.33 0 Auto Lightning Lightning TDA RED SAL 138198
08/07/2003 00:52 08/07/2003 00:52 Boardman-Ione No 1 69kV line 69.0 L 30.09 0 Auto Lightning Lightning TRI 138199
08/07/2003 00:53 08/07/2003 00:53 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:53 08/07/2003 00:53 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:53 08/07/2003 00:53 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:53 08/07/2003 00:53 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:53 08/07/2003 00:53 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:53 08/07/2003 00:53 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:53 08/07/2003 00:53 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:53 08/07/2003 00:53 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138200
08/07/2003 00:54 08/07/2003 00:54 Condon tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.10 0 Auto Lightning Lightning TDA 138201
08/07/2003 00:54 08/07/2003 00:54 Condon Wind tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.01 0 Auto Lightning Lightning TDA 138201
08/07/2003 00:54 08/07/2003 00:54 Condon Wind-Condon section of De Moss-Fossil No 1 69kV line 69.0 S G 1.46 0 Auto Lightning Lightning TDA 138201
08/07/2003 00:54 08/07/2003 00:54 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S G 18.43 0 Auto Lightning Lightning TDA 138201
08/07/2003 00:54 08/07/2003 00:54 De Moss-Fossil No 1 69kV line 69.0 L 52.93 0 Auto Lightning Lightning TDA 138201
08/07/2003 00:54 08/07/2003 00:54 De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line 69.0 S G 0.11 0 Auto Lightning Lightning TDA 138201
08/07/2003 00:54 08/07/2003 00:54 Gordon Hollow tap to De Moss-Fossil No 1 69kV line 69.0 T G 0.11 0 Auto Lightning Lightning TDA 138201
08/07/2003 00:54 08/07/2003 00:54 Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line 69.0 S G 32.93 0 Auto Lightning Lightning TDA 138201
08/07/2003 01:03 08/07/2003 01:03 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 0 Auto Unknown Lightning IDF 138202
08/07/2003 01:15 08/07/2003 01:16 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T G 1 Auto Lightning Lightning TDA 138203
08/07/2003 01:15 08/07/2003 01:16 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S G 136.53 1 Auto Lightning Lightning TDA RED 138203
08/07/2003 01:15 08/07/2003 01:16 McNary-Dalreed section of McNary-Santiam No 2 230kV line 230.0 S G 35.95 1 Auto Lightning Lightning TRI TDA 138203
08/07/2003 01:15 08/07/2003 01:16 McNary-Santiam No 2 230kV line 230.0 L 200.43 1 Auto Lightning Lightning TRI TDA RED SAL 138203
08/07/2003 01:15 08/07/2003 01:16 Tumble Creek tap to McNary-Santiam No 2 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning SAL 138203
08/07/2003 01:15 08/07/2003 01:16 Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line 230.0 S G 27.95 1 Auto Lightning Lightning SAL 138203
08/07/2003 01:16 08/07/2003 01:17 Slatt-John Day No 1 500kV line 500.0 L 30.32 1 Auto Lightning Lightning TRI TDA 138204
08/07/2003 01:22 08/07/2003 01:23 Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line 230.0 S G 23.44 1 Auto Lightning Lightning TDA 138205
08/07/2003 01:22 08/07/2003 01:23 Big Eddy-Troutdale No 1 230kV line 230.0 L 77.43 1 Auto Lightning Lightning TDA LGV 138205
08/07/2003 01:22 08/07/2003 01:23 Parkdale tap to Big Eddy-Troutdale No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning TDA 138205
08/07/2003 01:22 08/07/2003 01:23 Parkdale-Troutdale section of Big Eddy-Troutdale No 1 230kV line 230.0 S G 53.99 1 Auto Lightning Lightning TDA LGV 138205
08/07/2003 01:38 08/07/2003 05:31 Schultz-Raver No 2 500kV line 500.0 L 77.24 233 Plan Voltage Control WEN COV 138206
08/07/2003 02:10 08/07/2003 02:10 Coyote Springs-Slatt No 1 500kV line 500.0 L 28.09 0 Auto Lightning Lightning TRI TDA 138207
08/07/2003 02:55 08/07/2003 02:55 Slatt-Buckley No 1 500kV line 500.0 L 52.32 0 Auto Lightning Lightning TRI TDA 138208
08/07/2003 02:55 08/07/2003 02:55 Buckley-Grizzly No 1 500kV line 500.0 L 53.60 0 Auto Improper Relaying Unknown TDA RED 138209
08/07/2003 02:55 08/07/2003 02:55 Buckley-Marion No 1 500kV line 500.0 L 99.33 0 Auto Improper Relaying Lightning TDA RED SAL 138227
08/07/2003 02:55 08/07/2003 05:37 Condon-Fossil section of De Moss-Fossil No 1 69kV line 69.0 S 18.43 162 Auto Lightning Lightning TDA 138228
08/07/2003 02:55 08/07/2003 05:37 De Moss-Fossil No 1 69kV line 69.0 L G 52.93 162 Auto Lightning Lightning TDA 138228
08/07/2003 02:55 08/07/2003 06:28 Antelope tap to Fossil-Maupin 69kV line 69.0 T 0.10 213 Auto Foreign Trouble Foreign Trouble TDA 138275
08/07/2003 02:55 08/07/2003 06:28 Antelope-Bakeoven section of Fossil-Maupin 69kV line 69.0 S 21.40 213 Auto Foreign Trouble Foreign Trouble RED 138275
08/07/2003 02:55 08/07/2003 06:28 Bakeoven tap to Fossil-Maupin 69kV line 69.0 T 0.10 213 Auto Foreign Trouble Foreign Trouble RED 138275
08/07/2003 02:55 08/07/2003 06:28 Bakeoven-Maupin section of Fossil-Maupin 69kV line 69.0 S 7.00 213 Auto Foreign Trouble Foreign Trouble RED 138275
08/07/2003 02:55 08/11/2003 13:20 Fossil-Maupin 69kV line 69.0 L G 56.93 6385 Auto Foreign Trouble Foreign Trouble TDA 138275
08/07/2003 02:55 08/07/2003 06:56 Fossil-Muddy Ranch section of Fossil-Maupin 69kV line 69.0 S 14.77 241 Auto Foreign Trouble Foreign Trouble TDA 138275
08/07/2003 02:55 08/07/2003 06:56 Muddy Ranch tap to Fossil-Maupin 69kV line 69.0 T 8.00 241 Auto Foreign Trouble Foreign Trouble TDA 138275
08/07/2003 02:55 08/11/2003 13:20 Muddy Ranch-Antelope section of Fossil-Maupin 69kV line 69.0 S 13.87 6385 Auto Foreign Trouble Foreign Trouble TDA 138275
08/07/2003 03:50 08/07/2003 03:50 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T G 0 Auto Lightning Lightning TDA 138211
08/07/2003 03:50 08/07/2003 03:50 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S G 136.53 0 Auto Lightning Lightning TDA RED 138211
08/07/2003 03:50 08/07/2003 03:50 McNary-Dalreed section of McNary-Santiam No 2 230kV line 230.0 S G 35.95 0 Auto Lightning Lightning TRI TDA 138211
08/07/2003 03:50 08/07/2003 03:50 McNary-Santiam No 2 230kV line 230.0 L 200.43 0 Auto Lightning Lightning TRI TDA RED SAL 138211
08/07/2003 03:50 08/07/2003 03:50 Tumble Creek tap to McNary-Santiam No 2 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning SAL 138211
08/07/2003 03:50 08/07/2003 03:50 Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line 230.0 S G 27.95 0 Auto Lightning Lightning SAL 138211
08/07/2003 04:16 08/07/2003 04:16 Ashe tap to Midway-HEW No 2 230kV line 230.0 T G 8.60 0 Auto Lightning Lightning TRI 138212
08/07/2003 04:16 08/07/2003 04:16 Midway-HEW No 2 230kV line 230.0 L 23.89 0 Auto Lightning Lightning TRI 138212
08/07/2003 04:25 08/07/2003 04:25 Ashe-Slatt No 1 500kV line 500.0 L 72.24 0 Auto Lightning Lightning TRI TDA 138213
08/07/2003 04:25 08/07/2003 04:25 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T G 0 Auto Lightning Lightning TDA 138214
08/07/2003 04:25 08/07/2003 04:25 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S G 136.53 0 Auto Lightning Lightning TDA RED 138214
08/07/2003 04:25 08/07/2003 04:25 McNary-Dalreed section of McNary-Santiam No 2 230kV line 230.0 S G 35.95 0 Auto Lightning Lightning TRI TDA 138214
08/07/2003 04:25 08/07/2003 04:25 McNary-Santiam No 2 230kV line 230.0 L 200.43 0 Auto Lightning Lightning TRI TDA RED SAL 138214
08/07/2003 04:25 08/07/2003 04:25 Tumble Creek tap to McNary-Santiam No 2 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning SAL 138214
08/07/2003 04:25 08/07/2003 04:25 Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line 230.0 S G 27.95 0 Auto Lightning Lightning SAL 138214
08/07/2003 04:34 08/07/2003 04:34 McNary-Ross No 1 345kV line 345.0 L 174.57 0 Auto Lightning Lightning TRI TDA LGV 138215
08/07/2003 05:08 08/07/2003 05:08 McNary-Ross No 1 345kV line 345.0 L 174.57 0 Auto Lightning Lightning TRI TDA LGV 138216
08/07/2003 05:17 08/07/2003 05:17 Hanford-John Day No 1 500kV line 500.0 L 97.27 0 Auto Lightning Lightning TRI WEN TDA 138217
08/07/2003 06:00 08/07/2003 06:00 Sullivan tap to Vera tap to Trentwood-Valley Way No 1 115kV line 115.0 TT G 0.04 0 Auto Lightning Lightning SPK 138229
08/07/2003 06:00 08/07/2003 06:00 Sullivan-Vera section of Vera tap to Trentwood-Valley Way No 1 115kV line 115.0 TS G 2.52 0 Auto Lightning Lightning SPK 138229
08/07/2003 06:00 08/07/2003 06:00 Trentwood-Valley Way No 1 115kV line 115.0 L 2.72 0 Auto Lightning Lightning SPK 138229
08/07/2003 06:00 08/07/2003 06:00 Trentwood-Vera section of Trentwood-Valley Way No 1 115kV line 115.0 S G 0.78 0 Auto Lightning Lightning SPK 138229
08/07/2003 06:00 08/07/2003 06:00 Vera tap to Trentwood-Valley Way No 1 115kV line 115.0 T G 3.80 0 Auto Lightning Lightning SPK 138229
08/07/2003 06:00 08/07/2003 06:00 Vera-Valley Way section of Trentwood-Valley Way No 1 115kV line 115.0 S G 1.94 0 Auto Lightning Lightning SPK 138229
08/07/2003 07:22 08/07/2003 15:19 Station FG-Bremerton No 1 115kV line 115.0 L 0.47 477 Plan Foreign Request OLY 138241
08/07/2003 07:32 08/07/2003 14:52 Creston-Bell No 1 115kV line 115.0 L G 53.80 440 Plan Maintenance WEN SPK 138230
08/07/2003 07:32 08/07/2003 14:52 Springhill-Bell section of Creston-Bell No 1 115kV line 115.0 S 9.92 440 Plan Maintenance SPK 138230
08/07/2003 07:56 08/07/2003 08:02 Grand Coulee-Westside AVA No 1 230kV line 230.0 L 77.32 6 Auto Lightning WEN SPK 138231
08/07/2003 08:03 08/07/2003 10:23 Raymond-Cosmopolis No 1 115kV line 115.0 L 18.36 140 Plan Maintenance OLY 138232
08/07/2003 08:05 08/07/2003 14:27 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 382 Plan Maintenance EUG 138233
08/07/2003 08:16 08/07/2003 15:48 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T 452 Plan Maintenance TDA 138234
08/07/2003 08:16 08/07/2003 15:48 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S 136.53 452 Plan Maintenance TDA RED 138234
08/07/2003 08:16 08/07/2003 15:48 McNary-Santiam No 2 230kV line 230.0 L G 200.43 452 Plan Maintenance TRI TDA RED SAL 138234
08/07/2003 08:40 08/07/2003 15:30 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 19.40 410 Plan Maintenance SPK 138235
08/07/2003 08:40 08/07/2003 15:30 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L G 52.68 410 Plan Maintenance SPK 138235
08/07/2003 09:05 08/07/2003 17:15 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T 0.10 490 Plan Maintenance SPK 138236
08/07/2003 09:05 08/07/2003 17:15 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L O 52.68 490 Plan Maintenance SPK 138236
08/07/2003 09:05 08/07/2003 17:15 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 5.80 490 Plan Maintenance SPK 138236
08/07/2003 23:09 08/08/2003 07:33 Schultz-Raver No 1 500kV line 500.0 L 77.24 504 Plan Voltage Control WEN COV 138237
08/08/2003 02:49 08/08/2003 06:32 Schultz-Raver No 3 500kV line 500.0 L 77.47 223 Plan Voltage Control WEN COV 138238
08/08/2003 07:10 08/08/2003 15:14 Longview-Allston No 1 230kV line 230.0 L 4.59 484 Plan Maintenance LGV 138242
08/08/2003 07:53 08/08/2003 14:11 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 378 Plan Maintenance EUG 138243
08/08/2003 07:56 08/08/2003 11:32 Ice Harbor-Franklin No 2 115kV line 115.0 L 9.07 216 Plan Foreign Request TRI 138244
08/08/2003 07:56 08/08/2003 11:32 Ice Harbor-Sacajawea section of Ice Harbor-Franklin No 2 115kV line 115.0 S G 0.30 216 Plan Foreign Request TRI 138244
08/08/2003 07:56 08/08/2003 11:32 Martindale-Franklin section of Ice Harbor-Franklin No 2 115kV line 115.0 S G 5.20 216 Plan Foreign Request TRI 138244
08/08/2003 07:56 08/08/2003 11:32 Sacajawea tap to Ice Harbor-Franklin No 2 115kV line 115.0 T G 0.52 216 Plan Foreign Request TRI 138244
08/08/2003 07:56 08/08/2003 11:32 Sacajawea-Martindale section of Ice Harbor-Franklin No 2 115kV line 115.0 S G 3.57 216 Plan Foreign Request TRI 138244
08/08/2003 08:01 08/08/2003 15:49 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S 136.53 468 Plan Maintenance TDA RED 138245
08/08/2003 08:01 08/08/2003 15:49 McNary-Santiam No 2 230kV line 230.0 L G 200.43 468 Plan Maintenance TRI TDA RED SAL 138245
08/08/2003 08:20 08/08/2003 14:16 Station FG-Bremerton No 1 115kV line 115.0 L 0.47 356 Plan Foreign Request OLY 138246
08/08/2003 08:29 08/08/2003 14:43 Midway-Cold Creek section of Midway-Grandview No 1 115kV line 115.0 S 4.21 374 Plan Maintenance TRI WEN 138247
08/08/2003 08:29 08/08/2003 14:43 Midway-Grandview No 1 115kV line 115.0 L G 25.07 374 Plan Maintenance TRI WEN 138247
08/08/2003 08:39 08/08/2003 16:01 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T 442 Plan Maintenance TDA 138248
08/08/2003 08:39 08/08/2003 16:01 McNary-Santiam No 2 230kV line 230.0 L T 200.43 442 Plan Maintenance TRI TDA RED SAL 138248
08/08/2003 08:45 08/08/2003 13:30 North Bonneville-Ross No 2 230kV line 230.0 L 35.99 285 Plan Maintenance LGV 138249
08/08/2003 08:45 08/08/2003 13:30 North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line 230.0 S G 27.51 285 Plan Maintenance LGV 138249
08/08/2003 08:45 08/08/2003 13:30 Sifton tap to North Bonneville-Ross No 2 230kV line 230.0 T G 1.20 285 Plan Maintenance LGV 138249
08/08/2003 08:45 08/08/2003 13:30 Sifton-Ross section of North Bonneville-Ross No 2 230kV line 230.0 S G 8.48 285 Plan Maintenance LGV 138249
08/08/2003 18:30 08/08/2003 18:30 Rattlesnake-Garrison No 1 230kV line 230.0 L 60.94 0 Auto Lightning Lightning KAL 138250
08/08/2003 18:31 08/08/2003 18:32 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 1 Auto Lightning Lightning KAL 138251
08/08/2003 18:31 08/08/2003 18:32 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 1 Auto Lightning Lightning KAL 138251
08/08/2003 18:31 08/08/2003 18:32 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 1 Auto Lightning Lightning KAL 138251
08/08/2003 18:31 08/08/2003 18:32 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 1 Auto Lightning Lightning KAL 138251
08/08/2003 23:02 08/09/2003 12:27 Schultz-Raver No 1 500kV line 500.0 L 77.24 805 Plan Voltage Control WEN COV 138252
08/08/2003 23:10 08/09/2003 08:04 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 534 Plan Voltage Control RED 138253
08/09/2003 01:32 08/09/2003 11:13 Schultz-Raver No 3 500kV line 500.0 L 77.47 581 Plan Voltage Control WEN COV 138254
08/09/2003 04:51 08/09/2003 04:51 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 138255
08/09/2003 04:51 08/09/2003 04:51 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 138255
08/09/2003 04:51 08/09/2003 04:51 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 138255
08/09/2003 22:20 08/11/2003 07:10 Schultz-Raver No 3 500kV line 500.0 L 77.47 1970 Plan Voltage Control WEN COV 138258
08/10/2003 00:01 08/10/2003 05:03 Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 L T 45.05 302 Plan Maintenance LGV 138259
08/10/2003 00:01 08/10/2003 05:03 Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line 115.0 TT 1.24 302 Plan Maintenance LGV TDA 138259
08/10/2003 00:50 08/11/2003 06:10 Schultz-Raver No 2 500kV line 500.0 L 77.24 1760 Plan Voltage Control WEN COV 138260
08/10/2003 01:58 08/10/2003 08:12 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 374 Plan Voltage Control RED 138261
08/10/2003 03:22 08/10/2003 09:15 John Day-Marion No 1 500kV line 500.0 L 127.51 353 Plan Voltage Control TDA RED SAL 138262
08/11/2003 01:26 08/11/2003 05:02 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 216 Plan Voltage Control RED 138263
08/11/2003 06:05 08/12/2003 16:10 Palisades-Snake River No 1 115kV line 115.0 L 17.50 2045 Plan Maintenance IDF 138276
08/11/2003 06:36 08/11/2003 15:52 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 556 Plan Maintenance KAL 138277
08/11/2003 06:36 08/11/2003 15:52 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 556 Plan Maintenance KAL SPK 138277
08/11/2003 07:03 08/11/2003 14:00 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 417 Plan Maintenance OLY 138278
08/11/2003 07:25 08/11/2003 15:09 Longview-Allston No 3 230kV line 230.0 L 4.29 464 Plan Fiber Optic Work LGV 138279
08/11/2003 07:56 08/11/2003 16:02 North Bonneville-Ross No 1 230kV line 230.0 L 36.32 486 Plan Maintenance LGV 138280
08/11/2003 07:56 08/11/2003 16:02 North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line 230.0 S G 27.65 486 Plan Maintenance LGV 138280
08/11/2003 07:56 08/11/2003 16:02 Sifton tap to North Bonneville-Ross No 1 230kV line 230.0 T G 1.24 486 Plan Maintenance LGV 138280
08/11/2003 07:56 08/11/2003 16:02 Sifton-Ross section of North Bonneville-Ross No 1 230kV line 230.0 S G 8.67 486 Plan Maintenance LGV 138280
08/11/2003 07:59 08/11/2003 15:40 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 461 Plan Maintenance RED 138281
08/11/2003 08:00 08/12/2003 15:21 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 1881 Plan Maintenance EUG 138282
08/11/2003 08:00 08/12/2003 15:21 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 1881 Plan Maintenance EUG 138282
08/11/2003 08:10 08/14/2003 10:20 Benton-451B No 1 115kV line 115.0 L G 4.75 4450 Plan Maintenance TRI 138283
08/11/2003 08:10 08/14/2003 10:20 Hanford 2 Construction-451B section of Benton-451B No 1 115kV line 115.0 S 2.97 4450 Plan Maintenance TRI 138283
08/11/2003 08:13 08/15/2003 11:08 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 5935 Plan Maintenance SAL 138284
08/11/2003 08:13 08/15/2003 11:08 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 5935 Plan Maintenance SAL 138284
08/11/2003 08:44 08/11/2003 09:33 Garrison-NWE Mill Creek No 1 230kV line 230.0 L 30.40 49 Auto Foreign Trouble Foreign Trouble KAL 138285
08/11/2003 09:12 08/11/2003 09:29 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 17 Plan Emergency KAL 138286
08/11/2003 09:27 08/11/2003 10:45 Creston-Bell No 1 115kV line 115.0 L G 53.80 78 Plan Maintenance WEN SPK 138287
08/11/2003 09:27 08/11/2003 10:45 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 78 Plan Maintenance WEN 138287
08/11/2003 09:34 08/11/2003 10:45 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 71 Plan Maintenance WEN SPK 138288
08/11/2003 09:34 08/11/2003 10:45 Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line 115.0 S 10.21 71 Plan Maintenance WEN SPK 138288
08/11/2003 11:13 08/11/2003 14:52 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 219 Plan Maintenance EUG 138289
08/11/2003 12:18 08/11/2003 16:05 McNary-Dalreed section of McNary-Santiam No 2 230kV line 230.0 S 35.95 227 Plan Maintenance TRI TDA 138290
08/11/2003 12:18 08/11/2003 16:05 McNary-Santiam No 2 230kV line 230.0 L G 200.43 227 Plan Maintenance TRI TDA RED SAL 138290
08/11/2003 22:09 08/11/2003 22:09 Foster tap to Green Peter-Lebanon No 1 115kV line 115.0 T G 3.77 0 Auto Unknown Unknown EUG 138291
08/11/2003 22:09 08/11/2003 22:09 Foster tap-Lebanon section of Green Peter-Lebanon No 1 115kV line 115.0 S G 11.78 0 Auto Unknown Unknown EUG 138291
08/11/2003 22:09 08/11/2003 22:09 Foster tap-North Butte tap section of Foster tap to Green Peter-Lebanon No 1 115kV line 115.0 TS G 3.43 0 Auto Unknown Unknown EUG 138291
08/11/2003 22:09 08/11/2003 22:09 Green Peter-Foster tap section of Green Peter-Lebanon No 1 115kV line 115.0 S 6.31 0 Auto Unknown Unknown EUG 138291
08/11/2003 22:09 08/11/2003 22:09 Green Peter-Lebanon No 1 115kV line 115.0 L 18.09 0 Auto Unknown Unknown EUG 138291
08/11/2003 22:09 08/11/2003 22:09 North Butte tap-Foster section of Foster tap to Green Peter-Lebanon No 1 115kV line 115.0 TS G 0.34 0 Auto Unknown Unknown EUG 138291
08/11/2003 22:53 08/12/2003 06:22 Schultz-Raver No 1 500kV line 500.0 L 77.24 449 Plan Voltage Control WEN COV 138292
08/11/2003 23:47 08/12/2003 05:35 Schultz-Raver No 2 500kV line 500.0 L 77.24 348 Plan Voltage Control WEN COV 138293
08/12/2003 01:44 08/12/2003 01:44 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 138294
08/12/2003 01:44 08/12/2003 01:44 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 138294
08/12/2003 01:44 08/12/2003 01:44 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 138294
08/12/2003 01:44 08/12/2003 01:44 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 138294
08/12/2003 01:44 08/12/2003 01:44 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 138294
08/12/2003 01:44 08/12/2003 01:44 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 138294
08/12/2003 01:44 08/12/2003 01:44 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 138294
08/12/2003 01:44 08/12/2003 01:44 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 138294
08/12/2003 05:56 08/12/2003 15:57 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 601 Plan Maintenance KAL 138306
08/12/2003 05:56 08/12/2003 15:57 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 601 Plan Maintenance KAL SPK 138306
08/12/2003 06:02 08/12/2003 16:07 Ice Harbor-Franklin No 1 115kV line 115.0 L 9.34 605 Plan Foreign Request TRI 138307
08/12/2003 06:03 08/12/2003 14:35 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 512 Plan Maintenance OLY 138308
08/12/2003 07:10 08/14/2003 17:13 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 3483 Plan Foreign Request LGV 138309
08/12/2003 07:10 08/14/2003 17:13 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 3483 Plan Foreign Request LGV 138309
08/12/2003 07:38 08/12/2003 15:15 Longview-Allston No 3 230kV line 230.0 L 4.29 457 Plan Fiber Optic Work LGV 138310
08/12/2003 07:59 08/12/2003 15:42 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 463 Plan Maintenance RED 138311
08/12/2003 08:09 08/12/2003 14:22 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 373 Plan Maintenance EUG 138312
08/12/2003 08:51 08/13/2003 09:40 B212-Wilbur section of Grand Coulee-Creston No 1 115kV line 115.0 S 16.47 1489 Plan Maintenance WEN 138313
08/12/2003 08:51 08/13/2003 09:40 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 1489 Plan Maintenance WEN SPK 138313
08/12/2003 11:03 08/12/2003 15:54 McNary-Ross No 1 345kV line 345.0 L 174.57 291 Plan Maintenance TRI TDA LGV 138314
08/12/2003 16:24 08/12/2003 16:25 Fairview-Bandon No 2 115kV line 115.0 L 19.73 1 Plan Switching EUG 138315
08/12/2003 22:41 08/13/2003 06:54 Schultz-Raver No 1 500kV line 500.0 L 77.24 493 Plan Voltage Control WEN COV 138316
08/13/2003 00:02 08/13/2003 05:53 Raver-Paul No 1 500kV line 500.0 L 69.31 351 Plan Maintenance COV OLY 138317
08/13/2003 01:47 08/13/2003 02:24 Lookout Point-Alvey No 1 115kV line 115.0 L G 15.77 37 Plan Switching EUG 138318
08/13/2003 01:47 08/13/2003 02:24 Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.66 37 Plan Switching EUG 138318
08/13/2003 01:50 08/13/2003 14:02 Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.74 732 Plan Maintenance EUG 138319
08/13/2003 01:50 08/13/2003 14:02 Lookout Point-Alvey No 1 115kV line 115.0 L O 15.77 732 Plan Maintenance EUG 138319
08/13/2003 01:56 08/13/2003 06:10 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 254 Plan Foreign Request KAL SPK 138320
08/13/2003 01:56 08/13/2003 06:10 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 254 Plan Foreign Request KAL SPK 138320
08/13/2003 02:10 08/13/2003 06:02 Libby-Bonners Ferry No 1 115kV line 115.0 L O 59.58 232 Plan Foreign Request KAL SPK 138321
08/13/2003 02:10 08/13/2003 06:02 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 232 Plan Foreign Request SPK 138321
08/13/2003 04:05 08/13/2003 04:05 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 138322
08/13/2003 04:05 08/13/2003 04:05 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 138322
08/13/2003 04:05 08/13/2003 04:05 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 138322
08/13/2003 04:16 08/13/2003 09:15 Longview-Allston No 4 115kV line 115.0 L G 4.64 299 Plan Fiber Optic Work LGV 138323
08/13/2003 04:16 08/13/2003 09:15 Longview-Donald Nys section of Longview-Allston No 4 115kV line 115.0 S 3.63 299 Plan Fiber Optic Work LGV 138323
08/13/2003 04:40 08/13/2003 10:34 Longview-Allston No 3 230kV line 230.0 L 4.29 354 Plan Fiber Optic Work LGV 138324
08/13/2003 06:51 08/13/2003 13:24 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 393 Plan Maintenance KAL 138327
08/13/2003 06:51 08/13/2003 13:24 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 393 Plan Maintenance KAL SPK 138327
08/13/2003 07:17 08/13/2003 15:17 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 480 Plan Maintenance IDF 138328
08/13/2003 07:24 08/13/2003 15:13 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 469 Plan Maintenance RED 138329
08/13/2003 07:25 08/13/2003 11:28 Benson-Belfair section of Shelton-Kitsap No 2 115kV line 115.0 S 7.30 243 Plan Maintenance OLY 138330
08/13/2003 07:25 08/13/2003 11:28 Shelton-Kitsap No 2 115kV line 115.0 L G 30.34 243 Plan Maintenance OLY 138330
08/13/2003 07:28 08/14/2003 15:36 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 1928 Plan Maintenance EUG 138331
08/13/2003 07:28 08/14/2003 15:36 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S 10.26 1928 Plan Maintenance EUG 138331
08/13/2003 08:06 08/13/2003 17:31 Klamath Cogen-Meridian No 1 500kV line 500.0 L 57.99 565 Plan Foreign Request RED 138332
08/13/2003 08:17 08/13/2003 15:22 Big Eddy-Troutdale No 1 230kV line 230.0 L G 77.43 425 Plan Maintenance TDA LGV 138333
08/13/2003 08:17 08/13/2003 15:22 Parkdale-Troutdale section of Big Eddy-Troutdale No 1 230kV line 230.0 S 53.99 425 Plan Maintenance TDA LGV 138333
08/13/2003 08:18 08/13/2003 15:21 North Bonneville-Troutdale No 1 230kV line 230.0 L 27.74 423 Plan Maintenance LGV 138334
08/13/2003 08:18 08/13/2003 15:22 North Bonneville-Troutdale No 2 230kV line 230.0 L 27.77 424 Plan Maintenance LGV 138335
08/13/2003 08:45 08/13/2003 16:47 Ice Harbor-Franklin No 1 115kV line 115.0 L 9.34 482 Plan Foreign Request TRI 138336
08/13/2003 15:12 08/14/2003 00:21 Bell-AVA Beacon No 5 230kV line 230.0 L 6.00 549 Auto Foreign Trouble Foreign Trouble SPK 138337
08/13/2003 16:19 08/13/2003 19:16 Bell-AVA Beacon No 4 230kV line 230.0 L 5.90 177 Plan Foreign Request SPK 138338
08/13/2003 18:16 08/13/2003 18:25 Garrison-NWE Mill Creek No 1 230kV line 230.0 L 30.40 9 Plan Foreign Request KAL 138339
08/13/2003 22:42 08/14/2003 06:32 Schultz-Raver No 1 500kV line 500.0 L 77.24 470 Plan Voltage Control WEN COV 138340
08/14/2003 01:30 08/14/2003 05:34 Schultz-Raver No 2 500kV line 500.0 L 77.24 244 Plan Voltage Control WEN COV 138341
08/14/2003 03:54 08/14/2003 09:15 Longview-Allston No 4 115kV line 115.0 L G 4.64 321 Plan Fiber Optic Work LGV 138342
08/14/2003 03:54 08/14/2003 09:15 Longview-Donald Nys section of Longview-Allston No 4 115kV line 115.0 S 3.63 321 Plan Fiber Optic Work LGV 138342
08/14/2003 04:24 08/14/2003 15:54 Longview-Allston No 3 230kV line 230.0 L 4.29 690 Plan Fiber Optic Work LGV 138343
08/14/2003 05:52 08/14/2003 16:11 Ice Harbor-Franklin No 1 115kV line 115.0 L 9.34 619 Plan Foreign Request TRI 138349
08/14/2003 06:04 08/14/2003 13:40 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 456 Plan Maintenance KAL 138350
08/14/2003 06:04 08/14/2003 13:40 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 456 Plan Maintenance KAL SPK 138350
08/14/2003 06:42 08/14/2003 17:10 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 628 Plan Maintenance RED 138351
08/14/2003 07:02 08/15/2003 14:31 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 1889 Plan Maintenance WEN TRI 138352
08/14/2003 07:02 08/15/2003 14:31 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 1889 Plan Maintenance WEN TRI 138352
08/14/2003 07:12 08/14/2003 15:03 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 11.60 471 Plan Foreign Request SAL 138353
08/14/2003 07:12 08/14/2003 15:03 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 471 Plan Foreign Request SAL 138353
08/14/2003 07:17 08/14/2003 14:29 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 432 Plan Maintenance IDF 138354
08/14/2003 07:27 08/14/2003 15:08 Shelton-Benson section of Shelton-Kitsap No 2 115kV line 115.0 S 12.13 461 Plan Maintenance OLY 138355
08/14/2003 07:27 08/14/2003 15:08 Shelton-Kitsap No 2 115kV line 115.0 L G 30.34 461 Plan Maintenance OLY 138355
08/14/2003 07:48 08/14/2003 14:51 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 423 Plan Maintenance EUG 138356
08/14/2003 07:48 08/14/2003 14:51 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 423 Plan Maintenance EUG 138356
08/14/2003 08:54 08/14/2003 15:36 Troutdale-PACW Linneman No 1 230kV line 230.0 L 6.54 402 Plan Maintenance LGV 138357
08/14/2003 08:58 08/14/2003 15:37 Ostrander-Troutdale No 1 500kV line 500.0 L 23.82 399 Plan Maintenance LGV 138358
08/14/2003 09:02 08/14/2003 09:02 Lane-Wendson No 2 230kV line 230.0 L 41.03 0 Auto Unknown Tree cut EUG 138359
08/14/2003 09:38 08/29/2003 11:15 Milton tap to Walla Walla-Freewater No 1 69kV line 69.0 T 3.70 21697 Plan Foreign Request TRI 138360
08/14/2003 09:38 08/29/2003 11:15 Walla Walla-Freewater No 1 69kV line 69.0 L T 11.74 21697 Plan Foreign Request TRI 138360
08/14/2003 14:55 08/14/2003 14:57 Garrison-Taft No 2 500kV line 500.0 L 159.38 2 Auto Smoke Fire KAL 138361
08/14/2003 15:01 08/15/2003 08:05 Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 1024 Plan Normally Out EUG 138362
08/14/2003 15:01 08/15/2003 08:05 Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 1024 Plan Normally Out EUG 138362
08/14/2003 16:12 08/14/2003 16:22 Garrison-Taft No 2 500kV line 500.0 L 159.38 10 Auto Smoke Fire KAL 138363
08/14/2003 17:55 08/14/2003 18:06 Garrison-Taft No 1 500kV line 500.0 L 159.38 11 Auto Smoke Fire KAL 138364
08/14/2003 17:55 08/14/2003 18:08 Garrison-Taft No 2 500kV line 500.0 L 159.38 13 Auto Smoke Fire KAL 138365
08/14/2003 18:00 08/14/2003 18:00 Box Canyon tap to Colville-Boundary No 1 115kV line 115.0 T G 2.39 0 Auto Unknown Unknown SPK 138366
08/14/2003 18:00 08/14/2003 18:00 Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line 115.0 S G 4.75 0 Auto Unknown Unknown SPK 138366
08/14/2003 18:00 08/14/2003 18:00 Colville-Boundary No 1 115kV line 115.0 L O 43.06 0 Auto Unknown Unknown SPK 138366
08/14/2003 18:00 08/14/2003 18:00 Colville-Spirit section of Colville-Boundary No 1 115kV line 115.0 S G 17.42 0 Auto Unknown Unknown SPK 138366
08/14/2003 18:00 08/14/2003 18:00 Metaline Falls tap to Colville-Boundary No 1 115kV line 115.0 T G 1.20 0 Auto Unknown Unknown SPK 138366
08/14/2003 18:00 08/14/2003 18:00 Spirit tap to Colville-Boundary No 1 115kV line 115.0 T G 5.23 0 Auto Unknown Unknown SPK 138366
08/14/2003 18:00 08/14/2003 18:00 Spirit-Box Canyon section of Colville-Boundary No 1 115kV line 115.0 S G 11.98 0 Auto Unknown Unknown SPK 138366
08/15/2003 04:52 08/15/2003 16:27 Longview-Allston No 3 230kV line 230.0 L 4.29 695 Plan Fiber Optic Work LGV 138367
08/15/2003 05:23 08/15/2003 05:27 Anaconda-NWE Mill Creek No 1 230kV line 230.0 L 0.40 4 Plan Switching KAL 138370
08/15/2003 05:23 08/15/2003 05:27 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 4 Plan Switching KAL 138371
08/15/2003 08:10 08/15/2003 13:16 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 306 Plan Maintenance EUG 138372
08/15/2003 08:10 08/15/2003 13:16 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S 2.31 306 Plan Maintenance EUG 138372
08/15/2003 08:10 08/15/2003 13:48 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 338 Plan Maintenance EUG 138373
08/15/2003 08:10 08/15/2003 13:48 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 338 Plan Maintenance EUG 138373
08/15/2003 08:22 08/15/2003 15:08 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 406 Plan Maintenance RED 138374
08/15/2003 14:00   Alvey-Martin Creek No 1 115kV line 115.0 L G 22.51 still out Plan Normally Out EUG 138375
08/15/2003 14:00   Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line 115.0 S 1.89 still out Plan Normally Out EUG 138375
08/15/2003 15:47 08/15/2003 15:47 Goshen-Drummond No 1 161kV line 161.0 L 72.75 0 Auto Lightning Lightning IDF 138376
08/15/2003 19:42 08/15/2003 19:56 Garrison-Taft No 1 500kV line 500.0 L 159.38 14 Auto Forced (Configuration) Power System Condition KAL 138377
08/15/2003 19:42 08/15/2003 19:56 Broadview-Garrison No 1 500kV line 500.0 L 224.71 14 Auto Lightning Lightning KAL 138378
08/15/2003 19:58 08/15/2003 19:58 Rattlesnake-Garrison No 1 230kV line 230.0 L 60.94 0 Auto Lightning Fire KAL 138379
08/16/2003 01:02 08/16/2003 02:49 Forest Grove-Filbert section of Forest Grove-McMinnville No 1 115kV line 115.0 S 0.77 107 Auto Foreign Trouble SAL 138398
08/16/2003 01:02 08/16/2003 02:49 Forest Grove-McMinnville No 1 115kV line 115.0 L G 23.72 107 Auto Foreign Trouble SAL 138398
08/16/2003 01:02 08/16/2003 02:49 Keeler-Forest Grove No 2 115kV line 115.0 L 10.51 107 Auto Foreign Trouble SAL 138399
08/16/2003 02:16 08/16/2003 02:16 East Omak tap to Grand Coulee-Foster Creek No 1 115kV line 115.0 T 34.24 0 Auto Lightning Lightning WEN 138400
08/16/2003 02:16 08/16/2003 02:16 East Omak-Foster Creek section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S G 1.05 0 Auto Lightning Lightning WEN 138400
08/16/2003 02:16 08/16/2003 02:16 Grand Coulee-Foster Creek No 1 115kV line 115.0 L 32.57 0 Auto Lightning Lightning WEN 138400
08/16/2003 02:16 08/16/2003 02:16 Grand Coulee-Nilles Corner section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S G 20.23 0 Auto Lightning Lightning WEN 138400
08/16/2003 02:16 08/16/2003 02:16 Nilles Corner-East Omak section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S G 11.29 0 Auto Lightning Lightning WEN 138400
08/16/2003 02:19 08/16/2003 10:08 Schultz-Raver No 1 500kV line 500.0 L 77.24 469 Plan Voltage Control WEN COV 138380
08/16/2003 02:30 08/16/2003 10:15 John Day-Marion No 1 500kV line 500.0 L 127.51 465 Plan Voltage Control TDA RED SAL 138381
08/16/2003 15:44 08/17/2003 15:58 Garrison-Taft No 1 500kV line 500.0 L 159.38 1454 Auto Fire Fire KAL 138401
08/16/2003 15:55 08/17/2003 15:55 Garrison-Taft No 2 500kV line 500.0 L 159.38 1440 Auto Fire Fire KAL 138402
08/16/2003 15:56 08/16/2003 21:14 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 318 Auto Bird or Animal Bird or Animal KAL 138403
08/16/2003 15:56 08/16/2003 21:14 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 318 Auto Bird or Animal Bird or Animal KAL SPK 138403
08/16/2003 15:56 08/16/2003 15:56 Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.27 0 Auto Bird or Animal Bird or Animal KAL 138403
08/16/2003 15:56 08/16/2003 15:56 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 0 Auto Bird or Animal Bird or Animal SPK 138403
08/16/2003 15:56 08/16/2003 15:56 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.41 0 Auto Bird or Animal Bird or Animal KAL 138403
08/16/2003 15:56 08/16/2003 15:56 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 0 Auto Bird or Animal Bird or Animal KAL SPK 138403
08/16/2003 22:03 08/16/2003 23:01 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 58 Plan Maintenance KAL SPK 138404
