Out Datetime | In Datetime | Name | Voltage (kV) |
Duration (minutes) |
Outage Type |
Dispatcher Cause | Field Cause | System In Control | MW Intrpt | District | Outage ID |
---|---|---|---|---|---|---|---|---|---|---|---|
02/06/1998 14:05 | St. Johns: Portland Gen Elec 11.5kV Feeder 3 | 11.5 | still out | Plan | Normally Out | Customer Request | None | LGV | 107653 | ||
08/11/1999 10:45 | Port Angeles: Port Angeles WA 69kV Feeder 1 to Rayonier | 69.0 | still out | Plan | Normally Out | Customer Request | None | OLY | 117190 | ||
11/12/2000 18:30 | Mackay: Salmon River Coop 69kV Feeder 1 | 69.0 | still out | Plan | Normally Out | Customer Request | None | IDF | 123981 | ||
12/06/2000 15:03 | Arco: Lost River Elec 69kV Feeder 1 by PacifiCorp (PACE) | 69.0 | still out | Plan | Normally Out | Transferor Request | Unknown | IDF | 124097 | ||
12/07/2000 12:15 | Valhalla: Alcoa 13.8kV Feeder 4 | 13.8 | still out | Plan | Normally Out | Customer Request | None | WEN | 129275 | ||
05/10/2001 12:00 | Valhalla: Alcoa 13.8kV Feeder 1 | 13.8 | still out | Plan | Normally Out | Customer Request | Unknown | WEN | 125878 | ||
04/03/2003 13:26 | Foster Creek NVEC: Okanogan Co PUD 115kV Feeder 1 | 115.0 | still out | Plan | Normally Out | BPA Request | Unknown | WEN | 138810 | ||
05/09/2003 07:36 | Longview: Longview Alum LLC 13.8kV Feeder C | 13.8 | still out | Plan | Normally Out | BPA Request | None | LGV | 138929 | ||
06/16/2003 07:37 | Valhalla: Alcoa 13.8kV Feeder 5 | 13.8 | still out | Plan | Normally Out | Customer Request | None | WEN | 137212 | ||
08/12/2003 10:13 | 03/03/2004 13:48 | Conkelley: Col Falls Alum Co 13.8kV Feeder 1 | 13.8 | 294035 | Plan | Maintenance | BPA Request | None | KAL | 138297 | |
08/12/2003 10:13 | 03/03/2004 11:07 | Conkelley: Col Falls Alum Co 13.8kV Feeder 2 | 13.8 | 293874 | Plan | Maintenance | BPA Request | None | KAL | 138298 | |
08/12/2003 10:13 | 04/09/2004 14:34 | Conkelley: Col Falls Alum Co 13.8kV Feeder 3 | 13.8 | 347301 | Plan | Maintenance | BPA Request | None | KAL | 138299 | |
09/12/2003 09:22 | 04/30/2004 14:37 | Longview: Longview Alum LLC 13.8kV Feeder B | 13.8 | 332955 | Plan | Foreign Request | Customer Request | Unknown | LGV | 138784 | |
12/04/2003 12:15 | 01/01/2004 13:14 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 40379 | Plan | Normally Out | Customer Request | Unknown | EUG | 139818 | |
12/31/2003 16:34 | 01/01/2004 02:00 | Condon Wind: SeaWest Power 69kV Feeder 1 | 69.0 | 566 | Auto | TT Noise | BPA Trouble | None | TDA | 140010 | |
01/01/2004 07:00 | 01/01/2004 16:52 | Alvey: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 592 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | EUG | 140013 |
01/01/2004 07:11 | 01/01/2004 17:50 | Canby: Surprise Valley 69kV Feeder 1 | 69.0 | 639 | Auto | Weather | Weather | BPA Trouble | Unknown | RED | 140014 |
01/01/2004 07:46 | 01/01/2004 08:15 | Eugene: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 29 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | EUG | 140015 |
01/01/2004 10:10 | 01/01/2004 15:45 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 335 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 140016 |
01/01/2004 10:15 | 01/01/2004 17:23 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 428 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 140017 |
01/01/2004 11:08 | 01/01/2004 15:12 | Oakridge: Lane Elec Coop 115kV Feeder 1 | 115.0 | 244 | Auto | Weather | Weather | BPA Trouble | Unknown | EUG | 140018 |
01/01/2004 11:11 | 01/01/2004 13:49 | Marcola: Emerald PUD 230kV Feeder 1 | 230.0 | 158 | Auto | Tree blown | BPA Trouble | 7 | EUG | 140019 | |
01/01/2004 11:11 | 01/01/2004 13:49 | Marcola: Emerald PUD 230kV Feeder 2 | 230.0 | 158 | Auto | Tree blown | BPA Trouble | 7 | EUG | 140020 | |
01/01/2004 11:56 | 01/01/2004 11:56 | Bridge: Raft River Elec 138kV Feeder 1 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 14 | IDF | 140021 |
01/01/2004 11:56 | 01/01/2004 11:56 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | IDF | 140022 |
01/01/2004 11:56 | 01/01/2004 11:56 | Bridge: Raft River Elec 34.5kV Feeder 1 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 140023 |
01/01/2004 11:56 | 01/01/2004 11:56 | Curlew: Raft River Elec 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Foreign Trouble | BPA Trouble | 1 | IDF | 140024 |
01/01/2004 11:56 | 01/01/2004 11:56 | Idahome: Raft River Elec 34.5kV Feeder 1 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 140025 |
01/01/2004 11:59 | 01/01/2004 11:59 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 140026 |
01/01/2004 12:28 | 01/01/2004 14:09 | Blue River: Lane Elec Coop 115kV Feeder 1 | 115.0 | 101 | Auto | Weather | BPA Trouble | Unknown | EUG | 140027 | |
01/01/2004 12:28 | 01/01/2004 14:09 | Carmen PH: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 101 | Auto | Weather | Weather | BPA Trouble | Unknown | EUG | 140028 |
01/01/2004 13:56 | 01/01/2004 14:42 | Condon Wind: SeaWest Power 69kV Feeder 1 | 69.0 | 46 | Auto | Weather | BPA Trouble | 45 | TDA | 140029 | |
01/01/2004 15:50 | 01/02/2004 03:09 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 679 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | IDF | 140030 |
01/01/2004 16:08 | 01/01/2004 17:22 | Oakridge: Lane Elec Coop 115kV Feeder 1 | 115.0 | 74 | Auto | Foreign Trouble | Customer Trouble | Unknown | EUG | 140031 | |
01/01/2004 17:50 | Canby SVEC: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | still out | Plan | Normally Out | BPA Request | 1 | RED | 140032 | ||
01/01/2004 18:17 | 01/01/2004 18:31 | Alvey: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 14 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | EUG | 140033 |
01/01/2004 19:40 | 01/01/2004 20:06 | Oakridge: Lane Elec Coop 115kV Feeder 1 | 115.0 | 26 | Auto | Foreign Trouble | Customer Trouble | Unknown | EUG | 140034 | |
01/02/2004 01:11 | 01/02/2004 01:11 | Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | OLY | 140035 |
01/02/2004 01:22 | 01/02/2004 01:22 | Warren: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | LGV | 140086 |
01/02/2004 01:29 | 01/03/2004 11:00 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 2011 | Auto | Tree blown | BPA Trouble | None | EUG | 140036 | |
01/02/2004 01:29 | 01/02/2004 02:18 | Sumner: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 49 | Auto | Weather | Overload | BPA Trouble | Unknown | EUG | 140037 |
01/02/2004 01:29 | 01/02/2004 02:18 | Glasgow: Central Linc PUD 115kV Feeder 1 | 115.0 | 49 | Auto | Weather | Overload | BPA Trouble | Unknown | EUG | 140038 |
01/02/2004 01:29 | 01/02/2004 01:30 | Hauser CLP: Central Linc PUD 115kV Feeder 1 | 115.0 | 1 | Auto | Weather | BPA Trouble | Unknown | EUG | 140039 | |
01/02/2004 01:29 | 01/02/2004 01:30 | Lakeside CLP: Central Linc PUD 115kV Feeder 1 | 115.0 | 1 | Auto | Weather | Overload | BPA Trouble | Unknown | EUG | 140040 |
01/02/2004 01:29 | 01/02/2004 02:38 | Geisel Monument: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 69 | Auto | Weather | BPA Trouble | Unknown | EUG | 140041 | |
01/02/2004 01:29 | 01/02/2004 02:25 | Langlois: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 56 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140042 |
01/02/2004 01:29 | 01/02/2004 02:25 | Port Orford: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 56 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140043 |
01/02/2004 01:29 | 01/02/2004 02:25 | Two Mile Road: Bandon OR 12.5kV Feeder 1 | 12.5 | 56 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140044 |
01/02/2004 01:29 | 01/02/2004 03:05 | Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) | 34.5 | 96 | Auto | Tree blown | BPA Trouble | Unknown | EUG | 140045 | |
01/02/2004 01:29 | 01/02/2004 03:05 | Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) | 34.5 | 96 | Auto | Tree blown | BPA Trouble | Unknown | EUG | 140046 | |
01/02/2004 01:29 | 01/02/2004 03:05 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 96 | Auto | Tree blown | BPA Trouble | Unknown | EUG | 140047 | |
01/02/2004 01:29 | 01/02/2004 03:05 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 96 | Auto | Tree blown | BPA Trouble | Unknown | EUG | 140048 | |
01/02/2004 01:29 | 01/02/2004 03:05 | Latham: Emerald PUD 115kV Feeder 1 | 115.0 | 96 | Auto | Tree blown | BPA Trouble | Unknown | EUG | 140049 | |
01/02/2004 01:29 | 01/02/2004 02:27 | Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 | 12.5 | 58 | Auto | Weather | Forced (Configuration) | BPA Trouble | 1 | EUG | 140050 |
01/02/2004 01:29 | 01/02/2004 02:25 | Langlois: Bandon OR 12.5kV Feeder 1 | 12.5 | 56 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140051 |
01/02/2004 01:29 | 01/02/2004 02:26 | Bandon: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 57 | Auto | Weather | Forced (Configuration) | BPA Trouble | 1 | EUG | 140052 |
01/02/2004 01:29 | 01/02/2004 02:22 | Morrison: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 53 | Auto | Weather | BPA Trouble | 1 | EUG | 140053 | |
01/02/2004 01:29 | 01/02/2004 02:22 | Norway: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 53 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140054 |
01/02/2004 01:29 | 01/02/2004 02:22 | Norway: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 53 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140055 |
01/02/2004 01:29 | 01/02/2004 02:29 | Fairview CCEC: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 60 | Auto | Weather | Forced (Configuration) | BPA Trouble | 1 | EUG | 140056 |
01/02/2004 01:29 | 01/02/2004 02:23 | Bandon: Bandon OR 12.5kV Feeder 1 | 12.5 | 54 | Auto | Weather | Forced (Configuration) | BPA Trouble | 8 | EUG | 140057 |
01/02/2004 01:29 | 01/02/2004 02:40 | Gold Beach: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 71 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140087 |
01/02/2004 01:29 | 01/02/2004 02:40 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 71 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140088 |
01/02/2004 01:29 | 01/02/2004 02:40 | Gold Beach: Coos-Curry Coop 115kV Feeder 3 | 115.0 | 71 | Auto | Weather | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140089 |
01/02/2004 02:11 | 01/02/2004 02:18 | Hauser CLP: Central Linc PUD 115kV Feeder 1 | 115.0 | 7 | Auto | Weather | BPA Trouble | Unknown | EUG | 140058 | |
01/02/2004 02:11 | 01/02/2004 02:18 | Lakeside CLP: Central Linc PUD 115kV Feeder 1 | 115.0 | 7 | Auto | Weather | Power System Condition | BPA Trouble | Unknown | EUG | 140059 |
01/02/2004 04:10 | 01/02/2004 08:01 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 231 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 140060 |
01/02/2004 04:42 | 01/02/2004 04:58 | Blue River: Lane Elec Coop 115kV Feeder 1 | 115.0 | 16 | Auto | Weather | BPA Trouble | Unknown | EUG | 140061 | |
01/02/2004 05:00 | 01/02/2004 05:00 | Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | OLY | 140062 |
01/02/2004 05:35 | 01/02/2004 14:40 | Warren: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 545 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | LGV | 140247 |
01/02/2004 09:00 | 01/02/2004 09:48 | Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma | 69.0 | 48 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 7 | OLY | 140090 |
01/02/2004 17:20 | 01/02/2004 17:23 | Eugene: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 3 | Plan | Foreign Request | Customer Request | None | EUG | 140091 | |
01/03/2004 13:42 | 01/13/2004 09:27 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 14145 | Plan | Normally Out | BPA Request | Unknown | EUG | 140095 | |
01/03/2004 23:08 | 01/03/2004 23:48 | Hay Mill: Rupert ID 138kV Feeder 1 | 138.0 | 40 | Plan | Foreign Request | Customer Request | 4 | IDF | 140096 | |
01/03/2004 23:08 | 01/03/2004 23:48 | Hay Mill: United Elec Coop 138kV Feeder 1 | 138.0 | 40 | Plan | Foreign Request | Customer Request | 3 | IDF | 140097 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 3 | Auto | Forced (Configuration) | Weather | BPA Trouble | 5 | EUG | 140098 |
01/04/2004 01:32 | 01/04/2004 01:35 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 3 | Auto | Forced (Configuration) | Weather | BPA Trouble | Unknown | EUG | 140099 |
01/04/2004 01:32 | 01/04/2004 01:35 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 3 | Auto | Forced (Configuration) | Weather | BPA Trouble | Unknown | EUG | 140100 |
01/04/2004 01:32 | 01/04/2004 01:35 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 3 | Auto | Forced (Configuration) | Weather | BPA Trouble | Unknown | EUG | 140101 |
01/04/2004 01:32 | 01/04/2004 01:35 | Latham: Emerald PUD 115kV Feeder 1 | 115.0 | 3 | Auto | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140102 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) | 34.5 | 3 | Auto | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140103 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) | 34.5 | 3 | Auto | Forced (Configuration) | BPA Trouble | Unknown | EUG | 140104 | |
01/04/2004 07:23 | 01/04/2004 07:32 | Anaconda: NorthWestern Ener 115kV Feeder 2 | 115.0 | 9 | Plan | Switching | BPA Request | None | KAL | 140113 | |
01/04/2004 18:01 | 01/04/2004 22:57 | Glade: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 296 | Auto | Foreign Trouble | Foreign Utility | Customer Trouble | Unknown | TRI | 140114 |
01/05/2004 17:50 | 01/05/2004 17:52 | Parkdale: Hood River Elec 12.5kV Feeder 1 | 12.5 | 2 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TDA | 140125 |
01/05/2004 19:00 | 01/05/2004 19:00 | Pine Hollow: Wasco Elec Coop 12.5kV Feeder 1 by Northrn Wasco PUD | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TDA | 140207 |
01/05/2004 23:13 | 01/05/2004 23:16 | Carson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 3 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140128 |
01/05/2004 23:13 | 01/05/2004 23:16 | Stevenson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 3 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140129 |
01/05/2004 23:13 | 01/05/2004 23:16 | North Bonneville: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 3 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140130 |
01/05/2004 23:13 | 01/05/2004 23:16 | Underwood: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 3 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140131 |
01/05/2004 23:18 | 01/06/2004 01:34 | Carson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 136 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140134 |
01/05/2004 23:18 | 01/06/2004 01:34 | North Bonneville: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 136 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140135 |
01/05/2004 23:18 | 01/06/2004 01:34 | Stevenson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 136 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140136 |
01/05/2004 23:18 | 01/06/2004 01:34 | Underwood: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 136 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140137 |
01/06/2004 01:46 | 01/06/2004 08:29 | Carson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 403 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140138 |
01/06/2004 01:46 | 01/06/2004 08:29 | North Bonneville: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 403 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140139 |
01/06/2004 01:46 | 01/06/2004 08:29 | Stevenson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 403 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140140 |
01/06/2004 01:46 | 01/06/2004 01:46 | Cape Horn: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 0 | Auto | Tree blown | Ice | BPA Trouble | Unknown | LGV | 140141 |
01/06/2004 01:46 | 01/06/2004 01:46 | Evans: Clark Public Util 115kV Feeder 1 | 115.0 | 0 | Auto | Tree blown | BPA Trouble | Unknown | LGV | 140142 | |
01/06/2004 01:46 | 01/06/2004 05:55 | Underwood: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 249 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | LGV | 140143 |
01/06/2004 01:59 | 01/06/2004 05:42 | Evans: Clark Public Util 115kV Feeder 1 | 115.0 | 223 | Plan | Switching | BPA Request | Unknown | LGV | 140146 | |
01/06/2004 01:59 | 01/06/2004 05:42 | Cape Horn: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 223 | Plan | Switching | BPA Request | Unknown | LGV | 140147 | |
01/06/2004 06:45 | 01/06/2004 06:45 | Pine Hollow: Wasco Elec Coop 12.5kV Feeder 1 by Northrn Wasco PUD | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TDA | 140208 |
01/06/2004 07:43 | 01/06/2004 07:57 | Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 14 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 140161 | |
01/06/2004 07:43 | 01/06/2004 07:57 | Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 14 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SAL | 140162 |
01/06/2004 07:43 | 01/06/2004 09:41 | Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 118 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SAL | 140163 |
01/06/2004 07:43 | 01/06/2004 07:57 | Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 14 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SAL | 140164 |
01/06/2004 17:14 | 01/07/2004 00:23 | Santiam: Consumers Power 69kV Feeder 1 | 69.0 | 429 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SAL | 140165 |
01/07/2004 03:22 | 01/07/2004 03:22 | Eugene: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | EUG | 140166 |
01/07/2004 05:08 | 01/07/2004 07:09 | Parker: Blachly-Lane Co 115kV Feeder 1 | 115.0 | 121 | Auto | Foreign Trouble | Customer Trouble | Unknown | EUG | 140175 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Alderwood: Blachly-Lane Co 12.5kV Feeder 1 | 12.5 | 121 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 140176 |
01/07/2004 05:08 | 01/07/2004 07:09 | Cheshire: Emerald PUD 115kV Feeder 1 | 115.0 | 121 | Auto | Foreign Trouble | Customer Trouble | Unknown | EUG | 140177 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Cheshire: Emerald PUD 115kV Feeder 2 | 115.0 | 121 | Auto | Foreign Trouble | Customer Trouble | Unknown | EUG | 140178 | |
01/07/2004 05:08 | 01/07/2004 12:27 | Harrisburg: Consumers Power 115kV Feeder 1 to Greenberry | 115.0 | 439 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 140179 |
01/07/2004 05:08 | 01/07/2004 12:27 | Harrisburg: Consumers Power 12.5kV Feeder 1 | 12.5 | 439 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 140180 |
01/07/2004 05:08 | 01/07/2004 07:09 | Junction City BLC: Blachly-Lane Co 115kV Feeder 1 | 115.0 | 121 | Auto | Foreign Trouble | Customer Trouble | Unknown | EUG | 140181 | |
01/07/2004 06:29 | 01/07/2004 15:09 | Sno-King: Snohomish Co PUD 115kV Feeder 1 | 115.0 | 520 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | SNO | 140182 |
01/07/2004 07:33 | 01/07/2004 08:19 | Oxbow: Pacific Co PUD 115kV Feeder 1 | 115.0 | 46 | Auto | Tree blown | BPA Trouble | Unknown | LGV | 140183 | |
01/08/2004 11:15 | 01/08/2004 13:00 | Warren: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 105 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | LGV | 140246 |
01/12/2004 15:59 | 01/12/2004 17:12 | Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp | 69.0 | 73 | Plan | Foreign Request | Customer Request | Unknown | SPK | 140201 | |
01/12/2004 16:08 | 01/12/2004 17:05 | Brincken's Corner: Clearwater P Co 115kV Feeder 1 by Avista Corp | 115.0 | 57 | Plan | Foreign Request | Customer Request | None | SPK | 140202 | |
01/13/2004 08:13 | 01/13/2004 14:49 | Western Kraft: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 396 | Plan | Maintenance | BPA Request | None | SAL | 140210 | |
01/13/2004 09:27 | 01/13/2004 09:27 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 0 | Auto | Unknown | BPA Trouble | 3 | EUG | 140211 | |
01/13/2004 09:27 | 01/13/2004 09:27 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | BPA Trouble | 3 | EUG | 140212 | |
01/13/2004 09:27 | 01/13/2004 09:27 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | BPA Trouble | 3 | EUG | 140213 | |
01/13/2004 13:00 | 01/25/2004 09:49 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 17089 | Plan | Normally Out | BPA Request | None | EUG | 140214 | |
01/14/2004 10:40 | 01/15/2004 14:01 | Silver Bow: Vigilante E Coop 69kV Feeder 1 | 69.0 | 1641 | Plan | Maintenance | BPA Request | None | KAL | 140220 | |
01/14/2004 12:03 | 01/14/2004 14:09 | Bridge: Raft River Elec 138kV Feeder 1 | 138.0 | 126 | Plan | Foreign Request | Customer Request | None | IDF | 140221 | |
01/14/2004 12:55 | 01/14/2004 12:56 | Alcoa: Evergreen/Vanalco 13.8kV Feeder 3 | 13.8 | 1 | Plan | Maintenance | BPA Request | None | LGV | 140222 | |
01/15/2004 08:28 | 01/15/2004 12:37 | Cascade Steel: McMinnville W&L 230kV Feeder 1 | 230.0 | 249 | Plan | Maintenance | BPA Request | None | SAL | 140227 | |
01/16/2004 04:26 | 01/16/2004 05:21 | Usk: Pend Oreille PUD 230kV Feeder 1 | 230.0 | 55 | Auto | Foreign Trouble | Customer Trouble | 92 | SPK | 140234 | |
01/16/2004 07:53 | 01/16/2004 14:46 | Franklin: Franklin Co PUD 115kV Feeder 1 to Angus | 115.0 | 413 | Plan | Forced | BPA Request | None | TRI | 140235 | |
01/20/2004 12:13 | 01/23/2004 16:43 | Ross: Clark Public Util 115kV Feeder 1 | 115.0 | 4590 | Plan | Foreign Request | Customer Request | None | LGV | 140248 | |
01/20/2004 16:48 | 01/20/2004 17:52 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 64 | Plan | Emergency | BPA Request | None | IDF | 140249 | |
01/21/2004 08:50 | 01/21/2004 12:39 | Davis Creek: Surprise Valley 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 229 | Plan | Maintenance | BPA Request | None | RED | 140255 | |
01/21/2004 12:23 | 01/21/2004 17:25 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 302 | Plan | Maintenance | BPA Request | None | IDF | 140256 | |
01/23/2004 11:31 | 01/23/2004 11:39 | Dutch Canyon: Columbia Rivr PUD 115kV Feeder 1 | 115.0 | 8 | Auto | Tree cut | BPA Trouble | 5 | LGV | 140267 | |
01/23/2004 11:31 | 01/23/2004 12:40 | Tarbell: Columbia Rivr PUD 115kV Feeder 1 | 115.0 | 69 | Auto | Tree cut | BPA Trouble | Unknown | LGV | 140268 | |
01/23/2004 11:31 | 01/23/2004 12:40 | Warren: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 69 | Auto | Tree cut | Tree cut | BPA Trouble | Unknown | LGV | 140269 |
01/23/2004 12:35 | 01/23/2004 12:40 | Dutch Canyon: Columbia Rivr PUD 115kV Feeder 1 | 115.0 | 5 | Plan | Switching | BPA Request | 5 | LGV | 140270 | |
01/23/2004 16:05 | 01/23/2004 16:30 | La Grande: Oregon Trail 69kV Feeder 1 | 69.0 | 25 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 6 | TRI | 140271 |
01/23/2004 16:39 | 01/23/2004 16:39 | La Grande: Oregon Trail 69kV Feeder 1 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 6 | TRI | 140272 |
01/23/2004 17:39 | 01/26/2004 09:54 | La Grande: Oregon Trail 69kV Feeder 1 | 69.0 | 3855 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | TRI | 140273 |
01/25/2004 09:49 | 01/25/2004 09:49 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | EUG | 140280 | |
01/25/2004 09:49 | 01/25/2004 09:49 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown Trouble | Unknown | EUG | 140281 | |
01/25/2004 09:49 | 01/25/2004 09:49 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown Trouble | Unknown | EUG | 140282 | |
01/25/2004 12:16 | 02/13/2004 09:28 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 27192 | Plan | Normally Out | BPA Request | None | EUG | 140283 | |
01/26/2004 07:44 | 01/26/2004 07:45 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 1 | Plan | Switching | BPA Request | None | SNO | 140285 | |
01/26/2004 10:11 | 01/27/2004 13:37 | Intalco: Alcoa 13.8kV Feeder 6 | 13.8 | 1646 | Plan | Maintenance | BPA Request | None | SNO | 140286 | |
01/26/2004 14:38 | 01/26/2004 16:58 | Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp | 69.0 | 140 | Auto | Foreign Trouble | Foreign Utility | Customer Trouble | Unknown | SPK | 140287 |
01/28/2004 11:01 | 01/28/2004 12:00 | Dixon: Mission Vly Power 69kV Feeder 1 | 69.0 | 59 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 140301 |
01/29/2004 22:41 | 01/30/2004 18:52 | Eugene: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 1211 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | EUG | 140310 |
01/30/2004 03:09 | 01/30/2004 03:09 | Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | EUG | 140311 |
01/30/2004 03:15 | 01/30/2004 03:15 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Foreign Trouble | Foreign Utility | Customer Trouble | Unknown | RED | 140342 |
01/30/2004 03:21 | 01/30/2004 05:05 | McNary: Umatilla E Coop 115kV Feeder 2 | 115.0 | 104 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 26 | TRI | 140312 |
01/30/2004 04:10 | 01/30/2004 08:19 | Mission: Umatilla E Coop 69kV Feeder 1 | 69.0 | 249 | Auto | Wind | Wind | BPA Trouble | Unknown | TRI | 140320 |
01/30/2004 04:10 | 01/30/2004 08:19 | Pendleton: Umatilla E Coop 12.5kV Feeder 1 | 12.5 | 249 | Auto | Wind | Wind | BPA Trouble | Unknown | TRI | 140321 |
01/30/2004 04:31 | 01/30/2004 04:32 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 1 | Auto | Foreign Trouble | Transferor Trouble | Unknown | COV | 143980 | |
01/30/2004 11:24 | 01/30/2004 15:25 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 241 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 140322 |
01/31/2004 14:56 | 01/31/2004 14:56 | Satsop Park: Grays Harbor PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Forced (Configuration) | Unknown Trouble | Unknown | OLY | 140329 |
02/02/2004 08:10 | 02/05/2004 11:24 | Intalco: Alcoa 13.8kV Feeder 6 | 13.8 | 4514 | Plan | Maintenance | BPA Request | None | SNO | 140334 | |
02/02/2004 08:47 | 02/03/2004 14:37 | Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Patawa Creek | 69.0 | 1790 | Plan | Foreign Request | Customer Request | None | TRI | 140335 | |
02/02/2004 08:49 | 02/03/2004 14:39 | Pendleton: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 1790 | Plan | Foreign Request | Customer Request | None | TRI | 140336 | |
02/02/2004 16:14 | 02/02/2004 18:26 | Berrydale CLP: Central Linc PUD 115kV Feeder 1 | 115.0 | 132 | Auto | Earth slide | Earth slide | BPA Trouble | None | EUG | 140337 |
02/04/2004 07:49 | 02/04/2004 17:02 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 553 | Plan | Foreign Request | Customer Request | 25 | LGV | 140353 | |
02/04/2004 08:52 | 02/05/2004 15:19 | Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Birch Creek | 69.0 | 1827 | Plan | Foreign Request | Customer Request | None | TRI | 140354 | |
02/05/2004 08:43 | 02/05/2004 08:43 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | IDF | 140357 | |
02/05/2004 08:43 | 02/05/2004 08:43 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Unknown | Ice | BPA Trouble | Unknown | IDF | 140358 |
02/05/2004 08:43 | 02/05/2004 08:43 | Victor FREC: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Ice | BPA Trouble | Unknown | IDF | 140359 |
02/05/2004 08:57 | 02/05/2004 11:04 | Scooteney: S Col Basin Ir Dt 34.5kV Feeder 1 | 34.5 | 127 | Plan | Foreign Request | Customer Request | Unknown | TRI | 140360 | |
02/06/2004 07:04 | 02/06/2004 14:59 | Lexington: Cowlitz Co PUD 115kV Feeder 2 | 115.0 | 475 | Plan | Maintenance | BPA Request | None | LGV | 140372 | |
02/06/2004 07:14 | 02/06/2004 16:21 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 547 | Plan | Foreign Request | Customer Request | 25 | LGV | 140373 | |
02/09/2004 07:58 | 02/18/2004 10:30 | Alcoa: Clark Public Util 115kV Feeder 1 | 115.0 | 13112 | Plan | Maintenance | BPA Request | 10 | LGV | 140380 | |
02/09/2004 09:23 | 02/09/2004 16:30 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 427 | Plan | Foreign Request | Customer Request | None | LGV | 140381 | |
02/10/2004 08:05 | 02/10/2004 16:42 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 517 | Plan | Foreign Request | Customer Request | None | LGV | 140386 | |
02/10/2004 10:58 | 02/10/2004 16:22 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 324 | Plan | PCS Cellular Work | BPA Request | Unknown | COV | 140387 | |
02/11/2004 07:34 | 02/11/2004 14:30 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 416 | Plan | Foreign Request | Customer Request | None | LGV | 140394 | |
02/11/2004 07:57 | 02/11/2004 14:32 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 395 | Plan | PCS Cellular Work | BPA Request | None | COV | 140395 | |
02/12/2004 07:52 | 02/12/2004 17:59 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 607 | Plan | PCS Cellular Work | BPA Request | None | COV | 140400 | |
02/12/2004 13:49 | 02/12/2004 14:35 | Ross: Clark Public Util 69kV Feeder 4 | 69.0 | 46 | Plan | Foreign Request | Customer Request | None | LGV | 140401 | |
02/12/2004 18:07 | 02/12/2004 19:49 | Chemawa: Portland Gen Elec 57kV Feeder 2 | 57.0 | 102 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 6 | SAL | 140402 |
02/13/2004 08:03 | 02/13/2004 13:41 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 338 | Plan | PCS Cellular Work | BPA Request | None | COV | 140406 | |
02/13/2004 08:46 | 02/13/2004 12:46 | Potholes: Grant Co PUD 115kV Feeder 1 | 115.0 | 240 | Plan | Foreign Request | Customer Request | None | WEN | 140407 | |
02/13/2004 09:28 | 02/13/2004 13:25 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 237 | Plan | Maintenance | BPA Request | None | EUG | 140408 | |
02/13/2004 13:25 | 04/16/2004 08:05 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 90340 | Plan | Normally Out | BPA Request | Unknown | EUG | 140409 | |
02/14/2004 20:17 | 02/14/2004 21:39 | Chemawa: Portland Gen Elec 57kV Feeder 4 | 57.0 | 82 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | SAL | 140415 |
02/15/2004 07:56 | 02/15/2004 07:56 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 140418 |
02/15/2004 07:56 | 02/15/2004 07:56 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 140419 |
02/15/2004 21:01 | 02/20/2004 11:18 | Grand Coulee 115 kV Switchyard: Grant Co PUD 12kV Feeder 1 | 12.0 | 6617 | Auto | Foreign Trouble | Customer Trouble | Unknown | WEN | 140420 | |
02/15/2004 21:01 | 02/16/2004 02:05 | Lone Pine NVEC: Nespelem Valley 12kV Feeder 1 by City of Coulee D | 12.0 | 304 | Auto | Foreign Trouble | Transferor Trouble | Unknown | WEN | 140421 | |
02/16/2004 08:08 | 02/16/2004 16:17 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 489 | Plan | Foreign Request | Customer Request | Unknown | LGV | 140423 | |
02/17/2004 06:26 | 02/18/2004 16:23 | Salem: Salem Elec 115kV Feeder 1 | 115.0 | 2037 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 14 | SAL | 140424 |
02/17/2004 11:36 | 02/18/2004 10:58 | McMinnville: McMinnville W&L 115kV Feeder 2 | 115.0 | 1402 | Plan | Foreign Request | Customer Request | None | SAL | 140425 | |
02/18/2004 07:39 | 02/18/2004 08:10 | Conkelley: Col Falls Alum Co 13.8kV Feeder 5 | 13.8 | 31 | Plan | Foreign Request | Customer Request | 65 | KAL | 140429 | |
02/18/2004 07:48 | 02/18/2004 08:09 | Ross: Clark Public Util 69kV Feeder 4 | 69.0 | 21 | Plan | Foreign Request | Customer Request | 17 | LGV | 140430 | |
02/18/2004 07:52 | 02/18/2004 16:47 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 535 | Plan | Foreign Request | Customer Request | 21 | LGV | 140431 | |
02/18/2004 09:35 | 02/18/2004 09:43 | Conkelley: Col Falls Alum Co 13.8kV Feeder 5 | 13.8 | 8 | Plan | Foreign Request | Customer Request | 63 | KAL | 140432 | |
02/18/2004 10:13 | 02/18/2004 10:45 | Ross: Clark Public Util 69kV Feeder 4 | 69.0 | 32 | Plan | Foreign Request | Customer Request | 7 | LGV | 140433 | |
02/19/2004 05:51 | 02/19/2004 17:16 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 685 | Plan | Foreign Request | Customer Request | 20 | LGV | 140438 | |
02/19/2004 08:31 | 02/20/2004 09:39 | Alvey: Sprngfld Util Brd 115kV Feeder 1 to Springfield | 115.0 | 1508 | Plan | Maintenance | BPA Request | None | EUG | 140439 | |
02/19/2004 08:33 | 02/19/2004 10:43 | Happy Valley: Clallam Co PUD 69kV Feeder 1 | 69.0 | 130 | Plan | Foreign Request | Customer Request | None | OLY | 140440 | |
02/19/2004 10:44 | 02/19/2004 13:22 | Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern | 69.0 | 158 | Plan | Foreign Request | Customer Request | None | OLY | 140441 | |
02/20/2004 07:44 | 02/20/2004 16:03 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 499 | Plan | Foreign Request | Customer Request | None | LGV | 140447 | |
02/20/2004 08:28 | 02/20/2004 14:51 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 383 | Plan | PCS Cellular Work | BPA Request | 1 | COV | 140448 | |
02/23/2004 08:41 | 02/23/2004 16:29 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 468 | Plan | Foreign Request | Customer Request | None | LGV | 140462 | |
02/23/2004 16:44 | 02/23/2004 17:17 | Lost River: Lost River Elec 69kV Feeder 1 | 69.0 | 33 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | 4 | IDF | 140463 |
02/23/2004 16:44 | 02/23/2004 17:17 | Spar Canyon: Salmon River Coop 230kV Feeder 1 | 230.0 | 33 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | IDF | 140464 |
02/23/2004 16:44 | 02/23/2004 17:17 | Round Valley: Salmon River Coop 69kV Feeder 1 | 69.0 | 33 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | 6 | IDF | 140465 |
02/24/2004 07:47 | 02/24/2004 16:13 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 506 | Plan | Foreign Request | Customer Request | 23 | LGV | 140472 | |
02/25/2004 07:17 | 02/25/2004 16:45 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 568 | Plan | Foreign Request | Customer Request | 24 | LGV | 140481 | |
02/25/2004 11:09 | 02/25/2004 11:09 | Tanner: Tanner Elec 115kV Feeder 1 by Puget Sound Energ | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | 4 | COV | 140482 | |
02/25/2004 14:57 | 02/27/2004 13:27 | Lagoon: Milton-Freewater 69kV Feeder 1 | 69.0 | 2790 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 140483 | |
02/25/2004 14:57 | 02/25/2004 16:41 | Weston Mountain: Umatilla E Coop 69kV Feeder 1 | 69.0 | 104 | Auto | Machinery, Farming | BPA Trouble | Unknown | TRI | 140484 | |
02/25/2004 14:57 | 02/25/2004 18:01 | Vansycle Ridge Wind Generating Plant: ESI Vansycle Part 69kV Feeder 1 | 69.0 | 184 | Auto | Machinery, Farming | BPA Trouble | Unknown | TRI | 140485 | |
02/25/2004 14:57 | 02/25/2004 18:01 | Stateline: Columbia REA 69kV Feeder 1 | 69.0 | 184 | Auto | Machinery, Farming | Human Element | BPA Trouble | Unknown | TRI | 140486 |
02/25/2004 17:21 | 02/25/2004 17:41 | Ukiah: Columbia P Coop 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 20 | Auto | Foreign Trouble | Transferor Trouble | Unknown | TRI | 140487 | |
02/25/2004 17:52 | 02/25/2004 21:08 | Plymouth: Benton REA 115kV Feeder 1 by Benton Co PUD | 115.0 | 196 | Auto | Foreign Object | BPA Trouble | Unknown | TRI | 140488 | |
02/25/2004 17:52 | 02/25/2004 19:39 | Berrian: Benton Co PUD 115kV Feeder 1 | 115.0 | 107 | Auto | Foreign Object | Wind | BPA Trouble | Unknown | TRI | 140489 |
02/25/2004 17:52 | 02/25/2004 19:39 | H2F: Benton Co PUD 115kV Feeder 1 | 115.0 | 107 | Auto | Foreign Object | Wind | BPA Trouble | Unknown | TRI | 140490 |
02/25/2004 17:52 | 02/25/2004 19:39 | Nine Canyon: Benton Co PUD 115kV Feeder 1 | 115.0 | 107 | Auto | Foreign Object | BPA Trouble | Unknown | TRI | 140491 | |
02/25/2004 17:52 | 02/25/2004 21:08 | Paterson: Benton Co PUD 115kV Feeder 1 | 115.0 | 196 | Auto | Foreign Object | BPA Trouble | Unknown | TRI | 140492 | |
02/26/2004 06:40 | 02/26/2004 09:54 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 194 | Plan | Maintenance | BPA Request | None | KAL | 140498 | |
02/26/2004 07:28 | 02/26/2004 15:34 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 486 | Plan | Maintenance | BPA Request | Unknown | EUG | 140499 | |
02/26/2004 07:44 | 02/26/2004 17:04 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 560 | Plan | Foreign Request | Customer Request | 24 | LGV | 140500 | |
02/26/2004 08:15 | 02/26/2004 15:50 | Lexington: Cowlitz Co PUD 115kV Feeder 4 | 115.0 | 455 | Plan | Foreign Request | Customer Request | None | LGV | 140501 | |
02/26/2004 08:46 | 02/26/2004 14:04 | Glade: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 318 | Plan | Maintenance | BPA Request | None | TRI | 140502 | |
02/26/2004 08:46 | 02/26/2004 14:04 | Glade: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 318 | Plan | Maintenance | BPA Request | None | TRI | 140503 | |
02/26/2004 09:07 | 02/26/2004 13:11 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 244 | Plan | Maintenance | BPA Request | None | KAL | 140504 | |
02/26/2004 09:54 | 02/27/2004 13:13 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 1639 | Plan | Foreign Request | Customer Request | None | KAL | 140505 | |
02/26/2004 09:56 | 02/27/2004 06:27 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 1231 | Plan | Foreign Request | Customer Request | None | KAL | 140506 | |
02/26/2004 13:11 | 02/27/2004 13:04 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 1433 | Plan | Foreign Request | Customer Request | None | KAL | 140507 | |
02/26/2004 14:04 | 02/27/2004 11:25 | Glade: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 1281 | Plan | Foreign Request | Customer Request | None | TRI | 140508 | |
02/27/2004 06:27 | 02/27/2004 12:31 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 364 | Plan | Maintenance | BPA Request | None | KAL | 140519 | |
02/27/2004 07:10 | 02/27/2004 14:07 | Lexington: Cowlitz Co PUD 115kV Feeder 4 | 115.0 | 417 | Plan | Foreign Request | Customer Request | None | LGV | 140520 | |
02/27/2004 07:21 | 02/27/2004 16:13 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 532 | Plan | Foreign Request | Customer Request | None | LGV | 140521 | |
02/27/2004 08:44 | 02/27/2004 08:46 | Mt. Vernon: Sprngfld Util Brd 115kV Feeder 1 | 115.0 | 2 | Plan | Switching | Customer Request | Unknown | EUG | 140522 | |
02/27/2004 09:04 | 02/27/2004 15:21 | Mt. Vernon: Sprngfld Util Brd 115kV Feeder 1 | 115.0 | 377 | Plan | Maintenance | BPA Request | None | EUG | 140523 | |
02/27/2004 16:24 | 02/27/2004 16:48 | Lexington: Cowlitz Co PUD 115kV Feeder 4 | 115.0 | 24 | Plan | Foreign Request | Customer Request | Unknown | LGV | 140524 | |
03/01/2004 08:10 | 03/01/2004 16:53 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 523 | Plan | Foreign Request | Customer Request | Unknown | LGV | 140550 | |
03/01/2004 08:11 | 03/11/2004 15:31 | The Dalles: Northrn Wasco PUD 115kV Feeder 1 | 115.0 | 14840 | Plan | Maintenance | BPA Request | None | TDA | 140551 | |
03/01/2004 08:37 | 03/01/2004 12:45 | Dexter: Lane Elec Coop 115kV Feeder 1 | 115.0 | 248 | Plan | Maintenance | BPA Request | None | EUG | 140552 | |
03/01/2004 08:40 | 03/03/2004 14:03 | Intalco: Alcoa 13.8kV Feeder 7 | 13.8 | 3203 | Plan | Maintenance | BPA Request | None | SNO | 140553 | |
03/01/2004 13:20 | 03/01/2004 16:45 | Bridge: Raft River Elec 34.5kV Feeder 1 | 34.5 | 205 | Auto | Bird or Animal | Foreign Object | BPA Trouble | 1 | IDF | 140554 |
03/01/2004 14:02 | 03/08/2004 12:20 | Bell: Kaiser Alum 230kV Feeder 3 | 230.0 | 9978 | Plan | Maintenance | BPA Request | None | SPK | 140555 | |
03/02/2004 08:12 | 03/02/2004 14:31 | Mabton: Benton REA 12.5kV Feeder 1 | 12.5 | 379 | Plan | Maintenance | BPA Request | 1 | TRI | 140565 | |
03/02/2004 08:12 | 03/02/2004 16:17 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 485 | Plan | Foreign Request | Customer Request | Unknown | LGV | 140566 | |
03/02/2004 09:13 | 03/02/2004 12:55 | Milton: Milton-Freewater 69kV Feeder 1 | 69.0 | 222 | Plan | Foreign Request | Customer Request | None | TRI | 140567 | |
03/03/2004 07:12 | 03/11/2004 19:58 | Ross: Clark Public Util 115kV Feeder 1 | 115.0 | 12286 | Plan | Foreign Request | Customer Request | None | LGV | 140577 | |
03/03/2004 14:10 | 03/04/2004 08:40 | Eltopia: Big Bend Coop 115kV Feeder 1 by Franklin Co PUD | 115.0 | 1110 | Plan | Foreign Request | Transferor Request | None | TRI | 140578 | |
03/04/2004 08:41 | 03/05/2004 10:59 | Eltopia: Big Bend Coop 115kV Feeder 1 by Franklin Co PUD | 115.0 | 1578 | Plan | Foreign Request | Customer Request | None | TRI | 140587 | |
03/04/2004 09:12 | 03/04/2004 09:12 | Fairmount: Clallam Co PUD 69kV Feeder 1 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | OLY | 140588 |
03/04/2004 11:09 | 03/04/2004 14:38 | Mt. Vernon: Sprngfld Util Brd 115kV Feeder 1 | 115.0 | 209 | Plan | Foreign Request | Customer Request | Unknown | EUG | 140589 | |
03/05/2004 06:46 | 03/05/2004 09:35 | Conkelley: Col Falls Alum Co 13.8kV Feeder S1 | 13.8 | 169 | Plan | Maintenance | BPA Request | None | KAL | 140596 | |
03/05/2004 12:28 | Conkelley: Col Falls Alum Co 13.8kV Feeder 1 | 13.8 | still out | Plan | Foreign Request | Customer Request | None | KAL | 140597 | ||
03/05/2004 12:28 | Conkelley: Col Falls Alum Co 13.8kV Feeder 2 | 13.8 | still out | Plan | Foreign Request | Customer Request | None | KAL | 140598 | ||
03/05/2004 15:40 | 03/05/2004 17:27 | Fairmount: Clallam Co PUD 69kV Feeder 1 | 69.0 | 107 | Auto | Unknown | Foreign Trouble | Unknown Trouble | 16 | OLY | 140599 |
03/06/2004 00:46 | 03/06/2004 00:46 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | IDF | 140600 |
03/06/2004 00:51 | 03/06/2004 00:51 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | IDF | 140601 |
03/06/2004 00:52 | 03/06/2004 00:52 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | IDF | 140602 |
03/06/2004 00:53 | 03/06/2004 02:36 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 103 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 140603 |
03/06/2004 00:55 | 03/06/2004 02:00 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 65 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | IDF | 140604 |
03/06/2004 02:27 | 03/06/2004 02:27 | Spar Canyon: Salmon River Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 6 | IDF | 140605 |
03/06/2004 02:29 | 03/06/2004 02:31 | Dixon: Mission Vly Power 69kV Feeder 1 | 69.0 | 2 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 140606 |
03/08/2004 04:31 | 03/08/2004 06:47 | Ovando: Missoula E Coop 69kV Feeder 1 by NorthWestern Ener | 69.0 | 136 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | KAL | 140618 |
03/08/2004 08:28 | 03/12/2004 13:43 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 6075 | Plan | Foreign Request | Customer Request | 22 | LGV | 140625 | |
03/08/2004 09:32 | 03/08/2004 10:14 | Dixon: Mission Vly Power 69kV Feeder 1 | 69.0 | 42 | Auto | Line Material Failure | Line Material Failure | BPA Trouble | Unknown | KAL | 140626 |
03/08/2004 09:58 | 03/08/2004 13:43 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 225 | Auto | Tree cut | BPA Trouble | None | OLY | 140627 | |
03/08/2004 09:59 | 03/08/2004 10:19 | Henkle Street: Pacific Co PUD 115kV Feeder 1 | 115.0 | 20 | Auto | Unknown | BPA Trouble | 10 | OLY | 140628 | |
03/08/2004 10:14 | 03/11/2004 13:51 | Stateline: Columbia REA 69kV Feeder 1 | 69.0 | 4537 | Plan | Maintenance | BPA Request | None | TRI | 140629 | |
03/08/2004 11:10 | 03/08/2004 14:47 | Dayton MCP3: Mason Co PUD 3 115kV Feeder 1 | 115.0 | 217 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 10 | OLY | 140630 |
03/08/2004 13:43 | 04/02/2004 13:36 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 35993 | Plan | Maintenance | BPA Request | None | OLY | 140743 | |
03/09/2004 15:29 | 03/09/2004 15:33 | McNary: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 4 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 11 | TRI | 140642 |
03/10/2004 07:33 | 03/10/2004 14:50 | Western Kraft: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 437 | Plan | Foreign Request | Customer Request | None | SAL | 140652 | |
03/10/2004 07:36 | 03/12/2004 17:49 | Longview: Cowlitz Co PUD 69kV Feeder 2 | 69.0 | 3493 | Plan | Foreign Request | Customer Request | None | LGV | 140653 | |
03/10/2004 07:36 | 03/12/2004 17:49 | Longview: Cowlitz Co PUD 69kV Feeder 1 | 69.0 | 3493 | Plan | Foreign Request | Customer Request | None | LGV | 140654 | |
03/10/2004 08:01 | 03/10/2004 10:10 | The Dalles: Wasco Elec Coop 12.5kV Feeder 1 by Northrn Wasco PUD | 12.5 | 129 | Plan | Maintenance | BPA Request | None | TDA | 140655 | |
03/10/2004 08:04 | 03/10/2004 12:48 | Ross: Clark Public Util 69kV Feeder 4 | 69.0 | 284 | Plan | Foreign Request | Customer Request | None | LGV | 140656 | |
03/10/2004 08:29 | 03/12/2004 13:42 | Bell: Kaiser Alum 13.8kV Feeder 10 | 13.8 | 3193 | Plan | Maintenance | BPA Request | Unknown | SPK | 140657 | |
03/10/2004 08:57 | 03/10/2004 13:47 | Eugene: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 290 | Plan | Foreign Request | Customer Request | None | EUG | 140658 | |
03/10/2004 11:43 | 03/11/2004 09:14 | Bridge: Raft River Elec 34.5kV Feeder 1 | 34.5 | 1291 | Plan | Foreign Request | Customer Request | None | IDF | 140659 | |
03/11/2004 12:40 | 03/11/2004 13:02 | Pomeroy: Inland P+L 69kV Feeder 1 | 69.0 | 22 | Plan | Maintenance | BPA Request | Unknown | SPK | 140667 | |
03/12/2004 07:48 | 03/12/2004 08:51 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 63 | Plan | Foreign Request | Customer Request | None | KAL | 140678 | |