08/16/2003 22:03 08/16/2003 23:01 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.41 58 Plan Maintenance KAL 138404
08/17/2003 01:05 08/18/2003 06:05 Schultz-Raver No 1 500kV line 500.0 L 77.24 1740 Plan Voltage Control WEN COV 138405
08/17/2003 02:00 08/17/2003 10:16 John Day-Marion No 1 500kV line 500.0 L 127.51 496 Plan Voltage Control TDA RED SAL 138406
08/18/2003 03:17 08/18/2003 05:45 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 148 Plan Voltage Control TRI WEN TDA LGV 138407
08/18/2003 05:52 10/03/2003 15:35 Alvey-Dixonville No 1 230kV line 230.0 L 59.40 66823 Plan Foreign Request EUG 138409
08/18/2003 05:52 08/18/2003 05:52 Alvey-Dixonville No 1 500kV line 500.0 L 57.95 0 Plan Foreign Request EUG 138437
08/18/2003 07:01 08/22/2003 13:27 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 6146 Plan Foreign Request LGV 138410
08/18/2003 07:01 08/22/2003 13:27 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 6146 Plan Foreign Request LGV 138410
08/18/2003 07:16 08/18/2003 15:50 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 514 Plan Maintenance IDF 138411
08/18/2003 07:37 08/18/2003 14:35 Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.74 418 Plan Maintenance EUG 138412
08/18/2003 07:37 08/18/2003 14:35 Lookout Point-Alvey No 1 115kV line 115.0 L G 15.77 418 Plan Maintenance EUG 138412
08/18/2003 07:42 08/19/2003 15:37 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 1915 Plan Maintenance EUG 138413
08/18/2003 07:52 08/18/2003 15:07 Lexington-Longview No 1 115kV line 115.0 L G 9.43 435 Plan Fiber Optic Work LGV OLY 138414
08/18/2003 07:52 08/18/2003 15:07 Lexington-Pacific Way section of Lexington-Longview No 1 115kV line 115.0 S 6.15 435 Plan Fiber Optic Work LGV OLY 138414
08/18/2003 08:04 08/22/2003 14:16 Salem-Albany No 2 115kV line 115.0 L G 27.85 6132 Plan Maintenance SAL EUG 138415
08/18/2003 08:04 08/22/2003 14:16 Salem-Monmouth section of Salem-Albany No 2 115kV line 115.0 S 9.10 6132 Plan Maintenance SAL 138415
08/18/2003 08:14 08/18/2003 11:53 Sand Hill Crane-First Street section of White Bluffs-Richland No 1 115kV line 115.0 S 1.10 219 Plan Foreign Request TRI 138416
08/18/2003 08:14 08/18/2003 11:53 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 219 Plan Foreign Request TRI 138416
08/18/2003 08:24 08/18/2003 16:25 Chehalis-Mayfield No 1 230kV line 230.0 L G 21.37 481 Plan Foreign Request OLY 138417
08/18/2003 08:24 08/18/2003 16:25 Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line 230.0 S 1.17 481 Plan Foreign Request OLY 138417
08/18/2003 08:25 08/18/2003 15:41 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 436 Plan Maintenance TDA RED 138418
08/18/2003 08:25 08/18/2003 15:41 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 436 Plan Maintenance TDA RED 138418
08/18/2003 08:35 08/21/2003 13:58 Creston-Bell No 1 115kV line 115.0 L G 53.80 4643 Plan Maintenance WEN SPK 138419
08/18/2003 08:35 08/21/2003 13:58 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 4643 Plan Maintenance WEN 138419
08/18/2003 08:55 08/18/2003 15:37 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 402 Plan Maintenance SPK 138420
08/18/2003 08:55 08/18/2003 15:37 Priest River-Laclede section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 6.28 402 Plan Maintenance SPK 138420
08/18/2003 12:08 10/02/2003 08:02 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 64554 Plan Normally Out TRI 138421
08/18/2003 12:08 10/02/2003 08:02 White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line 115.0 S 4.30 64554 Plan Normally Out TRI 138421
08/18/2003 17:04 08/21/2003 11:24 Bothell-Sno-King No 1 230kV line 230.0 L 3.68 3980 Plan Construction SNO 138422
08/19/2003 01:31 08/19/2003 01:31 Palisades-Goshen No 1 115kV line 115.0 L 51.71 0 Auto Unknown Unknown IDF 138423
08/19/2003 01:31 08/19/2003 05:59 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 268 Plan Voltage Control RED 138424
08/19/2003 02:08 08/20/2003 08:32 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 1824 Plan Foreign Request KAL SPK 138438
08/19/2003 02:08 08/20/2003 08:21 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 1813 Plan Foreign Request SPK 138438
08/19/2003 02:08 08/20/2003 08:32 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 1824 Plan Foreign Request KAL SPK 138438
08/19/2003 04:41 08/19/2003 04:41 Broadview-Garrison No 2 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 138425
08/19/2003 05:11 08/19/2003 05:11 Lower Monumental-McNary No 1 500kV line 500.0 L 64.75 0 Auto Unknown Unknown TRI 138426
08/19/2003 05:11 08/19/2003 05:11 Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line 500.0 S G 26.64 0 Auto Unknown Unknown TRI 138426
08/19/2003 05:11 08/19/2003 05:11 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T G 6.07 0 Auto Unknown Unknown TRI 138426
08/19/2003 05:11 08/19/2003 05:11 Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line 500.0 S G 38.11 0 Auto Unknown Unknown TRI 138426
08/19/2003 07:05 08/19/2003 07:05 La Grande-IPC Brownlee No 1 230kV line 230.0 L 79.30 0 Auto Foreign Trouble Foreign Utility TRI 138439
08/19/2003 07:05 08/19/2003 07:05 Quartz tap to La Grande-IPC Brownlee No 1 230kV line 230.0 T G 10.30 0 Auto Foreign Trouble Foreign Utility TRI 138439
08/19/2003 07:16 08/19/2003 15:39 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 503 Plan Maintenance IDF 138440
08/19/2003 07:28 08/19/2003 14:55 Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.74 447 Plan Maintenance EUG 138441
08/19/2003 07:28 08/19/2003 14:55 Lookout Point-Alvey No 1 115kV line 115.0 L G 15.77 447 Plan Maintenance EUG 138441
08/19/2003 07:34 08/19/2003 16:58 Fairmount-Port Angeles No 1 230kV line 230.0 L 26.70 564 Plan Maintenance OLY 138442
08/19/2003 08:11 08/19/2003 11:18 Midway-Cold Creek section of Midway-Grandview No 1 115kV line 115.0 S 4.21 187 Plan Maintenance TRI WEN 138443
08/19/2003 08:11 08/19/2003 11:18 Midway-Grandview No 1 115kV line 115.0 L G 25.07 187 Plan Maintenance TRI WEN 138443
08/19/2003 08:17 08/19/2003 16:09 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 472 Plan Maintenance TDA RED 138444
08/19/2003 08:17 08/19/2003 16:09 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 472 Plan Maintenance TDA RED 138444
08/19/2003 08:40 08/29/2003 11:02 Tacoma-TPWR Northeast No 2 230kV line 230.0 L 0.10 14542 Plan Foreign Request COV 138445
08/19/2003 09:52 08/19/2003 13:50 Ice Harbor-Franklin No 3 115kV line 115.0 L T 9.08 238 Plan Maintenance TRI 138446
08/19/2003 09:52 08/19/2003 13:50 Levey tap to Ice Harbor-Franklin No 3 115kV line 115.0 T 0.10 238 Plan Maintenance TRI 138446
08/19/2003 10:00 08/19/2003 13:16 Ice Harbor-Franklin No 3 115kV line 115.0 L G 9.08 196 Plan Maintenance TRI 138447
08/19/2003 10:00 08/19/2003 13:16 Ice Harbor-Levey section of Ice Harbor-Franklin No 3 115kV line 115.0 S 0.88 196 Plan Maintenance TRI 138447
08/19/2003 10:00 08/19/2003 13:16 Levey-Franklin section of Ice Harbor-Franklin No 3 115kV line 115.0 S 8.20 196 Plan Maintenance TRI 138447
08/19/2003 14:13 09/29/2003 14:29 Ice Harbor-Franklin No 2 115kV line 115.0 L T 9.07 59056 Plan Normally Out TRI 138448
08/19/2003 14:13 09/29/2003 14:29 Martindale tap to Ice Harbor-Franklin No 2 115kV line 115.0 T 0.10 59056 Plan Normally Out TRI 138448
08/19/2003 17:58 08/19/2003 18:00 Garrison-Taft No 1 500kV line 500.0 L 159.38 2 Auto Lightning Lightning KAL 138449
08/19/2003 18:01 08/19/2003 18:03 Garrison-Taft No 1 500kV line 500.0 L 159.38 2 Auto Lightning Lightning KAL 138450
08/20/2003 01:24 08/20/2003 05:53 Schultz-Raver No 3 500kV line 500.0 L 77.47 269 Plan Voltage Control WEN COV 138451
08/20/2003 01:53 08/20/2003 05:34 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 221 Plan Voltage Control RED 138452
08/20/2003 07:10 08/21/2003 15:12 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 1922 Plan Maintenance IDF 138456
08/20/2003 07:13 08/20/2003 15:11 Fairmount-Port Angeles No 1 230kV line 230.0 L 26.70 478 Plan Maintenance OLY 138457
08/20/2003 07:52 08/20/2003 14:27 Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line 115.0 S 6.74 395 Plan Maintenance EUG 138458
08/20/2003 07:52 08/20/2003 14:27 Lookout Point-Alvey No 1 115kV line 115.0 L G 15.77 395 Plan Maintenance EUG 138458
08/20/2003 08:29 08/20/2003 16:36 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 487 Plan Maintenance TDA RED 138459
08/20/2003 08:29 08/20/2003 16:36 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 487 Plan Maintenance TDA RED 138459
08/20/2003 08:38 08/20/2003 16:16 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 458 Plan Maintenance SPK 138460
08/20/2003 08:38 08/20/2003 16:16 Priest River-Laclede section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 6.28 458 Plan Maintenance SPK 138460
08/20/2003 09:40 08/20/2003 10:57 Fairview-Bandon No 2 115kV line 115.0 L 19.73 77 Plan Testing EUG 138461
08/20/2003 11:10 08/21/2003 10:56 Fairview-Rogue No 1 230kV line 230.0 L 65.28 1426 Plan Maintenance EUG 138462
08/20/2003 17:09 08/20/2003 17:27 Hilltop-Bordertown No 1 345kV line 345.0 L 147.00 18 Auto Foreign Trouble RED 138463
08/21/2003 01:55 08/21/2003 01:55 Broadview-Garrison No 2 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 138464
08/21/2003 06:56 08/21/2003 14:57 Albeni Falls-Sand Creek No 1 115kV line 115.0 L G 29.67 481 Plan Maintenance SPK 138466
08/21/2003 06:56 08/21/2003 14:57 Laclede-Sandpoint section of Albeni Falls-Sand Creek No 1 115kV line 115.0 S 9.77 481 Plan Maintenance SPK 138466
08/21/2003 07:14 08/21/2003 15:08 Fairmount-Port Angeles No 1 230kV line 230.0 L 26.70 474 Plan Maintenance OLY 138467
08/21/2003 08:22 08/21/2003 16:06 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 464 Plan Maintenance TDA RED 138468
08/21/2003 08:22 08/21/2003 16:06 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 464 Plan Maintenance TDA RED 138468
08/21/2003 08:50 08/21/2003 14:07 Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line 115.0 S 14.02 317 Plan Maintenance EUG 138469
08/21/2003 08:50 08/21/2003 14:07 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 317 Plan Maintenance EUG 138469
08/21/2003 12:03 08/28/2003 13:45 Echo Lake-Maple Valley No 1&2 500kV line 500.0 L 31.51 10182 Plan Construction COV 138470
08/21/2003 14:58 08/21/2003 14:58 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 138471
08/21/2003 14:58 08/21/2003 14:58 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 0 Auto Foreign Trouble TDA 138471
08/21/2003 14:58 08/21/2003 14:58 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 0 Auto Foreign Trouble TDA 138471
08/21/2003 14:58 08/21/2003 14:58 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 0 Auto Foreign Trouble TDA 138471
08/21/2003 14:58 08/21/2003 14:58 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 0 Auto Foreign Trouble TDA 138471
08/21/2003 14:58 08/21/2003 14:58 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 0 Auto Foreign Trouble TDA 138471
08/21/2003 17:01 08/21/2003 18:11 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 70 Plan Maintenance TDA RED 138472
08/21/2003 17:01 08/21/2003 18:11 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 70 Plan Maintenance TDA 138472
08/21/2003 17:19 08/21/2003 17:19 Adelaide-Minidoka PH No 1 138kV line 138.0 L 11.90 0 Auto Foreign Trouble Foreign Utility IDF 138473
08/22/2003 03:11 08/22/2003 05:11 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 120 Plan Voltage Control RED 138474
08/22/2003 08:27 08/22/2003 14:05 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 338 Plan Maintenance OLY 138481
08/22/2003 10:20 08/22/2003 14:51 Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 271 Plan Foreign Request SAL 138482
08/22/2003 10:20 08/22/2003 14:51 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 271 Plan Foreign Request SAL 138482
08/22/2003 12:16 08/22/2003 14:29 Sno-King-Maple Valley No 2 230kV line 230.0 L 24.91 133 Plan Construction SNO COV 138483
08/22/2003 14:45 08/25/2003 10:40 Anaconda-Silver Bow No 1 115kV line 115.0 L 12.69 4075 Auto Lightning Lightning KAL 138484
08/22/2003 14:45 08/22/2003 17:24 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 159 Auto Forced (Configuration) Lightning KAL 138485
08/22/2003 14:45 08/22/2003 17:24 Anaconda-NWE Mill Creek No 1 230kV line 230.0 L 0.40 159 Auto Forced (Configuration) Lightning KAL 138486
08/23/2003 01:39 08/23/2003 12:20 Schultz-Raver No 3 500kV line 500.0 L 77.47 641 Plan Voltage Control WEN COV 138487
08/23/2003 02:25 08/23/2003 07:09 John Day-Marion No 1 500kV line 500.0 L 127.51 284 Plan Voltage Control TDA RED SAL 138488
08/23/2003 05:00 08/23/2003 05:00 Lower Monumental-Hanford No 1 500kV line 500.0 L 53.47 0 Auto Unknown Unknown TRI 138489
08/23/2003 14:21 08/23/2003 14:25 B212-Wilbur section of Grand Coulee-Creston No 1 115kV line 115.0 S G 16.47 4 Auto Unknown Unknown WEN 138497
08/23/2003 14:21 08/23/2003 14:25 Grand Coulee City tap to Grand Coulee-Creston No 1 115kV line 115.0 T G 0.01 4 Auto Unknown Unknown WEN 138497
08/23/2003 14:21 08/23/2003 14:25 Grand Coulee-B212 section of Grand Coulee-Creston No 1 115kV line 115.0 S G 1.59 4 Auto Unknown Unknown WEN 138497
08/23/2003 14:21 08/23/2003 14:25 Grand Coulee-Creston No 1 115kV line 115.0 L 28.27 4 Auto Unknown Unknown WEN SPK 138497
08/23/2003 14:21 08/23/2003 14:25 Wagner Lake tap to Wilbur tap to Grand Coulee-Creston No 1 115kV line 115.0 TT G 10.63 4 Auto Unknown Unknown WEN 138497
08/23/2003 14:21 08/23/2003 14:25 Wilbur tap to Grand Coulee-Creston No 1 115kV line 115.0 T G 5.35 4 Auto Unknown Unknown WEN 138497
08/23/2003 14:21 08/23/2003 14:25 Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line 115.0 S G 10.21 4 Auto Unknown Unknown WEN SPK 138497
08/23/2003 21:34 08/24/2003 08:03 Cowlitz-LaGrande No 1,2 115kV lines 115.0 L T 25.69 629 Plan Maintenance COV 138498
08/23/2003 21:34 08/24/2003 08:03 Lynch Creek tap to Cowlitz-LaGrande No 1,2 115kV lines 115.0 T 3.28 629 Plan Maintenance COV OLY 138498
08/24/2003 01:07 08/24/2003 08:15 Schultz-Raver No 3 500kV line 500.0 L 77.47 428 Plan Voltage Control WEN COV 138499
08/24/2003 02:03 08/24/2003 09:09 John Day-Marion No 1 500kV line 500.0 L 127.51 426 Plan Voltage Control TDA RED SAL 138500
08/24/2003 03:02 08/24/2003 09:16 Schultz-Raver No 1 500kV line 500.0 L 77.24 374 Plan Voltage Control WEN COV 138501
08/24/2003 04:22 08/24/2003 04:22 Goshen-Drummond No 1 161kV line 161.0 L 72.75 0 Auto Unknown Unknown IDF 138504
08/24/2003 07:51 10/27/2003 14:33 Albany-Eugene No 1 115kV line 115.0 L O 39.80 92622 Plan Construction EUG 138505
08/24/2003 07:51 08/24/2003 16:48 Parker tap to Albany-Eugene No 1 115kV line 115.0 T 0.10 537 Plan Construction EUG 138505
08/24/2003 07:51 10/27/2003 14:33 Parker-Eugene section of Albany-Eugene No 1 115kV line 115.0 S 3.90 92622 Plan Construction EUG 138505
08/24/2003 08:10 08/24/2003 19:29 Grizzly-PGE Round Butte No 1 500kV line 500.0 L 15.60 679 Plan Foreign Request RED 138506
08/25/2003 00:47 08/25/2003 05:50 John Day-Marion No 1 500kV line 500.0 L 127.51 303 Plan Voltage Control TDA RED SAL 138507
08/25/2003 01:33 08/25/2003 05:47 Schultz-Raver No 3 500kV line 500.0 L 77.47 254 Plan Voltage Control WEN COV 138508
08/25/2003 02:48 08/25/2003 02:48 Fairview-Rogue No 1 230kV line 230.0 L 65.28 0 Auto Unknown Lightning EUG 138509
08/25/2003 07:54 08/28/2003 15:55 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 4801 Plan Maintenance WEN TRI 138512
08/25/2003 07:54 08/28/2003 15:55 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 4801 Plan Maintenance WEN TRI 138512
08/25/2003 08:08 09/08/2003 10:47 Benton-Franklin No 2 115kV line 115.0 L T 21.03 20319 Plan Maintenance TRI 138513
08/25/2003 08:08 09/08/2003 10:47 North Pasco-Taylor Flats section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS 7.10 20319 Plan Maintenance TRI 138513
08/25/2003 08:35 08/25/2003 14:57 Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line 115.0 S 5.81 382 Plan Maintenance EUG 138514
08/25/2003 08:35 08/25/2003 14:57 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 382 Plan Maintenance EUG 138514
08/25/2003 08:37 08/25/2003 12:54 Eugene-Lane No 1 115kV line 115.0 L 5.47 257 Plan Construction EUG 138515
08/25/2003 08:38 08/25/2003 08:49 Grizzly-PGE Round Butte No 1 500kV line 500.0 L 15.60 11 Auto Foreign Trouble Foreign Trouble RED 138516
08/25/2003 08:55 08/28/2003 13:48 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 4613 Plan Maintenance TRI 138517
08/25/2003 08:55 08/28/2003 13:48 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 4613 Plan Maintenance TRI 138517
08/25/2003 10:01 08/25/2003 14:40 Ross-Alcoa No 3 230kV line 230.0 L 4.29 279 Plan Construction LGV 138518
08/25/2003 11:02 08/25/2003 11:05 Grizzly-PGE Round Butte No 1 500kV line 500.0 L 15.60 3 Auto Foreign Trouble Foreign Trouble RED 138519
08/25/2003 12:27 08/25/2003 13:51 Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line 115.0 S 2.12 84 Plan Maintenance EUG 138520
08/25/2003 12:27 08/25/2003 13:51 Cougar-Thurston No 1 115kV line 115.0 L G 39.99 84 Plan Maintenance EUG 138520
08/25/2003 13:05 08/25/2003 15:49 Big Eddy-De Moss No 1 115kV line 115.0 L G 23.98 164 Plan Emergency TDA 138521
08/25/2003 13:05 08/25/2003 15:49 Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line 115.0 T 9.25 164 Plan Emergency TDA 138521
08/25/2003 13:05 08/25/2003 15:49 Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line 115.0 S 0.01 164 Plan Emergency TDA 138521
08/25/2003 13:25 08/25/2003 15:34 Big Eddy-De Moss No 1 115kV line 115.0 L O 23.98 129 Plan Emergency TDA 138522
08/25/2003 13:25 08/25/2003 15:34 Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line 115.0 S 23.97 129 Plan Emergency TDA 138522
08/25/2003 18:49 08/26/2003 09:05 Chief Joseph-Monroe No 1 500kV line 500.0 L 121.60 856 Auto Malicious Malicious WEN SNO 138523
08/25/2003 23:19 08/25/2003 23:19 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 0 Auto Unknown Unknown SPK 138524
08/25/2003 23:19 08/25/2003 23:19 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 0 Auto Unknown Unknown SPK 138524
08/25/2003 23:19 08/25/2003 23:19 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 0 Auto Unknown Unknown SPK 138524
08/25/2003 23:19 08/25/2003 23:19 Bell-Boundary No 3 230kV line 230.0 L 108.07 0 Auto Unknown Unknown SPK 138524
08/26/2003 06:45 08/26/2003 17:06 Naselle-Hagen section of Naselle-Tarlett No 2 115kV line 115.0 S 13.00 621 Plan Maintenance LGV OLY 138526
08/26/2003 06:45 08/26/2003 17:06 Naselle-Tarlett No 2 115kV line 115.0 L G 17.30 621 Plan Maintenance LGV OLY 138526
08/26/2003 07:10 08/26/2003 15:52 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 522 Plan Maintenance KAL 138527
08/26/2003 07:10 08/26/2003 15:52 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 522 Plan Maintenance KAL 138527
08/26/2003 07:10 08/26/2003 15:52 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 522 Plan Maintenance KAL 138527
08/26/2003 07:10 08/26/2003 15:52 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 522 Plan Maintenance KAL 138527
08/26/2003 07:27 08/26/2003 12:14 Broadview-Garrison No 2 500kV line 500.0 L 224.71 287 Auto Foreign Trouble Foreign Trouble KAL 138528
08/26/2003 07:48 08/26/2003 14:01 Lane-Wendson No 1 115kV line 115.0 L T 41.39 373 Plan Maintenance EUG 138529
08/26/2003 07:48 08/26/2003 14:01 Rainbow Valley tap to Lane-Wendson No 1 115kV line 115.0 T 3.29 373 Plan Maintenance EUG 138529
08/26/2003 08:08 08/26/2003 14:21 Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line 115.0 S 5.81 373 Plan Maintenance EUG 138530
08/26/2003 08:08 08/26/2003 14:21 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 373 Plan Maintenance EUG 138530
08/26/2003 08:13 08/26/2003 14:47 Salem-Albany No 1 115kV line 115.0 L 23.90 394 Plan Maintenance SAL EUG 138531
08/26/2003 08:15 08/26/2003 21:37 Chehalis-Mayfield No 1 230kV line 230.0 L G 21.37 802 Plan Foreign Request OLY 138532
08/26/2003 08:15 08/26/2003 21:37 Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line 230.0 S 1.17 802 Plan Foreign Request OLY 138532
08/26/2003 08:16 08/29/2003 12:22 Creston-Bell No 1 115kV line 115.0 L G 53.80 4566 Plan Maintenance WEN SPK 138533
08/26/2003 08:16 08/29/2003 12:22 Larene-Springhill section of Creston-Bell No 1 115kV line 115.0 S 27.16 4566 Plan Maintenance SPK 138533
08/26/2003 08:20 08/26/2003 09:04 Chehalis-Centralia No 1 69kV line 69.0 L 11.05 44 Auto Foreign Trouble Foreign Trouble OLY 138534
08/26/2003 08:20 08/26/2003 09:04 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 44 Auto Foreign Trouble Foreign Trouble OLY 138535
08/26/2003 08:20 08/26/2003 09:04 Fords Prairie-Centralia section of Chehalis-Centralia No 2 69kV line 69.0 S 3.13 44 Auto Foreign Trouble Foreign Trouble OLY 138535
08/26/2003 08:58 08/26/2003 10:22 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 84 Plan Foreign Request LGV 138536
08/26/2003 08:58 08/26/2003 10:22 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 84 Plan Foreign Request LGV 138536
08/26/2003 20:43 08/27/2003 13:14 Lower Monumental-McNary No 1 500kV line 500.0 L T 64.75 991 Plan Switching TRI 138537
08/26/2003 20:43 08/27/2003 13:14 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 991 Plan Switching TRI 138537
08/27/2003 05:03 08/27/2003 10:45 Port Angeles-Sappho No 1 115kV line 115.0 L 42.03 342 Plan Maintenance OLY 138542
08/27/2003 07:04 08/29/2003 14:23 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 3319 Plan Foreign Request LGV 138543
08/27/2003 07:04 08/29/2003 14:23 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 3319 Plan Foreign Request LGV 138543
08/27/2003 07:16 08/27/2003 10:01 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 165 Plan Maintenance IDF 138544
08/27/2003 07:32 08/29/2003 14:40 Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line 115.0 S 18.50 3308 Plan Maintenance SAL 138545
08/27/2003 07:32 08/29/2003 14:40 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 3308 Plan Maintenance SAL 138545
08/27/2003 08:13 08/28/2003 12:35 Grand Coulee-Foster Creek No 1 115kV line 115.0 L G 32.57 1702 Plan Maintenance WEN 138546
08/27/2003 08:13 08/28/2003 12:35 Grand Coulee-Nilles Corner section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S 20.23 1702 Plan Maintenance WEN 138546
08/27/2003 08:26 08/27/2003 13:52 Fairview-Bandon No 1 115kV line 115.0 L G 25.16 326 Plan Maintenance EUG 138547
08/27/2003 08:26 08/27/2003 13:52 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S 10.26 326 Plan Maintenance EUG 138547
08/27/2003 08:29 08/27/2003 14:12 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 343 Plan Maintenance OLY 138548
08/28/2003 03:19 08/28/2003 03:19 John Day-Grizzly No 1 500kV line 500.0 L 88.41 0 Auto Unknown Unknown TDA RED 138549
08/28/2003 07:23 08/28/2003 15:24 Lane-Wendson No 1 115kV line 115.0 L G 41.39 481 Plan Maintenance EUG 138551
08/28/2003 07:23 08/28/2003 15:24 Mapleton-Wendson section of Lane-Wendson No 1 115kV line 115.0 S 8.00 481 Plan Maintenance EUG 138551
08/28/2003 07:29 08/28/2003 14:50 Naselle-Tarlett No 1 115kV line 115.0 L 15.86 441 Plan Maintenance LGV OLY 138552
08/28/2003 07:58 08/28/2003 17:57 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 599 Plan Foreign Request TRI SPK 138553
08/28/2003 08:10 08/28/2003 09:57 Ashe-White Bluffs No 1 230kV line 230.0 L 9.52 107 Plan Maintenance TRI 138554
08/28/2003 08:27 08/28/2003 14:07 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 340 Plan Maintenance OLY 138555
08/28/2003 09:44 08/29/2003 14:38 Albany-Burnt Woods No 1 115kV line 115.0 L 25.77 1734 Plan Maintenance EUG 138556
08/28/2003 11:28 08/28/2003 12:28 Adair tap to Salem-Albany No 2 115kV line 115.0 T 1.01 60 Plan Testing SAL 138557
08/28/2003 11:28 08/28/2003 12:28 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 60 Plan Testing SAL EUG 138557
08/28/2003 11:28 08/28/2003 12:28 Salem-Albany No 2 115kV line 115.0 L G 27.85 60 Plan Testing SAL EUG 138557
08/28/2003 18:07 08/29/2003 08:12 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 845 Auto Foreign Trouble Foreign Trouble TRI SPK 138558
08/29/2003 01:13 08/29/2003 06:00 John Day-Marion No 1 500kV line 500.0 L 127.51 287 Plan Voltage Control TDA RED SAL 138559
08/29/2003 01:16 08/29/2003 06:13 Schultz-Raver No 1 500kV line 500.0 L 77.24 297 Plan Voltage Control WEN COV 138560
08/29/2003 07:15 08/29/2003 14:45 Snohomish-Beverly Park No 3 115kV line 115.0 L 4.59 450 Plan Foreign Request SNO 138563
08/29/2003 07:31 08/29/2003 09:05 Goshen-Drummond No 1 161kV line 161.0 L 72.75 94 Plan Maintenance IDF 138564
08/29/2003 07:53 08/29/2003 16:00 Bell-AVA Beacon No 5 230kV line 230.0 L 6.00 487 Plan Foreign Request SPK 138565
08/29/2003 09:18 08/29/2003 13:17 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 239 Plan Maintenance OLY 138566
08/29/2003 11:02 10/08/2003 07:26 Tacoma-TPWR Northeast No 1 230kV line 230.0 L 0.10 57384 Plan Normally Out COV 138567
08/29/2003 18:03 08/29/2003 18:05 Grizzly-Malin PGE No 2 500kV line 500.0 L 178.50 2 Auto Foreign Trouble Foreign Trouble RED 138568
08/29/2003 22:05 08/30/2003 01:49 Goshen-Drummond No 1 161kV line 161.0 L 72.75 224 Auto Foreign Trouble Foreign Utility IDF 138569
08/29/2003 22:05 08/30/2003 01:50 Palisades-Goshen No 1 115kV line 115.0 L 51.71 225 Auto Foreign Trouble Foreign Utility IDF 138570
08/30/2003 01:39 08/30/2003 08:05 Schultz-Raver No 1 500kV line 500.0 L 77.24 386 Plan Voltage Control WEN COV 138571
08/30/2003 04:43 08/30/2003 04:43 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 138572
08/30/2003 05:22 08/30/2003 08:17 John Day-Marion No 1 500kV line 500.0 L 127.51 175 Plan Voltage Control TDA RED SAL 138573
08/30/2003 14:48 08/30/2003 17:23 Creston-Bell No 1 115kV line 115.0 L G 53.80 155 Plan Emergency WEN SPK 138574
08/30/2003 14:48 08/30/2003 17:23 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 155 Plan Emergency WEN 138574
08/30/2003 14:48 08/30/2003 17:23 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 155 Plan Emergency WEN SPK 138575
08/30/2003 14:48 08/30/2003 17:23 Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line 115.0 S 10.21 155 Plan Emergency WEN SPK 138575
08/30/2003 16:10 08/30/2003 16:30 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 20 Auto Unknown TDA RED 138576
08/30/2003 16:10 08/30/2003 16:17 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 7 Auto Unknown TDA 138576
08/30/2003 16:10 08/30/2003 16:30 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 20 Auto Unknown TDA 138576
08/30/2003 16:10 08/30/2003 16:30 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 20 Auto Unknown TDA 138576
08/30/2003 16:10 08/30/2003 16:30 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 20 Auto Unknown TDA 138576
08/30/2003 16:10 08/30/2003 16:30 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 20 Auto Unknown TDA 138576
08/31/2003 00:53 08/31/2003 08:52 John Day-Marion No 1 500kV line 500.0 L 127.51 479 Plan Voltage Control TDA RED SAL 138578
08/31/2003 01:34 08/31/2003 09:54 Schultz-Raver No 1 500kV line 500.0 L 77.24 500 Plan Voltage Control WEN COV 138579
08/31/2003 03:48 08/31/2003 08:51 Schultz-Raver No 4 500kV line 500.0 L 77.43 303 Plan Voltage Control WEN COV 138580
08/31/2003 04:49 08/31/2003 04:49 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 138581
08/31/2003 04:49 08/31/2003 04:49 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 138581
08/31/2003 04:49 08/31/2003 04:49 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 138581
08/31/2003 07:03 08/31/2003 07:49 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 46 Plan Voltage Control RED 138582
09/01/2003 00:12 09/01/2003 09:12 John Day-Marion No 1 500kV line 500.0 L 127.51 540 Plan Voltage Control TDA RED SAL 138583
09/01/2003 00:50 09/01/2003 09:02 Schultz-Raver No 1 500kV line 500.0 L 77.24 492 Plan Voltage Control WEN COV 138584
09/01/2003 04:09 09/01/2003 08:49 Marion-Lane No 1 500kV line 500.0 L 68.97 280 Plan Voltage Control SAL EUG 138585
09/01/2003 05:02 09/01/2003 05:02 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 0 Auto Foreign Trouble Foreign Trouble RED 138586
09/01/2003 14:49 09/01/2003 14:50 Columbia Falls-Stillwater section of Columbia Falls-Trego No 1 115kV line 115.0 S G 18.58 1 Auto Unknown Unknown KAL 138590
09/01/2003 14:49 09/01/2003 14:50 Columbia Falls-Trego No 1 115kV line 115.0 L 45.96 1 Auto Unknown Unknown KAL 138590
09/01/2003 14:49 09/01/2003 14:50 Stillwater tap to Columbia Falls-Trego No 1 115kV line 115.0 T G 0.10 1 Auto Unknown Unknown KAL 138590
09/01/2003 14:49 09/01/2003 14:50 Stillwater-Trego section of Columbia Falls-Trego No 1 115kV line 115.0 S G 27.38 1 Auto Unknown Unknown KAL 138590
09/02/2003 01:13 09/02/2003 05:53 Buckley-Marion No 1 500kV line 500.0 L 99.33 280 Plan Voltage Control TDA RED SAL 138591
09/02/2003 04:02 09/02/2003 05:58 Schultz-Raver No 1 500kV line 500.0 L 77.24 116 Plan Voltage Control WEN COV 138592
09/02/2003 06:54 09/04/2003 14:50 Olympia-PSE No 2 115kV line 115.0 L 2.40 3356 Plan Maintenance OLY 138596
09/02/2003 08:07 09/02/2003 14:25 Ashe-Slatt No 1 500kV line 500.0 L 72.24 378 Plan Maintenance TRI TDA 138597
09/02/2003 08:07 09/02/2003 15:10 Allston-Astoria No 1 115kV line 115.0 L T 41.98 423 Plan Maintenance LGV 138598
09/02/2003 08:07 09/02/2003 15:10 Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 10.32 423 Plan Maintenance LGV OLY 138598
09/02/2003 08:11 09/04/2003 11:10 Bothell-Sno-King No 1 230kV line 230.0 L 3.68 3059 Plan Foreign Request SNO 138599
09/02/2003 08:14 09/02/2003 14:33 Santiam-Toledo No 1 230kV line 230.0 L G 67.62 379 Plan Maintenance SAL EUG 138600
09/02/2003 08:14 09/02/2003 14:33 Santiam-Wren section of Santiam-Toledo No 1 230kV line 230.0 S 41.94 379 Plan Maintenance SAL EUG 138600
09/02/2003 08:57 09/05/2003 13:23 B212-Wilbur section of Grand Coulee-Creston No 1 115kV line 115.0 S 16.47 4586 Plan Maintenance WEN 138601
09/02/2003 08:57 09/05/2003 13:23 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 4586 Plan Maintenance WEN SPK 138601
09/02/2003 09:00 09/08/2003 16:16 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 9076 Plan Maintenance KAL SPK 138602
09/02/2003 09:00 09/08/2003 16:16 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 9076 Plan Maintenance SPK 138602
09/02/2003 09:00 09/08/2003 16:16 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 9076 Plan Maintenance KAL SPK 138602
09/02/2003 09:11 09/05/2003 15:23 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 4692 Plan Maintenance SAL 138603
09/02/2003 09:11 09/05/2003 15:23 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 4692 Plan Maintenance SAL 138603
09/02/2003 09:17 09/02/2003 15:18 Ross-Alcoa No 2&4 115kV line 115.0 L 8.23 361 Plan Maintenance LGV 138604
09/02/2003 18:21 09/02/2003 18:21 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 0 Auto Foreign Trouble TDA RED 138605
09/02/2003 18:21 09/02/2003 18:21 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 138605
09/02/2003 18:21 09/02/2003 18:21 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 138605
09/02/2003 18:21 09/02/2003 18:21 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 138605
09/02/2003 18:21 09/02/2003 18:21 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 138605
09/02/2003 18:21 09/02/2003 18:21 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 0 Auto Foreign Trouble TDA 138605
09/03/2003 02:04 09/03/2003 05:47 Schultz-Raver No 1 500kV line 500.0 L 77.24 223 Plan Voltage Control WEN COV 138606
09/03/2003 02:14 09/03/2003 05:30 John Day-Marion No 1 500kV line 500.0 L 127.51 196 Plan Voltage Control TDA RED SAL 138607
09/03/2003 05:03 09/03/2003 18:09 Broadview-Garrison No 1 500kV line 500.0 L 224.71 786 Plan Foreign Request KAL 138608
09/03/2003 06:05 09/04/2003 14:04 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 1919 Plan Foreign Request LGV 138610
09/03/2003 06:05 09/04/2003 14:04 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 1919 Plan Foreign Request LGV 138610
09/03/2003 06:45 09/03/2003 13:29 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 404 Plan Maintenance KAL 138611
09/03/2003 06:45 09/03/2003 13:29 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 404 Plan Maintenance KAL 138611
09/03/2003 06:45 09/03/2003 13:29 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 404 Plan Maintenance KAL 138611
09/03/2003 06:45 09/03/2003 13:29 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 404 Plan Maintenance KAL 138611
09/03/2003 06:48 10/07/2003 11:24 McNary PH-McNary No 2 230kV line 230.0 L 1.06 49236 Plan Foreign Request TRI 138612
09/03/2003 06:50 09/03/2003 09:12 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 142 Plan Maintenance TDA RED 138613
09/03/2003 06:50 09/03/2003 09:12 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 142 Plan Maintenance TDA 138613
09/03/2003 06:55 09/03/2003 18:15 Sickler-Douglas Switchyard No 1 230kV line 230.0 L 0.58 680 Plan Construction WEN 138614
09/03/2003 07:50 09/03/2003 13:27 Bell-AVA Beacon No 4 230kV line 230.0 L 5.90 337 Plan Foreign Request SPK 138615
09/03/2003 07:56 09/03/2003 14:04 Santiam-Toledo No 1 230kV line 230.0 L G 67.62 368 Plan Maintenance SAL EUG 138616
09/03/2003 07:56 09/03/2003 14:04 Santiam-Wren section of Santiam-Toledo No 1 230kV line 230.0 S 41.94 368 Plan Maintenance SAL EUG 138616
09/03/2003 08:04 09/03/2003 14:16 Ashe-Slatt No 1 500kV line 500.0 L 72.24 372 Plan Maintenance TRI TDA 138617
09/03/2003 08:05 09/03/2003 15:14 Allston-Astoria No 1 115kV line 115.0 L T 41.98 429 Plan Maintenance LGV 138618
09/03/2003 08:05 09/03/2003 15:14 Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 10.32 429 Plan Maintenance LGV OLY 138618
09/03/2003 08:24 09/04/2003 11:24 Tahkenitch-Reedsport No 1 115kV line 115.0 L 4.38 1620 Plan Maintenance EUG 138619
09/03/2003 11:16 09/03/2003 11:36 Ross-Alcoa No 2&4 115kV line 115.0 L 8.23 20 Plan Maintenance LGV 138620
09/03/2003 11:35 09/03/2003 12:45 Goshen-Eagle Rock No 1 161kV line 161.0 L T 11.60 70 Plan Maintenance IDF 138621
09/03/2003 11:35 09/03/2003 12:45 Westside tap to Goshen-Eagle Rock No 1 161kV line 161.0 T 0.10 70 Plan Maintenance IDF 138621
09/03/2003 13:30 09/03/2003 13:30 Chief Joseph-East Omak No 1 230kV line 230.0 L 33.99 0 Auto Unknown Unknown WEN 138622
09/04/2003 00:12 09/04/2003 05:55 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 343 Plan Voltage Control RED 138623
09/04/2003 02:04 09/04/2003 04:56 Schultz-Raver No 1 500kV line 500.0 L 77.24 172 Plan Voltage Control WEN COV 138624
09/04/2003 05:06 09/04/2003 17:26 Broadview-Garrison No 1 500kV line 500.0 L 224.71 740 Plan Foreign Request KAL 138625
09/04/2003 06:09 09/04/2003 18:08 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 719 Plan Foreign Request RED 138638