03/15/2004 07:24 | 03/15/2004 16:05 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 521 | Plan | Foreign Request | Customer Request | 20 | LGV | 140695 | |
03/15/2004 08:54 | 03/15/2004 10:26 | Grand Coulee #2 Metering Point: Grant Co PUD 115kV Feeder 1 | 115.0 | 92 | Plan | Construction | BPA Request | None | SPK | 140696 | |
03/15/2004 10:04 | 03/16/2004 14:37 | Bridge: Raft River Elec 34.5kV Feeder 1 | 34.5 | 1713 | Plan | Maintenance | BPA Request | None | IDF | 140697 | |
03/16/2004 07:12 | 03/16/2004 10:50 | Ross: Clark Public Util 115kV Feeder 1 | 115.0 | 218 | Plan | Foreign Request | Customer Request | 27 | LGV | 140706 | |
03/16/2004 07:48 | 04/09/2004 12:43 | Cowlitz: Cowlitz Co PUD 115kV Feeder 1 | 115.0 | 34795 | Plan | Foreign Request | Customer Request | None | LGV | 140707 | |
03/16/2004 08:16 | 03/16/2004 17:39 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 563 | Plan | Foreign Request | Customer Request | 22 | LGV | 140708 | |
03/16/2004 10:42 | 03/16/2004 13:42 | Bell: Kaiser Alum 13.8kV Feeder 10 | 13.8 | 180 | Plan | Maintenance | BPA Request | Unknown | SPK | 140709 | |
03/16/2004 22:00 | 03/16/2004 22:00 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | 3 | IDF | 140710 | |
03/16/2004 22:00 | 03/16/2004 22:00 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | 4 | IDF | 140711 |
03/16/2004 22:00 | 03/16/2004 22:00 | Victor FREC: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | 2 | IDF | 140712 |
03/17/2004 07:25 | 03/17/2004 15:55 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 510 | Plan | Foreign Request | Customer Request | None | LGV | 140729 | |
03/17/2004 08:15 | 03/17/2004 14:36 | Burnt Woods: Consumers Power 24.9kV Feeder 1 | 24.9 | 381 | Plan | Maintenance | BPA Request | None | EUG | 140730 | |
03/17/2004 13:23 | 03/18/2004 14:05 | Franklin: Franklin Co PUD 115kV Feeder 1 to Angus | 115.0 | 1482 | Plan | Maintenance | BPA Request | None | TRI | 140731 | |
03/18/2004 07:10 | 03/18/2004 13:38 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 388 | Plan | Foreign Request | Customer Request | None | LGV | 140744 | |
03/18/2004 13:44 | 03/18/2004 13:44 | De Moss: Wasco Elec Coop 69kV Feeder 1 to Klondike | 69.0 | 0 | Auto | Unknown | Foreign Trouble | Unknown Trouble | Unknown | TDA | 140745 |
03/18/2004 14:00 | 03/18/2004 14:00 | Elma: McCleary WA 69kV Feeder 1 by Grays Harbor PUD | 69.0 | 0 | Auto | Foreign Trouble | Foreign Utility | Transferor Trouble | Unknown | OLY | 140822 |
03/18/2004 15:24 | 03/18/2004 15:24 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | KAL | 140746 |
03/18/2004 15:24 | 03/18/2004 15:24 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | SPK | 140747 |
03/18/2004 15:24 | 03/18/2004 15:24 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | SPK | 140748 |
03/18/2004 15:24 | 03/18/2004 15:24 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | SPK | 140749 |
03/18/2004 15:24 | 03/18/2004 15:24 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | KAL | 140750 |
03/18/2004 15:24 | 03/18/2004 15:24 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 140751 |
03/18/2004 15:24 | 03/18/2004 15:24 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 140752 |
03/18/2004 15:24 | 03/18/2004 15:24 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 140753 |
03/18/2004 15:24 | 03/18/2004 15:25 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 1 | Auto | Unknown | Forced (Configuration) | BPA Trouble | 4 | SPK | 140754 |
03/18/2004 15:24 | 03/18/2004 22:48 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 444 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 140755 |
03/18/2004 17:51 | 03/18/2004 17:51 | Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Wind | Wind | BPA Trouble | 1 | SPK | 140756 |
03/18/2004 17:51 | 03/18/2004 17:51 | Metaline Falls: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Wind | BPA Trouble | 1 | SPK | 140757 | |
03/18/2004 17:51 | 03/18/2004 17:51 | Spirit: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Wind | BPA Trouble | 1 | SPK | 140758 | |
03/18/2004 20:54 | 03/18/2004 20:54 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140759 |
03/18/2004 20:54 | 03/18/2004 20:54 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140760 |
03/18/2004 20:54 | 03/18/2004 20:54 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140761 |
03/18/2004 20:54 | 03/18/2004 20:54 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140762 |
03/18/2004 20:54 | 03/18/2004 20:54 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140763 |
03/18/2004 20:54 | 03/18/2004 20:54 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140764 |
03/18/2004 20:54 | 03/18/2004 20:54 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140765 |
03/18/2004 20:54 | 03/18/2004 20:54 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140766 |
03/18/2004 22:53 | 03/18/2004 22:53 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140767 |
03/18/2004 22:53 | 03/18/2004 22:53 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140768 |
03/18/2004 22:53 | 03/18/2004 22:53 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140769 |
03/18/2004 22:53 | 03/18/2004 22:53 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140770 |
03/18/2004 22:53 | 03/18/2004 22:53 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140771 |
03/18/2004 22:53 | 03/18/2004 22:53 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | 5 | SPK | 140772 |
03/18/2004 22:53 | 03/18/2004 22:53 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Customer Trouble | 2 | KAL | 143981 | |
03/18/2004 22:53 | 03/18/2004 22:53 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Customer Trouble | 2 | SPK | 143982 | |
03/18/2004 22:53 | 03/18/2004 22:53 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Customer Trouble | 2 | SPK | 143983 | |
03/18/2004 22:53 | 03/18/2004 22:53 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Customer Trouble | 2 | SPK | 143984 | |
03/18/2004 23:56 | 03/18/2004 23:56 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140773 |
03/18/2004 23:56 | 03/18/2004 23:56 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140774 |
03/18/2004 23:56 | 03/18/2004 23:56 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140775 |
03/18/2004 23:56 | 03/18/2004 23:56 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140776 |
03/18/2004 23:56 | 03/18/2004 23:56 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140777 |
03/18/2004 23:56 | 03/18/2004 23:56 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140778 |
03/18/2004 23:56 | 03/18/2004 23:56 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140779 |
03/18/2004 23:56 | 03/18/2004 23:56 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140780 |
03/18/2004 23:56 | 03/18/2004 23:56 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140781 |
03/18/2004 23:56 | 03/18/2004 23:56 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | 5 | SPK | 140782 |
03/19/2004 00:58 | 03/19/2004 00:58 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | 5 | SPK | 140783 |
03/19/2004 00:58 | 03/19/2004 00:58 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140784 |
03/19/2004 00:58 | 03/19/2004 00:58 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140785 |
03/19/2004 00:58 | 03/19/2004 00:58 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140786 |
03/19/2004 00:58 | 03/19/2004 00:58 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140787 |
03/19/2004 00:58 | 03/19/2004 00:58 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140788 |
03/19/2004 00:58 | 03/19/2004 00:58 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140789 |
03/19/2004 00:58 | 03/19/2004 00:58 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140790 |
03/19/2004 00:58 | 03/19/2004 00:58 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140791 |
03/19/2004 00:58 | 03/19/2004 00:58 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140792 |
03/19/2004 01:01 | 03/19/2004 04:16 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 195 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140793 |
03/19/2004 01:01 | 03/19/2004 01:02 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140794 |
03/19/2004 01:01 | 03/19/2004 01:02 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140795 |
03/19/2004 01:01 | 03/19/2004 01:02 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140796 |
03/19/2004 01:01 | 03/19/2004 01:01 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | 5 | SPK | 140797 |
03/19/2004 01:01 | 03/19/2004 01:11 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 10 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | 9 | KAL | 140798 |
03/19/2004 01:01 | 03/19/2004 01:02 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140799 |
03/19/2004 01:01 | 03/19/2004 01:02 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140800 |
03/19/2004 01:01 | 03/19/2004 01:02 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | SPK | 140801 |
03/19/2004 01:01 | 03/19/2004 01:02 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | KAL | 140802 |
03/19/2004 01:30 | 03/19/2004 18:08 | Surprise Lake: Milton WA 12.5kV Feeder 1 by Tacoma Power | 12.5 | 998 | Auto | Bird or Animal | Bird or Animal | BPA Trouble | 13 | COV | 140803 |
03/19/2004 08:14 | 03/19/2004 14:03 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 349 | Plan | Foreign Request | Customer Request | None | LGV | 140823 | |
03/19/2004 12:46 | 04/02/2004 10:00 | Mapleton: Blachly-Lane Co 34.5kV Feeder 1 | 34.5 | 19994 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | BPA Trouble | None | EUG | 140824 |
03/22/2004 07:35 | 03/22/2004 16:38 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 543 | Plan | Foreign Request | Customer Request | None | LGV | 140833 | |
03/22/2004 09:01 | 03/22/2004 15:32 | Redmond: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 391 | Plan | Maintenance | BPA Request | None | RED | 140834 | |
03/22/2004 10:00 | 03/26/2004 14:38 | Idahome: Raft River Elec 34.5kV Feeder 1 | 34.5 | 6038 | Plan | Maintenance | BPA Request | None | IDF | 140835 | |
03/23/2004 07:45 | 03/23/2004 14:52 | Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Coyote Creek | 69.0 | 427 | Plan | Foreign Request | Customer Request | None | TRI | 140855 | |
03/23/2004 08:11 | 03/23/2004 16:37 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 506 | Plan | Foreign Request | Customer Request | None | LGV | 140856 | |
03/23/2004 10:02 | 03/26/2004 10:49 | Silver Bow: Vigilante E Coop 69kV Feeder 1 | 69.0 | 4367 | Plan | Maintenance | BPA Request | None | KAL | 140857 | |
03/23/2004 10:10 | 03/26/2004 08:58 | Longview: Cowlitz Co PUD 115kV Feeder 5 | 115.0 | 4248 | Plan | Foreign Request | Customer Request | None | LGV | 140858 | |
03/24/2004 07:08 | 03/24/2004 16:20 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 552 | Plan | Foreign Request | Customer Request | Unknown | LGV | 140866 | |
03/24/2004 08:06 | 03/24/2004 14:16 | Ione: Columbia Basin 12.5kV Feeder 1 | 12.5 | 370 | Plan | Maintenance | BPA Request | None | TRI | 140867 | |
03/24/2004 14:16 | 03/24/2004 17:01 | Ione: Columbia Basin 12.5kV Feeder 1 | 12.5 | 165 | Plan | Foreign Request | Customer Request | None | TRI | 140868 | |
03/25/2004 07:41 | 03/25/2004 14:27 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 406 | Plan | Foreign Request | Customer Request | None | LGV | 140873 | |
03/25/2004 08:44 | 03/25/2004 14:28 | Ross: Clark Public Util 69kV Feeder 4 | 69.0 | 344 | Plan | Foreign Request | Customer Request | None | LGV | 140874 | |
03/25/2004 08:46 | 03/25/2004 10:50 | Grand Coulee #2 Metering Point: Grant Co PUD 115kV Feeder 1 | 115.0 | 124 | Plan | Maintenance | BPA Request | None | SPK | 140875 | |
03/25/2004 09:00 | 03/25/2004 11:00 | Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD | 115.0 | 120 | Plan | Foreign Request | Customer Request | None | SNO | 140876 | |
03/25/2004 09:00 | 03/25/2004 11:00 | Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD | 115.0 | 120 | Plan | Foreign Request | Customer Request | None | SNO | 140877 | |
03/27/2004 21:20 | 03/27/2004 23:28 | Hatton: Big Bend Coop 115kV Feeder 1 | 115.0 | 128 | Plan | Emergency | BPA Request | Unknown | TRI | 140893 | |
03/27/2004 21:32 | 03/28/2004 00:10 | Connell: Franklin Co PUD 12.5kV Feeder 1 | 12.5 | 158 | Plan | Emergency | BPA Request | 5 | TRI | 140894 | |
03/29/2004 04:22 | 03/29/2004 04:22 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | 4 | IDF | 140895 | |
03/29/2004 04:22 | 03/29/2004 04:22 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Unknown | Bird or Animal | BPA Trouble | 5 | IDF | 140896 |
03/29/2004 04:22 | 03/29/2004 04:22 | Victor FREC: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Bird or Animal | BPA Trouble | 5 | IDF | 140897 |
03/29/2004 07:51 | 03/29/2004 14:21 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 390 | Plan | Foreign Request | Customer Request | None | LGV | 140906 | |
03/29/2004 09:15 | 03/30/2004 15:23 | Franklin: Franklin Co PUD 115kV Feeder 1 to Angus | 115.0 | 1808 | Plan | Maintenance | BPA Request | None | TRI | 140907 | |
03/30/2004 07:49 | 03/30/2004 15:29 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 460 | Plan | Foreign Request | Customer Request | Unknown | LGV | 140925 | |
03/31/2004 08:09 | 03/31/2004 20:33 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 744 | Plan | Foreign Request | Customer Request | None | LGV | 140934 | |
04/01/2004 08:10 | 04/01/2004 15:25 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 435 | Plan | Foreign Request | Customer Request | None | LGV | 140944 | |
04/02/2004 09:30 | 04/02/2004 14:22 | McMinnville: McMinnville W&L 115kV Feeder 1 | 115.0 | 292 | Plan | Maintenance | BPA Request | None | SAL | 140954 | |
04/04/2004 06:19 | 04/04/2004 06:19 | First Street: City of Richland 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 140970 |
04/04/2004 06:19 | 04/04/2004 06:19 | First Street: City of Richland 115kV Feeder 2 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 140971 |
04/04/2004 06:19 | 04/04/2004 06:19 | Sand Hill Crane: City of Richland 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 140972 |
04/04/2004 06:19 | 04/04/2004 06:19 | Stevens Drive: City of Richland 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 140973 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Stevens Drive: City of Richland 115kV Feeder 2 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 140974 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Stevens Drive: City of Richland 115kV Feeder 3 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 140975 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Thayer Drive: City of Richland 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 140976 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Thayer Drive: City of Richland 115kV Feeder 2 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 140977 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Thayer Drive: City of Richland 115kV Feeder 3 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 140978 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Snyder: City of Richland 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 140979 |
04/05/2004 08:08 | 04/06/2004 09:34 | The Dalles: USBR The Dalles 12.5kV Feeder 1 | 12.5 | 1526 | Plan | Foreign Request | Customer Request | Unknown | TDA | 140984 | |
04/05/2004 08:19 | 04/09/2004 13:24 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 6065 | Plan | Foreign Request | Customer Request | None | LGV | 140985 | |
04/05/2004 08:54 | 04/05/2004 15:07 | Snohomish: Snohomish Co PUD 115kV Feeder 1 | 115.0 | 373 | Plan | Foreign Request | Customer Request | None | SNO | 140980 | |
04/05/2004 08:55 | 04/05/2004 15:01 | The Dalles: Northrn Wasco PUD 12.5kV Feeder 2 | 12.5 | 366 | Plan | Foreign Request | Customer Request | None | TDA | 140986 | |
04/05/2004 10:22 | 04/05/2004 15:26 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 304 | Plan | Foreign Request | Customer Request | 39 | LGV | 140987 | |
04/05/2004 13:24 | 04/05/2004 13:24 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 0 | Auto | Arc while switching | Terminal Equipment Failure | BPA Trouble | Unknown | SAL | 140988 |
04/05/2004 13:24 | 04/05/2004 13:24 | Dalreed: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 0 | Auto | Arc while switching | BPA Trouble | Unknown | TRI | 140989 | |
04/05/2004 13:33 | 04/05/2004 17:31 | Dalreed: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 238 | Plan | Foreign Request | Customer Request | None | TRI | 140990 | |
04/05/2004 14:44 | 04/05/2004 14:45 | The Dalles: Northrn Wasco PUD 12.5kV Feeder 1 | 12.5 | 1 | Auto | Foreign Trouble | Foreign Utility | Customer Trouble | 2 | TDA | 140991 |
04/06/2004 07:33 | 04/06/2004 15:20 | Franklin: Franklin Co PUD 12.5kV Feeder 1 | 12.5 | 467 | Plan | Maintenance | BPA Request | None | TRI | 141011 | |
04/06/2004 08:40 | 04/06/2004 15:10 | Snohomish: Snohomish Co PUD 115kV Feeder 1 | 115.0 | 390 | Plan | Foreign Request | Customer Request | None | SNO | 140992 | |
04/06/2004 08:58 | 04/06/2004 15:52 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 414 | Plan | Foreign Request | Customer Request | None | LGV | 141012 | |
04/06/2004 09:58 | 04/06/2004 14:32 | Hay Mill: United Elec Coop 138kV Feeder 1 | 138.0 | 274 | Plan | Foreign Request | Customer Request | Unknown | IDF | 141013 | |
04/06/2004 09:58 | 04/06/2004 14:32 | Hay Mill: Rupert ID 138kV Feeder 1 | 138.0 | 274 | Plan | Foreign Request | Customer Request | Unknown | IDF | 141014 | |
04/07/2004 08:14 | 04/07/2004 16:17 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 483 | Plan | Foreign Request | Customer Request | None | LGV | 141015 | |
04/07/2004 17:39 | 04/07/2004 17:39 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | IDF | 141016 |
04/08/2004 08:12 | 04/08/2004 17:28 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 556 | Plan | Foreign Request | Customer Request | None | LGV | 141045 | |
04/08/2004 08:13 | 04/08/2004 08:13 | Mission: Umatilla E Coop 69kV Feeder 1 | 69.0 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | TRI | 141149 |
04/08/2004 08:13 | 04/08/2004 08:13 | Pendleton: Umatilla E Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | TRI | 141150 |
04/08/2004 10:33 | 04/08/2004 10:37 | Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 4 | Auto | Foreign Trouble | Transferor Trouble | Unknown | TRI | 141046 | |
04/09/2004 00:01 | 04/09/2004 03:48 | Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co | 34.5 | 227 | Plan | Maintenance | BPA Request | Unknown | SPK | 141064 | |
04/09/2004 00:01 | 04/09/2004 03:48 | Clarkston: Clearwater P Co 34.5kV Feeder 1 | 34.5 | 227 | Plan | Maintenance | BPA Request | Unknown | SPK | 141065 | |
04/09/2004 07:54 | 04/09/2004 16:18 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 504 | Plan | Foreign Request | Customer Request | None | LGV | 141066 | |
04/09/2004 08:22 | 04/09/2004 13:11 | McMinnville: McMinnville W&L 115kV Feeder 1 | 115.0 | 289 | Plan | Maintenance | BPA Request | None | SAL | 141067 | |
04/09/2004 09:31 | 04/09/2004 09:37 | The Dalles: Northrn Wasco PUD 12.5kV Feeder 2 | 12.5 | 6 | Plan | Switching | BPA Request | None | TDA | 141068 | |
04/09/2004 09:31 | 04/09/2004 09:37 | The Dalles: USBR The Dalles 12.5kV Feeder 1 | 12.5 | 6 | Plan | Switching | BPA Request | None | TDA | 141069 | |
04/09/2004 14:01 | Conkelley: Col Falls Alum Co 13.8kV Feeder 4 | 13.8 | still out | Plan | Maintenance | BPA Request | 70 | KAL | 151093 | ||
04/09/2004 17:21 | 04/29/2004 12:04 | Conkelley: Col Falls Alum Co 13.8kV Feeder 5 | 13.8 | 28483 | Plan | Emergency | BPA Request | None | KAL | 141071 | |
04/12/2004 08:31 | 04/12/2004 15:56 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 445 | Plan | Foreign Request | Customer Request | None | LGV | 141092 | |
04/12/2004 09:06 | 04/19/2004 13:13 | Court Street: Franklin Co PUD 115kV Feeder 1 | 115.0 | 10327 | Plan | Foreign Request | Customer Request | None | TRI | 141093 | |
04/13/2004 08:03 | 04/13/2004 15:20 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 437 | Plan | Foreign Request | Customer Request | Unknown | LGV | 141106 | |
04/13/2004 08:18 | 04/13/2004 12:51 | Henkle Street: Pacific Co PUD 115kV Feeder 1 | 115.0 | 273 | Auto | Bird or Animal | BPA Trouble | 11 | OLY | 141107 | |
04/13/2004 16:14 | 04/13/2004 16:14 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141108 |
04/13/2004 16:14 | 04/13/2004 16:14 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141109 |
04/14/2004 05:07 | 04/14/2004 05:08 | Swan Valley: Lower Valy Energy 12.5kV Feeder 1 | 12.5 | 1 | Auto | Unknown | Unknown | BPA Trouble | 1 | IDF | 141121 |
04/14/2004 06:45 | 04/14/2004 14:24 | Chemawa: Portland Gen Elec 57kV Feeder 4 | 57.0 | 459 | Plan | Maintenance | BPA Request | None | SAL | 141122 | |
04/14/2004 07:29 | 04/14/2004 13:10 | Roy L Zimmerman: Centralia City Lt 69kV Feeder 1 | 69.0 | 341 | Plan | Maintenance | BPA Request | None | OLY | 141123 | |
04/14/2004 07:35 | 04/14/2004 14:34 | McNary: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 419 | Plan | Maintenance | BPA Request | None | TRI | 141124 | |
04/14/2004 18:38 | 04/14/2004 18:52 | Fairview CCEC: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 14 | Plan | Foreign Request | Customer Request | None | EUG | 141125 | |
04/15/2004 04:19 | 04/15/2004 04:19 | Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | TDA | 141195 | |
04/15/2004 05:43 | 04/15/2004 05:43 | Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | TDA | 141196 | |
04/15/2004 08:46 | 04/15/2004 08:46 | Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | TDA | 141197 | |
04/16/2004 10:32 | 04/16/2004 10:36 | Fairview CCEC: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 4 | Plan | Foreign Request | Customer Request | None | EUG | 141163 | |
04/16/2004 12:03 | 04/19/2004 11:19 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 4276 | Plan | Foreign Request | Customer Request | None | IDF | 141164 | |
04/16/2004 12:12 | 04/26/2004 08:06 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 14154 | Plan | Normally Out | BPA Request | None | EUG | 141165 | |
04/19/2004 06:38 | 04/19/2004 07:36 | Station H: US Navy 115kV Feeder 1 | 115.0 | 58 | Plan | Foreign Request | Customer Request | None | OLY | 141176 | |
04/19/2004 08:23 | 04/19/2004 14:01 | Intalco: Alcoa 13.8kV Feeder 6 | 13.8 | 338 | Plan | Maintenance | BPA Request | None | SNO | 141177 | |
04/19/2004 09:40 | 04/19/2004 11:17 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 97 | Plan | Switching | BPA Request | None | IDF | 141178 | |
04/19/2004 09:43 | 04/22/2004 16:31 | Victor FREC: Fall River E Coop 115kV Feeder 1 | 115.0 | 4728 | Plan | Maintenance | BPA Request | None | IDF | 141232 | |
04/19/2004 22:13 | 04/19/2004 23:38 | Bingen: Klickitat Co PUD 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 85 | Auto | Foreign Utility | Transferor Trouble | Unknown | TDA | 141198 | |
04/20/2004 07:54 | 04/20/2004 13:34 | Forest Grove: Portland Gen Elec 115kV Feeder 1 | 115.0 | 340 | Plan | Maintenance | BPA Request | None | SAL | 141199 | |
04/20/2004 08:57 | 04/28/2004 14:17 | Lexington: Cowlitz Co PUD 115kV Feeder 3 | 115.0 | 11840 | Plan | Foreign Request | Customer Request | None | LGV | 141200 | |
04/20/2004 09:22 | 04/20/2004 17:25 | Tillamook: Tillamook PUD 115kV Feeder 1 to Trask Rv | 115.0 | 483 | Plan | Maintenance | BPA Request | None | SAL | 141201 | |
04/20/2004 09:30 | 04/20/2004 09:30 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | BPA Trouble | None | RED | 141202 |
04/20/2004 09:30 | 04/20/2004 09:30 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | None | RED | 141203 |
04/20/2004 11:47 | 04/20/2004 11:50 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 3 | Auto | Forced (Configuration) | BPA Trouble | 6 | IDF | 141204 | |
04/20/2004 11:47 | 04/20/2004 11:50 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 6 | IDF | 141205 |
04/20/2004 11:47 | 04/20/2004 11:50 | Drummond: Fall River E Coop 46kV Feeder 1 | 46.0 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | None | IDF | 141206 |
04/20/2004 11:47 | 04/20/2004 11:50 | Drummond: Fall River E Coop 46kV Feeder 2 | 46.0 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 2 | IDF | 141207 |
04/20/2004 11:47 | 04/20/2004 11:50 | Greentimber: Fall River E Coop 115kV Feeder 1 | 115.0 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 1 | IDF | 141208 |
04/20/2004 11:47 | 04/20/2004 11:50 | Macks Inn: Fall River E Coop 46kV Feeder 1 | 46.0 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 1 | IDF | 141209 |
04/20/2004 11:47 | 04/20/2004 11:50 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 2 | IDF | 141210 |
04/20/2004 11:47 | 04/20/2004 11:50 | Madison: Fall River E Coop 46kV Feeder 1 | 46.0 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 4 | IDF | 141211 |
04/21/2004 08:17 | 04/21/2004 18:19 | Tillamook: Tillamook PUD 115kV Feeder 1 to Trask Rv | 115.0 | 602 | Plan | Maintenance | BPA Request | None | SAL | 141223 | |
04/22/2004 05:55 | 04/22/2004 19:46 | Sifton: Clark Public Util 115kV Feeder 5 | 115.0 | 831 | Plan | Foreign Request | Customer Request | None | LGV | 141233 | |
04/22/2004 14:41 | 04/22/2004 16:47 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 126 | Plan | Maintenance | BPA Request | None | IDF | 141234 | |
04/22/2004 14:45 | 04/22/2004 16:35 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 110 | Plan | Maintenance | BPA Request | None | IDF | 141235 | |
04/23/2004 08:57 | 04/23/2004 11:30 | Potlatch: Mason Co PUD 1 34.5kV Feeder 1 | 34.5 | 153 | Auto | Malicious | Malicious | BPA Trouble | 4 | OLY | 141241 |
04/23/2004 08:57 | 04/23/2004 11:30 | Duckabush: Mason Co PUD 1 12.5kV Feeder 1 | 12.5 | 153 | Auto | Malicious | Malicious | BPA Trouble | 4 | OLY | 141242 |
04/23/2004 08:57 | 04/23/2004 08:57 | Quilcene: Puget Sound Energ 115kV Feeder 1 | 115.0 | 0 | Auto | Malicious | Malicious | BPA Trouble | 2 | OLY | 141243 |
04/23/2004 08:57 | 04/23/2004 11:30 | Potlatch: Mason Co PUD 3 12.5kV Feeder 1 | 12.5 | 153 | Auto | Malicious | Malicious | BPA Trouble | 4 | OLY | 141244 |
04/24/2004 08:04 | 04/24/2004 09:21 | Outlook: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 77 | Plan | Switching | BPA Request | None | TRI | 141252 | |
04/25/2004 00:04 | 04/25/2004 04:14 | Dayton CREA: Columbia REA 24.9kV Feeder 1 by PacifiCorp (PACW) | 24.9 | 250 | Plan | Foreign Request | Customer Request | Unknown | TRI | 141253 | |
04/25/2004 00:05 | 04/25/2004 01:33 | Cathlamet: Wahkiakum Co PUD 12.5kV Feeder 1 | 12.5 | 88 | Plan | Foreign Request | Customer Request | None | LGV | 141254 | |
04/25/2004 02:01 | 04/25/2004 02:07 | Cape Horn: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 6 | Plan | Maintenance | BPA Request | Unknown | LGV | 141255 | |
04/25/2004 02:01 | 04/25/2004 02:07 | Evans: Clark Public Util 115kV Feeder 1 | 115.0 | 6 | Plan | Maintenance | BPA Request | Unknown | LGV | 141256 | |
04/25/2004 02:01 | 04/25/2004 03:33 | Carson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 92 | Plan | Maintenance | BPA Request | Unknown | LGV | 141257 | |
04/25/2004 02:01 | 04/25/2004 03:33 | North Bonneville: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 92 | Plan | Maintenance | BPA Request | Unknown | LGV | 141258 | |
04/25/2004 02:01 | 04/25/2004 03:33 | Stevenson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 92 | Plan | Maintenance | BPA Request | Unknown | LGV | 141259 | |
04/25/2004 07:59 | 04/25/2004 18:35 | St. Johns: Portland Gen Elec 57kV Feeder 3 | 57.0 | 636 | Plan | Foreign Request | Customer Request | None | LGV | 141277 | |
04/26/2004 04:10 | 04/26/2004 12:52 | Centralia Switching Station: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 522 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | OLY | 141278 |
04/26/2004 08:15 | 04/26/2004 08:15 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141279 |
04/26/2004 08:15 | 04/26/2004 08:15 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141280 |
04/26/2004 08:15 | 04/26/2004 08:15 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141281 |
04/26/2004 08:15 | 04/26/2004 08:15 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141282 |
04/26/2004 08:15 | 04/26/2004 08:15 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141283 |
04/26/2004 08:15 | 04/26/2004 08:15 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | KAL | 141284 |
04/26/2004 08:35 | 04/26/2004 12:59 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 264 | Plan | Maintenance | BPA Request | None | OLY | 141285 | |
04/26/2004 14:41 | 04/27/2004 08:05 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 1044 | Plan | Normally Out | BPA Request | None | EUG | 141286 | |
04/27/2004 14:29 | 04/27/2004 14:29 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 141304 |
04/27/2004 14:29 | 04/27/2004 14:29 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 141305 |
04/27/2004 14:29 | 04/27/2004 14:29 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 141306 |
04/27/2004 14:29 | 04/27/2004 14:29 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | KAL | 141307 | |
04/27/2004 14:29 | 04/27/2004 16:39 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 130 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 141308 |
04/27/2004 14:29 | 04/27/2004 19:03 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 274 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 141309 |
04/27/2004 15:15 | 07/08/2004 19:56 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 103961 | Plan | Normally Out | BPA Request | Unknown | EUG | 141310 | |
04/27/2004 15:20 | 04/27/2004 15:25 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 5 | Auto | Foreign Trouble | Transferor Trouble | Unknown | COV | 141311 | |
04/27/2004 15:34 | 04/27/2004 15:34 | Elma: McCleary WA 69kV Feeder 1 by Grays Harbor PUD | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | OLY | 141399 |
04/27/2004 15:37 | 04/27/2004 20:06 | Murray: Snohomish Co PUD 115kV Feeder 3 | 115.0 | 269 | Auto | Foreign Trouble | Customer Trouble | 10 | SNO | 141312 | |
04/27/2004 15:37 | 04/27/2004 15:37 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | SNO | 141313 |
04/27/2004 16:45 | 04/27/2004 16:46 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 1 | Auto | Foreign Trouble | Transferor Trouble | Unknown | COV | 141314 | |
04/27/2004 16:45 | 04/27/2004 16:45 | Snohomish: Snohomish Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | SNO | 141315 |
04/27/2004 16:49 | 04/27/2004 17:57 | Snohomish: Snohomish Co PUD 115kV Feeder 6 | 115.0 | 68 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | SNO | 141316 |
04/27/2004 16:50 | 04/28/2004 00:12 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 442 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 20 | SNO | 141317 |
04/27/2004 16:52 | 04/27/2004 23:40 | Snohomish: Snohomish Co PUD 115kV Feeder 8 | 115.0 | 408 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | SNO | 141318 |
04/27/2004 17:07 | 04/27/2004 17:07 | Fairmount: Clallam Co PUD 69kV Feeder 1 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 29 | OLY | 141319 |
04/27/2004 17:07 | 04/27/2004 17:07 | Port Townsend: Port Townsnd Corp 69kV Feeder 1 by Clallam Co PUD | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | OLY | 141320 |
04/27/2004 17:11 | 04/27/2004 18:28 | Fairmount: Clallam Co PUD 69kV Feeder 1 | 69.0 | 77 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 9 | OLY | 141321 |
04/27/2004 17:11 | 04/27/2004 18:28 | Port Townsend: Port Townsnd Corp 69kV Feeder 1 by Clallam Co PUD | 69.0 | 77 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | OLY | 141322 |
04/27/2004 17:20 | 04/27/2004 18:51 | Sno-King: Snohomish Co PUD 115kV Feeder 3 | 115.0 | 91 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 28 | SNO | 141323 |
04/27/2004 18:10 | 04/27/2004 18:10 | Sno-King: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | SNO | 141324 |
04/27/2004 19:45 | 04/28/2004 07:11 | Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Patawa Creek | 69.0 | 686 | Auto | Foreign Trouble | Foreign Utility | Customer Trouble | 12 | TRI | 141325 |
04/27/2004 19:45 | 04/28/2004 00:49 | Pendleton: Umatilla E Coop 12.5kV Feeder 1 | 12.5 | 304 | Auto | Foreign Trouble | Foreign Utility | Other Customer Trouble | Unknown | TRI | 141326 |
04/27/2004 19:45 | 04/28/2004 00:14 | Mission: Umatilla E Coop 69kV Feeder 1 | 69.0 | 269 | Auto | Foreign Trouble | Foreign Utility | Other Customer Trouble | 2 | TRI | 141327 |
04/27/2004 21:12 | 04/27/2004 21:12 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Wind | BPA Trouble | 2 | KAL | 141328 | |
04/27/2004 21:12 | 04/27/2004 21:12 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Wind | Wind | BPA Trouble | 2 | KAL | 141329 |
04/27/2004 21:12 | 04/27/2004 21:12 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Wind | Wind | BPA Trouble | 4 | KAL | 141330 |
04/27/2004 21:12 | 04/27/2004 21:12 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Wind | Wind | BPA Trouble | 1 | KAL | 141331 |
04/27/2004 21:12 | 04/27/2004 21:12 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Wind | Wind | BPA Trouble | 1 | KAL | 141332 |
04/27/2004 21:12 | 04/27/2004 21:12 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Wind | Wind | BPA Trouble | 1 | KAL | 141333 |
04/29/2004 08:06 | 04/29/2004 12:19 | Scooteney: S Col Basin Ir Dt 34.5kV Feeder 1 | 34.5 | 253 | Plan | Foreign Request | Customer Request | Unknown | TRI | 141365 | |
04/30/2004 06:12 | 04/30/2004 06:12 | Clymer: Puget Sound Energ 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | WEN | 141376 | |
05/01/2004 00:01 | 05/01/2004 04:33 | Priest River: Northern Lights 34.5kV Feeder 1 | 34.5 | 272 | Plan | Maintenance | BPA Request | Unknown | SPK | 141377 | |
05/01/2004 05:25 | 05/01/2004 05:27 | Dalreed: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 2 | Plan | Foreign Request | Customer Request | Unknown | TRI | 141378 | |
05/01/2004 05:25 | 05/01/2004 05:27 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 2 | Plan | Foreign Request | Customer Request | Unknown | SAL | 141379 | |
05/02/2004 00:01 | 05/02/2004 03:22 | Duckabush: Mason Co PUD 1 12.5kV Feeder 1 | 12.5 | 201 | Plan | Construction | BPA Request | 1 | OLY | 141392 | |
05/03/2004 06:40 | 05/14/2004 14:19 | Station H: US Navy 115kV Feeder 1 | 115.0 | 16299 | Plan | Foreign Request | Customer Request | None | OLY | 141567 | |
05/03/2004 07:44 | 05/03/2004 13:21 | Sno-King: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 337 | Plan | Foreign Request | Customer Request | None | SNO | 141400 | |
05/03/2004 08:15 | 07/02/2004 14:56 | Longview: Longview Alum LLC 13.8kV Feeder J | 13.8 | 86801 | Plan | Normally Out | Customer Request | None | LGV | 141404 | |
05/03/2004 09:17 | 05/06/2004 13:09 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 4552 | Plan | Maintenance | BPA Request | None | KAL | 141405 | |
05/03/2004 09:20 | 05/19/2004 10:59 | Conkelley: Col Falls Alum Co 13.8kV Feeder S1 | 13.8 | 23139 | Plan | Foreign Request | Customer Request | None | KAL | 141406 | |
05/04/2004 08:03 | 05/04/2004 10:19 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 136 | Plan | Foreign Request | Customer Request | None | KAL | 141426 | |
05/05/2004 08:39 | 05/05/2004 08:51 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 12 | Plan | Foreign Request | Customer Request | None | SNO | 141446 | |
05/06/2004 08:18 | 05/06/2004 14:38 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 380 | Plan | Maintenance | BPA Request | None | OLY | 141460 | |
05/06/2004 13:09 | 05/07/2004 07:49 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 1120 | Plan | Foreign Request | Customer Request | None | KAL | 141505 | |
05/06/2004 14:15 | 05/10/2004 10:07 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 5512 | Plan | Foreign Request | Customer Request | 2 | EUG | 141461 | |
05/07/2004 08:25 | 05/07/2004 15:01 | Timber: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 396 | Plan | Maintenance | BPA Request | Unknown | SAL | 141477 | |
05/08/2004 05:02 | 05/08/2004 05:02 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141489 |
05/08/2004 05:02 | 05/08/2004 05:02 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141490 |
05/08/2004 06:30 | 05/08/2004 06:30 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | KAL | 141888 |
05/08/2004 22:32 | 05/09/2004 04:52 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 380 | Plan | Maintenance | BPA Request | Unknown | KAL | 141491 | |
05/10/2004 00:09 | 05/10/2004 00:46 | Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 37 | Auto | Foreign Trouble | Foreign Utility | Customer Trouble | 28 | TRI | 141500 |
05/10/2004 08:09 | 05/10/2004 10:15 | Bell: Kaiser Alum 13.8kV Feeder 10 | 13.8 | 126 | Plan | Foreign Request | Customer Request | Unknown | SPK | 141506 | |
05/10/2004 08:26 | 05/14/2004 13:28 | Ross: Clark Public Util 115kV Feeder 1 | 115.0 | 6062 | Plan | Foreign Request | Customer Request | None | LGV | 141507 | |
05/11/2004 04:10 | 05/11/2004 07:51 | Oakridge: Lane Elec Coop 115kV Feeder 1 | 115.0 | 221 | Auto | Tree | Tree | BPA Trouble | 4 | EUG | 141508 |
05/12/2004 09:43 | 05/12/2004 14:20 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 277 | Plan | Maintenance | BPA Request | Unknown | IDF | 141536 | |
05/14/2004 00:01 | 05/14/2004 05:05 | Lopez Island: Orcas P+L 69kV Feeder 3 by Puget Sound Energ | 69.0 | 304 | Plan | Foreign Request | Customer Request | 2 | SNO | 141553 | |
05/14/2004 00:01 | 05/14/2004 05:06 | Lopez Island: Orcas P+L 69kV Feeder 4 by Puget Sound Energ | 69.0 | 305 | Plan | Foreign Request | Customer Request | 7 | SNO | 141554 | |
05/14/2004 11:09 | 05/14/2004 12:29 | Outlook: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 80 | Plan | Switching | BPA Request | None | TRI | 141568 | |
05/14/2004 14:33 | 05/14/2004 14:33 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141569 |
05/14/2004 14:33 | 05/14/2004 14:33 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141570 |
05/15/2004 03:28 | 05/15/2004 03:28 | Chambers: Inland P+L 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SPK | 141571 | |
05/15/2004 08:00 | 05/15/2004 08:01 | Mabton: Benton REA 12.5kV Feeder 1 | 12.5 | 1 | Plan | Maintenance | BPA Request | Unknown | TRI | 141584 | |
05/16/2004 15:43 | 05/16/2004 15:43 | Foster Creek NVEC: Nespelem Valley 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 141589 | |
05/16/2004 15:43 | 05/16/2004 15:43 | Nilles Corner: Douglas Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 141590 | |
05/16/2004 15:46 | 05/16/2004 15:46 | Foster Creek NVEC: Nespelem Valley 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 141591 | |
05/16/2004 15:46 | 05/16/2004 15:46 | Nilles Corner: Douglas Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 141592 | |
05/17/2004 07:47 | 05/28/2004 12:39 | Clatsop: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 16132 | Plan | Maintenance | BPA Request | None | LGV | 141602 | |
05/17/2004 09:05 | 05/19/2004 14:14 | Lexington: Cowlitz Co PUD 115kV Feeder 2 | 115.0 | 3189 | Plan | Foreign Request | Customer Request | None | LGV | 141603 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Goose Lake: Nespelem Valley 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 141604 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Keller: Ferry Co PUD 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141605 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Nespelem: Nespelem Valley 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 141606 | |
05/17/2004 17:26 | 05/17/2004 17:28 | East Omak: Okanogan Co PUD 115kV Feeder 1 to Okanogan | 115.0 | 2 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 23 | WEN | 141607 |
05/18/2004 11:31 | 05/18/2004 11:31 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 0 | Auto | Unknown | Unknown | Unknown Trouble | 2 | IDF | 141631 |
05/18/2004 13:37 | 05/18/2004 13:37 | Lyle: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 1 | TDA | 141632 |
05/18/2004 13:37 | 05/18/2004 13:37 | Spearfish: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 1 | TDA | 141633 | |
05/18/2004 13:39 | 05/18/2004 13:39 | Lyle: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 1 | TDA | 141634 |
05/18/2004 13:39 | 05/18/2004 13:39 | Spearfish: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 1 | TDA | 141635 | |
05/18/2004 13:41 | 05/18/2004 13:41 | Lyle: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 1 | TDA | 141636 |
05/18/2004 13:41 | 05/18/2004 13:41 | Spearfish: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 1 | TDA | 141637 | |
05/18/2004 13:44 | 05/18/2004 13:44 | Lyle: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 1 | TDA | 141638 |
05/18/2004 13:44 | 05/18/2004 13:44 | Spearfish: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 1 | TDA | 141639 | |
05/18/2004 20:45 | 05/18/2004 20:45 | De Moss: Wasco Elec Coop 69kV Feeder 2 to Rosebush | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | TDA | 141640 |
05/19/2004 01:24 | 05/19/2004 01:24 | Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141641 | |
05/19/2004 01:24 | 05/19/2004 01:24 | Clarkston: Clearwater P Co 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141642 | |
05/19/2004 01:24 | 05/19/2004 01:24 | Pomeroy: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141643 | |
05/19/2004 01:24 | 05/19/2004 01:24 | Pomeroy: Inland P+L 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141644 |
05/19/2004 14:47 | 05/19/2004 14:47 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141657 |
05/19/2004 14:47 | 05/19/2004 14:47 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141658 |
05/19/2004 14:47 | 05/19/2004 14:47 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141659 |
05/19/2004 14:47 | 05/19/2004 14:47 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141660 |
05/19/2004 14:47 | 05/19/2004 14:47 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141661 |
05/19/2004 14:47 | 05/19/2004 14:47 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141662 |
05/19/2004 14:47 | 05/19/2004 14:47 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141663 |
05/19/2004 14:47 | 05/19/2004 14:47 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141664 |
05/19/2004 14:47 | 05/19/2004 14:47 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141665 |
05/19/2004 14:47 | 05/19/2004 14:47 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141872 |
05/19/2004 15:45 | 05/21/2004 11:41 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 2636 | Plan | Foreign Request | Customer Request | None | EUG | 141666 | |
05/19/2004 16:02 | 05/19/2004 18:36 | Albany: US DOE Albany 12kV Feeder 1 | 12.0 | 154 | Plan | Foreign Request | Customer Request | None | EUG | 141667 | |
05/19/2004 17:43 | 05/19/2004 17:43 | Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141668 |
05/19/2004 17:43 | 05/19/2004 17:43 | Metaline Falls: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141669 | |
05/19/2004 17:43 | 05/19/2004 17:43 | Spirit: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141670 | |
05/19/2004 19:37 | 05/19/2004 19:37 | Clymer: Puget Sound Energ 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 1 | WEN | 141671 | |
05/20/2004 05:31 | 05/20/2004 05:31 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Lightning | BPA Trouble | Unknown | RED | 141687 |
05/20/2004 05:31 | 05/20/2004 05:31 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Lightning | BPA Trouble | Unknown | RED | 141688 |
05/20/2004 07:29 | 06/14/2004 08:29 | Cowlitz: Cowlitz Co PUD 115kV Feeder 1 | 115.0 | 36060 | Plan | Foreign Request | Customer Request | None | LGV | 141689 | |
05/20/2004 12:21 | 05/20/2004 12:21 | Dalreed: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141690 | |
05/20/2004 12:21 | 05/20/2004 12:21 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SAL | 141691 |
05/20/2004 13:52 | 05/20/2004 13:56 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 4 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141692 |
05/20/2004 13:52 | 05/20/2004 13:56 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 4 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 141693 |
05/20/2004 15:26 | 05/20/2004 15:26 | Half Moon: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141694 |
05/20/2004 15:26 | 05/20/2004 15:26 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141695 |
05/20/2004 15:26 | 05/20/2004 15:26 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141696 |
05/20/2004 15:26 | 05/20/2004 15:26 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141697 |
05/20/2004 15:26 | 05/20/2004 15:26 | Colbert: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141698 |
05/20/2004 15:26 | 05/20/2004 15:26 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141699 |
05/20/2004 15:26 | 05/20/2004 15:26 | Tum Tum: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141700 |
05/20/2004 15:26 | 05/20/2004 15:26 | Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141701 |
05/20/2004 15:26 | 05/20/2004 15:26 | Milan: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141702 |
05/20/2004 15:26 | 05/20/2004 15:26 | Mead: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141703 | |
05/20/2004 15:26 | 05/20/2004 15:26 | Loon Lake: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141704 |
05/20/2004 16:10 | 05/20/2004 16:10 | Colbert: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141705 |
05/20/2004 16:10 | 05/20/2004 16:10 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141706 |
05/20/2004 16:10 | 05/20/2004 16:10 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141707 |
05/20/2004 16:10 | 05/20/2004 16:10 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141708 |
05/20/2004 16:10 | 05/20/2004 16:10 | Half Moon: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141709 |
05/20/2004 16:10 | 05/20/2004 16:10 | Loon Lake: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141710 |
05/20/2004 16:10 | 05/20/2004 16:10 | Mead: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141711 | |
05/20/2004 16:10 | 05/20/2004 16:10 | Milan: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141712 |
05/20/2004 16:10 | 05/20/2004 16:10 | Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141713 |
05/20/2004 16:10 | 05/20/2004 16:10 | Tum Tum: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141714 |
05/20/2004 16:10 | 05/20/2004 16:10 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141715 |
05/20/2004 16:22 | 05/20/2004 16:22 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141716 |
05/20/2004 16:22 | 05/20/2004 16:22 | Half Moon: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141717 |
05/20/2004 16:22 | 05/20/2004 16:22 | Loon Lake: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141718 |
05/20/2004 16:22 | 05/20/2004 16:22 | Mead: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141719 | |
05/20/2004 16:22 | 05/20/2004 16:22 | Milan: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141720 |
05/20/2004 16:22 | 05/20/2004 16:22 | Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141721 |
05/20/2004 16:22 | 05/20/2004 16:22 | Tum Tum: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141722 |
05/20/2004 16:22 | 05/20/2004 16:22 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141723 |
05/20/2004 16:22 | 05/20/2004 16:22 | Colbert: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141724 |
05/20/2004 16:22 | 05/20/2004 16:22 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141725 |
05/20/2004 16:22 | 05/20/2004 16:22 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141726 |
05/20/2004 16:35 | 05/20/2004 16:35 | Bigelow: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141727 | |
05/20/2004 16:35 | 05/20/2004 16:35 | Green Bluff: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141728 | |
05/20/2004 18:43 | 05/20/2004 18:43 | Berrian: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141729 |
05/20/2004 18:43 | 05/20/2004 18:43 | H2F: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141730 |
05/20/2004 18:43 | 05/20/2004 18:43 | Nine Canyon: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141731 | |
05/20/2004 18:43 | 05/20/2004 18:43 | Paterson: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141732 | |
05/20/2004 18:57 | 05/20/2004 18:57 | Broadmoor: Big Bend Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141733 | |
05/20/2004 18:57 | 05/20/2004 18:57 | Cochrane: Franklin Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141734 | |
05/20/2004 18:57 | 05/20/2004 18:57 | Glade: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141735 |
05/20/2004 18:57 | 05/20/2004 18:57 | Glade: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141736 |
05/20/2004 18:57 | 05/20/2004 18:57 | North Pasco: Big Bend Coop 12.5kV Feeder 1 by Franklin Co PUD | 12.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141737 | |
05/20/2004 18:57 | 05/20/2004 18:57 | North Pasco: Franklin Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141738 | |
05/20/2004 18:57 | 05/20/2004 18:57 | Taylor Flats: Franklin Co PUD 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141739 |
05/21/2004 00:00 | 05/21/2004 04:58 | Lopez Island: Orcas P+L 69kV Feeder 3 by Puget Sound Energ | 69.0 | 298 | Plan | Foreign Request | BPA Request | 8 | SNO | 141740 | |
05/21/2004 00:00 | 05/21/2004 04:58 | Lopez Island: Orcas P+L 69kV Feeder 4 by Puget Sound Energ | 69.0 | 298 | Plan | Foreign Request | BPA Request | 5 | SNO | 141741 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Sullivan: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141770 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Valley Way: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141771 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Valley Way: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141772 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Vera: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141773 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Vera: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141774 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Bigelow: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141775 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Green Bluff: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141776 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Springhill: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141777 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood: Kaiser Alum 6.9kV Feeder 5 | 6.9 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141778 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood IPL: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141779 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood: Kaiser Alum 6.9kV Feeder 1 | 6.9 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141780 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood: Kaiser Alum 6.9kV Feeder 2 | 6.9 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141781 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood: Kaiser Alum 6.9kV Feeder 3 | 6.9 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141782 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood: Kaiser Alum 6.9kV Feeder 4 | 6.9 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141783 |
05/21/2004 13:28 | 05/21/2004 13:28 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141784 |
05/21/2004 13:28 | 05/21/2004 13:28 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141785 |
05/21/2004 13:28 | 05/21/2004 13:28 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141786 |
05/21/2004 13:28 | 05/21/2004 13:28 | Half Moon: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141787 |
05/21/2004 13:28 | 05/21/2004 13:28 | Loon Lake: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141788 |
05/21/2004 13:28 | 05/21/2004 13:28 | Mead: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141789 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Milan: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141790 |
05/21/2004 13:28 | 05/21/2004 13:28 | Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141791 |
05/21/2004 13:28 | 05/21/2004 13:28 | Tum Tum: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141792 |
05/21/2004 13:28 | 05/21/2004 13:28 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141793 |
05/21/2004 13:28 | 05/21/2004 13:28 | Colbert: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141794 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood: Kaiser Alum 6.9kV Feeder 6 | 6.9 | 0 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | SPK | 141873 |
05/21/2004 14:21 | 05/21/2004 14:21 | Vera: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141795 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Vera: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141796 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Sullivan: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141797 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Valley Way: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141798 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Valley Way: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141799 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Vera: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141800 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Valley Way: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141801 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Valley Way: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141802 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Vera: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141803 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Sullivan: Vera Water & Pwr 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 2 | SPK | 141804 | |
05/21/2004 17:06 | 05/21/2004 17:06 | Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141805 |
05/21/2004 17:06 | 05/21/2004 17:06 | Tum Tum: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141806 |
05/21/2004 17:06 | 05/21/2004 17:06 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141807 |
05/21/2004 17:06 | 05/21/2004 17:06 | Colbert: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141808 |
05/21/2004 17:06 | 05/21/2004 17:06 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141809 |
05/21/2004 17:06 | 05/21/2004 17:06 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141810 |
05/21/2004 17:06 | 05/21/2004 17:06 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141811 |
05/21/2004 17:06 | 05/21/2004 17:06 | Half Moon: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141812 |
05/21/2004 17:06 | 05/21/2004 17:06 | Loon Lake: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141813 |
05/21/2004 17:06 | 05/21/2004 17:06 | Mead: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141814 | |
05/21/2004 17:06 | 05/21/2004 17:06 | Milan: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 141815 |
05/21/2004 17:26 | 05/21/2004 17:26 | Cooke Mountain: Ferry Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141816 | |
05/21/2004 17:26 | 05/21/2004 17:26 | Kettle Falls: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141817 | |
05/21/2004 17:26 | 05/21/2004 17:26 | Republic: Ferry Co PUD 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 141818 | |
05/23/2004 16:20 | 05/23/2004 16:20 | Rattlesnake BREA: Benton REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141853 |
05/24/2004 08:23 | 07/06/2004 15:51 | Redmond: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 62368 | Plan | Switching | Customer Request | None | RED | 141859 | |
05/24/2004 14:29 | 05/24/2004 14:50 | Heyburn: Idaho Power Co 138kV Feeder 1 | 138.0 | 21 | Plan | Maintenance | BPA Request | 6 | IDF | 141860 | |
05/25/2004 05:32 | 05/25/2004 05:32 | Joso: Columbia REA 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | TRI | 141874 | |
05/25/2004 05:32 | 05/25/2004 05:32 | Burbank: Columbia REA 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | TRI | 141875 |
05/25/2004 05:32 | 05/25/2004 05:32 | Burbank: S Col Basin Ir Dt 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | TRI | 141876 |
05/25/2004 05:32 | 05/25/2004 05:32 | Nine Mile: FPL Energy Van 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | TRI | 141877 | |
05/25/2004 09:15 | 09/29/2004 13:49 | Junction City BLC: Blachly-Lane Co 115kV Feeder 1 | 115.0 | 183154 | Plan | Construction | BPA Request | None | EUG | 144345 | |
05/27/2004 07:06 | 05/27/2004 09:15 | Oregon City: Portland Gen Elec 57kV Feeder 2 | 57.0 | 129 | Plan | Foreign Request | Customer Request | None | SAL | 141897 | |
05/27/2004 09:54 | 05/27/2004 10:04 | Santiam: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 10 | Plan | Maintenance | BPA Request | None | SAL | 141898 | |
05/27/2004 11:21 | 05/27/2004 12:32 | Skookum: Mason Co PUD 3 115kV Feeder 1 | 115.0 | 71 | Auto | Line Material Failure | Weather | BPA Trouble | Unknown | OLY | 141899 |
05/28/2004 00:01 | 05/28/2004 05:37 | Lopez Island: Orcas P+L 69kV Feeder 3 by Puget Sound Energ | 69.0 | 336 | Plan | Foreign Request | Customer Request | 4 | SNO | 141900 | |
05/28/2004 00:01 | 05/28/2004 05:36 | Lopez Island: Orcas P+L 69kV Feeder 4 by Puget Sound Energ | 69.0 | 335 | Plan | Foreign Request | Customer Request | 6 | SNO | 141901 | |
05/28/2004 07:58 | 05/28/2004 16:02 | Valhalla: Chelan Co PUD 115kV Feeder 1 | 115.0 | 484 | Plan | Foreign Request | Customer Request | Unknown | WEN | 141919 | |
05/28/2004 08:57 | 05/28/2004 11:48 | Mission: Umatilla E Coop 69kV Feeder 1 | 69.0 | 171 | Plan | Maintenance | BPA Request | None | TRI | 141920 | |
05/28/2004 12:18 | 05/28/2004 12:26 | Ione: Columbia Basin 12.5kV Feeder 1 | 12.5 | 8 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | TRI | 141921 |
05/28/2004 12:18 | 05/28/2004 12:26 | Sand Hollow: Columbia Basin 69kV Feeder 1 | 69.0 | 8 | Auto | Foreign Trouble | Customer Trouble | 2 | TRI | 141922 | |
05/28/2004 17:30 | 05/28/2004 17:31 | Mabton: Benton REA 12.5kV Feeder 1 | 12.5 | 1 | Plan | Switching | BPA Request | 6 | TRI | 141923 | |
05/29/2004 23:00 | 05/30/2004 05:26 | Curlew: Raft River Elec 24.9kV Feeder 1 | 24.9 | 386 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | IDF | 141938 |
06/01/2004 08:15 | 06/01/2004 08:44 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 29 | Plan | Foreign Request | Customer Request | None | LGV | 141948 | |
06/01/2004 08:30 | 06/01/2004 08:46 | Ione: Columbia Basin 12.5kV Feeder 1 | 12.5 | 16 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | TRI | 141949 |
06/01/2004 08:30 | 06/01/2004 08:46 | Sand Hollow: Columbia Basin 69kV Feeder 1 | 69.0 | 16 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 141950 | |
06/01/2004 09:58 | 06/01/2004 10:17 | Snohomish: Snohomish Co PUD 115kV Feeder 7 | 115.0 | 19 | Plan | Foreign Request | Customer Request | None | SNO | 141951 | |
06/01/2004 12:23 | 06/04/2004 18:23 | Station X: US Navy 115kV Feeder 1 | 115.0 | 4680 | Plan | Foreign Request | Customer Request | None | OLY | 141952 | |
06/01/2004 12:23 | 06/04/2004 18:23 | Station X: US Navy 115kV Feeder 2 | 115.0 | 4680 | Plan | Foreign Request | Customer Request | None | OLY | 141953 | |
06/02/2004 15:56 | 06/02/2004 16:19 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 23 | Plan | Foreign Request | Customer Request | None | LGV | 141965 | |
06/03/2004 12:30 | 06/03/2004 14:55 | Raft: Raft River Elec 24.9kV Feeder 1 by Idaho Power Co | 24.9 | 145 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 141973 |
06/04/2004 08:30 | 06/04/2004 10:10 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 100 | Plan | Foreign Request | Customer Request | Unknown | IDF | 141982 | |
06/04/2004 08:45 | 06/04/2004 13:10 | Curlew: Raft River Elec 24.9kV Feeder 1 | 24.9 | 265 | Plan | Maintenance | BPA Request | Unknown | IDF | 141983 | |
06/04/2004 10:55 | 06/04/2004 10:55 | Bridge: Raft River Elec 34.5kV Feeder 1 | 34.5 | 0 | Auto | Bird or Animal | Bird or Animal | BPA Trouble | Unknown | IDF | 141984 |
06/04/2004 13:04 | 06/04/2004 13:10 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 6 | Plan | Switching | Customer Request | Unknown | IDF | 141985 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Benton City: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141987 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Benton City: Benton REA 12.5kV Feeder 1 by Benton Co PUD | 12.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141988 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Chandler PH: USBR Yakima 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141989 |
06/05/2004 02:14 | 06/05/2004 02:14 | Prosser: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141990 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Prosser: Benton REA 12.5kV Feeder 1 by Benton Co PUD | 12.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141991 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Snipes: Benton REA 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 141992 |
06/05/2004 02:30 | 06/05/2004 02:30 | City View: City of Richland 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141993 | |
06/05/2004 02:30 | 06/05/2004 02:30 | Kennedy: Benton REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141994 | |
06/05/2004 02:30 | 06/05/2004 02:30 | Ledbeder: Benton REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141995 | |
06/05/2004 02:30 | 06/05/2004 02:30 | Horn Rapids: Benton REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 141996 | |
06/05/2004 13:36 | 06/05/2004 14:22 | Samuels: Northern Lights 115kV Feeder 1 | 115.0 | 46 | Plan | Emergency | BPA Request | 3 | SPK | 142009 | |
06/05/2004 13:36 | 06/05/2004 14:22 | Selle: Northern Lights 13.8kV Feeder 1 | 13.8 | 46 | Plan | Emergency | BPA Request | 3 | SPK | 142010 | |
06/05/2004 13:36 | 06/05/2004 14:54 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 78 | Plan | Emergency | BPA Request | None | SPK | 142011 | |
06/05/2004 13:36 | 06/08/2004 13:37 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 4321 | Plan | Emergency | BPA Request | 1 | SPK | 142067 | |
06/05/2004 13:36 | 06/08/2004 13:37 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 4321 | Plan | Emergency | BPA Request | 1 | SPK | 142068 | |
06/05/2004 14:10 | 06/05/2004 14:10 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142012 |
06/05/2004 14:10 | 06/05/2004 14:10 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142013 |
06/05/2004 14:11 | 06/05/2004 14:11 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 7 | KAL | 142014 |
06/05/2004 14:11 | 06/05/2004 14:11 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | KAL | 142015 |
06/05/2004 17:59 | 06/05/2004 17:59 | Roza: Kittitas Co PUD 34.5kV Feeder 1 by USBR GENERAL | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 142016 | |
06/05/2004 17:59 | 06/05/2004 17:59 | Roza: USBR Yakima 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 142017 |
06/05/2004 19:20 | 06/06/2004 02:03 | Roza: Kittitas Co PUD 34.5kV Feeder 1 by USBR GENERAL | 34.5 | 403 | Plan | Emergency | BPA Request | Unknown | TRI | 142018 | |
06/05/2004 19:20 | 06/06/2004 02:03 | Roza: USBR Yakima 115kV Feeder 1 | 115.0 | 403 | Plan | Emergency | BPA Request | Unknown | TRI | 142019 | |
06/08/2004 07:55 | 06/08/2004 08:18 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 23 | Plan | Foreign Request | Customer Request | None | LGV | 142041 | |
06/08/2004 08:55 | 06/09/2004 15:30 | Western Kraft: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 1835 | Plan | Maintenance | BPA Request | None | SAL | 142042 | |
06/08/2004 13:47 | 06/10/2004 09:27 | Pomeroy: Inland P+L 69kV Feeder 1 | 69.0 | 2620 | Plan | Foreign Request | Customer Request | None | SPK | 142043 | |
06/08/2004 17:00 | 06/08/2004 17:14 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 14 | Plan | Foreign Request | Customer Request | None | LGV | 142044 | |
06/09/2004 07:38 | 06/09/2004 07:58 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 20 | Plan | Foreign Request | Customer Request | None | LGV | 142069 | |
06/09/2004 12:15 | 06/09/2004 14:43 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 148 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | RED | 142070 |
06/10/2004 04:00 | 06/10/2004 07:45 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 225 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 142083 |
06/10/2004 09:05 | 06/10/2004 09:06 | Fairview CCEC: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 1 | Plan | Foreign Request | Customer Request | None | EUG | 142084 | |
06/10/2004 11:04 | 06/10/2004 11:07 | Chandler PH: USBR Yakima 115kV Feeder 1 | 115.0 | 3 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 142085 |
06/10/2004 11:04 | 06/10/2004 11:07 | Benton City: Benton Co PUD 115kV Feeder 1 | 115.0 | 3 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 142086 | |
06/10/2004 11:04 | 06/10/2004 11:07 | Benton City: Benton REA 12.5kV Feeder 1 by Benton Co PUD | 12.5 | 3 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 142087 | |
06/10/2004 11:04 | 06/10/2004 11:07 | Prosser: Benton Co PUD 115kV Feeder 1 | 115.0 | 3 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 142088 | |
06/10/2004 11:04 | 06/10/2004 11:07 | Prosser: Benton REA 12.5kV Feeder 1 by Benton Co PUD | 12.5 | 3 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 142089 | |
06/10/2004 11:04 | 06/10/2004 11:07 | Snipes: Benton REA 12.5kV Feeder 1 | 12.5 | 3 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 142090 |
06/10/2004 16:18 | 06/10/2004 17:11 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 53 | Plan | Foreign Request | Customer Request | None | LGV | 142091 | |
06/11/2004 07:46 | 06/11/2004 08:41 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 55 | Plan | Foreign Request | Customer Request | None | LGV | 142097 | |
06/11/2004 09:02 | 06/11/2004 15:38 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 396 | Plan | Foreign Request | Customer Request | None | KAL | 142098 | |
06/11/2004 14:26 | 06/11/2004 15:37 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 71 | Plan | Foreign Request | Customer Request | None | LGV | 142099 | |
06/11/2004 16:33 | 06/11/2004 17:13 | Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 | 12.5 | 40 | Plan | Emergency | Customer Request | Unknown | EUG | 142100 | |
06/13/2004 22:08 | 06/13/2004 22:08 | Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 142103 |
06/13/2004 22:08 | 06/13/2004 22:08 | Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 142104 |
06/13/2004 22:08 | 06/13/2004 22:08 | Latham: Emerald PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | EUG | 142105 |
06/14/2004 06:45 | 06/14/2004 20:24 | Fairmount: Clallam Co PUD 69kV Feeder 1 | 69.0 | 819 | Plan | Maintenance | BPA Request | None | OLY | 142109 | |
06/14/2004 06:46 | 06/18/2004 15:45 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 6299 | Plan | Foreign Request | Customer Request | None | SNO | 142110 | |
06/14/2004 07:40 | 06/14/2004 09:03 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 83 | Plan | Foreign Request | Customer Request | Unknown | LGV | 142111 | |
06/14/2004 07:42 | 06/14/2004 08:02 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 20 | Plan | Foreign Request | Customer Request | Unknown | LGV | 142112 | |
06/14/2004 08:24 | 06/16/2004 14:24 | Western Kraft: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 3240 | Plan | Maintenance | BPA Request | None | SAL | 142163 | |
06/14/2004 08:37 | 06/16/2004 12:54 | McMinnville: McMinnville W&L 115kV Feeder 1 | 115.0 | 3137 | Plan | Foreign Request | Customer Request | None | SAL | 142113 | |
06/14/2004 09:10 | 06/18/2004 07:57 | Cowlitz: Cowlitz Co PUD 115kV Feeder 2 | 115.0 | 5687 | Plan | Foreign Request | Customer Request | None | LGV | 142114 | |
06/14/2004 14:38 | 06/14/2004 14:59 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 21 | Plan | Foreign Request | Customer Request | None | LGV | 142115 | |
06/14/2004 15:21 | 06/14/2004 16:09 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 48 | Plan | Foreign Request | Customer Request | Unknown | LGV | 142116 | |
06/15/2004 07:57 | 06/15/2004 08:21 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 24 | Plan | Foreign Request | Customer Request | None | LGV | 142135 | |
06/15/2004 08:51 | 06/15/2004 09:18 | Parkdale: Hood River Elec 12.5kV Feeder 1 | 12.5 | 27 | Plan | Emergency | BPA Request | Unknown | TDA | 142136 | |
06/15/2004 14:06 | 06/15/2004 14:52 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 46 | Plan | Foreign Request | Customer Request | None | LGV | 142137 | |
06/16/2004 07:50 | 06/16/2004 08:23 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 33 | Plan | Foreign Request | Customer Request | None | LGV | 142164 | |
06/16/2004 09:03 | 06/16/2004 11:04 | Langlois: Bandon OR 12.5kV Feeder 1 | 12.5 | 121 | Plan | Maintenance | BPA Request | None | EUG | 142165 | |
06/16/2004 09:03 | 06/16/2004 11:04 | Langlois: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 121 | Plan | Maintenance | BPA Request | None | EUG | 142166 | |
06/16/2004 10:34 | 06/16/2004 12:30 | Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 116 | Plan | Foreign Request | Customer Request | 1 | SAL | 142167 | |
06/16/2004 14:55 | 06/16/2004 15:24 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 29 | Plan | Foreign Request | Customer Request | None | LGV | 142168 | |
06/17/2004 07:04 | 06/17/2004 12:54 | Fairmount: Clallam Co PUD 69kV Feeder 1 | 69.0 | 350 | Plan | Foreign Request | Customer Request | None | OLY | 142179 | |
06/17/2004 07:51 | 06/17/2004 08:15 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 24 | Plan | Foreign Request | Customer Request | None | LGV | 142180 | |
06/17/2004 08:08 | 06/17/2004 15:05 | Carmen PH: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 417 | Plan | Maintenance | BPA Request | None | EUG | 142181 | |
06/17/2004 14:48 | 06/17/2004 15:10 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 22 | Plan | Foreign Request | Customer Request | None | LGV | 142182 | |
06/17/2004 16:25 | 06/17/2004 16:25 | Valhalla: Douglas Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 31 | WEN | 142183 |
06/17/2004 16:41 | 06/17/2004 16:51 | Alvey: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 10 | Plan | Foreign Request | Customer Request | 1 | EUG | 142184 | |
06/18/2004 00:59 | 06/18/2004 00:59 | Valhalla: Douglas Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 31 | WEN | 142185 |
06/18/2004 10:11 | 07/21/2004 08:25 | The Dalles: Northrn Wasco PUD 115kV Feeder 1 | 115.0 | 47414 | Plan | Foreign Request | Customer Request | None | TDA | 142197 | |
06/18/2004 15:53 | 06/18/2004 16:56 | Ross: Clark Public Util 69kV Feeder 3 | 69.0 | 63 | Auto | Terminal Equipment Failure | Lightning | BPA Trouble | 23 | LGV | 142198 |
06/18/2004 15:53 | 06/18/2004 23:45 | Ross: Clark Public Util 69kV Feeder 4 | 69.0 | 472 | Auto | Terminal Equipment Failure | Lightning | BPA Trouble | 10 | LGV | 142199 |
06/18/2004 18:11 | 06/18/2004 18:11 | Brincken's Corner: Clearwater P Co 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142200 |
06/18/2004 18:11 | 06/18/2004 18:11 | Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142201 |
06/18/2004 18:13 | 06/18/2004 18:13 | Brincken's Corner: Clearwater P Co 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142202 |
06/18/2004 18:13 | 06/18/2004 18:13 | Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142203 |
06/21/2004 08:23 | 06/25/2004 15:17 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 6174 | Plan | Foreign Request | BPA Request | Unknown | SNO | 142219 | |
06/22/2004 07:56 | 06/22/2004 08:32 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 36 | Plan | Foreign Request | Customer Request | None | LGV | 142237 | |
06/22/2004 08:40 | 06/22/2004 08:44 | Rattlesnake BREA: Benton REA 115kV Feeder 1 | 115.0 | 4 | Auto | Arc while switching | Arc while switching | BPA Trouble | 2 | TRI | 142238 |
06/22/2004 14:04 | 06/22/2004 14:04 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Weather | BPA Trouble | Unknown | KAL | 142239 |
06/22/2004 14:10 | 06/22/2004 14:10 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142240 |
06/22/2004 15:21 | 06/22/2004 15:45 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 24 | Plan | Foreign Request | Customer Request | None | LGV | 142241 | |
06/23/2004 06:58 | 06/23/2004 14:07 | Sno-King: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 429 | Plan | Foreign Request | Customer Request | None | SNO | 142260 | |
06/23/2004 07:21 | 06/23/2004 13:04 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 343 | Plan | Foreign Request | Customer Request | None | KAL | 142261 | |
06/23/2004 07:21 | 06/23/2004 13:04 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 343 | Plan | Foreign Request | Customer Request | None | KAL | 142262 | |
06/23/2004 07:44 | 06/23/2004 09:09 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 85 | Plan | Foreign Request | Customer Request | 34 | LGV | 142263 | |
06/23/2004 08:18 | 06/23/2004 11:00 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 162 | Plan | Foreign Request | Customer Request | None | KAL | 142264 | |
06/23/2004 18:09 | 06/23/2004 18:09 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 142265 |
06/23/2004 18:09 | 06/23/2004 18:09 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142266 |
06/23/2004 18:09 | 06/23/2004 18:09 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142267 |
06/23/2004 18:09 | 06/23/2004 18:09 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142268 |
06/23/2004 18:09 | 06/23/2004 18:09 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142269 |
06/23/2004 18:09 | 06/23/2004 18:09 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142270 |
06/23/2004 18:09 | 06/23/2004 18:09 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142271 |
06/23/2004 18:09 | 06/23/2004 18:09 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142272 |
06/23/2004 18:09 | 06/23/2004 18:09 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142273 |
06/23/2004 18:09 | 06/23/2004 18:09 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142274 |
06/24/2004 08:35 | 06/24/2004 13:46 | McNary: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 311 | Plan | Maintenance | BPA Request | 8 | TRI | 142281 | |
06/24/2004 09:42 | 06/24/2004 10:25 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 43 | Plan | Foreign Request | Customer Request | 36 | LGV | 142282 | |
06/24/2004 17:36 | 06/24/2004 17:36 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | KAL | 142283 |
06/24/2004 17:36 | 06/24/2004 17:36 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 142284 |
06/24/2004 17:36 | 06/24/2004 17:36 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | KAL | 142285 | |
06/24/2004 17:36 | 06/24/2004 17:36 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142286 |
06/24/2004 17:36 | 06/24/2004 17:36 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142287 |
06/24/2004 17:36 | 06/24/2004 17:36 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142288 |
06/24/2004 17:36 | 06/24/2004 17:36 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | KAL | 142289 |
06/24/2004 17:36 | 06/24/2004 17:36 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | KAL | 142290 |
06/24/2004 17:36 | 06/24/2004 17:36 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | KAL | 142291 |
06/24/2004 17:36 | 06/24/2004 17:36 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | KAL | 142292 |
06/24/2004 17:45 | 06/24/2004 17:45 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 142293 |
06/24/2004 17:45 | 06/24/2004 17:45 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142294 |
06/24/2004 17:45 | 06/24/2004 17:45 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142295 |
06/24/2004 17:45 | 06/24/2004 17:45 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142296 |
06/24/2004 17:45 | 06/24/2004 17:45 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142297 |
06/24/2004 17:45 | 06/24/2004 17:45 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142298 |
06/24/2004 17:45 | 06/24/2004 17:45 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142299 |
06/24/2004 17:45 | 06/24/2004 17:45 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142300 |
06/24/2004 17:45 | 06/24/2004 17:45 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142301 |
06/24/2004 17:45 | 06/24/2004 17:45 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142302 |
06/25/2004 09:28 | 06/25/2004 10:32 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 64 | Plan | Foreign Request | Customer Request | 36 | LGV | 142312 | |
06/25/2004 15:30 | 06/25/2004 16:03 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 33 | Plan | Foreign Request | Customer Request | 38 | LGV | 142313 | |
06/25/2004 16:18 | 06/25/2004 16:18 | Madison: Fall River E Coop 46kV Feeder 1 | 46.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 4 | IDF | 142314 |
06/25/2004 17:59 | 06/25/2004 17:59 | Dover Switching Station: Northern Lights 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142315 |
06/25/2004 17:59 | 06/25/2004 17:59 | Laclede: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142316 |
06/25/2004 17:59 | 06/25/2004 17:59 | Priest River AVA: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142317 |
06/25/2004 17:59 | 06/25/2004 17:59 | Sandpoint: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142318 |
06/25/2004 17:59 | 06/25/2004 17:59 | Priest River: Northern Lights 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142389 |
06/25/2004 19:09 | 06/25/2004 19:09 | Elmo: Mission Vly Power 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | KAL | 142319 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Wilbur: Avista Corp 115kV Feeder 1 | 115.0 | 3 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142320 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Larene: Inland P+L 115kV Feeder 1 | 115.0 | 3 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142321 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Springhill: Inland P+L 115kV Feeder 1 | 115.0 | 3 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142322 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Creston: Inland P+L 34.5kV Feeder 1 | 34.5 | 3 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142323 |
06/25/2004 23:37 | 06/25/2004 23:40 | Grand Coulee #2 Metering Point: Grant Co PUD 115kV Feeder 1 | 115.0 | 3 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142324 |
06/25/2004 23:37 | 06/25/2004 23:40 | Wagner Lake: Inland P+L 34.5kV Feeder 1 by Avista Corp | 34.5 | 3 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142325 |
06/26/2004 08:00 | 06/26/2004 08:00 | Eagle Lake: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 142390 |
06/26/2004 12:17 | 06/26/2004 12:17 | Tonasket: Okanogan Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 15 | WEN | 142340 | |
06/26/2004 12:20 | 06/26/2004 12:24 | Bell: Kaiser Alum 230kV Feeder 3 | 230.0 | 4 | Auto | Lightning | BPA Trouble | 1 | SPK | 142341 | |
06/26/2004 13:08 | 06/26/2004 13:08 | Springhill: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 2 | SPK | 142342 | |
06/26/2004 18:35 | 06/26/2004 19:04 | Winthrop: Okanogan El Coop 13.2kV Feeder 1 by Okanogan Co PUD | 13.2 | 29 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | WEN | 142343 |
06/26/2004 21:30 | 06/26/2004 22:00 | Winthrop: Okanogan El Coop 13.2kV Feeder 1 by Okanogan Co PUD | 13.2 | 30 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | WEN | 142344 |
06/26/2004 23:12 | 06/26/2004 23:12 | Tonasket: Okanogan Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 142345 | |
06/26/2004 23:12 | 06/26/2004 23:12 | Tonasket: Okanogan Co PUD 115kV Feeder 2 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 142346 | |
06/27/2004 00:08 | 06/27/2004 05:27 | Duckabush: Mason Co PUD 1 12.5kV Feeder 1 | 12.5 | 319 | Plan | Construction | BPA Request | Unknown | OLY | 142347 | |
06/27/2004 03:00 | 06/27/2004 06:34 | Eureka: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 214 | Plan | Maintenance | BPA Request | Unknown | KAL | 142348 | |
06/27/2004 03:00 | 06/27/2004 06:34 | Stillwater: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 214 | Plan | Maintenance | BPA Request | Unknown | KAL | 142349 | |
06/27/2004 03:00 | 06/27/2004 06:34 | Trego: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 214 | Plan | Maintenance | BPA Request | Unknown | KAL | 142350 | |
06/27/2004 03:00 | 06/27/2004 06:34 | Trego: Lincoln Elec - MT 115kV Feeder 2 | 115.0 | 214 | Plan | Maintenance | BPA Request | Unknown | KAL | 142351 | |
06/27/2004 07:01 | 06/27/2004 07:01 | Diamond Lake: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142379 | |
06/27/2004 13:17 | 06/27/2004 13:17 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 3 | IDF | 142380 |
06/27/2004 14:08 | 06/27/2004 14:08 | Teton: Lower Valy Energy 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 12 | IDF | 142381 |
06/27/2004 14:08 | 06/27/2004 14:08 | Teton: Lower Valy Energy 115kV Feeder 2 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | IDF | 142382 |
06/28/2004 06:24 | 07/02/2004 13:38 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 6194 | Plan | Foreign Request | Customer Request | None | SNO | 142391 | |
06/28/2004 10:31 | 06/28/2004 11:02 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 31 | Plan | Foreign Request | Customer Request | None | LGV | 142392 | |
06/28/2004 13:26 | 06/28/2004 13:26 | Dover Switching Station: Northern Lights 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 3 | SPK | 142393 |
06/28/2004 13:26 | 06/28/2004 13:26 | Laclede: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | 3 | SPK | 142394 |
06/28/2004 13:26 | 06/28/2004 13:26 | Priest River AVA: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 3 | SPK | 142395 |
06/28/2004 13:26 | 06/28/2004 13:26 | Priest River: Northern Lights 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | 3 | SPK | 142396 |
06/28/2004 14:03 | 06/28/2004 14:03 | Spar Canyon: Salmon River Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 25 | IDF | 142397 |
06/28/2004 15:40 | 06/28/2004 16:31 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 51 | Plan | Foreign Request | Customer Request | None | LGV | 142398 | |
06/28/2004 20:38 | 06/28/2004 20:38 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142399 |
06/28/2004 20:38 | 06/28/2004 20:38 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142400 |
06/28/2004 23:25 | 06/29/2004 04:24 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 299 | Plan | Emergency | BPA Request | Unknown | RED | 142401 | |
06/29/2004 07:44 | 06/29/2004 08:20 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 36 | Plan | Foreign Request | Customer Request | None | LGV | 142424 | |
06/29/2004 13:56 | 06/29/2004 13:56 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142425 |
06/29/2004 13:56 | 06/29/2004 13:56 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142426 |
06/29/2004 14:15 | 06/29/2004 14:44 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 29 | Plan | Foreign Request | Customer Request | None | LGV | 142427 | |
06/29/2004 14:32 | 06/29/2004 14:32 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142428 |
06/29/2004 14:32 | 06/29/2004 14:32 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142429 |
06/29/2004 14:37 | 06/29/2004 14:37 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142430 |
06/29/2004 14:37 | 06/29/2004 14:37 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142431 |
06/29/2004 16:25 | 06/29/2004 18:56 | Maupin: Northrn Wasco PUD 69kV Feeder 1 | 69.0 | 151 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | TDA | 142432 |
06/29/2004 16:25 | 06/29/2004 18:56 | Tygh Valley WEC: Wasco Elec Coop 12.5kV Feeder 1 | 12.5 | 151 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | TDA | 142433 |
06/29/2004 16:25 | 06/29/2004 18:55 | Antelope WEC: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 150 | Auto | Lightning | Terminal Equipment Failure | BPA Trouble | Unknown | TDA | 142434 |
06/29/2004 16:25 | 06/29/2004 18:55 | Bakeoven: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 150 | Auto | Lightning | Terminal Equipment Failure | BPA Trouble | Unknown | TDA | 142435 |
06/29/2004 16:25 | 06/29/2004 18:55 | Muddy Ranch: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 150 | Auto | Lightning | Terminal Equipment Failure | BPA Trouble | Unknown | TDA | 142436 |
06/29/2004 16:25 | 06/29/2004 18:56 | Wamic: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 151 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | TDA | 142437 |
06/30/2004 08:28 | 07/01/2004 14:48 | The Dalles: Northrn Wasco PUD 12.5kV Feeder 1 | 12.5 | 1820 | Plan | Construction | Customer Request | None | TDA | 142462 | |
06/30/2004 08:28 | 07/01/2004 14:43 | The Dalles: Northrn Wasco PUD 12.5kV Feeder 2 | 12.5 | 1815 | Plan | Construction | Customer Request | None | TDA | 142463 | |
06/30/2004 08:38 | 06/30/2004 09:02 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 24 | Plan | Foreign Request | Customer Request | None | LGV | 142464 | |
06/30/2004 13:33 | 06/30/2004 13:41 | Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) | 34.5 | 8 | Auto | Human Element | Substation Operations | BPA Trouble | Unknown | EUG | 142465 |
06/30/2004 13:33 | 06/30/2004 13:41 | Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) | 34.5 | 8 | Auto | Human Element | Substation Operations | BPA Trouble | Unknown | EUG | 142466 |
06/30/2004 13:33 | 06/30/2004 13:41 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 8 | Auto | Human Element | Substation Operations | BPA Trouble | Unknown | EUG | 142467 |
06/30/2004 13:33 | 06/30/2004 13:41 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 8 | Auto | Human Element | Substation Operations | BPA Trouble | Unknown | EUG | 142468 |
06/30/2004 13:33 | 06/30/2004 13:41 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 8 | Auto | Human Element | Substation Operations | BPA Trouble | Unknown | EUG | 142469 |
06/30/2004 13:33 | 06/30/2004 13:41 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 8 | Auto | Human Element | Substation Operations | BPA Trouble | Unknown | EUG | 142470 |
06/30/2004 13:33 | 06/30/2004 13:41 | Latham: Emerald PUD 115kV Feeder 1 | 115.0 | 8 | Auto | Human Element | Substation Operations | BPA Trouble | Unknown | EUG | 142471 |
06/30/2004 13:48 | 06/30/2004 13:48 | Cathlamet: Wahkiakum Co PUD 12.5kV Feeder 1 | 12.5 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | LGV | 142472 |
06/30/2004 13:48 | 06/30/2004 13:48 | Clatskanie: Clatskanie PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | LGV | 142473 |
06/30/2004 13:48 | 06/30/2004 13:48 | Delena: Clatskanie PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | LGV | 142474 |
06/30/2004 13:48 | 06/30/2004 13:48 | Fern Hill: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | LGV | 142475 |
06/30/2004 13:48 | 06/30/2004 13:48 | Grays River: Wahkiakum Co PUD 12.5kV Feeder 1 | 12.5 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | LGV | 142476 |
06/30/2004 13:48 | 06/30/2004 13:48 | Knappa Svensen: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 0 | Auto | Machinery, Logging | BPA Trouble | Unknown | LGV | 142477 | |
06/30/2004 13:48 | 06/30/2004 13:48 | Mist: West Oregon Elec 115kV Feeder 1 | 115.0 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | LGV | 142478 |
06/30/2004 14:09 | 06/30/2004 14:10 | Creswell: Emerald PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 1 | Auto | Human Element | BPA Trouble | Unknown | EUG | 142479 | |
06/30/2004 17:33 | 06/30/2004 17:33 | Half Moon: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142480 |
06/30/2004 17:33 | 06/30/2004 17:33 | Loon Lake: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142481 |
06/30/2004 17:33 | 06/30/2004 17:33 | Mead: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142482 | |
06/30/2004 17:33 | 06/30/2004 17:33 | Milan: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142483 |
06/30/2004 17:33 | 06/30/2004 17:33 | Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142484 |
06/30/2004 17:33 | 06/30/2004 17:33 | Tum Tum: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142485 |
06/30/2004 17:33 | 06/30/2004 17:33 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142486 |
06/30/2004 17:33 | 06/30/2004 17:33 | Colbert: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142487 |
06/30/2004 17:33 | 06/30/2004 17:33 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142488 |
06/30/2004 17:33 | 06/30/2004 17:33 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142489 |
06/30/2004 17:33 | 06/30/2004 17:33 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142490 |
06/30/2004 18:16 | 06/30/2004 18:16 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142491 |
06/30/2004 18:16 | 06/30/2004 18:16 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142492 |
06/30/2004 18:23 | 06/30/2004 18:23 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142493 |
06/30/2004 18:23 | 06/30/2004 18:23 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142494 |
06/30/2004 18:24 | 06/30/2004 18:24 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142495 |
06/30/2004 18:24 | 06/30/2004 18:24 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142496 |
06/30/2004 19:54 | 06/30/2004 19:56 | Creston: Inland P+L 34.5kV Feeder 1 | 34.5 | 2 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142497 |
06/30/2004 19:54 | 06/30/2004 19:56 | Grand Coulee #2 Metering Point: Grant Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142498 |