09/04/2003 07:04 09/04/2003 12:32 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T G 0.10 328 Plan Maintenance KAL 138639
09/04/2003 07:04 09/04/2003 12:32 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 33.85 328 Plan Maintenance KAL 138639
09/04/2003 07:04 09/04/2003 12:32 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S G 25.06 328 Plan Maintenance KAL 138639
09/04/2003 07:04 09/04/2003 12:32 Hot Springs-Rattlesnake No 1 230kV line 230.0 L 58.91 328 Plan Maintenance KAL 138639
09/04/2003 08:11 09/04/2003 14:04 Ashe-Slatt No 1 500kV line 500.0 L 72.24 353 Plan Maintenance TRI TDA 138640
09/04/2003 08:15 09/04/2003 14:11 Santiam-Toledo No 1 230kV line 230.0 L G 67.62 356 Plan Maintenance SAL EUG 138641
09/04/2003 08:15 09/04/2003 14:11 Santiam-Wren section of Santiam-Toledo No 1 230kV line 230.0 S 41.94 356 Plan Maintenance SAL EUG 138641
09/04/2003 08:34 09/04/2003 12:30 Bell-AVA Northeast No 3 115kV line 115.0 L 1.60 236 Plan Foreign Request SPK 138642
09/04/2003 08:40 09/04/2003 13:44 Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line 115.0 S G 1.33 304 Plan Construction OLY LGV 138643
09/04/2003 08:40 09/04/2003 13:44 Raymond-Baleville section of Raymond-Willapa River No 1 115kV line 115.0 S G 3.18 304 Plan Construction OLY 138643
09/04/2003 08:40 09/04/2003 13:44 Raymond-Willapa River No 1 115kV line 115.0 L 4.51 304 Plan Construction OLY 138643
09/04/2003 08:55 09/04/2003 12:22 Ross-Alcoa No 2&4 115kV line 115.0 L 8.23 207 Plan Testing LGV 138644
09/04/2003 08:59 09/04/2003 14:41 Ashe tap to Midway-HEW No 2 230kV line 230.0 T 8.60 342 Plan Maintenance TRI 138645
09/04/2003 08:59 09/04/2003 14:41 Midway-HEW No 2 230kV line 230.0 L T 23.89 342 Plan Maintenance TRI 138645
09/04/2003 09:01 09/04/2003 14:17 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 316 Plan Maintenance OLY 138646
09/04/2003 09:39 09/04/2003 09:41 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 2 Auto Human Element Human Element RED 138647
09/04/2003 09:50 09/04/2003 09:55 Fairview-Bandon No 1 115kV line 115.0 L 25.16 5 Auto Unknown Tree cut EUG 138648
09/04/2003 09:50 09/04/2003 09:55 Fairview-Norway section of Fairview-Bandon No 1 115kV line 115.0 S G 12.59 5 Auto Unknown Tree cut EUG 138648
09/04/2003 09:50 09/04/2003 09:55 Morrison tap to Fairview-Bandon No 1 115kV line 115.0 T G 0.10 5 Auto Unknown Tree cut EUG 138648
09/04/2003 09:50 09/04/2003 09:55 Morrison-Bandon section of Fairview-Bandon No 1 115kV line 115.0 S G 2.31 5 Auto Unknown Tree cut EUG 138648
09/04/2003 09:50 09/04/2003 09:55 Norway tap to Fairview-Bandon No 1 115kV line 115.0 T G 0.01 5 Auto Unknown Tree cut EUG 138648
09/04/2003 09:50 09/04/2003 09:55 Norway-Morrison section of Fairview-Bandon No 1 115kV line 115.0 S G 10.26 5 Auto Unknown Tree cut EUG 138648
09/04/2003 09:50 09/04/2003 10:19 Fairview-PACW Coquille No 1 115kV line 115.0 L 6.00 29 Auto Unknown Dispatcher EUG 138649
09/04/2003 09:50 09/04/2003 09:56 Fairview-Bandon No 2 115kV line 115.0 L 19.73 6 Auto Unknown Tree cut EUG 138650
09/04/2003 09:50 09/04/2003 10:13 Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line 115.0 S 14.02 23 Auto Tree cut Tree cut EUG 138651
09/04/2003 09:50 09/04/2003 11:25 Hauser tap to Reedsport-Fairview No 1 115kV line 115.0 T 1.27 95 Auto Tree cut Tree cut EUG 138651
09/04/2003 09:50 09/04/2003 10:13 Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line 115.0 S 5.81 23 Auto Tree cut Tree cut EUG 138651
09/04/2003 09:50 09/04/2003 11:25 Lakeside-Hauser section of Reedsport-Fairview No 1 115kV line 115.0 S 3.94 95 Auto Tree cut Tree cut EUG 138651
09/04/2003 09:50 09/04/2003 11:25 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 95 Auto Tree cut Tree cut EUG 138651
09/04/2003 09:50 09/04/2003 11:25 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 95 Auto Tree cut Tree cut EUG 138651
09/04/2003 09:50 09/04/2003 10:13 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 23 Auto Tree cut Tree cut EUG 138651
09/04/2003 15:18 09/05/2003 11:15 Captain Jack-Malin No 1 500kV line 500.0 L 7.35 1197 Plan Emergency RED 138652
09/04/2003 21:12 09/04/2003 21:12 Canby tap to Malin-Hilltop No 1 230kV line 230.0 T G 7.85 0 Auto Lightning Lightning RED 138653
09/04/2003 21:12 09/04/2003 21:12 Canby-Hilltop section of Malin-Hilltop No 1 230kV line 230.0 S G 18.72 0 Auto Lightning Lightning RED 138653
09/04/2003 21:12 09/04/2003 21:12 Malin-Canby section of Malin-Hilltop No 1 230kV line 230.0 S G 43.54 0 Auto Lightning Lightning RED 138653
09/04/2003 21:12 09/04/2003 21:12 Malin-Hilltop No 1 230kV line 230.0 L 62.26 0 Auto Lightning Lightning RED 138653
09/04/2003 21:16 09/04/2003 21:16 Canby tap to Malin-Hilltop No 1 230kV line 230.0 T G 7.85 0 Auto Lightning Lightning RED 138654
09/04/2003 21:16 09/04/2003 21:16 Canby-Hilltop section of Malin-Hilltop No 1 230kV line 230.0 S G 18.72 0 Auto Lightning Lightning RED 138654
09/04/2003 21:16 09/04/2003 21:16 Malin-Canby section of Malin-Hilltop No 1 230kV line 230.0 S G 43.54 0 Auto Lightning Lightning RED 138654
09/04/2003 21:16 09/04/2003 21:16 Malin-Hilltop No 1 230kV line 230.0 L 62.26 0 Auto Lightning Lightning RED 138654
09/04/2003 21:31 09/04/2003 21:31 Canby tap to Malin-Hilltop No 1 230kV line 230.0 T G 7.85 0 Auto Lightning Lightning RED 138655
09/04/2003 21:31 09/04/2003 21:31 Canby-Hilltop section of Malin-Hilltop No 1 230kV line 230.0 S G 18.72 0 Auto Lightning Lightning RED 138655
09/04/2003 21:31 09/04/2003 21:31 Malin-Canby section of Malin-Hilltop No 1 230kV line 230.0 S G 43.54 0 Auto Lightning Lightning RED 138655
09/04/2003 21:31 09/04/2003 21:31 Malin-Hilltop No 1 230kV line 230.0 L 62.26 0 Auto Lightning Lightning RED 138655
09/05/2003 02:13 09/05/2003 06:02 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 229 Plan Voltage Control RED 138656
09/05/2003 07:10 09/05/2003 17:00 Maple Valley-East Pine No 1 230kV line 230.0 L 14.08 590 Plan Foreign Request COV 138666
09/05/2003 07:55 09/05/2003 14:44 Chehalis-Mayfield No 1 230kV line 230.0 L G 21.37 409 Plan Maintenance OLY 138667
09/05/2003 07:55 09/05/2003 14:44 Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line 230.0 S 20.20 409 Plan Maintenance OLY 138667
09/05/2003 08:05 09/05/2003 14:19 Ashe-Slatt No 1 500kV line 500.0 L 72.24 374 Plan Maintenance TRI TDA 138668
09/05/2003 08:08 09/05/2003 13:57 Santiam-Toledo No 1 230kV line 230.0 L G 67.62 349 Plan Maintenance SAL EUG 138669
09/05/2003 08:08 09/05/2003 13:57 Wren-Toledo section of Santiam-Toledo No 1 230kV line 230.0 S 25.68 349 Plan Maintenance EUG 138669
09/05/2003 08:52 09/05/2003 13:25 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 273 Plan Maintenance OLY 138670
09/05/2003 15:48 09/05/2003 23:14 Addy tap to Bell-Boundary No 3 230kV line 230.0 T 0.02 446 Plan Emergency SPK 138671
09/05/2003 15:48 09/05/2003 23:14 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S 57.73 446 Plan Emergency SPK 138671
09/05/2003 15:48 09/06/2003 01:16 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S 50.34 568 Plan Emergency SPK 138671
09/05/2003 15:48 09/06/2003 01:16 Bell-Boundary No 3 230kV line 230.0 L G 108.07 568 Plan Emergency SPK 138671
09/05/2003 15:57 09/06/2003 00:17 Bell-Addy No 1 115kV line 115.0 L G 51.18 500 Plan Emergency SPK 138672
09/05/2003 15:57 09/06/2003 00:17 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S 22.34 500 Plan Emergency SPK 138672
09/05/2003 22:07 09/05/2003 22:07 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 138673
09/05/2003 23:13 12/09/2003 14:22 Addy-Cusick No 1 230kV line 230.0 L 25.77 136329 Plan Normally Out SPK 138674
09/06/2003 00:59 09/06/2003 08:13 John Day-Marion No 1 500kV line 500.0 L 127.51 434 Plan Voltage Control TDA RED SAL 138675
09/06/2003 01:20 09/06/2003 09:07 Schultz-Raver No 2 500kV line 500.0 L 77.24 467 Plan Voltage Control WEN COV 138676
09/06/2003 02:41 09/06/2003 05:30 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 169 Plan Voltage Control TRI WEN TDA LGV 138677
09/06/2003 04:58 09/24/2003 13:06 John Day PH-John Day No 2 500kV line 500.0 L 3.48 26408 Plan Foreign Request TDA 138679
09/06/2003 11:39 09/07/2003 19:56 Allston-Astoria No 1 115kV line 115.0 L G 41.98 1937 Plan Maintenance LGV 138680
09/06/2003 11:39 09/07/2003 19:56 Clatskanie-Mist section of Allston-Astoria No 1 115kV line 115.0 S 4.80 1937 Plan Maintenance LGV 138680
09/06/2003 23:39 09/07/2003 09:22 John Day-Marion No 1 500kV line 500.0 L 127.51 583 Plan Voltage Control TDA RED SAL 138681
09/06/2003 23:50 09/07/2003 08:39 Schultz-Raver No 2 500kV line 500.0 L 77.24 529 Plan Voltage Control WEN COV 138682
09/07/2003 00:11 09/07/2003 08:26 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 495 Plan Voltage Control TRI WEN TDA LGV 138683
09/07/2003 06:43 09/07/2003 19:45 Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line 230.0 S 15.65 782 Plan PCS Cellular Work COV 138695
09/07/2003 06:43 09/07/2003 19:45 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 782 Plan PCS Cellular Work COV 138695
09/07/2003 10:21 09/08/2003 05:54 John Day-Marion No 1 500kV line 500.0 L 127.51 1173 Plan Voltage Control TDA RED SAL 138696
09/07/2003 20:14 09/07/2003 20:29 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 15 Auto Foreign Trouble TDA RED 138698
09/07/2003 20:14 09/07/2003 20:29 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 15 Auto Foreign Trouble TDA 138698
09/07/2003 20:14 09/07/2003 20:29 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 15 Auto Foreign Trouble TDA 138698
09/07/2003 20:14 09/07/2003 20:29 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 15 Auto Foreign Trouble TDA 138698
09/07/2003 20:14 09/07/2003 20:29 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 15 Auto Foreign Trouble TDA 138698
09/07/2003 20:14 09/07/2003 20:29 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 15 Auto Foreign Trouble TDA 138698
09/07/2003 22:00 09/07/2003 22:00 Hungry Horse-Columbia Falls No 1 230kV line 230.0 L 7.58 0 Auto Unknown Unknown KAL 138699
09/07/2003 22:06 09/08/2003 11:14 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 788 Auto Foreign Trouble OLY 138700
09/07/2003 22:06 09/08/2003 11:14 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 788 Auto Foreign Trouble OLY 138700
09/07/2003 23:08 09/08/2003 04:10 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 302 Plan Voltage Control TRI WEN TDA LGV 138701
09/07/2003 23:35 09/08/2003 05:36 Schultz-Raver No 2 500kV line 500.0 L 77.24 361 Plan Voltage Control WEN COV 138702
09/08/2003 02:08 09/08/2003 03:25 Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T 0.10 77 Auto Terminal Equipment Failure Unknown SPK 138703
09/08/2003 02:08 09/08/2003 03:25 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 19.40 77 Auto Terminal Equipment Failure Unknown SPK 138703
09/08/2003 02:08 09/08/2003 03:25 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L G 52.68 77 Auto Terminal Equipment Failure Unknown SPK 138703
09/08/2003 02:08 09/08/2003 03:25 Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 1.30 77 Auto Terminal Equipment Failure Unknown SPK 138703
09/08/2003 02:08 09/08/2003 11:38 Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 T 0.10 570 Auto Terminal Equipment Failure Unknown SPK 138703
09/08/2003 02:08 09/08/2003 03:25 Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 5.80 77 Auto Terminal Equipment Failure Unknown SPK 138703
09/08/2003 05:35 09/08/2003 08:23 Libby PH-Libby No 2 230kV line 230.0 L 1.29 168 Plan Foreign Request KAL 138707
09/08/2003 06:09 09/08/2003 07:19 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 70 Plan Foreign Request LGV 138708
09/08/2003 06:09 09/08/2003 07:19 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 70 Plan Foreign Request LGV 138708
09/08/2003 06:41 09/08/2003 06:53 McNary PH-McNary 3&4 No 4 230kV line 230.0 L 1.00 12 Plan Foreign Request TRI 138709
09/08/2003 06:41 09/08/2003 06:53 McNary PH-McNary 3&4 No 3 230kV line 230.0 L 1.18 12 Plan Foreign Request TRI 138710
09/08/2003 07:01 09/11/2003 15:31 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 4830 Plan Maintenance WEN 138705
09/08/2003 07:11 09/14/2003 05:49 Chehalis-Centralia No 1 69kV line 69.0 L 11.05 8558 Plan Maintenance OLY 138711
09/08/2003 07:39 09/08/2003 15:33 Oregon City-Chemawa No 2 115kV line 115.0 L G 25.20 474 Plan Maintenance SAL 138712
09/08/2003 07:39 09/08/2003 15:33 Oregon City-Fargo section of Oregon City-Chemawa No 2 115kV line 115.0 S 6.70 474 Plan Maintenance SAL 138712
09/08/2003 07:48 09/08/2003 14:13 Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line 230.0 T 4.43 385 Plan Foreign Request SNO 138713
09/08/2003 07:48 09/08/2003 08:16 Horse Ranch-Snohomish section of Monroe-Snohomish No 1&2 230kV line 230.0 S 0.98 28 Plan Foreign Request SNO 138713
09/08/2003 07:48 09/08/2003 08:16 Monroe-Horse Ranch section of Monroe-Snohomish No 1&2 230kV line 230.0 S 10.40 28 Plan Foreign Request SNO 138713
09/08/2003 07:48 09/08/2003 08:16 Monroe-Snohomish No 1&2 230kV line 230.0 L G 22.17 28 Plan Foreign Request SNO 138713
09/08/2003 07:51 09/08/2003 14:31 Midway-Potholes No 1 230kV line 230.0 L 36.87 400 Plan Maintenance TRI WEN 138714
09/08/2003 08:09 09/12/2003 14:48 Tacoma-Raver No 1&2 500kV line 500.0 L 33.06 6159 Plan Maintenance COV 138715
09/08/2003 08:16 09/08/2003 15:29 Slatt-Buckley No 1 500kV line 500.0 L 52.32 433 Plan Maintenance TRI TDA 138716
09/08/2003 08:34 09/08/2003 15:38 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 424 Plan Maintenance TDA RED 138717
09/08/2003 08:34 09/08/2003 15:38 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 424 Plan Maintenance TDA RED 138717
09/08/2003 08:54 09/08/2003 12:03 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 189 Plan Maintenance OLY 138718
09/08/2003 09:05 09/11/2003 14:35 South Tacoma-Cowlitz No 1 230kV line 230.0 L 6.19 4650 Plan Maintenance COV 138719
09/08/2003 10:18 09/15/2003 09:52 Macks Inn-Madison No 1 115kV line 115.0 L 17.12 10054 Plan Maintenance IDF 138720
09/08/2003 11:04 09/08/2003 13:07 Benton-Othello No 1 115kV line 115.0 L G 37.00 123 Auto Foreign Trouble Foreign Utility TRI SPK 138721
09/08/2003 11:04 09/08/2003 13:07 Benton-South Othello section of Benton-Othello No 1 115kV line 115.0 S 34.20 123 Auto Foreign Trouble Foreign Utility TRI 138721
09/08/2003 11:04 09/08/2003 13:07 South Othello-Othello AVA section of Benton-Othello No 1 115kV line 115.0 S 2.80 123 Auto Foreign Trouble Foreign Utility TRI 138721
09/08/2003 11:10 09/08/2003 16:16 McNary-Franklin No 2 230kV line 230.0 L 26.88 306 Plan Maintenance TRI 138722
09/08/2003 12:37 09/12/2003 13:39 Anaconda-NWE Mill Creek No 1 230kV line 230.0 L 0.40 5822 Plan Maintenance KAL 138723
09/08/2003 13:19 09/08/2003 13:29 Horse Ranch-Snohomish section of Monroe-Snohomish No 1&2 230kV line 230.0 S 0.98 10 Plan Foreign Request SNO 138724
09/08/2003 13:19 09/08/2003 13:29 Monroe-Horse Ranch section of Monroe-Snohomish No 1&2 230kV line 230.0 S 10.40 10 Plan Foreign Request SNO 138724
09/08/2003 13:19 09/08/2003 13:29 Monroe-Snohomish No 1&2 230kV line 230.0 L G 22.17 10 Plan Foreign Request SNO 138724
09/08/2003 16:41 09/08/2003 16:46 McNary PH-McNary 3&4 No 3 230kV line 230.0 L 1.18 5 Plan Foreign Request TRI 138725
09/08/2003 16:41 09/08/2003 16:46 McNary PH-McNary 3&4 No 4 230kV line 230.0 L 1.00 5 Plan Foreign Request TRI 138726
09/08/2003 23:31 09/09/2003 05:53 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 382 Plan Voltage Control RED 138727
09/09/2003 00:04 09/09/2003 05:51 John Day-Marion No 1 500kV line 500.0 L 127.51 347 Plan Voltage Control TDA RED SAL 138728
09/09/2003 00:21 09/09/2003 02:09 Dixon tap to Hot Springs-Rattlesnake No 1 230kV line 230.0 T 0.10 108 Auto Fire Fire KAL 138739
09/09/2003 00:21 09/11/2003 16:16 Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S 33.85 3835 Auto Fire Fire KAL 138739
09/09/2003 00:21 09/09/2003 02:09 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S 25.06 108 Auto Fire Fire KAL 138739
09/09/2003 00:21 09/11/2003 16:16 Hot Springs-Rattlesnake No 1 230kV line 230.0 L G 58.91 3835 Auto Fire Fire KAL 138739
09/09/2003 05:02 09/09/2003 17:40 Broadview-Garrison No 2 500kV line 500.0 L 224.71 758 Plan Foreign Request KAL 138730
09/09/2003 06:02 09/09/2003 09:47 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 225 Plan Maintenance KAL 138740
09/09/2003 06:02 09/09/2003 09:47 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 225 Plan Maintenance KAL SPK 138740
09/09/2003 07:18 09/11/2003 15:34 Slatt-Buckley No 1 500kV line 500.0 L 52.32 3376 Plan Maintenance TRI TDA 138741
09/09/2003 07:57 09/09/2003 12:32 Midway-Rocky Ford No 1 230kV line 230.0 L 47.57 275 Plan Maintenance TRI WEN 138742
09/09/2003 08:13 09/09/2003 15:14 Chemawa-Salem No 2 115kV line 115.0 L G 10.41 421 Plan Maintenance SAL 138743
09/09/2003 08:13 09/09/2003 15:14 Hughes-Salem section of Chemawa-Salem No 2 115kV line 115.0 S 1.88 421 Plan Maintenance SAL 138743
09/09/2003 08:36 09/09/2003 14:29 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 353 Plan Maintenance TDA RED 138744
09/09/2003 08:36 09/09/2003 14:29 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 353 Plan Maintenance TDA RED 138744
09/09/2003 08:58 09/09/2003 14:06 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 308 Plan Maintenance TDA RED 138745
09/09/2003 08:58 09/09/2003 14:06 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 308 Plan Maintenance TDA 138745
09/09/2003 10:41 09/11/2003 14:41 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 3120 Plan Maintenance KAL SPK 138746
09/09/2003 10:41 09/11/2003 14:41 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 3120 Plan Maintenance SPK 138746
09/09/2003 10:41 09/11/2003 14:41 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 3120 Plan Maintenance KAL SPK 138746
09/09/2003 12:00 09/09/2003 14:02 Swan Valley-Teton No 1 115kV line 115.0 L G 35.47 122 Plan Maintenance IDF 138747
09/09/2003 12:00 09/09/2003 14:02 Targhee-Teton section of Swan Valley-Teton No 1 115kV line 115.0 S 17.99 122 Plan Maintenance IDF 138747
09/09/2003 13:31 09/10/2003 16:08 Rattlesnake-Garrison No 1 230kV line 230.0 L 60.94 1597 Plan Emergency KAL 138748
09/10/2003 02:05 09/10/2003 05:26 John Day-Marion No 1 500kV line 500.0 L 127.51 201 Plan Voltage Control TDA RED SAL 138749
09/10/2003 04:49 09/10/2003 14:41 Broadview-Garrison No 2 500kV line 500.0 L 224.71 592 Plan Foreign Request KAL 138750
09/10/2003 06:07 09/10/2003 15:45 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 578 Plan Maintenance OLY 138754
09/10/2003 07:20 09/10/2003 15:53 Detroit PH-Detroit No 1 230kV line 230.0 L 0.48 513 Plan Foreign Request SAL 138755
09/10/2003 07:23 09/10/2003 16:57 Alvey-Lane No 1 230kV line 230.0 L 13.41 574 Plan Maintenance EUG 138756
09/10/2003 07:37 09/10/2003 15:17 Salem-Grand Ronde No 1 115kV line 115.0 L 27.80 460 Plan Maintenance SAL 138757
09/10/2003 07:42 09/10/2003 14:07 Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line 115.0 S 14.02 385 Plan Maintenance EUG 138758
09/10/2003 07:42 09/10/2003 14:07 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 385 Plan Maintenance EUG 138758
09/10/2003 08:04 09/10/2003 14:09 Santiam-Toledo No 1 230kV line 230.0 L G 67.62 365 Plan Maintenance SAL EUG 138759
09/10/2003 08:04 09/10/2003 14:09 Wren-Toledo section of Santiam-Toledo No 1 230kV line 230.0 S 25.68 365 Plan Maintenance EUG 138759
09/10/2003 08:17 09/10/2003 08:17 Tacoma-Covington No 4 230kV line 230.0 L 15.10 0 Auto Machinery, Construction Machinery, Construction COV 138760
09/10/2003 08:31 09/10/2003 14:51 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 380 Plan Maintenance TDA RED 138761
09/10/2003 08:31 09/10/2003 14:51 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 380 Plan Maintenance TDA RED 138761
09/10/2003 09:28 09/10/2003 15:18 Tacoma-Covington No 4 230kV line 230.0 L 15.10 350 Plan Emergency COV 138762
09/10/2003 11:14 09/10/2003 11:20 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 6 Auto Foreign Trouble RED 138763
09/10/2003 11:14 09/10/2003 11:20 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 6 Auto Foreign Trouble IDF RED 138763
09/10/2003 11:14 09/10/2003 11:20 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 6 Auto Foreign Trouble IDF RED 138763
09/10/2003 15:03 09/10/2003 15:40 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 37 Plan Foreign Request TRI 138764
09/11/2003 00:01 09/14/2003 16:06 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 5285 Plan Foreign Request OLY 138765
09/11/2003 02:25 09/11/2003 02:25 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 138766
09/11/2003 02:29 09/11/2003 05:19 Ashe-Marion No 2 500kV line 500.0 L 224.01 170 Plan Voltage Control TRI TDA RED SAL 138767
09/11/2003 07:13 09/11/2003 14:42 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 449 Plan Maintenance OLY 138769
09/11/2003 07:17 09/11/2003 13:50 Detroit PH-Detroit No 2 230kV line 230.0 L 0.48 393 Plan Foreign Request SAL 138770
09/11/2003 07:32 09/11/2003 18:38 Captain Jack-Olinda No 1 500kV line 500.0 L 148.86 666 Plan Foreign Request RED 138771
09/11/2003 07:34 09/11/2003 09:28 Albany-Lebanon No 1 115kV line 115.0 L G 17.01 114 Plan Maintenance EUG 138772
09/11/2003 07:34 09/11/2003 09:28 Albany-Lochner section of Albany-Lebanon No 1 115kV line 115.0 S 2.43 114 Plan Maintenance EUG 138772
09/11/2003 07:36 09/11/2003 15:49 Marcola A500-Alvey section of Santiam-Alvey No 1&2 230kV line 230.0 S 15.05 493 Plan Maintenance EUG 138773
09/11/2003 07:36 09/11/2003 15:49 Santiam-Alvey No 1&2 230kV line 230.0 L G 118.50 493 Plan Maintenance SAL EUG 138773
09/11/2003 07:39 09/11/2003 16:54 Salem-Grand Ronde No 1 115kV line 115.0 L 27.80 555 Plan Maintenance SAL 138774
09/11/2003 07:43 09/11/2003 15:41 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 478 Plan Foreign Request LGV 138775
09/11/2003 07:43 09/11/2003 15:41 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 478 Plan Foreign Request LGV 138775
09/11/2003 08:00 09/11/2003 09:57 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 117 Plan Maintenance TDA RED 138776
09/11/2003 08:00 09/11/2003 09:57 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 117 Plan Maintenance TDA 138776
09/11/2003 08:18 09/11/2003 14:45 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 387 Plan Maintenance TDA RED 138777
09/11/2003 08:18 09/11/2003 14:45 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 387 Plan Maintenance TDA RED 138777
09/11/2003 08:19 09/12/2003 15:00 Ross-Alcoa No 3 230kV line 230.0 L 4.29 1841 Plan Maintenance LGV 138778
09/11/2003 09:18 09/11/2003 10:30 Swan Valley-Teton No 2 115kV line 115.0 L 35.41 72 Plan Maintenance IDF 138779
09/11/2003 23:08 09/11/2003 23:08 Flathead-Hot Springs No 1 230kV line 230.0 L 56.45 0 Auto Lightning Lightning KAL 138780
09/11/2003 23:08 09/11/2003 23:08 Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line 230.0 S G 13.50 0 Auto Lightning Lightning KAL 138780
09/11/2003 23:08 09/11/2003 23:08 Lion Mountain tap to Flathead-Hot Springs No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 138780
09/11/2003 23:08 09/11/2003 23:08 Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line 230.0 S G 42.95 0 Auto Lightning Lightning KAL 138780
09/11/2003 23:08 09/11/2003 23:10 Libby PH-Libby No 2 230kV line 230.0 L 1.29 2 Auto RAS Initiated RAS Initiated KAL 138781
09/11/2003 23:31 09/12/2003 05:38 John Day-Marion No 1 500kV line 500.0 L 127.51 367 Plan Voltage Control TDA RED SAL 138782
09/12/2003 02:59 09/12/2003 05:24 Schultz-Raver No 2 500kV line 500.0 L 77.24 145 Plan Voltage Control WEN COV 138783
09/12/2003 07:01 09/12/2003 15:30 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 509 Plan Maintenance TDA RED 138785
09/12/2003 07:01 09/12/2003 15:30 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 509 Plan Maintenance TDA 138785
09/12/2003 07:24 09/12/2003 14:16 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 412 Plan Maintenance OLY 138786
09/12/2003 07:26 09/12/2003 14:14 Salem-Grand Ronde No 1 115kV line 115.0 L 27.80 408 Plan Maintenance SAL 138787
09/12/2003 08:55 09/12/2003 13:07 La Pine-Fort Rock No 1 115kV line 115.0 L 47.03 252 Plan Maintenance RED 138788
09/12/2003 23:42 09/12/2003 23:42 Benton-Othello No 1 115kV line 115.0 L 37.00 0 Auto Foreign Trouble Foreign Trouble TRI SPK 138789
09/12/2003 23:42 09/12/2003 23:42 Benton-South Othello section of Benton-Othello No 1 115kV line 115.0 S G 34.20 0 Auto Foreign Trouble Foreign Trouble TRI 138789
09/12/2003 23:42 09/12/2003 23:42 South Othello-Othello AVA section of Benton-Othello No 1 115kV line 115.0 S G 2.80 0 Auto Foreign Trouble Foreign Trouble TRI 138789
09/13/2003 00:11 09/13/2003 16:08 John Day-Marion No 1 500kV line 500.0 L 127.51 957 Plan Voltage Control TDA RED SAL 138790
09/13/2003 00:21 09/15/2003 04:47 Schultz-Raver No 1 500kV line 500.0 L 77.24 3146 Plan Voltage Control WEN COV 138791
09/13/2003 02:53 09/13/2003 07:46 Schultz-Raver No 2 500kV line 500.0 L 77.24 293 Plan Voltage Control WEN COV 138792
09/13/2003 06:46 09/13/2003 07:34 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 48 Plan Foreign Request WEN 138793
09/13/2003 07:10 09/13/2003 12:29 Captain Jack-Olinda No 1 500kV line 500.0 L 148.86 319 Plan Foreign Request RED 138794
09/13/2003 07:37 09/13/2003 12:37 Bothell-Sno-King No 2 230kV line 230.0 L 3.58 300 Plan Foreign Request SNO 138795
09/13/2003 11:19 09/13/2003 11:55 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 36 Plan Foreign Request WEN 138796
09/13/2003 22:59 09/14/2003 14:14 John Day-Marion No 1 500kV line 500.0 L 127.51 915 Plan Voltage Control TDA RED SAL 138797
09/14/2003 00:19 11/14/2003 15:00 Hanford-Ostrander No 1 500kV line 500.0 L 180.30 88781 Plan Construction TRI WEN TDA LGV 138798
09/14/2003 00:20 09/14/2003 06:19 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 359 Plan Foreign Request OLY 138799
09/14/2003 00:20 09/14/2003 06:19 Fords Prairie-Centralia section of Chehalis-Centralia No 2 69kV line 69.0 S 3.13 359 Plan Foreign Request OLY 138799
09/14/2003 01:01 09/14/2003 06:08 Schultz-Raver No 2 500kV line 500.0 L 77.24 307 Plan Voltage Control WEN COV 138800
09/14/2003 06:04 09/14/2003 17:17 Horse Ranch-Snohomish section of Monroe-Snohomish No 1&2 230kV line 230.0 S 0.98 673 Plan Maintenance SNO 138801
09/14/2003 06:04 09/14/2003 17:17 Monroe-Horse Ranch section of Monroe-Snohomish No 1&2 230kV line 230.0 S 10.40 673 Plan Maintenance SNO 138801
09/14/2003 06:04 09/14/2003 17:17 Monroe-Snohomish No 1&2 230kV line 230.0 L G 22.17 673 Plan Maintenance SNO 138801
09/14/2003 06:16 09/14/2003 17:19 Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line 230.0 T 4.43 663 Plan Maintenance SNO 138804
09/14/2003 06:16 09/14/2003 17:19 Monroe-Snohomish No 1&2 230kV line 230.0 L T 22.17 663 Plan Maintenance SNO 138804
09/14/2003 06:42 09/14/2003 09:34 Schultz-Raver No 2 500kV line 500.0 L 77.24 172 Plan Voltage Control WEN COV 138805
09/14/2003 08:18 11/14/2003 15:40 Alfalfa-Outlook section of North Bonneville-Midway No 1 230kV line 230.0 S 8.57 88342 Plan Construction WEN 138806
09/14/2003 08:18 11/14/2003 15:40 North Bonneville-Midway No 1 230kV line 230.0 L G 134.71 88342 Plan Construction LGV TDA WEN TRI 138806
09/14/2003 09:00 09/14/2003 09:05 North Bonneville-Midway No 1 230kV line 230.0 L O 134.71 5 Plan Switching LGV TDA WEN TRI 138807
09/14/2003 09:00 09/14/2003 09:05 Outlook tap to North Bonneville-Midway No 1 230kV line 230.0 T 0.10 5 Plan Switching TRI 138807
09/14/2003 09:00 09/14/2003 09:05 Outlook-Midway section of North Bonneville-Midway No 1 230kV line 230.0 S 22.53 5 Plan Switching WEN TRI 138807
09/15/2003 00:07 09/15/2003 05:40 John Day-Marion No 1 500kV line 500.0 L 127.51 333 Plan Voltage Control TDA RED SAL 138808
09/15/2003 04:48 09/15/2003 04:57 Schultz-Raver No 1 500kV line 500.0 L 77.24 9 Auto Equipment/Miscellaneous Equipment/Miscellaneous WEN COV 138809
09/15/2003 06:00 09/17/2003 15:15 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 3435 Plan Foreign Request LGV 138813
09/15/2003 06:00 09/17/2003 15:15 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 3435 Plan Foreign Request LGV 138813
09/15/2003 06:01 09/15/2003 16:43 Snohomish-Bothell No 2 230kV line 230.0 L 7.40 642 Plan Foreign Request SNO 138814
09/15/2003 06:55 09/18/2003 15:09 Filbert-Carlton section of Forest Grove-McMinnville No 1 115kV line 115.0 S 17.74 4814 Plan Maintenance SAL 138815
09/15/2003 06:55 09/18/2003 15:09 Forest Grove-McMinnville No 1 115kV line 115.0 L G 23.72 4814 Plan Maintenance SAL 138815
09/15/2003 07:06 09/15/2003 16:19 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 553 Plan Maintenance OLY 138816
09/15/2003 07:57 09/15/2003 15:13 Chehalis-Centralia No 2 69kV line 69.0 L G 15.26 436 Plan Maintenance OLY 138817
09/15/2003 07:57 09/15/2003 15:13 Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line 69.0 S 11.79 436 Plan Maintenance OLY 138817
09/15/2003 08:09 09/15/2003 14:55 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 406 Plan Maintenance EUG 138818
09/15/2003 08:09 09/15/2003 14:55 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 406 Plan Maintenance EUG 138818
09/15/2003 08:23 09/15/2003 14:27 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S 29.39 364 Plan Maintenance TDA 138819
09/15/2003 08:23 09/15/2003 14:27 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 364 Plan Maintenance TDA RED 138819
09/15/2003 08:27 09/17/2003 14:42 Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line 115.0 S 13.98 3255 Plan Maintenance EUG 138820
09/15/2003 08:27 09/17/2003 14:42 Wendson-Tahkenitch No 1 115kV line 115.0 L G 20.34 3255 Plan Maintenance EUG 138820
09/15/2003 08:35 09/16/2003 17:58 Schultz-Raver No 1 500kV line 500.0 L 77.24 2003 Plan Construction WEN COV 138821
09/15/2003 08:35 09/19/2003 15:52 Custer-Portal Way No 1 230kV line 230.0 L 0.10 6197 Plan Foreign Request SNO 138822
09/15/2003 08:35 09/16/2003 17:58 Schultz-Raver No 2 500kV line 500.0 L 77.24 2003 Plan Construction WEN COV 138839
09/15/2003 09:12 09/26/2003 13:02 Little Goose-Lower Granite No 1 500kV line 500.0 L 32.80 16070 Plan Maintenance SPK TRI 138823
09/15/2003 09:14 09/18/2003 15:09 Carlton tap to Forest Grove-McMinnville No 1 115kV line 115.0 T 0.03 4675 Plan Maintenance SAL 138824
09/15/2003 09:14 09/18/2003 15:09 Forest Grove-McMinnville No 1 115kV line 115.0 L T 23.72 4675 Plan Maintenance SAL 138824
09/15/2003 09:20 09/18/2003 12:43 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 4523 Plan Maintenance KAL SPK 138825
09/15/2003 09:20 09/18/2003 12:43 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 4523 Plan Maintenance SPK 138825
09/15/2003 09:20 09/18/2003 12:43 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 4523 Plan Maintenance KAL SPK 138825
09/15/2003 10:07 09/26/2003 17:07 Dworshak PH-Dworshak No 1 500kV line 500.0 L 3.67 16260 Plan Maintenance TRI SPK 138826
09/16/2003 01:16 09/16/2003 01:16 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 0 Auto Unknown Lightning SPK 138827
09/16/2003 01:16 09/16/2003 01:16 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 0 Auto Unknown Lightning SPK 138827
09/16/2003 01:16 09/16/2003 01:16 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 0 Auto Unknown Lightning SPK 138827
09/16/2003 01:16 09/16/2003 01:16 Bell-Boundary No 3 230kV line 230.0 L 108.07 0 Auto Unknown Lightning SPK 138827
09/16/2003 03:18 09/16/2003 05:26 Ashe-Marion No 2 500kV line 500.0 L 224.01 128 Plan Voltage Control TRI TDA RED SAL 138828
09/16/2003 05:59 09/16/2003 05:59 Lower Monumental-Hanford No 1 500kV line 500.0 L 53.47 0 Auto Unknown Unknown TRI 138840
09/16/2003 07:13 09/16/2003 18:11 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 658 Plan Maintenance OLY 138841
09/16/2003 07:54 09/16/2003 13:44 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 350 Plan Maintenance EUG 138842
09/16/2003 07:54 09/16/2003 13:44 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S 19.14 350 Plan Maintenance EUG 138842
09/16/2003 07:59 09/16/2003 14:36 Midway-Benton No 2 230kV line 230.0 L 29.02 397 Plan Maintenance TRI 138843
09/16/2003 08:16 09/16/2003 15:50 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 454 Plan Maintenance TDA RED 138844
09/16/2003 08:16 09/16/2003 15:50 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 454 Plan Maintenance TDA RED 138844
09/16/2003 11:58 09/16/2003 11:58 Columbia Falls-Flathead No 1 230kV line 230.0 L 14.46 0 Auto Lightning Lightning KAL 138845
09/16/2003 11:58 09/16/2003 12:00 Libby PH-Libby No 2 230kV line 230.0 L 1.29 2 Auto RAS Initiated RAS Initiated KAL 138846
09/16/2003 13:15 09/16/2003 13:15 North Bonneville-Ross No 2 230kV line 230.0 L 35.99 0 Auto Lightning Lightning LGV 138847
09/16/2003 13:15 09/16/2003 13:15 North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line 230.0 S G 27.51 0 Auto Lightning Lightning LGV 138847
09/16/2003 13:15 09/16/2003 13:15 Sifton tap to North Bonneville-Ross No 2 230kV line 230.0 T G 1.20 0 Auto Lightning Lightning LGV 138847
09/16/2003 13:15 09/16/2003 13:15 Sifton-Ross section of North Bonneville-Ross No 2 230kV line 230.0 S G 8.48 0 Auto Lightning Lightning LGV 138847
09/16/2003 13:30 09/16/2003 20:07 Garrison-Taft No 1 500kV line 500.0 L 159.38 397 Plan Voltage Control KAL 138848
09/16/2003 16:00 09/16/2003 16:00 Raver-Paul No 1 500kV line 500.0 L 69.31 0 Auto Lightning Lightning COV OLY 138849
09/16/2003 17:53 09/16/2003 17:53 Sullivan tap to Vera tap to Trentwood-Valley Way No 1 115kV line 115.0 TT 0.04 0 Auto Unknown Unknown SPK 138850
09/16/2003 17:53 09/16/2003 17:53 Sullivan-Vera section of Vera tap to Trentwood-Valley Way No 1 115kV line 115.0 TS 2.52 0 Auto Unknown Unknown SPK 138850
09/16/2003 17:53 09/16/2003 17:53 Trentwood-Valley Way No 1 115kV line 115.0 L G 2.72 0 Auto Unknown Unknown SPK 138850
09/16/2003 17:53 09/16/2003 17:53 Trentwood-Vera section of Trentwood-Valley Way No 1 115kV line 115.0 S 0.78 0 Auto Unknown Unknown SPK 138850
09/16/2003 17:53 09/16/2003 17:53 Vera tap-Sullivan section of Vera tap to Trentwood-Valley Way No 1 115kV line 115.0 TS 1.28 0 Auto Unknown Unknown SPK 138850
09/16/2003 17:53 09/16/2003 17:53 Vera-Valley Way section of Trentwood-Valley Way No 1 115kV line 115.0 S 1.94 0 Auto Unknown Unknown SPK 138850
09/17/2003 07:08 09/17/2003 17:46 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 638 Plan Maintenance OLY 138852
09/17/2003 08:08 09/18/2003 17:29 Schultz-Raver No 1 500kV line 500.0 L 77.24 2001 Plan Construction WEN COV 138862
09/17/2003 08:23 09/17/2003 14:39 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 376 Plan Maintenance TDA RED 138853
09/17/2003 08:23 09/17/2003 14:39 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 376 Plan Maintenance TDA RED 138853