06/30/2004 19:54 | 06/30/2004 19:56 | Wagner Lake: Inland P+L 34.5kV Feeder 1 by Avista Corp | 34.5 | 2 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142499 |
06/30/2004 19:54 | 06/30/2004 19:56 | Wilbur: Avista Corp 115kV Feeder 1 | 115.0 | 2 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142500 | |
06/30/2004 19:54 | 06/30/2004 20:04 | Larene: Inland P+L 115kV Feeder 1 | 115.0 | 10 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142501 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Hoodoo: Inland P+L 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142502 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Scarcello: Kootenai E Coop 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142503 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Athol: Kootenai E Coop 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142504 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Athol: Northern Lights 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SPK | 142505 | |
06/30/2004 21:53 | 06/30/2004 21:53 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | 1 | SPK | 142506 |
06/30/2004 21:53 | 06/30/2004 21:53 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 11 | SPK | 142507 |
06/30/2004 21:53 | 06/30/2004 21:53 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142508 |
06/30/2004 21:53 | 06/30/2004 21:53 | Samuels: Northern Lights 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142509 |
06/30/2004 21:53 | 06/30/2004 21:53 | Selle: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142510 |
07/01/2004 00:42 | 07/01/2004 00:42 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142539 |
07/01/2004 00:42 | 07/01/2004 00:42 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142540 |
07/01/2004 05:57 | 07/01/2004 05:58 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 1 | Auto | Unknown | Unknown Trouble | Unknown | COV | 142511 | |
07/01/2004 15:18 | 07/01/2004 15:18 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142541 |
07/01/2004 15:30 | 07/01/2004 15:30 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142542 |
07/01/2004 15:50 | 07/09/2004 08:18 | Lexington: Cowlitz Co PUD 115kV Feeder 2 | 115.0 | 11068 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 14 | LGV | 142543 |
07/01/2004 16:04 | 07/01/2004 16:29 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 25 | Plan | Foreign Request | Customer Request | None | LGV | 142544 | |
07/02/2004 07:28 | 07/02/2004 12:32 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 304 | Plan | Foreign Request | Customer Request | None | KAL | 142569 | |
07/02/2004 07:28 | 07/02/2004 12:38 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 310 | Plan | Foreign Request | Customer Request | None | KAL | 142570 | |
07/02/2004 08:06 | 07/02/2004 12:06 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 240 | Plan | Foreign Request | Customer Request | None | KAL | 142571 | |
07/02/2004 11:06 | 07/02/2004 11:11 | The Dalles: USBR The Dalles 12.5kV Feeder 1 | 12.5 | 5 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 3 | TDA | 142572 |
07/02/2004 12:24 | 07/02/2004 12:24 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142573 |
07/02/2004 12:41 | 07/02/2004 12:41 | Spar Canyon: Salmon River Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 26 | IDF | 142574 |
07/03/2004 15:57 | 07/03/2004 15:57 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142583 |
07/03/2004 15:57 | 07/03/2004 15:57 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 9 | SPK | 142584 |
07/03/2004 15:57 | 07/03/2004 15:57 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142585 |
07/03/2004 15:57 | 07/03/2004 15:57 | Samuels: Northern Lights 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142586 |
07/03/2004 15:57 | 07/03/2004 15:57 | Selle: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142587 |
07/03/2004 16:48 | 07/03/2004 16:48 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142588 |
07/03/2004 16:48 | 07/03/2004 16:48 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 9 | SPK | 142589 |
07/03/2004 16:48 | 07/03/2004 16:48 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142590 |
07/03/2004 16:48 | 07/03/2004 16:48 | Samuels: Northern Lights 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142591 |
07/03/2004 16:48 | 07/03/2004 16:48 | Selle: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142592 |
07/04/2004 10:12 | 07/04/2004 10:12 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | IDF | 142600 |
07/04/2004 10:20 | 07/04/2004 10:20 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | IDF | 142601 |
07/04/2004 11:01 | 07/04/2004 11:01 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142602 |
07/04/2004 11:01 | 07/04/2004 11:01 | Colbert: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142603 |
07/04/2004 11:01 | 07/04/2004 11:01 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142604 |
07/04/2004 11:01 | 07/04/2004 11:01 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142605 |
07/04/2004 11:01 | 07/04/2004 11:01 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142606 |
07/04/2004 11:01 | 07/04/2004 11:01 | Half Moon: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142607 |
07/04/2004 11:01 | 07/04/2004 11:01 | Loon Lake: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142608 |
07/04/2004 11:01 | 07/04/2004 11:01 | Mead: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142609 | |
07/04/2004 11:01 | 07/04/2004 11:01 | Milan: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142610 |
07/04/2004 11:01 | 07/04/2004 11:01 | Milan: Inland P+L 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142611 |
07/04/2004 16:11 | 07/04/2004 16:11 | Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 142612 |
07/04/2004 16:11 | 07/04/2004 16:11 | Metaline Falls: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142613 | |
07/04/2004 16:11 | 07/04/2004 16:11 | Spirit: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 142614 | |
07/06/2004 06:51 | 07/09/2004 14:08 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 4757 | Plan | Foreign Request | Customer Request | None | SNO | 142627 | |
07/06/2004 08:19 | 07/06/2004 08:40 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 21 | Plan | Foreign Request | Customer Request | None | LGV | 142628 | |
07/06/2004 16:08 | 07/06/2004 16:27 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 19 | Plan | Foreign Request | Customer Request | None | LGV | 142629 | |
07/07/2004 08:17 | 07/07/2004 08:39 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 22 | Plan | Foreign Request | Customer Request | None | LGV | 142641 | |
07/07/2004 08:55 | 07/07/2004 13:55 | Parkdale: Hood River Elec 12.5kV Feeder 1 | 12.5 | 300 | Plan | Maintenance | BPA Request | None | TDA | 142642 | |
07/07/2004 09:14 | 07/07/2004 11:12 | Teton: Lower Valy Energy 115kV Feeder 1 | 115.0 | 118 | Plan | Maintenance | BPA Request | None | IDF | 142643 | |
07/07/2004 16:08 | 07/07/2004 16:25 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 17 | Plan | Foreign Request | Customer Request | None | LGV | 142644 | |
07/08/2004 07:53 | 07/08/2004 08:20 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 27 | Plan | Foreign Request | Customer Request | None | LGV | 142659 | |
07/08/2004 08:10 | 07/08/2004 08:11 | Wendson: Central Linc PUD 115kV Feeder 1 | 115.0 | 1 | Auto | Equipment/Miscellaneous | BPA Trouble | 15 | EUG | 142660 | |
07/08/2004 11:20 | 07/08/2004 12:32 | Morrison: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 72 | Plan | Foreign Request | BPA Request | Unknown | EUG | 142661 | |
07/08/2004 13:20 | 07/08/2004 14:29 | Dayton MCP3: Mason Co PUD 3 115kV Feeder 1 | 115.0 | 69 | Auto | Tree cut | Tree cut | BPA Trouble | 6 | OLY | 142662 |
07/08/2004 19:18 | 07/08/2004 20:31 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 73 | Plan | Foreign Request | Customer Request | None | LGV | 142663 | |
07/08/2004 19:56 | 07/08/2004 19:56 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 0 | Auto | Malicious | Malicious | BPA Trouble | Unknown | EUG | 142664 |
07/08/2004 19:56 | 07/08/2004 19:56 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Malicious | Malicious | BPA Trouble | Unknown | EUG | 142665 |
07/08/2004 19:56 | 07/08/2004 19:56 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Malicious | Malicious | BPA Trouble | Unknown | EUG | 142666 |
07/09/2004 04:30 | 07/09/2004 04:30 | Eagle Lake: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 142667 |
07/09/2004 04:30 | 07/09/2004 04:30 | Eagle Lake: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 142668 |
07/09/2004 04:30 | 07/09/2004 04:30 | Radar Pumping Plant: S Col Basin Ir Dt 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 142669 |
07/09/2004 04:30 | 07/09/2004 04:30 | Sagehill: Franklin Co PUD 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 142670 |
07/09/2004 04:30 | 07/09/2004 04:30 | Scooteney: Big Bend Coop 34.5kV Feeder 2 | 34.5 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 142671 |
07/09/2004 04:30 | 07/09/2004 04:30 | Scooteney: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 142672 |
07/09/2004 04:30 | 07/09/2004 04:30 | Scooteney: S Col Basin Ir Dt 34.5kV Feeder 1 | 34.5 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | TRI | 142673 |
07/09/2004 07:56 | 07/09/2004 08:19 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 23 | Plan | Foreign Request | Customer Request | None | LGV | 142698 | |
07/09/2004 08:34 | 07/09/2004 14:33 | Chandler PH: USBR Yakima 115kV Feeder 1 | 115.0 | 359 | Plan | Foreign Request | Customer Request | Unknown | TRI | 142699 | |
07/09/2004 10:28 | 07/20/2004 07:13 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 15645 | Plan | Normally Out | BPA Request | None | EUG | 142924 | |
07/09/2004 18:57 | 07/09/2004 18:57 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 8 | IDF | 142700 |
07/09/2004 22:14 | 07/09/2004 23:22 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 68 | Plan | Foreign Request | Customer Request | None | LGV | 142701 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 10 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 142708 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 10 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 142709 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 10 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | SAL | 142710 |
07/10/2004 12:16 | 07/10/2004 12:26 | Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 10 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 142711 | |
07/10/2004 14:43 | 07/10/2004 14:43 | Snohomish: Snohomish Co PUD 115kV Feeder 9 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 57 | SNO | 142712 |
07/10/2004 17:45 | 07/10/2004 17:45 | La Grande: Oregon Trail 69kV Feeder 1 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | TRI | 142713 |
07/11/2004 01:30 | 07/11/2004 03:51 | Elmo: Mission Vly Power 115kV Feeder 1 | 115.0 | 141 | Plan | Construction | BPA Request | 2 | KAL | 142714 | |
07/12/2004 06:52 | 07/21/2004 15:17 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 13465 | Plan | Foreign Request | Customer Request | None | SNO | 142723 | |
07/12/2004 08:10 | 07/12/2004 21:21 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 791 | Plan | Maintenance | BPA Request | None | TDA | 142724 | |
07/12/2004 09:02 | 07/16/2004 15:04 | Bellingham: Whatcom Co PUD 115kV Feeder 1 | 115.0 | 6122 | Plan | Foreign Request | Customer Request | None | SNO | 142725 | |
07/12/2004 13:12 | 07/12/2004 13:15 | Skookum: Mason Co PUD 3 115kV Feeder 1 | 115.0 | 3 | Plan | Emergency | BPA Request | 9 | OLY | 142726 | |
07/12/2004 17:08 | 07/12/2004 18:47 | Vaughn: Peninsula L Co 115kV Feeder 1 by Tacoma Power | 115.0 | 99 | Auto | Foreign Trouble | Transferor Trouble | 6 | COV | 142727 | |
07/13/2004 03:26 | 07/13/2004 03:26 | Blue River: Lane Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | EUG | 142728 | |
07/13/2004 03:26 | 07/13/2004 03:26 | Carmen PH: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | EUG | 142729 |
07/13/2004 08:18 | 07/13/2004 09:18 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 60 | Plan | Foreign Request | Customer Request | None | IDF | 142744 | |
07/13/2004 09:00 | 07/13/2004 12:15 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 195 | Plan | Maintenance | BPA Request | None | OLY | 142745 | |
07/13/2004 10:33 | 07/13/2004 14:29 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 236 | Plan | Maintenance | BPA Request | None | TDA | 142746 | |
07/14/2004 07:52 | 07/14/2004 15:01 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 429 | Plan | Maintenance | BPA Request | None | TDA | 142757 | |
07/15/2004 01:44 | 07/15/2004 01:44 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 13 | KAL | 142758 |
07/15/2004 07:07 | 07/15/2004 14:18 | Springhill: Inland P+L 115kV Feeder 1 | 115.0 | 431 | Plan | Maintenance | BPA Request | Unknown | SPK | 142791 | |
07/15/2004 07:49 | 07/16/2004 15:30 | Alcoa: Clark Public Util 115kV Feeder 1 | 115.0 | 1901 | Plan | Foreign Request | Customer Request | None | LGV | 142772 | |
07/15/2004 07:50 | 07/15/2004 15:50 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 480 | Plan | Foreign Request | Customer Request | None | LGV | 142773 | |
07/15/2004 09:19 | 07/15/2004 13:00 | Freewater CMF: Milton-Freewater 69kV Feeder 1 | 69.0 | 221 | Plan | Maintenance | BPA Request | None | TRI | 142774 | |
07/16/2004 14:00 | 07/30/2004 09:55 | Tyee: Lakeview L+P Co 115kV Feeder 1 by Tacoma Power | 115.0 | 19915 | Plan | Foreign Request | Customer Request | None | COV | 142792 | |
07/17/2004 05:12 | 07/17/2004 05:12 | Milton: Milton-Freewater 69kV Feeder 1 | 69.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 142793 | |
07/17/2004 05:12 | 07/17/2004 05:12 | Whitman: Columbia REA 69kV Feeder 1 | 69.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 142794 | |
07/17/2004 05:12 | 07/17/2004 05:12 | Freewater CMF: Milton-Freewater 69kV Feeder 1 | 69.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 142802 | |
07/17/2004 19:51 | 07/17/2004 19:51 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Lightning | BPA Trouble | Unknown | RED | 142803 |
07/17/2004 19:51 | 07/17/2004 19:51 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Lightning | BPA Trouble | Unknown | RED | 142804 |
07/18/2004 01:02 | 07/18/2004 01:02 | Highlands: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | TRI | 142805 | |
07/18/2004 01:02 | 07/18/2004 01:02 | Orchard View: Benton Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | TRI | 142806 | |
07/18/2004 12:16 | 07/18/2004 12:16 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 8 | IDF | 142813 |
07/18/2004 15:03 | 07/18/2004 19:49 | Foster: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 286 | Auto | Malicious | Malicious | BPA Trouble | Unknown | EUG | 142814 |
07/18/2004 15:03 | 07/18/2004 19:49 | North Butte: Consumers Power 12.5kV Feeder 1 | 12.5 | 286 | Auto | Malicious | Malicious | BPA Trouble | Unknown | EUG | 142815 |
07/19/2004 00:04 | 07/19/2004 00:04 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | RED | 142816 |
07/19/2004 00:04 | 07/19/2004 00:04 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | RED | 142817 |
07/19/2004 03:41 | 07/19/2004 03:41 | Lyle: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TDA | 142818 |
07/19/2004 03:41 | 07/19/2004 03:41 | Spearfish: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TDA | 142819 | |
07/19/2004 05:26 | 07/19/2004 06:23 | Alvey: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 57 | Auto | Foreign Trouble | Customer Trouble | 1 | EUG | 142830 | |
07/19/2004 07:21 | 07/22/2004 17:12 | Bellingham: Whatcom Co PUD 115kV Feeder 1 | 115.0 | 4911 | Plan | Foreign Request | Customer Request | None | SNO | 142831 | |
07/19/2004 09:50 | 07/19/2004 14:37 | Pomeroy: Inland P+L 69kV Feeder 1 | 69.0 | 287 | Plan | Foreign Request | Customer Request | None | SPK | 142832 | |
07/19/2004 10:13 | 07/19/2004 18:32 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 499 | Plan | Maintenance | BPA Request | None | TDA | 142833 | |
07/19/2004 10:28 | 07/19/2004 14:30 | Pomeroy: Inland P+L 115kV Feeder 1 | 115.0 | 242 | Plan | Foreign Request | Customer Request | None | SPK | 142834 | |
07/19/2004 13:49 | 07/19/2004 13:49 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142835 |
07/19/2004 13:49 | 07/19/2004 13:49 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142836 |
07/19/2004 14:17 | 07/19/2004 14:19 | Flathead: Flathead E Coop 230kV Feeder 1 | 230.0 | 2 | Auto | Lightning | BPA Trouble | Unknown | KAL | 142837 | |
07/19/2004 14:17 | 07/19/2004 14:17 | Elmo: Mission Vly Power 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 2 | KAL | 142838 | |
07/19/2004 14:17 | 07/19/2004 14:18 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 1 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 142874 |
07/19/2004 14:18 | 07/19/2004 14:18 | Dixon: Mission Vly Power 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Weather | BPA Trouble | 14 | KAL | 142839 |
07/19/2004 15:47 | 07/19/2004 15:47 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | RED | 142840 |
07/19/2004 15:47 | 07/19/2004 15:47 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | RED | 142841 |
07/19/2004 16:39 | 07/19/2004 16:49 | La Grande: Oregon Trail 230kV Feeder 1 | 230.0 | 10 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | TRI | 142842 |
07/19/2004 16:56 | 07/19/2004 16:56 | La Grande: Oregon Trail 69kV Feeder 1 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | TRI | 142843 |
07/19/2004 17:32 | 07/19/2004 17:32 | Riverton: Heyburn ID 138kV Feeder 1 | 138.0 | 0 | Auto | Lightning | BPA Trouble | 7 | IDF | 142844 | |
07/19/2004 17:32 | 07/19/2004 17:32 | Burley: Burley ID 138kV Feeder 1 | 138.0 | 0 | Auto | Lightning | BPA Trouble | 6 | IDF | 142845 | |
07/20/2004 01:21 | 07/20/2004 01:21 | Eureka: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 2 | KAL | 142875 | |
07/20/2004 01:21 | 07/20/2004 01:21 | Stillwater: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 2 | KAL | 142876 | |
07/20/2004 01:21 | 07/20/2004 01:21 | Trego: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 2 | KAL | 142877 | |
07/20/2004 01:21 | 07/20/2004 01:21 | Trego: Lincoln Elec - MT 115kV Feeder 2 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 2 | KAL | 142878 | |
07/20/2004 01:51 | 07/20/2004 01:51 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | None | OLY | 142879 | |
07/20/2004 07:13 | 07/20/2004 07:13 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 0 | Auto | Tree cut | Tree cut | BPA Trouble | Unknown | EUG | 142880 |
07/20/2004 07:13 | 07/20/2004 07:13 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Tree cut | Tree cut | BPA Trouble | Unknown | EUG | 142881 |
07/20/2004 07:13 | 07/20/2004 07:13 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Tree cut | Tree cut | BPA Trouble | Unknown | EUG | 142882 |
07/20/2004 08:10 | 07/20/2004 08:34 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 24 | Plan | Foreign Request | Customer Request | None | LGV | 142883 | |
07/20/2004 08:14 | 07/20/2004 14:25 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 371 | Plan | Maintenance | BPA Request | None | TDA | 142884 | |
07/20/2004 08:48 | 07/20/2004 15:37 | Keller: Ferry Co PUD 34.5kV Feeder 1 | 34.5 | 409 | Plan | Maintenance | BPA Request | None | SPK | 142885 | |
07/20/2004 08:49 | 07/20/2004 09:24 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 35 | Plan | Foreign Request | Customer Request | None | LGV | 142886 | |
07/20/2004 09:07 | 07/21/2004 12:38 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 1651 | Plan | Normally Out | BPA Request | Unknown | EUG | 142887 | |
07/20/2004 10:33 | 07/21/2004 13:21 | Langlois: Bandon OR 12.5kV Feeder 1 | 12.5 | 1608 | Plan | Maintenance | BPA Request | None | EUG | 142888 | |
07/20/2004 10:33 | 07/21/2004 13:21 | Langlois: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 1608 | Plan | Maintenance | BPA Request | None | EUG | 142889 | |
07/20/2004 14:27 | 07/20/2004 15:00 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 33 | Plan | Foreign Request | Customer Request | None | LGV | 142890 | |
07/20/2004 16:02 | 07/20/2004 16:03 | Greentimber: Fall River E Coop 115kV Feeder 1 | 115.0 | 1 | Auto | Lightning | Lightning | BPA Trouble | 1 | IDF | 142891 |
07/20/2004 16:02 | 07/20/2004 16:03 | Macks Inn: Fall River E Coop 46kV Feeder 1 | 46.0 | 1 | Auto | Lightning | Lightning | BPA Trouble | 1 | IDF | 142892 |
07/20/2004 16:02 | 07/20/2004 16:03 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 1 | Auto | Lightning | Lightning | BPA Trouble | 3 | IDF | 142893 |
07/20/2004 16:02 | 07/20/2004 16:03 | Madison: Fall River E Coop 46kV Feeder 1 | 46.0 | 1 | Auto | Lightning | Lightning | BPA Trouble | 5 | IDF | 142894 |
07/20/2004 17:21 | 07/20/2004 17:55 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 34 | Plan | Foreign Request | Customer Request | None | LGV | 142895 | |
07/20/2004 22:41 | 07/20/2004 22:41 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | None | EUG | 142896 |
07/20/2004 22:41 | 07/20/2004 22:41 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | BPA Trouble | None | EUG | 142897 |
07/20/2004 22:41 | 07/20/2004 22:41 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | BPA Trouble | None | EUG | 142898 |
07/21/2004 07:49 | 07/23/2004 09:54 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 3005 | Plan | Foreign Request | Customer Request | None | KAL | 142925 | |
07/21/2004 07:54 | 07/21/2004 13:15 | Chemawa: Portland Gen Elec 57kV Feeder 2 | 57.0 | 321 | Plan | Foreign Request | Customer Request | None | SAL | 142926 | |
07/21/2004 08:05 | 07/21/2004 09:26 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 81 | Plan | Foreign Request | Customer Request | None | LGV | 142927 | |
07/21/2004 08:11 | 07/21/2004 15:23 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 432 | Plan | Maintenance | BPA Request | None | TDA | 142928 | |
07/21/2004 12:38 | 07/21/2004 12:38 | Drain: Douglas Elec Coop 69kV Feeder 2 to Elkton | 69.0 | 0 | Auto | Forced (Configuration) | Fire | BPA Trouble | Unknown | EUG | 142929 |
07/21/2004 12:38 | 07/21/2004 12:38 | Drain: Douglas Elec Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Forced (Configuration) | Fire | BPA Trouble | Unknown | EUG | 142930 |
07/21/2004 12:38 | 07/21/2004 12:38 | Drain: Drain OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Forced (Configuration) | Fire | BPA Trouble | Unknown | EUG | 142931 |
07/21/2004 19:44 | 08/16/2004 07:05 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 36681 | Plan | Normally Out | BPA Request | Unknown | EUG | 142932 | |
07/22/2004 08:27 | 07/22/2004 14:36 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 369 | Plan | Maintenance | BPA Request | None | TDA | 142942 | |
07/22/2004 14:48 | 07/22/2004 15:58 | Sifton: Clark Public Util 115kV Feeder 3 | 115.0 | 70 | Plan | Foreign Request | Customer Request | None | LGV | 142943 | |
07/22/2004 23:00 | 07/23/2004 02:57 | Brincken's Corner: Clearwater P Co 69kV Feeder 1 by Avista Corp | 69.0 | 237 | Plan | Foreign Request | Customer Request | None | SPK | 142944 | |
07/23/2004 07:32 | 07/27/2004 08:34 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 5822 | Plan | Foreign Request | Customer Request | None | EUG | 142959 | |
07/23/2004 08:41 | 07/23/2004 13:47 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 306 | Plan | Maintenance | BPA Request | None | TDA | 142960 | |
07/24/2004 18:04 | 07/24/2004 18:04 | Fort Rock: Midstate E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | RED | 142967 |
07/24/2004 18:04 | 10/20/2004 10:12 | Christmas Valley: Midstate E Coop 115kV Feeder 1 | 115.0 | 126248 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | RED | 142968 |
07/24/2004 20:04 | 07/24/2004 20:15 | Mountain Avenue: City of Ashland 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 11 | Auto | Foreign Trouble | Transferor Trouble | Unknown | EUG | 142969 | |
07/24/2004 20:05 | 07/24/2004 20:05 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142970 |
07/24/2004 20:05 | 07/24/2004 20:05 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 142971 |
07/25/2004 18:52 | 07/25/2004 18:52 | Harney: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 20 | RED | 142977 |
07/26/2004 07:46 | 07/29/2004 13:38 | Bellingham: Whatcom Co PUD 115kV Feeder 1 | 115.0 | 4672 | Plan | Foreign Request | Customer Request | None | SNO | 142984 | |
07/26/2004 08:09 | 07/26/2004 08:11 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 2 | Auto | Machinery, Logging | Forced (Configuration) | BPA Trouble | 1 | SPK | 142985 |
07/26/2004 08:09 | 07/26/2004 08:09 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Machinery, Logging | Human Element | BPA Trouble | Unknown | KAL | 142986 |
07/26/2004 08:09 | 07/26/2004 08:09 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | KAL | 142987 |
07/26/2004 08:09 | 07/26/2004 08:09 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | KAL | 142988 |
07/26/2004 08:09 | 07/26/2004 08:09 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | KAL | 142989 |
07/26/2004 08:09 | 07/26/2004 08:09 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | KAL | 142990 |
07/26/2004 08:09 | 07/26/2004 08:09 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Machinery, Logging | Machinery, Logging | BPA Trouble | Unknown | KAL | 142991 |
07/26/2004 08:09 | 07/26/2004 08:09 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Machinery, Logging | Human Element | BPA Trouble | Unknown | SPK | 142992 |
07/26/2004 08:09 | 07/26/2004 08:09 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Machinery, Logging | Human Element | BPA Trouble | Unknown | SPK | 142993 |
07/26/2004 08:09 | 07/26/2004 08:09 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Machinery, Logging | Human Element | BPA Trouble | Unknown | SPK | 142994 |
07/26/2004 08:12 | 07/29/2004 10:02 | Intalco: Alcoa 13.8kV Feeder 4 | 13.8 | 4430 | Plan | Maintenance | BPA Request | None | SNO | 142996 | |
07/27/2004 07:16 | 07/27/2004 11:03 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 227 | Plan | Foreign Request | Customer Request | None | KAL | 143009 | |
07/27/2004 07:17 | 07/27/2004 11:03 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 226 | Plan | Foreign Request | Customer Request | None | KAL | 143010 | |
07/27/2004 07:49 | 07/27/2004 10:35 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 166 | Plan | Foreign Request | Customer Request | None | KAL | 143011 | |
07/27/2004 07:57 | 07/27/2004 08:49 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 52 | Plan | Foreign Request | Customer Request | None | LGV | 143012 | |
07/27/2004 10:08 | 07/27/2004 16:05 | Naselle: Pacific Co PUD 115kV Feeder 1 | 115.0 | 357 | Plan | Maintenance | BPA Request | None | LGV | 143013 | |
07/28/2004 19:00 | 07/28/2004 20:06 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 66 | Plan | Emergency | BPA Request | Unknown | SAL | 143340 | |
07/30/2004 07:24 | 07/30/2004 07:24 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 3 | IDF | 143050 |
07/30/2004 13:36 | 07/30/2004 13:46 | Happy Valley: Clallam Co PUD 69kV Feeder 1 | 69.0 | 10 | Auto | Substation Operations | Substation Operations | BPA Trouble | 20 | OLY | 143051 |
07/30/2004 13:36 | 07/30/2004 13:36 | Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern | 69.0 | 0 | Auto | Forced (Configuration) | Substation Operations | BPA Trouble | 10 | OLY | 143052 |
07/30/2004 13:36 | 07/30/2004 13:36 | Port Angeles: Clallam Co PUD 69kV Feeder 2 to Central | 69.0 | 0 | Auto | Forced (Configuration) | Substation Operations | BPA Trouble | 7 | OLY | 143053 |
07/30/2004 13:36 | 07/30/2004 13:36 | Port Angeles: Port Angeles WA 69kV Feeder 1 to Nippon | 69.0 | 0 | Auto | Forced (Configuration) | Substation Operations | BPA Trouble | 6 | OLY | 143054 |
07/30/2004 13:36 | 07/30/2004 13:36 | Port Angeles: Port Angeles WA 69kV Feeder 1 | 69.0 | 0 | Auto | Forced (Configuration) | Substation Operations | BPA Trouble | 16 | OLY | 143055 |
07/30/2004 13:36 | 07/30/2004 13:36 | Sappho: Clallam Co PUD 69kV Feeder 1 | 69.0 | 0 | Auto | Forced (Configuration) | Substation Operations | BPA Trouble | 10 | OLY | 143056 |
07/30/2004 13:36 | 07/30/2004 13:36 | Sappho: Clallam Co PUD 69kV Feeder 2 | 69.0 | 0 | Auto | Forced (Configuration) | Substation Operations | BPA Trouble | 10 | OLY | 143057 |
07/30/2004 13:36 | 07/30/2004 13:36 | Port Angeles: Port Angeles WA 69kV Feeder 2 | 69.0 | 0 | Auto | Forced (Configuration) | Substation Operations | BPA Trouble | 8 | OLY | 143058 |
07/30/2004 15:35 | 07/31/2004 12:36 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 1261 | Plan | Foreign Request | Customer Request | None | LGV | 143059 | |
07/31/2004 07:16 | 07/31/2004 12:39 | Albany: US DOE Albany 12kV Feeder 1 | 12.0 | 323 | Plan | Foreign Request | Customer Request | None | EUG | 143075 | |
07/31/2004 21:38 | 08/01/2004 01:30 | Dayton CREA: Columbia REA 24.9kV Feeder 1 by PacifiCorp (PACW) | 24.9 | 232 | Plan | Emergency | Customer Request | Unknown | TRI | 143076 | |
08/01/2004 08:41 | 08/01/2004 08:42 | Chemawa: Portland Gen Elec 57kV Feeder 2 | 57.0 | 1 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | SAL | 143080 |
08/01/2004 08:41 | 08/03/2004 11:39 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 3058 | Plan | Foreign Request | Customer Request | Unknown | EUG | 143122 | |
08/01/2004 14:17 | 08/01/2004 14:19 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 2 | Plan | Emergency | BPA Request | 1 | SAL | 143081 | |
08/01/2004 20:09 | 08/01/2004 20:09 | Redmond: Central Elec Coop 69kV Feeder 2 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 15 | RED | 143082 |
08/02/2004 07:40 | 08/05/2004 13:14 | Bellingham: Whatcom Co PUD 115kV Feeder 1 | 115.0 | 4654 | Plan | Foreign Request | Customer Request | None | SNO | 143090 | |
08/02/2004 08:17 | 08/02/2004 08:39 | Maupin: Northrn Wasco PUD 69kV Feeder 1 | 69.0 | 22 | Auto | Terminal Equipment Failure | Forced (Configuration) | BPA Trouble | 6 | TDA | 143091 |
08/02/2004 08:29 | 08/02/2004 11:22 | Sifton: Clark Public Util 115kV Feeder 2 | 115.0 | 173 | Plan | Foreign Request | Customer Request | Unknown | LGV | 143092 | |
08/02/2004 14:57 | 08/02/2004 14:57 | Roundup: PacifiCorp (PACW) 69kV Feeder 1 to Coyote Creek | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 143219 |
08/02/2004 15:01 | 08/02/2004 15:01 | Redmond: Central Elec Coop 69kV Feeder 2 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 5 | RED | 143093 |
08/02/2004 15:54 | 08/02/2004 15:54 | Mission: Umatilla E Coop 69kV Feeder 1 | 69.0 | 0 | Auto | Foreign Trouble | Other Customer Trouble | 3 | TRI | 143094 | |
08/02/2004 16:57 | 08/02/2004 16:57 | Redmond: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 12 | RED | 143095 |
08/02/2004 17:06 | 08/02/2004 17:06 | Madison: Fall River E Coop 46kV Feeder 1 | 46.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | IDF | 143096 |
08/02/2004 17:30 | 08/02/2004 17:30 | Big Eddy: Northrn Wasco PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Lightning | Unknown Trouble | 16 | TDA | 143097 |
08/02/2004 19:06 | 08/03/2004 15:38 | Ukiah: Columbia P Coop 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 1232 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 143098 | |
08/03/2004 01:43 | 08/03/2004 02:43 | Dixon: Mission Vly Power 69kV Feeder 1 | 69.0 | 60 | Auto | Unknown | Weather | BPA Trouble | Unknown | KAL | 143099 |
08/03/2004 06:14 | 08/03/2004 06:14 | Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co | 34.5 | 0 | Auto | Unknown | Unknown Trouble | Unknown | SPK | 143125 | |
08/03/2004 06:14 | 08/03/2004 06:14 | Clarkston: Clearwater P Co 34.5kV Feeder 1 | 34.5 | 0 | Auto | Unknown | Unknown Trouble | Unknown | SPK | 143126 | |
08/03/2004 11:29 | 08/03/2004 11:29 | Geisel Monument: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | EUG | 143127 | |
08/03/2004 11:29 | 08/03/2004 11:29 | Langlois: Bandon OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Tree cut | BPA Trouble | Unknown | EUG | 143128 |
08/03/2004 11:29 | 08/03/2004 11:29 | Langlois: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Tree cut | BPA Trouble | Unknown | EUG | 143129 |
08/03/2004 11:29 | 08/03/2004 11:29 | Port Orford: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Tree cut | BPA Trouble | Unknown | EUG | 143130 |
08/03/2004 11:29 | 08/03/2004 11:29 | Two Mile Road: Bandon OR 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Tree cut | BPA Trouble | Unknown | EUG | 143131 |
08/03/2004 12:10 | 08/05/2004 13:29 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 2959 | Plan | Foreign Request | Customer Request | None | KAL | 143132 | |
08/03/2004 12:39 | 08/05/2004 13:54 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 2955 | Plan | Foreign Request | Customer Request | None | KAL | 143133 | |
08/03/2004 12:52 | 08/03/2004 13:01 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 9 | Plan | Foreign Request | Customer Request | None | KAL | 143134 | |
08/03/2004 13:09 | 08/05/2004 13:10 | Kalispell: Flathead E Coop 34.5kV Feeder 2 | 34.5 | 2881 | Plan | Foreign Request | Customer Request | None | KAL | 143135 | |
08/03/2004 13:36 | 08/05/2004 13:04 | Kalispell: Flathead E Coop 34.5kV Feeder 3 | 34.5 | 2848 | Plan | Foreign Request | Customer Request | None | KAL | 143136 | |
08/03/2004 13:44 | 08/05/2004 12:18 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 2794 | Plan | Foreign Request | Customer Request | None | KAL | 143137 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Ruby Street: Franklin Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Substation Operations | BPA Trouble | 15 | TRI | 143138 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Foster Wells: Franklin Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Substation Operations | Substation Operations | BPA Trouble | 15 | TRI | 143139 |
08/03/2004 13:58 | 08/03/2004 14:00 | Court Street: Franklin Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Substation Operations | Substation Operations | BPA Trouble | 15 | TRI | 143140 |
08/03/2004 13:58 | 08/03/2004 14:15 | Levey: Franklin Co PUD 115kV Feeder 1 | 115.0 | 17 | Auto | Substation Operations | Substation Operations | BPA Trouble | 21 | TRI | 143141 |
08/03/2004 13:58 | 08/03/2004 14:15 | Eltopia: Big Bend Coop 115kV Feeder 1 by Franklin Co PUD | 115.0 | 17 | Auto | Substation Operations | BPA Trouble | Unknown | TRI | 143142 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Ely: Benton Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Substation Operations | Substation Operations | BPA Trouble | Unknown | TRI | 143143 |
08/03/2004 13:58 | 08/03/2004 14:00 | Gum Street: Benton Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Substation Operations | Substation Operations | BPA Trouble | Unknown | TRI | 143144 |
08/03/2004 13:58 | 08/03/2004 14:00 | Kennewick: Benton Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Substation Operations | Substation Operations | BPA Trouble | Unknown | TRI | 143145 |
08/03/2004 23:16 | 08/03/2004 23:16 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Lightning | BPA Trouble | Unknown | RED | 143146 |
08/03/2004 23:16 | 08/03/2004 23:16 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Lightning | BPA Trouble | Unknown | RED | 143147 |
08/04/2004 08:56 | 08/04/2004 12:12 | Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 196 | Plan | Foreign Request | Customer Request | None | SAL | 143168 | |
08/04/2004 16:08 | 08/04/2004 16:08 | La Grande: Oregon Trail 69kV Feeder 1 | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 143169 |
08/04/2004 17:40 | 08/05/2004 01:42 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 482 | Plan | Foreign Request | Customer Request | None | SNO | 143170 | |
08/04/2004 19:22 | 08/04/2004 19:22 | East Ellensburg: City of Ellensbrg 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | WEN | 143171 | |
08/04/2004 19:22 | 08/04/2004 19:22 | Jenkins: Kittitas Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | WEN | 143172 |
08/04/2004 19:26 | 08/04/2004 19:26 | Condon: Columbia Basin 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TDA | 143173 |
08/04/2004 19:26 | 08/04/2004 19:26 | Condon Wind: SeaWest Power 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | BPA Trouble | 3 | TDA | 143174 | |
08/04/2004 19:26 | 08/04/2004 19:26 | Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TDA | 143175 |
08/04/2004 19:26 | 08/04/2004 19:26 | Fossil: Columbia Basin 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TDA | 143220 |
08/04/2004 19:26 | 08/04/2004 19:26 | Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek | 69.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TDA | 143221 | |
08/04/2004 19:26 | 08/04/2004 19:26 | Fossil: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TDA | 143222 |
08/04/2004 19:26 | 08/04/2004 19:26 | Tygh Valley WEC: Wasco Elec Coop 12.5kV Feeder 1 | 12.5 | 0 | Auto | Forced (Configuration) | Lightning | BPA Trouble | Unknown | TDA | 143223 |
08/04/2004 19:26 | 08/04/2004 19:26 | Wamic: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 0 | Auto | Forced (Configuration) | Lightning | BPA Trouble | Unknown | TDA | 143224 |
08/04/2004 20:09 | 08/04/2004 20:09 | Nine Mile: FPL Energy Van 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 83 | TRI | 143176 | |
08/04/2004 20:09 | 08/04/2004 20:09 | Burbank: Columbia REA 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143177 |
08/04/2004 20:09 | 08/04/2004 20:09 | Burbank: S Col Basin Ir Dt 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143178 |
08/04/2004 20:09 | 08/04/2004 20:09 | Joso: Columbia REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143179 | |
08/04/2004 20:13 | 08/04/2004 20:13 | Burbank: Columbia REA 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143180 |
08/04/2004 20:13 | 08/04/2004 20:13 | Burbank: S Col Basin Ir Dt 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143181 |
08/04/2004 20:13 | 08/04/2004 20:13 | Joso: Columbia REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143182 | |
08/04/2004 20:13 | 08/04/2004 20:13 | Nine Mile: FPL Energy Van 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143183 | |
08/04/2004 20:16 | 08/04/2004 20:16 | Nine Mile: FPL Energy Van 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143184 | |
08/04/2004 20:16 | 08/04/2004 20:16 | Burbank: Columbia REA 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143185 |
08/04/2004 20:16 | 08/04/2004 20:16 | Burbank: S Col Basin Ir Dt 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143186 |
08/04/2004 20:16 | 08/04/2004 20:16 | Joso: Columbia REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143187 | |
08/04/2004 20:46 | 08/04/2004 20:46 | Sun Harbor: Columbia REA 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143188 | |
08/04/2004 20:46 | 08/04/2004 20:46 | Sun Harbor: Columbia REA 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143189 | |
08/05/2004 00:10 | 08/05/2004 00:10 | Fort Rock: Midstate E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | 15 | RED | 143190 |
08/05/2004 05:43 | 08/05/2004 05:43 | Broadmoor: Big Bend Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143225 | |
08/05/2004 05:43 | 08/05/2004 05:43 | Cochrane: Franklin Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143226 | |
08/05/2004 05:43 | 08/05/2004 05:43 | Glade: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143227 |
08/05/2004 05:43 | 08/05/2004 05:43 | Glade: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143228 |
08/05/2004 05:43 | 08/05/2004 05:43 | North Pasco: Big Bend Coop 12.5kV Feeder 1 by Franklin Co PUD | 12.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143229 | |
08/05/2004 05:43 | 08/05/2004 05:43 | North Pasco: Franklin Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143230 | |
08/05/2004 05:43 | 08/05/2004 05:43 | Taylor Flats: Franklin Co PUD 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143231 |
08/05/2004 05:54 | 08/05/2004 05:54 | Boardman: Umatilla E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 50 | TRI | 143232 |
08/05/2004 07:52 | 08/05/2004 08:49 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 57 | Plan | Foreign Request | Customer Request | 18 | LGV | 143233 | |
08/05/2004 09:34 | 08/05/2004 14:33 | Morrison: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 299 | Plan | Foreign Request | Customer Request | None | EUG | 143234 | |
08/05/2004 11:58 | 08/06/2004 19:00 | Pasco: PacifiCorp (PACW) 115kV Feeder 1 by Franklin Co PUD | 115.0 | 1862 | Plan | Foreign Request | Customer Request | Unknown | TRI | 143235 | |
08/05/2004 11:58 | 08/05/2004 12:17 | Franklin: Franklin Co PUD 115kV Feeder 1 to Angus | 115.0 | 19 | Plan | Foreign Request | Customer Request | 20 | TRI | 143236 | |
08/05/2004 11:58 | 08/05/2004 12:17 | Angus: Benton Co PUD 115kV Feeder 1 | 115.0 | 19 | Plan | Foreign Request | Customer Request | Unknown | TRI | 143237 | |
08/05/2004 11:58 | 08/05/2004 12:17 | Vista: Benton Co PUD 115kV Feeder 1 | 115.0 | 19 | Plan | Foreign Request | Customer Request | Unknown | TRI | 143238 | |
08/05/2004 13:13 | 08/05/2004 13:30 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 17 | Plan | Foreign Request | Customer Request | Unknown | KAL | 143239 | |
08/05/2004 20:41 | 08/05/2004 21:04 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 23 | Plan | Foreign Request | Customer Request | None | LGV | 143240 | |
08/06/2004 02:00 | 08/06/2004 04:38 | Ovando: Missoula E Coop 69kV Feeder 1 by NorthWestern Ener | 69.0 | 158 | Plan | Foreign Request | Customer Request | Unknown | KAL | 143241 | |
08/06/2004 07:53 | 08/06/2004 08:48 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 55 | Plan | Foreign Request | Customer Request | 18 | LGV | 143254 | |
08/06/2004 07:59 | 08/06/2004 12:50 | Foster: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 291 | Auto | Foreign Trouble | Customer Trouble | Unknown | EUG | 143255 | |
08/06/2004 08:32 | 08/06/2004 10:45 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 133 | Plan | Foreign Request | Customer Request | None | EUG | 143256 | |
08/06/2004 14:09 | 08/06/2004 14:44 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 35 | Plan | Foreign Request | Customer Request | 21 | LGV | 143257 | |
08/06/2004 16:29 | 08/06/2004 16:29 | Snohomish: Snohomish Co PUD 115kV Feeder 8 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 49 | SNO | 143258 |
08/06/2004 16:37 | 08/06/2004 16:37 | Snohomish: Snohomish Co PUD 115kV Feeder 3 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 33 | SNO | 143259 |
08/06/2004 18:02 | 08/06/2004 18:02 | Ione: Columbia Basin 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Lightning | Unknown Trouble | Unknown | TRI | 143401 |
08/06/2004 18:02 | 08/06/2004 18:02 | Sand Hollow: Columbia Basin 69kV Feeder 1 | 69.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | TRI | 143402 | |
08/06/2004 18:50 | 08/06/2004 18:52 | Berrian: Benton Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143261 |
08/06/2004 18:50 | 08/06/2004 18:52 | H2F: Benton Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143262 |
08/06/2004 18:50 | 08/06/2004 18:52 | Nine Canyon: Benton Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Lightning | BPA Trouble | Unknown | TRI | 143263 | |
08/07/2004 02:05 | 08/07/2004 02:07 | Condon: Columbia Basin 69kV Feeder 1 | 69.0 | 2 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TDA | 143264 |
08/07/2004 02:05 | 08/07/2004 02:07 | Condon Wind: SeaWest Power 69kV Feeder 1 | 69.0 | 2 | Auto | Foreign Trouble | Other Customer Trouble | Unknown | TDA | 143265 | |
08/07/2004 02:05 | 08/07/2004 02:07 | Gordon Hollow: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 2 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | TDA | 143266 |
08/07/2004 02:05 | 08/07/2004 02:07 | Antelope WEC: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143267 |
08/07/2004 02:05 | 08/07/2004 02:07 | Bakeoven: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143268 |
08/07/2004 02:05 | 08/07/2004 02:07 | Muddy Ranch: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143269 |
08/07/2004 02:05 | 08/07/2004 02:07 | Fossil: Columbia Basin 69kV Feeder 1 | 69.0 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143270 |
08/07/2004 02:05 | 08/07/2004 02:07 | Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek | 69.0 | 2 | Auto | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143271 | |
08/07/2004 02:05 | 08/07/2004 02:07 | Fossil: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143272 |
08/07/2004 02:05 | 08/07/2004 02:07 | Tygh Valley WEC: Wasco Elec Coop 12.5kV Feeder 1 | 12.5 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143273 |
08/07/2004 02:05 | 08/07/2004 02:07 | Wamic: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143274 |