09/17/2003 08:53 09/17/2003 09:03 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 10 Plan Maintenance OLY 138854
09/17/2003 09:07 09/17/2003 09:19 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 12 Plan Maintenance OLY 138855
09/17/2003 09:07 09/17/2003 09:19 Satsop-Aberdeen section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 5.85 12 Plan Maintenance OLY 138855
09/17/2003 09:19 09/17/2003 09:32 Raymond-Cosmopolis No 1 115kV line 115.0 L 18.36 13 Plan Maintenance OLY 138856
09/17/2003 10:14 09/17/2003 13:58 Targhee-Drummond No 1 115kV line 115.0 L 26.80 224 Plan Maintenance IDF 138857
09/17/2003 15:30 09/17/2003 17:03 Ross-Lexington No 1 230kV line 230.0 L 41.21 93 Auto Foreign Trouble Foreign Trouble LGV 138858
09/17/2003 15:30 09/17/2003 17:03 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 93 Auto Foreign Trouble Foreign Trouble LGV 138858
09/17/2003 15:30 09/17/2003 17:03 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 93 Auto Foreign Trouble Foreign Trouble LGV 138858
09/17/2003 15:30 09/17/2003 17:03 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 93 Auto Foreign Trouble Foreign Trouble LGV 138858
09/18/2003 00:20 09/18/2003 00:50 Ross-Lexington No 1 230kV line 230.0 L 41.21 30 Plan Foreign Request LGV 138863
09/18/2003 00:20 09/18/2003 00:50 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 30 Plan Foreign Request LGV 138863
09/18/2003 00:20 09/18/2003 00:50 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 30 Plan Foreign Request LGV 138863
09/18/2003 00:20 09/18/2003 00:50 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 30 Plan Foreign Request LGV 138863
09/18/2003 03:19 09/18/2003 05:32 Ashe-Marion No 2 500kV line 500.0 L 224.01 133 Plan Voltage Control TRI TDA RED SAL 138859
09/18/2003 04:38 09/19/2003 14:44 Olympia-PSE No 1 115kV line 115.0 L 2.40 2046 Plan Maintenance OLY 138864
09/18/2003 05:39 09/18/2003 05:39 Benton-Othello No 1 115kV line 115.0 L 37.00 0 Auto Foreign Trouble Foreign Trouble TRI SPK 138865
09/18/2003 05:39 09/18/2003 05:39 Benton-South Othello section of Benton-Othello No 1 115kV line 115.0 S G 34.20 0 Auto Foreign Trouble Foreign Trouble TRI 138865
09/18/2003 05:39 09/18/2003 05:39 South Othello-Othello AVA section of Benton-Othello No 1 115kV line 115.0 S G 2.80 0 Auto Foreign Trouble Foreign Trouble TRI 138865
09/18/2003 07:09 09/18/2003 15:32 Palisades-Goshen No 1 115kV line 115.0 L 51.71 503 Plan Maintenance IDF 138866
09/18/2003 07:15 09/18/2003 14:50 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 455 Plan Maintenance OLY 138867
09/18/2003 07:55 09/18/2003 16:19 Hauser tap to Reedsport-Fairview No 1 115kV line 115.0 T 1.27 504 Plan Maintenance EUG 138868
09/18/2003 07:55 09/18/2003 16:19 Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line 115.0 S 5.81 504 Plan Maintenance EUG 138868
09/18/2003 07:55 09/18/2003 16:19 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 504 Plan Maintenance EUG 138868
09/19/2003 02:17 09/19/2003 05:28 Ashe-Marion No 2 500kV line 500.0 L 224.01 191 Plan Voltage Control TRI TDA RED SAL 138869
09/19/2003 06:00 09/19/2003 16:55 Chief Joseph-Snohomish No 4 345kV line 345.0 L 133.07 655 Plan Maintenance WEN SNO 138870
09/19/2003 07:44 09/19/2003 15:19 Eugene-Alvey No 2 115kV line 115.0 L G 12.67 455 Plan Maintenance EUG 138884
09/19/2003 07:44 09/19/2003 15:19 Eugene-Dillard section of Eugene-Alvey No 2 115kV line 115.0 S 9.36 455 Plan Maintenance EUG 138884
09/19/2003 07:48 09/19/2003 15:08 Hauser tap to Reedsport-Fairview No 1 115kV line 115.0 T 1.27 440 Plan Maintenance EUG 138885
09/19/2003 07:48 09/19/2003 15:08 Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line 115.0 S 5.81 440 Plan Maintenance EUG 138885
09/19/2003 07:48 09/19/2003 15:08 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 440 Plan Maintenance EUG 138885
09/19/2003 08:57 09/19/2003 15:17 Sifton-Fishers Road No 1 115kV line 115.0 L 2.21 380 Plan Maintenance LGV 138886
09/19/2003 18:35 09/19/2003 18:35 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 17.09 0 Auto Lightning Lightning KAL 138887
09/19/2003 18:35 09/19/2003 18:35 Libby-Bonners Ferry No 1 115kV line 115.0 L 59.58 0 Auto Lightning Lightning KAL SPK 138887
09/19/2003 18:35 09/19/2003 18:35 Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.27 0 Auto Lightning Lightning KAL 138887
09/19/2003 18:35 09/19/2003 18:35 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 6.23 0 Auto Lightning Lightning SPK 138887
09/19/2003 18:35 09/19/2003 18:35 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 12.41 0 Auto Lightning Lightning KAL 138887
09/19/2003 18:35 09/19/2003 18:35 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S G 11.58 0 Auto Lightning Lightning KAL SPK 138887
09/19/2003 19:01 09/19/2003 19:01 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.01 0 Auto Lightning Lightning KAL 138888
09/19/2003 19:01 09/19/2003 19:01 Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line 230.0 S G 31.50 0 Auto Lightning Lightning KAL 138888
09/19/2003 19:01 09/19/2003 19:01 Libby-Conkelley No 1 230kV line 230.0 L 83.94 0 Auto Lightning Lightning KAL 138888
09/19/2003 19:01 09/19/2003 19:01 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S G 45.10 0 Auto Lightning Lightning KAL 138888
09/19/2003 19:01 09/19/2003 19:01 Trumbull Creek tap to Libby-Conkelley No 1 230kV line 230.0 T G 0.10 0 Auto Lightning Lightning KAL 138888
09/19/2003 19:01 09/19/2003 19:01 Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line 230.0 S G 7.34 0 Auto Lightning Lightning KAL 138888
09/19/2003 19:01 09/19/2003 19:03 Noxon-Libby No 1 230kV line 230.0 L 70.17 2 Auto Lightning Lightning KAL 138889
09/19/2003 19:01 09/19/2003 19:05 Libby PH-Libby No 1 230kV line 230.0 L 1.35 4 Auto RAS Initiated RAS Initiated KAL 138890
09/19/2003 19:01 09/19/2003 19:05 Libby PH-Libby No 2 230kV line 230.0 L 1.29 4 Auto RAS Initiated RAS Initiated KAL 138891
09/19/2003 19:39 09/19/2003 19:56 Monroe-Sammamish No 1 230kV line 230.0 L T 27.18 17 Auto Human Element Substation Operations SNO COV 138892
09/19/2003 19:39 09/19/2003 19:56 Sno-King tap to Monroe-Sammamish No 1 230kV line 230.0 T 12.84 17 Auto Human Element Substation Operations SNO 138892
09/20/2003 00:37 09/20/2003 09:51 Schultz-Raver No 1 500kV line 500.0 L 77.24 554 Plan Voltage Control WEN COV 138893
09/20/2003 01:27 09/20/2003 08:13 John Day-Marion No 1 500kV line 500.0 L 127.51 406 Plan Voltage Control TDA RED SAL 138894
09/20/2003 06:01 09/20/2003 09:46 Monroe-Custer No 2 500kV line 500.0 L 85.81 225 Plan Maintenance SNO 138895
09/20/2003 06:15 09/20/2003 18:21 Longview-Allston No 4 115kV line 115.0 L G 4.64 726 Plan Construction LGV 138898
09/20/2003 06:15 09/20/2003 18:21 Longview-Donald Nys section of Longview-Allston No 4 115kV line 115.0 S 3.63 726 Plan Construction LGV 138898
09/20/2003 06:24 09/20/2003 18:02 Garrison-Taft No 2 500kV line 500.0 L 159.38 698 Plan Voltage Control KAL 138899
09/20/2003 06:52 09/20/2003 19:14 Lexington-Longview No 1 115kV line 115.0 L G 9.43 742 Plan Construction LGV OLY 138900
09/20/2003 06:52 09/20/2003 19:14 Pacific Way-Longview section of Lexington-Longview No 1 115kV line 115.0 S 3.28 742 Plan Construction OLY LGV 138900
09/20/2003 07:18 09/20/2003 19:40 Longview-Allston No 3 230kV line 230.0 L 4.29 742 Plan Construction LGV 138901
09/20/2003 18:04 09/21/2003 00:23 Garrison-Taft No 1 500kV line 500.0 L 159.38 379 Plan Voltage Control KAL 138902
09/20/2003 23:07 09/21/2003 07:44 Ashe-Marion No 2 500kV line 500.0 L 224.01 517 Plan Voltage Control TRI TDA RED SAL 138903
09/21/2003 00:15 09/21/2003 22:25 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 1330 Plan Foreign Request OLY 138904
09/21/2003 00:23 09/21/2003 00:23 Garrison-Taft No 1 500kV line 500.0 L 159.38 0 Plan Voltage Control KAL 138905
09/21/2003 00:34 09/21/2003 05:45 Schultz-Raver No 2 500kV line 500.0 L 77.24 311 Plan Voltage Control WEN COV 138906
09/21/2003 01:55 09/22/2003 05:41 Schultz-Raver No 1 500kV line 500.0 L 77.24 1666 Plan Voltage Control WEN COV 138907
09/21/2003 03:09 09/21/2003 03:09 Broadview-Garrison No 1 500kV line 500.0 L 224.71 0 Auto Foreign Trouble Foreign Trouble KAL 138908
09/21/2003 05:56   Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 still out Plan Construction TDA RED 138914
09/21/2003 05:56   Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T still out Plan Construction TDA 138914
09/21/2003 05:56 09/21/2003 12:58 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 422 Plan Switching TDA RED 138915
09/21/2003 05:56 09/21/2003 12:58 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 422 Plan Switching TDA 138915
09/21/2003 05:56 09/21/2003 12:58 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 422 Plan Switching TDA 138915
09/21/2003 05:56 09/21/2003 12:58 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 422 Plan Switching TDA 138915
09/21/2003 06:01 09/29/2003 01:08 Monroe-Sammamish No 1 230kV line 230.0 L G 27.18 11227 Plan Construction SNO COV 138909
09/21/2003 06:01 09/29/2003 01:08 Sno-King tap-Sammamish section of Monroe-Sammamish No 1 230kV line 230.0 S 18.30 11227 Plan Construction SNO COV 138909
09/21/2003 06:02 09/29/2003 01:08 Monroe-Sammamish No 1 230kV line 230.0 L O 27.18 11226 Plan Construction SNO COV 138910
09/21/2003 06:02 09/29/2003 01:08 Monroe-Sno-King tap section of Monroe-Sammamish No 1 230kV line 230.0 S 8.90 11226 Plan Construction SNO 138910
09/21/2003 06:09 09/29/2003 07:00 Echo Lake-Monroe No 1 500kV line 500.0 L G 29.98 11571 Plan Construction COV SNO 138916
09/21/2003 06:09 09/29/2003 07:00 Echo Lake-Sno-King section of Echo Lake-Monroe No 1 500kV line 500.0 S 21.18 11571 Plan Construction COV SNO 138916
09/21/2003 06:09 09/29/2003 07:00 Sno-King-Monroe section of Echo Lake-Monroe No 1 500kV line 500.0 S 8.80 11571 Plan Construction SNO 138916
09/21/2003 06:19 09/21/2003 12:58 Big Eddy-Celilo No 3 230kV line 230.0 L 1.09 399 Plan Switching TDA 138912
09/21/2003 09:00 09/21/2003 21:13 Garrison-Taft No 2 500kV line 500.0 L 159.38 733 Plan Voltage Control KAL 138917
09/21/2003 13:06 09/21/2003 14:45 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 99 Auto Terminal Equipment Failure TDA RED 138918
09/21/2003 13:06 09/21/2003 14:45 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 99 Auto Terminal Equipment Failure TDA 138918
09/21/2003 13:06 09/21/2003 14:45 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 99 Auto Terminal Equipment Failure TDA 138918
09/21/2003 13:06 09/21/2003 14:45 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 99 Auto Terminal Equipment Failure TDA 138918
09/21/2003 13:06 09/21/2003 14:45 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 99 Auto Terminal Equipment Failure TDA 138918
09/21/2003 23:15 09/22/2003 05:18 John Day-Marion No 1 500kV line 500.0 L 127.51 363 Plan Voltage Control TDA RED SAL 138919
09/22/2003 00:08 09/22/2003 04:56 Cedarville Junction tap to Mile-Hi-Alturas 115kV line 115.0 T 0.03 288 Plan Maintenance RED 138920
09/22/2003 00:08 09/22/2003 04:56 Mile-Hi-Alturas 115kV line 115.0 L T 288 Plan Maintenance RED 138920
09/22/2003 01:18 09/22/2003 04:48 Marion-Lane No 1 500kV line 500.0 L 68.97 210 Plan Voltage Control SAL EUG 138921
09/22/2003 06:01 09/26/2003 18:42 Grizzly-Malin PGE No 2 500kV line 500.0 L 178.50 6521 Plan Foreign Request RED 138922
09/22/2003 06:04 09/22/2003 06:04 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 138923
09/22/2003 06:04 09/22/2003 06:04 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 138923
09/22/2003 06:04 09/22/2003 06:04 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 138923
09/22/2003 06:10 10/01/2003 10:00 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 13190 Plan Maintenance TDA RED 138924
09/22/2003 06:10 10/01/2003 10:00 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 13190 Plan Maintenance TDA 138924
09/22/2003 06:10 10/01/2003 10:00 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 13190 Plan Maintenance TDA RED 138925
09/22/2003 06:10 10/01/2003 10:00 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 13190 Plan Maintenance TDA 138925
09/22/2003 06:10 09/30/2003 20:26 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 12376 Plan Switching TDA 138926
09/22/2003 06:10 09/30/2003 20:26 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 12376 Plan Switching TDA 138927
09/22/2003 07:01 10/17/2003 13:53 South Tacoma-White River No 1 230kV line 230.0 L 14.95 36412 Plan Foreign Request COV 138935
09/22/2003 07:04 09/22/2003 17:07 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 603 Plan Maintenance OLY 138936
09/22/2003 07:05 09/22/2003 08:22 Antelope-Lost River 230kV line 230.0 L 30.81 77 Plan Switching IDF 138937
09/22/2003 07:14 09/25/2003 16:46 Keeler-Forest Grove No 2 115kV line 115.0 L 10.51 4892 Plan Maintenance SAL 138938
09/22/2003 08:05 09/26/2003 10:22 Marion-Santiam No 1 500kV line 500.0 L 2.44 5897 Plan Maintenance SAL 138939
09/22/2003 08:29 09/22/2003 14:29 Lane-Wendson No 2 230kV line 230.0 L 41.03 360 Plan Maintenance EUG 138940
09/22/2003 09:50 09/22/2003 18:49 Antelope-Lost River 230kV line 230.0 L 30.81 539 Plan Maintenance IDF 138941
09/22/2003 09:50 09/22/2003 18:51 Lost River-Spar Canyon No 1 230kV line 230.0 L 53.19 541 Plan Maintenance IDF 138942
09/22/2003 13:57 10/06/2003 08:43 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 19846 Plan Switching KAL SPK 138943
09/22/2003 13:57 09/22/2003 14:04 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 7 Plan Switching SPK 138943
09/22/2003 13:57 10/06/2003 08:43 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 19846 Plan Switching KAL SPK 138943
09/23/2003 06:13 09/23/2003 16:50 Malin-Round Mountain No 1 500kV line 500.0 L 94.50 637 Plan Foreign Request RED 138945
09/23/2003 07:04 09/23/2003 15:23 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 499 Plan Maintenance OLY 138946
09/23/2003 08:05 09/24/2003 14:00 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.50 1795 Plan Foreign Request SAL 138947
09/23/2003 08:05 09/24/2003 10:05 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 11.60 1560 Plan Foreign Request SAL 138947
09/23/2003 08:05 09/24/2003 14:00 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 1795 Plan Foreign Request SAL 138947
09/23/2003 08:15 09/25/2003 15:06 Midway-Moxee No 1 115kV line 115.0 L G 33.98 3291 Plan Maintenance TRI WEN 138948
09/23/2003 08:15 09/25/2003 15:06 Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line 115.0 S 17.37 3291 Plan Maintenance WEN 138948
09/23/2003 08:45 09/23/2003 14:27 Cusick-Boundary section of Usk-Boundary No 1 230kV line 230.0 S 48.18 342 Plan Maintenance SPK 138949
09/23/2003 08:45 09/23/2003 14:27 Usk-Boundary No 1 230kV line 230.0 L G 55.04 342 Plan Maintenance SPK 138949
09/23/2003 16:08 09/23/2003 16:40 John Day PH-John Day No 3 500kV line 500.0 L 3.48 32 Plan Foreign Request TDA 138950
09/24/2003 01:40 09/24/2003 06:14 Schultz-Raver No 1 500kV line 500.0 L 77.24 274 Plan Voltage Control WEN COV 138951
09/24/2003 06:45 09/24/2003 06:45 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 138958
09/24/2003 06:45 09/24/2003 06:45 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 138958
09/24/2003 06:45 09/24/2003 06:45 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 138958
09/24/2003 06:45 09/24/2003 06:45 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 138958
09/24/2003 06:45 09/24/2003 06:45 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 138958
09/24/2003 06:45 09/24/2003 06:45 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 138958
09/24/2003 06:45 09/24/2003 06:45 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 138958
09/24/2003 06:45 09/24/2003 06:45 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 138958
09/24/2003 07:06 09/24/2003 16:13 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 547 Plan Maintenance OLY 138959
09/24/2003 07:43 09/24/2003 17:25 Taft-Bell No 1 500kV line 500.0 L 96.44 582 Plan Maintenance KAL SPK 138960
09/24/2003 07:44 09/24/2003 07:56 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 12 Auto Terminal Equipment Failure TDA RED 138961
09/24/2003 07:44 09/24/2003 07:56 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 12 Auto Terminal Equipment Failure TDA 138961
09/24/2003 07:44 09/24/2003 07:56 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 12 Auto Terminal Equipment Failure TDA 138961
09/24/2003 07:44 09/24/2003 19:11 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 687 Auto Terminal Equipment Failure TDA 138961
09/24/2003 07:44 09/24/2003 07:56 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 12 Auto Terminal Equipment Failure TDA 138961
09/24/2003 08:37 09/24/2003 08:42 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 5 Plan Switching TDA RED 138963
09/24/2003 08:37 09/24/2003 08:42 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Plan Switching TDA 138963
09/24/2003 08:37 09/24/2003 08:42 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Plan Switching TDA 138963
09/24/2003 08:37 09/24/2003 08:42 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Plan Switching TDA 138963
09/24/2003 08:37 09/24/2003 08:42 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Plan Switching TDA 138963
09/24/2003 19:08 09/24/2003 19:11 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 3 Plan Switching TDA RED 138964
09/24/2003 19:08 09/24/2003 19:11 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Plan Switching TDA 138964
09/24/2003 19:08 09/24/2003 19:11 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Plan Switching TDA 138964
09/24/2003 19:08 09/24/2003 19:11 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Plan Switching TDA 138964
09/24/2003 19:08 09/24/2003 19:11 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Plan Switching TDA 138964
09/24/2003 23:59 09/25/2003 09:12 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 553 Auto Terminal Equipment Failure TDA RED 138965
09/24/2003 23:59 09/25/2003 09:12 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138965
09/24/2003 23:59 09/25/2003 09:12 Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138965
09/24/2003 23:59 09/25/2003 09:12 Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138965
09/24/2003 23:59 09/25/2003 09:12 Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138965
09/24/2003 23:59 09/25/2003 09:12 Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138965
09/24/2003 23:59 09/25/2003 09:12 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 553 Auto Terminal Equipment Failure TDA RED 138966
09/24/2003 23:59 09/25/2003 09:12 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138966
09/24/2003 23:59 09/25/2003 09:12 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138966
09/24/2003 23:59 09/25/2003 09:12 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138966
09/24/2003 23:59 09/25/2003 09:12 Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138966
09/24/2003 23:59 09/25/2003 09:12 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 553 Auto Terminal Equipment Failure TDA 138966
09/25/2003 02:01 09/25/2003 02:33 Libby-Bonners Ferry No 1 115kV line 115.0 L O 59.58 32 Plan Foreign Request KAL SPK 138971
09/25/2003 02:01 09/25/2003 02:33 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 32 Plan Foreign Request SPK 138971
09/25/2003 03:15 09/25/2003 03:19 Libby-Bonners Ferry No 1 115kV line 115.0 L O 59.58 4 Plan Foreign Request KAL SPK 138972
09/25/2003 03:15 09/25/2003 03:19 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 4 Plan Foreign Request SPK 138972
09/25/2003 07:00 09/25/2003 14:25 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 445 Plan Maintenance OLY 138973
09/25/2003 07:35 09/25/2003 13:00 Garrison-Taft No 2 500kV line 500.0 L 159.38 325 Plan Voltage Control KAL 138974
09/25/2003 07:41 09/25/2003 14:21 Hawkins-Alvey No 1 115kV line 115.0 L G 7.78 400 Plan Maintenance EUG 138975
09/25/2003 07:41 09/25/2003 14:21 Hawkins-Hideaway section of Hawkins-Alvey No 1 115kV line 115.0 S 5.32 400 Plan Maintenance EUG 138975
09/25/2003 09:53 09/27/2003 15:35 Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line 115.0 S 15.50 3222 Plan Foreign Request LGV 138976
09/25/2003 09:53 09/27/2003 15:35 Cardwell-PACW Merwin No 1 115kV line 115.0 L G 16.30 3222 Plan Foreign Request LGV 138976
09/25/2003 10:29 09/27/2003 07:44 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 2715 Plan Foreign Request OLY 138977
09/25/2003 10:29 09/27/2003 07:44 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 2715 Plan Foreign Request OLY 138977
09/25/2003 12:03 09/25/2003 12:35 Grizzly-PGE Round Butte No 1 500kV line 500.0 L 15.60 32 Auto Foreign Trouble Foreign Utility RED 138978
09/25/2003 12:34 09/25/2003 12:34 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 0 Plan Maintenance TRI 138979
09/25/2003 12:34 09/25/2003 12:34 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 0 Plan Maintenance TRI 138979
09/26/2003 00:34 09/26/2003 06:03 Schultz-Raver No 1 500kV line 500.0 L 77.24 329 Plan Voltage Control WEN COV 138980
09/26/2003 04:32 09/26/2003 04:33 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 1 Auto Unknown Unknown OLY COV WEN 138981
09/26/2003 05:46 09/26/2003 18:33 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S 1.90 767 Plan Maintenance SAL 139000
09/26/2003 05:46 09/26/2003 18:33 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S 10.53 767 Plan Maintenance SAL 139000
09/26/2003 05:46 09/26/2003 18:33 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 767 Plan Maintenance SAL 139000
09/26/2003 06:33 09/26/2003 20:48 Fairview-Rogue No 1 230kV line 230.0 L 65.28 855 Plan Forced EUG 139001
09/26/2003 06:56 09/26/2003 13:36 Chehalis-Olympia No 1 230kV line 230.0 L 30.03 400 Plan Maintenance OLY 139002
09/26/2003 07:40 09/26/2003 13:58 Hawkins-Alvey No 1 115kV line 115.0 L G 7.78 378 Plan Maintenance EUG 139003
09/26/2003 07:40 09/26/2003 13:58 Hawkins-Hideaway section of Hawkins-Alvey No 1 115kV line 115.0 S 5.32 378 Plan Maintenance EUG 139003
09/26/2003 07:50 09/26/2003 16:35 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 525 Plan Foreign Request SAL 139004
09/26/2003 07:50 09/26/2003 16:35 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 525 Plan Foreign Request SAL 139004
09/26/2003 10:00 09/26/2003 13:12 Albeni Falls-Pine Street No 1 115kV line 115.0 L G 2.27 192 Plan Foreign Request SPK 139005
09/26/2003 10:00 09/26/2003 13:12 Newport-Pine Street section of Albeni Falls-Pine Street No 1 115kV line 115.0 S 0.16 192 Plan Foreign Request SPK 139005
09/26/2003 14:07 09/26/2003 14:26 Schultz-Raver No 2 500kV line 500.0 L 77.24 19 Plan Switching WEN COV 138985
09/27/2003 00:00 09/27/2003 02:53 Cedarville Junction tap to Mile-Hi-Alturas 115kV line 115.0 T 0.03 173 Plan Maintenance RED 139006
09/27/2003 00:00 09/27/2003 02:53 Mile-Hi-Alturas 115kV line 115.0 L T 173 Plan Maintenance RED 139006
09/27/2003 00:02 09/27/2003 06:24 Schultz-Raver No 1 500kV line 500.0 L 77.24 382 Plan Voltage Control WEN COV 138986
09/27/2003 02:15 09/27/2003 07:54 John Day-Marion No 1 500kV line 500.0 L 127.51 339 Plan Voltage Control TDA RED SAL 138987
09/27/2003 05:09 10/03/2003 16:37 John Day PH-John Day No 3 500kV line 500.0 L 3.48 9328 Plan Foreign Request TDA 138988
09/27/2003 07:00 09/27/2003 18:42 Captain Jack-Olinda No 1 500kV line 500.0 L 148.86 702 Plan Foreign Request RED 138989
09/27/2003 13:05 09/27/2003 13:16 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 11 Auto Foreign Trouble TDA RED 138990
09/27/2003 13:05 09/27/2003 13:16 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 11 Auto Foreign Trouble TDA 138990
09/27/2003 23:39 09/28/2003 07:54 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S 136.53 495 Plan Maintenance TDA RED 139007
09/27/2003 23:39 09/28/2003 07:54 McNary-Santiam No 2 230kV line 230.0 L G 200.43 495 Plan Maintenance TRI TDA RED SAL 139007
09/28/2003 00:03 09/28/2003 11:59 John Day-Marion No 1 500kV line 500.0 L 127.51 716 Plan Voltage Control TDA RED SAL 138991
09/28/2003 00:45 09/28/2003 08:15 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T 450 Plan Maintenance TDA 138992
09/28/2003 00:45 09/28/2003 08:15 McNary-Santiam No 2 230kV line 230.0 L T 200.43 450 Plan Maintenance TRI TDA RED SAL 138992
09/28/2003 00:52 09/28/2003 07:18 McNary-Santiam No 2 230kV line 230.0 L O 200.43 386 Plan Maintenance TRI TDA RED SAL 139008
09/28/2003 00:52 09/28/2003 07:18 Tumble Creek tap to McNary-Santiam No 2 230kV line 230.0 T 0.10 386 Plan Maintenance SAL 139008
09/28/2003 00:52 09/28/2003 07:18 Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line 230.0 S 27.95 386 Plan Maintenance SAL 139008
09/28/2003 07:00 09/28/2003 16:33 Captain Jack-Olinda No 1 500kV line 500.0 L 148.86 573 Plan Foreign Request RED 138993
09/28/2003 12:23 09/28/2003 15:04 Hilltop-Bordertown No 1 345kV line 345.0 L 147.00 161 Auto Foreign Trouble RED 139009
09/28/2003 15:17 10/23/2003 09:38 Bonneville PH 1-North Bonneville No 1 230kV line 230.0 L 0.84 35661 Plan Foreign Request LGV 139010
09/28/2003 17:22 09/28/2003 17:32 Hilltop-Bordertown No 1 345kV line 345.0 L 147.00 10 Auto Foreign Trouble RED 139011
09/29/2003 00:46 09/29/2003 00:56 Little Goose PH-Little Goose No 1 500kV line 500.0 L 1.67 10 Auto Foreign Trouble Foreign Trouble SPK TRI 139012
09/29/2003 01:53 09/29/2003 05:50 John Day-Marion No 1 500kV line 500.0 L 127.51 237 Plan Voltage Control TDA RED SAL 139013
09/29/2003 06:05 09/29/2003 06:05 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 139020
09/29/2003 06:05 09/29/2003 06:05 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 139020
09/29/2003 06:05 09/29/2003 06:05 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139020
09/29/2003 06:05 09/29/2003 06:05 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 139020
09/29/2003 06:05 09/29/2003 06:05 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 139020
09/29/2003 06:05 09/29/2003 06:05 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 139020
09/29/2003 06:05 09/29/2003 06:05 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139020
09/29/2003 06:05 09/29/2003 06:05 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 139020
09/29/2003 07:02 11/15/2003 17:42 Raver-Echo Lake No 1 500kV line 500.0 L 11.93 68380 Plan Construction COV 139021
09/29/2003 07:06 10/03/2003 15:46 Cosmopolis-Aberdeen No 1 115kV line 115.0 L 6.79 6280 Plan Foreign Request OLY 139022
09/29/2003 07:28 09/29/2003 15:12 Paul-Allston No 2 500kV line 500.0 L 47.89 464 Plan Maintenance OLY LGV 139023
09/29/2003 08:01 09/29/2003 14:30 Bell-Addy No 1 115kV line 115.0 L G 51.18 389 Plan Maintenance SPK 139024
09/29/2003 08:01 09/29/2003 14:30 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S 22.34 389 Plan Maintenance SPK 139024
09/29/2003 08:22 09/29/2003 15:24 Ashe tap to Midway-HEW No 2 230kV line 230.0 T G 8.60 422 Plan Maintenance TRI 139025
09/29/2003 08:22 09/29/2003 15:24 Midway-HEW No 2 230kV line 230.0 L 23.89 422 Plan Maintenance TRI 139025
09/29/2003 08:59 09/29/2003 09:11 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 12 Auto Foreign Trouble TDA RED 139026
09/29/2003 08:59 09/29/2003 09:11 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 12 Auto Foreign Trouble TDA 139026
09/29/2003 09:08 10/24/2003 15:01 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 36353 Plan Maintenance OLY 139027
09/29/2003 09:08 10/24/2003 15:01 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 36353 Plan Maintenance OLY 139027
09/29/2003 09:22 10/03/2003 14:57 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 6095 Plan Maintenance SAL 139028
09/29/2003 12:27 09/29/2003 12:44 Rogue-Gold Beach No 2 115kV line 115.0 L 5.49 17 Plan Foreign Request EUG 139029
09/29/2003 12:31 10/01/2003 12:13 Rogue-Gold Beach No 1 115kV line 115.0 L 5.47 2862 Plan Switching EUG 139051
09/30/2003 00:14 09/30/2003 05:32 John Day-Marion No 1 500kV line 500.0 L 127.51 318 Plan Voltage Control TDA RED SAL 139030
09/30/2003 07:02 09/30/2003 19:03 Paul-Allston No 2 500kV line 500.0 L 47.89 721 Plan Fiber Optic Work OLY LGV 139034
09/30/2003 07:15 09/30/2003 13:48 Bell-Bigelow section of Bell-Trentwood No 2 115kV line 115.0 S 6.60 393 Plan Maintenance SPK 139035
09/30/2003 07:15 09/30/2003 13:48 Bell-Trentwood No 2 115kV line 115.0 L G 11.30 393 Plan Maintenance SPK 139035
09/30/2003 07:25 10/02/2003 13:57 Ice Harbor-Franklin No 3 115kV line 115.0 L 9.08 3272 Plan Foreign Request TRI 139036
09/30/2003 07:25 10/02/2003 13:57 Ice Harbor-Levey section of Ice Harbor-Franklin No 3 115kV line 115.0 S 0.88 3272 Plan Foreign Request TRI 139036
09/30/2003 07:25 10/02/2003 13:57 Levey-Franklin section of Ice Harbor-Franklin No 3 115kV line 115.0 S 8.20 3272 Plan Foreign Request TRI 139036
09/30/2003 07:25 10/03/2003 09:20 Ice Harbor-Franklin No 3 115kV line 115.0 L T 9.08 4435 Plan Maintenance TRI 139087
09/30/2003 07:25 10/03/2003 09:20 Levey tap to Ice Harbor-Franklin No 3 115kV line 115.0 T 0.10 4435 Plan Maintenance TRI 139087
09/30/2003 08:00 10/01/2003 13:38 Sifton-Ross No 1 115kV line 115.0 L 8.49 1778 Plan Maintenance LGV 139037
09/30/2003 08:12 10/06/2003 13:51 Ross-Alcoa No 2&4 115kV line 115.0 L 8.23 8979 Plan Maintenance LGV 139038
09/30/2003 09:47 10/04/2003 12:35 Blue River-Thurston section of Cougar-Thurston No 1 115kV line 115.0 S 34.24 5928 Plan Foreign Request EUG 139039
09/30/2003 09:47 10/04/2003 12:35 Cougar-Thurston No 1 115kV line 115.0 L G 39.99 5928 Plan Foreign Request EUG 139039
09/30/2003 13:11 10/03/2003 11:13 Palisades-Goshen No 1 115kV line 115.0 L 51.71 4202 Plan Maintenance IDF 139040
09/30/2003 22:26 10/01/2003 02:06 Schultz-Raver No 2 500kV line 500.0 L 77.24 220 Plan Testing WEN COV 139041
09/30/2003 22:33 09/30/2003 22:33 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 0 Auto Improper Relaying Improper Relaying WEN 139042
10/01/2003 00:09 10/01/2003 05:40 John Day-Marion No 1 500kV line 500.0 L 127.51 331 Plan Voltage Control TDA RED SAL 139043
10/01/2003 02:29 10/01/2003 02:29 Schultz-Raver No 2 500kV line 500.0 L 77.24 0 Auto Staged Test Staged Test WEN COV 139067
10/01/2003 02:52 10/01/2003 05:37 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 165 Plan Voltage Control RED 139045
10/01/2003 06:18 10/01/2003 06:18 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 139052
10/01/2003 06:18 10/01/2003 06:18 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 139052
10/01/2003 06:18 10/01/2003 06:18 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 139052
10/01/2003 07:00 10/03/2003 10:27 Bell-Trentwood No 2 115kV line 115.0 L T 11.30 3087 Plan Maintenance SPK 139053
10/01/2003 07:00 10/03/2003 10:27 Green Bluff tap to Bell-Trentwood No 2 115kV line 115.0 T 7.35 3087 Plan Maintenance SPK 139053
10/01/2003 08:03 10/05/2003 21:27 Boundary-Nelway No 1 230kV line 230.0 L 2.40 6564 Plan Foreign Request SPK 139054
10/01/2003 08:12 10/01/2003 13:04 Bell-Addy No 1 115kV line 115.0 L G 51.18 292 Plan Forced SPK 139055
10/01/2003 08:12 10/01/2003 13:04 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S 22.34 292 Plan Forced SPK 139055
10/01/2003 08:46 10/01/2003 15:11 Bandon-Rogue No 1 115kV line 115.0 L G 46.00 385 Plan Maintenance EUG 139056
10/01/2003 08:46 10/01/2003 15:11 Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line 115.0 S 21.50 385 Plan Maintenance EUG 139056
10/01/2003 10:12 10/01/2003 10:36 The Dalles PH-Big Eddy No 6 230kV line 230.0 L 0.95 24 Auto Foreign Trouble Foreign Utility TDA 139057
10/01/2003 10:16 10/01/2003 17:06 Goble-Rainier section of St Helens-Allston No 1 115kV line 115.0 S 5.30 410 Plan Foreign Request LGV 139058
10/01/2003 10:16 10/01/2003 17:06 St Helens-Allston No 1 115kV line 115.0 L G 25.22 410 Plan Foreign Request LGV 139058
10/01/2003 10:19 10/01/2003 16:18 Rainier-Allston section of St Helens-Allston No 1 115kV line 115.0 S 6.25 359 Plan Foreign Request LGV 139059
10/01/2003 10:19 10/01/2003 16:18 St Helens-Allston No 1 115kV line 115.0 L O 25.22 359 Plan Foreign Request LGV 139059
10/01/2003 12:13 10/01/2003 12:22 Rogue-Gold Beach No 2 115kV line 115.0 L 5.49 9 Plan Switching EUG 139060
10/01/2003 19:41 10/01/2003 20:11 Hilltop-Bordertown No 1 345kV line 345.0 L 147.00 30 Plan Foreign Request RED 139061
10/01/2003 21:09 10/01/2003 21:09 Schultz-Raver No 2 500kV line 500.0 L 77.24 0 Auto Staged Test Staged Test WEN COV 139062
10/01/2003 21:33 10/01/2003 21:36 Schultz-Raver No 2 500kV line 500.0 L 77.24 3 Auto Staged Test Staged Test WEN COV 139063
10/01/2003 23:47 10/01/2003 23:47 Schultz-Raver No 2 500kV line 500.0 L 77.24 0 Auto Staged Test Staged Test WEN COV 139064
10/02/2003 00:08 10/02/2003 00:23 Schultz-Raver No 2 500kV line 500.0 L 77.24 15 Auto Staged Test Staged Test WEN COV 139065
10/02/2003 06:01   Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 still out Plan Maintenance TDA RED 139070
10/02/2003 06:01   Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T still out Plan Maintenance TDA 139070
10/02/2003 06:01   Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T still out Plan Maintenance TDA 139070
10/02/2003 06:01   Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T still out Plan Maintenance TDA 139070
10/02/2003 06:01   Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 still out Plan Maintenance TDA RED 139071
10/02/2003 06:01 10/22/2003 15:48 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 29387 Plan Maintenance TDA 139071
10/02/2003 06:01 10/22/2003 15:48 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 29387 Plan Maintenance TDA 139071
10/02/2003 06:01   Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T still out Plan Maintenance TDA 139071
10/02/2003 06:01 10/22/2003 15:48 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 29387 Plan Maintenance TDA 139071
10/02/2003 06:01   Big Eddy-Celilo No 3 230kV line 230.0 L 1.09 still out Plan Switching TDA 139072
10/02/2003 06:01 10/20/2003 15:47 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 26506 Plan Switching TDA 139073
10/02/2003 07:11 11/28/2003 09:17 Fairview-Bandon No 2 115kV line 115.0 L 19.73 82266 Plan Foreign Request EUG 139074
10/02/2003 07:30 10/02/2003 15:13 Olympia-Dayton section of Olympia-Shelton No 1 115kV line 115.0 S 17.95 463 Plan Maintenance OLY 139075
10/02/2003 07:30 10/02/2003 15:13 Olympia-Shelton No 1 115kV line 115.0 L G 19.73 463 Plan Maintenance OLY 139075
10/02/2003 08:05 10/02/2003 11:43 White Bluffs-Snyder section of White Bluffs-Stevens Drive No 2 115kV line 115.0 S 1.90 218 Plan Foreign Request TRI 139076
10/02/2003 08:05 10/02/2003 11:43 White Bluffs-Stevens Drive No 2 115kV line 115.0 L G 6.90 218 Plan Foreign Request TRI 139076