08/07/2004 02:05 | 08/07/2004 02:07 | Maupin: Northrn Wasco PUD 69kV Feeder 1 | 69.0 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | TDA | 143275 |
08/09/2004 05:26 | 08/09/2004 05:26 | Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co | 34.5 | 0 | Auto | Unknown | BPA Trouble | Unknown | SPK | 143301 | |
08/09/2004 05:26 | 08/09/2004 05:26 | Clarkston: Clearwater P Co 34.5kV Feeder 1 | 34.5 | 0 | Auto | Unknown | BPA Trouble | Unknown | SPK | 143302 | |
08/09/2004 05:26 | 08/09/2004 05:26 | Pomeroy: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | SPK | 143303 | |
08/09/2004 05:26 | 08/09/2004 05:26 | Pomeroy: Inland P+L 69kV Feeder 1 | 69.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | SPK | 143304 | |
08/09/2004 10:07 | 08/09/2004 13:02 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 175 | Plan | Foreign Request | Customer Request | None | EUG | 143305 | |
08/10/2004 09:30 | 08/10/2004 14:37 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 307 | Plan | Maintenance | BPA Request | Unknown | IDF | 143319 | |
08/11/2004 00:44 | 08/11/2004 01:48 | Pleasant Hill: Emerald PUD 115kV Feeder 1 | 115.0 | 64 | Plan | Maintenance | BPA Request | None | EUG | 143320 | |
08/11/2004 07:33 | 08/11/2004 15:26 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 473 | Plan | Maintenance | BPA Request | None | IDF | 143354 | |
08/11/2004 07:53 | 08/12/2004 10:41 | Alcoa: Evergreen/Vanalco 13.8kV Feeder 4A | 13.8 | 1608 | Plan | Maintenance | BPA Request | None | LGV | 143357 | |
08/11/2004 08:19 | 08/11/2004 10:00 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 101 | Plan | Foreign Request | Customer Request | None | EUG | 143341 | |
08/11/2004 14:33 | 08/11/2004 14:35 | Dexter: Lane Elec Coop 115kV Feeder 1 | 115.0 | 2 | Auto | Arc while switching | Arc while switching | BPA Trouble | Unknown | EUG | 143342 |
08/11/2004 14:33 | 08/11/2004 14:35 | Pleasant Hill: Emerald PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Arc while switching | Arc while switching | BPA Trouble | Unknown | EUG | 143343 |
08/13/2004 06:28 | 08/13/2004 10:27 | Intalco: Alcoa 13.8kV Feeder 1 | 13.8 | 239 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | BPA Trouble | None | SNO | 143371 |
08/13/2004 17:06 | 08/13/2004 17:33 | Cedarville Junction: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 27 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | 5 | RED | 143372 |
08/13/2004 17:06 | 08/13/2004 17:33 | Davis Creek: Surprise Valley 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 27 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | 5 | RED | 143373 |
08/14/2004 00:05 | 08/14/2004 06:44 | Cathlamet: Wahkiakum Co PUD 12.5kV Feeder 1 | 12.5 | 399 | Plan | Maintenance | BPA Request | None | LGV | 143374 | |
08/14/2004 13:15 | 08/14/2004 13:15 | Hagen: Pacific Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | 10 | LGV | 143383 | |
08/14/2004 15:30 | 08/14/2004 23:05 | Austin Switchyard: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 455 | Auto | Foreign Trouble | Transferor Trouble | Unknown | RED | 143384 | |
08/14/2004 16:11 | 08/14/2004 16:11 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 4 | IDF | 143385 |
08/14/2004 16:11 | 08/14/2004 16:11 | Curlew: Raft River Elec 24.9kV Feeder 1 | 24.9 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 143386 |
08/14/2004 20:29 | 08/14/2004 21:29 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 60 | Plan | Foreign Request | Customer Request | 8 | IDF | 143387 | |
08/15/2004 16:55 | 08/15/2004 16:55 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 143398 |
08/15/2004 16:55 | 08/15/2004 16:55 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 143399 |
08/16/2004 07:05 | 08/16/2004 18:24 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 679 | Plan | Maintenance | BPA Request | Unknown | EUG | 143403 | |
08/16/2004 07:45 | 08/16/2004 16:49 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 544 | Plan | Foreign Request | Customer Request | Unknown | LGV | 143404 | |
08/16/2004 08:28 | 08/18/2004 14:33 | Intalco: Alcoa 13.8kV Feeder 5 | 13.8 | 3245 | Plan | Maintenance | BPA Request | None | SNO | 143405 | |
08/16/2004 08:50 | 08/16/2004 08:50 | Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | OLY | 143406 |
08/16/2004 15:55 | 08/16/2004 15:55 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 143407 |
08/16/2004 15:55 | 08/16/2004 15:55 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | RED | 143408 |
08/16/2004 18:26 | 08/17/2004 07:04 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 758 | Plan | Normally Out | BPA Request | None | EUG | 143409 | |
08/16/2004 21:53 | 08/16/2004 21:53 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143410 |
08/16/2004 21:53 | 08/16/2004 21:53 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143411 |
08/16/2004 22:21 | 08/16/2004 22:21 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143412 |
08/16/2004 22:21 | 08/16/2004 22:21 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143413 |
08/17/2004 07:32 | 08/17/2004 16:30 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 538 | Plan | Maintenance | BPA Request | None | SNO | 143441 | |
08/17/2004 07:37 | 08/17/2004 16:06 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 509 | Plan | Foreign Request | Customer Request | None | LGV | 143442 | |
08/17/2004 15:49 | 08/18/2004 07:05 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 916 | Plan | Normally Out | BPA Request | None | EUG | 143443 | |
08/18/2004 00:58 | 08/18/2004 00:58 | Dixon: Mission Vly Power 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Weather | BPA Trouble | 6 | KAL | 143444 |
08/18/2004 02:31 | 08/18/2004 02:31 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143445 |
08/18/2004 02:31 | 08/18/2004 02:31 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143446 |
08/18/2004 02:38 | 08/18/2004 02:38 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143447 |
08/18/2004 02:38 | 08/18/2004 02:38 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143448 |
08/18/2004 04:06 | 08/18/2004 04:06 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143449 |
08/18/2004 04:06 | 08/18/2004 04:06 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143450 |
08/18/2004 04:06 | 08/18/2004 04:06 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143451 |
08/18/2004 04:06 | 08/18/2004 04:06 | Samuels: Northern Lights 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143452 |
08/18/2004 04:06 | 08/18/2004 04:06 | Selle: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143453 |
08/18/2004 05:00 | 08/18/2004 05:00 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143454 |
08/18/2004 05:00 | 08/18/2004 05:00 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143455 |
08/18/2004 05:00 | 08/18/2004 05:00 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143456 |
08/18/2004 05:00 | 08/18/2004 05:00 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143457 |
08/18/2004 05:00 | 08/18/2004 05:00 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143458 |
08/18/2004 05:00 | 08/18/2004 05:00 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143459 |
08/18/2004 05:00 | 08/18/2004 05:00 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143460 |
08/18/2004 05:00 | 08/18/2004 05:00 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143461 |
08/18/2004 05:00 | 08/18/2004 05:00 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143462 |
08/18/2004 05:00 | 08/18/2004 05:01 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 1 | Auto | Lightning | Forced (Configuration) | BPA Trouble | Unknown | SPK | 143463 |
08/18/2004 07:05 | 08/18/2004 15:09 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 484 | Plan | Switching | BPA Request | None | EUG | 143492 | |
08/18/2004 07:18 | 08/18/2004 17:34 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 616 | Plan | Foreign Request | Customer Request | None | LGV | 143493 | |
08/18/2004 07:52 | 08/18/2004 09:15 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 83 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143494 |
08/18/2004 07:52 | 08/18/2004 09:15 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 83 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143495 |
08/18/2004 07:52 | 08/18/2004 18:13 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 621 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143496 |
08/18/2004 07:55 | 08/18/2004 09:29 | Camp: Avista Corp 230kV Feeder 1 | 230.0 | 94 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143497 |
08/18/2004 07:55 | 08/18/2004 09:29 | Camp: Northern Lights 13.8kV Feeder 1 by Avista Corp | 13.8 | 94 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143498 |
08/18/2004 07:55 | 08/18/2004 09:29 | Trout Creek: Northern Lights 230kV Feeder 1 | 230.0 | 94 | Auto | Lightning | BPA Trouble | Unknown | KAL | 143499 | |
08/18/2004 09:46 | 08/19/2004 15:49 | Sno-King: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 1803 | Plan | Foreign Request | Customer Request | None | SNO | 143500 | |
08/18/2004 10:26 | 08/18/2004 12:44 | Pomeroy: Inland P+L 115kV Feeder 1 | 115.0 | 138 | Plan | Maintenance | BPA Request | None | SPK | 143501 | |
08/18/2004 10:26 | 08/18/2004 12:44 | Pomeroy: Inland P+L 69kV Feeder 1 | 69.0 | 138 | Plan | Maintenance | BPA Request | None | SPK | 143502 | |
08/18/2004 15:09 | 08/19/2004 07:01 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 952 | Plan | Normally Out | BPA Request | None | EUG | 143503 | |
08/18/2004 16:59 | 08/18/2004 16:59 | Kettle Falls: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143504 | |
08/18/2004 16:59 | 08/18/2004 16:59 | Republic: Ferry Co PUD 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143505 | |
08/18/2004 16:59 | 08/18/2004 16:59 | Cooke Mountain: Ferry Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143506 | |
08/19/2004 01:20 | 08/19/2004 01:20 | Camp: Avista Corp 230kV Feeder 1 | 230.0 | 0 | Auto | Unknown | Lightning | Unknown Trouble | Unknown | KAL | 143530 |
08/19/2004 01:20 | 08/19/2004 01:20 | Camp: Northern Lights 13.8kV Feeder 1 by Avista Corp | 13.8 | 0 | Auto | Unknown | Lightning | Unknown Trouble | Unknown | KAL | 143531 |
08/19/2004 01:20 | 08/19/2004 01:20 | Trout Creek: Northern Lights 230kV Feeder 1 | 230.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | KAL | 143532 | |
08/19/2004 07:01 | 08/19/2004 15:26 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 505 | Plan | Switching | BPA Request | None | EUG | 143533 | |
08/19/2004 07:20 | 08/19/2004 14:07 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 407 | Plan | Maintenance | BPA Request | None | SNO | 143534 | |
08/19/2004 07:24 | 08/19/2004 09:10 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 106 | Plan | Foreign Request | Customer Request | Unknown | KAL | 143535 | |
08/19/2004 07:50 | 08/19/2004 16:19 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 509 | Plan | Foreign Request | Customer Request | None | LGV | 143536 | |
08/19/2004 07:55 | 08/23/2004 13:24 | Intalco: Alcoa 13.8kV Feeder 1 | 13.8 | 6089 | Plan | Maintenance | BPA Request | None | SNO | 143537 | |
08/19/2004 09:33 | 08/19/2004 11:34 | Pacific Way: Cowlitz Co PUD 115kV Feeder 1 | 115.0 | 121 | Plan | Foreign Request | Customer Request | Unknown | LGV | 143538 | |
08/19/2004 13:08 | 08/19/2004 13:08 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143539 |
08/19/2004 15:26 | 08/20/2004 07:05 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 939 | Plan | Normally Out | BPA Request | None | EUG | 143540 | |
08/19/2004 17:58 | 08/19/2004 17:58 | Eureka: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | KAL | 143541 | |
08/19/2004 17:58 | 08/19/2004 17:58 | Stillwater: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | KAL | 143542 | |
08/19/2004 17:58 | 08/19/2004 17:58 | Trego: Lincoln Elec - MT 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | KAL | 143543 | |
08/19/2004 17:58 | 08/19/2004 17:58 | Trego: Lincoln Elec - MT 115kV Feeder 2 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | KAL | 143544 | |
08/19/2004 20:25 | 08/19/2004 20:25 | Harney: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 19 | RED | 143545 |
08/20/2004 05:54 | 08/20/2004 14:48 | Pacific Way: Cowlitz Co PUD 115kV Feeder 1 | 115.0 | 534 | Plan | Foreign Request | Customer Request | Unknown | LGV | 143559 | |
08/20/2004 07:05 | 08/20/2004 14:44 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 459 | Plan | Switching | BPA Request | None | EUG | 143560 | |
08/20/2004 07:19 | 08/20/2004 07:19 | Walla Walla: Columbia REA 12.5kV Feeder 1 | 12.5 | 0 | Auto | Bird or Animal | Bird or Animal | BPA Trouble | 3 | TRI | 143561 |
08/20/2004 07:22 | 08/20/2004 13:48 | Walla Walla: Columbia REA 12.5kV Feeder 1 | 12.5 | 386 | Plan | Emergency | BPA Request | Unknown | TRI | 143562 | |
08/20/2004 08:09 | 08/20/2004 15:39 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 450 | Plan | Foreign Request | Customer Request | None | LGV | 143563 | |
08/20/2004 14:44 | 08/23/2004 07:02 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 3858 | Plan | Normally Out | BPA Request | Unknown | EUG | 143564 | |
08/21/2004 19:50 | 08/21/2004 19:50 | Pe Ell: Lewis Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Terminal Equipment Failure | BPA Trouble | Unknown | OLY | 143570 | |
08/21/2004 20:43 | 08/21/2004 20:45 | Oxbow: Pacific Co PUD 115kV Feeder 1 | 115.0 | 2 | Plan | Emergency | BPA Request | Unknown | LGV | 143571 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Pe Ell: Lewis Co PUD 115kV Feeder 1 | 115.0 | 1 | Plan | Emergency | BPA Request | Unknown | OLY | 143572 | |
08/22/2004 03:41 | 08/22/2004 03:41 | Snohomish: Snohomish Co PUD 115kV Feeder 8 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 26 | SNO | 143573 |
08/22/2004 05:43 | 08/22/2004 05:43 | Condon Wind: SeaWest Power 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | BPA Trouble | 25 | TDA | 143589 | |
08/22/2004 18:05 | 08/22/2004 22:50 | Walla Walla: Columbia REA 12.5kV Feeder 1 | 12.5 | 285 | Auto | Bird or Animal | Unknown | BPA Trouble | 3 | TRI | 143590 |
08/22/2004 18:26 | 08/22/2004 18:26 | Harney: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 17 | RED | 143591 |
08/22/2004 19:30 | 08/22/2004 19:30 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 32 | SNO | 143592 |
08/22/2004 19:30 | 08/22/2004 19:42 | Murray: Snohomish Co PUD 115kV Feeder 3 | 115.0 | 12 | Auto | Foreign Trouble | Customer Trouble | 15 | SNO | 143593 | |
08/23/2004 07:02 | 08/27/2004 14:36 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 6214 | Plan | Switching | BPA Request | None | EUG | 143604 | |
08/23/2004 09:05 | 08/30/2004 08:51 | Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern | 69.0 | 10066 | Plan | Foreign Request | Customer Request | None | OLY | 143605 | |
08/23/2004 13:50 | 08/24/2004 07:59 | Murray: Snohomish Co PUD 115kV Feeder 3 | 115.0 | 1089 | Plan | Foreign Request | Customer Request | None | SNO | 143606 | |
08/23/2004 18:30 | 08/23/2004 19:43 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 73 | Plan | Maintenance | BPA Request | Unknown | RED | 143607 | |
08/24/2004 05:08 | 08/24/2004 07:02 | Eugene: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 114 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | EUG | 143608 |
08/24/2004 08:59 | 08/24/2004 10:41 | Hood River: Hood River Elec 12.5kV Feeder 1 | 12.5 | 102 | Plan | Maintenance | BPA Request | None | TDA | 143627 | |
08/25/2004 05:50 | 08/25/2004 05:50 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | RED | 143635 |
08/25/2004 05:50 | 08/25/2004 05:50 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | RED | 143636 |
08/25/2004 08:24 | 08/25/2004 16:03 | Intalco: Alcoa 13.8kV Feeder 6 | 13.8 | 459 | Plan | Maintenance | BPA Request | None | SNO | 143637 | |
08/25/2004 09:02 | 08/27/2004 11:20 | Clatsop: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 3018 | Plan | Maintenance | BPA Request | None | LGV | 143638 | |
08/25/2004 09:29 | 08/25/2004 12:08 | La Grande: Oregon Trail 69kV Feeder 1 | 69.0 | 159 | Plan | Maintenance | BPA Request | None | TRI | 143639 | |
08/25/2004 16:16 | 08/25/2004 16:16 | Bigelow: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143640 | |
08/25/2004 16:16 | 08/25/2004 16:16 | Green Bluff: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143641 | |
08/25/2004 22:59 | 08/26/2004 04:53 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 354 | Plan | Maintenance | BPA Request | Unknown | KAL | 143642 | |
08/25/2004 22:59 | 08/26/2004 04:00 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 301 | Plan | Maintenance | BPA Request | None | KAL | 143643 | |
08/25/2004 22:59 | 08/26/2004 04:00 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 301 | Plan | Maintenance | BPA Request | None | KAL | 143644 | |
08/26/2004 02:00 | 08/26/2004 03:34 | Henkle Street: Pacific Co PUD 115kV Feeder 1 | 115.0 | 94 | Plan | Forced | BPA Request | Unknown | OLY | 143651 | |
08/26/2004 02:00 | 08/26/2004 03:34 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 94 | Plan | Forced | BPA Request | Unknown | OLY | 143652 | |
08/26/2004 07:34 | 08/27/2004 15:05 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 1891 | Plan | Foreign Request | Customer Request | None | EUG | 143653 | |
08/26/2004 08:01 | 08/26/2004 08:38 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 37 | Plan | Foreign Request | Customer Request | None | LGV | 143654 | |
08/26/2004 08:06 | 08/26/2004 16:33 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 507 | Plan | Foreign Request | Customer Request | None | LGV | 143655 | |
08/26/2004 08:18 | 08/26/2004 09:20 | Langlois: Bandon OR 12.5kV Feeder 1 | 12.5 | 62 | Plan | Maintenance | BPA Request | None | EUG | 143656 | |
08/26/2004 08:18 | 08/26/2004 09:20 | Langlois: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 62 | Plan | Maintenance | BPA Request | None | EUG | 143657 | |
08/26/2004 08:24 | 08/26/2004 13:08 | Intalco: Alcoa 13.8kV Feeder 6 | 13.8 | 284 | Plan | Maintenance | BPA Request | Unknown | SNO | 143658 | |
08/27/2004 07:11 | 08/27/2004 12:30 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 319 | Plan | Foreign Request | Customer Request | None | LGV | 143669 | |
08/27/2004 07:33 | 08/27/2004 14:50 | Snohomish: Snohomish Co PUD 115kV Feeder 1 | 115.0 | 437 | Plan | Maintenance | BPA Request | None | SNO | 143664 | |
08/27/2004 13:45 | 08/27/2004 14:31 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 46 | Plan | Maintenance | BPA Request | None | IDF | 143670 | |
08/27/2004 14:36 | 10/04/2004 10:08 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 54452 | Plan | Normally Out | BPA Request | None | EUG | 143671 | |
08/29/2004 06:28 | 08/29/2004 12:47 | Albany: PacifiCorp (PACW) 12kV Feeder 2 | 12.0 | 379 | Auto | Equipment/Miscellaneous | Terminal Equipment Failure | BPA Trouble | 3 | EUG | 143687 |
08/29/2004 06:28 | 08/29/2004 12:47 | Albany: US DOE Albany 12kV Feeder 1 | 12.0 | 379 | Auto | Equipment/Miscellaneous | Terminal Equipment Failure | BPA Trouble | 1 | EUG | 143688 |
08/29/2004 13:33 | 08/29/2004 13:33 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | IDF | 143689 |
08/30/2004 06:39 | 09/02/2004 19:53 | Sifton: Clark Public Util 115kV Feeder 5 | 115.0 | 5114 | Plan | Foreign Request | Customer Request | None | LGV | 143693 | |
08/30/2004 07:31 | 09/03/2004 15:57 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 6266 | Plan | Foreign Request | Customer Request | 1 | LGV | 143694 | |
08/30/2004 07:41 | 08/30/2004 16:31 | Snohomish: Snohomish Co PUD 115kV Feeder 7 | 115.0 | 530 | Plan | Maintenance | BPA Request | None | SNO | 143695 | |
08/30/2004 07:50 | 09/03/2004 14:48 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 6178 | Plan | Foreign Request | Customer Request | Unknown | EUG | 143696 | |
08/30/2004 08:50 | 08/30/2004 14:47 | Klondike Schoolhouse KWP2: Wasco Elec Coop 115kV Feeder 1 | 115.0 | 357 | Plan | Maintenance | BPA Request | None | TDA | 143697 | |
08/30/2004 14:51 | 09/01/2004 08:44 | Wendson: Central Linc PUD 115kV Feeder 1 | 115.0 | 2513 | Plan | Foreign Request | Customer Request | None | EUG | 143698 | |
08/31/2004 02:00 | 08/31/2004 03:16 | Willapa River: Pacific Co PUD 115kV Feeder 1 | 115.0 | 76 | Plan | Forced | BPA Request | 3 | OLY | 143699 | |
08/31/2004 02:00 | 08/31/2004 03:16 | Henkle Street: Pacific Co PUD 115kV Feeder 1 | 115.0 | 76 | Plan | Forced | BPA Request | 4 | OLY | 143700 | |
08/31/2004 03:50 | 08/31/2004 03:51 | Mabton: Benton REA 12.5kV Feeder 1 | 12.5 | 1 | Auto | Lightning | Lightning | BPA Trouble | Unknown | TRI | 143720 |
08/31/2004 08:00 | 09/01/2004 14:47 | Salem: Salem Elec 115kV Feeder 1 | 115.0 | 1847 | Plan | Foreign Request | Customer Request | None | SAL | 143721 | |
08/31/2004 08:11 | 09/01/2004 13:04 | Langlois: Bandon OR 12.5kV Feeder 1 | 12.5 | 1733 | Plan | Maintenance | BPA Request | None | EUG | 143722 | |
08/31/2004 08:11 | 09/01/2004 13:04 | Langlois: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 1733 | Plan | Maintenance | BPA Request | None | EUG | 143723 | |
08/31/2004 15:46 | 08/31/2004 16:18 | Alvey: Sprngfld Util Brd 115kV Feeder 1 to 10th Street | 115.0 | 32 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | EUG | 143724 |
08/31/2004 17:30 | 08/31/2004 18:42 | Maupin: Northrn Wasco PUD 69kV Feeder 1 | 69.0 | 72 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 1 | TDA | 143725 |
08/31/2004 17:30 | 08/31/2004 18:42 | Wamic: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 72 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 1 | TDA | 143726 |
08/31/2004 17:30 | 08/31/2004 18:42 | Tygh Valley WEC: Wasco Elec Coop 12.5kV Feeder 1 | 12.5 | 72 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 2 | TDA | 143727 |
08/31/2004 17:30 | 08/31/2004 18:42 | Pine Hollow: Wasco Elec Coop 12.5kV Feeder 1 by Northrn Wasco PUD | 12.5 | 72 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | 1 | TDA | 143728 |
09/01/2004 07:12 | 09/01/2004 07:12 | Box Canyon PH: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143751 |
09/01/2004 07:12 | 09/01/2004 07:12 | Metaline Falls: Pend Oreille PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143752 | |
09/01/2004 07:12 | 09/01/2004 07:12 | Spirit: Avista Corp 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143753 | |
09/01/2004 07:28 | 09/01/2004 07:28 | Libby BPA,FEC: Flathead E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143754 |
09/01/2004 07:28 | 09/01/2004 07:28 | Yaak: Northern Lights 12.5kV Feeder 1 | 12.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143755 |
09/01/2004 07:28 | 09/01/2004 07:28 | North Bench: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143756 |
09/01/2004 07:28 | 09/01/2004 07:28 | North Bench: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143757 |
09/01/2004 07:28 | 09/01/2004 07:28 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | SPK | 143758 |
09/01/2004 07:28 | 09/01/2004 07:28 | Moyie: Bonners Ferry ID 115kV Feeder 1 | 115.0 | 0 | Auto | Forced (Configuration) | Forced (Configuration) | BPA Trouble | Unknown | SPK | 143908 |
09/01/2004 07:40 | 09/01/2004 14:19 | Intalco: Alcoa 13.8kV Feeder 7 | 13.8 | 399 | Plan | Maintenance | BPA Request | None | SNO | 143759 | |
09/01/2004 08:19 | 09/01/2004 14:16 | Sandpoint: Northern Lights 13.8kV Feeder 1 | 13.8 | 357 | Plan | Maintenance | BPA Request | None | SPK | 143760 | |
09/01/2004 11:32 | 09/01/2004 11:32 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143761 |
09/01/2004 11:32 | 09/01/2004 11:32 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143762 |
09/01/2004 11:32 | 09/01/2004 11:32 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143763 |
09/01/2004 11:32 | 09/01/2004 11:32 | Samuels: Northern Lights 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143764 |
09/01/2004 11:32 | 09/01/2004 11:32 | Selle: Northern Lights 13.8kV Feeder 1 | 13.8 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143765 |
09/01/2004 11:35 | 09/01/2004 11:35 | Bonners Ferry: Northern Lights 115kV Feeder 1 to Smith Falls | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | SPK | 143766 |
09/01/2004 12:13 | 09/01/2004 12:13 | Dixon: Mission Vly Power 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143767 |
09/01/2004 12:18 | 09/01/2004 12:18 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143768 |
09/01/2004 12:18 | 09/01/2004 12:18 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143769 |
09/01/2004 12:37 | 09/01/2004 12:37 | Centralia Switching Station: PacifiCorp (PACW) 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Tree | BPA Trouble | 12 | OLY | 143770 |
09/01/2004 12:38 | 09/01/2004 12:38 | Lion Mountain: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | KAL | 143771 |
09/01/2004 12:42 | 09/01/2004 12:42 | Elmo: Mission Vly Power 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | KAL | 143772 | |
09/01/2004 16:29 | 09/01/2004 16:29 | Snohomish: Snohomish Co PUD 115kV Feeder 7 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | SNO | 143773 |
09/02/2004 08:24 | 09/08/2004 11:22 | Mapleton: Blachly-Lane Co 34.5kV Feeder 1 | 34.5 | 8818 | Plan | Foreign Request | Customer Request | None | EUG | 143802 | |
09/02/2004 14:33 | 09/02/2004 15:07 | Sifton: Clark Public Util 115kV Feeder 1 | 115.0 | 34 | Plan | Foreign Request | Customer Request | None | LGV | 143803 | |
09/03/2004 23:31 | 09/04/2004 02:33 | East Hills: South Side Elec 34.5kV Feeder 1 | 34.5 | 182 | Plan | Maintenance | BPA Request | 6 | IDF | 143819 | |
09/04/2004 18:46 | 09/04/2004 20:41 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 115 | Auto | Malicious | Malicious | BPA Trouble | Unknown | KAL | 143834 |
09/04/2004 18:46 | 09/04/2004 20:41 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 115 | Auto | Malicious | Malicious | BPA Trouble | Unknown | KAL | 143835 |
09/07/2004 07:59 | 09/08/2004 14:45 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 1846 | Plan | Foreign Request | Customer Request | None | EUG | 143845 | |
09/07/2004 08:31 | 09/07/2004 12:38 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 247 | Plan | Maintenance | BPA Request | None | IDF | 143846 | |
09/07/2004 09:01 | 11/04/2004 03:38 | Happy Valley: Clallam Co PUD 69kV Feeder 1 | 69.0 | 83257 | Plan | Construction | Customer Request | None | OLY | 143847 | |
09/07/2004 09:04 | 09/17/2004 14:18 | Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma | 69.0 | 14714 | Plan | Foreign Request | Customer Request | None | OLY | 143848 | |
09/07/2004 09:32 | 09/23/2004 09:23 | The Dalles: Northrn Wasco PUD 115kV Feeder 1 | 115.0 | 23031 | Plan | Maintenance | BPA Request | None | TDA | 143849 | |
09/07/2004 10:05 | 09/08/2004 14:41 | Deer Park: Inland P+L 115kV Feeder 1 | 115.0 | 1716 | Plan | Maintenance | BPA Request | None | SPK | 143850 | |
09/07/2004 12:48 | 09/08/2004 16:13 | Deer Park: Avista Corp 13.8kV Feeder 2 | 13.8 | 1645 | Plan | Foreign Request | Customer Request | None | SPK | 143851 | |
09/07/2004 13:00 | 09/08/2004 16:13 | Deer Park: Avista Corp 13.8kV Feeder 1 | 13.8 | 1633 | Plan | Foreign Request | Customer Request | None | SPK | 143852 | |
09/08/2004 07:11 | 09/08/2004 13:31 | Aberdeen: Grays Harbor PUD 115kV Feeder 4 | 115.0 | 380 | Plan | Maintenance | BPA Request | None | OLY | 143874 | |
09/08/2004 07:56 | 09/08/2004 19:59 | Alcoa: Clark Public Util 115kV Feeder 1 | 115.0 | 723 | Plan | Foreign Request | Customer Request | None | LGV | 143875 | |
09/08/2004 08:11 | 09/08/2004 15:29 | Sifton: Clark Public Util 115kV Feeder 5 | 115.0 | 438 | Plan | Maintenance | BPA Request | None | LGV | 143876 | |
09/08/2004 09:12 | 09/10/2004 16:31 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 3319 | Plan | Maintenance | BPA Request | None | IDF | 143965 | |
09/08/2004 10:38 | 09/08/2004 10:46 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 8 | Plan | Switching | BPA Request | None | SNO | 143877 | |
09/08/2004 15:39 | 09/08/2004 15:46 | Longview: Cowlitz Co PUD 115kV Feeder 5 | 115.0 | 7 | Auto | Construction | Construction | BPA Trouble | 7 | LGV | 143878 |
09/09/2004 07:59 | 09/09/2004 15:30 | Aberdeen: Grays Harbor PUD 115kV Feeder 6 | 115.0 | 451 | Plan | Maintenance | BPA Request | None | OLY | 143894 | |
09/09/2004 08:03 | 09/10/2004 15:22 | Eugene: EWEB (Eugene OR) 115kV Feeder 3 | 115.0 | 1879 | Plan | Maintenance | BPA Request | None | EUG | 143895 | |
09/10/2004 07:26 | 09/10/2004 13:36 | Aberdeen: Grays Harbor PUD 115kV Feeder 3 | 115.0 | 370 | Plan | Maintenance | BPA Request | None | OLY | 143910 | |
09/10/2004 08:56 | 09/10/2004 12:27 | City View: City of Richland 115kV Feeder 1 | 115.0 | 211 | Plan | Foreign Request | Customer Request | None | TRI | 143911 | |
09/10/2004 09:56 | 09/10/2004 10:00 | Round Valley: Salmon River Coop 69kV Feeder 1 | 69.0 | 4 | Plan | Foreign Request | Customer Request | 6 | IDF | 143912 | |
09/10/2004 12:38 | 09/10/2004 12:38 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 0 | Plan | Foreign Request | Customer Request | Unknown | EUG | 144065 | |
09/10/2004 16:37 | 09/14/2004 11:16 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 5439 | Plan | Maintenance | BPA Request | None | IDF | 143966 | |
09/12/2004 00:00 | 09/12/2004 03:39 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 219 | Plan | Maintenance | BPA Request | 1 | SAL | 143928 | |
09/12/2004 12:00 | 09/12/2004 15:27 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 207 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 143939 |
09/12/2004 15:27 | 09/12/2004 18:09 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 162 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 143940 |
09/12/2004 23:58 | 09/13/2004 01:56 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 118 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 143941 |
09/13/2004 01:56 | 09/13/2004 04:34 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 158 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 143942 |
09/13/2004 07:40 | 09/17/2004 15:11 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 6211 | Plan | Foreign Request | Customer Request | None | EUG | 143946 | |
09/13/2004 09:29 | 09/29/2004 11:59 | Silver Bow: Vigilante E Coop 69kV Feeder 1 | 69.0 | 23190 | Plan | Maintenance | BPA Request | None | KAL | 143967 | |
09/13/2004 09:29 | 09/29/2004 11:15 | Anaconda: NorthWestern Ener 115kV Feeder 2 | 115.0 | 23146 | Plan | Maintenance | BPA Request | None | KAL | 144205 | |
09/13/2004 15:15 | 09/13/2004 15:15 | Clarkston: Asotin County PUD 34.5kV Feeder 1 by Clearwater P Co | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143947 | |
09/13/2004 15:15 | 09/13/2004 15:15 | Clarkston: Clearwater P Co 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143948 | |
09/13/2004 15:15 | 09/13/2004 15:15 | Pomeroy: Inland P+L 115kV Feeder 1 | 115.0 | 0 | Auto | Lightning | BPA Trouble | Unknown | SPK | 143949 | |
09/13/2004 15:15 | 09/13/2004 15:15 | Pomeroy: Inland P+L 69kV Feeder 1 | 69.0 | 0 | Auto | Lightning | Lightning | BPA Trouble | Unknown | SPK | 143950 |
09/14/2004 08:28 | 09/14/2004 16:18 | Snohomish: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 470 | Plan | Foreign Request | Customer Request | None | SNO | 143968 | |
09/15/2004 02:49 | 09/15/2004 03:02 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 13 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | IDF | 143985 |
09/15/2004 07:25 | 09/15/2004 16:13 | Snohomish: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 528 | Plan | Foreign Request | BPA Request | None | SNO | 143986 | |
09/15/2004 07:43 | 09/15/2004 14:07 | Selle: Northern Lights 13.8kV Feeder 1 | 13.8 | 384 | Plan | Maintenance | BPA Request | None | SPK | 143987 | |
09/15/2004 08:32 | 09/17/2004 11:14 | Kennedy: Benton REA 115kV Feeder 1 | 115.0 | 3042 | Plan | Maintenance | BPA Request | None | TRI | 143988 | |
09/15/2004 09:05 | 09/15/2004 19:20 | Teton: Lower Valy Energy 115kV Feeder 1 | 115.0 | 615 | Plan | Switching | BPA Request | None | IDF | 143989 | |
09/15/2004 12:17 | 09/15/2004 13:03 | Ross: Clark Public Util 115kV Feeder 2 | 115.0 | 46 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 48 | LGV | 143990 |
09/15/2004 21:21 | 09/15/2004 21:21 | Echo Lake: Personal Comm Sys 14.4kV Feeder 1 by Puget Sound Energ | 14.4 | 0 | Auto | Foreign Trouble | Transferor Trouble | None | COV | 143991 | |
09/15/2004 22:32 | 09/15/2004 22:40 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 8 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | IDF | 143992 |
09/16/2004 02:26 | 09/16/2004 02:31 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 5 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | IDF | 144004 |
09/16/2004 04:16 | 09/16/2004 07:48 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 212 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | None | IDF | 144005 |
09/16/2004 07:07 | 09/16/2004 12:39 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 332 | Plan | Maintenance | BPA Request | None | KAL | 144006 | |
09/16/2004 07:10 | 09/16/2004 15:17 | Snohomish: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 487 | Plan | Foreign Request | Customer Request | None | SNO | 144007 | |
09/16/2004 09:11 | 09/16/2004 11:33 | Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD | 115.0 | 142 | Plan | Foreign Request | Customer Request | None | SNO | 144008 | |
09/16/2004 09:11 | 09/16/2004 11:33 | Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD | 115.0 | 142 | Plan | Foreign Request | Customer Request | None | SNO | 144009 | |
09/17/2004 07:40 | 09/17/2004 15:42 | Snohomish: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 482 | Plan | Foreign Request | Customer Request | None | SNO | 144022 | |
09/17/2004 08:55 | 09/17/2004 14:57 | Troy: Northern Lights 115kV Feeder 1 to Asarco | 115.0 | 362 | Plan | Maintenance | BPA Request | Unknown | KAL | 144023 | |
09/17/2004 19:52 | 09/17/2004 19:52 | Snohomish: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 45 | SNO | 144024 |
09/17/2004 19:52 | 09/17/2004 19:52 | Murray: Snohomish Co PUD 115kV Feeder 3 | 115.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 7 | SNO | 144025 |
09/17/2004 21:21 | 09/17/2004 21:21 | Macks Inn: Fall River E Coop 46kV Feeder 2 | 46.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 2 | IDF | 144026 |
09/19/2004 00:25 | 09/19/2004 11:37 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 672 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 144042 |
09/19/2004 08:00 | 09/19/2004 17:30 | Redmond: PacifiCorp (PACW) 69kV Feeder 1 | 69.0 | 570 | Plan | Maintenance | BPA Request | None | RED | 144053 | |
09/19/2004 15:41 | 09/19/2004 15:41 | Chambers: Inland P+L 115kV Feeder 1 by Avista Corp | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SPK | 144054 | |
09/20/2004 07:38 | 09/20/2004 16:07 | Snohomish: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 509 | Plan | Foreign Request | Customer Request | None | SNO | 144066 | |
09/20/2004 07:40 | 10/08/2004 12:11 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 26191 | Plan | Foreign Request | Customer Request | None | EUG | 144067 | |
09/20/2004 08:13 | 09/21/2004 15:31 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 1878 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 144068 |
09/20/2004 09:31 | 09/23/2004 13:40 | Weston Mountain: Umatilla E Coop 69kV Feeder 1 | 69.0 | 4569 | Plan | Maintenance | BPA Request | None | TRI | 144131 | |
09/20/2004 12:04 | 09/20/2004 12:57 | Lexington: Cowlitz Co PUD 115kV Feeder 4 | 115.0 | 53 | Plan | Foreign Request | Customer Request | None | LGV | 144069 | |
09/20/2004 12:27 | 09/20/2004 12:27 | Haskill: Flathead E Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | KAL | 144070 |
09/20/2004 12:27 | 09/20/2004 12:27 | Trumbull Creek: Flathead E Coop 230kV Feeder 1 | 230.0 | 0 | Auto | Lightning | Unknown | BPA Trouble | Unknown | KAL | 144071 |
09/21/2004 06:40 | 09/21/2004 15:21 | Bigelow: Inland P+L 115kV Feeder 1 | 115.0 | 521 | Plan | Maintenance | BPA Request | None | SPK | 144097 | |
09/21/2004 06:40 | 09/21/2004 15:21 | Green Bluff: Inland P+L 115kV Feeder 1 | 115.0 | 521 | Plan | Maintenance | BPA Request | None | SPK | 144098 | |
09/21/2004 07:37 | 09/21/2004 16:40 | Snohomish: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 543 | Plan | Foreign Request | Customer Request | None | SNO | 144099 | |
09/21/2004 07:47 | 09/21/2004 14:19 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 392 | Plan | Maintenance | BPA Request | None | SPK | 144100 | |
09/21/2004 07:47 | 09/21/2004 14:19 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 392 | Plan | Maintenance | BPA Request | None | SPK | 144101 | |
09/21/2004 08:00 | 09/21/2004 08:00 | Austin Switchyard: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | RED | 144102 | |
09/22/2004 23:06 | 09/23/2004 05:20 | Troy: City of Troy 13.8kV Feeder 1 | 13.8 | 374 | Plan | Maintenance | BPA Request | None | KAL | 144117 | |
09/22/2004 23:06 | 09/23/2004 04:52 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 346 | Plan | Maintenance | BPA Request | None | KAL | 144118 | |
09/22/2004 23:06 | 09/23/2004 05:30 | Troy: Northern Lights 13.8kV Feeder 2 | 13.8 | 384 | Plan | Maintenance | BPA Request | None | KAL | 144119 | |
09/23/2004 09:07 | 09/23/2004 13:44 | South Fork TLP: Tillamook PUD 115kV Feeder 1 | 115.0 | 277 | Plan | Maintenance | BPA Request | Unknown | SAL | 144132 | |
09/23/2004 14:05 | 09/23/2004 14:50 | Lexington: Cowlitz Co PUD 115kV Feeder 4 | 115.0 | 45 | Plan | Foreign Request | Customer Request | Unknown | LGV | 144133 | |
09/25/2004 16:33 | 09/25/2004 20:25 | Laclede: Northern Lights 13.8kV Feeder 1 | 13.8 | 232 | Plan | Maintenance | BPA Request | None | SPK | 144159 | |
09/27/2004 09:46 | 10/21/2004 14:06 | Silver Creek: Lewis Co PUD 69kV Feeder 2 to Glenoma | 69.0 | 34820 | Plan | Foreign Request | Customer Request | None | OLY | 144166 | |
09/27/2004 13:56 | 09/27/2004 14:46 | Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 50 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | TRI | 144167 |
09/27/2004 21:30 | 09/27/2004 23:08 | Glade: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 98 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 144168 |
09/28/2004 08:11 | 09/28/2004 09:05 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 54 | Plan | Foreign Request | Customer Request | None | LGV | 144183 | |
09/28/2004 13:10 | 09/28/2004 13:59 | Cowlitz: Cowlitz Co PUD 115kV Feeder 2 | 115.0 | 49 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 17 | LGV | 144184 |
09/28/2004 15:04 | 09/28/2004 15:24 | Teton: Lower Valy Energy 115kV Feeder 2 | 115.0 | 20 | Plan | Maintenance | BPA Request | None | IDF | 144185 | |
09/28/2004 17:46 | 09/28/2004 17:58 | Fairmount: Clallam Co PUD 115kV Feeder 1 | 115.0 | 12 | Plan | Foreign Request | Customer Request | None | OLY | 144186 | |
09/29/2004 07:48 | 09/29/2004 15:43 | Snohomish: Snohomish Co PUD 115kV Feeder 1 | 115.0 | 475 | Plan | Foreign Request | Customer Request | None | SNO | 144206 | |
09/29/2004 08:11 | 09/29/2004 14:40 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 389 | Plan | Maintenance | BPA Request | None | IDF | 144207 | |
09/29/2004 08:23 | 09/29/2004 14:27 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 364 | Plan | Maintenance | BPA Request | None | IDF | 144208 | |
09/29/2004 13:19 | 09/29/2004 13:52 | St. Johns: Portland Gen Elec 57kV Feeder 1 | 57.0 | 33 | Plan | Foreign Request | Customer Request | None | LGV | 144209 | |
09/29/2004 20:39 | 09/29/2004 20:39 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 0 | Auto | Lightning | Lightning | BPA Trouble | 4 | KAL | 144210 |
09/30/2004 08:09 | 09/30/2004 14:18 | Snohomish: Snohomish Co PUD 115kV Feeder 1 | 115.0 | 369 | Plan | Foreign Request | Customer Request | None | SNO | 144221 | |
10/01/2004 08:27 | 10/01/2004 09:57 | Richland: City of Richland 115kV Feeder 1 | 115.0 | 90 | Plan | Maintenance | BPA Request | None | TRI | 144233 | |
10/03/2004 00:02 | 10/03/2004 05:17 | Underwood: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 315 | Plan | Maintenance | BPA Request | None | LGV | 144248 | |
10/03/2004 01:57 | 10/03/2004 04:23 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 146 | Plan | Maintenance | BPA Request | Unknown | SAL | 144240 | |
10/04/2004 07:57 | 10/08/2004 08:28 | Surprise Lake: Milton WA 12.5kV Feeder 1 by Tacoma Power | 12.5 | 5791 | Plan | Foreign Request | Transferor Request | None | COV | 144250 | |
10/04/2004 07:59 | 10/06/2004 14:22 | Lexington: Cowlitz Co PUD 115kV Feeder 2 | 115.0 | 3263 | Plan | Foreign Request | Customer Request | None | LGV | 144251 | |
10/04/2004 10:08 | 10/04/2004 13:55 | Green Valley: Douglas Elec Coop 69kV Feeder 1 | 69.0 | 227 | Plan | Maintenance | BPA Request | None | EUG | 144252 | |
10/04/2004 13:55 | 10/27/2004 08:04 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 32769 | Plan | Normally Out | BPA Request | Unknown | EUG | 144253 | |
10/06/2004 08:57 | 10/20/2004 10:20 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 20243 | Plan | Foreign Request | Customer Request | None | EUG | 144282 | |
10/07/2004 08:57 | 10/07/2004 14:34 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 337 | Plan | Maintenance | BPA Request | None | SNO | 144291 | |
10/08/2004 03:00 | 10/08/2004 05:05 | Tumble Creek: Consumers Power 24.9kV Feeder 1 | 24.9 | 125 | Plan | Maintenance | BPA Request | Unknown | SAL | 144292 | |
10/08/2004 09:45 | 10/08/2004 11:17 | Bridge: Raft River Elec 34.5kV Feeder 1 | 34.5 | 92 | Plan | Foreign Request | Other Customer Request | Unknown | IDF | 144302 | |
10/08/2004 09:45 | 10/08/2004 11:17 | Curlew: Raft River Elec 24.9kV Feeder 1 | 24.9 | 92 | Plan | Foreign Request | Other Customer Request | Unknown | IDF | 144303 | |
10/08/2004 09:45 | 10/08/2004 11:17 | Idahome: Raft River Elec 34.5kV Feeder 1 | 34.5 | 92 | Plan | Foreign Request | Transferor Request | Unknown | IDF | 144304 | |
10/08/2004 09:45 | 10/08/2004 11:17 | Bridge: Raft River Elec 138kV Feeder 1 | 138.0 | 92 | Plan | Foreign Request | Other Customer Request | Unknown | IDF | 144305 | |
10/08/2004 09:45 | 10/08/2004 11:17 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 92 | Plan | Foreign Request | Other Customer Request | Unknown | IDF | 144306 | |
10/08/2004 12:59 | 10/15/2004 14:29 | Alvey: EWEB (Eugene OR) 115kV Feeder 1 | 115.0 | 10170 | Plan | Foreign Request | Customer Request | None | EUG | 144307 | |
10/08/2004 14:27 | 10/08/2004 14:29 | Dayton MCP3: Mason Co PUD 3 115kV Feeder 1 | 115.0 | 2 | Auto | Unknown | Unknown | BPA Trouble | 5 | OLY | 144308 |
10/11/2004 07:11 | 10/13/2004 15:33 | Sifton: Clark Public Util 115kV Feeder 2 | 115.0 | 3382 | Plan | Foreign Request | Customer Request | None | LGV | 144336 | |
10/11/2004 07:11 | 10/13/2004 15:33 | Sifton: Clark Public Util 115kV Feeder 3 | 115.0 | 3382 | Plan | Foreign Request | Customer Request | None | LGV | 144337 | |
10/11/2004 10:03 | 10/13/2004 09:59 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 2876 | Plan | Foreign Request | Customer Request | None | KAL | 144338 | |
10/12/2004 07:31 | 10/12/2004 15:05 | Timber: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 454 | Plan | Maintenance | BPA Request | None | SAL | 144346 | |
10/13/2004 07:04 | 10/15/2004 12:27 | Conkelley: Col Falls Alum Co 13.8kV Feeder 5 | 13.8 | 3203 | Plan | Maintenance | BPA Request | None | KAL | 144389 | |
10/13/2004 07:38 | 10/13/2004 15:50 | Timber: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 492 | Plan | Maintenance | BPA Request | None | SAL | 144364 | |
10/13/2004 12:25 | 10/13/2004 12:30 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 5 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | IDF | 144365 |
10/13/2004 13:07 | 10/13/2004 13:22 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 15 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | IDF | 144366 |
10/14/2004 07:40 | 10/14/2004 15:48 | Timber: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 488 | Plan | Maintenance | BPA Request | None | SAL | 144381 | |
10/14/2004 09:02 | 10/14/2004 10:19 | Franklin: Franklin Co PUD 115kV Feeder 1 to Angus | 115.0 | 77 | Plan | Maintenance | BPA Request | None | TRI | 144382 | |
10/15/2004 07:07 | 10/15/2004 17:22 | Sifton: Clark Public Util 115kV Feeder 2 | 115.0 | 615 | Plan | Foreign Request | Customer Request | None | LGV | 144390 | |
10/15/2004 07:44 | 10/15/2004 15:50 | Timber: West Oregon Elec 34.5kV Feeder 1 | 34.5 | 486 | Plan | Maintenance | BPA Request | None | SAL | 144391 | |
10/15/2004 08:49 | 10/15/2004 12:12 | Heyburn: Idaho Power Co 138kV Feeder 1 | 138.0 | 203 | Plan | Maintenance | BPA Request | 11 | IDF | 144392 | |
10/15/2004 17:45 | 10/15/2004 17:45 | Alfalfa: Benton REA 34.5kV Feeder 1 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 144413 |