10/02/2003 08:20 10/03/2003 13:21 Midway-Moxee No 1 115kV line 115.0 L G 33.98 1741 Plan Maintenance TRI WEN 139077
10/02/2003 08:20 10/03/2003 13:21 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S 16.61 1741 Plan Maintenance TRI WEN 139077
10/02/2003 08:21 10/02/2003 09:54 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 93 Plan Maintenance EUG 139078
10/02/2003 08:21 10/02/2003 09:54 Sumner-Fairview section of Reedsport-Fairview No 1 115kV line 115.0 S 5.36 93 Plan Maintenance EUG 139078
10/02/2003 08:58 10/02/2003 10:56 Jim Creek Service No 1 115kV line 115.0 L 9.57 118 Plan Foreign Request SNO 139079
10/02/2003 10:04 10/02/2003 10:05 Broadview-Garrison No 2 500kV line 500.0 L 224.71 1 Auto Unknown Unknown KAL 139080
10/02/2003 11:57 10/20/2003 10:36 White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 25839 Plan Normally Out TRI 139081
10/02/2003 11:57 10/20/2003 10:36 White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line 115.0 S 4.30 25839 Plan Normally Out TRI 139081
10/02/2003 20:59 10/03/2003 02:09 Schultz-Raver No 2 500kV line 500.0 L 77.24 310 Plan Testing WEN COV 139082
10/03/2003 01:06 10/03/2003 01:06 Schultz-Raver No 1 500kV line 500.0 L 77.24 0 Auto Staged Test Staged Test WEN COV 139083
10/03/2003 06:41 10/03/2003 10:21 Canal tap to Minidoka PH-Unity No 1 138kV line 138.0 T 2.67 220 Auto Terminal Equipment Failure Terminal Equipment Failure IDF 139088
10/03/2003 06:41 10/03/2003 08:03 Canal-East Hills section of Minidoka PH-Unity No 1 138kV line 138.0 S 6.42 82 Auto Terminal Equipment Failure Terminal Equipment Failure IDF 139088
10/03/2003 06:41 10/03/2003 08:03 East Hills tap to Minidoka PH-Unity No 1 138kV line 138.0 T 0.10 82 Auto Terminal Equipment Failure Terminal Equipment Failure IDF 139088
10/03/2003 06:41 10/03/2003 08:03 East Hills-Unity section of Minidoka PH-Unity No 1 138kV line 138.0 S 5.97 82 Auto Terminal Equipment Failure Terminal Equipment Failure IDF 139088
10/03/2003 06:41 10/03/2003 08:11 Minidoka PH-Canal section of Minidoka PH-Unity No 1 138kV line 138.0 S 12.52 90 Auto Terminal Equipment Failure Terminal Equipment Failure IDF 139088
10/03/2003 06:41 10/03/2003 08:11 Minidoka PH-Unity No 1 138kV line 138.0 L G 24.91 90 Auto Terminal Equipment Failure Terminal Equipment Failure IDF 139088
10/03/2003 06:41 10/03/2003 13:38 Canal-Jackson section of Canal-Second Lift No 1 34.5kV line 34.5 S 0.00 417 Auto Forced (Configuration) Forced (Configuration) IDF 139089
10/03/2003 06:41 10/03/2003 13:38 Canal-Second Lift No 1 34.5kV line 34.5 L O 1.00 417 Auto Forced (Configuration) Forced (Configuration) IDF 139089
10/03/2003 06:41 10/03/2003 13:38 Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 T 5.50 417 Auto Forced (Configuration) Forced (Configuration) IDF 139089
10/03/2003 06:41 10/03/2003 13:38 Jackson tap-Newcomb section of Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 TS 4.20 417 Auto Forced (Configuration) Forced (Configuration) IDF 139089
10/03/2003 06:41 10/03/2003 13:38 Newcomb tap to Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 TT 0.10 417 Auto Forced (Configuration) Forced (Configuration) IDF 139089
10/03/2003 06:41 10/03/2003 13:38 Newcomb-Jackson section of Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 TS 1.30 417 Auto Forced (Configuration) Forced (Configuration) IDF 139089
10/03/2003 06:41 10/03/2003 13:38 Canal-Jackson section of Canal-Second Lift No 2 34.5kV line 34.5 S G 0.00 417 Auto Forced (Configuration) Forced (Configuration) IDF 139090
10/03/2003 06:41 10/03/2003 13:38 Canal-Second Lift No 2 34.5kV line 34.5 L 1.00 417 Auto Forced (Configuration) Forced (Configuration) IDF 139090
10/03/2003 06:41 10/03/2003 13:38 Jackson-Second Lift section of Canal-Second Lift No 2 34.5kV line 34.5 S G 1.00 417 Auto Forced (Configuration) Forced (Configuration) IDF 139090
10/03/2003 07:30 10/03/2003 14:59 Olympia-Kitsap No 3 230kV line 230.0 L 50.26 449 Plan Maintenance OLY 139091
10/03/2003 08:15 10/03/2003 11:37 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 202 Plan Maintenance SPK 139092
10/03/2003 09:04 10/03/2003 20:46 Summer Lake-Malin No 1 500kV line 500.0 L 75.12 702 Plan Maintenance RED 139093
10/03/2003 09:27   Ice Harbor-Franklin No 2 115kV line 115.0 L T 9.07 still out Plan Normally Out TRI 139094
10/03/2003 09:27   Martindale tap to Ice Harbor-Franklin No 2 115kV line 115.0 T 0.10 still out Plan Normally Out TRI 139094
10/03/2003 10:08 10/03/2003 14:14 Canal-East Hills section of Minidoka PH-Unity No 1 138kV line 138.0 S 6.42 246 Plan Testing IDF 139095
10/03/2003 10:08 10/03/2003 14:14 Minidoka PH-Unity No 1 138kV line 138.0 L G 24.91 246 Plan Testing IDF 139095
10/03/2003 11:31 10/03/2003 12:49 Canal tap to Minidoka PH-Unity No 1 138kV line 138.0 T 2.67 78 Auto Terminal Equipment Failure Forced (Configuration) IDF 139096
10/03/2003 11:31 10/03/2003 12:49 Minidoka PH-Canal section of Minidoka PH-Unity No 1 138kV line 138.0 S 12.52 78 Auto Terminal Equipment Failure Forced (Configuration) IDF 139096
10/03/2003 11:31 10/03/2003 12:49 Minidoka PH-Unity No 1 138kV line 138.0 L O 24.91 78 Auto Terminal Equipment Failure Forced (Configuration) IDF 139096
10/04/2003 04:37 10/04/2003 07:53 Ashe-Marion No 2 500kV line 500.0 L 224.01 196 Plan Voltage Control TRI TDA RED SAL 139097
10/05/2003 00:04 10/05/2003 08:51 Ashe-Marion No 2 500kV line 500.0 L 224.01 527 Plan Voltage Control TRI TDA RED SAL 139100
10/05/2003 02:22 10/05/2003 03:06 Palisades-Goshen No 1 115kV line 115.0 L 51.71 44 Auto Unknown Unknown IDF 139101
10/05/2003 23:03 10/06/2003 05:27 John Day-Marion No 1 500kV line 500.0 L 127.51 384 Plan Voltage Control TDA RED SAL 139102
10/06/2003 00:23 10/06/2003 06:06 Schultz-Raver No 4 500kV line 500.0 L 77.43 343 Plan Voltage Control WEN COV 139103
10/06/2003 00:27 10/06/2003 05:58 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 331 Plan Voltage Control RED 139104
10/06/2003 07:00 10/06/2003 07:43 McNary PH-McNary No 5 230kV line 230.0 L 1.28 43 Plan Foreign Request TRI 139112
10/06/2003 07:11 10/06/2003 16:38 Harvalum-Big Eddy No 1 230kV line 230.0 L 23.34 567 Plan Forced TDA 139113
10/06/2003 07:20 10/06/2003 16:38 The Dalles PH-Big Eddy No 5 230kV line 230.0 L 0.92 558 Plan Forced TDA 139114
10/06/2003 07:20 10/06/2003 16:42 The Dalles PH-Big Eddy No 6 230kV line 230.0 L 0.95 562 Plan Forced TDA 139115
10/06/2003 07:24 10/06/2003 16:37 Big Eddy 500/230kV Tie No 2 500kV line 500.0 L 0.41 553 Plan Switching TDA 139116
10/06/2003 07:34 10/06/2003 14:12 Ashe-White Bluffs No 1 230kV line 230.0 L 9.52 398 Plan Forced TRI 139117
10/06/2003 09:20 10/06/2003 14:28 Bell-Addy No 1 115kV line 115.0 L G 51.18 308 Plan Maintenance SPK 139118
10/06/2003 09:20 10/06/2003 14:28 Mead-Colbert section of Bell-Addy No 1 115kV line 115.0 S 4.95 308 Plan Maintenance SPK 139118
10/06/2003 09:22 10/09/2003 11:10 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 4428 Plan Maintenance KAL SPK 139119
10/06/2003 09:22 10/09/2003 11:10 Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line 115.0 S 6.23 4428 Plan Maintenance SPK 139119
10/06/2003 12:11 10/09/2003 08:58 Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 S 19.40 4127 Plan Maintenance SPK 139120
10/06/2003 12:11 10/09/2003 08:58 Sand Creek-Bonners Ferry No 1&2 115kV line 115.0 L G 52.68 4127 Plan Maintenance SPK 139120
10/06/2003 12:15 10/06/2003 13:56 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 101 Plan Maintenance SAL 139121
10/06/2003 12:15 10/06/2003 13:56 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S 12.20 101 Plan Maintenance SAL 139121
10/06/2003 12:18 10/06/2003 13:56 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 98 Plan Maintenance SAL 139122
10/06/2003 12:18 10/06/2003 13:56 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 98 Plan Maintenance SAL 139122
10/06/2003 13:56 10/16/2003 16:35 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 14559 Plan Maintenance SAL 139123
10/06/2003 13:56 10/16/2003 16:35 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S 8.04 14559 Plan Maintenance SAL 139123
10/06/2003 15:40 10/06/2003 15:52 Allston-PGE Beaver No 1 230kV line 230.0 L 9.20 12 Auto Construction Construction LGV 139124
10/06/2003 17:37 10/07/2003 02:10 Wendson-Tahkenitch No 2 230kV line 230.0 L 19.99 513 Auto Line Material Failure Weather EUG 139125
10/06/2003 22:53 10/06/2003 23:07 McMinnville-PGE Dayton No 1 115kV line 115.0 L 4.50 14 Plan Foreign Request SAL 139126
10/06/2003 23:56 10/07/2003 05:49 Ashe-Marion No 2 500kV line 500.0 L 224.01 353 Plan Voltage Control TRI TDA RED SAL 139127
10/07/2003 00:58 10/07/2003 06:11 Schultz-Raver No 4 500kV line 500.0 L 77.43 313 Plan Voltage Control WEN COV 139128
10/07/2003 04:00 10/22/2003 15:48 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 22308 Plan Maintenance TDA RED 139129
10/07/2003 04:00 10/22/2003 15:48 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 22308 Plan Maintenance TDA 139129
10/07/2003 04:00 10/22/2003 15:48 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 22308 Plan Maintenance TDA RED 139130
10/07/2003 04:00 10/22/2003 15:48 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 22308 Plan Maintenance TDA 139130
10/07/2003 04:03 10/20/2003 15:47 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 19424 Plan Switching TDA 139131
10/07/2003 04:03 10/20/2003 15:47 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 19424 Plan Switching TDA 139132
10/07/2003 06:57 10/07/2003 16:21 Pearl-Sherwood No 1&2 230kV line 230.0 L 9.67 564 Plan Construction SAL 139139
10/07/2003 06:57 10/07/2003 16:21 McLoughlin-Sherwood No 1 230kV line 230.0 L G 16.24 564 Plan Construction LGV SAL 139140
10/07/2003 06:57 10/07/2003 16:21 Pearl-Sherwood section of McLoughlin-Sherwood No 1 230kV line 230.0 S 4.57 564 Plan Construction SAL 139140
10/07/2003 07:03 10/07/2003 15:00 Dayton-Shelton section of Olympia-Shelton No 1 115kV line 115.0 S 1.78 477 Plan Maintenance OLY 139141
10/07/2003 07:03 10/07/2003 15:00 Olympia-Shelton No 1 115kV line 115.0 L G 19.73 477 Plan Maintenance OLY 139141
10/07/2003 07:44 10/07/2003 15:19 Ashe tap to Midway-HEW No 2 230kV line 230.0 T 8.60 455 Plan Forced TRI 139142
10/07/2003 07:44 10/07/2003 15:19 Midway-HEW No 2 230kV line 230.0 L T 23.89 455 Plan Forced TRI 139142
10/07/2003 08:09 10/07/2003 13:38 Vantage-Hanford No 1 500kV line 500.0 L 23.46 329 Plan Switching WEN TRI 139143
10/07/2003 08:11 10/07/2003 13:38 Carmen Smith tap to Cougar-Thurston No 1 115kV line 115.0 T 18.00 327 Plan Foreign Request EUG 139144
10/07/2003 08:11 10/07/2003 13:38 Cougar-Thurston No 1 115kV line 115.0 L T 39.99 327 Plan Foreign Request EUG 139144
10/07/2003 08:30 10/07/2003 10:43 B-1345-B-1605 section of McNary-Badger Canyon No 1 115kV line 115.0 S 0.34 133 Auto Foreign Trouble Foreign Trouble TRI 139145
10/07/2003 08:30 10/07/2003 10:29 B-1605-B-1014 section of McNary-Badger Canyon No 1 115kV line 115.0 S 2.14 119 Auto Foreign Trouble Foreign Trouble TRI 139145
10/07/2003 08:30 10/07/2003 10:29 H2F-Nine Canyon section of McNary-Badger Canyon No 1 115kV line 115.0 S 12.58 119 Auto Foreign Trouble Foreign Trouble TRI 139145
10/07/2003 08:30 10/07/2003 10:21 McNary-B-1345 section of McNary-Badger Canyon No 1 115kV line 115.0 S 2.53 111 Auto Foreign Trouble Foreign Trouble TRI 139145
10/07/2003 08:30 10/07/2003 10:43 McNary-Badger Canyon No 1 115kV line 115.0 L G 28.40 133 Auto Foreign Trouble Foreign Trouble TRI 139145
10/07/2003 08:30 10/07/2003 10:29 Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line 115.0 S 10.81 119 Auto Foreign Trouble Foreign Trouble TRI 139145
10/07/2003 08:52 10/07/2003 13:38 Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line 115.0 S 3.63 286 Plan Foreign Request EUG 139146
10/07/2003 08:52 10/07/2003 13:58 Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line 115.0 S 2.12 306 Plan Foreign Request EUG 139146
10/07/2003 08:52 10/07/2003 13:58 Cougar-Thurston No 1 115kV line 115.0 L G 39.99 306 Plan Foreign Request EUG 139146
10/07/2003 09:02 10/07/2003 15:04 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 362 Plan Maintenance RED 139147
10/07/2003 12:58 10/07/2003 13:01 Broadview-Garrison No 2 500kV line 500.0 L 224.71 3 Auto Improper Relaying Maintenance KAL 139148
10/07/2003 16:51 10/10/2003 15:03 McNary PH-McNary No 2 230kV line 230.0 L 1.06 4212 Plan Maintenance TRI 139149
10/07/2003 23:09 10/07/2003 23:09 Buckley-Grizzly No 1 500kV line 500.0 L 53.60 0 Auto Unknown Unknown TDA RED 139150
10/08/2003 00:13 10/08/2003 06:13 Schultz-Raver No 4 500kV line 500.0 L 77.43 360 Plan Voltage Control WEN COV 139151
10/08/2003 00:28 10/08/2003 05:41 Ashe-Marion No 2 500kV line 500.0 L 224.01 313 Plan Voltage Control TRI TDA RED SAL 139152
10/08/2003 00:41 10/08/2003 00:41 Buckley-Grizzly No 1 500kV line 500.0 L 53.60 0 Auto Unknown Unknown TDA RED 139153
10/08/2003 03:00 10/08/2003 03:00 Buckley-Grizzly No 1 500kV line 500.0 L 53.60 0 Auto Unknown Unknown TDA RED 139154
10/08/2003 07:27 10/16/2003 10:07 Tacoma-TPWR Northeast No 2 230kV line 230.0 L 0.10 11680 Plan Foreign Request COV 139158
10/08/2003 08:02 10/08/2003 16:43 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 521 Plan Maintenance RED 139159
10/08/2003 08:08 10/08/2003 15:10 Dayton-Shelton section of Olympia-Shelton No 1 115kV line 115.0 S 1.78 422 Plan Maintenance OLY 139160
10/08/2003 08:08 10/08/2003 15:10 Olympia-Shelton No 1 115kV line 115.0 L G 19.73 422 Plan Maintenance OLY 139160
10/08/2003 08:17 10/08/2003 16:42 North Bonneville-Troutdale No 1 230kV line 230.0 L 27.74 505 Plan Maintenance LGV 139161
10/08/2003 08:18 10/08/2003 16:42 North Bonneville-Troutdale No 2 230kV line 230.0 L 27.77 504 Plan Maintenance LGV 139162
10/09/2003 01:02 10/09/2003 05:56 Schultz-Raver No 4 500kV line 500.0 L 77.43 294 Plan Voltage Control WEN COV 139163
10/09/2003 01:20 10/09/2003 05:33 John Day-Marion No 1 500kV line 500.0 L 127.51 253 Plan Voltage Control TDA RED SAL 139164
10/09/2003 02:57 10/09/2003 05:37 Schultz-Raver No 3 500kV line 500.0 L 77.47 160 Plan Voltage Control WEN COV 139165
10/09/2003 03:57 10/09/2003 06:39 Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line 115.0 S 29.43 162 Auto Unknown Unknown WEN TRI 139166
10/09/2003 03:57 10/09/2003 06:39 Ellensburg-Moxee No 1 115kV line 115.0 L G 30.81 162 Auto Unknown Unknown WEN TRI 139166
10/09/2003 03:57 10/10/2003 12:01 Midway-Moxee No 1 115kV line 115.0 L G 33.98 1924 Auto Equipment/Miscellaneous Unknown TRI WEN 139167
10/09/2003 03:57 10/09/2003 03:57 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S 16.61 0 Auto Equipment/Miscellaneous Unknown TRI WEN 139167
10/09/2003 03:57 10/09/2003 03:57 Rattlesnake tap to Midway-Moxee No 1 115kV line 115.0 T 0.01 0 Auto Equipment/Miscellaneous Unknown WEN 139167
10/09/2003 03:57 10/10/2003 12:01 Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line 115.0 S 17.37 1924 Auto Equipment/Miscellaneous Unknown WEN 139167
10/09/2003 03:57 10/09/2003 06:43 Moxee-Union Gap No 1 115kV line 115.0 L 6.50 166 Auto Unknown TRI 139168
10/09/2003 03:57 10/09/2003 06:49 Moxee-Roza No 1 115kV line 115.0 L 5.30 172 Auto Unknown Unknown TRI WEN 139177
10/09/2003 06:01 10/10/2003 20:22 Monroe-Custer No 1 500kV line 500.0 L 86.83 2301 Plan Fiber Optic Work SNO 139178
10/09/2003 06:29 10/09/2003 13:54 Big Eddy 500/230kV Tie No 2 500kV line 500.0 L 0.41 445 Plan Maintenance TDA 139179
10/09/2003 06:53 10/09/2003 17:49 La Grande-IPC Brownlee No 1 230kV line 230.0 L 79.30 656 Plan Foreign Request TRI 139180
10/09/2003 06:53 10/09/2003 17:49 Quartz tap to La Grande-IPC Brownlee No 1 230kV line 230.0 T G 10.30 656 Plan Foreign Request TRI 139180
10/09/2003 07:01 10/09/2003 17:19 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 618 Plan Foreign Request TRI SPK 139181
10/09/2003 07:08 10/09/2003 15:48 Olympia-Shelton No 2 115kV line 115.0 L G 19.73 520 Plan Maintenance OLY 139182
10/09/2003 07:08 10/09/2003 15:48 Skookum-Shelton section of Olympia-Shelton No 2 115kV line 115.0 S 6.96 520 Plan Maintenance OLY 139182
10/09/2003 07:19 10/09/2003 17:40 Dworshak-Taft No 1 500kV line 500.0 L 90.38 621 Plan Construction SPK KAL 139183
10/09/2003 07:30 10/09/2003 13:56 Harvalum-Big Eddy No 1 230kV line 230.0 L 23.34 386 Plan Forced TDA 139184
10/09/2003 07:33 10/09/2003 15:30 Troutdale-PACW Linneman No 1 230kV line 230.0 L 6.54 477 Plan Maintenance LGV 139185
10/09/2003 07:38 10/09/2003 13:58 The Dalles PH-Big Eddy No 5 230kV line 230.0 L 0.92 380 Plan Forced TDA 139186
10/09/2003 07:39 10/09/2003 13:58 The Dalles PH-Big Eddy No 6 230kV line 230.0 L 0.95 379 Plan Forced TDA 139187
10/09/2003 08:14 10/09/2003 14:59 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 405 Plan Maintenance RED 139188
10/09/2003 11:12 10/10/2003 05:46 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 1114 Plan Maintenance KAL SPK 139189
10/09/2003 11:12 10/10/2003 05:46 Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line 115.0 S 11.58 1114 Plan Maintenance KAL SPK 139189
10/09/2003 12:53 10/09/2003 12:55 Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line 230.0 S G 23.44 2 Auto Lightning Lightning TDA 139190
10/09/2003 12:53 10/09/2003 12:55 Big Eddy-Troutdale No 1 230kV line 230.0 L 77.43 2 Auto Lightning Lightning TDA LGV 139190
10/09/2003 12:53 10/09/2003 12:55 Parkdale tap to Big Eddy-Troutdale No 1 230kV line 230.0 T G 0.10 2 Auto Lightning Lightning TDA 139190
10/09/2003 12:53 10/09/2003 12:55 Parkdale-Troutdale section of Big Eddy-Troutdale No 1 230kV line 230.0 S G 53.99 2 Auto Lightning Lightning TDA LGV 139190
10/09/2003 13:56 10/10/2003 14:07 Garrison-Taft No 2 500kV line 500.0 L 159.38 1451 Plan Voltage Control KAL 139191
10/10/2003 00:01 10/10/2003 05:51 Schultz-Raver No 4 500kV line 500.0 L 77.43 350 Plan Voltage Control WEN COV 139192
10/10/2003 01:43 10/10/2003 05:33 Schultz-Raver No 3 500kV line 500.0 L 77.47 230 Plan Voltage Control WEN COV 139193
10/10/2003 01:56 10/10/2003 05:09 John Day-Marion No 1 500kV line 500.0 L 127.51 193 Plan Voltage Control TDA RED SAL 139194
10/10/2003 07:02 10/10/2003 15:21 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 499 Plan Foreign Request TRI SPK 139202
10/10/2003 07:22 10/10/2003 14:20 Olympia-Dayton section of Olympia-Shelton No 1 115kV line 115.0 S 17.95 418 Plan Maintenance OLY 139203
10/10/2003 07:22 10/10/2003 14:20 Olympia-Shelton No 1 115kV line 115.0 L G 19.73 418 Plan Maintenance OLY 139203
10/10/2003 10:21 10/10/2003 19:09 Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line 230.0 S 25.06 528 Plan Emergency KAL 139204
10/10/2003 10:21 10/10/2003 19:09 Hot Springs-Rattlesnake No 1 230kV line 230.0 L G 58.91 528 Plan Emergency KAL 139204
10/10/2003 14:14 10/11/2003 03:20 Garrison-Taft No 1 500kV line 500.0 L 159.38 786 Plan Voltage Control KAL 139205
10/10/2003 14:20 10/10/2003 14:20 Alvey-Fairview No 1 230kV line 230.0 L 97.46 0 Auto Unknown Smoke EUG 139206
10/10/2003 14:20 10/10/2003 14:20 Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line 230.0 S G 19.14 0 Auto Unknown Smoke EUG 139206
10/10/2003 14:20 10/10/2003 14:20 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S G 50.95 0 Auto Unknown Smoke EUG 139206
10/10/2003 14:20 10/10/2003 14:20 Martin Creek tap to Alvey-Fairview No 1 230kV line 230.0 T G 0.27 0 Auto Unknown Smoke EUG 139206
10/10/2003 14:20 10/10/2003 14:20 Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line 230.0 S G 27.37 0 Auto Unknown Smoke EUG 139206
10/10/2003 22:59 10/11/2003 06:51 Schultz-Raver No 4 500kV line 500.0 L 77.43 472 Plan Voltage Control WEN COV 139207
10/10/2003 23:32 10/12/2003 06:48 John Day-Marion No 1 500kV line 500.0 L 127.51 1876 Plan Voltage Control TDA RED SAL 139208
10/11/2003 01:27 10/13/2003 05:12 Schultz-Raver No 1 500kV line 500.0 L 77.24 3105 Plan Voltage Control WEN COV 139209
10/11/2003 01:35 10/11/2003 06:48 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 313 Plan Voltage Control RED 139210
10/11/2003 03:22 10/12/2003 01:57 Garrison-Taft No 2 500kV line 500.0 L 159.38 1355 Plan Voltage Control KAL 139211
10/11/2003 10:02 10/11/2003 14:33 Echo Lake-Monroe No 1 500kV line 500.0 L T 29.98 271 Plan Construction COV SNO 139214
10/11/2003 10:02 10/11/2003 14:33 Sno-King tap to Echo Lake-Monroe No 1 500kV line 500.0 T 12.82 271 Plan Construction SNO 139214
10/12/2003 00:29 10/13/2003 05:53 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1764 Plan Voltage Control RED 139215
10/12/2003 02:01 10/12/2003 13:58 Garrison-Taft No 1 500kV line 500.0 L 159.38 717 Plan Voltage Control KAL 139216
10/12/2003 14:00 10/12/2003 19:37 Garrison-Taft No 2 500kV line 500.0 L 159.38 337 Plan Voltage Control KAL 139218
10/12/2003 15:38 10/14/2003 00:20 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 1962 Auto Foreign Trouble RED 139219
10/12/2003 15:38 10/14/2003 00:20 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 1962 Auto Foreign Trouble IDF RED 139219
10/12/2003 15:38 10/14/2003 00:20 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 1962 Auto Foreign Trouble IDF RED 139219
10/12/2003 16:26 10/12/2003 16:26 Monroe-Custer No 1 500kV line 500.0 L 86.83 0 Auto Lightning Lightning SNO 139220
10/12/2003 23:57 10/13/2003 04:29 Ashe-Marion No 2 500kV line 500.0 L 224.01 272 Plan Voltage Control TRI TDA RED SAL 139221
10/13/2003 00:01 10/13/2003 05:39 Schultz-Raver No 4 500kV line 500.0 L 77.43 338 Plan Voltage Control WEN COV 139222
10/13/2003 01:43 10/13/2003 05:03 John Day-Grizzly No 1 500kV line 500.0 L 88.41 200 Plan Voltage Control TDA RED 144148
10/13/2003 05:55 10/13/2003 06:35 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 40 Plan Voltage Control RED 139223
10/13/2003 07:47 10/14/2003 15:05 St Johns-PACW St Johns No 1 115kV line 115.0 L 1.60 1878 Plan Foreign Request LGV 139225
10/13/2003 10:50 10/24/2003 12:21 Ross-Alcoa No 3 230kV line 230.0 L 4.29 15931 Plan Maintenance LGV 139226
10/13/2003 18:52 10/13/2003 18:53 Schultz-Raver No 2 500kV line 500.0 L 77.24 1 Auto Unknown Terminal Equipment Failure WEN COV 139227
10/13/2003 18:54 10/14/2003 11:58 Schultz-Raver No 2 500kV line 500.0 L 77.24 1024 Auto Unknown Terminal Equipment Failure WEN COV 139228
10/13/2003 22:14 10/14/2003 06:02 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 468 Plan Voltage Control RED 139229
10/14/2003 07:35 10/14/2003 15:20 Chehalis-Mayfield No 1 230kV line 230.0 L G 21.37 465 Plan Maintenance OLY 139241
10/14/2003 07:35 10/14/2003 15:20 Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line 230.0 S 20.20 465 Plan Maintenance OLY 139241
10/14/2003 07:35 10/14/2003 15:20 Chehalis-Centralia Switching Station section of Chehalis-Covington No 1 230kV line 230.0 S 10.30 465 Plan Maintenance OLY 139242
10/14/2003 07:35 10/14/2003 15:20 Chehalis-Covington No 1 230kV line 230.0 L G 69.40 465 Plan Maintenance OLY COV 139242
10/14/2003 07:35 10/14/2003 15:20 Longview-Chehalis 1&3 No 3 230kV line 230.0 L 31.13 465 Plan Maintenance LGV OLY 139243
10/14/2003 07:50 10/14/2003 14:40 Allston-Astoria No 1 115kV line 115.0 L T 41.98 410 Plan Maintenance LGV 139244
10/14/2003 07:50 10/14/2003 14:40 Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 18.27 410 Plan Maintenance LGV OLY 139244
10/14/2003 08:03 10/16/2003 14:11 Buckley-Grizzly No 1 500kV line 500.0 L 53.60 3248 Plan Maintenance TDA RED 139245
10/14/2003 08:16 10/14/2003 08:18 Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line 230.0 S 71.70 2 Plan Switching TDA TRI 139246
10/14/2003 08:16 10/14/2003 08:18 Big Eddy-Midway No 1 230kV line 230.0 L G 102.80 2 Plan Switching TDA TRI 139246
10/14/2003 08:16 10/14/2003 08:18 Mabton tap to Big Eddy-Midway No 1 230kV line 230.0 T 0.10 2 Plan Switching TRI 139246
10/14/2003 08:16 10/14/2003 18:01 Big Eddy-Midway No 1 230kV line 230.0 L O 102.80 585 Plan Maintenance TDA TRI 139247
10/14/2003 08:16 10/14/2003 18:01 Mabton-Midway section of Big Eddy-Midway No 1 230kV line 230.0 S 31.10 585 Plan Maintenance TRI 139247
10/14/2003 09:40 10/17/2003 15:26 Allston-PGE Beaver No 1 230kV line 230.0 L 9.20 4666 Plan Maintenance LGV 139248
10/14/2003 10:15 10/14/2003 10:15 Cold Springs-Hat Rock section of McNary-Wallula 230kV line 230.0 S G 6.50 0 Auto Line Material Failure Contamination TRI 139249
10/14/2003 10:15 10/14/2003 10:15 Hat Rock tap to McNary-Wallula 230kV line 230.0 T G 0.43 0 Auto Line Material Failure Contamination TRI 139249
10/14/2003 10:15 10/14/2003 10:15 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S G 18.00 0 Auto Line Material Failure Contamination TRI 139249
10/14/2003 10:15 10/14/2003 10:15 McNary-Cold Springs section of McNary-Wallula 230kV line 230.0 S G 6.20 0 Auto Line Material Failure Contamination TRI 139249
10/14/2003 10:15 10/14/2003 10:15 McNary-Wallula 230kV line 230.0 L 30.70 0 Auto Line Material Failure Contamination TRI 139249
10/14/2003 11:15 10/16/2003 17:23 Cold Springs-Hat Rock section of McNary-Wallula 230kV line 230.0 S 6.50 3248 Plan Emergency TRI 139250
10/14/2003 11:15 10/16/2003 17:23 Hat Rock tap to McNary-Wallula 230kV line 230.0 T 0.43 3248 Plan Emergency TRI 139250
10/14/2003 11:15 10/16/2003 17:23 Hat Rock-PACW Wallula section of McNary-Wallula 230kV line 230.0 S 18.00 3248 Plan Emergency TRI 139250
10/14/2003 11:15 10/14/2003 11:43 McNary-Cold Springs section of McNary-Wallula 230kV line 230.0 S 6.20 28 Plan Emergency TRI 139250
10/14/2003 11:15 10/16/2003 17:23 McNary-Wallula 230kV line 230.0 L G 30.70 3248 Plan Emergency TRI 139250
10/14/2003 11:28 10/14/2003 11:53 Fern Ridge tap to Lane-Wendson No 1 115kV line 115.0 T 0.10 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Fern Ridge-Noti Creek section of Lane-Wendson No 1 115kV line 115.0 S 2.82 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Lane-Rainbow section of Lane-Wendson No 1 115kV line 115.0 S 0.85 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 12:59 Lane-Wendson No 1 115kV line 115.0 L G 41.39 91 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Mapleton-Wendson section of Lane-Wendson No 1 115kV line 115.0 S 8.00 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Noti Creek tap to Lane-Wendson No 1 115kV line 115.0 T 0.10 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Noti Creek-Walton section of Lane-Wendson No 1 115kV line 115.0 S 9.52 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Rainbow Valley tap to Lane-Wendson No 1 115kV line 115.0 T 3.29 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Rainbow-Fern Ridge section of Lane-Wendson No 1 115kV line 115.0 S 5.58 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 11:53 Walton tap to Lane-Wendson No 1 115kV line 115.0 T 0.10 25 Plan Emergency EUG 139251
10/14/2003 11:28 10/14/2003 12:59 Walton-Mapleton section of Lane-Wendson No 1 115kV line 115.0 S 14.62 91 Plan Emergency EUG 139251
10/14/2003 18:00 10/14/2003 18:01 Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line 230.0 S 71.70 1 Plan Switching TDA TRI 139252
10/14/2003 18:00 10/14/2003 18:01 Big Eddy-Midway No 1 230kV line 230.0 L O 102.80 1 Plan Switching TDA TRI 139252
10/14/2003 18:00 10/14/2003 18:01 Mabton tap to Big Eddy-Midway No 1 230kV line 230.0 T 0.10 1 Plan Switching TRI 139252
10/15/2003 01:39 10/15/2003 05:02 Schultz-Raver No 1 500kV line 500.0 L 77.24 203 Plan Voltage Control WEN COV 139253
10/15/2003 07:04 10/15/2003 11:32 Boundary-Nelway No 1 230kV line 230.0 L 2.40 268 Plan Foreign Request SPK 139256
10/15/2003 07:12 10/15/2003 16:19 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 547 Plan Construction WEN 139257
10/15/2003 07:54 10/15/2003 13:29 Hills Creek-Lookout Point No 1 115kV line 115.0 L G 24.80 335 Plan Maintenance EUG 139258
10/15/2003 07:54 10/15/2003 13:29 Hills Creek-Oakridge section of Hills Creek-Lookout Point No 1 115kV line 115.0 S 4.80 335 Plan Maintenance EUG 139258
10/15/2003 10:05 10/15/2003 16:11 McNary PH-McNary No 5 230kV line 230.0 L 1.28 366 Plan Maintenance TRI 139259
10/15/2003 10:24 10/15/2003 15:30 Moxee-Union Gap No 1 115kV line 115.0 L 6.50 306 Plan Foreign Request TRI 139260
10/16/2003 02:35 10/16/2003 12:51 Addy-AVA Gifford No 1 115kV line 115.0 L 20.70 616 Plan Foreign Request SPK 139270
10/16/2003 05:00 10/16/2003 05:00 Rocky Ford-Grand Coulee No 1 230kV line 230.0 L 52.94 0 Auto Unknown WEN 139271
10/16/2003 06:02 10/17/2003 20:49 Monroe-Custer No 1 500kV line 500.0 L 86.83 2327 Plan Fiber Optic Work SNO 139272
10/16/2003 06:35 10/17/2003 14:35 Columbia-Grand Coulee No 3 230kV line 230.0 L 72.94 1920 Plan Construction WEN 139273
10/16/2003 06:48 10/16/2003 06:48 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 139274
10/16/2003 06:48 10/16/2003 06:48 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 139274
10/16/2003 06:48 10/16/2003 06:48 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139274
10/16/2003 06:48 10/16/2003 06:48 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 139274
10/16/2003 06:48 10/16/2003 06:48 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 139274
10/16/2003 06:48 10/16/2003 06:48 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 139274
10/16/2003 06:48 10/16/2003 06:48 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139274
10/16/2003 06:48 10/16/2003 06:48 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 139274
10/16/2003 07:03 10/16/2003 16:07 Moxee-Union Gap No 1 115kV line 115.0 L 6.50 544 Plan Foreign Request TRI 139275
10/16/2003 08:25 10/16/2003 13:41 Adair-Albany section of Salem-Albany No 2 115kV line 115.0 S 7.45 316 Plan Maintenance SAL EUG 139276
10/16/2003 08:25 10/16/2003 13:41 Salem-Albany No 2 115kV line 115.0 L G 27.85 316 Plan Maintenance SAL EUG 139276
10/16/2003 08:34 10/16/2003 15:52 Antelope-Lost River 230kV line 230.0 L 30.81 438 Plan Maintenance IDF 139277
10/16/2003 08:34 10/16/2003 16:03 Lost River-Spar Canyon No 1 230kV line 230.0 L 53.19 449 Plan Maintenance IDF 139278
10/16/2003 08:34 10/16/2003 16:07 Spar Canyon-Round Valley No 1 230kV line 230.0 L 11.92 453 Plan Maintenance IDF 139279
10/16/2003 09:16 10/17/2003 14:28 Fairmount-Port Angeles No 1 230kV line 230.0 L 26.70 1752 Plan Maintenance OLY 139280
10/16/2003 09:42 10/16/2003 09:54 Hills Creek-Lookout Point No 1 115kV line 115.0 L 24.80 12 Auto Tree cut Tree cut EUG 139281
10/16/2003 09:42 10/16/2003 09:54 Hills Creek-Oakridge section of Hills Creek-Lookout Point No 1 115kV line 115.0 S G 4.80 12 Auto Tree cut Tree cut EUG 139281
10/16/2003 09:42 10/16/2003 09:54 Oakridge tap to Hills Creek-Lookout Point No 1 115kV line 115.0 T G 0.10 12 Auto Tree cut Tree cut EUG 139281
10/16/2003 09:42 10/16/2003 09:54 Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line 115.0 S G 20.00 12 Auto Tree cut Tree cut EUG 139281
10/16/2003 09:51 10/16/2003 09:55 McNary-Coyote Springs No 1 500kV line 500.0 L 19.44 4 Auto Human Element Human Element TRI 139282
10/16/2003 10:07   Tacoma-TPWR Northeast No 1 230kV line 230.0 L 0.10 still out Plan Normally Out COV 139283
10/16/2003 15:01 10/16/2003 15:05 Belfair tap to Shelton-Kitsap No 2 115kV line 115.0 T G 0.03 4 Auto Foreign Trouble Foreign Trouble OLY 139284
10/16/2003 15:01 10/16/2003 15:05 Belfair-Kitsap section of Shelton-Kitsap No 2 115kV line 115.0 S G 10.91 4 Auto Foreign Trouble Foreign Trouble OLY 139284
10/16/2003 15:01 10/16/2003 15:05 Benson tap to Shelton-Kitsap No 2 115kV line 115.0 T G 0.40 4 Auto Foreign Trouble Foreign Trouble OLY 139284
10/16/2003 15:01 10/16/2003 15:05 Benson-Belfair section of Shelton-Kitsap No 2 115kV line 115.0 S G 7.30 4 Auto Foreign Trouble Foreign Trouble OLY 139284
10/16/2003 15:01 10/16/2003 15:05 Shelton-Benson section of Shelton-Kitsap No 2 115kV line 115.0 S G 12.13 4 Auto Foreign Trouble Foreign Trouble OLY 139284
10/16/2003 15:01 10/16/2003 15:05 Shelton-Kitsap No 2 115kV line 115.0 L 30.34 4 Auto Foreign Trouble Foreign Trouble OLY 139284
10/16/2003 16:00 10/16/2003 16:42 Pearl-Marion No 1 500kV line 500.0 L 39.38 42 Plan Testing SAL 139285
10/16/2003 17:22 10/16/2003 17:23 McNary-Cold Springs section of McNary-Wallula 230kV line 230.0 S 6.20 1 Plan Foreign Request TRI 139286
10/16/2003 17:22 10/16/2003 17:23 McNary-Wallula 230kV line 230.0 L O 30.70 1 Plan Foreign Request TRI 139286
10/17/2003 00:39 10/17/2003 12:50 Raymond-Cosmopolis No 1 115kV line 115.0 L 18.36 731 Auto Tree blown Tree blown OLY 139288
10/17/2003 01:03 10/17/2003 05:42 John Day-Marion No 1 500kV line 500.0 L 127.51 279 Plan Voltage Control TDA RED SAL 139287
10/17/2003 07:03 10/17/2003 15:40 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 517 Plan Foreign Request TRI SPK 139289
10/17/2003 08:00 10/17/2003 16:32 Klamath Cogen-Meridian No 1 500kV line 500.0 L 57.99 512 Plan Foreign Request RED 139290
10/17/2003 08:03 10/21/2003 13:09 Boundary-Waneta No 1 230kV line 230.0 L 16.50 6066 Plan Foreign Request SPK 139291
10/17/2003 09:18 10/17/2003 19:25 Bell-Boundary No 1 230kV line 230.0 L G 91.66 607 Plan Maintenance SPK 139292
10/17/2003 09:18 10/17/2003 19:25 Sacheen-Boundary section of Bell-Boundary No 1 230kV line 230.0 S 60.06 607 Plan Maintenance SPK 139292
10/17/2003 23:35 10/18/2003 07:11 John Day-Marion No 1 500kV line 500.0 L 127.51 456 Plan Voltage Control TDA RED SAL 139293
10/18/2003 03:24 10/18/2003 06:46 Schultz-Raver No 3 500kV line 500.0 L 77.47 202 Plan Voltage Control WEN COV 139294
10/18/2003 06:18 10/19/2003 15:26 Rocky Reach-Maple Valley No 1 345kV line 345.0 L 128.87 1988 Plan Foreign Request WEN COV 139299
10/18/2003 06:20 10/19/2003 15:26 Rocky Reach-Columbia No 1 230kV line 230.0 L 20.94 1986 Plan Foreign Request WEN 139300
10/18/2003 07:04 10/18/2003 19:36 Custer-Ingledow No 1 500kV line 500.0 L 22.55 752 Plan PCS Cellular Work SNO 139301
10/18/2003 08:41 10/18/2003 08:58 Monroe-Custer No 1 500kV line 500.0 L 86.83 17 Auto Forced (Configuration) Forced (Configuration) SNO 139302
10/18/2003 12:04 10/18/2003 21:06 Port Angeles-Sappho No 1 115kV line 115.0 L 42.03 542 Auto Tree blown Tree blown OLY 139303
10/18/2003 23:32 10/19/2003 08:14 Buckley-Marion No 1 500kV line 500.0 L 99.33 522 Plan Voltage Control TDA RED SAL 139304
10/19/2003 01:57 10/19/2003 06:28 Schultz-Raver No 1 500kV line 500.0 L 77.24 271 Plan Voltage Control WEN COV 139305
10/19/2003 02:54 10/19/2003 03:59 South Elma-Satsop Park No 1 115kV line 115.0 L 4.60 65 Auto Improper Relaying Improper Relaying OLY 139307
10/19/2003 02:54 10/19/2003 04:34 Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line 115.0 T 14.58 100 Auto Tree blown Tree blown OLY 139309
10/19/2003 02:54 10/19/2003 11:32 Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 9.22 518 Auto Tree blown Tree blown OLY 139309
10/19/2003 02:54 10/19/2003 11:32 Satsop Park-Cosmopolis No 1 115kV line 115.0 L G 15.32 518 Auto Tree blown Tree blown OLY 139309
10/19/2003 02:54 10/19/2003 04:34 Satsop Park-Satsop section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 0.20 100 Auto Tree blown Tree blown OLY 139309