10/16/2004 09:02 | 10/16/2004 16:57 | Nespelem: Nespelem Valley 115kV Feeder 1 | 115.0 | 475 | Plan | Foreign Request | Customer Request | None | WEN | 144400 | |
10/17/2004 09:07 | 10/17/2004 13:38 | Dorena: Lane Elec Coop 34.5kV Feeder 1 by PacifiCorp (PACW) | 34.5 | 271 | Auto | Tree | Tree blown | BPA Trouble | Unknown | EUG | 144406 |
10/17/2004 09:07 | 10/17/2004 13:38 | Dorena: Lane Elec Coop 34.5kV Feeder 2 by PacifiCorp (PACW) | 34.5 | 271 | Auto | Tree | Tree blown | BPA Trouble | Unknown | EUG | 144407 |
10/17/2004 09:07 | 10/17/2004 10:11 | Latham: Emerald PUD 115kV Feeder 1 | 115.0 | 64 | Auto | Tree | Tree blown | BPA Trouble | Unknown | EUG | 144408 |
10/18/2004 08:14 | 10/18/2004 15:06 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 412 | Plan | Foreign Request | Customer Request | None | SNO | 144414 | |
10/18/2004 10:34 | 10/22/2004 10:38 | Port Angeles: Port Angeles WA 69kV Feeder 1 | 69.0 | 5764 | Plan | Construction | BPA Request | None | OLY | 144415 | |
10/19/2004 07:36 | 10/19/2004 07:36 | Ukiah: Columbia P Coop 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 144431 | |
10/19/2004 07:48 | 10/19/2004 07:48 | Ukiah: Columbia P Coop 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 144432 | |
10/19/2004 08:08 | 10/19/2004 08:08 | Ukiah: Columbia P Coop 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | TRI | 144433 | |
10/19/2004 08:10 | 10/19/2004 15:14 | Chemawa: Portland Gen Elec 57kV Feeder 2 | 57.0 | 424 | Plan | Foreign Request | Customer Request | None | SAL | 144434 | |
10/20/2004 03:10 | 10/20/2004 06:02 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 172 | Auto | Foreign Trouble | Foreign Trouble | Other Customer Trouble | Unknown | IDF | 144459 |
10/20/2004 07:08 | 10/20/2004 09:21 | Teton: Lower Valy Energy 115kV Feeder 1 | 115.0 | 133 | Plan | Maintenance | BPA Request | None | IDF | 144460 | |
10/20/2004 07:34 | 10/20/2004 14:59 | Chemawa: Portland Gen Elec 57kV Feeder 2 | 57.0 | 445 | Plan | Foreign Request | Customer Request | None | SAL | 144461 | |
10/20/2004 08:28 | 10/22/2004 17:16 | Sno-King: Snohomish Co PUD 115kV Feeder 5 | 115.0 | 3408 | Plan | Foreign Request | Customer Request | None | SNO | 144462 | |
10/20/2004 08:51 | 10/20/2004 12:41 | Troy: Northern Lights 13.8kV Feeder 1 | 13.8 | 230 | Plan | Maintenance | BPA Request | 1 | KAL | 144463 | |
10/20/2004 09:00 | 10/20/2004 16:29 | La Grande: Oregon Trail 230kV Feeder 1 | 230.0 | 449 | Plan | Maintenance | BPA Request | Unknown | TRI | 144464 | |
10/20/2004 11:51 | 10/20/2004 11:58 | Madison: Fall River E Coop 46kV Feeder 1 | 46.0 | 7 | Auto | Unknown | Forced (Configuration) | BPA Trouble | 5 | IDF | 144465 |
10/21/2004 08:56 | 10/21/2004 11:44 | Jim Creek: US Navy 115kV Feeder A by Snohomish Co PUD | 115.0 | 168 | Plan | Maintenance | BPA Request | None | SNO | 144484 | |
10/21/2004 15:14 | 10/21/2004 15:14 | Columbia Falls: Flathead E Coop 34.5kV Feeder 2 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | KAL | 144485 |
10/23/2004 04:56 | 12/22/2004 13:02 | Dixie: Idaho Power Co 24.9kV Feeder 1 | 24.9 | 86946 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 144506 |
10/25/2004 06:33 | 10/28/2004 09:40 | Conkelley: Col Falls Alum Co 13.8kV Feeder S2 | 13.8 | 4507 | Plan | Maintenance | BPA Request | None | KAL | 144515 | |
10/25/2004 08:03 | 10/25/2004 08:03 | Spearfish: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Weather | BPA Trouble | 4 | TDA | 144516 | |
10/25/2004 08:03 | 10/25/2004 08:03 | Lyle: Klickitat Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Weather | Weather | BPA Trouble | Unknown | TDA | 144517 |
10/25/2004 11:49 | 10/25/2004 12:45 | Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern | 69.0 | 56 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 57 | OLY | 144518 |
10/25/2004 12:47 | 10/25/2004 13:06 | Port Angeles: Clallam Co PUD 69kV Feeder 1 to Eastern | 69.0 | 19 | Plan | Foreign Request | Customer Request | 109 | OLY | 144519 | |
10/25/2004 16:03 | 10/25/2004 17:13 | Mattawa: Kittitas Co PUD 13.8kV Feeder 1 by Grant Co PUD | 13.8 | 70 | Auto | Foreign Trouble | Transferor Trouble | Unknown | WEN | 144520 | |
10/26/2004 07:42 | 10/26/2004 14:40 | Clayton: Inland P+L 115kV Feeder 1 | 115.0 | 418 | Plan | Maintenance | BPA Request | None | SPK | 144539 | |
10/26/2004 07:56 | 10/28/2004 12:54 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 3178 | Plan | Maintenance | BPA Request | None | SNO | 144540 | |
10/26/2004 08:58 | 11/10/2004 15:46 | Sifton: Clark Public Util 115kV Feeder 2 | 115.0 | 22068 | Plan | Foreign Request | Customer Request | Unknown | LGV | 144541 | |
10/27/2004 08:11 | 11/10/2004 07:32 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 20181 | Plan | Foreign Request | Customer Request | None | IDF | 144559 | |
10/27/2004 15:15 | 11/18/2004 07:51 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 31296 | Plan | Normally Out | BPA Request | None | EUG | 144560 | |
10/28/2004 03:57 | 10/28/2004 03:57 | Cedarville Junction: Surprise Valley 69kV Feeder 1 by PacifiCorp (PACW) | 69.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | RED | 144561 |
10/28/2004 03:57 | 10/28/2004 03:57 | Davis Creek: Surprise Valley 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | RED | 144574 |
10/28/2004 06:00 | 10/28/2004 06:00 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 144575 |
10/28/2004 06:00 | 10/28/2004 06:00 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 144576 |
10/28/2004 11:31 | 10/28/2004 11:33 | Republic: Ferry Co PUD 34.5kV Feeder 1 | 34.5 | 2 | Auto | Unknown | Tree cut | BPA Trouble | Unknown | SPK | 144577 |
10/28/2004 11:31 | 10/28/2004 11:33 | Cooke Mountain: Ferry Co PUD 115kV Feeder 1 | 115.0 | 2 | Auto | Unknown | Tree cut | BPA Trouble | Unknown | SPK | 144578 |
10/29/2004 10:51 | 10/29/2004 10:53 | Salem Alumina: Salem Elec 115kV Feeder 1 | 115.0 | 2 | Auto | Unknown | BPA Trouble | 31 | SAL | 144590 | |
10/29/2004 19:59 | 10/29/2004 19:59 | Ocean Park: Pacific Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown Trouble | 6 | LGV | 144591 | |
10/30/2004 00:01 | 10/30/2004 02:02 | East Hills: South Side Elec 34.5kV Feeder 1 | 34.5 | 121 | Plan | Maintenance | BPA Request | 3 | IDF | 144592 | |
10/30/2004 08:01 | 10/30/2004 09:55 | Port Angeles: Port Angeles WA 69kV Feeder 1 to Nippon | 69.0 | 114 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 9 | OLY | 144605 |
11/01/2004 08:23 | 11/10/2004 15:50 | Sno-King: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 13407 | Plan | Foreign Request | Customer Request | None | SNO | 144609 | |
11/01/2004 12:38 | 11/02/2004 14:59 | Hatton: Big Bend Coop 115kV Feeder 1 | 115.0 | 1581 | Plan | Maintenance | BPA Request | None | TRI | 144610 | |
11/02/2004 02:02 | 11/02/2004 02:02 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | RED | 144611 |
11/02/2004 02:02 | 11/02/2004 02:02 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | Unknown Trouble | Unknown | RED | 144612 |
11/02/2004 08:14 | 11/02/2004 10:57 | The Dalles: Northrn Wasco PUD 115kV Feeder 1 | 115.0 | 163 | Plan | Maintenance | BPA Request | None | TDA | 144628 | |
11/02/2004 11:22 | 11/02/2004 12:14 | Bonners Ferry: Bonners Ferry ID 13.8kV Feeder 1 | 13.8 | 52 | Plan | Maintenance | BPA Request | None | SPK | 144629 | |
11/02/2004 11:22 | 11/02/2004 12:14 | Bonners Ferry: Northern Lights 13.8kV Feeder 1 | 13.8 | 52 | Plan | Maintenance | BPA Request | None | SPK | 144630 | |
11/02/2004 13:00 | 11/02/2004 14:32 | Shano: Big Bend Coop 115kV Feeder 1 | 115.0 | 92 | Plan | Maintenance | BPA Request | None | TRI | 144631 | |
11/02/2004 15:53 | 11/10/2004 11:05 | Eagle Lake: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 11232 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | TRI | 144632 |
11/05/2004 08:40 | 11/05/2004 17:03 | Hanford No.2 Construction: Energy Northwest 13.8kV Feeder 1 | 13.8 | 503 | Plan | Maintenance | BPA Request | None | TRI | 144673 | |
11/06/2004 07:39 | 11/06/2004 09:07 | Albany: US DOE Albany 12kV Feeder 1 | 12.0 | 88 | Plan | Foreign Request | Customer Request | None | EUG | 144688 | |
11/06/2004 08:44 | 11/06/2004 08:44 | Chemawa: Portland Gen Elec 57kV Feeder 4 | 57.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 25 | SAL | 144689 |
11/08/2004 08:19 | 11/09/2004 17:07 | Davis Creek: Surprise Valley 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 1968 | Plan | Maintenance | BPA Request | None | RED | 144700 | |
11/08/2004 10:39 | 11/10/2004 11:05 | Eagle Lake: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 2906 | Plan | Maintenance | BPA Request | None | TRI | 144701 | |
11/10/2004 07:40 | 11/10/2004 09:31 | Redmond: PacifiCorp (PACW) 115kV Feeder 1 | 115.0 | 111 | Plan | Maintenance | BPA Request | Unknown | RED | 144729 | |
11/10/2004 07:41 | 11/10/2004 17:02 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 561 | Plan | Foreign Request | Customer Request | None | SNO | 144730 | |
11/10/2004 12:36 | 11/10/2004 13:42 | Eagle Lake: Big Bend Coop 13.8kV Feeder 1 | 13.8 | 66 | Plan | Maintenance | BPA Request | None | TRI | 144731 | |
11/10/2004 12:36 | 11/10/2004 13:42 | Eagle Lake: S Col Basin Ir Dt 13.8kV Feeder 1 | 13.8 | 66 | Plan | Maintenance | BPA Request | None | TRI | 144732 | |
11/12/2004 07:33 | 11/12/2004 16:17 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 524 | Plan | Foreign Request | Customer Request | None | SNO | 144748 | |
11/13/2004 03:45 | 11/13/2004 08:48 | North Butte: Consumers Power 12.5kV Feeder 1 | 12.5 | 303 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | EUG | 144758 |
11/15/2004 07:30 | 11/15/2004 08:01 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 31 | Plan | Foreign Request | Customer Request | None | SNO | 144764 | |
11/15/2004 08:03 | 11/15/2004 08:15 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 12 | Plan | Switching | Customer Request | None | SNO | 144765 | |
11/15/2004 09:18 | 11/18/2004 11:53 | Intalco: Alcoa 13.8kV Feeder 6 | 13.8 | 4475 | Plan | Foreign Request | Customer Request | None | SNO | 144766 | |
11/16/2004 07:41 | 11/16/2004 13:44 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 363 | Plan | Foreign Request | Customer Request | None | SNO | 144775 | |
11/16/2004 08:47 | 11/16/2004 16:48 | Sifton: Clark Public Util 115kV Feeder 2 | 115.0 | 481 | Plan | Foreign Request | Customer Request | 20 | LGV | 144776 | |
11/16/2004 09:38 | 12/02/2004 09:55 | Wagner Lake: Inland P+L 34.5kV Feeder 1 by Avista Corp | 34.5 | 23057 | Plan | Maintenance | BPA Request | None | SPK | 144777 | |
11/18/2004 08:51 | 11/18/2004 11:14 | Jim Creek: US Navy 115kV Feeder B by Snohomish Co PUD | 115.0 | 143 | Plan | Maintenance | BPA Request | None | SNO | 144802 | |
11/18/2004 12:54 | 11/18/2004 14:36 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 102 | Plan | Maintenance | BPA Request | None | SNO | 144803 | |
11/18/2004 12:55 | 12/13/2004 12:46 | Alvey: Sprngfld Util Brd 115kV Feeder 1 to Springfield | 115.0 | 35991 | Plan | Foreign Request | Customer Request | None | EUG | 144804 | |
11/18/2004 15:16 | 11/19/2004 08:29 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | 1033 | Plan | Normally Out | BPA Request | None | EUG | 144805 | |
11/19/2004 07:34 | 11/19/2004 15:58 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 504 | Plan | Foreign Request | Customer Request | None | SNO | 144822 | |
11/19/2004 12:36 | 11/30/2004 16:51 | Roza: USBR Yakima 115kV Feeder 1 | 115.0 | 16095 | Plan | Foreign Request | Customer Request | None | TRI | 144823 | |
11/19/2004 13:03 | 11/19/2004 14:49 | Cowlitz: Cowlitz Co PUD 115kV Feeder 2 | 115.0 | 106 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | None | LGV | 144824 |
11/19/2004 13:23 | Drain: Douglas Elec Coop 69kV Feeder 1 to Oakland | 69.0 | still out | Plan | Normally Out | Customer Request | None | EUG | 144825 | ||
11/20/2004 09:01 | 11/20/2004 09:32 | Grandview: USBR Yakima 34.5kV Feeder 1 | 34.5 | 31 | Plan | Foreign Request | Customer Request | None | TRI | 144837 | |
11/20/2004 16:30 | 11/20/2004 16:52 | Grandview: USBR Yakima 34.5kV Feeder 1 | 34.5 | 22 | Plan | Foreign Request | Customer Request | None | TRI | 144838 | |
11/22/2004 07:19 | 11/22/2004 13:04 | Cardwell: Cowlitz Co PUD 115kV Feeder 3 | 115.0 | 345 | Plan | Foreign Request | Customer Request | None | LGV | 144839 | |
11/22/2004 08:38 | 11/22/2004 13:06 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 268 | Plan | Foreign Request | Customer Request | None | SNO | 144840 | |
11/22/2004 12:25 | 11/24/2004 08:55 | Kalispell: Flathead E Coop 34.5kV Feeder 5 | 34.5 | 2670 | Plan | Foreign Request | Customer Request | None | KAL | 144869 | |
11/22/2004 12:55 | 11/24/2004 08:53 | Kalispell: Flathead E Coop 34.5kV Feeder 4 | 34.5 | 2638 | Plan | Foreign Request | Customer Request | None | KAL | 144868 | |
11/22/2004 13:10 | 11/22/2004 13:19 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 9 | Plan | Foreign Request | Customer Request | None | KAL | 144895 | |
11/22/2004 13:24 | 11/24/2004 08:18 | Kalispell: Flathead E Coop 34.5kV Feeder 2 | 34.5 | 2574 | Plan | Foreign Request | Customer Request | None | KAL | 144866 | |
11/22/2004 13:28 | 11/24/2004 08:16 | Kalispell: Flathead E Coop 34.5kV Feeder 3 | 34.5 | 2568 | Plan | Foreign Request | Customer Request | None | KAL | 144867 | |
11/22/2004 13:41 | 11/24/2004 07:56 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 2535 | Plan | Foreign Request | Customer Request | None | KAL | 144865 | |
11/22/2004 17:17 | 11/22/2004 18:20 | Tygh Valley WEC: Wasco Elec Coop 12.5kV Feeder 1 | 12.5 | 63 | Auto | Unknown | Forced (Configuration) | BPA Trouble | Unknown | TDA | 144841 |
11/22/2004 17:17 | 11/22/2004 18:20 | Wamic: Wasco Elec Coop 69kV Feeder 1 | 69.0 | 63 | Auto | Unknown | Forced (Configuration) | BPA Trouble | Unknown | TDA | 144842 |
11/23/2004 07:53 | 11/23/2004 15:18 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 445 | Plan | Foreign Request | Customer Request | None | SNO | 144870 | |
11/23/2004 08:28 | 11/24/2004 10:22 | Big Eddy: Northrn Wasco PUD 115kV Feeder 1 | 115.0 | 1554 | Plan | Foreign Request | Customer Request | 15 | TDA | 144871 | |
11/23/2004 16:50 | 11/23/2004 16:50 | Lakeside CLP: Central Linc PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Tree cut | Unknown Trouble | Unknown | EUG | 144872 |
11/23/2004 16:50 | 11/23/2004 16:50 | Sumner: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Tree cut | Unknown Trouble | Unknown | EUG | 144873 |
11/23/2004 16:50 | 11/23/2004 16:50 | Glasgow: Central Linc PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Tree cut | Unknown Trouble | Unknown | EUG | 144874 |
11/23/2004 16:50 | 11/23/2004 16:50 | Hauser CLP: Central Linc PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown Trouble | Unknown | EUG | 144875 | |
11/24/2004 06:50 | 11/24/2004 06:50 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 144896 |
11/24/2004 06:50 | 11/24/2004 06:50 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 144897 |
11/24/2004 07:27 | 11/24/2004 08:05 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 38 | Plan | Foreign Request | Customer Request | None | SNO | 144898 | |
11/24/2004 08:22 | 11/24/2004 08:31 | Kalispell: Flathead E Coop 34.5kV Feeder 1 | 34.5 | 9 | Plan | Foreign Request | Customer Request | None | KAL | 144899 | |
11/24/2004 11:17 | 11/29/2004 12:27 | Westside: Idaho Falls Power 46kV Feeder 1 by PacifiCorp (PACE) | 46.0 | 7270 | Plan | Foreign Request | Customer Request | None | IDF | 144900 | |
11/24/2004 14:31 | 11/24/2004 22:14 | Alder Metering Point: Alder Light 24.9kV Feeder 1 by Lewis Co PUD | 24.9 | 463 | Auto | Foreign Trouble | Transferor Trouble | Unknown | OLY | 144901 | |
11/27/2004 08:07 | 11/27/2004 08:07 | Wren: Consumers Power 69kV Feeder 1 | 69.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | 14 | EUG | 144915 |
11/29/2004 07:02 | 11/29/2004 07:02 | Harrisburg: Consumers Power 115kV Feeder 1 to Greenberry | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | EUG | 144917 |
11/29/2004 07:02 | 11/29/2004 07:02 | Harrisburg: Consumers Power 12.5kV Feeder 1 | 12.5 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | EUG | 144918 |
11/29/2004 07:02 | 11/29/2004 07:02 | Junction City BLC: Blachly-Lane Co 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | EUG | 144919 | |
11/29/2004 08:30 | 11/29/2004 09:13 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 43 | Plan | Foreign Request | Customer Request | None | SNO | 144920 | |
11/30/2004 08:52 | 12/01/2004 13:02 | Sagehill: Franklin Co PUD 12.5kV Feeder 1 | 12.5 | 1690 | Plan | Maintenance | BPA Request | None | TRI | 144931 | |
12/01/2004 13:02 | 12/02/2004 13:34 | Sagehill: Franklin Co PUD 12.5kV Feeder 1 | 12.5 | 1472 | Plan | Foreign Request | Customer Request | None | TRI | 144937 | |
12/02/2004 07:14 | 12/02/2004 07:26 | Oak Knoll: City of Ashland 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 12 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | EUG | 144942 |
12/02/2004 07:14 | 12/02/2004 07:26 | Ashland: City of Ashland 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 12 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | EUG | 144943 |
12/02/2004 07:14 | 12/02/2004 07:26 | Mountain Avenue: City of Ashland 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 12 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | EUG | 144944 |
12/06/2004 08:03 | 12/06/2004 08:06 | Mabton: Benton REA 12.5kV Feeder 1 | 12.5 | 3 | Plan | Switching | BPA Request | Unknown | TRI | 144991 | |
12/07/2004 11:23 | 12/07/2004 14:53 | Alvey: Lane Elec Coop 34.5kV Feeder 1 | 34.5 | 210 | Plan | Foreign Request | Customer Request | None | EUG | 145003 | |
12/07/2004 22:54 | 12/07/2004 22:54 | Bandon: PacifiCorp (PACW) 12.5kV Feeder 1 | 12.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 1 | EUG | 145004 |
12/07/2004 23:57 | 12/08/2004 19:21 | Wendson: Central Linc PUD 115kV Feeder 1 | 115.0 | 1164 | Auto | Foreign Trouble | Customer Trouble | 16 | EUG | 145005 | |
12/08/2004 00:25 | 12/08/2004 01:35 | Morrison: Coos-Curry Coop 115kV Feeder 1 | 115.0 | 70 | Auto | Tree blown | BPA Trouble | Unknown | EUG | 145006 | |
12/08/2004 00:25 | 12/08/2004 01:35 | Norway: Coos-Curry Coop 12.5kV Feeder 1 | 12.5 | 70 | Auto | Tree blown | Tree blown | BPA Trouble | Unknown | EUG | 145007 |
12/08/2004 07:05 | 12/08/2004 20:39 | Cooke Mountain: Ferry Co PUD 115kV Feeder 1 | 115.0 | 814 | Auto | Weather | Weather | BPA Trouble | 1 | SPK | 145015 |
12/08/2004 07:05 | 12/08/2004 20:40 | Kettle Falls: Avista Corp 115kV Feeder 1 | 115.0 | 815 | Auto | Weather | BPA Trouble | 1 | SPK | 145016 | |
12/08/2004 07:05 | 12/08/2004 20:48 | Republic: Ferry Co PUD 34.5kV Feeder 1 | 34.5 | 823 | Auto | Weather | Weather | BPA Trouble | 3 | SPK | 145017 |
12/08/2004 08:34 | 12/08/2004 11:31 | Chemawa: Portland Gen Elec 57kV Feeder 1 | 57.0 | 177 | Plan | Foreign Request | Customer Request | None | SAL | 145018 | |
12/08/2004 08:36 | 12/08/2004 08:36 | Tonasket: Okanogan Co PUD 115kV Feeder 1 | 115.0 | 0 | Auto | Foreign Trouble | Customer Trouble | 17 | WEN | 145019 | |
12/08/2004 13:13 | 12/08/2004 20:32 | Walla Walla: Columbia REA 12.5kV Feeder 1 | 12.5 | 439 | Auto | Bird droppings | Bird droppings | BPA Trouble | 3 | TRI | 145020 |
12/08/2004 13:27 | 12/16/2004 12:12 | Gold Beach: Coos-Curry Coop 115kV Feeder 2 | 115.0 | 11445 | Plan | Foreign Request | Customer Request | None | EUG | 145021 | |
12/09/2004 09:26 | 12/09/2004 10:10 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 44 | Plan | Maintenance | BPA Request | None | IDF | 145038 | |
12/09/2004 09:35 | 12/09/2004 10:05 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 30 | Plan | Maintenance | BPA Request | None | IDF | 145039 | |
12/09/2004 09:39 | 12/09/2004 10:06 | Drummond: Fall River E Coop 46kV Feeder 1 | 46.0 | 27 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | 12 | IDF | 145040 |
12/09/2004 11:27 | 12/09/2004 11:27 | Ledbeder: Benton REA 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 145041 | |
12/09/2004 11:27 | 12/09/2004 11:27 | Horn Rapids: Benton REA 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 145042 | |
12/09/2004 11:27 | 12/09/2004 11:27 | City View: City of Richland 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 145043 | |
12/09/2004 11:27 | 12/09/2004 11:27 | Kennedy: Benton REA 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | TRI | 145044 | |
12/09/2004 11:37 | 12/09/2004 13:52 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 135 | Plan | Maintenance | BPA Request | None | IDF | 145045 | |
12/09/2004 11:50 | 12/09/2004 13:56 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 126 | Plan | Maintenance | BPA Request | None | IDF | 145046 | |
12/10/2004 09:18 | 12/10/2004 14:04 | Swan Valley: Lower Valy Energy 12.5kV Feeder 1 | 12.5 | 286 | Auto | Unknown | Terminal Equipment Failure | BPA Trouble | 1 | IDF | 145058 |
12/10/2004 09:50 | 12/10/2004 09:50 | Drummond: Fall River E Coop 46kV Feeder 2 | 46.0 | 0 | Auto | Unknown | Forced (Configuration) | BPA Trouble | Unknown | IDF | 145059 |
12/10/2004 09:50 | 12/10/2004 09:50 | Victor FREC: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | IDF | 145060 |
12/10/2004 09:50 | 12/10/2004 09:50 | Drummond: Fall River E Coop 46kV Feeder 1 | 46.0 | 0 | Auto | Unknown | Forced (Configuration) | BPA Trouble | Unknown | IDF | 145061 |
12/12/2004 11:53 | 12/12/2004 11:57 | Stevenson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 4 | Auto | Wind | Wind | BPA Trouble | Unknown | LGV | 145078 |
12/12/2004 11:53 | 12/12/2004 11:57 | Carson: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 4 | Auto | Wind | Wind | BPA Trouble | Unknown | LGV | 145079 |
12/12/2004 11:53 | 12/12/2004 11:57 | Underwood: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 4 | Auto | Wind | Wind | BPA Trouble | Unknown | LGV | 145080 |
12/12/2004 11:53 | 12/12/2004 11:57 | North Bonneville: Skamania Co PUD 12.5kV Feeder 1 | 12.5 | 4 | Auto | Wind | Wind | BPA Trouble | Unknown | LGV | 145081 |
12/12/2004 13:51 | 12/12/2004 15:50 | Ocean Park: Pacific Co PUD 115kV Feeder 1 | 115.0 | 119 | Auto | Foreign Trouble | Customer Trouble | 11 | LGV | 145082 | |
12/12/2004 16:59 | 12/12/2004 19:01 | Dutch Canyon: Columbia Rivr PUD 115kV Feeder 1 | 115.0 | 122 | Auto | Tree blown | BPA Trouble | Unknown | LGV | 145083 | |
12/12/2004 20:49 | 12/12/2004 20:49 | Odessa: Inland P+L 34.5kV Feeder 1 by Avista Corp | 34.5 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SPK | 145084 | |
12/13/2004 08:02 | 12/16/2004 10:07 | Angus: Benton Co PUD 115kV Feeder 1 | 115.0 | 4445 | Plan | Construction | BPA Request | None | TRI | 145156 | |
12/13/2004 09:04 | 12/13/2004 13:08 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 244 | Plan | Foreign Request | Customer Request | None | SNO | 145094 | |
12/13/2004 13:39 | 12/13/2004 13:42 | Junction City BLC: Blachly-Lane Co 115kV Feeder 1 | 115.0 | 3 | Auto | Arc while switching | BPA Trouble | 3 | EUG | 145095 | |
12/13/2004 16:20 | 12/13/2004 16:20 | Garibaldi: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 145096 | |
12/13/2004 16:20 | 12/13/2004 16:20 | Mohler: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 145097 | |
12/13/2004 16:20 | 12/13/2004 16:20 | Necanicum: West Oregon Elec 12.5kV Feeder 1 by PacifiCorp (PACW) | 12.5 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 145098 | |
12/13/2004 16:20 | 12/13/2004 16:20 | Nehalem: Tillamook PUD 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 0 | Auto | Foreign Trouble | Transferor Trouble | Unknown | SAL | 145099 | |
12/14/2004 08:10 | 12/14/2004 15:32 | Cascade Steel: McMinnville W&L 230kV Feeder 1 | 230.0 | 442 | Plan | Foreign Request | Customer Request | Unknown | SAL | 145115 | |
12/14/2004 10:39 | 12/17/2004 13:28 | Happy Valley: Clallam Co PUD 115kV Feeder 1 | 115.0 | 4489 | Plan | Foreign Request | Customer Request | 16 | OLY | 145116 | |
12/14/2004 11:39 | 12/14/2004 11:40 | Intalco: Alcoa 13.8kV Feeder 2 | 13.8 | 1 | Plan | Foreign Request | Customer Request | None | SNO | 145117 | |
12/14/2004 12:57 | 12/14/2004 14:53 | Intalco: Alcoa 13.8kV Feeder 6 | 13.8 | 116 | Plan | Maintenance | BPA Request | None | SNO | 145118 | |
12/15/2004 07:06 | 12/15/2004 10:13 | Oregon City: Portland Gen Elec 57kV Feeder 2 | 57.0 | 187 | Plan | Foreign Request | Customer Request | None | SAL | 145127 | |
12/15/2004 09:03 | 12/15/2004 16:15 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 432 | Plan | Foreign Request | Customer Request | None | SNO | 145128 | |
12/15/2004 10:00 | 12/15/2004 10:00 | Targhee: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | BPA Trouble | Unknown | IDF | 145129 | |
12/15/2004 10:00 | 12/15/2004 10:00 | Targhee: Fall River E Coop 46kV Feeder N | 46.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | IDF | 145130 |
12/15/2004 10:00 | 12/15/2004 10:00 | Victor FREC: Fall River E Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | IDF | 145131 |
12/15/2004 11:01 | 12/21/2004 13:16 | Franklin: Franklin Co PUD 12.5kV Feeder 2 | 12.5 | 8775 | Plan | Foreign Request | Customer Request | None | TRI | 145132 | |
12/15/2004 13:41 | 12/15/2004 14:52 | Intalco: Alcoa 13.8kV Feeder 7 | 13.8 | 71 | Plan | Maintenance | BPA Request | None | SNO | 145133 | |
12/16/2004 08:40 | 12/16/2004 15:09 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 389 | Plan | Foreign Request | Customer Request | None | SNO | 145157 | |
12/16/2004 08:44 | 12/16/2004 13:15 | Hat Rock: Umatilla E Coop 115kV Feeder 1 by PacifiCorp (PACW) | 115.0 | 271 | Plan | Maintenance | BPA Request | None | TRI | 145158 | |
12/17/2004 14:30 | 12/17/2004 14:30 | Mabton: Benton REA 12.5kV Feeder 1 | 12.5 | 0 | Plan | Switching | BPA Request | Unknown | TRI | 145171 | |
12/20/2004 09:13 | 12/20/2004 15:20 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 367 | Plan | Foreign Request | Customer Request | None | SNO | 145181 | |
12/21/2004 09:14 | 12/21/2004 14:13 | Grand Avenue: Clark Public Util 115kV Feeder 1 | 115.0 | 299 | Plan | Maintenance | BPA Request | None | LGV | 145185 | |
12/21/2004 09:14 | 12/21/2004 14:13 | Mac Heights: Clark Public Util 115kV Feeder 2 | 115.0 | 299 | Plan | Maintenance | BPA Request | None | LGV | 145186 | |
12/21/2004 12:12 | Christmas Valley: Midstate E Coop 115kV Feeder 1 | 115.0 | still out | Plan | Switching | BPA Request | None | RED | 145187 | ||
12/23/2004 07:25 | 12/23/2004 14:15 | Cowlitz: Cowlitz Co PUD 115kV Feeder 3 | 115.0 | 410 | Plan | Maintenance | BPA Request | None | LGV | 145197 | |
12/27/2004 15:08 | Conkelley: Col Falls Alum Co 13.8kV Feeder 3 | 13.8 | still out | Plan | Maintenance | BPA Request | None | KAL | 145211 | ||
12/28/2004 20:25 | 12/28/2004 20:25 | Bridge: Raft River Elec 138kV Feeder 1 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 145214 |
12/28/2004 20:25 | 12/28/2004 20:25 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 145215 |
12/28/2004 20:25 | 12/28/2004 20:25 | Bridge: Raft River Elec 34.5kV Feeder 1 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 145216 |
12/28/2004 20:25 | 12/28/2004 20:25 | Curlew: Raft River Elec 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Foreign Trouble | Unknown Trouble | Unknown | IDF | 145217 |
12/28/2004 20:25 | 12/28/2004 20:25 | Idahome: Raft River Elec 34.5kV Feeder 1 | 34.5 | 0 | Auto | Foreign Trouble | Foreign Trouble | Customer Trouble | Unknown | IDF | 145226 |
12/28/2004 20:27 | 12/28/2004 20:27 | Bridge: Raft River Elec 138kV Feeder 2 | 138.0 | 0 | Auto | Unknown | Foreign Trouble | Unknown Trouble | 1 | IDF | 145219 |
12/28/2004 20:27 | 12/28/2004 20:27 | Curlew: Raft River Elec 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Foreign Trouble | Unknown Trouble | Unknown | IDF | 145227 |
12/28/2004 22:32 | 12/28/2004 22:32 | Raft: Raft River Elec 24.9kV Feeder 1 by Idaho Power Co | 24.9 | 0 | Auto | Unknown | Foreign Trouble | Unknown Trouble | Unknown | IDF | 145220 |
12/29/2004 09:22 | 12/29/2004 09:22 | Fossil: Columbia P Coop 69kV Feeder 1 to Service Creek | 69.0 | 0 | Auto | Foreign Trouble | Customer Trouble | Unknown | TDA | 145228 | |
12/29/2004 12:59 | 12/29/2004 13:04 | Anaconda: NorthWestern Ener 115kV Feeder 2 | 115.0 | 5 | Plan | Testing | BPA Request | None | KAL | 145229 | |
12/29/2004 16:57 | 12/30/2004 00:15 | Sifton: Clark Public Util 115kV Feeder 3 | 115.0 | 438 | Plan | Foreign Request | Customer Request | None | LGV | 145230 | |
12/30/2004 08:53 | 12/30/2004 13:36 | Murray: Snohomish Co PUD 115kV Feeder 2 | 115.0 | 283 | Plan | Foreign Request | Customer Request | None | SNO | 145238 | |
12/30/2004 13:06 | Richland: City of Richland 115kV Feeder 1 | 115.0 | still out | Plan | Foreign Request | Customer Request | None | TRI | 145239 | ||
12/30/2004 17:17 | 12/30/2004 18:56 | Minidoka: Minidoka ID 2.4kV Feeder 1 by Idaho Power Co | 2.4 | 99 | Auto | Foreign Trouble | Foreign Trouble | Transferor Trouble | Unknown | IDF | 145240 |
12/31/2004 02:03 | 12/31/2004 02:03 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 145241 |
12/31/2004 02:03 | 12/31/2004 02:03 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 145242 |
12/31/2004 19:04 | 12/31/2004 19:04 | Hampton: Central Elec Coop 24.9kV Feeder 1 | 24.9 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 145248 |
12/31/2004 19:04 | 12/31/2004 19:04 | Riley: Harney Elec Coop 115kV Feeder 1 | 115.0 | 0 | Auto | Unknown | Unknown | BPA Trouble | Unknown | RED | 145249 |
Out Datetime | In Datetime | Name | Voltage (kV) |
Line Type |
Gen Flag |
Length (miles) |
Duration (minutes) |
Outage Type |
Dispatcher Cause | Field Cause | District | Outage ID |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01/01/1988 11:00 | Ashe-Marion No 2 500kV line | 500.0 | L | T | 224.01 | still out | Plan | Normally Out | TRI TDA RED SAL | 107973 | ||
01/01/1988 11:00 | Slatt tap to Ashe-Marion No 2 500kV line | 500.0 | T | 0.10 | still out | Plan | Normally Out | TRI | 107973 | |||
01/20/1995 10:31 | Satsop-Grays Harbor Public Development Authority No 1 230kV line | 230.0 | L | 0.10 | still out | Plan | Normally Out | OLY | 37162 | |||
04/03/1995 10:00 | Bell-AVA Beacon No 2 115kV line | 115.0 | L | 6.20 | still out | Plan | Normally Out | SPK | 170232 | |||
06/13/1996 10:20 | Alvey-Fairview No 1 230kV line | 230.0 | L | T | 97.46 | still out | Plan | Normally Out | EUG | 47311 | ||
06/13/1996 10:20 | Reston tap to Alvey-Fairview No 1 230kV line | 230.0 | T | 0.04 | still out | Plan | Normally Out | EUG | 47311 | |||
10/14/1999 15:19 | 03/17/2004 12:58 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | T | 5.51 | 2326959 | Plan | Normally Out | TRI | 118239 | |
10/14/1999 15:19 | 03/17/2004 12:58 | Vista tap to Badger Canyon-Richland No 1 115kV line | 115.0 | T | 0.10 | 2326959 | Plan | Normally Out | TRI | 118239 | ||
05/05/2001 15:00 | Opportunity tap to Trentwood-Valley Way No 1 115kV line | 115.0 | T | 0.10 | still out | Plan | Normally Out | SPK | 125806 | |||
05/05/2001 15:00 | Trentwood-Valley Way No 1 115kV line | 115.0 | L | T | 2.72 | still out | Plan | Normally Out | SPK | 125806 | ||
09/20/2001 14:59 | Liberty Lake tap to Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TT | 0.10 | still out | Plan | Normally Out | SPK | 162814 | |||
09/20/2001 14:59 | Trentwood-Valley Way No 1 115kV line | 115.0 | L | T | 2.72 | still out | Plan | Normally Out | SPK | 162814 | ||
05/17/2002 15:34 | Chemawa-Salem Alumina No 1 115kV line | 115.0 | L | T | 3.30 | still out | Plan | Normally Out | SAL | 131615 | ||
05/17/2002 15:34 | University tap to Chemawa-Salem Alumina No 1 115kV line | 115.0 | T | 9.00 | still out | Plan | Normally Out | SAL | 131615 | |||
07/22/2002 14:55 | 11/15/2004 11:19 | Canal-Second Lift No 2 34.5kV line | 34.5 | L | T | 1.00 | 1219524 | Plan | Normally Out | IDF | 132808 | |
07/22/2002 14:55 | 11/15/2004 11:19 | Jackson tap to Canal-Second Lift No 2 34.5kV line | 34.5 | T | 5.50 | 1219524 | Plan | Normally Out | IDF | 132808 | ||
08/07/2002 13:18 | 03/01/2004 09:48 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | T | 38.93 | 823530 | Plan | Normally Out | TRI | 133092 | |
08/07/2002 13:18 | 03/01/2004 09:48 | Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | TS | 0.48 | 823530 | Plan | Normally Out | TRI | 133092 | ||
08/15/2002 11:37 | 03/17/2004 13:41 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | T | 13.35 | 835384 | Plan | Normally Out | TRI | 133190 | |
08/15/2002 11:37 | 03/17/2004 13:41 | Hedges tap to Franklin-Badger Canyon No 2 115kV line | 115.0 | T | 0.33 | 835384 | Plan | Normally Out | TRI | 133190 | ||
10/01/2002 14:16 | Four Lakes tap to Sunset-East Colfax 115kV line | 115.0 | T | 5.92 | still out | Plan | Normally Out | SPK | 133974 | |||
10/01/2002 14:16 | Sunset-East Colfax 115kV line | 115.0 | L | T | 52.65 | still out | Plan | Normally Out | SPK TRI | 133974 | ||
10/10/2002 11:06 | 04/09/2004 08:18 | Baker Creek-Walnut City section of Walnut City tap to Forest Grove-McMinnville No 1 115kV line | 115.0 | TS | 1.20 | 787512 | Plan | Normally Out | SAL | 134113 | ||
10/10/2002 11:06 | 04/09/2004 08:18 | Forest Grove-McMinnville No 1 115kV line | 115.0 | L | T | 23.72 | 787512 | Plan | Normally Out | SAL | 134113 | |
12/10/2002 08:47 | 02/27/2004 09:59 | Boardman tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.28 | 639432 | Plan | Normally Out | TRI | 134834 | ||
12/10/2002 08:47 | 02/27/2004 09:59 | McNary-Santiam No 2 230kV line | 230.0 | L | T | 200.43 | 639432 | Plan | Normally Out | TRI TDA RED SAL | 134834 | |
01/10/2003 11:48 | 11/22/2004 10:51 | Fidalgo-Lopez Island No 3 34.5kV line | 34.5 | L | 8.57 | 982023 | Plan | Normally Out | SNO | 135243 | ||
01/29/2003 10:41 | 02/02/2004 08:38 | Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 13.40 | 531237 | Plan | Normally Out | TRI | 135381 | ||
01/29/2003 10:41 | 02/02/2004 08:38 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | G | 38.93 | 531237 | Plan | Normally Out | TRI | 135381 | |
03/10/2003 14:05 | 04/08/2004 07:26 | West Burley-Burley section of West Burley-Heyburn No 1 138kV line | 138.0 | S | 2.22 | 568341 | Plan | Normally Out | IDF | 135744 | ||
03/10/2003 14:05 | 04/08/2004 07:26 | West Burley-Heyburn No 1 138kV line | 138.0 | L | G | 4.43 | 568341 | Plan | Normally Out | IDF | 135744 | |
03/20/2003 18:00 | Colville-Boundary No 1 115kV line | 115.0 | L | G | 43.06 | still out | Plan | Normally Out | SPK | 135926 | ||
03/20/2003 18:00 | Metaline Falls-Boundary section of Colville-Boundary No 1 115kV line | 115.0 | S | 8.91 | still out | Plan | Normally Out | SPK | 135926 | |||
05/09/2003 12:01 | 05/13/2004 13:27 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | G | 24.08 | 532886 | Plan | Normally Out | TDA | 136569 | |
05/09/2003 12:01 | 05/13/2004 13:27 | Spearfish-Goldendale section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 20.24 | 532886 | Plan | Normally Out | TDA | 136569 | ||
05/12/2003 15:34 | 02/26/2004 09:32 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 31.20 | 417298 | Plan | Normally Out | RED | 140641 | ||
05/12/2003 15:34 | 02/26/2004 09:32 | Redmond-Harney No 1 115kV line | 115.0 | L | T | 125.40 | 417298 | Plan | Normally Out | RED | 140641 | |
07/08/2003 07:37 | Canal-Second Lift No 1 34.5kV line | 34.5 | L | G | 1.00 | still out | Plan | Normally Out | IDF | 137507 | ||
07/08/2003 07:37 | Jackson-Second Lift section of Canal-Second Lift No 1 34.5kV line | 34.5 | S | 1.00 | still out | Plan | Normally Out | IDF | 137507 | |||
07/11/2003 10:58 | 06/14/2004 08:51 | Cowlitz-LaGrande No 1,2 115kV lines | 115.0 | L | T | 25.69 | 488033 | Plan | Normally Out | COV | 137554 | |
07/11/2003 10:58 | 06/14/2004 08:51 | McCullough tap to Cowlitz-LaGrande No 1,2 115kV lines | 115.0 | T | 2.18 | 488033 | Plan | Normally Out | COV | 137554 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Bald Mountain tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.38 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 0.99 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | T | 22.12 | 237495 | Plan | Normally Out | LGV | 137799 | |
07/25/2003 11:14 | 01/06/2004 08:29 | Carson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 1.24 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 15.35 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.10 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 5.30 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Stevenson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.10 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 3.60 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 25.00 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
07/25/2003 11:14 | 01/06/2004 08:29 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 0.10 | 237495 | Plan | Normally Out | LGV TDA | 137799 | ||
08/15/2003 14:00 | 05/26/2004 08:28 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | G | 22.51 | 410068 | Plan | Normally Out | EUG | 138375 | |
08/15/2003 14:00 | 05/26/2004 08:28 | Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.89 | 410068 | Plan | Normally Out | EUG | 138375 | ||
09/21/2003 05:56 | 03/16/2004 22:42 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 255946 | Plan | Construction | TDA RED | 138914 | |
09/21/2003 05:56 | 03/16/2004 22:42 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 255946 | Plan | Construction | TDA | 138914 | |||
10/02/2003 06:01 | 03/16/2004 22:42 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 240101 | Plan | Maintenance | TDA RED | 139070 | |
10/02/2003 06:01 | 03/16/2004 22:42 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 240101 | Plan | Maintenance | TDA | 139070 | |||
10/02/2003 06:01 | 03/16/2004 22:42 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 240101 | Plan | Maintenance | TDA | 139070 | |||
10/02/2003 06:01 | 03/16/2004 22:42 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 240101 | Plan | Maintenance | TDA | 139070 | |||
10/02/2003 06:01 | 04/10/2004 04:20 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 274939 | Plan | Maintenance | TDA RED | 139071 | |
10/02/2003 06:01 | 04/10/2004 04:20 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 274939 | Plan | Maintenance | TDA | 139071 | |||
10/02/2003 06:01 | 03/13/2004 00:52 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 234471 | Plan | Switching | TDA | 139072 | ||
10/03/2003 09:27 | 06/15/2004 08:11 | Ice Harbor-Franklin No 2 115kV line | 115.0 | L | T | 9.07 | 368564 | Plan | Normally Out | TRI | 139094 | |
10/03/2003 09:27 | 06/15/2004 08:11 | Martindale tap to Ice Harbor-Franklin No 2 115kV line | 115.0 | T | 0.10 | 368564 | Plan | Normally Out | TRI | 139094 | ||
10/16/2003 10:07 | Tacoma-TPWR Northeast No 1 230kV line | 230.0 | L | 0.10 | still out | Plan | Normally Out | COV | 139283 | |||
10/20/2003 16:49 | 09/16/2004 08:38 | White Bluffs-Richland No 1 115kV line | 115.0 | L | G | 11.02 | 477589 | Plan | Normally Out | TRI | 139330 | |
10/20/2003 16:49 | 09/16/2004 08:38 | White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 4.30 | 477589 | Plan | Normally Out | TRI | 139330 | ||
10/29/2003 10:38 | The Dalles PH-Big Eddy No 2 115kV line | 115.0 | L | 0.82 | still out | Auto | Foreign Trouble | Foreign Trouble | TDA | 139445 | ||
11/03/2003 14:59 | 03/15/2004 15:00 | Ely-Highland section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.98 | 191521 | Plan | Normally Out | TRI | 139485 | ||
11/03/2003 14:59 | 03/15/2004 15:00 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 191521 | Plan | Normally Out | TRI | 139485 | |
11/07/2003 11:46 | Riverland-Midway No 1 13.8kV line | 13.8 | L | 2.36 | still out | Plan | Normally Out | TRI | 139515 | |||
11/16/2003 00:22 | 03/15/2004 10:00 | Benton-Scooteney No 1 115kV line | 115.0 | L | O | 20.32 | 173378 | Plan | Normally Out | TRI | 139599 | |
11/16/2003 00:22 | 03/15/2004 10:00 | Connell-Scooteney section of Benton-Scooteney No 1 115kV line | 115.0 | S | 1.57 | 173378 | Plan | Normally Out | TRI | 139599 | ||
12/18/2003 13:44 | 04/05/2004 11:35 | Albany-Eugene No 1 115kV line | 115.0 | L | G | 39.80 | 156771 | Plan | Normally Out | EUG | 139947 | |
12/18/2003 13:44 | 04/05/2004 11:35 | Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line | 115.0 | S | 5.53 | 156771 | Plan | Normally Out | EUG | 139947 | ||
12/31/2003 17:45 | Raver tap to Schultz-Echo Lake No 1 500kV line | 500.0 | T | 2.95 | still out | Plan | Normally Out | COV | 140124 | |||
12/31/2003 17:45 | Schultz-Echo Lake No 1 500kV line | 500.0 | L | T | 83.36 | still out | Plan | Normally Out | WEN COV | 140124 | ||
01/01/2004 04:17 | 01/01/2004 08:20 | Sickler-Douglas Switchyard No 1 230kV line | 230.0 | L | 0.58 | 243 | Plan | Emergency | WEN | 140012 | ||
01/01/2004 07:11 | 01/01/2004 07:11 | Canby tap to Malin-Hilltop No 1 230kV line | 230.0 | T | G | 7.85 | 0 | Auto | Weather | Weather | RED | 140063 |
01/01/2004 07:11 | 01/01/2004 07:11 | Canby-Hilltop section of Malin-Hilltop No 1 230kV line | 230.0 | S | G | 18.72 | 0 | Auto | Weather | Weather | RED | 140063 |
01/01/2004 07:11 | 01/01/2004 07:11 | Malin-Canby section of Malin-Hilltop No 1 230kV line | 230.0 | S | G | 43.54 | 0 | Auto | Weather | Weather | RED | 140063 |
01/01/2004 07:11 | 01/01/2004 07:11 | Malin-Hilltop No 1 230kV line | 230.0 | L | 62.26 | 0 | Auto | Weather | Weather | RED | 140063 | |
01/01/2004 10:50 | 01/01/2004 10:50 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 0 | Auto | Unknown | Unknown | RED | 140064 | |
01/01/2004 10:50 | 01/02/2004 13:31 | Grizzly-Malin PGE No 2 500kV line | 500.0 | L | 178.50 | 1601 | Auto | Foreign Trouble | Foreign Trouble | RED | 140065 | |
01/01/2004 11:08 | 01/01/2004 20:06 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 538 | Auto | Weather | Weather | EUG | 140066 |
01/01/2004 11:08 | 01/01/2004 20:06 | Hills Creek-Oakridge section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 4.80 | 538 | Auto | Weather | Weather | EUG | 140066 | |
01/01/2004 11:08 | 01/01/2004 20:06 | Oakridge tap to Hills Creek-Lookout Point No 1 115kV line | 115.0 | T | 0.10 | 538 | Auto | Weather | Weather | EUG | 140066 | |
01/01/2004 11:08 | 01/01/2004 20:06 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 538 | Auto | Weather | Weather | EUG | 140066 | |
01/01/2004 11:11 | 01/01/2004 13:49 | Marcola A500-Alvey section of Santiam-Alvey No 1&2 230kV line | 230.0 | S | 15.05 | 158 | Auto | Tree blown | Tree blown | EUG | 140092 | |
01/01/2004 11:11 | 01/02/2004 14:19 | Marcola tap to Santiam-Alvey No 1&2 230kV line | 230.0 | T | 0.10 | 1628 | Auto | Tree blown | Tree blown | EUG | 140092 | |
01/01/2004 11:11 | 01/02/2004 14:19 | Santiam-Alvey No 1&2 230kV line | 230.0 | L | G | 118.50 | 1628 | Auto | Tree blown | Tree blown | SAL EUG | 140092 |
01/01/2004 11:11 | 01/02/2004 14:19 | Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line | 230.0 | S | 46.81 | 1628 | Auto | Tree blown | Tree blown | SAL EUG | 140092 | |
01/01/2004 11:56 | 01/01/2004 11:56 | Idahome-Bridge section of Minidoka PH-Bridge No 1 138kV line | 138.0 | S | G | 20.40 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 140068 |
01/01/2004 11:56 | 01/01/2004 11:56 | Minidoka PH-Bridge No 1 138kV line | 138.0 | L | 40.90 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 140068 | |
01/01/2004 11:56 | 01/01/2004 11:56 | Minidoka PH-Idahome section of Minidoka PH-Bridge No 1 138kV line | 138.0 | S | G | 20.50 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 140068 |
01/01/2004 12:28 | 01/01/2004 14:09 | Blue River tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 0.32 | 101 | Auto | Weather | Weather | EUG | 140069 | |
01/01/2004 12:28 | 01/02/2004 01:48 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 800 | Auto | Weather | Weather | EUG | 140069 | |
01/01/2004 12:28 | 01/01/2004 14:09 | Carmen Smith tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 18.00 | 101 | Auto | Weather | Weather | EUG | 140069 | |
01/01/2004 12:28 | 01/01/2004 14:09 | Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line | 115.0 | S | 3.63 | 101 | Auto | Weather | Weather | EUG | 140069 | |
01/01/2004 12:28 | 01/01/2004 14:09 | Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line | 115.0 | S | 2.12 | 101 | Auto | Weather | Weather | EUG | 140069 | |
01/01/2004 12:28 | 01/02/2004 01:48 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 800 | Auto | Weather | Weather | EUG | 140069 |
01/01/2004 13:56 | 01/01/2004 13:56 | De Moss-Fossil No 1 69kV line | 69.0 | L | G | 52.93 | 0 | Auto | Weather | Weather | TDA | 140070 |
01/01/2004 13:56 | 01/01/2004 13:56 | De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line | 69.0 | S | 0.11 | 0 | Auto | Weather | Weather | TDA | 140070 | |
01/01/2004 14:04 | 01/03/2004 02:27 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 2183 | Auto | Weather | Tree | EUG | 140071 | |
01/02/2004 00:32 | 01/03/2004 10:19 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 2027 | Auto | Tree blown | Tree | EUG | 140072 |