10/19/2003 02:54 10/19/2003 04:34 Satsop-Aberdeen section of Satsop Park-Cosmopolis No 1 115kV line 115.0 S 5.85 100 Auto Tree blown Tree blown OLY 139309
10/20/2003 00:11 10/20/2003 05:14 Buckley-Marion No 1 500kV line 500.0 L 99.33 303 Plan Voltage Control TDA RED SAL 139310
10/20/2003 00:36 10/20/2003 05:12 Schultz-Raver No 1 500kV line 500.0 L 77.24 276 Plan Voltage Control WEN COV 139311
10/20/2003 05:00 10/31/2003 16:19 Grand Coulee Switchyard 230-500kV Tie No 1 500kV line 500.0 L 1.25 16579 Plan Foreign Request WEN 139312
10/20/2003 06:07 10/20/2003 06:08 La Grande-IPC Brownlee No 1 230kV line 230.0 L 79.30 1 Plan Foreign Request TRI 139316
10/20/2003 06:07 10/20/2003 06:08 Quartz tap to La Grande-IPC Brownlee No 1 230kV line 230.0 T G 10.30 1 Plan Foreign Request TRI 139316
10/20/2003 06:18 10/20/2003 19:04 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 766 Plan Foreign Request RED 139317
10/20/2003 06:18 10/20/2003 19:04 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 766 Plan Foreign Request IDF RED 139317
10/20/2003 06:18 10/20/2003 19:04 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 766 Plan Foreign Request IDF RED 139317
10/20/2003 06:26 10/20/2003 17:13 Big Eddy-Chemawa No 1 230kV line 230.0 L 116.41 647 Plan Maintenance TDA LGV SAL 139318
10/20/2003 07:03 10/20/2003 22:21 Raver-Covington No 1 500kV line 500.0 L 10.28 918 Plan Maintenance COV 139319
10/20/2003 07:21 10/20/2003 17:16 Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line 230.0 S 29.39 595 Plan Construction TDA 139320
10/20/2003 07:21 10/20/2003 17:16 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 595 Plan Construction TDA RED 139320
10/20/2003 07:27 10/23/2003 09:23 Ross-St Johns No 1 230kV line 230.0 L 7.26 4436 Plan Foreign Request LGV 139321
10/20/2003 07:40 10/20/2003 14:25 Targhee-Drummond No 1 115kV line 115.0 L 26.80 405 Plan Maintenance IDF 139322
10/20/2003 07:48 10/20/2003 17:05 The Dalles PH-Big Eddy No 4 230kV line 230.0 L 0.91 557 Plan Construction TDA 139323
10/20/2003 08:32 10/24/2003 15:29 St Johns-PACW St Johns No 1 115kV line 115.0 L 1.60 6177 Plan Foreign Request LGV 139324
10/20/2003 08:49 10/20/2003 10:47 Covington-Duwamish No 1 230kV line 230.0 L 15.82 118 Plan Load Control COV 139325
10/20/2003 11:05 10/20/2003 16:33 Snyder-Stevens Drive section of White Bluffs-Stevens Drive No 2 115kV line 115.0 S 5.00 328 Plan Foreign Request TRI 139326
10/20/2003 11:05 10/20/2003 16:33 White Bluffs-Snyder section of White Bluffs-Stevens Drive No 2 115kV line 115.0 S 1.90 328 Plan Foreign Request TRI 139326
10/20/2003 11:05 10/20/2003 16:33 White Bluffs-Stevens Drive No 2 115kV line 115.0 L G 6.90 328 Plan Foreign Request TRI 139326
10/20/2003 13:24 10/20/2003 22:54 Covington-White River No 1 230kV line 230.0 L 9.55 570 Plan Load Control COV 139327
10/20/2003 14:15 10/20/2003 18:02 Port Angeles-Sappho No 1 115kV line 115.0 L 42.03 227 Auto Tree blown Tree blown OLY 139328
10/20/2003 14:17 10/21/2003 13:33 Benton-Franklin No 2 115kV line 115.0 L T 21.03 1396 Plan Foreign Request TRI 139329
10/20/2003 14:17 10/21/2003 13:33 North Pasco-Taylor Flats section of Taylor Flats tap to Benton-Franklin No 2 115kV line 115.0 TS 7.10 1396 Plan Foreign Request TRI 139329
10/20/2003 16:49   White Bluffs-Richland No 1 115kV line 115.0 L G 11.02 still out Plan Normally Out TRI 139330
10/20/2003 16:49   White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line 115.0 S 4.30 still out Plan Normally Out TRI 139330
10/21/2003 00:02 10/21/2003 05:32 John Day-Marion No 1 500kV line 500.0 L 127.51 330 Plan Voltage Control TDA RED SAL 139332
10/21/2003 00:57 10/21/2003 05:30 Marion-Lane No 1 500kV line 500.0 L 68.97 273 Plan Voltage Control SAL EUG 139333
10/21/2003 06:14 10/21/2003 15:56 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 582 Plan Foreign Request RED 139340
10/21/2003 06:14 10/21/2003 15:56 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 582 Plan Foreign Request IDF RED 139340
10/21/2003 06:14 10/21/2003 15:56 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 582 Plan Foreign Request IDF RED 139340
10/21/2003 07:03 10/21/2003 21:31 Raver-Covington No 1 500kV line 500.0 L 10.28 868 Plan Maintenance COV 139341
10/21/2003 07:14 10/21/2003 14:36 Targhee-Drummond No 1 115kV line 115.0 L 26.80 442 Plan Maintenance IDF 139342
10/21/2003 08:09 10/21/2003 15:21 John Day-Big Eddy No 1 500kV line 500.0 L 18.94 432 Plan Maintenance TDA 139343
10/21/2003 08:12 10/22/2003 08:59 Carlton tap to Forest Grove-McMinnville No 1 115kV line 115.0 T 0.03 1487 Plan Maintenance SAL 139344
10/21/2003 08:12 10/22/2003 08:59 Forest Grove-McMinnville No 1 115kV line 115.0 L T 23.72 1487 Plan Maintenance SAL 139344
10/21/2003 12:46 10/21/2003 13:48 Beaver tap to Boyer-Tillamook No 1 115kV line 115.0 T 0.10 62 Auto Tree cut Tree cut SAL 139345
10/21/2003 12:46 10/21/2003 13:48 Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line 115.0 S 14.45 62 Auto Tree cut Tree cut SAL 139345
10/21/2003 12:46 10/21/2003 19:24 Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line 115.0 S 12.44 398 Auto Tree cut Tree cut SAL 139345
10/21/2003 12:46 10/21/2003 19:24 Boyer-Tillamook No 1 115kV line 115.0 L G 31.91 398 Auto Tree cut Tree cut SAL 139345
10/21/2003 12:46 10/21/2003 13:48 Hebo tap to Boyer-Tillamook No 1 115kV line 115.0 T 0.04 62 Auto Tree cut Tree cut SAL 139345
10/21/2003 12:46 10/21/2003 13:48 Hebo-Beaver section of Boyer-Tillamook No 1 115kV line 115.0 S 4.53 62 Auto Tree cut Tree cut SAL 139345
10/21/2003 12:46 10/21/2003 13:48 Nestucca-Hebo section of Boyer-Tillamook No 1 115kV line 115.0 S 0.49 62 Auto Tree cut Tree cut SAL 139345
10/21/2003 16:22 10/21/2003 16:42 Lower Granite PH-Lower Granite No 1 500kV line 500.0 L 0.75 20 Auto Foreign Trouble Foreign Trouble TRI SPK 139346
10/21/2003 22:45 10/22/2003 05:56 Ashe-Marion No 2 500kV line 500.0 L 224.01 431 Plan Voltage Control TRI TDA RED SAL 139347
10/22/2003 06:01 10/24/2003 19:02 Monroe-Custer No 1 500kV line 500.0 L 86.83 3661 Plan Fiber Optic Work SNO 139348
10/22/2003 06:23 10/22/2003 18:35 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 732 Plan Foreign Request RED 139350
10/22/2003 06:23 10/22/2003 18:35 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 732 Plan Foreign Request IDF RED 139350
10/22/2003 06:23 10/22/2003 18:35 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 732 Plan Foreign Request IDF RED 139350
10/22/2003 06:53 10/23/2003 16:39 Paul-PSE Tono No 1 500kV line 500.0 L 0.10 2026 Plan Foreign Request OLY 139351
10/22/2003 08:05 10/22/2003 14:39 John Day-Big Eddy No 2 500kV line 500.0 L 18.96 394 Plan Maintenance TDA 139352
10/22/2003 08:18 10/22/2003 11:35 Eugene-Bertelsen No 1 115kV line 115.0 L 2.28 197 Plan Construction EUG 139353
10/22/2003 08:25 10/22/2003 08:56 McNary PH-McNary No 5 230kV line 230.0 L 1.28 31 Auto Foreign Utility Foreign Utility TRI 139354
10/22/2003 12:44 10/24/2003 14:19 Eugene-Lane No 1 115kV line 115.0 L 5.47 2975 Plan Construction EUG 139355
10/22/2003 13:16 10/22/2003 14:50 Bonneville PH 1-North Bonneville No 2 230kV line 230.0 L 0.83 94 Plan Foreign Request LGV 139356
10/22/2003 13:36 10/22/2003 22:04 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 508 Plan Emergency OLY 139357
10/22/2003 14:02 10/22/2003 15:12 Cusick-Boundary section of Usk-Boundary No 1 230kV line 230.0 S 48.18 70 Plan Maintenance SPK 139358
10/22/2003 14:02 10/22/2003 15:12 Usk-Boundary No 1 230kV line 230.0 L G 55.04 70 Plan Maintenance SPK 139358
10/22/2003 23:06 10/23/2003 05:26 Ashe-Marion No 2 500kV line 500.0 L 224.01 380 Plan Voltage Control TRI TDA RED SAL 139359
10/23/2003 06:04 10/23/2003 19:18 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 794 Plan Foreign Request RED 139360
10/23/2003 06:04 10/23/2003 19:18 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 794 Plan Foreign Request IDF RED 139360
10/23/2003 06:04 10/23/2003 19:18 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 794 Plan Foreign Request IDF RED 139360
10/23/2003 07:21 10/23/2003 13:07 Garrison-NWE Mill Creek No 1 230kV line 230.0 L 30.40 346 Plan Foreign Request KAL 139364
10/23/2003 07:57 10/23/2003 14:10 Fidalgo-Lopez Island No 5 69kV line 69.0 L 8.49 373 Plan Maintenance SNO 139365
10/23/2003 08:06 10/27/2003 18:18 Columbia-Grand Coulee No 3 230kV line 230.0 L 72.94 6432 Plan Construction WEN 139366
10/23/2003 08:13 10/23/2003 13:36 Targhee-Drummond No 1 115kV line 115.0 L 26.80 323 Plan Maintenance IDF 139367
10/24/2003 01:10 10/24/2003 05:08 John Day-Marion No 1 500kV line 500.0 L 127.51 238 Plan Voltage Control TDA RED SAL 139368
10/24/2003 06:04 10/24/2003 16:10 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 606 Plan Foreign Request RED 139369
10/24/2003 06:04 10/24/2003 16:10 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 606 Plan Foreign Request IDF RED 139369
10/24/2003 06:04 10/24/2003 16:10 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 606 Plan Foreign Request IDF RED 139369
10/24/2003 06:08 10/27/2003 18:08 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 5100 Plan Construction OLY COV WEN 139373
10/24/2003 07:04 10/27/2003 15:40 Grand Coulee-Foster Creek No 1 115kV line 115.0 L G 32.57 4896 Plan Construction WEN 139393
10/24/2003 07:04 10/27/2003 15:40 Grand Coulee-Nilles Corner section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S 20.23 4896 Plan Construction WEN 139393
10/24/2003 07:17 10/24/2003 16:48 Big Eddy-Redmond No 1 230kV line 230.0 L G 97.46 571 Plan Forced TDA RED 139374
10/24/2003 07:17 10/24/2003 16:48 Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line 230.0 S 68.07 571 Plan Forced TDA RED 139374
10/24/2003 07:19 10/24/2003 16:49 Big Eddy-Chemawa No 1 230kV line 230.0 L 116.41 570 Plan Forced TDA LGV SAL 139375
10/24/2003 07:24 10/24/2003 16:48 The Dalles PH-Big Eddy No 4 230kV line 230.0 L 0.91 564 Plan Forced TDA 139376
10/24/2003 07:38 10/24/2003 10:02 Fidalgo-Lopez Island No 4 115kV line 115.0 L 8.48 144 Plan Switching SNO 139377
10/24/2003 07:40 10/24/2003 16:17 Longview-Cowlitz No 1 115kV line 115.0 L 3.61 517 Plan Construction LGV 139378
10/24/2003 08:05 10/27/2003 10:42 Grand Coulee-Chief Joseph No 1 230kV line 230.0 L 32.73 4537 Plan Construction WEN 139379
10/24/2003 08:06 10/27/2003 10:43 Grand Coulee-Chief Joseph No 2 230kV line 230.0 L 32.59 4537 Plan Construction WEN 139380
10/24/2003 17:49 10/24/2003 17:49 Addy tap to Bell-Boundary No 3 230kV line 230.0 T G 0.02 0 Auto Unknown Unknown SPK 139381
10/24/2003 17:49 10/24/2003 17:49 Addy-Boundary section of Bell-Boundary No 3 230kV line 230.0 S G 57.73 0 Auto Unknown Unknown SPK 139381
10/24/2003 17:49 10/24/2003 17:49 Bell-Addy section of Bell-Boundary No 3 230kV line 230.0 S G 50.34 0 Auto Unknown Unknown SPK 139381
10/24/2003 17:49 10/24/2003 17:49 Bell-Boundary No 3 230kV line 230.0 L 108.07 0 Auto Unknown Unknown SPK 139381
10/24/2003 22:41 10/25/2003 04:55 Boundary-Nelway No 1 230kV line 230.0 L 2.40 374 Plan Foreign Request SPK 139382
10/25/2003 06:40 10/25/2003 06:40 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 139383
10/25/2003 06:40 10/25/2003 06:40 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 139383
10/25/2003 06:40 10/25/2003 06:40 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 139383
10/25/2003 08:04 10/25/2003 17:44 Slatt-John Day No 1 500kV line 500.0 L 30.32 580 Plan Maintenance TRI TDA 139384
10/26/2003 01:47 10/26/2003 05:04 Ashe-Marion No 2 500kV line 500.0 L 224.01 257 Plan Voltage Control TRI TDA RED SAL 139385
10/26/2003 07:06 10/26/2003 20:57 Vantage-Hanford No 1 500kV line 500.0 L 23.46 831 Plan Maintenance WEN TRI 139386
10/26/2003 08:16 10/26/2003 16:44 Slatt-Buckley No 1 500kV line 500.0 L 52.32 508 Plan Maintenance TRI TDA 139387
10/26/2003 09:10 10/26/2003 16:06 Coyote Springs-Slatt No 1 500kV line 500.0 L 28.09 416 Plan Maintenance TRI TDA 139388
10/27/2003 03:25 10/29/2003 13:08 Buckley-Marion No 1 500kV line 500.0 L 99.33 3463 Plan Voltage Control TDA RED SAL 139389
10/27/2003 07:36 10/27/2003 18:26 Longview-Cowlitz No 1 115kV line 115.0 L 3.61 650 Plan Construction LGV 139394
10/27/2003 07:46 10/27/2003 14:04 Salem-Grand Ronde No 1 115kV line 115.0 L 27.80 378 Plan Foreign Request SAL 139395
10/27/2003 08:00 11/12/2003 14:36 Noxon-Libby No 1 230kV line 230.0 L 70.17 23436 Plan Foreign Request KAL 139396
10/27/2003 08:31 10/31/2003 11:23 Franklin-Badger Canyon No 1 115kV line 115.0 L 15.77 5932 Plan Maintenance TRI 139397
10/27/2003 09:01 10/27/2003 11:10 Ice Harbor-Franklin No 1 115kV line 115.0 L 9.34 129 Plan Foreign Request TRI 139398
10/27/2003 09:32 10/27/2003 17:03 McNary-Cold Springs section of McNary-Wallula 230kV line 230.0 S 6.20 451 Plan Construction TRI 139399
10/27/2003 09:32 10/27/2003 17:03 McNary-Wallula 230kV line 230.0 L G 30.70 451 Plan Construction TRI 139399
10/27/2003 10:20 10/27/2003 12:15 Eugene-Lane No 1 115kV line 115.0 L 5.47 115 Plan Construction EUG 139400
10/27/2003 10:21 10/27/2003 14:52 Fidalgo-Lopez Island No 5 69kV line 69.0 L 8.49 271 Plan Forced SNO 139401
10/27/2003 11:16 10/27/2003 11:18 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 2 Plan Switching KAL 139402
10/27/2003 11:16 10/27/2003 11:18 Anaconda-NWE Mill Creek No 1 230kV line 230.0 L 0.40 2 Plan Switching KAL 139403
10/27/2003 11:16 11/06/2003 08:45 Anaconda-Silver Bow No 1 115kV line 115.0 L 12.69 14249 Plan Maintenance KAL 139404
10/27/2003 11:23 10/27/2003 12:05 Reston-Fairview No 2 230kV line 230.0 L 29.47 42 Plan Foreign Request EUG 139405
10/27/2003 11:23 10/27/2003 12:05 Dixonville PACW-Reston No 1 230kV line 230.0 L 17.40 42 Plan Foreign Request EUG 139406
10/27/2003 12:27 10/27/2003 12:48 Ice Harbor-Franklin No 1 115kV line 115.0 L 9.34 21 Plan Foreign Request TRI 139407
10/27/2003 15:23 12/09/2003 07:59 Albany-Eugene No 1 115kV line 115.0 L G 39.80 61476 Plan Normally Out EUG 139408
10/27/2003 15:23 12/09/2003 07:59 Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 61476 Plan Normally Out EUG 139408
10/28/2003 08:00 10/30/2003 13:13 Schultz-Raver No 2 500kV line 500.0 L 77.24 3193 Plan Maintenance WEN COV 139420
10/28/2003 08:07 10/28/2003 13:45 Grizzly-Summer Lake No 1 500kV line 500.0 L T 103.37 338 Plan Maintenance RED 139421
10/28/2003 08:07 10/28/2003 13:45 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T 0.01 338 Plan Maintenance RED 139421
10/28/2003 08:25 10/31/2003 08:53 Midway-Cold Creek section of Midway-Grandview No 1 115kV line 115.0 S 4.21 4348 Plan Maintenance TRI WEN 139422
10/28/2003 08:25 10/31/2003 08:53 Midway-Grandview No 1 115kV line 115.0 L G 25.07 4348 Plan Maintenance TRI WEN 139422
10/28/2003 09:24 10/28/2003 09:24 Franklin-Hedges No 1 115kV line 115.0 L 5.00 0 Auto Foreign Trouble Foreign Trouble TRI 139423
10/28/2003 09:42 10/31/2003 12:18 Eugene-Lane No 1 115kV line 115.0 L 5.47 4476 Plan Construction EUG 139424
10/28/2003 10:13 10/28/2003 15:11 Fidalgo-Lopez Island No 4 115kV line 115.0 L 8.48 298 Plan Forced SNO 139425
10/28/2003 12:56 10/28/2003 14:34 Franklin-Badger Canyon No 2 115kV line 115.0 L G 13.35 98 Plan Emergency TRI 139426
10/28/2003 12:56 10/28/2003 14:34 Franklin-Gum Street section of Franklin-Badger Canyon No 2 115kV line 115.0 S 5.56 98 Plan Emergency TRI 139426
10/28/2003 14:38 11/01/2003 10:15 Ely-Highland section of Franklin-Badger Canyon No 2 115kV line 115.0 S 1.98 5497 Plan Normally Out TRI 139427
10/28/2003 14:38 11/01/2003 10:15 Franklin-Badger Canyon No 2 115kV line 115.0 L G 13.35 5497 Plan Normally Out TRI 139427
10/28/2003 15:32 10/28/2003 15:32 Boardman-Tower Road No 1 115kV line 115.0 L 8.53 0 Auto Unknown Wind TRI TDA 139428
10/28/2003 16:29 10/28/2003 16:30 Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line 230.0 T 4.43 1 Auto Foreign Trouble SNO 139429
10/28/2003 16:29 10/28/2003 16:30 Monroe-Snohomish No 1&2 230kV line 230.0 L T 22.17 1 Auto Foreign Trouble SNO 139429
10/28/2003 17:07 10/29/2003 11:24 Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line 230.0 T 4.43 1097 Auto Foreign Trouble SNO 139430
10/28/2003 17:07 10/29/2003 11:24 Monroe-Snohomish No 1&2 230kV line 230.0 L T 22.17 1097 Auto Foreign Trouble SNO 139430
10/29/2003 02:41 10/29/2003 16:57 Goshen-Drummond No 1 161kV line 161.0 L 72.75 856 Auto Line Material Failure Malicious IDF 139431
10/29/2003 06:48 10/29/2003 13:50 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 422 Plan Maintenance OLY LGV 139440
10/29/2003 06:48 10/29/2003 13:50 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 422 Plan Maintenance OLY LGV 139440
10/29/2003 06:50 10/29/2003 20:11 Colville-Kettle Falls section of Colville-Republic No 1 115kV line 115.0 S 13.30 801 Plan Maintenance SPK 139441
10/29/2003 06:50 10/29/2003 20:11 Colville-Republic No 1 115kV line 115.0 L G 44.47 801 Plan Maintenance SPK 139441
10/29/2003 09:23 10/29/2003 13:14 Ponderosa-Pilot Butte No 1 230kV line 230.0 L 21.85 231 Plan Maintenance RED 139442
10/29/2003 09:25 10/29/2003 11:02 Lancaster-Noxon No 1 230kV line 230.0 L 72.72 97 Plan Foreign Request SPK KAL 139443
10/29/2003 10:22 10/29/2003 10:24 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S 1.90 2 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 10:24 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S 10.53 2 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 12:49 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 147 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 10:23 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T 0.10 1 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 10:23 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 1 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 10:24 Thatcher Junction tap to Keeler-Tillamook No 1 115kV line 115.0 T 0.75 2 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 12:49 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S 8.04 147 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 15:39 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 317 Auto Tree blown Tree SAL 139444
10/29/2003 10:22 10/29/2003 12:49 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S 12.20 147 Auto Tree blown Tree SAL 139444
10/29/2003 10:38   The Dalles PH-Big Eddy No 2 115kV line 115.0 L 0.82 still out Auto Foreign Trouble Foreign Trouble TDA 139445
10/29/2003 12:20 10/29/2003 12:22 Anaconda-NWE Mill Creek No 1 230kV line 230.0 L 0.40 2 Plan Switching KAL 139446
10/29/2003 12:20 10/29/2003 12:28 Garrison-Anaconda No 1 230kV line 230.0 L 31.31 8 Plan Switching KAL 139447
10/29/2003 23:16 10/30/2003 04:47 John Day-Marion No 1 500kV line 500.0 L 127.51 331 Plan Voltage Control TDA RED SAL 139448
10/30/2003 01:52 10/30/2003 02:44 Clarkston tap to Walla Walla-North Lewiston No 1 115kV line 115.0 T 0.10 52 Auto Line Material Failure Line Material Failure TRI 139449
10/30/2003 01:52 10/30/2003 02:44 Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 3.71 52 Auto Line Material Failure Line Material Failure TRI 139449
10/30/2003 01:52 10/30/2003 04:08 Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line 115.0 T 0.10 136 Auto Line Material Failure Line Material Failure TRI 139449
10/30/2003 01:52 10/30/2003 19:13 Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 24.00 1041 Auto Line Material Failure Line Material Failure TRI 139449
10/30/2003 01:52 10/30/2003 19:13 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 1041 Auto Line Material Failure Line Material Failure TRI 139449
10/30/2003 01:52 10/30/2003 04:08 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 136 Auto Line Material Failure Line Material Failure TRI 139449
10/30/2003 05:46 10/30/2003 05:48 Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 3.71 2 Plan Testing TRI 139456
10/30/2003 05:46 10/30/2003 05:48 Walla Walla-North Lewiston No 1 115kV line 115.0 L O 80.80 2 Plan Testing TRI 139456
10/30/2003 06:02 10/30/2003 14:41 Custer-Ingledow No 1 500kV line 500.0 L 22.55 519 Plan Maintenance SNO 139450
10/30/2003 07:21 10/30/2003 15:01 Big Eddy-McLoughlin No 1&2 230kV line 230.0 L 117.77 460 Plan Maintenance TDA LGV 139457
10/30/2003 07:58 10/30/2003 14:27 Shelton-Fairmount No 2 115kV line 115.0 L 60.17 389 Plan Maintenance OLY 139458
10/30/2003 09:15 10/30/2003 09:40 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 25 Auto Foreign Trouble Foreign Trouble WEN 139459
10/30/2003 09:40 10/30/2003 15:04 Alvey-Lane No 1 230kV line 230.0 L 13.41 324 Plan Maintenance EUG 139460
10/31/2003 07:32 10/31/2003 15:37 Big Eddy-McLoughlin No 1&2 230kV line 230.0 L 117.77 485 Plan Maintenance TDA LGV 139462
10/31/2003 09:02 10/31/2003 18:36 Dworshak-Taft No 1 500kV line 500.0 L 90.38 574 Plan Forced SPK KAL 139463
10/31/2003 09:02 10/31/2003 18:59 Dworshak PH-Dworshak No 1 500kV line 500.0 L 3.67 597 Plan Forced TRI SPK 139464
10/31/2003 09:02 10/31/2003 18:36 Hatwai-Dworshak No 1 500kV line 500.0 L 28.52 574 Plan Construction SPK 139465
10/31/2003 09:13 10/31/2003 09:17 Slatt-Buckley No 1 500kV line 500.0 L 52.32 4 Auto Forced (Configuration) Forced (Configuration) TRI TDA 139466
10/31/2003 09:13 10/31/2003 09:17 Buckley-Grizzly No 1 500kV line 500.0 L 53.60 4 Auto Equipment/Miscellaneous Terminal Equipment Failure TDA RED 139467
10/31/2003 09:13 10/31/2003 09:17 Buckley-Marion No 1 500kV line 500.0 L 99.33 4 Auto Equipment/Miscellaneous Terminal Equipment Failure TDA RED SAL 139468
11/01/2003 07:30 11/01/2003 07:40 Columbia Generating Station-Ashe No 2 230kV line 230.0 L 0.49 10 Auto Foreign Trouble Foreign Utility TRI 139469
11/01/2003 10:20 11/02/2003 09:59 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 1419 Plan Foreign Request OLY 139470
11/01/2003 10:24 11/03/2003 14:41 Franklin-Badger Canyon No 2 115kV line 115.0 L G 13.35 3137 Plan Maintenance TRI 139471
11/01/2003 10:24 11/03/2003 14:41 Franklin-Gum Street section of Franklin-Badger Canyon No 2 115kV line 115.0 S 5.56 3137 Plan Maintenance TRI 139471
11/01/2003 10:51 11/01/2003 12:12 Grizzly-Summer Lake No 1 500kV line 500.0 L T 103.37 81 Plan Maintenance RED 139472
11/01/2003 10:51 11/01/2003 12:12 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T 0.01 81 Plan Maintenance RED 139472
11/03/2003 00:45 11/03/2003 00:48 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 3 Auto Foreign Trouble TDA RED 139473
11/03/2003 00:45 11/03/2003 00:48 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Auto Foreign Trouble TDA 139473
11/03/2003 00:45 11/03/2003 00:48 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Auto Foreign Trouble TDA 139473
11/03/2003 00:45 11/03/2003 00:48 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Auto Foreign Trouble TDA 139473
11/03/2003 00:45 11/03/2003 00:48 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3 Auto Foreign Trouble TDA 139473
11/03/2003 05:32 11/03/2003 12:36 Echo Lake-Monroe No 1 500kV line 500.0 L T 29.98 424 Auto Improper Relaying Improper Relaying COV SNO 139474
11/03/2003 05:32 11/03/2003 12:36 Sno-King tap to Echo Lake-Monroe No 1 500kV line 500.0 T 12.82 424 Auto Improper Relaying Improper Relaying SNO 139474
11/03/2003 06:37 11/03/2003 06:37 Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line 115.0 T 14.58 0 Auto Unknown OLY 139476
11/03/2003 06:37 11/03/2003 06:37 Satsop Park-Cosmopolis No 1 115kV line 115.0 L T 15.32 0 Auto Unknown OLY 139476
11/03/2003 06:40 11/03/2003 06:40 Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line 115.0 T 14.58 0 Auto Unknown OLY 139477
11/03/2003 06:40 11/03/2003 06:40 Satsop Park-Cosmopolis No 1 115kV line 115.0 L T 15.32 0 Auto Unknown OLY 139477
11/03/2003 06:46 11/03/2003 06:46 Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line 115.0 T 14.58 0 Auto Unknown Line Material Failure OLY 139478
11/03/2003 06:46 11/03/2003 06:46 Satsop Park-Cosmopolis No 1 115kV line 115.0 L T 15.32 0 Auto Unknown Line Material Failure OLY 139478
11/03/2003 06:47 11/03/2003 09:00 Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line 115.0 T 14.58 133 Plan Emergency OLY 139479
11/03/2003 06:47 11/03/2003 09:00 Satsop Park-Cosmopolis No 1 115kV line 115.0 L T 15.32 133 Plan Emergency OLY 139479
11/03/2003 08:34 11/06/2003 14:59 Creston-Bell No 1 115kV line 115.0 L G 53.80 4705 Plan Maintenance WEN SPK 139480
11/03/2003 08:34 11/06/2003 14:59 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 4705 Plan Maintenance WEN 139480
11/03/2003 09:30 11/03/2003 11:42 Moxee-Union Gap No 1 115kV line 115.0 L 6.50 132 Plan Foreign Request TRI 139481
11/03/2003 09:45 11/03/2003 09:45 McNary-Ross No 1 345kV line 345.0 L 174.57 0 Auto Unknown Unknown TRI TDA LGV 139482
11/03/2003 10:26 11/03/2003 15:26 Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line 115.0 T 14.58 300 Plan Emergency OLY 139483
11/03/2003 10:26 11/03/2003 15:26 Satsop Park-Cosmopolis No 1 115kV line 115.0 L T 15.32 300 Plan Emergency OLY 139483
11/03/2003 14:26 11/03/2003 16:12 McNary PH-McNary No 5 230kV line 230.0 L 1.28 106 Plan Foreign Request TRI 139484
11/03/2003 14:59   Ely-Highland section of Franklin-Badger Canyon No 2 115kV line 115.0 S 1.98 still out Plan Normally Out TRI 139485
11/03/2003 14:59   Franklin-Badger Canyon No 2 115kV line 115.0 L G 13.35 still out Plan Normally Out TRI 139485
11/04/2003 06:32 11/04/2003 16:43 John Day PH-John Day No 2 500kV line 500.0 L 3.48 611 Plan Foreign Request TDA 139487
11/04/2003 06:47 11/04/2003 16:24 Columbia Falls-Kalispell No 1 115kV line 115.0 L 10.80 577 Plan Construction KAL 139488
11/04/2003 07:56 11/06/2003 15:15 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 3319 Plan Maintenance EUG 139489
11/04/2003 07:56 11/06/2003 15:15 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S 50.95 3319 Plan Maintenance EUG 139489
11/04/2003 13:07 11/04/2003 14:38 McNary PH-McNary No 5 230kV line 230.0 L 1.28 91 Plan Foreign Request TRI 139490
11/05/2003 06:06 11/05/2003 06:11 McNary PH-McNary 3&4 No 4 230kV line 230.0 L 1.00 5 Plan Foreign Request TRI 139493
11/05/2003 06:06 11/25/2003 11:24 McNary PH-McNary 3&4 No 3 230kV line 230.0 L 1.18 29118 Plan Foreign Request TRI 139494
11/06/2003 07:52 11/06/2003 14:12 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 380 Plan Maintenance EUG 139498
11/06/2003 08:15 11/06/2003 10:08 Canal-Jackson section of Canal-Second Lift No 1 34.5kV line 34.5 S 0.00 113 Plan Maintenance IDF 139499
11/06/2003 08:15 11/06/2003 10:08 Canal-Second Lift No 1 34.5kV line 34.5 L O 1.00 113 Plan Maintenance IDF 139499
11/06/2003 08:15 11/06/2003 10:08 Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 T 5.50 113 Plan Maintenance IDF 139499
11/06/2003 08:15 11/06/2003 10:08 Jackson tap-Newcomb section of Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 TS 4.20 113 Plan Maintenance IDF 139499
11/06/2003 08:15 11/06/2003 10:08 Newcomb tap to Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 TT 0.10 113 Plan Maintenance IDF 139499
11/06/2003 08:15 11/06/2003 10:08 Newcomb-Jackson section of Jackson tap to Canal-Second Lift No 1 34.5kV line 34.5 TS 1.30 113 Plan Maintenance IDF 139499
11/06/2003 08:15 11/06/2003 10:08 Canal-Jackson section of Canal-Second Lift No 2 34.5kV line 34.5 S G 0.00 113 Plan Maintenance IDF 139500
11/06/2003 08:15 11/06/2003 10:08 Canal-Second Lift No 2 34.5kV line 34.5 L 1.00 113 Plan Maintenance IDF 139500
11/06/2003 08:15 11/06/2003 10:08 Jackson-Second Lift section of Canal-Second Lift No 2 34.5kV line 34.5 S G 1.00 113 Plan Maintenance IDF 139500
11/06/2003 12:31 11/06/2003 14:15 Ross-Lexington No 1 230kV line 230.0 L 41.21 104 Plan Testing LGV 139501
11/06/2003 12:31 11/06/2003 14:15 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S G 19.85 104 Plan Testing LGV 139501
11/06/2003 12:31 11/06/2003 14:15 Swift tap to Ross-Lexington No 1 230kV line 230.0 T G 26.06 104 Plan Testing LGV 139501
11/06/2003 12:31 11/06/2003 14:15 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S G 21.36 104 Plan Testing LGV 139501
11/06/2003 13:28 11/06/2003 13:57 Captain Jack-Malin No 2 500kV line 500.0 L 6.90 29 Plan Switching RED 139502
11/06/2003 16:44 11/06/2003 16:57 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 13 Auto Construction TDA RED 139503
11/06/2003 16:44 11/06/2003 16:57 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 13 Auto Construction TDA 139503
11/06/2003 16:44 11/06/2003 16:57 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 13 Auto Construction TDA 139503
11/06/2003 16:44 11/06/2003 16:57 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 13 Auto Construction TDA 139503
11/06/2003 16:44 11/06/2003 16:57 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 13 Auto Construction Construction TDA 139504
11/07/2003 02:13 11/07/2003 05:03 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 170 Plan Voltage Control RED 139505
11/07/2003 06:05 11/07/2003 15:14 Grand Coulee-Schultz No 1 500kV line 500.0 L 97.01 549 Plan Foreign Request WEN 139508
11/07/2003 08:10 11/07/2003 23:52 Dworshak PH-Dworshak No 1 500kV line 500.0 L 3.67 942 Plan Forced TRI SPK 139509
11/07/2003 08:13 11/07/2003 23:52 Dworshak-Taft No 1 500kV line 500.0 L 90.38 939 Plan Forced SPK KAL 139510
11/07/2003 08:13 11/07/2003 23:52 Hatwai-Dworshak No 1 500kV line 500.0 L 28.52 939 Plan Construction SPK 139511
11/07/2003 08:17 11/07/2003 14:57 East Omak tap to Grand Coulee-Foster Creek No 1 115kV line 115.0 T 34.24 400 Plan Maintenance WEN 139512
11/07/2003 08:17 11/07/2003 14:35 East Omak-Foster Creek section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S 1.05 378 Plan Maintenance WEN 139512
11/07/2003 08:17 11/07/2003 14:35 Grand Coulee-Foster Creek No 1 115kV line 115.0 L G 32.57 378 Plan Maintenance WEN 139512
11/07/2003 08:17 11/07/2003 14:35 Grand Coulee-Nilles Corner section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S 20.23 378 Plan Maintenance WEN 139512
11/07/2003 08:17 11/07/2003 14:35 Nilles Corner-East Omak section of Grand Coulee-Foster Creek No 1 115kV line 115.0 S 11.29 378 Plan Maintenance WEN 139512
11/07/2003 09:01 11/07/2003 16:19 Ostrander-Troutdale No 1 500kV line 500.0 L 23.82 438 Plan Maintenance LGV 139513
11/07/2003 09:42 11/07/2003 09:50 Vantage-Wanapum No 3 230kV line 230.0 L 1.50 8 Plan Foreign Request WEN 139514
11/07/2003 11:46   Riverland-Midway No 1 13.8kV line 13.8 L 2.36 still out Plan Normally Out TRI 139515
11/08/2003 00:12 11/08/2003 06:11 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 359 Plan Voltage Control RED 139516
11/08/2003 00:59 11/08/2003 00:59 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 139517
11/08/2003 00:59 11/08/2003 00:59 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 139517
11/08/2003 00:59 11/08/2003 00:59 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 139517
11/08/2003 06:01 11/09/2003 16:16 Monroe-Custer No 1 500kV line 500.0 L 86.83 2055 Plan Fiber Optic Work SNO 139518
11/08/2003 23:38 11/09/2003 06:21 John Day-Marion No 1 500kV line 500.0 L 127.51 403 Plan Voltage Control TDA RED SAL 139519
11/09/2003 11:37 11/09/2003 11:37 Hanford-John Day No 1 500kV line 500.0 L 97.27 0 Auto Unknown Unknown TRI WEN TDA 139520
11/09/2003 14:39 11/09/2003 14:39 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 0 Auto Foreign Trouble Foreign Trouble SPK 139521
11/10/2003 05:36 11/13/2003 10:48 Dworshak PH-Ahsahka section of Dworshak PH-Orofino No 1 115kV line 115.0 S 0.83 4632 Plan Foreign Request TRI SPK 139525
11/10/2003 05:36 11/13/2003 10:48 Dworshak PH-Orofino No 1 115kV line 115.0 L G 4.45 4632 Plan Foreign Request TRI SPK 139525
11/10/2003 06:09 11/14/2003 11:04 Redmond-PGE Round Butte No 1 230kV line 230.0 L 23.60 6055 Plan Foreign Request RED 139526
11/10/2003 07:04 11/14/2003 16:45 Ross-St Johns No 1 230kV line 230.0 L 7.26 6341 Plan Foreign Request LGV 139527
11/10/2003 08:13 11/14/2003 15:25 Ledbeder-Richland section of Red Mountain-Richland No 1 115kV line 115.0 S 3.20 6192 Plan Construction TRI 139528
11/10/2003 08:13 11/14/2003 15:25 Red Mountain-Richland No 1 115kV line 115.0 L G 6.00 6192 Plan Construction TRI 139528
11/10/2003 08:24 11/10/2003 13:22 Marion-Santiam No 1 500kV line 500.0 L 2.44 298 Plan Switching SAL 139529
11/10/2003 08:47 11/10/2003 12:49 Palisades-Goshen No 1 115kV line 115.0 L 51.71 242 Plan Maintenance IDF 139530
11/10/2003 09:11 11/10/2003 12:20 Lookout Point PH-Lookout Point No 1 115kV line 115.0 L 0.21 189 Plan Foreign Request EUG 139531
11/10/2003 21:59 11/11/2003 00:23 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 144 Plan Maintenance TDA RED 139532
11/10/2003 21:59 11/11/2003 00:23 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 144 Plan Maintenance TDA 139532
11/10/2003 21:59 11/11/2003 00:23 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 144 Plan Maintenance TDA 139532
11/10/2003 21:59 11/11/2003 00:23 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 144 Plan Maintenance TDA 139532
11/10/2003 21:59 11/11/2003 00:23 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 144 Plan Maintenance TDA 139532
11/10/2003 21:59 11/11/2003 00:23 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L T 844.15 144 Plan Maintenance TDA RED 139533
11/10/2003 21:59 11/11/2003 00:23 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T 144 Plan Maintenance TDA 139533
11/11/2003 16:41 11/11/2003 19:42 Captain Jack-Malin No 2 500kV line 500.0 L 6.90 181 Auto Foreign Trouble Foreign Trouble RED 139534
11/11/2003 23:31 11/12/2003 05:11 John Day-Marion No 1 500kV line 500.0 L 127.51 340 Plan Voltage Control TDA RED SAL 139535
11/12/2003 06:44 11/12/2003 12:41 Columbia Falls-Kalispell No 1 115kV line 115.0 L 10.80 357 Plan Maintenance KAL 139537
11/12/2003 07:10 11/12/2003 17:05 Schultz-Raver No 3 500kV line 500.0 L 77.47 595 Plan Maintenance WEN COV 139538
11/12/2003 07:25 11/14/2003 16:15 Marion-Alvey No 1 500kV line 500.0 L 64.88 3410 Plan Maintenance SAL EUG 139539
11/12/2003 08:32 11/14/2003 17:01 B212-Wilbur section of Grand Coulee-Creston No 1 115kV line 115.0 S 16.47 3389 Plan Maintenance WEN 139540
11/12/2003 08:32 11/14/2003 17:01 Grand Coulee-Creston No 1 115kV line 115.0 L G 28.27 3389 Plan Maintenance WEN SPK 139540
11/12/2003 08:53 11/12/2003 15:25 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 392 Plan Maintenance SAL 139541
11/12/2003 08:53 11/12/2003 15:25 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 392 Plan Maintenance SAL 139541
11/12/2003 13:27 11/12/2003 13:33 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 6 Plan Foreign Request WEN 139542
11/13/2003 07:27 11/13/2003 12:18 Columbia-Grand Coulee No 3 230kV line 230.0 L 72.94 291 Plan Maintenance WEN 139547
11/13/2003 07:36 11/16/2003 19:14 Snohomish-Beverly Park No 3 115kV line 115.0 L 4.59 5018 Plan Foreign Request SNO 139548
11/13/2003 08:00 11/13/2003 13:30 Ross-Lexington No 1 230kV line 230.0 L G 41.21 330 Plan Maintenance LGV 139549
11/13/2003 08:00 11/13/2003 13:30 Ross-Woodland section of Ross-Lexington No 1 230kV line 230.0 S 19.85 330 Plan Maintenance LGV 139549
11/13/2003 08:03 11/13/2003 13:26 Lower Monumental-McNary No 1 500kV line 500.0 L T 64.75 323 Plan Switching TRI 139550
11/13/2003 08:03 11/13/2003 13:26 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 323 Plan Switching TRI 139550
11/13/2003 08:22 11/14/2003 13:56 Alvey-Fairview No 1 230kV line 230.0 L G 97.46 1774 Plan Maintenance EUG 139551
11/13/2003 08:22 11/14/2003 13:56 Green Valley-Fairview section of Alvey-Fairview No 1 230kV line 230.0 S 50.95 1774 Plan Maintenance EUG 139551
11/13/2003 08:36 11/13/2003 13:51 Bell-Addy No 1 115kV line 115.0 L G 51.18 315 Plan Maintenance SPK 139552
11/13/2003 08:36 11/13/2003 13:51 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S 22.34 315 Plan Maintenance SPK 139552
11/13/2003 08:37 11/13/2003 13:55 Addy-Colville No 1 115kV line 115.0 L 15.22 318 Plan Maintenance SPK 139553
11/13/2003 08:38 11/13/2003 08:39 Lower Monumental-Hanford No 1 500kV line 500.0 L 53.47 1 Plan Construction TRI 139554
11/13/2003 08:38 11/13/2003 13:54 Addy-AVA Kettle Falls No 1 115kV line 115.0 L 27.10 316 Plan Maintenance SPK 139555
11/13/2003 08:38 11/13/2003 14:37 Carlton-Sherwood No 1 230kV line 230.0 L T 17.92 359 Plan Maintenance SAL 139556
11/13/2003 08:38 11/13/2003 14:37 Cascade Steel tap to Carlton-Sherwood No 1 230kV line 230.0 T 12.67 359 Plan Maintenance SAL 139556
11/13/2003 08:51 11/13/2003 09:20 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 29 Plan Forced SAL 139557
11/13/2003 08:51 11/13/2003 15:02 Carlton-Cascade Steel section of Carlton-Sherwood No 1 230kV line 230.0 S 8.94 371 Plan Maintenance SAL 139558
11/13/2003 08:51 11/13/2003 15:02 Carlton-Sherwood No 1 230kV line 230.0 L G 17.92 371 Plan Maintenance SAL 139558
11/13/2003 08:51 11/13/2003 14:37 Cascade Steel-Sherwood section of Carlton-Sherwood No 1 230kV line 230.0 S 8.98 346 Plan Maintenance SAL 139558
11/13/2003 14:54 11/13/2003 15:02 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 8 Plan Forced SAL 139560
11/14/2003 06:10 11/15/2003 19:05 The Dalles PH-Big Eddy No 6 230kV line 230.0 L 0.95 2215 Plan Foreign Request TDA 139568
11/14/2003 07:09 11/14/2003 07:10 Vantage-Hanford No 1 500kV line 500.0 L 23.46 1 Auto Unknown Unknown WEN TRI 139569
11/14/2003 07:57 11/14/2003 14:30 Goshen-Drummond No 1 161kV line 161.0 L 72.75 393 Plan Maintenance IDF 139570
11/14/2003 08:06 11/14/2003 12:23 Ross-Lexington No 1 230kV line 230.0 L G 41.21 257 Plan Maintenance LGV 139571
11/14/2003 08:06 11/14/2003 12:23 Woodland-Lexington section of Ross-Lexington No 1 230kV line 230.0 S 21.36 257 Plan Maintenance LGV 139571
11/14/2003 08:19 11/14/2003 13:00 Lower Monumental-McNary No 1 500kV line 500.0 L T 64.75 281 Plan Switching TRI 139572
11/14/2003 08:19 11/14/2003 13:00 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 281 Plan Switching TRI 139572
11/14/2003 09:12 11/14/2003 14:17 Keeler-Tillamook No 1 115kV line 115.0 L T 57.81 305 Plan Maintenance SAL 139573
11/14/2003 09:12 11/14/2003 14:17 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 305 Plan Maintenance SAL 139573
11/14/2003 10:20 11/14/2003 14:22 Chief Joseph PH-Chief Joseph No 1 230kV line 230.0 L 1.09 242 Plan Switching WEN 139574
11/14/2003 10:20 11/14/2003 14:22 Chief Joseph PH-Chief Joseph No 2 230kV line 230.0 L 1.03 242 Plan Switching WEN 139575
11/14/2003 10:20 11/14/2003 14:24 Grand Coulee-Chief Joseph No 2 230kV line 230.0 L 32.59 244 Plan Switching WEN 139576
11/14/2003 10:21 11/14/2003 15:46 Chief Joseph-East Omak No 1 230kV line 230.0 L 33.99 325 Plan Maintenance WEN 139577
11/14/2003 10:51 11/21/2003 14:25 Benton-Scooteney No 1 115kV line 115.0 L T 20.32 10294 Plan Maintenance TRI 139578
11/14/2003 10:51 11/21/2003 14:25 Hatton tap to Connell tap to Benton-Scooteney No 1 115kV line 115.0 TT 15.35 10294 Plan Maintenance TRI 139578
11/14/2003 13:37 11/17/2003 14:44 Willow Creek-Hawkins No 1 115kV line 115.0 L 2.99 4387 Plan Foreign Request EUG 139604
11/14/2003 14:31 11/14/2003 15:56 North Bonneville-Midway No 1 230kV line 230.0 L O 134.71 85 Plan Switching LGV TDA WEN TRI 139579
11/14/2003 14:31 11/14/2003 15:56 Outlook tap to North Bonneville-Midway No 1 230kV line 230.0 T 0.10 85 Plan Switching TRI 139579
11/14/2003 14:31 11/14/2003 15:40 Outlook-Midway section of North Bonneville-Midway No 1 230kV line 230.0 S 22.53 69 Plan Switching WEN TRI 139579
11/15/2003 06:00 11/16/2003 20:15 Monroe-Custer No 1 500kV line 500.0 L 86.83 2295 Plan Maintenance SNO 139591
11/15/2003 08:24 11/16/2003 10:12 Lower Monumental PH-Lower Monumental No 1 500kV line 500.0 L 0.97 1548 Plan Maintenance TRI 139592
11/15/2003 09:02 11/15/2003 09:33 Midway-Priest Rapids No 2 230kV line 230.0 L 7.50 31 Auto Foreign Trouble Foreign Trouble TRI 139593
11/15/2003 16:59 11/15/2003 17:16 Walla Walla-PACW Walla Walla No 1 69kV line 69.0 L 1.40 17 Auto Sympathetic Terminal Equipment Failure TRI 139594
11/15/2003 16:59 11/15/2003 17:17 Lagoon-Stateline section of Walla Walla-Pendleton No 1 69kV line 69.0 S 3.63 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 5.47 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Milton tap-Weston Mountain section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS 4.99 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Milton-Lagoon section of Walla Walla-Pendleton No 1 69kV line 69.0 S 1.06 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Stateline tap to Walla Walla-Pendleton No 1 69kV line 69.0 T 1.31 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Stateline-Vansycle section of Walla Walla-Pendleton No 1 69kV line 69.0 S 4.62 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Walla Walla-Milton section of Walla Walla-Pendleton No 1 69kV line 69.0 S 9.55 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Walla Walla-Pendleton No 1 69kV line 69.0 L O 38.93 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line 69.0 TS T 0.48 18 Auto Forced (Configuration) Terminal Equipment Failure TRI 139595
11/15/2003 16:59 11/15/2003 17:17 Milton tap to Walla Walla-Freewater No 1 69kV line 69.0 T 3.70 18 Auto Forced (Configuration) Forced (Configuration) TRI 139596
11/15/2003 16:59 11/15/2003 17:17 Walla Walla-Freewater No 1 69kV line 69.0 L G 11.74 18 Auto Forced (Configuration) Forced (Configuration) TRI 139596
11/15/2003 16:59 11/15/2003 17:17 Walla Walla-Whitman section of Walla Walla-Freewater No 1 69kV line 69.0 S 3.80 18 Auto Forced (Configuration) Forced (Configuration) TRI 139596
11/15/2003 16:59 11/15/2003 17:17 Whitman tap to Walla Walla-Freewater No 1 69kV line 69.0 T 0.01 18 Auto Forced (Configuration) Forced (Configuration) TRI 139596
11/15/2003 16:59 11/15/2003 17:17 Whitman-Freewater section of Walla Walla-Freewater No 1 69kV line 69.0 S 7.94 18 Auto Forced (Configuration) Forced (Configuration) TRI 139596
11/16/2003 00:22 11/16/2003 05:26 Benton-Scooteney No 1 115kV line 115.0 L G 20.32 304 Plan Maintenance TRI 139597
11/16/2003 00:22 11/16/2003 05:26 Connell tap-Hatton tap section of Connell tap to Benton-Scooteney No 1 115kV line 115.0 TS 4.65 304 Plan Maintenance TRI 139597
11/16/2003 00:22 11/16/2003 05:26 Hatton tap-Connell section of Connell tap to Benton-Scooteney No 1 115kV line 115.0 TS 3.00 304 Plan Maintenance TRI 139597
11/16/2003 00:22 11/16/2003 05:26 Mesa-Connell section of Benton-Scooteney No 1 115kV line 115.0 S 4.53 304 Plan Maintenance TRI 139597
11/16/2003 00:22   Benton-Scooteney No 1 115kV line 115.0 L O 20.32 still out Plan Normally Out TRI 139599
11/16/2003 00:22   Connell-Scooteney section of Benton-Scooteney No 1 115kV line 115.0 S 1.57 still out Plan Normally Out TRI 139599
11/16/2003 01:21 11/16/2003 06:27 Ashe-Marion No 2 500kV line 500.0 L 224.01 306 Plan Voltage Control TRI TDA RED SAL 139600
11/16/2003 04:52 11/17/2003 05:43 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 1491 Plan Voltage Control RED 139598
11/16/2003 11:25 11/16/2003 11:25 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 0 Auto Unknown Unknown SAL 139601
11/16/2003 13:59 11/16/2003 14:11 Lower Monumental PH-Lower Monumental No 1 500kV line 500.0 L 0.97 12 Plan Foreign Request TRI 139602
11/17/2003 06:02 11/24/2003 18:56 Schultz-Raver No 2 500kV line 500.0 L 77.24 10854 Plan Construction WEN COV 139605
11/17/2003 06:27 11/26/2003 12:46 Lookout Point PH-Lookout Point No 1 115kV line 115.0 L 0.21 13339 Plan Foreign Request EUG 139606
11/17/2003 06:30 11/17/2003 16:39 Sammamish-Klahanie section of Sammamish-Maple Valley No 1 230kV line 230.0 S 16.38 609 Plan Foreign Request COV 139607
11/17/2003 06:30 11/17/2003 16:39 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 609 Plan Foreign Request COV 139607
11/17/2003 07:12 11/17/2003 17:04 McNary-Ross No 1 345kV line 345.0 L 174.57 592 Plan Maintenance TRI TDA LGV 139608
11/17/2003 08:04 11/17/2003 17:52 Schultz-Raver No 1 500kV line 500.0 L 77.24 588 Plan Maintenance WEN COV 139609
11/17/2003 08:34 11/20/2003 16:05 Creston-Bell No 1 115kV line 115.0 L G 53.80 4771 Plan Maintenance WEN SPK 139610
11/17/2003 08:34 11/20/2003 16:05 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 4771 Plan Maintenance WEN 139610
11/17/2003 10:27 11/25/2003 14:29 Lower Monumental PH-Lower Monumental No 1 500kV line 500.0 L 0.97 11762 Plan Maintenance TRI 139611
11/17/2003 10:36 11/22/2003 02:27 Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line 500.0 S 0.24 6711 Auto Foreign Trouble Foreign Trouble OLY 139612
11/17/2003 10:36 11/22/2003 02:27 Paul-Centralia Thermal PH No 1 500kV line 500.0 L G 0.78 6711 Auto Foreign Trouble Foreign Trouble OLY 139612
11/17/2003 11:44 11/18/2003 15:32 Chief Joseph-East Omak No 1 230kV line 230.0 L 33.99 1668 Plan Foreign Request WEN 139613
11/17/2003 19:41 11/17/2003 19:41 Swan Valley-Goshen No 1 161kV line 161.0 L 46.46 0 Auto Unknown Weather IDF 139614
11/17/2003 23:02 11/18/2003 01:04 Noxon-Libby No 1 230kV line 230.0 L 70.17 122 Auto Foreign Trouble Foreign Trouble KAL 139615
11/17/2003 23:02 11/17/2003 23:04 Libby PH-Libby No 2 230kV line 230.0 L 1.29 2 Auto RAS Initiated RAS Initiated KAL 139616
11/17/2003 23:02 11/18/2003 00:57 Noxon-Camp section of Noxon-Hot Springs No 1 230kV line 230.0 S 0.20 115 Auto Foreign Trouble Foreign Trouble KAL 139617
11/17/2003 23:02 11/18/2003 00:57 Noxon-Hot Springs No 1 230kV line 230.0 L G 68.28 115 Auto Foreign Trouble Foreign Trouble KAL 139617
11/17/2003 23:02 11/18/2003 01:04 Lancaster-Noxon No 1 230kV line 230.0 L 72.72 122 Auto Foreign Trouble SPK KAL 139618
11/18/2003 04:24 11/18/2003 04:25 Dayton-Shelton section of Olympia-Shelton No 1 115kV line 115.0 S G 1.78 1 Auto Unknown Weather OLY 139636
11/18/2003 04:24 11/18/2003 04:25 Olympia-Dayton section of Olympia-Shelton No 1 115kV line 115.0 S G 17.95 1 Auto Unknown Weather OLY 139636
11/18/2003 04:24 11/18/2003 04:25 Olympia-Shelton No 1 115kV line 115.0 L 19.73 1 Auto Unknown Weather OLY 139636
11/18/2003 06:01 11/18/2003 18:06 Schultz-Raver No 1 500kV line 500.0 L 77.24 725 Plan Maintenance WEN COV 139637
11/18/2003 06:08 11/18/2003 08:50 Libby PH-Libby No 2 230kV line 230.0 L 1.29 162 Auto RAS Initiated RAS Initiated KAL 139638
11/18/2003 06:08 11/18/2003 09:03 Lancaster-Noxon No 1 230kV line 230.0 L 72.72 175 Auto Foreign Trouble SPK KAL 139639
11/18/2003 06:08 11/18/2003 09:05 Noxon-Libby No 1 230kV line 230.0 L 70.17 177 Auto Foreign Trouble Foreign Trouble KAL 139640
11/18/2003 06:08 11/18/2003 09:02 Noxon-Camp section of Noxon-Hot Springs No 1 230kV line 230.0 S 0.20 174 Auto Foreign Trouble Foreign Trouble KAL 139641
11/18/2003 06:08 11/18/2003 09:02 Noxon-Hot Springs No 1 230kV line 230.0 L G 68.28 174 Auto Foreign Trouble Foreign Trouble KAL 139641
11/18/2003 06:25 11/18/2003 14:02 Sammamish-Klahanie section of Sammamish-Maple Valley No 1 230kV line 230.0 S 16.38 457 Plan Foreign Request COV 139642
11/18/2003 06:25 11/18/2003 14:02 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 457 Plan Foreign Request COV 139642
11/18/2003 07:00 11/18/2003 08:26 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 86 Plan Foreign Request TDA RED 139643
11/18/2003 07:00 11/18/2003 08:26 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 86 Plan Foreign Request TDA 139643
11/18/2003 07:00 11/18/2003 08:26 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 86 Plan Foreign Request TDA 139643
11/18/2003 07:00 11/18/2003 08:26 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 86 Plan Foreign Request TDA 139643
11/18/2003 07:00 11/18/2003 08:26 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 86 Plan Foreign Request TDA 139643
11/18/2003 07:00 11/18/2003 08:26 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 86 Plan Foreign Request TDA RED 139644
11/18/2003 07:00 11/18/2003 08:26 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 86 Plan Foreign Request TDA 139644
11/18/2003 07:16 11/18/2003 17:23 McNary-Ross No 1 345kV line 345.0 L 174.57 607 Plan Maintenance TRI TDA LGV 139645
11/18/2003 07:31 11/18/2003 14:23 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 412 Plan Maintenance EUG 139646
11/18/2003 07:31 11/18/2003 14:23 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 412 Plan Maintenance EUG 139646
11/18/2003 08:16 11/18/2003 13:22 Midway-PACW Union Gap No 1 230kV line 230.0 L 39.10 306 Plan Maintenance TRI 139647
11/18/2003 08:38 11/18/2003 15:08 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 390 Plan Fiber Optic Work RED 139648
11/18/2003 09:06 11/18/2003 09:13 Noxon-Libby No 1 230kV line 230.0 L 70.17 7 Auto Foreign Trouble Foreign Trouble KAL 139649
11/18/2003 09:06 11/18/2003 09:35 Libby PH-Libby No 2 230kV line 230.0 L 1.29 29 Auto RAS Initiated RAS Initiated KAL 139650
11/18/2003 11:03 11/18/2003 11:54 Grand Coulee-Schultz No 2 500kV line 500.0 L 97.02 51 Plan Maintenance WEN 139651
11/18/2003 18:28 11/18/2003 22:42 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 254 Auto Foreign Trouble Foreign Utility RED 139652
11/18/2003 18:28 11/18/2003 22:27 Redmond-Pilot Butte PACW No 1 230kV line 230.0 L 15.12 239 Auto Foreign Trouble Foreign Trouble RED 139653
11/18/2003 18:29 11/18/2003 18:36 Redmond-PGE Round Butte No 1 230kV line 230.0 L 23.60 7 Auto Foreign Trouble Foreign Trouble RED 139654
11/18/2003 19:41 11/18/2003 19:46 Redmond-PGE Round Butte No 1 230kV line 230.0 L 23.60 5 Auto Foreign Trouble Foreign Trouble RED 139655
11/18/2003 20:35 11/18/2003 20:35 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 139656
11/18/2003 20:35 11/18/2003 20:35 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 139656
11/18/2003 20:35 11/18/2003 20:35 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139656
11/18/2003 20:35 11/18/2003 20:35 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 139656
11/18/2003 20:35 11/18/2003 20:35 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 139656
11/18/2003 20:35 11/18/2003 20:35 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 139656
11/18/2003 20:35 11/18/2003 20:35 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139656
11/18/2003 20:35 11/18/2003 20:35 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 139656
11/19/2003 03:09 11/19/2003 05:09 Ashe-Marion No 2 500kV line 500.0 L 224.01 120 Plan Voltage Control TRI TDA RED SAL 139657
11/19/2003 04:19 11/19/2003 04:19 Bell-Addy No 1 115kV line 115.0 L 51.18 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Bell-Mead section of Bell-Addy No 1 115kV line 115.0 S G 2.95 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Clayton tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Clayton-Loon Lake section of Bell-Addy No 1 115kV line 115.0 S G 6.27 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Colbert tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Colbert-Half Moon section of Bell-Addy No 1 115kV line 115.0 S G 0.04 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Deer Park tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Deer Park-Clayton section of Bell-Addy No 1 115kV line 115.0 S G 5.19 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Half Moon tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Half Moon-Tum Tum section of Bell-Addy No 1 115kV line 115.0 S G 1.75 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Loon Lake tap to Bell-Addy No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Loon Lake-Addy section of Bell-Addy No 1 115kV line 115.0 S G 22.34 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Mead tap to Bell-Addy No 1 115kV line 115.0 T G 0.18 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Mead-Colbert section of Bell-Addy No 1 115kV line 115.0 S G 4.95 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Milan tap to Bell-Addy No 1 115kV line 115.0 T G 8.22 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Milan-Deer Park section of Bell-Addy No 1 115kV line 115.0 S G 1.97 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Tum Tum tap to Bell-Addy No 1 115kV line 115.0 T G 10.50 0 Auto Unknown Wind SPK 139658
11/19/2003 04:19 11/19/2003 04:19 Tum Tum-Milan section of Bell-Addy No 1 115kV line 115.0 S G 5.72 0 Auto Unknown Wind SPK 139658
11/19/2003 05:18 11/19/2003 05:18 Addy-AVA Gifford No 1 115kV line 115.0 L 20.70 0 Auto Foreign Trouble Foreign Trouble SPK 139659
11/19/2003 06:33 11/19/2003 14:19 McNary-Ross No 1 345kV line 345.0 L 174.57 466 Plan Maintenance TRI TDA LGV 139665
11/19/2003 06:58 11/19/2003 07:17 Sammamish-Klahanie section of Sammamish-Maple Valley No 1 230kV line 230.0 S 16.38 19 Plan Foreign Request COV 139666
11/19/2003 06:58 11/19/2003 07:17 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 19 Plan Foreign Request COV 139666
11/19/2003 07:05 11/19/2003 09:10 Monroe-Sammamish No 1 230kV line 230.0 L 27.18 125 Auto Foreign Trouble Foreign Trouble SNO COV 139667
11/19/2003 12:05 11/19/2003 16:37 Schultz-Raver No 1 500kV line 500.0 L 77.24 272 Plan Maintenance WEN COV 139668
11/20/2003 06:23 11/20/2003 18:12 Sammamish-Klahanie section of Sammamish-Maple Valley No 1 230kV line 230.0 S 16.38 709 Plan Foreign Request COV 139670
11/20/2003 06:23 11/20/2003 18:12 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 709 Plan Foreign Request COV 139670
11/20/2003 06:31 11/20/2003 08:39 McNary-Ross No 1 345kV line 345.0 L 174.57 128 Plan Maintenance TRI TDA LGV 139671
11/20/2003 08:02 11/20/2003 14:53 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 411 Plan Maintenance EUG 139672
11/20/2003 08:04 11/20/2003 14:48 Ashe-Hanford No 1 500kV line 500.0 L 17.31 404 Plan Maintenance TRI 139673
11/20/2003 08:13 11/20/2003 17:33 Schultz-Raver No 1 500kV line 500.0 L 77.24 560 Plan Maintenance WEN COV 139674
11/20/2003 08:13 11/20/2003 15:33 McMinnville-PGE Dayton No 1 115kV line 115.0 L 4.50 440 Plan Maintenance SAL 139675
11/20/2003 08:14 11/20/2003 11:26 Gem State tap to Westside-Sugar Mill No 1 161kV line 161.0 T G 1.25 192 Plan Foreign Request IDF 139676
11/20/2003 08:14 11/20/2003 11:26 Gem State-York Road section of Westside-Sugar Mill No 1 161kV line 161.0 S G 3.00 192 Plan Foreign Request IDF 139676
11/20/2003 08:14 11/20/2003 11:26 Westside-Gem State section of Westside-Sugar Mill No 1 161kV line 161.0 S G 7.00 192 Plan Foreign Request IDF 139676
11/20/2003 08:14 11/20/2003 11:26 Westside-Sugar Mill No 1 161kV line 161.0 L 12.50 192 Plan Foreign Request IDF 139676
11/20/2003 08:14 11/20/2003 11:26 York Road-Sugar Mill section of Westside-Sugar Mill No 1 161kV line 161.0 S G 2.50 192 Plan Foreign Request IDF 139676
11/20/2003 08:19 11/20/2003 14:18 Lower Monumental-McNary No 1 500kV line 500.0 L T 64.75 359 Plan Maintenance TRI 139677
11/20/2003 08:19 11/20/2003 14:18 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 359 Plan Maintenance TRI 139677
11/20/2003 08:55 11/20/2003 11:45 Walla Walla-PACW Walla Walla No 1 69kV line 69.0 L 1.40 170 Plan Maintenance TRI 139678
11/20/2003 10:03 11/20/2003 14:44 Bell-AVA Northeast No 3 115kV line 115.0 L 1.60 281 Plan Maintenance SPK 139679
11/20/2003 14:38 11/20/2003 14:40 Palisades-Snake River No 1 115kV line 115.0 L 17.50 2 Auto Foreign Utility Foreign Utility IDF 139680
11/21/2003 06:48 11/21/2003 09:48 Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line 230.0 S 15.65 180 Plan Foreign Request COV 139683
11/21/2003 06:48 11/21/2003 09:48 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 180 Plan Foreign Request COV 139683
11/21/2003 07:57 11/21/2003 14:27 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 390 Plan Maintenance EUG 139684
11/21/2003 08:00 11/21/2003 14:48 Hanford-John Day No 1 500kV line 500.0 L 97.27 408 Plan Maintenance TRI WEN TDA 139685
11/21/2003 09:48 11/21/2003 16:40 Sammamish-Klahanie section of Sammamish-Maple Valley No 1 230kV line 230.0 S 16.38 412 Plan Switching COV 139686
11/21/2003 09:48 11/21/2003 16:40 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 412 Plan Switching COV 139686
11/21/2003 10:36 11/21/2003 16:51 Lexington-Longview No 1 115kV line 115.0 L G 9.43 375 Plan Maintenance LGV OLY 139687
11/21/2003 10:36 11/21/2003 16:51 Pacific Way-Longview section of Lexington-Longview No 1 115kV line 115.0 S 3.28 375 Plan Maintenance OLY LGV 139687
11/21/2003 12:34 11/21/2003 16:05 Schultz-Raver No 1 500kV line 500.0 L 77.24 211 Plan Maintenance WEN COV 139688
11/21/2003 12:40 11/21/2003 14:46 Carlton-McMinnville No 1 115kV line 115.0 L G 5.35 126 Plan Foreign Request SAL 139689
11/21/2003 12:40 11/21/2003 14:46 Windishar-McMinnville section of Carlton-McMinnville No 1 115kV line 115.0 S 1.48 126 Plan Foreign Request SAL 139689
11/22/2003 05:58 11/24/2003 16:52 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 3534 Plan Foreign Request TDA RED 139690
11/22/2003 05:58 11/24/2003 16:52 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3534 Plan Foreign Request TDA 139690
11/22/2003 05:58 11/24/2003 16:52 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3534 Plan Foreign Request TDA 139690
11/22/2003 05:58 11/24/2003 16:52 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3534 Plan Foreign Request TDA 139690
11/22/2003 05:58 11/24/2003 16:52 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 3534 Plan Foreign Request TDA 139690
11/22/2003 05:58 11/24/2003 16:52 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 3534 Plan Foreign Request TDA RED 139691
11/22/2003 05:58 11/24/2003 16:52 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 3534 Plan Foreign Request TDA 139691
11/22/2003 07:12 11/22/2003 16:02 Chief Joseph-East Omak No 1 230kV line 230.0 L 33.99 530 Plan Maintenance WEN 139692
11/22/2003 09:26 11/22/2003 16:03 Grand Coulee-Chief Joseph No 2 230kV line 230.0 L 32.59 397 Plan Switching WEN 139693
11/22/2003 09:27 11/22/2003 16:00 Chief Joseph PH-Chief Joseph No 1 230kV line 230.0 L 1.09 393 Plan Switching WEN 139694
11/22/2003 09:27 11/22/2003 16:01 Chief Joseph PH-Chief Joseph No 2 230kV line 230.0 L 1.03 394 Plan Switching WEN 139695
11/22/2003 11:15 11/24/2003 04:03 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 2448 Plan Foreign Request OLY 139696
11/22/2003 14:38 11/22/2003 17:31 Schultz-Raver No 1 500kV line 500.0 L 77.24 173 Plan Maintenance WEN COV 139697
11/23/2003 07:32 11/23/2003 17:53 Schultz-Raver No 1 500kV line 500.0 L 77.24 621 Plan Maintenance WEN COV 139698
11/24/2003 01:54 11/24/2003 05:06 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 192 Plan Voltage Control RED 139699
11/24/2003 07:56 11/26/2003 13:27 Ledbeder-Richland section of Red Mountain-Richland No 1 115kV line 115.0 S 3.20 3211 Plan Construction TRI 139706
11/24/2003 07:56 11/26/2003 13:27 Red Mountain-Richland No 1 115kV line 115.0 L G 6.00 3211 Plan Construction TRI 139706
11/24/2003 08:04 11/24/2003 16:48 Grizzly-Summer Lake No 1 500kV line 500.0 L T 103.37 524 Plan Maintenance RED 139707
11/24/2003 08:04 11/24/2003 16:48 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T 0.01 524 Plan Maintenance RED 139707
11/24/2003 08:06 11/24/2003 16:43 Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line 500.0 S 18.26 517 Plan Maintenance RED 139708
11/24/2003 08:06 11/24/2003 16:43 Grizzly-Summer Lake No 1 500kV line 500.0 L G 103.37 517 Plan Maintenance RED 139708
11/24/2003 08:06 11/24/2003 16:43 Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line 500.0 S 85.11 517 Plan Maintenance RED 139708
11/24/2003 08:13 11/24/2003 14:05 Goshen-Drummond No 1 161kV line 161.0 L 72.75 352 Plan Maintenance IDF 139709
11/24/2003 08:50 11/24/2003 17:25 Columbia-Ellensburg No 1 115kV line 115.0 L G 34.98 515 Auto Line Material Failure Line Material Failure WEN 139710
11/24/2003 08:50 11/24/2003 17:25 East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 1.09 515 Auto Line Material Failure Line Material Failure WEN 139710
11/24/2003 13:40 11/24/2003 13:40 B408-Jenkins section of Columbia-Ellensburg No 1 115kV line 115.0 S 23.63 0 Auto Line Material Failure Line Material Failure WEN 139711
11/24/2003 13:40 11/24/2003 13:40 Columbia-B408 section of Columbia-Ellensburg No 1 115kV line 115.0 S 0.04 0 Auto Line Material Failure Line Material Failure WEN 139711
11/24/2003 13:40 11/24/2003 13:40 Columbia-Ellensburg No 1 115kV line 115.0 L O 34.98 0 Auto Line Material Failure Line Material Failure WEN 139711
11/24/2003 13:40 11/24/2003 13:40 East Ellensburg tap to Columbia-Ellensburg No 1 115kV line 115.0 T 3.21 0 Auto Line Material Failure Line Material Failure WEN 139711
11/24/2003 13:40 11/24/2003 13:40 Jenkins tap to Columbia-Ellensburg No 1 115kV line 115.0 T 0.10 0 Auto Line Material Failure Line Material Failure WEN 139711
11/24/2003 13:40 11/24/2003 13:40 Jenkins-East Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 10.22 0 Auto Line Material Failure Line Material Failure WEN 139711
11/24/2003 13:46 11/24/2003 14:30 B408-Jenkins section of Columbia-Ellensburg No 1 115kV line 115.0 S 23.63 44 Auto Line Material Failure WEN 139712
11/24/2003 13:46 11/24/2003 14:30 Columbia-B408 section of Columbia-Ellensburg No 1 115kV line 115.0 S 0.04 44 Auto Line Material Failure WEN 139712
11/24/2003 13:46 11/24/2003 17:25 Columbia-Ellensburg No 1 115kV line 115.0 L O 34.98 219 Auto Line Material Failure WEN 139712
11/24/2003 13:46 11/24/2003 17:25 East Ellensburg tap to Columbia-Ellensburg No 1 115kV line 115.0 T 3.21 219 Auto Line Material Failure WEN 139712
11/24/2003 13:46 11/24/2003 14:30 Jenkins tap to Columbia-Ellensburg No 1 115kV line 115.0 T 0.10 44 Auto Line Material Failure WEN 139712
11/24/2003 13:46 11/24/2003 17:25 Jenkins-East Ellensburg section of Columbia-Ellensburg No 1 115kV line 115.0 S 10.22 219 Auto Line Material Failure WEN 139712
11/24/2003 15:04 11/24/2003 15:52 Big Eddy-Celilo No 1 500kV line 500.0 L 0.72 48 Auto Maintenance Maintenance TDA 139713
11/24/2003 15:22 11/24/2003 16:02 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 40 Auto Maintenance Maintenance TDA 139714
11/24/2003 15:22 11/24/2003 15:52 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 30 Auto Maintenance Maintenance TDA 139715
11/24/2003 15:39 11/24/2003 16:31 Grand Coulee Switchyard 230-500kV Tie No 1 500kV line 500.0 L 1.25 52 Auto Foreign Trouble WEN 139716
11/25/2003 03:24 11/25/2003 03:24 Lower Monumental-Ashe No 1 500kV line 500.0 L 39.58 0 Auto Unknown Unknown TRI 139717
11/25/2003 07:03 11/25/2003 11:22 McNary PH-McNary 3&4 No 4 230kV line 230.0 L 1.00 259 Plan Foreign Request TRI 139720
11/25/2003 07:59 11/25/2003 13:48 Goshen-Drummond No 1 161kV line 161.0 L 72.75 349 Plan Maintenance IDF 139721
11/25/2003 08:47 11/26/2003 15:13 Grizzly-Summer Lake No 1 500kV line 500.0 L T 103.37 1826 Plan Maintenance RED 139722
11/25/2003 08:47 11/26/2003 15:13 Ponderosa tap to Grizzly-Summer Lake No 1 500kV line 500.0 T 0.01 1826 Plan Maintenance RED 139722
11/25/2003 08:49 11/26/2003 15:06 Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line 500.0 S 18.26 1817 Plan Maintenance RED 139723
11/25/2003 08:49 11/26/2003 15:06 Grizzly-Summer Lake No 1 500kV line 500.0 L G 103.37 1817 Plan Maintenance RED 139723
11/25/2003 08:49 11/26/2003 15:06 Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line 500.0 S 85.11 1817 Plan Maintenance RED 139723
11/25/2003 15:15 11/25/2003 16:02 Lower Monumental PH-Lower Monumental No 1 500kV line 500.0 L 0.97 47 Plan Maintenance TRI 139724
11/26/2003 05:12 11/26/2003 05:12 Lower Granite-Hatwai No 1 500kV line 500.0 L 32.87 0 Auto Unknown Unknown SPK TRI 139725
11/26/2003 08:14 11/26/2003 13:13 Goshen-Drummond No 1 161kV line 161.0 L 72.75 299 Plan Maintenance IDF 139727
11/26/2003 12:26 11/26/2003 14:33 The Dalles PH-Big Eddy No 6 230kV line 230.0 L 0.95 127 Auto Foreign Trouble Foreign Utility TDA 139728
11/27/2003 06:31 11/27/2003 06:36 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 5 Auto Foreign Trouble TDA RED 139732
11/27/2003 06:31 11/27/2003 06:36 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Auto Foreign Trouble TDA 139732
11/27/2003 06:31 11/27/2003 06:36 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Auto Foreign Trouble TDA 139732
11/27/2003 06:31 11/27/2003 06:36 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Auto Foreign Trouble TDA 139732
11/27/2003 06:31 11/27/2003 06:36 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 5 Auto Foreign Trouble TDA 139732
11/27/2003 17:14 11/27/2003 17:14 Snoqualmie-Lake Tradition No 1 115kV line 115.0 L T 8.54 0 Auto Foreign Trouble Foreign Trouble COV 139733
11/27/2003 17:14 11/27/2003 17:14 Tanner tap to Snoqualmie-Lake Tradition No 1 115kV line 115.0 T 4.50 0 Auto Foreign Trouble Foreign Trouble COV 139733
11/27/2003 17:16 11/27/2003 17:16 Snoqualmie-Lake Tradition No 1 115kV line 115.0 L T 8.54 0 Auto Foreign Trouble Foreign Trouble COV 139734
11/27/2003 17:16 11/27/2003 17:16 Tanner tap to Snoqualmie-Lake Tradition No 1 115kV line 115.0 T 4.50 0 Auto Foreign Trouble Foreign Trouble COV 139734
11/27/2003 17:19 11/27/2003 17:19 Snoqualmie-Lake Tradition No 1 115kV line 115.0 L T 8.54 0 Auto Foreign Trouble Foreign Trouble COV 139735
11/27/2003 17:19 11/27/2003 17:19 Tanner tap to Snoqualmie-Lake Tradition No 1 115kV line 115.0 T 4.50 0 Auto Foreign Trouble Foreign Trouble COV 139735
11/28/2003 01:20 11/28/2003 05:51 John Day-Marion No 1 500kV line 500.0 L 127.51 271 Plan Voltage Control TDA RED SAL 139736
11/28/2003 10:13 11/28/2003 10:16 Allston-Clatsop No 1 230kV line 230.0 L G 42.61 3 Auto Wind Tree blown LGV 139752
11/28/2003 10:13 11/28/2003 10:16 Allston-Driscoll section of Allston-Clatsop No 1 230kV line 230.0 S 20.84 3 Auto Wind Tree blown LGV 139752
11/28/2003 10:13 11/28/2003 10:16 Driscoll tap to Allston-Clatsop No 1 230kV line 230.0 T 0.22 3 Auto Wind Tree blown LGV 139752
11/28/2003 10:13 11/28/2003 10:16 Driscoll-Clatsop section of Allston-Clatsop No 1 230kV line 230.0 S 21.77 3 Auto Wind Tree blown LGV 139752
11/28/2003 10:49 11/28/2003 10:49 Carlton-Tillamook No 1 230kV line 230.0 L 40.96 0 Auto Unknown Wind SAL 139753
11/28/2003 12:09 11/28/2003 14:43 Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 154 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 12:17 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T 0.10 8 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 12:17 Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 10.90 8 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 12:17 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.50 8 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 14:19 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 11.60 130 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 12:17 Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 12.80 8 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 12:17 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 8 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 14:43 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 154 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:09 11/28/2003 12:17 Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.70 8 Auto Foreign Trouble Foreign Trouble SAL 139754
11/28/2003 12:53 11/28/2003 12:54 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T 0.10 1 Auto Foreign Trouble SAL 139755
11/28/2003 12:53 11/28/2003 12:54 Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 10.90 1 Auto Foreign Trouble SAL 139755
11/28/2003 12:53 11/28/2003 12:54 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.50 1 Auto Foreign Trouble SAL 139755
11/28/2003 12:53 11/28/2003 12:54 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 1 Auto Foreign Trouble SAL 139755
11/28/2003 12:53 11/28/2003 12:54 Tillamook-PACW Astoria No 1 115kV line 115.0 L O 57.70 1 Auto Foreign Trouble SAL 139755
11/28/2003 14:00 11/28/2003 16:10 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 130 Plan Maintenance TDA RED 139763
11/28/2003 14:00 11/28/2003 16:10 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 130 Plan Maintenance TDA 139763
11/29/2003 00:02 11/29/2003 11:07 John Day-Marion No 1 500kV line 500.0 L 127.51 665 Plan Voltage Control TDA RED SAL 139756
11/29/2003 02:03 11/29/2003 03:29 Boardman-Ione No 1 69kV line 69.0 L 30.09 86 Auto Foreign Trouble Foreign Utility TRI 139757
11/29/2003 02:54 11/29/2003 02:54 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 139758
11/29/2003 02:54 11/29/2003 02:54 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 139758
11/29/2003 02:54 11/29/2003 02:54 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139758
11/29/2003 02:54 11/29/2003 02:54 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 139758
11/29/2003 02:54 11/29/2003 02:54 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 139758
11/29/2003 02:54 11/29/2003 02:54 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 139758
11/29/2003 02:54 11/29/2003 02:54 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139758
11/29/2003 02:54 11/29/2003 02:54 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 139758
11/29/2003 03:46 12/20/2003 09:07 Goshen-Drummond No 1 161kV line 161.0 L 72.75 30561 Auto Terminal Equipment Failure Terminal Equipment Failure IDF 139759
11/29/2003 09:03 11/29/2003 09:03 Jim Creek Service No 1 115kV line 115.0 L 9.57 0 Auto Foreign Trouble Foreign Trouble SNO 139764
11/29/2003 16:17 11/29/2003 19:20 Klamath Cogen-Meridian No 1 500kV line 500.0 L 57.99 183 Auto Foreign Trouble RED 139765
11/30/2003 01:57 11/30/2003 09:08 Ashe-Marion No 2 500kV line 500.0 L 224.01 431 Plan Voltage Control TRI TDA RED SAL 139766
11/30/2003 06:54 11/30/2003 06:54 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 139770
11/30/2003 06:54 11/30/2003 06:54 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 139770
11/30/2003 06:54 11/30/2003 06:54 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139770
11/30/2003 06:54 11/30/2003 06:54 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 139770