01/02/2004 00:32 | 01/02/2004 00:45 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 13 | Auto | Tree blown | Tree | EUG | 140072 | |
01/02/2004 00:32 | 01/03/2004 10:19 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 2027 | Auto | Tree blown | Tree | EUG | 140072 | |
01/02/2004 00:32 | 01/02/2004 00:45 | Martin Creek tap to Alvey-Fairview No 1 230kV line | 230.0 | T | 0.27 | 13 | Auto | Tree blown | Tree | EUG | 140072 | |
01/02/2004 00:32 | 01/02/2004 00:45 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 13 | Auto | Tree blown | Tree | EUG | 140072 | |
01/02/2004 01:29 | 01/02/2004 18:26 | Alvey-Fairview No 1 230kV line | 230.0 | L | O | 97.46 | 1017 | Auto | Tree blown | EUG | 140073 | |
01/02/2004 01:29 | 01/02/2004 03:05 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 96 | Auto | Tree blown | EUG | 140073 | ||
01/02/2004 01:29 | 01/02/2004 03:05 | Martin Creek tap to Alvey-Fairview No 1 230kV line | 230.0 | T | 0.27 | 96 | Auto | Tree blown | EUG | 140073 | ||
01/02/2004 01:29 | 01/02/2004 18:26 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 1017 | Auto | Tree blown | EUG | 140073 | ||
01/02/2004 01:29 | 01/03/2004 02:30 | Fairview-PACW Isthmus No 2 230kV line | 230.0 | L | 11.90 | 1501 | Auto | Weather | Forced (Configuration) | EUG | 140074 | |
01/02/2004 01:29 | 01/02/2004 02:18 | Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 14.02 | 49 | Auto | Weather | Overload | EUG | 140075 | |
01/02/2004 01:29 | 01/02/2004 01:30 | Hauser tap to Reedsport-Fairview No 1 115kV line | 115.0 | T | 1.27 | 1 | Auto | Weather | Overload | EUG | 140075 | |
01/02/2004 01:29 | 01/02/2004 02:18 | Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 5.81 | 49 | Auto | Weather | Overload | EUG | 140075 | |
01/02/2004 01:29 | 01/02/2004 01:30 | Lakeside-Hauser section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 3.94 | 1 | Auto | Weather | Overload | EUG | 140075 | |
01/02/2004 01:29 | 01/02/2004 02:20 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 51 | Auto | Weather | Overload | EUG | 140075 |
01/02/2004 01:29 | 01/02/2004 01:30 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 1 | Auto | Weather | Overload | EUG | 140075 | |
01/02/2004 01:29 | 01/02/2004 02:20 | Sumner-Fairview section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 5.36 | 51 | Auto | Weather | Overload | EUG | 140075 | |
01/02/2004 01:29 | 01/02/2004 02:38 | Bandon-Rogue No 1 115kV line | 115.0 | L | G | 46.00 | 69 | Auto | Weather | Forced (Configuration) | EUG | 140076 |
01/02/2004 01:29 | 01/02/2004 02:25 | Bandon-Two Mile section of Bandon-Rogue No 1 115kV line | 115.0 | S | 4.40 | 56 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:38 | Geisel Monument tap to Bandon-Rogue No 1 115kV line | 115.0 | T | 0.10 | 69 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:38 | Geisel Monument-Rogue section of Bandon-Rogue No 1 115kV line | 115.0 | S | 0.40 | 69 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:25 | Langlois tap to Bandon-Rogue No 1 115kV line | 115.0 | T | 0.28 | 56 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:25 | Langlois-Port Orford section of Bandon-Rogue No 1 115kV line | 115.0 | S | 10.00 | 56 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:25 | Port Orford tap to Bandon-Rogue No 1 115kV line | 115.0 | T | 0.10 | 56 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:38 | Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line | 115.0 | S | 21.50 | 69 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:25 | Two Mile tap to Bandon-Rogue No 1 115kV line | 115.0 | T | 0.02 | 56 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:25 | Two Mile-Langlois section of Bandon-Rogue No 1 115kV line | 115.0 | S | 9.70 | 56 | Auto | Weather | Forced (Configuration) | EUG | 140076 | |
01/02/2004 01:29 | 01/02/2004 02:40 | Rogue-Gold Beach No 1 115kV line | 115.0 | L | 5.47 | 71 | Auto | Weather | Forced (Configuration) | EUG | 140077 | |
01/02/2004 01:29 | 01/02/2004 02:40 | Rogue-Gold Beach No 2 115kV line | 115.0 | L | 5.49 | 71 | Auto | Weather | Forced (Configuration) | EUG | 140078 | |
01/02/2004 01:29 | 01/02/2004 02:27 | Fairview-Bandon No 2 115kV line | 115.0 | L | 19.73 | 58 | Auto | Weather | Forced (Configuration) | EUG | 140079 | |
01/02/2004 01:29 | 01/02/2004 03:05 | Fairview-PACW Coquille No 1 115kV line | 115.0 | L | 6.00 | 96 | Auto | Weather | Forced (Configuration) | EUG | 140080 | |
01/02/2004 01:29 | 01/02/2004 02:38 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 69 | Auto | Weather | Forced (Configuration) | EUG | 140081 | |
01/02/2004 01:29 | 01/02/2004 02:23 | Fairview-Bandon No 1 115kV line | 115.0 | L | G | 25.16 | 54 | Auto | Weather | Forced (Configuration) | EUG | 140082 |
01/02/2004 01:29 | 01/02/2004 02:22 | Fairview-Norway section of Fairview-Bandon No 1 115kV line | 115.0 | S | 12.59 | 53 | Auto | Weather | Forced (Configuration) | EUG | 140082 | |
01/02/2004 01:29 | 01/02/2004 02:22 | Morrison tap to Fairview-Bandon No 1 115kV line | 115.0 | T | 0.10 | 53 | Auto | Weather | Forced (Configuration) | EUG | 140082 | |
01/02/2004 01:29 | 01/02/2004 02:23 | Morrison-Bandon section of Fairview-Bandon No 1 115kV line | 115.0 | S | 2.31 | 54 | Auto | Weather | Forced (Configuration) | EUG | 140082 | |
01/02/2004 01:29 | 01/02/2004 02:22 | Norway tap to Fairview-Bandon No 1 115kV line | 115.0 | T | 0.01 | 53 | Auto | Weather | Forced (Configuration) | EUG | 140082 | |
01/02/2004 01:29 | 01/02/2004 02:22 | Norway-Morrison section of Fairview-Bandon No 1 115kV line | 115.0 | S | 10.26 | 53 | Auto | Weather | Forced (Configuration) | EUG | 140082 | |
01/02/2004 02:11 | 01/02/2004 02:18 | Hauser tap to Reedsport-Fairview No 1 115kV line | 115.0 | T | 1.27 | 7 | Auto | Weather | EUG | 140083 | ||
01/02/2004 02:11 | 01/02/2004 02:18 | Lakeside-Hauser section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 3.94 | 7 | Auto | Weather | EUG | 140083 | ||
01/02/2004 02:11 | 01/02/2004 02:18 | Reedsport-Fairview No 1 115kV line | 115.0 | L | O | 38.48 | 7 | Auto | Weather | EUG | 140083 | |
01/02/2004 02:11 | 01/02/2004 02:18 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 7 | Auto | Weather | EUG | 140083 | ||
01/02/2004 03:31 | 01/02/2004 03:39 | Fairview-PACW Coquille No 1 115kV line | 115.0 | L | 6.00 | 8 | Plan | Load Control | EUG | 140084 | ||
01/02/2004 04:42 | 01/02/2004 04:58 | Blue River tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 0.32 | 16 | Auto | Weather | Weather | EUG | 140085 | |
01/02/2004 04:42 | 01/03/2004 03:59 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 1397 | Auto | Weather | Weather | EUG | 140085 | |
01/02/2004 04:42 | 01/02/2004 04:58 | Carmen Smith tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 18.00 | 16 | Auto | Weather | Weather | EUG | 140085 | |
01/02/2004 04:42 | 01/02/2004 04:58 | Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line | 115.0 | S | 3.63 | 16 | Auto | Weather | Weather | EUG | 140085 | |
01/02/2004 04:42 | 01/02/2004 04:58 | Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line | 115.0 | S | 2.12 | 16 | Auto | Weather | Weather | EUG | 140085 | |
01/02/2004 04:42 | 01/03/2004 03:59 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 1397 | Auto | Weather | Weather | EUG | 140085 |
01/02/2004 23:04 | 01/02/2004 23:53 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 49 | Plan | Testing | EUG | 140093 | ||
01/03/2004 01:56 | 01/03/2004 02:14 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 18 | Plan | Testing | EUG | 140094 | ||
01/03/2004 10:07 | 01/03/2004 10:19 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 12 | Auto | Weather | Unknown | EUG | 140106 | |
01/03/2004 10:11 | 01/03/2004 10:20 | Fairview-PACW Isthmus No 2 230kV line | 230.0 | L | 11.90 | 9 | Plan | Emergency | EUG | 140107 | ||
01/03/2004 11:25 | 01/03/2004 11:27 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 2 | Auto | Weather | Unknown | EUG | 140108 | |
01/04/2004 00:10 | 01/05/2004 01:56 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 1546 | Plan | Foreign Request | OLY | 140109 | ||
01/04/2004 01:32 | 01/04/2004 01:35 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | EUG | 140111 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | O | 22.51 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | EUG | 140112 |
01/04/2004 01:32 | 01/04/2004 01:35 | Dorena tap to Alvey-Martin Creek No 1 115kV line | 115.0 | T | 4.67 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | EUG | 140112 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Dorena-Latham section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 3.71 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | EUG | 140112 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Latham tap to Alvey-Martin Creek No 1 115kV line | 115.0 | T | 2.06 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | EUG | 140112 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.03 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | EUG | 140112 | |
01/04/2004 01:32 | 01/04/2004 16:31 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 899 | Auto | Tree blown | Tree | EUG | 140115 |
01/04/2004 01:32 | 01/04/2004 01:35 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 3 | Auto | Tree blown | Tree | EUG | 140115 | |
01/04/2004 01:32 | 01/04/2004 16:31 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 899 | Auto | Tree blown | Tree | EUG | 140115 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Martin Creek tap to Alvey-Fairview No 1 230kV line | 230.0 | T | 0.27 | 3 | Auto | Tree blown | Tree | EUG | 140115 | |
01/04/2004 01:32 | 01/04/2004 01:35 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 3 | Auto | Tree blown | Tree | EUG | 140115 | |
01/04/2004 16:41 | 01/04/2004 19:11 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 150 | Plan | Maintenance | EUG | 140116 | ||
01/04/2004 16:41 | 01/04/2004 19:11 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 150 | Plan | Maintenance | EUG | 140117 | ||
01/04/2004 22:26 | 04/10/2004 04:20 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 138534 | Plan | Switching | TDA | 140119 | ||
01/04/2004 22:26 | 04/10/2004 04:20 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 138534 | Plan | Forced | TDA RED | 141072 | |
01/04/2004 22:26 | 04/10/2004 04:20 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 138534 | Plan | Forced | TDA | 141072 | |||
01/04/2004 22:26 | 04/10/2004 04:20 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 138534 | Plan | Forced | TDA | 141072 | |||
01/04/2004 22:26 | 04/10/2004 04:20 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 138534 | Plan | Forced | TDA | 141072 | |||
01/04/2004 22:47 | 01/04/2004 22:47 | Addy-AVA Gifford No 1 115kV line | 115.0 | L | 20.70 | 0 | Auto | Foreign Trouble | Foreign Utility | SPK | 140120 | |
01/04/2004 23:28 | 01/04/2004 23:28 | Willow Creek-Hawkins No 1 115kV line | 115.0 | L | 2.99 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140121 | |
01/05/2004 03:04 | 01/05/2004 03:04 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 140122 | ||
01/05/2004 03:04 | 01/05/2004 03:04 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 140122 | ||
01/05/2004 03:08 | 01/05/2004 04:27 | Addy-AVA Gifford No 1 115kV line | 115.0 | L | 20.70 | 79 | Plan | Foreign Request | SPK | 140123 | ||
01/05/2004 13:24 | 01/05/2004 20:18 | Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line | 115.0 | T | 14.58 | 414 | Plan | Emergency | OLY | 140148 | ||
01/05/2004 13:24 | 01/05/2004 20:18 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 9.22 | 414 | Plan | Emergency | OLY | 140148 | ||
01/05/2004 13:24 | 01/05/2004 20:19 | Satsop Park-Aberdeen tap section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 6.10 | 415 | Plan | Emergency | OLY | 140148 | ||
01/05/2004 13:24 | 01/05/2004 20:19 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | G | 15.32 | 415 | Plan | Emergency | OLY | 140148 | |
01/05/2004 14:19 | 01/05/2004 15:36 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | 50.34 | 77 | Plan | Emergency | SPK | 140149 | ||
01/05/2004 14:19 | 01/05/2004 15:36 | Bell-Boundary No 3 230kV line | 230.0 | L | G | 108.07 | 77 | Plan | Emergency | SPK | 140149 | |
01/05/2004 17:50 | 01/05/2004 17:52 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | G | 23.44 | 2 | Auto | Unknown | Unknown | TDA | 140150 |
01/05/2004 17:50 | 01/05/2004 17:52 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | 77.43 | 2 | Auto | Unknown | Unknown | TDA LGV | 140150 | |
01/05/2004 17:50 | 01/05/2004 17:52 | Parkdale tap to Big Eddy-Troutdale No 1 230kV line | 230.0 | T | G | 0.10 | 2 | Auto | Unknown | Unknown | TDA | 140150 |
01/05/2004 17:50 | 01/05/2004 17:52 | Parkdale-Troutdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | G | 53.99 | 2 | Auto | Unknown | Unknown | TDA LGV | 140150 |
01/05/2004 23:13 | 01/05/2004 23:16 | Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 0.38 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 0.99 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | 45.05 | 3 | Auto | Tree blown | Tree blown | LGV | 140151 | |
01/05/2004 23:13 | 01/05/2004 23:16 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | G | 0.93 | 3 | Auto | Tree blown | Tree blown | LGV | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 1.24 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 15.35 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 0.10 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 5.30 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 0.10 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 3.60 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | T | G | 25.00 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 0.10 | 3 | Auto | Tree blown | Tree blown | LGV TDA | 140151 |
01/05/2004 23:13 | 01/05/2004 23:16 | Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | G | 40.44 | 3 | Auto | Tree blown | Tree blown | LGV | 140151 |
01/05/2004 23:18 | 01/06/2004 01:44 | Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.38 | 146 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:44 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.99 | 146 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | G | 45.05 | 136 | Auto | Tree blown | Tree blown | LGV | 140152 |
01/05/2004 23:18 | 01/06/2004 01:34 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 0.93 | 136 | Auto | Tree blown | Tree blown | LGV | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 1.24 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 15.35 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 5.30 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 3.60 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | T | 25.00 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.10 | 136 | Auto | Tree blown | Tree blown | LGV TDA | 140152 | |
01/05/2004 23:18 | 01/06/2004 01:34 | Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 40.44 | 136 | Auto | Tree blown | Tree blown | LGV | 140152 | |
01/06/2004 01:46 | 01/06/2004 10:27 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | G | 22.12 | 521 | Auto | Tree blown | Tree | LGV | 140168 |
01/06/2004 01:46 | 01/06/2004 08:29 | Bonneville-Underwood section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 0.92 | 403 | Auto | Tree blown | Tree | LGV | 140168 | |
01/06/2004 01:46 | 01/06/2004 01:46 | Cape Horn tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Tree blown | Tree | LGV | 140168 | |
01/06/2004 01:46 | 01/06/2004 01:46 | Cape Horn-Evans section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 7.65 | 0 | Auto | Tree blown | Tree | LGV | 140168 | |
01/06/2004 01:46 | 01/06/2004 01:46 | Evans tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 1.60 | 0 | Auto | Tree blown | Tree | LGV | 140168 | |
01/06/2004 01:46 | 01/06/2004 01:46 | Evans-North Camas section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 1.96 | 0 | Auto | Tree blown | Tree | LGV | 140168 | |
01/06/2004 01:46 | 01/06/2004 10:27 | Underwood-Cape Horn section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 11.59 | 521 | Auto | Tree blown | Tree | LGV | 140168 | |
01/06/2004 01:46 | 04/25/2004 04:00 | Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.38 | 158474 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 04:00 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.99 | 158474 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 01/06/2004 12:28 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | G | 45.05 | 642 | Auto | Tree blown | Tree blown | LGV | 140169 |
01/06/2004 01:46 | 01/06/2004 12:28 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 0.93 | 642 | Auto | Tree blown | Tree blown | LGV | 140169 | |
01/06/2004 01:46 | 04/25/2004 03:33 | Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 1.24 | 158447 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 04:00 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 15.35 | 158474 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 03:33 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 158447 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 03:33 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 5.30 | 158447 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 03:33 | Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 158447 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 03:33 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 3.60 | 158447 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 03:33 | Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | T | 25.00 | 158447 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 04/25/2004 03:33 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.10 | 158447 | Auto | Tree blown | Tree blown | LGV TDA | 140169 | |
01/06/2004 01:46 | 01/06/2004 12:28 | Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 40.44 | 642 | Auto | Tree blown | Tree blown | LGV | 140169 | |
01/06/2004 01:59 | 01/06/2004 05:42 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | G | 22.12 | 223 | Plan | Switching | LGV | 140155 | |
01/06/2004 01:59 | 01/06/2004 05:42 | Cape Horn tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 0.10 | 223 | Plan | Switching | LGV | 140155 | ||
01/06/2004 01:59 | 01/06/2004 05:42 | Cape Horn-Evans section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 7.65 | 223 | Plan | Switching | LGV | 140155 | ||
01/06/2004 01:59 | 01/06/2004 05:42 | Evans tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 1.60 | 223 | Plan | Switching | LGV | 140155 | ||
01/06/2004 01:59 | 01/06/2004 05:42 | Evans-North Camas section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 1.96 | 223 | Plan | Switching | LGV | 140155 | ||
01/06/2004 04:42 | 01/07/2004 13:25 | Noxon AVA-Hot Springs No 2 230kV line | 230.0 | L | 70.00 | 1963 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140156 | |
01/06/2004 04:42 | 01/06/2004 05:50 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | 25.06 | 68 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140157 | |
01/06/2004 04:42 | 01/06/2004 05:50 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | G | 58.91 | 68 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140157 |
01/06/2004 04:42 | 01/06/2004 05:50 | Noxon-Hot Springs No 1 230kV line | 230.0 | L | G | 68.28 | 68 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140158 |
01/06/2004 04:42 | 01/06/2004 05:50 | Trout Creek-Hot Springs section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | 57.18 | 68 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140158 | |
01/06/2004 04:42 | 01/06/2004 05:50 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | G | 56.45 | 68 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140159 |
01/06/2004 04:42 | 01/06/2004 05:50 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | 42.95 | 68 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140159 | |
01/06/2004 04:42 | 01/06/2004 06:24 | Hot Springs-NWE Ovando No 1 230kV line | 230.0 | L | 89.70 | 102 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140160 | |
01/06/2004 04:42 | 01/06/2004 05:52 | Taft-Hot Springs No 1 500kV line | 500.0 | L | 53.83 | 70 | Auto | Forced (Configuration) | Forced (Configuration) | KAL | 140170 | |
01/06/2004 04:42 | 01/06/2004 05:02 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 20 | Auto | RAS Initiated | RAS Initiated | KAL | 140171 | |
01/06/2004 07:43 | 01/07/2004 17:34 | Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 2031 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 07:43 | 01/06/2004 07:57 | Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line | 115.0 | T | 0.10 | 14 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 07:43 | 01/06/2004 07:57 | Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 10.90 | 14 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 07:43 | 01/06/2004 07:57 | Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 2.50 | 14 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 07:43 | 01/06/2004 09:41 | Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 11.60 | 118 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 07:43 | 01/06/2004 09:41 | Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 12.80 | 118 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 07:43 | 01/06/2004 07:57 | Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 14 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 07:43 | 01/07/2004 17:34 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | G | 57.70 | 2031 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 |
01/06/2004 07:43 | 01/06/2004 09:41 | Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 2.70 | 118 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140172 | |
01/06/2004 08:29 | 01/06/2004 08:29 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | G | 22.12 | 0 | Plan | Maintenance | LGV | 140173 | |
01/06/2004 08:29 | 01/06/2004 08:29 | Bonneville-Underwood section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 0.92 | 0 | Plan | Maintenance | LGV | 140173 | ||
01/07/2004 02:00 | 01/07/2004 02:21 | Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line | 230.0 | S | 15.65 | 21 | Auto | Foreign Trouble | Foreign Trouble | COV | 140174 | |
01/07/2004 02:00 | 01/07/2004 12:58 | Sammamish-Klahanie section of Sammamish-Maple Valley No 1 230kV line | 230.0 | S | 16.38 | 658 | Auto | Foreign Trouble | Foreign Trouble | COV | 140174 | |
01/07/2004 02:00 | 01/07/2004 12:58 | Sammamish-Maple Valley No 1 230kV line | 230.0 | L | G | 32.03 | 658 | Auto | Foreign Trouble | Foreign Trouble | COV | 140174 |
01/07/2004 05:08 | 01/07/2004 12:27 | Albany-Eugene No 1 115kV line | 115.0 | L | O | 39.80 | 439 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 |
01/07/2004 05:08 | 01/07/2004 07:09 | Alderwood tap to Albany-Eugene No 1 115kV line | 115.0 | T | 9.21 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Alderwood tap-Cheshire section of Alderwood tap to Albany-Eugene No 1 115kV line | 115.0 | TS | 1.40 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Alderwood-Junction City section of Albany-Eugene No 1 115kV line | 115.0 | S | 2.04 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Cheshire tap to Alderwood tap to Albany-Eugene No 1 115kV line | 115.0 | TT | 0.01 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Cheshire-Alderwood section of Alderwood tap to Albany-Eugene No 1 115kV line | 115.0 | TS | 7.80 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 12:27 | Greenberry tap to Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | TT | 19.00 | 439 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 12:27 | Greenberry-Harrisburg section of Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | TS | 0.02 | 439 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 12:27 | Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | T | 0.04 | 439 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 12:27 | Harrisburg tap-Greenberry section of Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | TS | 0.02 | 439 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 12:27 | Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line | 115.0 | S | 8.28 | 439 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Junction City tap to Albany-Eugene No 1 115kV line | 115.0 | T | 0.05 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Junction City-Parker section of Albany-Eugene No 1 115kV line | 115.0 | S | 2.94 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Parker tap to Albany-Eugene No 1 115kV line | 115.0 | T | 0.10 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 05:08 | 01/07/2004 07:09 | Parker-Eugene section of Albany-Eugene No 1 115kV line | 115.0 | S | 3.90 | 121 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140185 | |
01/07/2004 06:14 | 01/08/2004 12:11 | Salem-PGE Bethel No 1 115kV line | 115.0 | L | 14.40 | 1797 | Auto | Foreign Trouble | Foreign Trouble | SAL | 140186 | |
01/07/2004 07:33 | 01/07/2004 15:18 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 465 | Auto | Tree blown | Tree blown | OLY LGV | 140187 |
01/07/2004 07:33 | 01/07/2004 08:19 | Holcomb-Oxbow section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 1.48 | 46 | Auto | Tree blown | Tree blown | OLY | 140187 | |
01/07/2004 07:33 | 01/07/2004 15:18 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 465 | Auto | Tree blown | Tree blown | OLY LGV | 140187 | |
01/07/2004 10:09 | 01/07/2004 10:26 | Lower Granite PH-Lower Granite No 1 500kV line | 500.0 | L | 0.75 | 17 | Plan | Foreign Request | TRI SPK | 140188 | ||
01/07/2004 16:54 | 01/07/2004 18:25 | Midway-Moxee No 1 115kV line | 115.0 | L | G | 33.98 | 91 | Plan | Switching | TRI WEN | 140189 | |
01/07/2004 16:54 | 01/07/2004 18:25 | Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line | 115.0 | S | 17.37 | 91 | Plan | Switching | WEN | 140189 | ||
01/08/2004 00:32 | 01/08/2004 00:35 | Raver-Paul No 1 500kV line | 500.0 | L | 69.31 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | COV OLY | 140190 | |
01/08/2004 02:07 | 01/08/2004 02:24 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 17 | Plan | Foreign Request | SAL | 140192 | ||
01/08/2004 10:21 | 01/08/2004 13:35 | McNary-Franklin No 2 230kV line | 230.0 | L | 26.88 | 194 | Plan | Maintenance | TRI | 140193 | ||
01/08/2004 12:16 | 01/08/2004 15:40 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 204 | Auto | Foreign Trouble | Foreign Trouble | LGV | 140194 |
01/08/2004 12:16 | 01/08/2004 15:40 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | 19.85 | 204 | Auto | Foreign Trouble | Foreign Trouble | LGV | 140194 | |
01/08/2004 12:16 | 01/08/2004 15:40 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | 26.06 | 204 | Auto | Foreign Trouble | Foreign Trouble | LGV | 140194 | |
01/08/2004 12:16 | 01/08/2004 15:40 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 204 | Auto | Foreign Trouble | Foreign Trouble | LGV | 140194 | |
01/08/2004 14:11 | 01/08/2004 14:59 | Anaconda-NWE Mill Creek No 1 230kV line | 230.0 | L | 0.40 | 48 | Plan | Foreign Request | KAL | 140195 | ||
01/09/2004 09:21 | 01/09/2004 13:16 | Lower Granite-Hatwai No 1 500kV line | 500.0 | L | 32.87 | 235 | Plan | Emergency | SPK TRI | 140196 | ||
01/09/2004 13:04 | 01/09/2004 15:56 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 172 | Auto | Foreign Trouble | OLY | 140197 | ||
01/09/2004 13:04 | 01/09/2004 15:56 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 172 | Auto | Foreign Trouble | OLY | 140197 | |
01/09/2004 14:39 | 01/09/2004 15:18 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 39 | Plan | Foreign Request | LGV | 140198 | ||
01/09/2004 14:39 | 01/09/2004 15:18 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 39 | Plan | Foreign Request | LGV | 140198 | |
01/09/2004 14:39 | 01/09/2004 15:18 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 39 | Plan | Foreign Request | LGV | 140198 | |
01/09/2004 14:39 | 01/09/2004 15:18 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 39 | Plan | Foreign Request | LGV | 140198 | |
01/09/2004 16:19 | 01/09/2004 16:53 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 34 | Auto | Foreign Trouble | OLY | 140199 | ||
01/09/2004 16:19 | 01/09/2004 16:53 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 34 | Auto | Foreign Trouble | OLY | 140199 | |
01/10/2004 14:50 | 01/10/2004 15:12 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 22 | Plan | Foreign Request | LGV | 140200 | ||
01/10/2004 14:50 | 01/10/2004 15:12 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 22 | Plan | Foreign Request | LGV | 140200 | |
01/10/2004 14:50 | 01/10/2004 15:12 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 22 | Plan | Foreign Request | LGV | 140200 | |
01/10/2004 14:50 | 01/10/2004 15:12 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 22 | Plan | Foreign Request | LGV | 140200 | |
01/12/2004 06:51 | 01/15/2004 15:23 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 4832 | Plan | Foreign Request | EUG | 140203 | ||
01/12/2004 08:04 | 01/12/2004 14:32 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 388 | Plan | Maintenance | OLY LGV | 140204 | |
01/12/2004 08:04 | 01/12/2004 14:32 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 388 | Plan | Maintenance | OLY LGV | 140204 | ||
01/12/2004 11:50 | 01/13/2004 13:28 | Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 0.38 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 0.99 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | 45.05 | 1538 | Plan | Foreign Request | LGV | 140205 | ||
01/12/2004 11:50 | 01/13/2004 13:28 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | G | 0.93 | 1538 | Plan | Foreign Request | LGV | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 1.24 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 15.35 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 0.10 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 5.30 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | G | 0.10 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 3.60 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | T | G | 25.00 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | G | 0.10 | 1538 | Plan | Foreign Request | LGV TDA | 140205 | |
01/12/2004 11:50 | 01/13/2004 13:28 | Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | G | 40.44 | 1538 | Plan | Foreign Request | LGV | 140205 | |
01/13/2004 00:49 | 01/13/2004 00:55 | Chief Joseph PH-Chief Joseph No 6 500kV line | 500.0 | L | 0.74 | 6 | Plan | Foreign Request | WEN | 140206 | ||
01/13/2004 07:21 | 01/13/2004 11:04 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | T | 29.98 | 223 | Plan | Testing | COV SNO | 140215 | |
01/13/2004 07:21 | 01/13/2004 11:04 | Sno-King tap to Echo Lake-Monroe No 1 500kV line | 500.0 | T | 12.82 | 223 | Plan | Testing | SNO | 140215 | ||
01/13/2004 08:09 | 01/13/2004 14:21 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 372 | Plan | Maintenance | OLY LGV | 140216 | |
01/13/2004 08:09 | 01/13/2004 14:21 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 372 | Plan | Maintenance | OLY LGV | 140216 | ||
01/13/2004 08:13 | 01/13/2004 14:49 | Salem-Albany No 1 115kV line | 115.0 | L | 23.90 | 396 | Plan | Maintenance | SAL EUG | 140217 | ||
01/13/2004 09:27 | 01/13/2004 13:00 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 213 | Auto | Machinery, Logging | Machinery, Logging | EUG | 140218 | |
01/13/2004 13:56 | 01/13/2004 18:48 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | T | 29.98 | 292 | Plan | Testing | COV SNO | 140219 | |
01/13/2004 13:56 | 01/13/2004 18:48 | Sno-King tap to Echo Lake-Monroe No 1 500kV line | 500.0 | T | 12.82 | 292 | Plan | Testing | SNO | 140219 | ||
01/14/2004 08:02 | 01/14/2004 15:36 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 454 | Plan | Maintenance | OLY LGV | 140223 | |
01/14/2004 08:02 | 01/14/2004 15:36 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 454 | Plan | Maintenance | OLY LGV | 140223 | ||
01/14/2004 13:22 | 01/14/2004 15:06 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 104 | Plan | Emergency | EUG | 140224 | |
01/14/2004 13:22 | 01/14/2004 15:06 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 104 | Plan | Emergency | EUG | 140224 | ||
01/15/2004 08:10 | 01/15/2004 09:23 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 73 | Plan | Maintenance | OLY | 140228 | ||
01/15/2004 08:14 | 01/15/2004 12:37 | Carlton-Cascade Steel section of Carlton-Sherwood No 1 230kV line | 230.0 | S | G | 8.94 | 263 | Plan | Maintenance | SAL | 140229 | |
01/15/2004 08:14 | 01/15/2004 12:37 | Carlton-Sherwood No 1 230kV line | 230.0 | L | 17.92 | 263 | Plan | Maintenance | SAL | 140229 | ||
01/15/2004 08:14 | 01/15/2004 12:37 | Cascade Steel tap to Carlton-Sherwood No 1 230kV line | 230.0 | T | G | 12.67 | 263 | Plan | Maintenance | SAL | 140229 | |
01/15/2004 08:14 | 01/15/2004 12:37 | Cascade Steel-Sherwood section of Carlton-Sherwood No 1 230kV line | 230.0 | S | G | 8.98 | 263 | Plan | Maintenance | SAL | 140229 | |
01/15/2004 08:34 | 01/15/2004 08:41 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 7 | Plan | Switching | SAL | 140230 | ||
01/15/2004 12:31 | 01/15/2004 12:37 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 6 | Plan | Switching | SAL | 140231 | ||
01/15/2004 18:11 | 09/03/2004 17:06 | Coyote Springs-AVA No 2 500kV line | 500.0 | L | 0.06 | 333955 | Plan | Foreign Request | TRI | 140232 | ||
01/16/2004 04:23 | 01/21/2004 14:55 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 7832 | Auto | Equipment/Miscellaneous | Terminal Equipment Failure | WEN SNO | 140233 | |
01/16/2004 08:23 | 01/16/2004 14:47 | Franklin-Hedges No 1 115kV line | 115.0 | L | 5.00 | 384 | Plan | Forced | TRI | 140236 | ||
01/16/2004 08:59 | 01/16/2004 13:59 | Baxter-Franklin section of Benton-Franklin No 1 115kV line | 115.0 | S | 15.96 | 300 | Plan | Forced | TRI | 140237 | ||
01/16/2004 08:59 | 01/16/2004 13:59 | Benton-Franklin No 1 115kV line | 115.0 | L | G | 21.03 | 300 | Plan | Forced | TRI | 140237 | |
01/16/2004 09:00 | 01/16/2004 14:00 | Franklin-Badger Canyon No 1 115kV line | 115.0 | L | 15.77 | 300 | Plan | Forced | TRI | 140238 | ||
01/16/2004 09:20 | 01/16/2004 12:36 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 196 | Plan | Maintenance | SAL EUG | 140239 | |
01/16/2004 09:20 | 01/16/2004 12:36 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 196 | Plan | Maintenance | SAL | 140239 | ||
01/16/2004 10:51 | 01/16/2004 15:01 | Ice Harbor-Franklin No 1 115kV line | 115.0 | L | 9.34 | 250 | Plan | Forced | TRI | 140240 | ||
01/16/2004 10:51 | 01/16/2004 13:59 | McNary-Franklin No 2 230kV line | 230.0 | L | 26.88 | 188 | Plan | Forced | TRI | 140241 | ||
01/17/2004 00:57 | 01/17/2004 10:56 | Grizzly-PGE Round Butte No 1 500kV line | 500.0 | L | 15.60 | 599 | Auto | Foreign Trouble | Foreign Trouble | RED | 140242 | |
01/17/2004 00:59 | 01/17/2004 02:04 | Redmond-PGE Round Butte No 1 230kV line | 230.0 | L | 23.60 | 65 | Auto | Foreign Trouble | Foreign Trouble | RED | 140243 | |
01/18/2004 03:48 | 01/18/2004 03:52 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 4 | Auto | Foreign Trouble | RED | 140244 | |
01/18/2004 03:48 | 01/18/2004 03:52 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 4 | Auto | Foreign Trouble | IDF RED | 140244 | |
01/18/2004 03:48 | 01/18/2004 03:52 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 4 | Auto | Foreign Trouble | IDF RED | 140244 | ||
01/18/2004 12:25 | 01/18/2004 12:28 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 3 | Auto | Foreign Trouble | RED | 140245 | |
01/18/2004 12:25 | 01/18/2004 12:28 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 3 | Auto | Foreign Trouble | IDF RED | 140245 | |
01/18/2004 12:25 | 01/18/2004 12:28 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 3 | Auto | Foreign Trouble | IDF RED | 140245 | ||
01/20/2004 07:32 | 01/20/2004 12:36 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 304 | Plan | Maintenance | OLY LGV | 140250 | |
01/20/2004 07:32 | 01/20/2004 12:36 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 304 | Plan | Maintenance | OLY LGV | 140250 | ||
01/20/2004 08:19 | 01/20/2004 14:56 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 397 | Plan | Maintenance | EUG | 140251 | |
01/20/2004 08:19 | 01/20/2004 14:56 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 397 | Plan | Maintenance | EUG | 140251 | ||
01/20/2004 16:53 | 01/21/2004 17:25 | Goshen-Eagle Rock No 1 161kV line | 161.0 | L | T | 11.60 | 1472 | Plan | Emergency | IDF | 140252 | |
01/20/2004 16:53 | 01/21/2004 17:25 | Westside tap to Goshen-Eagle Rock No 1 161kV line | 161.0 | T | 0.10 | 1472 | Plan | Emergency | IDF | 140252 | ||
01/20/2004 16:53 | 01/20/2004 17:52 | Westside-Gem State section of Westside-Sugar Mill No 1 161kV line | 161.0 | S | 7.00 | 59 | Plan | Emergency | IDF | 140253 | ||
01/20/2004 16:53 | 01/20/2004 17:52 | Westside-Sugar Mill No 1 161kV line | 161.0 | L | G | 12.50 | 59 | Plan | Emergency | IDF | 140253 | |
01/20/2004 23:17 | 01/20/2004 23:22 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 5 | Auto | Foreign Trouble | Foreign Trouble | RED | 140254 | |
01/21/2004 07:32 | 01/21/2004 15:46 | Olympia-Satsop No 3 230kV line | 230.0 | L | 26.19 | 494 | Plan | Maintenance | OLY | 140257 | ||
01/21/2004 08:18 | 01/21/2004 14:58 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 400 | Plan | Maintenance | EUG | 140258 | |
01/21/2004 08:18 | 01/21/2004 14:58 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 400 | Plan | Maintenance | EUG | 140258 | ||
01/21/2004 12:23 | 01/21/2004 17:36 | Westside-Gem State section of Westside-Sugar Mill No 1 161kV line | 161.0 | S | 7.00 | 313 | Plan | Maintenance | IDF | 140259 | ||
01/21/2004 12:23 | 01/21/2004 17:36 | Westside-Sugar Mill No 1 161kV line | 161.0 | L | G | 12.50 | 313 | Plan | Maintenance | IDF | 140259 | |
01/21/2004 14:33 | 01/21/2004 14:39 | B-891-Sand Creek section of Bronx-Sand Creek No 1 115kV line | 115.0 | S | G | 6.67 | 6 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140260 |
01/21/2004 14:33 | 01/21/2004 14:39 | Bronx-B-891 section of Bronx-Sand Creek No 1 115kV line | 115.0 | S | G | 6.62 | 6 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140260 |
01/21/2004 14:33 | 01/21/2004 14:39 | Bronx-Sand Creek No 1 115kV line | 115.0 | L | 13.29 | 6 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140260 | |
01/21/2004 18:54 | 01/22/2004 02:08 | Ostrander-Troutdale No 1 500kV line | 500.0 | L | 23.82 | 434 | Auto | Equipment/Miscellaneous | Power System Condition | LGV | 140262 | |
01/22/2004 07:25 | 01/22/2004 07:28 | Horse Heaven-Harvalum No 1 230kV line | 230.0 | L | 57.18 | 3 | Auto | Unknown | Unknown | TRI TDA | 140263 | |
01/22/2004 07:30 | 01/22/2004 14:43 | Olympia-Satsop No 3 230kV line | 230.0 | L | 26.19 | 433 | Plan | Maintenance | OLY | 140264 | ||
01/22/2004 08:20 | 01/22/2004 14:58 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 398 | Plan | Maintenance | EUG | 140265 | |
01/22/2004 08:20 | 01/22/2004 14:58 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 398 | Plan | Maintenance | EUG | 140265 | ||
01/22/2004 11:00 | 01/22/2004 15:06 | Little Goose PH-Little Goose No 1 500kV line | 500.0 | L | 1.67 | 246 | Plan | Maintenance | SPK TRI | 140266 | ||
01/23/2004 08:13 | 01/23/2004 14:33 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 380 | Plan | Maintenance | EUG | 140274 | |
01/23/2004 08:13 | 01/23/2004 14:33 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 380 | Plan | Maintenance | EUG | 140274 | ||
01/23/2004 11:31 | 01/23/2004 12:40 | Dutch Canyon-Warren section of St Johns-St Helens No 1 115kV line | 115.0 | S | 5.37 | 69 | Auto | Tree cut | Tree cut | LGV | 140275 | |
01/23/2004 11:31 | 01/23/2004 11:39 | St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line | 115.0 | S | 12.82 | 8 | Auto | Tree cut | Tree cut | LGV | 140275 | |
01/23/2004 11:31 | 01/23/2004 16:14 | St Johns-St Helens No 1 115kV line | 115.0 | L | G | 23.27 | 283 | Auto | Tree cut | Tree cut | LGV | 140275 |
01/23/2004 11:31 | 01/23/2004 16:14 | Warren-St Helens section of St Johns-St Helens No 1 115kV line | 115.0 | S | 5.08 | 283 | Auto | Tree cut | Tree cut | LGV | 140275 | |
01/23/2004 12:35 | 01/23/2004 12:40 | St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line | 115.0 | S | 12.82 | 5 | Plan | Switching | LGV | 140276 | ||
01/23/2004 12:35 | 01/23/2004 12:40 | St Johns-St Helens No 1 115kV line | 115.0 | L | O | 23.27 | 5 | Plan | Switching | LGV | 140276 | |
01/23/2004 13:45 | 01/23/2004 14:59 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 74 | Auto | Foreign Trouble | RED | 140277 | |
01/23/2004 13:45 | 01/23/2004 14:59 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 74 | Auto | Foreign Trouble | IDF RED | 140277 | |
01/23/2004 13:45 | 01/23/2004 14:59 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 74 | Auto | Foreign Trouble | IDF RED | 140277 | ||
01/24/2004 00:29 | 01/24/2004 22:43 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 1334 | Plan | Foreign Request | OLY | 140278 | ||
01/24/2004 06:00 | 01/24/2004 18:23 | Chief Joseph-Monroe No 1 500kV line | 500.0 | L | 121.60 | 743 | Plan | Maintenance | WEN SNO | 140279 | ||
01/25/2004 09:49 | 01/25/2004 10:05 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 16 | Auto | Unknown | Unknown | EUG | 140284 | |
01/26/2004 07:40 | 01/26/2004 14:37 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | G | 15.84 | 417 | Plan | Maintenance | EUG | 140288 | |
01/26/2004 07:40 | 01/26/2004 14:37 | Lookout Point-Mt. Vernon section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 14.10 | 417 | Plan | Maintenance | EUG | 140288 | ||
01/26/2004 08:08 | 01/26/2004 14:27 | Adair-Albany section of Salem-Albany No 2 115kV line | 115.0 | S | 7.45 | 379 | Plan | Maintenance | SAL EUG | 140289 | ||
01/26/2004 08:08 | 01/26/2004 14:27 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 379 | Plan | Maintenance | SAL EUG | 140289 | |
01/26/2004 08:27 | 01/30/2004 12:20 | Midway-Moxee No 1 115kV line | 115.0 | L | G | 33.98 | 5993 | Plan | Maintenance | TRI WEN | 140290 | |
01/26/2004 08:27 | 01/30/2004 12:20 | Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line | 115.0 | S | 17.37 | 5993 | Plan | Maintenance | WEN | 140290 | ||
01/27/2004 07:40 | 01/27/2004 13:32 | Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.74 | 352 | Plan | Maintenance | EUG | 140296 | ||
01/27/2004 07:40 | 01/27/2004 13:32 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 352 | Plan | Maintenance | EUG | 140296 | |
01/27/2004 08:15 | 03/02/2004 09:28 | Detroit PH-Detroit No 1 230kV line | 230.0 | L | 0.48 | 50473 | Plan | Foreign Request | SAL | 140297 | ||
01/27/2004 08:17 | 01/27/2004 16:04 | Allston-Astoria No 1 115kV line | 115.0 | L | G | 41.98 | 467 | Plan | Maintenance | LGV | 140298 | |
01/27/2004 08:17 | 01/27/2004 16:04 | Fern Hill-Astoria section of Allston-Astoria No 1 115kV line | 115.0 | S | 3.95 | 467 | Plan | Maintenance | LGV | 140298 | ||
01/27/2004 08:25 | 01/27/2004 14:42 | Adair-Albany section of Salem-Albany No 2 115kV line | 115.0 | S | 7.45 | 377 | Plan | Maintenance | SAL EUG | 140299 | ||
01/27/2004 08:25 | 01/27/2004 14:42 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 377 | Plan | Maintenance | SAL EUG | 140299 | |
01/27/2004 10:26 | 01/27/2004 14:10 | Big Cliff-Detroit PH No 1&2 13.8kV line | 13.8 | L | 5.66 | 224 | Plan | Maintenance | SAL | 140300 | ||
01/28/2004 07:19 | 01/28/2004 15:49 | Allston-Astoria No 1 115kV line | 115.0 | L | G | 41.98 | 510 | Plan | Maintenance | LGV | 140302 | |
01/28/2004 07:19 | 01/28/2004 15:49 | Fern Hill-Astoria section of Allston-Astoria No 1 115kV line | 115.0 | S | 3.95 | 510 | Plan | Maintenance | LGV | 140302 | ||
01/28/2004 08:11 | 01/28/2004 08:34 | Lower Granite PH-Lower Granite No 1 500kV line | 500.0 | L | 0.75 | 23 | Plan | Foreign Request | TRI SPK | 140303 | ||
01/28/2004 08:11 | 01/28/2004 13:36 | Custer-Intalco No 1 230kV line | 230.0 | L | 6.70 | 325 | Plan | Maintenance | SNO | 140304 | ||
01/28/2004 08:17 | 01/28/2004 11:53 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 216 | Plan | Maintenance | EUG | 140305 | |
01/28/2004 08:17 | 01/28/2004 11:53 | Lookout Point-Dexter section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 2.37 | 216 | Plan | Maintenance | EUG | 140305 | ||
01/28/2004 09:08 | 01/28/2004 14:57 | Santiam-Alvey No 1&2 230kV line | 230.0 | L | G | 118.50 | 349 | Plan | Maintenance | SAL EUG | 140306 | |
01/28/2004 09:08 | 01/28/2004 14:57 | Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line | 230.0 | S | 46.81 | 349 | Plan | Maintenance | SAL EUG | 140306 | ||
01/28/2004 09:15 | 02/03/2004 12:55 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 8860 | Plan | Foreign Request | LGV | 140307 | |
01/28/2004 09:15 | 02/03/2004 12:55 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 8860 | Plan | Foreign Request | LGV | 140307 | ||