11/30/2003 06:54 11/30/2003 06:54 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 139770
11/30/2003 06:54 11/30/2003 06:54 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 139770
11/30/2003 06:54 11/30/2003 06:54 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139770
11/30/2003 06:54 11/30/2003 06:54 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 139770
11/30/2003 20:18 11/30/2003 20:46 Coyote Springs-AVA No 2 500kV line 500.0 L 0.06 28 Auto Foreign Trouble TRI 139771
12/01/2003 07:15 12/01/2003 07:30 McKenzie tap to Rocky Reach-Columbia No 2 230kV line 230.0 T 0.30 15 Plan Foreign Request WEN 139773
12/01/2003 07:15 12/01/2003 07:30 McKenzie-Columbia section of Rocky Reach-Columbia No 2 230kV line 230.0 S 5.50 15 Plan Foreign Request WEN 139773
12/01/2003 07:15 12/01/2003 15:08 Rocky Reach-Columbia No 2 230kV line 230.0 L G 21.30 473 Plan Foreign Request WEN 139773
12/01/2003 07:15 12/01/2003 15:08 Rocky Reach-McKenzie section of Rocky Reach-Columbia No 2 230kV line 230.0 S 15.80 473 Plan Foreign Request WEN 139773
12/01/2003 07:43 12/05/2003 15:19 Red Mountain-Ledbeder section of Red Mountain-Richland No 1 115kV line 115.0 S 2.91 6216 Plan Construction TRI 139774
12/01/2003 07:43 12/05/2003 15:19 Red Mountain-Richland No 1 115kV line 115.0 L G 6.00 6216 Plan Construction TRI 139774
12/01/2003 08:18 12/11/2003 14:40 McNary-Franklin No 2 230kV line 230.0 L 26.88 14782 Plan Maintenance TRI 139775
12/01/2003 10:18 12/03/2003 13:11 Grandview-Red Mountain No 1 115kV line 115.0 L G 22.80 3053 Plan Maintenance TRI WEN 139776
12/01/2003 10:18 12/03/2003 13:11 Snipes-Chandler section of Grandview-Red Mountain No 1 115kV line 115.0 S 3.16 3053 Plan Maintenance WEN 139776
12/01/2003 10:48 12/03/2003 13:00 Chandler tap to Grandview-Red Mountain No 1 115kV line 115.0 T 2.87 3012 Plan Maintenance WEN 139777
12/01/2003 10:48 12/03/2003 13:00 Chandler-Benton City section of Grandview-Red Mountain No 1 115kV line 115.0 S 4.86 3012 Plan Maintenance WEN 139777
12/01/2003 10:48 12/03/2003 13:00 Grandview-Red Mountain No 1 115kV line 115.0 L O 22.80 3012 Plan Maintenance TRI WEN 139777
12/01/2003 11:40 12/01/2003 12:08 Captain Jack-Malin No 2 500kV line 500.0 L 6.90 28 Plan Switching RED 139778
12/01/2003 15:01 12/01/2003 15:08 McKenzie tap to Rocky Reach-Columbia No 2 230kV line 230.0 T 0.30 7 Plan Foreign Request WEN 139779
12/01/2003 15:01 12/01/2003 15:10 McKenzie-Columbia section of Rocky Reach-Columbia No 2 230kV line 230.0 S 5.50 9 Plan Foreign Request WEN 139779
12/01/2003 15:01 12/01/2003 15:10 Rocky Reach-Columbia No 2 230kV line 230.0 L O 21.30 9 Plan Foreign Request WEN 139779
12/02/2003 07:32 12/02/2003 15:27 Paul-Satsop No 1 500kV line 500.0 L 46.47 475 Plan Maintenance OLY 139783
12/02/2003 12:15 12/02/2003 12:21 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 6 Auto Foreign Utility Foreign Utility RED 139784
12/03/2003 01:12 12/03/2003 05:47 Schultz-Raver No 4 500kV line 500.0 L 77.43 275 Plan Voltage Control WEN COV 139785
12/03/2003 06:24 12/03/2003 16:04 Dutch Canyon-Warren section of St Johns-St Helens No 1 115kV line 115.0 S 5.37 580 Auto Tree Tree blown LGV 139797
12/03/2003 06:24 12/03/2003 07:52 St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line 115.0 S 12.82 88 Auto Tree Tree blown LGV 139797
12/03/2003 06:24 12/03/2003 16:04 St Johns-St Helens No 1 115kV line 115.0 L G 23.27 580 Auto Tree Tree blown LGV 139797
12/03/2003 06:24 12/03/2003 06:24 Warren-St Helens section of St Johns-St Helens No 1 115kV line 115.0 S 5.08 0 Auto Tree Tree blown LGV 139797
12/03/2003 07:58 12/03/2003 12:06 Carlton-McMinnville No 1 115kV line 115.0 L G 5.35 248 Plan Foreign Request SAL 139798
12/03/2003 07:58 12/03/2003 12:06 Windishar-McMinnville section of Carlton-McMinnville No 1 115kV line 115.0 S 1.48 248 Plan Foreign Request SAL 139798
12/03/2003 08:33 12/03/2003 14:09 Raymond-Cosmopolis No 1 115kV line 115.0 L 18.36 336 Plan Maintenance OLY 139799
12/03/2003 08:58 12/03/2003 12:10 Walla Walla-North Lewiston No 1 115kV line 115.0 L G 80.80 192 Plan Maintenance TRI 139800
12/03/2003 08:58 12/03/2003 12:10 Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line 115.0 S 53.10 192 Plan Maintenance TRI 139800
12/03/2003 12:12 12/03/2003 12:16 Heyburn-Adelaide No 1 138kV line 138.0 L G 12.35 4 Plan Switching IDF 139801
12/03/2003 12:12 12/03/2003 12:16 Heyburn-Hay Mill section of Heyburn-Adelaide No 1 138kV line 138.0 S 4.51 4 Plan Switching IDF 139801
12/03/2003 23:03 12/03/2003 23:09 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L 844.15 6 Auto Foreign Trouble TDA RED 139802
12/03/2003 23:03 12/03/2003 23:09 Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Foreign Trouble TDA 139802
12/03/2003 23:03 12/03/2003 23:09 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Foreign Trouble TDA 139802
12/03/2003 23:03 12/03/2003 23:09 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Foreign Trouble TDA 139802
12/03/2003 23:03 12/03/2003 23:09 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T G 6 Auto Foreign Trouble TDA 139802
12/04/2003 04:22 12/04/2003 04:38 Snoqualmie-Lake Tradition No 1 115kV line 115.0 L T 8.54 16 Auto Foreign Trouble Foreign Trouble COV 139803
12/04/2003 04:22 12/04/2003 04:38 Tanner tap to Snoqualmie-Lake Tradition No 1 115kV line 115.0 T 4.50 16 Auto Foreign Trouble Foreign Trouble COV 139803
12/04/2003 04:57 12/04/2003 05:01 Covington-Columbia No 3 230kV line 230.0 L 110.00 4 Auto Unknown Tree blown COV WEN 139804
12/04/2003 05:22 12/05/2003 14:15 Snoqualmie-Lake Tradition No 1 115kV line 115.0 L T 8.54 1973 Auto Foreign Trouble Foreign Trouble COV 139805
12/04/2003 05:22 12/05/2003 14:15 Tanner tap to Snoqualmie-Lake Tradition No 1 115kV line 115.0 T 4.50 1973 Auto Foreign Trouble Foreign Trouble COV 139805
12/04/2003 06:02 12/04/2003 21:35 Lower Monumental-McNary No 1 500kV line 500.0 L 64.75 933 Plan Construction TRI 139806
12/04/2003 06:02 12/04/2003 21:00 Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line 500.0 S 26.64 898 Plan Construction TRI 139806
12/04/2003 06:02 12/04/2003 21:00 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 898 Plan Construction TRI 139806
12/04/2003 06:02 12/04/2003 21:35 Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line 500.0 S 38.11 933 Plan Construction TRI 139806
12/04/2003 06:04 12/04/2003 18:46 Covington-Columbia No 3 230kV line 230.0 L 110.00 762 Auto Tree blown Tree blown COV WEN 139807
12/04/2003 06:46 12/04/2003 15:34 Olympia-Grand Coulee No 1 287kV line 287.0 L 229.12 528 Auto Tree blown Tree blown OLY COV WEN 139821
12/04/2003 07:09 12/05/2003 19:33 Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line 230.0 S 15.65 2184 Auto Foreign Trouble Foreign Trouble COV 139822
12/04/2003 07:09 12/05/2003 19:33 Sammamish-Maple Valley No 1 230kV line 230.0 L G 32.03 2184 Auto Foreign Trouble Foreign Trouble COV 139822
12/04/2003 07:23 12/04/2003 07:24 Raver-Paul No 1 500kV line 500.0 L 69.31 1 Auto Wind Wind COV OLY 139823
12/04/2003 08:14 12/04/2003 08:33 Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line 115.0 S 4.30 19 Auto Foreign Trouble Foreign Trouble LGV OLY 139824
12/04/2003 08:14 12/04/2003 08:33 Naselle-Hagen section of Naselle-Tarlett No 2 115kV line 115.0 S 13.00 19 Auto Foreign Trouble Foreign Trouble LGV OLY 139824
12/04/2003 08:14 12/04/2003 08:33 Naselle-Tarlett No 2 115kV line 115.0 L G 17.30 19 Auto Foreign Trouble Foreign Trouble LGV OLY 139824
12/04/2003 08:17 12/04/2003 12:15 Martin Creek-Drain No 1 115kV line 115.0 L 12.47 238 Plan Maintenance EUG 139825
12/04/2003 08:33 12/04/2003 12:57 McNary-Ross No 1 345kV line 345.0 L 174.57 264 Auto Tree blown Tree blown TRI TDA LGV 139826
12/04/2003 09:10 12/05/2003 10:00 La Pine-Chiloquin No 1 230kV line 230.0 L 81.02 1490 Plan Foreign Request RED 139827
12/04/2003 09:25 12/04/2003 09:27 Chief Joseph-Snohomish No 4 345kV line 345.0 L 133.07 2 Auto Wind Unknown WEN SNO 139828
12/04/2003 09:38 12/04/2003 09:48 Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 10 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 09:48 Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line 115.0 T 0.10 10 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 09:48 Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 10.90 10 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 09:48 Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.50 10 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 09:48 Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 11.60 10 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 12:33 Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 12.80 175 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 09:48 Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 8.60 10 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 12:33 Tillamook-PACW Astoria No 1 115kV line 115.0 L G 57.70 175 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 09:38 12/04/2003 12:33 Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line 115.0 S 2.70 175 Auto Foreign Trouble Foreign Trouble SAL 139829
12/04/2003 10:19 12/04/2003 12:52 Walla Walla-PACW Walla Walla No 1 69kV line 69.0 L 1.40 153 Plan Foreign Request TRI 139830
12/04/2003 12:35 12/06/2003 07:00 Chelatchie-Yale section of Merwin PACW-Yale No 1 115kV line 115.0 S 1.90 2545 Auto Foreign Trouble OLY 139838
12/04/2003 12:35 12/04/2003 16:16 Merwin PACW-Chelatchie section of Merwin PACW-Yale No 1 115kV line 115.0 S 8.90 221 Auto Foreign Trouble OLY 139838
12/04/2003 12:35 12/06/2003 07:00 Merwin PACW-Yale No 1 115kV line 115.0 L G 10.80 2545 Auto Foreign Trouble OLY 139838
12/04/2003 22:03 12/04/2003 22:04 Lower Monumental-McNary No 1 500kV line 500.0 L T 64.75 1 Plan Construction TRI 139831
12/04/2003 22:03 12/04/2003 22:04 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T 6.07 1 Plan Construction TRI 139831
12/05/2003 06:51 12/05/2003 06:51 Hanford-John Day No 1 500kV line 500.0 L 97.27 0 Auto Bird droppings Bird droppings TRI WEN TDA 139833
12/05/2003 06:57 12/05/2003 12:22 Libby-Conkelley No 1 230kV line 230.0 L G 83.94 325 Plan Maintenance KAL 139834
12/05/2003 06:57 12/05/2003 12:22 Libby-Haskill section of Libby-Conkelley No 1 230kV line 230.0 S 45.10 325 Plan Maintenance KAL 139834
12/05/2003 07:08 12/05/2003 07:09 Haskill tap to Libby-Conkelley No 1 230kV line 230.0 T 0.01 1 Plan Switching KAL 139835
12/05/2003 07:08 12/05/2003 07:09 Libby-Conkelley No 1 230kV line 230.0 L T 83.94 1 Plan Switching KAL 139835
12/05/2003 08:36 12/05/2003 09:17 Chehalis-Centralia No 1 69kV line 69.0 L 11.05 41 Plan Maintenance OLY 139836
12/05/2003 11:01 12/05/2003 14:04 Rocky Reach-Maple Valley No 1 345kV line 345.0 L 128.87 183 Plan Emergency WEN COV 139837
12/06/2003 06:11 12/06/2003 17:09 Echo Lake-Monroe No 1 500kV line 500.0 L T 29.98 658 Plan Maintenance COV SNO 139839
12/06/2003 06:11 12/06/2003 17:09 Sno-King tap to Echo Lake-Monroe No 1 500kV line 500.0 T 12.82 658 Plan Maintenance SNO 139839
12/06/2003 06:26 12/06/2003 16:50 Echo Lake-Monroe No 1 500kV line 500.0 L G 29.98 624 Plan Maintenance COV SNO 139840
12/06/2003 06:26 12/06/2003 16:50 Echo Lake-Sno-King section of Echo Lake-Monroe No 1 500kV line 500.0 S 21.18 624 Plan Maintenance COV SNO 139840
12/06/2003 06:26 12/06/2003 16:50 Sno-King-Monroe section of Echo Lake-Monroe No 1 500kV line 500.0 S 8.80 624 Plan Maintenance SNO 139840
12/07/2003 00:08 12/07/2003 07:07 John Day-Marion No 1 500kV line 500.0 L 127.51 419 Plan Voltage Control TDA RED SAL 139841
12/08/2003 07:47 12/09/2003 13:53 Keeler-Oregon City No 2 115kV line 115.0 L 21.43 1806 Plan Maintenance SAL LGV 139848
12/08/2003 08:44 12/08/2003 15:18 Allston-Astoria No 1 115kV line 115.0 L G 41.98 394 Plan Maintenance LGV 139849
12/08/2003 08:44 12/08/2003 15:18 Allston-Delena section of Allston-Astoria No 1 115kV line 115.0 S 3.31 394 Plan Maintenance LGV 139849
12/08/2003 09:54 12/08/2003 10:25 Bonneville PH 1-North Bonneville No 1 230kV line 230.0 L 0.84 31 Auto Foreign Trouble Foreign Trouble LGV 139850
12/09/2003 00:52 12/09/2003 05:01 John Day-Marion No 1 500kV line 500.0 L 127.51 249 Plan Voltage Control TDA RED SAL 139851
12/09/2003 08:00 12/18/2003 13:24 Albany-Eugene No 1 115kV line 115.0 L G 39.80 13284 Plan Fiber Optic Work EUG 139858
12/09/2003 08:00 12/18/2003 13:24 Albany-Halsey Mill section of Albany-Eugene No 1 115kV line 115.0 S 17.09 13284 Plan Fiber Optic Work EUG 139858
12/09/2003 08:17 12/09/2003 14:23 Midway-Moxee No 1 115kV line 115.0 L G 33.98 366 Plan Maintenance TRI WEN 139859
12/09/2003 08:17 12/09/2003 14:23 Midway-Rattlesnake section of Midway-Moxee No 1 115kV line 115.0 S 16.61 366 Plan Maintenance TRI WEN 139859
12/09/2003 08:27 12/09/2003 08:55 Alfalfa-Outlook section of North Bonneville-Midway No 1 230kV line 230.0 S 8.57 28 Plan Switching WEN 139860
12/09/2003 08:27 12/09/2003 08:55 North Bonneville-Midway No 1 230kV line 230.0 L G 134.71 28 Plan Switching LGV TDA WEN TRI 139860
12/09/2003 08:27 12/09/2003 08:55 Outlook tap to North Bonneville-Midway No 1 230kV line 230.0 T 0.10 28 Plan Switching TRI 139860
12/09/2003 08:27 12/09/2003 13:00 North Bonneville-Midway No 1 230kV line 230.0 L O 134.71 273 Plan Maintenance LGV TDA WEN TRI 139861
12/09/2003 08:27 12/09/2003 13:00 Outlook-Midway section of North Bonneville-Midway No 1 230kV line 230.0 S 22.53 273 Plan Maintenance WEN TRI 139861
12/09/2003 08:49 12/09/2003 12:11 Covington-Columbia No 3 230kV line 230.0 L 110.00 202 Plan Maintenance COV WEN 139862
12/09/2003 11:56 12/09/2003 14:23 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 147 Auto Tree cut Tree cut OLY LGV 139863
12/09/2003 11:56 12/09/2003 13:26 Holcomb-Oxbow section of Holcomb-Naselle No 1 115kV line 115.0 S 1.48 90 Auto Tree cut Tree cut OLY 139863
12/09/2003 11:56 12/09/2003 14:23 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 147 Auto Tree cut Tree cut OLY LGV 139863
12/09/2003 12:47 12/09/2003 13:00 Alfalfa-Outlook section of North Bonneville-Midway No 1 230kV line 230.0 S 8.57 13 Plan Switching WEN 139864
12/09/2003 12:47 12/09/2003 13:00 North Bonneville-Midway No 1 230kV line 230.0 L O 134.71 13 Plan Switching LGV TDA WEN TRI 139864
12/09/2003 12:47 12/09/2003 13:00 Outlook tap to North Bonneville-Midway No 1 230kV line 230.0 T 0.10 13 Plan Switching TRI 139864
12/09/2003 14:23 12/11/2003 10:10 Addy tap to Bell-Boundary No 3 230kV line 230.0 T 0.02 2627 Plan Switching SPK 139865
12/09/2003 14:23 12/11/2003 10:10 Bell-Boundary No 3 230kV line 230.0 L T 108.07 2627 Plan Switching SPK 139865
12/10/2003 07:36 12/10/2003 15:12 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 456 Plan Maintenance OLY LGV 139867
12/10/2003 07:36 12/10/2003 15:12 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 456 Plan Maintenance OLY LGV 139867
12/10/2003 07:40 12/11/2003 13:44 Benton-DOE B3-S4 No 1 115kV line 115.0 L 5.88 1804 Plan Foreign Request TRI 139868
12/10/2003 22:00 12/11/2003 00:03 Ross-Alcoa No 2&4 115kV line 115.0 L 8.23 123 Auto Forced (Configuration) Unknown LGV 139869
12/11/2003 04:14 12/11/2003 16:37 Allston-PGE Beaver No 1 230kV line 230.0 L 9.20 743 Auto Foreign Trouble Foreign Trouble LGV 139874
12/11/2003 06:15 12/11/2003 15:11 Lower Monumental-McNary No 1 500kV line 500.0 L 64.75 536 Plan Construction TRI 139875
12/11/2003 06:15 12/11/2003 15:11 Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line 500.0 S G 26.64 536 Plan Construction TRI 139875
12/11/2003 06:15 12/11/2003 15:11 Sacajawea tap to Lower Monumental-McNary No 1 500kV line 500.0 T G 6.07 536 Plan Construction TRI 139875
12/11/2003 06:15 12/11/2003 15:11 Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line 500.0 S G 38.11 536 Plan Construction TRI 139875
12/11/2003 07:30 12/11/2003 14:56 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 446 Plan Maintenance OLY LGV 139876
12/11/2003 07:30 12/11/2003 14:56 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 446 Plan Maintenance OLY LGV 139876
12/11/2003 07:59 12/11/2003 15:16 Wendson-Tahkenitch No 2 230kV line 230.0 L 19.99 437 Plan Maintenance EUG 139877
12/11/2003 08:07 12/11/2003 13:57 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 350 Plan Maintenance RED 139878
12/11/2003 09:21 12/11/2003 15:13 Salem-Albany No 1 115kV line 115.0 L 23.90 352 Plan Emergency SAL EUG 139879
12/11/2003 10:33 12/11/2003 14:47 Murray-Custer No 1 230kV line 230.0 L 63.39 254 Plan Maintenance SNO 139880
12/11/2003 10:33 12/11/2003 14:47 Murray-Sedro Woolley section of Murray-Custer No 1 230kV line 230.0 S G 25.67 254 Plan Maintenance SNO 139880
12/11/2003 10:33 12/11/2003 14:47 Sedro Woolley tap to Murray-Custer No 1 230kV line 230.0 T G 0.17 254 Plan Maintenance SNO 139880
12/11/2003 10:33 12/11/2003 14:47 Sedro Woolley-Custer section of Murray-Custer No 1 230kV line 230.0 S G 37.72 254 Plan Maintenance SNO 139880
12/12/2003 07:31 12/12/2003 13:31 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 360 Plan Maintenance OLY LGV 139882
12/12/2003 07:31 12/12/2003 13:31 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 360 Plan Maintenance OLY LGV 139882
12/12/2003 07:38 12/12/2003 14:42 White Bluffs-451B No 1 115kV line 115.0 L 6.19 424 Plan Maintenance TRI 139883
12/12/2003 08:06 12/12/2003 15:08 Wendson-Tahkenitch No 2 230kV line 230.0 L 19.99 422 Plan Maintenance EUG 139884
12/12/2003 13:34 12/12/2003 14:16 Malin-PACW 500/230kV Tie No 1 500kV line 500.0 L 0.10 42 Auto Foreign Trouble Foreign Trouble RED 139885
12/12/2003 13:34 12/12/2003 16:30 Malin-Round Mountain No 2 500kV line 500.0 L 94.40 176 Auto Foreign Trouble Foreign Trouble RED 139886
12/12/2003 15:12 12/12/2003 17:18 Allston-PGE Beaver No 1 230kV line 230.0 L 9.20 126 Plan Foreign Request LGV 139887
12/12/2003 16:28 12/12/2003 17:00 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 32 Plan Emergency KAL 139888
12/12/2003 16:28 12/12/2003 17:00 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 32 Plan Emergency KAL SPK 139888
12/13/2003 01:04 12/13/2003 06:18 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 314 Plan Voltage Control RED 139889
12/13/2003 06:01 12/13/2003 17:00 Monroe-Custer No 2 500kV line 500.0 L 85.81 659 Plan Maintenance SNO 139890
12/13/2003 06:52 12/13/2003 06:52 Addy-AVA Devils Gap No 1 115kV line 115.0 L 43.30 0 Auto Foreign Trouble Foreign Trouble SPK 139891
12/13/2003 23:26 12/14/2003 08:40 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 554 Plan Voltage Control RED 139892
12/13/2003 23:56 12/14/2003 00:05 Klamath Cogen-Meridian No 1 500kV line 500.0 L 57.99 9 Auto Foreign Trouble RED 139893
12/14/2003 00:32 12/18/2003 13:56 Alvey-Dixonville No 1 230kV line 230.0 L 59.40 6564 Auto Foreign Trouble Foreign Trouble EUG 139895
12/14/2003 08:56 12/14/2003 08:58 John Day-Marion No 1 500kV line 500.0 L 127.51 2 Auto Unknown Ice TDA RED SAL 139896
12/14/2003 09:05 12/14/2003 20:40 John Day-Marion No 1 500kV line 500.0 L 127.51 695 Auto Unknown Ice TDA RED SAL 139897
12/15/2003 01:04 12/15/2003 05:02 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 238 Plan Voltage Control RED 139898
12/15/2003 07:41 12/15/2003 16:09 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 508 Plan Maintenance KAL SPK 139899
12/15/2003 07:41 12/15/2003 16:09 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.41 508 Plan Maintenance KAL 139899
12/15/2003 07:42 12/15/2003 15:01 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 439 Plan Maintenance EUG 139900
12/15/2003 07:42 12/15/2003 15:01 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 439 Plan Maintenance EUG 139900
12/15/2003 07:45 12/19/2003 12:25 Keeler-Oregon City No 2 115kV line 115.0 L 21.43 6040 Plan Maintenance SAL LGV 139901
12/15/2003 07:50 12/16/2003 14:29 Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line 115.0 S 18.35 1839 Plan Maintenance OLY 139902
12/15/2003 07:50 12/16/2003 14:29 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 1839 Plan Maintenance OLY 139902
12/15/2003 09:28 12/15/2003 12:59 Palisades-Swan Valley No 1 115kV line 115.0 L 12.40 211 Plan Maintenance IDF 139903
12/15/2003 12:28 12/15/2003 16:41 Snohomish-Beverly Park No 3 115kV line 115.0 L 4.59 253 Plan Foreign Request SNO 139905
12/15/2003 14:53 12/15/2003 15:33 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 40 Auto Foreign Trouble Foreign Trouble WEN 139906
12/16/2003 01:15 12/16/2003 04:53 Grizzly-Captain Jack No 1 500kV line 500.0 L 174.50 218 Plan Voltage Control RED 139907
12/16/2003 06:31 12/16/2003 06:35 Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line 115.0 S 12.85 4 Auto Unknown Tree OLY 139922
12/16/2003 06:31 12/16/2003 06:35 Potlatch tap to Shelton-Fairmount No 1 115kV line 115.0 T 0.03 4 Auto Unknown Tree OLY 139922
12/16/2003 06:31 12/16/2003 06:35 Potlatch-Duckabush section of Shelton-Fairmount No 1 115kV line 115.0 S 23.01 4 Auto Unknown Tree OLY 139922
12/16/2003 06:31 12/16/2003 06:31 Quilcene-Fairmount section of Shelton-Fairmount No 1 115kV line 115.0 S 11.04 0 Auto Unknown Tree OLY 139922
12/16/2003 06:31 12/16/2003 06:35 Shelton-Fairmount No 1 115kV line 115.0 L G 60.23 4 Auto Unknown Tree OLY 139922
12/16/2003 06:31 12/16/2003 06:35 Shelton-Potlatch section of Shelton-Fairmount No 1 115kV line 115.0 S 13.33 4 Auto Unknown Tree OLY 139922
12/16/2003 06:39 12/17/2003 10:55 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 1696 Plan Maintenance KAL SPK 139923
12/16/2003 06:39 12/17/2003 10:55 Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line 115.0 S 12.41 1696 Plan Maintenance KAL 139923
12/16/2003 07:47 12/16/2003 14:22 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 395 Plan Maintenance EUG 139924
12/16/2003 07:47 12/16/2003 14:22 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 395 Plan Maintenance EUG 139924
12/16/2003 08:02 12/16/2003 08:26 Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line 230.0 S 35.80 24 Plan Switching OLY COV 139925
12/16/2003 08:02 12/16/2003 08:26 Chehalis-Covington No 1 230kV line 230.0 L G 69.40 24 Plan Switching OLY COV 139925
12/16/2003 08:05 12/16/2003 08:21 Chehalis-Covington No 1 230kV line 230.0 L T 69.40 16 Plan Switching OLY COV 139926
12/16/2003 08:05 12/16/2003 08:21 Cowlitz tap to Chehalis-Covington No 1 230kV line 230.0 T 6.30 16 Plan Switching COV 139926
12/16/2003 08:12 12/16/2003 17:23 Chehalis-Covington No 1 230kV line 230.0 L O 69.40 551 Plan PCS Cellular Work OLY COV 139927
12/16/2003 08:12 12/16/2003 17:23 TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line 230.0 S 23.30 551 Plan PCS Cellular Work COV 139927
12/16/2003 12:56 12/16/2003 12:56 Fidalgo-Lopez Island No 4 115kV line 115.0 L 8.48 0 Auto Foreign Trouble Foreign Trouble SNO 139928
12/16/2003 12:56 12/16/2003 12:56 Fidalgo-Lopez Island No 5 69kV line 69.0 L 8.49 0 Auto Foreign Trouble SNO 139929
12/16/2003 16:39 12/16/2003 16:43 Pearl-Keeler No 1 500kV line 500.0 L 18.33 4 Plan Testing SAL 139930
12/16/2003 17:02 12/16/2003 17:23 Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line 230.0 S 35.80 21 Plan Switching OLY COV 139931
12/16/2003 17:02 12/16/2003 17:23 Chehalis-Covington No 1 230kV line 230.0 L O 69.40 21 Plan Switching OLY COV 139931
12/16/2003 17:06 12/16/2003 17:31 Chehalis-Covington No 1 230kV line 230.0 L T 69.40 25 Plan Switching OLY COV 139932
12/16/2003 17:06 12/16/2003 17:31 Cowlitz tap to Chehalis-Covington No 1 230kV line 230.0 T 6.30 25 Plan Switching COV 139932
12/16/2003 18:11 12/16/2003 18:19 Chief Joseph PH-Chief Joseph No 6 500kV line 500.0 L 0.74 8 Auto Foreign Trouble Foreign Utility WEN 139933
12/16/2003 23:05 12/17/2003 03:32 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 267 Plan Maintenance KAL 139934
12/16/2003 23:05 12/17/2003 03:32 Libby-Bonners Ferry No 1 115kV line 115.0 L O 59.58 267 Plan Maintenance KAL SPK 139934
12/17/2003 03:21 12/17/2003 03:21 Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 110.40 0 Auto Foreign Trouble RED 139935
12/17/2003 03:21 12/17/2003 03:21 Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line 500.0 S G 260.40 0 Auto Foreign Trouble IDF RED 139935
12/17/2003 03:21 12/17/2003 03:21 Midpoint-Summer Lake No 1 500kV line 500.0 L 370.80 0 Auto Foreign Trouble IDF RED 139935
12/17/2003 07:38 12/17/2003 07:57 Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line 230.0 S 35.80 19 Plan Switching OLY COV 139938
12/17/2003 07:38 12/17/2003 07:57 Chehalis-Covington No 1 230kV line 230.0 L G 69.40 19 Plan Switching OLY COV 139938
12/17/2003 07:42 12/17/2003 07:49 Chehalis-Covington No 1 230kV line 230.0 L T 69.40 7 Plan Switching OLY COV 139939
12/17/2003 07:42 12/17/2003 07:49 Cowlitz tap to Chehalis-Covington No 1 230kV line 230.0 T 6.30 7 Plan Switching COV 139939
12/17/2003 07:42 12/17/2003 17:56 Chehalis-Covington No 1 230kV line 230.0 L O 69.40 614 Plan PCS Cellular Work OLY COV 139940
12/17/2003 07:42 12/17/2003 17:56 TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line 230.0 S 23.30 614 Plan PCS Cellular Work COV 139940
12/17/2003 08:39 12/17/2003 13:14 Blackrock-Sunnyside Port section of Midway-Grandview No 1 115kV line 115.0 S 16.25 275 Plan Maintenance WEN 139941
12/17/2003 08:39 12/17/2003 13:14 Midway-Grandview No 1 115kV line 115.0 L G 25.07 275 Plan Maintenance TRI WEN 139941
12/18/2003 00:02 12/18/2003 00:04 Celilo-Sylmar Pole No 3 1000kV line 1000.0 L 844.15 2 Auto Foreign Trouble TDA RED 139942
12/18/2003 00:02 12/18/2003 00:04 Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line 1000.0 T G 2 Auto Foreign Trouble TDA 139942
12/18/2003 06:37 12/18/2003 11:54 Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line 115.0 S 17.09 317 Plan Maintenance KAL 139943
12/18/2003 06:37 12/18/2003 11:54 Libby-Bonners Ferry No 1 115kV line 115.0 L G 59.58 317 Plan Maintenance KAL SPK 139943
12/18/2003 08:03 12/18/2003 13:57 Holcomb-Naselle No 1 115kV line 115.0 L G 21.09 354 Plan Maintenance OLY LGV 139944
12/18/2003 08:03 12/18/2003 13:57 Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line 115.0 S 19.61 354 Plan Maintenance OLY LGV 139944
12/18/2003 08:07 12/18/2003 12:43 Hilltop-Bordertown No 1 345kV line 345.0 L 147.00 276 Plan Foreign Request RED 139945
12/18/2003 09:00 12/18/2003 11:00 Jim Creek Service No 1 115kV line 115.0 L 9.57 120 Plan Foreign Request SNO 139946
12/18/2003 13:44   Albany-Eugene No 1 115kV line 115.0 L G 39.80 still out Plan Normally Out EUG 139947
12/18/2003 13:44   Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line 115.0 S 5.53 still out Plan Normally Out EUG 139947
12/19/2003 02:29 12/19/2003 02:29 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 0 Auto Foreign Trouble Foreign Trouble RED 139948
12/19/2003 08:05 12/19/2003 13:37 Chehalis-Raymond No 1 115kV line 115.0 L G 45.44 332 Plan Maintenance OLY 139951
12/19/2003 08:05 12/19/2003 13:37 Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line 115.0 S 12.18 332 Plan Maintenance OLY 139951
12/19/2003 08:16 12/19/2003 12:23 Hills Creek-Lookout Point No 1 115kV line 115.0 L G 24.80 247 Plan Maintenance EUG 139952
12/19/2003 08:16 12/19/2003 12:23 Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line 115.0 S 20.00 247 Plan Maintenance EUG 139952
12/19/2003 15:20 12/19/2003 18:38 Keeler-Oregon City No 2 115kV line 115.0 L 21.43 198 Auto Tree cut Tree cut SAL LGV 139953
12/19/2003 22:14 12/19/2003 22:14 Big Eddy-Chemawa No 1 230kV line 230.0 L 116.41 0 Auto Unknown Unknown TDA LGV SAL 139954
12/20/2003 01:55 12/21/2003 02:16 Paul-Centralia Thermal PH No 2 500kV line 500.0 L 0.68 1461 Plan Foreign Request OLY 139955
12/20/2003 03:06 12/20/2003 05:51 Ashe-Marion No 2 500kV line 500.0 L 224.01 165 Plan Voltage Control TRI TDA RED SAL 139956
12/20/2003 18:00 12/20/2003 18:27 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 27 Plan Testing TDA 139957
12/20/2003 18:00 12/20/2003 21:41 Celilo-Sylmar Pole No 4 1000kV line 1000.0 L T 844.15 221 Plan Testing TDA RED 139958
12/20/2003 18:00 12/20/2003 21:41 Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 221 Plan Testing TDA 139958
12/20/2003 18:00 12/20/2003 21:41 Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 221 Plan Testing TDA 139958
12/20/2003 18:00 12/20/2003 21:41 Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line 1000.0 T 221 Plan Testing TDA 139958
12/20/2003 19:27 12/20/2003 19:43 Big Eddy-Celilo No 4 230kV line 230.0 L 0.96 16 Plan Testing TDA 139959
12/21/2003 02:00 12/21/2003 06:11 Ashe-Marion No 2 500kV line 500.0 L 224.01 251 Plan Voltage Control TRI TDA RED SAL 139960
12/22/2003 07:55 12/22/2003 12:04 The Dalles-Chenoweth No 1 115kV line 115.0 L 2.03 249 Plan Maintenance TDA 139962
12/22/2003 08:45 12/22/2003 13:22 Creston-Bell No 1 115kV line 115.0 L G 53.80 277 Plan Maintenance WEN SPK 139963
12/22/2003 08:45 12/22/2003 13:22 Creston-Larene section of Creston-Bell No 1 115kV line 115.0 S 16.73 277 Plan Maintenance WEN 139963
12/22/2003 13:48 12/22/2003 13:48 Kitsap-Bangor No 1 115kV line 115.0 L 14.02 0 Auto Foreign Trouble Foreign Trouble OLY 139964
12/23/2003 07:17 12/23/2003 14:30 Big Eddy-Celilo No 2 500kV line 500.0 L 0.62 433 Plan Maintenance TDA 139965
12/23/2003 08:03 12/23/2003 14:11 Allston-Astoria No 1 115kV line 115.0 L T 41.98 368 Plan Maintenance LGV 139966
12/23/2003 08:03 12/23/2003 14:11 Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line 115.0 TS 18.27 368 Plan Maintenance LGV OLY 139966
12/23/2003 10:03 12/23/2003 10:17 Pilot Butte-La Pine No 1 230kV line 230.0 L 29.60 14 Plan Foreign Request RED 139967
12/23/2003 10:32 12/23/2003 14:31 Fidalgo-Lopez Island No 4 115kV line 115.0 L 8.48 239 Plan Maintenance SNO 139968
12/23/2003 13:40 12/23/2003 13:58 Moxee-Union Gap No 1 115kV line 115.0 L 6.50 18 Plan Foreign Request TRI 139969
12/23/2003 16:15 12/24/2003 03:54 Chief Joseph-Monroe No 1 500kV line 500.0 L 121.60 699 Auto Malicious Malicious WEN SNO 139970
12/24/2003 05:17 12/24/2003 06:23 Echo Lake-Maple Valley No 1&2 500kV line 500.0 L 31.51 66 Plan Emergency COV 139971
12/25/2003 00:35 12/25/2003 06:11 Ashe-Marion No 2 500kV line 500.0 L 224.01 336 Plan Voltage Control TRI TDA RED SAL 139972
12/25/2003 06:31 12/25/2003 06:31 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 0 Auto Foreign Trouble Foreign Trouble RED 139973
12/26/2003 01:06 12/26/2003 01:06 Christmas Valley tap to Redmond-Harney No 1 115kV line 115.0 T G 31.20 0 Auto Unknown Unknown RED 139981
12/26/2003 01:06 12/26/2003 01:06 Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line 115.0 S G 2.40 0 Auto Unknown Unknown RED 139981
12/26/2003 01:06 12/26/2003 01:06 Hampton tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139981
12/26/2003 01:06 12/26/2003 01:06 Hampton-Riley section of Redmond-Harney No 1 115kV line 115.0 S G 46.50 0 Auto Unknown Unknown RED 139981
12/26/2003 01:06 12/26/2003 01:06 Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line 115.0 S G 54.70 0 Auto Unknown Unknown RED 139981
12/26/2003 01:06 12/26/2003 01:06 Redmond-Harney No 1 115kV line 115.0 L 125.40 0 Auto Unknown Unknown RED 139981
12/26/2003 01:06 12/26/2003 01:06 Riley tap to Redmond-Harney No 1 115kV line 115.0 T G 0.10 0 Auto Unknown Unknown RED 139981
12/26/2003 01:06 12/26/2003 01:06 Riley-Harney section of Redmond-Harney No 1 115kV line 115.0 S G 21.80 0 Auto Unknown Unknown RED 139981
12/26/2003 05:39 12/26/2003 05:42 Captain Jack-Klamath Cogen No 1 500kV line 500.0 L 26.30 3 Auto Foreign Trouble Foreign Trouble RED 139974
12/28/2003 19:57 12/28/2003 19:59 Forest Grove-Thatcher Junction section of Keeler-Tillamook No 1 115kV line 115.0 S 1.90 2 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/28/2003 19:59 Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line 115.0 S 10.53 2 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/28/2003 23:00 Keeler-Tillamook No 1 115kV line 115.0 L G 57.81 183 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/28/2003 19:58 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T 0.10 1 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/28/2003 19:58 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 1 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/28/2003 19:59 Thatcher Junction tap to Keeler-Tillamook No 1 115kV line 115.0 T 0.75 2 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/28/2003 23:00 Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line 115.0 S 8.04 183 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/29/2003 06:55 Timber tap to Keeler-Tillamook No 1 115kV line 115.0 T 11.21 658 Auto Tree Tree blown SAL 139993
12/28/2003 19:57 12/28/2003 21:23 Timber-South Fork section of Keeler-Tillamook No 1 115kV line 115.0 S 12.20 86 Auto Tree Tree blown SAL 139993
12/28/2003 21:17 12/28/2003 21:23 Keeler-Tillamook No 1 115kV line 115.0 L O 57.81 6 Plan Testing SAL 139994
12/28/2003 21:17 12/28/2003 21:23 South Fork tap to Keeler-Tillamook No 1 115kV line 115.0 T 0.10 6 Plan Testing SAL 139994
12/28/2003 21:17 12/28/2003 21:23 South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line 115.0 S 25.14 6 Plan Testing SAL 139994
12/29/2003 06:24 12/29/2003 06:24 Salem-PGE Bethel No 1 115kV line 115.0 L 14.40 0 Auto Foreign Trouble Foreign Trouble SAL 140225
12/29/2003 10:06 12/29/2003 10:06 Salem-PGE Bethel No 1 115kV line 115.0 L 14.40 0 Auto Foreign Trouble Foreign Trouble SAL 140226
12/29/2003 10:08 12/29/2003 10:08 Buckley Station Service tap to McNary-Santiam No 2 230kV line 230.0 T G 0 Auto Unknown Ice TDA 140006
12/29/2003 10:08 12/29/2003 10:08 Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line 230.0 S G 136.53 0 Auto Unknown Ice TDA RED 140006
12/29/2003 10:08 12/29/2003 10:08 McNary-Dalreed section of McNary-Santiam No 2 230kV line 230.0 S G 35.95 0 Auto Unknown Ice TRI TDA 140006
12/29/2003 10:08 12/29/2003 10:08 McNary-Santiam No 2 230kV line 230.0 L 200.43 0 Auto Unknown Ice TRI TDA RED SAL 140006
12/29/2003 10:08 12/29/2003 10:08 Tumble Creek tap to McNary-Santiam No 2 230kV line 230.0 T G 0.10 0 Auto Unknown Ice SAL 140006
12/29/2003 10:08 12/29/2003 10:08 Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line 230.0 S G 27.95 0 Auto Unknown Ice SAL 140006
12/29/2003 13:49 12/30/2003 01:42 Schultz-Raver No 1 500kV line 500.0 L 77.24 713 Plan Maintenance WEN COV 140007
12/30/2003 07:30 12/30/2003 14:49 Reedsport-Fairview No 1 115kV line 115.0 L G 38.48 439 Plan Maintenance EUG 140009
12/30/2003 07:30 12/30/2003 14:49 Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line 115.0 S 9.35 439 Plan Maintenance EUG 140009
12/31/2003 06:26 12/31/2003 06:26 Ashe-Marion No 2 500kV line 500.0 L 224.01 0 Auto Unknown Unknown TRI TDA RED SAL 140011
12/31/2003 17:45   Raver tap to Schultz-Echo Lake No 1 500kV line 500.0 T 2.95 still out Plan Normally Out COV 140124
12/31/2003 17:45   Schultz-Echo Lake No 1 500kV line 500.0 L T 83.36 still out Plan Normally Out WEN COV 140124