01/28/2004 12:14 | 01/28/2004 13:50 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 96 | Plan | Maintenance | EUG | 140308 | |
01/28/2004 12:14 | 01/28/2004 13:50 | Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.66 | 96 | Plan | Maintenance | EUG | 140308 | ||
01/28/2004 17:07 | 01/28/2004 21:11 | Slatt-PGE Boardman No 1 500kV line | 500.0 | L | 17.83 | 244 | Plan | Foreign Request | TRI | 140309 | ||
01/29/2004 07:22 | 01/29/2004 16:12 | Allston-Astoria No 1 115kV line | 115.0 | L | G | 41.98 | 530 | Plan | Maintenance | LGV | 140313 | |
01/29/2004 07:22 | 01/29/2004 16:12 | Fern Hill-Astoria section of Allston-Astoria No 1 115kV line | 115.0 | S | 3.95 | 530 | Plan | Maintenance | LGV | 140313 | ||
01/29/2004 07:36 | 01/29/2004 13:59 | Dillard-Alvey section of Eugene-Alvey No 2 115kV line | 115.0 | S | 3.31 | 383 | Plan | Maintenance | EUG | 140314 | ||
01/29/2004 07:36 | 01/29/2004 13:59 | Eugene-Alvey No 2 115kV line | 115.0 | L | G | 12.67 | 383 | Plan | Maintenance | EUG | 140314 | |
01/29/2004 08:23 | 01/29/2004 15:00 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 397 | Plan | Maintenance | EUG | 140315 | |
01/29/2004 08:23 | 01/29/2004 15:00 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 397 | Plan | Maintenance | EUG | 140315 | ||
01/29/2004 10:28 | 01/29/2004 10:54 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 26 | Plan | Maintenance | TRI | 140316 | |
01/29/2004 10:28 | 01/29/2004 10:54 | Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 18.21 | 26 | Plan | Maintenance | TRI | 140316 | ||
01/29/2004 11:00 | 01/29/2004 11:27 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 27 | Plan | Maintenance | TRI | 140317 | |
01/29/2004 11:00 | 01/29/2004 11:27 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 53.10 | 27 | Plan | Maintenance | TRI | 140317 | ||
01/29/2004 18:27 | 01/29/2004 22:42 | Snohomish-Bothell No 2 230kV line | 230.0 | L | 7.40 | 255 | Auto | Foreign Trouble | Foreign Trouble | SNO | 140318 | |
01/29/2004 19:57 | 01/29/2004 20:02 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 5 | Auto | Unknown | Unknown | KAL | 140319 | |
01/30/2004 04:10 | 01/30/2004 08:19 | Mission-Pendleton section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 6.67 | 249 | Auto | Wind | Wind | TRI | 140323 | |
01/30/2004 04:10 | 01/30/2004 08:19 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | O | 38.93 | 249 | Auto | Wind | Wind | TRI | 140323 |
01/30/2004 06:25 | 01/31/2004 06:42 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 1457 | Auto | Foreign Trouble | SNO | 140324 | ||
01/30/2004 06:25 | 01/31/2004 06:42 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 1457 | Auto | Foreign Trouble | SNO | 140324 | |
01/30/2004 07:27 | 01/30/2004 13:58 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 391 | Plan | Maintenance | EUG | 140325 | |
01/30/2004 07:27 | 01/30/2004 13:58 | Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.66 | 391 | Plan | Maintenance | EUG | 140325 | ||
01/30/2004 08:08 | 01/30/2004 15:21 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 433 | Plan | Maintenance | EUG | 140326 | |
01/30/2004 08:08 | 01/30/2004 15:21 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 433 | Plan | Maintenance | EUG | 140326 | ||
01/30/2004 13:54 | 01/30/2004 17:24 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 210 | Plan | Emergency | EUG | 140327 | |
01/30/2004 13:54 | 01/30/2004 17:24 | Walton-Mapleton section of Lane-Wendson No 1 115kV line | 115.0 | S | 14.62 | 210 | Plan | Emergency | EUG | 140327 | ||
01/30/2004 15:11 | 01/30/2004 15:11 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 0 | Auto | Unknown | Unknown | SAL | 140328 | |
01/31/2004 07:07 | 02/02/2004 14:11 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 3304 | Auto | Foreign Trouble | Foreign Trouble | OLY | 140330 | |
01/31/2004 14:56 | 01/31/2004 14:56 | Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line | 115.0 | T | G | 14.58 | 0 | Auto | Unknown | Improper Relaying | OLY | 140331 |
01/31/2004 14:56 | 01/31/2004 14:56 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | G | 9.22 | 0 | Auto | Unknown | Improper Relaying | OLY | 140331 |
01/31/2004 14:56 | 01/31/2004 14:56 | Satsop Park-Aberdeen tap section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | G | 6.10 | 0 | Auto | Unknown | Improper Relaying | OLY | 140331 |
01/31/2004 14:56 | 01/31/2004 14:56 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | 15.32 | 0 | Auto | Unknown | Improper Relaying | OLY | 140331 | |
01/31/2004 14:56 | 01/31/2004 15:11 | South Elma-Satsop Park No 1 115kV line | 115.0 | L | 4.60 | 15 | Auto | Unknown | Unknown | OLY | 140332 | |
01/31/2004 20:55 | 02/01/2004 19:49 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 1374 | Auto | Foreign Trouble | OLY | 140333 | ||
01/31/2004 20:55 | 02/01/2004 19:49 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 1374 | Auto | Foreign Trouble | OLY | 140333 | |
02/02/2004 07:07 | 04/09/2004 16:28 | Hanford-John Day No 1 500kV line | 500.0 | L | 97.27 | 96981 | Plan | Construction | TRI WEN TDA | 140338 | ||
02/02/2004 08:34 | 02/03/2004 09:15 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 1481 | Plan | Maintenance | EUG | 140339 | ||
02/02/2004 16:14 | 02/13/2004 18:11 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 15957 | Auto | Earth slide | Earth slide | EUG | 140340 | |
02/02/2004 16:14 | 02/07/2004 19:13 | Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line | 115.0 | S | 13.98 | 7379 | Auto | Earth slide | Earth slide | EUG | 140341 | |
02/02/2004 16:14 | 02/02/2004 18:26 | Wendson-Berrydale section of Wendson-Tahkenitch No 1 115kV line | 115.0 | S | 6.36 | 132 | Auto | Earth slide | Earth slide | EUG | 140341 | |
02/02/2004 16:14 | 02/07/2004 19:13 | Wendson-Tahkenitch No 1 115kV line | 115.0 | L | G | 20.34 | 7379 | Auto | Earth slide | Earth slide | EUG | 140341 |
02/03/2004 07:15 | 02/06/2004 17:50 | Malin-Round Mountain No 1 500kV line | 500.0 | L | 94.50 | 4955 | Plan | Foreign Request | RED | 140343 | ||
02/03/2004 08:38 | 02/03/2004 14:16 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 338 | Plan | Maintenance | OLY | 140344 | |
02/03/2004 08:38 | 02/03/2004 14:16 | Skookum-Shelton section of Olympia-Shelton No 2 115kV line | 115.0 | S | 6.96 | 338 | Plan | Maintenance | OLY | 140344 | ||
02/03/2004 13:54 | 02/03/2004 14:03 | John Day-Big Eddy No 2 500kV line | 500.0 | L | 18.96 | 9 | Auto | Improper Relaying | Imp Install/Design/Applica | TDA | 140345 | |
02/03/2004 14:09 | 02/03/2004 14:13 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 4 | Auto | Forced (Configuration) | Forced (Configuration) | TRI TDA RED SAL | 140346 | |
02/03/2004 14:45 | 02/25/2004 18:01 | Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 13.40 | 31876 | Plan | Normally Out | TRI | 140347 | ||
02/03/2004 14:45 | 02/25/2004 18:01 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | G | 38.93 | 31876 | Plan | Normally Out | TRI | 140347 | |
02/03/2004 23:02 | 02/03/2004 23:23 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | G | 29.98 | 21 | Plan | Testing | COV SNO | 140348 | |
02/03/2004 23:02 | 02/03/2004 23:23 | Sno-King-Monroe section of Echo Lake-Monroe No 1 500kV line | 500.0 | S | 8.80 | 21 | Plan | Testing | SNO | 140348 | ||
02/03/2004 23:44 | 02/04/2004 01:00 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | G | 29.98 | 76 | Plan | Testing | COV SNO | 140349 | |
02/03/2004 23:44 | 02/04/2004 01:00 | Echo Lake-Sno-King section of Echo Lake-Monroe No 1 500kV line | 500.0 | S | 21.18 | 76 | Plan | Testing | COV SNO | 140349 | ||
02/03/2004 23:59 | 02/04/2004 00:40 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | O | 29.98 | 41 | Plan | Testing | COV SNO | 140350 | |
02/03/2004 23:59 | 02/04/2004 00:40 | Sno-King tap to Echo Lake-Monroe No 1 500kV line | 500.0 | T | 12.82 | 41 | Plan | Testing | SNO | 140350 | ||
02/03/2004 23:59 | 02/04/2004 00:40 | Sno-King-Monroe section of Echo Lake-Monroe No 1 500kV line | 500.0 | S | 8.80 | 41 | Plan | Testing | SNO | 140350 | ||
02/04/2004 01:04 | 02/04/2004 01:22 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | T | 29.98 | 18 | Plan | Testing | COV SNO | 140351 | |
02/04/2004 01:04 | 02/04/2004 01:22 | Sno-King tap to Echo Lake-Monroe No 1 500kV line | 500.0 | T | 12.82 | 18 | Plan | Testing | SNO | 140351 | ||
02/04/2004 03:07 | 02/04/2004 03:28 | Chief Joseph-Monroe No 1 500kV line | 500.0 | L | 121.60 | 21 | Plan | Testing | WEN SNO | 140352 | ||
02/04/2004 07:30 | 02/04/2004 14:50 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 440 | Plan | Maintenance | OLY | 140355 | |
02/04/2004 07:30 | 02/04/2004 14:50 | Skookum-Shelton section of Olympia-Shelton No 2 115kV line | 115.0 | S | 6.96 | 440 | Plan | Maintenance | OLY | 140355 | ||
02/04/2004 08:20 | 02/04/2004 13:20 | Filbert-Carlton section of Forest Grove-McMinnville No 1 115kV line | 115.0 | S | 17.74 | 300 | Plan | Maintenance | SAL | 140356 | ||
02/04/2004 08:20 | 02/04/2004 13:20 | Forest Grove-McMinnville No 1 115kV line | 115.0 | L | G | 23.72 | 300 | Plan | Maintenance | SAL | 140356 | |
02/05/2004 07:26 | 02/05/2004 15:16 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 470 | Plan | Maintenance | OLY | 140361 | |
02/05/2004 07:26 | 02/05/2004 15:16 | Skookum-Shelton section of Olympia-Shelton No 2 115kV line | 115.0 | S | 6.96 | 470 | Plan | Maintenance | OLY | 140361 | ||
02/05/2004 07:39 | 02/05/2004 14:52 | Redmond-Pilot Butte PACW No 1 230kV line | 230.0 | L | 15.12 | 433 | Plan | Maintenance | RED | 140362 | ||
02/05/2004 07:48 | 02/05/2004 15:20 | Allston-Astoria No 1 115kV line | 115.0 | L | T | 41.98 | 452 | Plan | Maintenance | LGV | 140363 | |
02/05/2004 07:48 | 02/05/2004 15:20 | Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | 18.27 | 452 | Plan | Maintenance | LGV OLY | 140363 | ||
02/05/2004 08:22 | 02/05/2004 08:28 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 6 | Auto | Unknown | Ice | IDF | 140364 | |
02/05/2004 08:30 | 02/05/2004 11:45 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 195 | Plan | Construction | EUG | 140365 | |
02/05/2004 08:30 | 02/05/2004 11:45 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 195 | Plan | Construction | EUG | 140365 | ||
02/05/2004 08:40 | 02/05/2004 11:44 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 184 | Plan | Construction | EUG | 140366 | ||
02/05/2004 08:41 | 02/05/2004 11:43 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 182 | Plan | Construction | EUG | 140367 | |
02/05/2004 08:41 | 02/05/2004 11:43 | Lookout Point-Dexter section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 2.37 | 182 | Plan | Construction | EUG | 140367 | ||
02/05/2004 08:42 | 02/05/2004 11:32 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | G | 15.84 | 170 | Plan | Construction | EUG | 140368 | |
02/05/2004 08:42 | 02/05/2004 11:32 | Lookout Point-Mt. Vernon section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 14.10 | 170 | Plan | Construction | EUG | 140368 | ||
02/05/2004 08:43 | 02/05/2004 08:43 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.48 | 0 | Auto | Unknown | Ice | IDF | 140369 |
02/05/2004 08:43 | 02/05/2004 08:43 | Swan Valley-Teton No 1 115kV line | 115.0 | L | 35.47 | 0 | Auto | Unknown | Ice | IDF | 140369 | |
02/05/2004 08:43 | 02/05/2004 08:43 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | G | 10.94 | 0 | Auto | Unknown | Ice | IDF | 140369 |
02/05/2004 08:43 | 02/05/2004 08:43 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.99 | 0 | Auto | Unknown | Ice | IDF | 140369 |
02/05/2004 09:00 | 02/05/2004 13:55 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | G | 57.70 | 295 | Plan | Foreign Request | SAL | 140370 | |
02/05/2004 09:00 | 02/05/2004 13:55 | Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 2.70 | 295 | Plan | Foreign Request | SAL | 140370 | ||
02/05/2004 13:51 | 02/05/2004 15:31 | Grizzly-PGE Round Butte No 1 500kV line | 500.0 | L | 15.60 | 100 | Plan | Foreign Request | RED | 140371 | ||
02/06/2004 07:03 | 02/06/2004 14:17 | Dayton-Shelton section of Olympia-Shelton No 1 115kV line | 115.0 | S | 1.78 | 434 | Plan | Maintenance | OLY | 140374 | ||
02/06/2004 07:03 | 02/06/2004 14:17 | Olympia-Shelton No 1 115kV line | 115.0 | L | G | 19.73 | 434 | Plan | Maintenance | OLY | 140374 | |
02/06/2004 07:44 | 02/06/2004 11:17 | Allston-Astoria No 1 115kV line | 115.0 | L | T | 41.98 | 213 | Plan | Maintenance | LGV | 140375 | |
02/06/2004 07:44 | 02/06/2004 11:17 | Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | 18.27 | 213 | Plan | Maintenance | LGV OLY | 140375 | ||
02/06/2004 08:41 | 02/06/2004 14:12 | Hawkins-Alvey No 1 115kV line | 115.0 | L | G | 7.78 | 331 | Plan | Foreign Request | EUG | 140376 | |
02/06/2004 08:41 | 02/06/2004 14:12 | Hawkins-Hideaway section of Hawkins-Alvey No 1 115kV line | 115.0 | S | 5.32 | 331 | Plan | Foreign Request | EUG | 140376 | ||
02/07/2004 01:11 | 02/07/2004 06:11 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 300 | Plan | Voltage Control | RED | 140377 | ||
02/07/2004 20:16 | 02/07/2004 20:16 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 0 | Auto | Foreign Trouble | Foreign Utility | SPK | 140378 | |
02/09/2004 00:06 | 02/09/2004 09:44 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 578 | Auto | Foreign Trouble | Foreign Utility | SPK | 140379 | |
02/09/2004 07:53 | 02/09/2004 12:47 | Fairview-Bandon No 1 115kV line | 115.0 | L | G | 25.16 | 294 | Plan | Maintenance | EUG | 140382 | |
02/09/2004 07:53 | 02/09/2004 12:47 | Norway-Morrison section of Fairview-Bandon No 1 115kV line | 115.0 | S | 10.26 | 294 | Plan | Maintenance | EUG | 140382 | ||
02/09/2004 07:59 | 02/13/2004 13:45 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 4.29 | 6106 | Plan | Maintenance | TRI | 140383 | ||
02/09/2004 07:59 | 02/13/2004 13:45 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 6106 | Plan | Maintenance | TRI | 140383 | |
02/09/2004 08:03 | 02/09/2004 13:50 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 347 | Plan | Maintenance | LGV | 140384 | |
02/09/2004 08:03 | 02/09/2004 13:50 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 347 | Plan | Maintenance | LGV | 140384 | ||
02/09/2004 22:21 | 02/09/2004 22:21 | Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | G | 18.26 | 0 | Auto | Unknown | Unknown | RED | 140385 |
02/09/2004 22:21 | 02/09/2004 22:21 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | 103.37 | 0 | Auto | Unknown | Unknown | RED | 140385 | |
02/09/2004 22:21 | 02/09/2004 22:21 | Ponderosa tap to Grizzly-Summer Lake No 1 500kV line | 500.0 | T | G | 0.01 | 0 | Auto | Unknown | Unknown | RED | 140385 |
02/09/2004 22:21 | 02/09/2004 22:21 | Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | G | 85.11 | 0 | Auto | Unknown | Unknown | RED | 140385 |
02/10/2004 07:29 | 02/10/2004 14:14 | McNary-Franklin No 2 230kV line | 230.0 | L | 26.88 | 405 | Plan | Maintenance | TRI | 140388 | ||
02/10/2004 07:47 | 02/10/2004 15:01 | Monmouth-Adair section of Salem-Albany No 2 115kV line | 115.0 | S | 11.30 | 434 | Plan | Maintenance | SAL | 140389 | ||
02/10/2004 07:47 | 02/10/2004 15:01 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 434 | Plan | Maintenance | SAL EUG | 140389 | |
02/10/2004 11:04 | 02/10/2004 11:38 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 34 | Plan | Maintenance | IDF | 140390 | ||
02/11/2004 04:07 | 02/11/2004 04:25 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 18 | Auto | Foreign Trouble | Foreign Trouble | TDA | 140391 | |
02/11/2004 04:07 | 02/11/2004 04:50 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 43 | Auto | Foreign Trouble | TDA RED | 140392 | ||
02/11/2004 04:07 | 02/11/2004 04:25 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 18 | Auto | Foreign Trouble | TDA | 140392 | |||
02/11/2004 07:10 | 02/11/2004 07:10 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 0 | Auto | Unknown | Unknown | TDA RED SAL | 140396 | |
02/11/2004 08:25 | 02/11/2004 13:42 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 317 | Plan | Maintenance | OLY | 140397 | ||
02/11/2004 08:37 | 02/11/2004 15:04 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 387 | Plan | Maintenance | SAL | 140398 | ||
02/11/2004 15:56 | 02/11/2004 16:34 | Columbia Generating Station-Ashe No 2 230kV line | 230.0 | L | 0.49 | 38 | Plan | Foreign Request | TRI | 140399 | ||
02/12/2004 05:51 | 02/12/2004 11:19 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 328 | Auto | Foreign Trouble | Foreign Utility | TDA | 140403 | |
02/12/2004 08:13 | 02/12/2004 16:40 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 507 | Plan | Maintenance | SAL | 140404 | ||
02/12/2004 15:29 | 02/12/2004 15:29 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 0 | Auto | Unknown | Unknown | IDF | 140405 | |
02/13/2004 07:58 | 02/13/2004 15:55 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 477 | Plan | Maintenance | SAL | 140410 | ||
02/13/2004 08:43 | 02/13/2004 09:40 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 57 | Auto | Unknown | Unknown | IDF | 140411 | |
02/13/2004 13:06 | 02/13/2004 13:06 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 0 | Plan | Testing | IDF | 140412 | ||
02/13/2004 13:23 | 02/13/2004 13:23 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 0 | Plan | Testing | IDF | 140413 | ||
02/13/2004 18:11 | 02/19/2004 16:43 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 8552 | Plan | Maintenance | EUG | 140414 | ||
02/14/2004 05:00 | 02/14/2004 05:13 | Salem-PACW Dallas No 1 115kV line | 115.0 | L | 13.20 | 13 | Plan | Foreign Request | SAL | 140416 | ||
02/15/2004 01:22 | 02/15/2004 07:36 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 374 | Plan | Voltage Control | TRI TDA RED SAL | 140417 | ||
02/15/2004 07:56 | 02/15/2004 07:56 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 31.20 | 0 | Auto | Unknown | Unknown | RED | 140422 |
02/15/2004 07:56 | 02/15/2004 07:56 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Unknown | RED | 140422 |
02/15/2004 07:56 | 02/15/2004 07:56 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 140422 |
02/15/2004 07:56 | 02/15/2004 07:56 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Unknown | RED | 140422 |
02/15/2004 07:56 | 02/15/2004 07:56 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Unknown | RED | 140422 |
02/15/2004 07:56 | 02/15/2004 07:56 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Unknown | RED | 140422 | |
02/15/2004 07:56 | 02/15/2004 07:56 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 140422 |
02/15/2004 07:56 | 02/15/2004 07:56 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Unknown | RED | 140422 |
02/17/2004 07:28 | 02/17/2004 15:25 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 477 | Plan | Maintenance | SAL | 140426 | ||
02/17/2004 07:36 | 02/17/2004 13:29 | Olympia-PSE No 2 115kV line | 115.0 | L | 2.40 | 353 | Plan | Foreign Request | OLY | 140427 | ||
02/17/2004 08:05 | 02/17/2004 13:21 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 316 | Plan | Maintenance | EUG | 140428 | ||
02/18/2004 07:17 | 02/18/2004 13:01 | Raymond-Cosmopolis No 1 115kV line | 115.0 | L | 18.36 | 344 | Plan | Maintenance | OLY | 140434 | ||
02/18/2004 07:26 | 02/18/2004 15:48 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 502 | Plan | Maintenance | SAL | 140435 | ||
02/18/2004 10:08 | 02/18/2004 10:44 | The Dalles PH-Big Eddy No 4 230kV line | 230.0 | L | 0.91 | 36 | Auto | Foreign Trouble | Foreign Utility | TDA | 140436 | |
02/19/2004 00:52 | 02/19/2004 01:20 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 28 | Plan | Foreign Request | OLY | 140437 | ||
02/19/2004 00:52 | 02/19/2004 01:20 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 28 | Plan | Foreign Request | OLY | 140437 | |
02/19/2004 08:03 | 02/19/2004 12:20 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | G | 29.67 | 257 | Plan | Maintenance | SPK | 140442 | |
02/19/2004 08:03 | 02/19/2004 12:20 | Priest River AVA-Priest River section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | 1.93 | 257 | Plan | Maintenance | SPK | 140442 | ||
02/19/2004 08:05 | 02/19/2004 09:10 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 9.22 | 65 | Plan | Maintenance | OLY | 140443 | ||
02/19/2004 08:05 | 02/19/2004 09:10 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | G | 15.32 | 65 | Plan | Maintenance | OLY | 140443 | |
02/19/2004 08:16 | 02/19/2004 16:01 | Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 12.44 | 465 | Plan | Maintenance | SAL | 140444 | ||
02/19/2004 08:16 | 02/19/2004 16:01 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 465 | Plan | Maintenance | SAL | 140444 | |
02/19/2004 10:18 | 02/19/2004 10:20 | Olympia-PSE No 1 115kV line | 115.0 | L | 2.40 | 2 | Plan | Foreign Request | OLY | 140445 | ||
02/19/2004 13:56 | 02/19/2004 14:32 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 36 | Plan | Foreign Request | OLY | 140446 | ||
02/19/2004 13:56 | 02/19/2004 14:32 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 36 | Plan | Foreign Request | OLY | 140446 | |
02/20/2004 04:53 | 02/20/2004 09:23 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 270 | Auto | Equipment/Miscellaneous | Terminal Equipment Failure | WEN COV | 140449 | |
02/20/2004 07:30 | 02/20/2004 15:53 | Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 12.44 | 503 | Plan | Maintenance | SAL | 140450 | ||
02/20/2004 07:30 | 02/20/2004 15:53 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 503 | Plan | Maintenance | SAL | 140450 | |
02/20/2004 08:03 | 02/20/2004 14:25 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | G | 29.67 | 382 | Plan | Maintenance | SPK | 140451 | |
02/20/2004 08:03 | 02/20/2004 14:25 | Priest River-Laclede section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | 6.28 | 382 | Plan | Maintenance | SPK | 140451 | ||
02/20/2004 11:05 | 02/20/2004 12:52 | Lower Monumental PH-Lower Monumental No 1 500kV line | 500.0 | L | 0.97 | 107 | Plan | Maintenance | TRI | 140452 | ||
02/21/2004 01:04 | 02/21/2004 01:07 | Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | 18.26 | 3 | Auto | Unknown | Unknown | RED | 140453 | |
02/21/2004 01:04 | 02/21/2004 01:07 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | G | 103.37 | 3 | Auto | Unknown | Unknown | RED | 140453 |
02/21/2004 01:04 | 02/21/2004 01:09 | Ponderosa tap to Grizzly-Summer Lake No 1 500kV line | 500.0 | T | 0.01 | 5 | Auto | Unknown | Unknown | RED | 140453 | |
02/21/2004 01:04 | 02/21/2004 01:07 | Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | 85.11 | 3 | Auto | Unknown | Unknown | RED | 140453 | |
02/21/2004 05:00 | 02/22/2004 16:48 | McNary-Ross No 1 345kV line | 345.0 | L | 174.57 | 2148 | Plan | Maintenance | TRI TDA LGV | 140454 | ||
02/21/2004 05:02 | 02/22/2004 16:46 | McNary-Franklin No 2 230kV line | 230.0 | L | 26.88 | 2144 | Plan | Maintenance | TRI | 140455 | ||
02/21/2004 05:05 | 02/22/2004 16:50 | McNary PH-McNary No 5 230kV line | 230.0 | L | 1.28 | 2145 | Plan | Maintenance | TRI | 140456 | ||
02/21/2004 07:39 | 02/21/2004 09:48 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 129 | Auto | Unknown | Unknown | IDF | 140457 | |
02/21/2004 08:10 | 02/21/2004 14:28 | Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 378 | Plan | Foreign Request | SAL | 140458 | ||
02/21/2004 08:10 | 02/21/2004 14:28 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | G | 57.70 | 378 | Plan | Foreign Request | SAL | 140458 | |
02/21/2004 09:00 | 02/21/2004 10:27 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 87 | Plan | Maintenance | TDA RED | 140459 | |
02/21/2004 09:00 | 02/21/2004 10:27 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 87 | Plan | Maintenance | TDA | 140459 | |||
02/22/2004 06:24 | 02/22/2004 06:26 | Vantage-Schultz No 1 500kV line | 500.0 | L | 34.65 | 2 | Auto | Unknown | Unknown | WEN | 140460 | |
02/23/2004 01:08 | 02/23/2004 01:08 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 140461 | ||
02/23/2004 01:08 | 02/23/2004 01:08 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 140461 | ||
02/23/2004 05:35 | 02/23/2004 07:31 | Chief Joseph PH-Chief Joseph No 4 230kV line | 230.0 | L | 0.90 | 116 | Plan | Foreign Request | WEN | 140466 | ||
02/23/2004 08:53 | 02/23/2004 16:00 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 427 | Plan | Maintenance | LGV OLY | 140467 | ||
02/23/2004 16:44 | 02/23/2004 17:16 | Lost River-Spar Canyon No 1 230kV line | 230.0 | L | 53.19 | 32 | Auto | Foreign Trouble | Foreign Trouble | IDF | 140468 | |
02/23/2004 16:44 | 02/23/2004 17:16 | Spar Canyon-Round Valley No 1 230kV line | 230.0 | L | 11.92 | 32 | Auto | Foreign Trouble | Foreign Trouble | IDF | 140469 | |
02/23/2004 16:44 | 02/23/2004 17:16 | Antelope-Lost River 230kV line | 230.0 | L | 30.81 | 32 | Auto | Foreign Trouble | Foreign Trouble | IDF | 140470 | |
02/24/2004 01:09 | 02/24/2004 03:18 | Little Goose-Lower Granite No 1 500kV line | 500.0 | L | 32.80 | 129 | Auto | Unknown | Unknown | SPK TRI | 140471 | |
02/24/2004 07:26 | 02/24/2004 16:18 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 532 | Plan | Maintenance | LGV OLY | 140473 | ||
02/24/2004 07:36 | 02/24/2004 19:23 | Midway-Vantage No 1 230kV line | 230.0 | L | 19.76 | 707 | Plan | Maintenance | TRI WEN | 140474 | ||
02/24/2004 07:36 | 02/24/2004 19:21 | Vantage-Columbia No 1 230kV line | 230.0 | L | 31.55 | 705 | Plan | Maintenance | WEN | 140475 | ||
02/24/2004 07:52 | 02/24/2004 14:03 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 371 | Plan | Maintenance | SAL | 140476 | ||
02/24/2004 07:59 | 02/26/2004 09:10 | Burbank-Joso section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 9.79 | 2951 | Plan | Maintenance | TRI | 140477 | ||
02/24/2004 07:59 | 02/26/2004 09:10 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 2951 | Plan | Maintenance | TRI | 140477 | |
02/24/2004 14:08 | 02/24/2004 14:08 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 140478 | |
02/24/2004 14:08 | 02/24/2004 14:08 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 140478 | |
02/24/2004 14:08 | 02/24/2004 14:08 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 140478 | ||
02/24/2004 15:14 | 02/24/2004 15:19 | Longview-Allston No 2 230kV line | 230.0 | L | 4.87 | 5 | Auto | Imp Install/Design/Applica | Imp Install/Design/Applica | LGV | 140479 | |
02/24/2004 21:27 | 02/24/2004 21:27 | Slatt-Buckley No 1 500kV line | 500.0 | L | 52.32 | 0 | Auto | Unknown | Unknown | TRI TDA | 140480 | |
02/25/2004 06:46 | 02/25/2004 06:46 | Blue River tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 0.32 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140493 | |
02/25/2004 06:46 | 02/25/2004 06:46 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140493 | |
02/25/2004 06:46 | 02/25/2004 15:10 | Carmen Smith tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 18.00 | 504 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140493 | |
02/25/2004 06:46 | 02/25/2004 08:25 | Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line | 115.0 | S | 3.63 | 99 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140493 | |
02/25/2004 06:46 | 02/25/2004 08:25 | Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line | 115.0 | S | 2.12 | 99 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140493 | |
02/25/2004 06:46 | 02/25/2004 08:25 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 99 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140493 |
02/25/2004 07:22 | 02/25/2004 15:53 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 511 | Plan | Maintenance | LGV OLY | 140494 | ||
02/25/2004 11:09 | 02/25/2004 11:09 | Snoqualmie-Lake Tradition No 1 115kV line | 115.0 | L | T | 8.54 | 0 | Auto | Foreign Trouble | Foreign Trouble | COV | 140495 |
02/25/2004 11:09 | 02/25/2004 11:09 | Tanner tap to Snoqualmie-Lake Tradition No 1 115kV line | 115.0 | T | 4.50 | 0 | Auto | Foreign Trouble | Foreign Trouble | COV | 140495 | |
02/25/2004 14:57 | 02/27/2004 13:27 | Lagoon-Stateline section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 3.63 | 2790 | Auto | Machinery, Farming | Human Element | TRI | 140496 | |
02/25/2004 14:57 | 02/25/2004 16:41 | Milton tap-Weston Mountain section of Milton tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | TS | 4.99 | 104 | Auto | Machinery, Farming | Human Element | TRI | 140496 | |
02/25/2004 14:57 | 02/27/2004 13:50 | Milton-Lagoon section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 1.06 | 2813 | Auto | Machinery, Farming | Human Element | TRI | 140496 | |
02/25/2004 14:57 | 02/25/2004 18:01 | Stateline tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | T | 1.31 | 184 | Auto | Machinery, Farming | Human Element | TRI | 140496 | |
02/25/2004 14:57 | 02/25/2004 18:01 | Stateline-Vansycle section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 4.62 | 184 | Auto | Machinery, Farming | Human Element | TRI | 140496 | |
02/25/2004 14:57 | 02/25/2004 16:41 | Walla Walla-Milton section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 9.55 | 104 | Auto | Machinery, Farming | Human Element | TRI | 140496 | |
02/25/2004 14:57 | 02/27/2004 13:50 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | O | 38.93 | 2813 | Auto | Machinery, Farming | Human Element | TRI | 140496 |
02/25/2004 17:52 | 02/25/2004 19:39 | B-1345-B-1605 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 0.34 | 107 | Auto | Foreign Object | Wind | TRI | 140497 | |
02/25/2004 17:52 | 02/25/2004 19:39 | B-1605-B-1014 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 2.14 | 107 | Auto | Foreign Object | Wind | TRI | 140497 | |
02/25/2004 17:52 | 02/25/2004 19:39 | H2F-Nine Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 12.58 | 107 | Auto | Foreign Object | Wind | TRI | 140497 | |
02/25/2004 17:52 | 02/25/2004 21:24 | McNary-B-1345 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 2.53 | 212 | Auto | Foreign Object | Wind | TRI | 140497 | |
02/25/2004 17:52 | 02/25/2004 21:24 | McNary-Badger Canyon No 1 115kV line | 115.0 | L | G | 28.40 | 212 | Auto | Foreign Object | Wind | TRI | 140497 |
02/25/2004 17:52 | 02/25/2004 19:39 | Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 10.81 | 107 | Auto | Foreign Object | Wind | TRI | 140497 | |
02/26/2004 00:02 | 02/27/2004 05:33 | Cosmopolis-Aberdeen No 1 115kV line | 115.0 | L | 6.79 | 1771 | Auto | Dispatcher | Dispatcher | OLY | 140525 | |
02/26/2004 06:15 | 02/26/2004 06:15 | Vantage-Schultz No 1 500kV line | 500.0 | L | 34.65 | 0 | Auto | Unknown | Unknown | WEN | 140509 | |
02/26/2004 07:18 | 02/26/2004 15:32 | Naselle-Hagen section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 13.00 | 494 | Plan | Maintenance | LGV OLY | 140510 | ||
02/26/2004 07:18 | 02/26/2004 15:32 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 494 | Plan | Maintenance | LGV OLY | 140510 | |
02/26/2004 08:15 | 02/26/2004 12:55 | Ross-St Johns No 1 230kV line | 230.0 | L | 7.26 | 280 | Plan | Maintenance | LGV | 140511 | ||
02/26/2004 08:46 | 02/26/2004 14:04 | Benton-Franklin No 2 115kV line | 115.0 | L | T | 21.03 | 318 | Plan | Maintenance | TRI | 140512 | |
02/26/2004 08:46 | 02/26/2004 14:04 | Glade tap to Benton-Franklin No 2 115kV line | 115.0 | T | 0.03 | 318 | Plan | Maintenance | TRI | 140512 | ||
02/26/2004 08:54 | 02/26/2004 12:34 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 220 | Plan | Maintenance | IDF | 140513 | ||
02/26/2004 09:55 | 10/20/2004 10:12 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 31.20 | 341237 | Plan | Normally Out | RED | 140514 | ||
02/26/2004 09:55 | 10/20/2004 10:12 | Redmond-Harney No 1 115kV line | 115.0 | L | T | 125.40 | 341237 | Plan | Normally Out | RED | 140514 | |
02/26/2004 12:59 | 02/26/2004 13:02 | Captain Jack-Olinda No 1 500kV line | 500.0 | L | 148.86 | 3 | Auto | Foreign Trouble | Foreign Trouble | RED | 140515 | |
02/26/2004 13:12 | 02/27/2004 07:02 | Captain Jack-Olinda No 1 500kV line | 500.0 | L | 148.86 | 1070 | Auto | Foreign Trouble | Foreign Trouble | RED | 140516 | |
02/26/2004 18:26 | 02/27/2004 14:06 | Grand Coulee-Schultz No 2 500kV line | 500.0 | L | 97.02 | 1180 | Plan | Emergency | WEN | 140517 | ||
02/27/2004 01:28 | 02/27/2004 01:31 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 3 | Plan | Voltage Control | RED | 140518 | ||
02/27/2004 07:03 | 02/27/2004 10:04 | Tacoma-TPWR Cowlitz No 2 230kV line | 230.0 | L | 6.00 | 181 | Auto | Foreign Trouble | Foreign Utility | COV | 140526 | |
02/27/2004 07:22 | 02/27/2004 07:22 | Bellingham PSE-Whatcom No 1 115kV line | 115.0 | L | 20.60 | 0 | Auto | Foreign Trouble | Foreign Trouble | SNO | 140527 | |
02/27/2004 07:48 | 02/27/2004 15:33 | Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line | 115.0 | S | G | 4.30 | 465 | Plan | Maintenance | LGV OLY | 140528 | |
02/27/2004 07:48 | 02/27/2004 15:33 | Naselle-Hagen section of Naselle-Tarlett No 2 115kV line | 115.0 | S | G | 13.00 | 465 | Plan | Maintenance | LGV OLY | 140528 | |
02/27/2004 07:48 | 02/27/2004 15:33 | Naselle-Tarlett No 2 115kV line | 115.0 | L | 17.30 | 465 | Plan | Maintenance | LGV OLY | 140528 | ||
02/27/2004 08:34 | 02/27/2004 15:32 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | G | 15.84 | 418 | Plan | Maintenance | EUG | 140529 | |
02/27/2004 08:34 | 02/27/2004 15:32 | Lookout Point-Mt. Vernon section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 14.10 | 418 | Plan | Maintenance | EUG | 140529 | ||
02/27/2004 08:44 | 02/27/2004 08:46 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | O | 15.84 | 2 | Plan | Switching | EUG | 140530 | |
02/27/2004 08:44 | 02/27/2004 08:46 | Mt. Vernon tap to Lookout Point-Alvey No 2 115kV line | 115.0 | T | 4.90 | 2 | Plan | Switching | EUG | 140530 | ||
02/27/2004 08:44 | 02/27/2004 08:46 | Mt. Vernon-Alvey section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 1.74 | 2 | Plan | Switching | EUG | 140530 | ||
02/27/2004 09:04 | 02/27/2004 15:21 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | O | 15.84 | 377 | Plan | Maintenance | EUG | 140531 | |
02/27/2004 09:04 | 02/27/2004 15:21 | Mt. Vernon tap to Lookout Point-Alvey No 2 115kV line | 115.0 | T | 4.90 | 377 | Plan | Maintenance | EUG | 140531 | ||
02/27/2004 09:04 | 02/27/2004 15:21 | Mt. Vernon-Alvey section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 1.74 | 377 | Plan | Maintenance | EUG | 140531 | ||
02/27/2004 10:03 | 03/01/2004 10:05 | McNary-Boardman No 1 230kV line | 230.0 | L | 18.18 | 4322 | Plan | Switching | TRI | 140532 | ||
02/27/2004 10:35 | 02/27/2004 10:56 | Captain Jack-Olinda No 1 500kV line | 500.0 | L | 148.86 | 21 | Auto | Foreign Trouble | Foreign Trouble | RED | 140533 | |
02/27/2004 11:36 | 02/27/2004 11:36 | Captain Jack-Olinda No 1 500kV line | 500.0 | L | 148.86 | 0 | Auto | Foreign Trouble | Foreign Trouble | RED | 140534 | |
02/27/2004 14:35 | 04/28/2004 00:14 | Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 13.40 | 86919 | Plan | Normally Out | TRI | 140535 | ||
02/27/2004 14:35 | 04/28/2004 00:14 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | G | 38.93 | 86919 | Plan | Normally Out | TRI | 140535 | |
02/28/2004 01:28 | 02/28/2004 06:39 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 311 | Plan | Voltage Control | RED | 140536 | ||
02/28/2004 06:34 | 03/03/2004 15:50 | McNary PH-McNary No 1 230kV line | 230.0 | L | 1.05 | 6316 | Plan | Construction | TRI | 140537 | ||
02/28/2004 06:34 | 02/29/2004 17:22 | McNary PH-McNary No 2 230kV line | 230.0 | L | 1.06 | 2088 | Plan | Maintenance | TRI | 140538 | ||
02/28/2004 06:35 | 02/29/2004 17:22 | McNary-Horse Heaven No 1 230kV line | 230.0 | L | 16.84 | 2087 | Plan | Maintenance | TRI | 140539 | ||
02/28/2004 06:35 | 02/29/2004 17:21 | McNary-Westland No 1 230kV line | 230.0 | L | 12.80 | 2086 | Plan | Maintenance | TRI | 140540 | ||
02/28/2004 15:07 | 02/29/2004 17:50 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 1603 | Plan | Voltage Control | RED | 140541 | ||
02/28/2004 18:06 | 02/28/2004 20:53 | Captain Jack-Malin No 1 500kV line | 500.0 | L | 7.35 | 167 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | RED | 140542 | |
02/28/2004 18:21 | 02/28/2004 18:21 | Benton-Othello No 1 115kV line | 115.0 | L | 37.00 | 0 | Auto | Unknown | Unknown | TRI SPK | 140543 | |
02/28/2004 18:21 | 02/28/2004 18:21 | Benton-South Othello section of Benton-Othello No 1 115kV line | 115.0 | S | G | 34.20 | 0 | Auto | Unknown | Unknown | TRI | 140543 |
02/28/2004 18:21 | 02/28/2004 18:21 | South Othello-Othello AVA section of Benton-Othello No 1 115kV line | 115.0 | S | G | 2.80 | 0 | Auto | Unknown | Unknown | TRI | 140543 |
02/29/2004 01:11 | 02/29/2004 01:11 | Lower Monumental-McNary No 1 500kV line | 500.0 | L | 64.75 | 0 | Auto | Unknown | Unknown | TRI | 140544 | |
02/29/2004 01:11 | 02/29/2004 01:11 | Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line | 500.0 | S | G | 26.64 | 0 | Auto | Unknown | Unknown | TRI | 140544 |
02/29/2004 01:11 | 02/29/2004 01:11 | Sacajawea tap to Lower Monumental-McNary No 1 500kV line | 500.0 | T | G | 6.07 | 0 | Auto | Unknown | Unknown | TRI | 140544 |
02/29/2004 01:11 | 02/29/2004 01:11 | Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line | 500.0 | S | G | 38.11 | 0 | Auto | Unknown | Unknown | TRI | 140544 |
02/29/2004 02:47 | 03/02/2004 14:20 | Olympia-South Elma No 1 115kV line | 115.0 | L | 21.18 | 3573 | Auto | Line Material Failure | Unknown | OLY | 140545 | |
02/29/2004 20:16 | 03/01/2004 05:58 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 582 | Plan | Voltage Control | RED | 140546 | ||
03/01/2004 02:08 | 03/01/2004 02:11 | Malin-PACW 500/230kV Tie No 1 500kV line | 500.0 | L | 0.10 | 3 | Auto | Foreign Trouble | Foreign Trouble | RED | 140547 | |
03/01/2004 02:13 | 03/01/2004 02:14 | Malin-PACW 500/230kV Tie No 1 500kV line | 500.0 | L | 0.10 | 1 | Auto | Foreign Trouble | Foreign Trouble | RED | 140548 | |
03/01/2004 02:15 | 03/01/2004 02:57 | Malin-PACW 500/230kV Tie No 1 500kV line | 500.0 | L | 0.10 | 42 | Auto | Foreign Trouble | Foreign Trouble | RED | 140549 | |
03/01/2004 06:28 | 03/02/2004 16:10 | Snohomish-Beverly Park No 3 115kV line | 115.0 | L | 4.59 | 2022 | Plan | PCS Cellular Work | SNO | 140556 | ||
03/01/2004 07:35 | 03/01/2004 14:47 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 432 | Plan | Maintenance | OLY LGV | 140557 | |
03/01/2004 07:35 | 03/01/2004 14:47 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 432 | Plan | Maintenance | OLY LGV | 140557 | ||
03/01/2004 07:42 | 03/11/2004 15:22 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 14860 | Plan | Construction | WEN SPK | 140558 | |
03/01/2004 07:42 | 03/11/2004 15:22 | Springhill-Bell section of Creston-Bell No 1 115kV line | 115.0 | S | 9.92 | 14860 | Plan | Construction | SPK | 140558 | ||
03/01/2004 08:08 | 03/14/2004 15:41 | Ostrander-Troutdale No 1 500kV line | 500.0 | L | 23.82 | 19173 | Plan | Maintenance | LGV | 140559 | ||
03/01/2004 08:39 | 03/04/2004 12:54 | Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 3.71 | 4575 | Plan | Foreign Request | TRI | 140561 | ||
03/01/2004 08:39 | 03/04/2004 12:54 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 4575 | Plan | Foreign Request | TRI | 140561 | |
03/01/2004 08:43 | 03/01/2004 10:54 | Dexter tap to Lookout Point-Alvey No 1 115kV line | 115.0 | T | 0.76 | 131 | Plan | Maintenance | EUG | 140562 | ||
03/01/2004 08:43 | 03/01/2004 10:54 | Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.74 | 131 | Plan | Maintenance | EUG | 140562 | ||
03/01/2004 08:43 | 03/01/2004 10:54 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 131 | Plan | Maintenance | EUG | 140562 | |
03/01/2004 08:43 | 03/01/2004 10:54 | Lookout Point-Dexter section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 2.37 | 131 | Plan | Maintenance | EUG | 140562 | ||
03/01/2004 09:48 | 03/03/2004 09:31 | Milton tap to Walla Walla-Freewater No 1 69kV line | 69.0 | T | 3.70 | 2863 | Plan | Foreign Request | TRI | 140563 | ||
03/01/2004 09:48 | 03/03/2004 09:31 | Walla Walla-Freewater No 1 69kV line | 69.0 | L | T | 11.74 | 2863 | Plan | Foreign Request | TRI | 140563 | |
03/01/2004 10:07 | 04/05/2004 17:31 | Boardman tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.28 | 50784 | Plan | Normally Out | TRI | 140564 | ||
03/01/2004 10:07 | 04/05/2004 17:31 | McNary-Santiam No 2 230kV line | 230.0 | L | T | 200.43 | 50784 | Plan | Normally Out | TRI TDA RED SAL | 140564 | |
03/02/2004 06:57 | 03/02/2004 16:09 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 552 | Plan | Maintenance | EUG | 140568 | ||
03/02/2004 07:33 | 03/02/2004 13:55 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | G | 15.84 | 382 | Plan | Maintenance | EUG | 140569 | |
03/02/2004 07:33 | 03/02/2004 13:55 | Lookout Point-Mt. Vernon section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 14.10 | 382 | Plan | Maintenance | EUG | 140569 | ||
03/02/2004 07:50 | 03/02/2004 10:49 | Mossyrock-Chehalis No 1 230kV line | 230.0 | L | 27.26 | 179 | Auto | Unknown | Unknown | OLY | 140570 | |
03/02/2004 08:11 | 03/02/2004 14:46 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 395 | Plan | Maintenance | EUG | 140571 | |
03/02/2004 08:11 | 03/02/2004 14:46 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 395 | Plan | Maintenance | EUG | 140571 | ||
03/02/2004 08:12 | 03/02/2004 14:31 | Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line | 230.0 | S | G | 71.70 | 379 | Plan | Maintenance | TDA TRI | 140572 | |
03/02/2004 08:12 | 03/02/2004 14:31 | Big Eddy-Midway No 1 230kV line | 230.0 | L | 102.80 | 379 | Plan | Maintenance | TDA TRI | 140572 | ||
03/02/2004 08:12 | 03/02/2004 14:31 | Mabton tap to Big Eddy-Midway No 1 230kV line | 230.0 | T | G | 0.10 | 379 | Plan | Maintenance | TRI | 140572 | |
03/02/2004 08:12 | 03/02/2004 14:31 | Mabton-Midway section of Big Eddy-Midway No 1 230kV line | 230.0 | S | G | 31.10 | 379 | Plan | Maintenance | TRI | 140572 | |
03/02/2004 08:28 | 03/05/2004 15:10 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 4722 | Plan | Maintenance | SAL | 140573 | |
03/02/2004 08:28 | 03/05/2004 15:10 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 4722 | Plan | Maintenance | SAL | 140573 | ||
03/02/2004 09:13 | 03/02/2004 12:55 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | T | 38.93 | 222 | Plan | Normally Out | TRI | 140574 | |
03/02/2004 09:13 | 03/02/2004 12:55 | Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | TS | 0.48 | 222 | Plan | Normally Out | TRI | 140574 | ||
03/02/2004 09:13 | 03/02/2004 13:31 | Ross-St Johns No 1 230kV line | 230.0 | L | 7.26 | 258 | Plan | Maintenance | LGV | 140575 | ||
03/02/2004 14:47 | 03/16/2004 12:32 | Detroit PH-Detroit No 2 230kV line | 230.0 | L | 0.48 | 20025 | Plan | Foreign Request | SAL | 140576 | ||
03/03/2004 07:01 | 03/03/2004 16:13 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 552 | Plan | Maintenance | EUG | 140579 | ||
03/03/2004 07:27 | 03/03/2004 14:16 | Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.74 | 409 | Plan | Maintenance | EUG | 140580 | ||
03/03/2004 07:27 | 03/03/2004 14:16 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 409 | Plan | Maintenance | EUG | 140580 | |
03/03/2004 08:03 | 03/03/2004 10:38 | Cosmopolis-Aberdeen No 1 115kV line | 115.0 | L | 6.79 | 155 | Plan | Maintenance | OLY | 140581 | ||
03/03/2004 08:08 | 03/03/2004 15:20 | Midway-Moxee No 1 115kV line | 115.0 | L | G | 33.98 | 432 | Plan | Maintenance | TRI WEN | 140582 | |
03/03/2004 08:08 | 03/03/2004 15:20 | Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line | 115.0 | S | 17.37 | 432 | Plan | Maintenance | WEN | 140582 | ||
03/03/2004 08:09 | 03/03/2004 15:08 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 419 | Plan | Maintenance | EUG | 140583 | |
03/03/2004 08:09 | 03/03/2004 15:08 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 419 | Plan | Maintenance | EUG | 140583 | ||
03/03/2004 08:14 | 03/03/2004 08:23 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 9 | Plan | Switching | WEN COV | 140584 | ||
03/03/2004 08:24 | 03/03/2004 15:53 | Chemawa-Salem No 1 230kV line | 230.0 | L | 10.66 | 449 | Plan | Maintenance | SAL | 140585 | ||
03/03/2004 09:39 | 07/15/2004 08:43 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | T | 38.93 | 192844 | Plan | Normally Out | TRI | 140586 | |
03/03/2004 09:39 | 07/15/2004 08:43 | Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | TS | 0.48 | 192844 | Plan | Normally Out | TRI | 140586 | ||
03/04/2004 06:20 | 03/05/2004 05:24 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 1384 | Plan | Foreign Request | OLY | 140590 | ||
03/04/2004 08:18 | 03/04/2004 14:37 | Midway-Cold Creek section of Midway-Grandview No 1 115kV line | 115.0 | S | 4.21 | 379 | Plan | Maintenance | TRI WEN | 140591 | ||
03/04/2004 08:18 | 03/04/2004 14:37 | Midway-Grandview No 1 115kV line | 115.0 | L | G | 25.07 | 379 | Plan | Maintenance | TRI WEN | 140591 | |
03/04/2004 09:32 | 03/04/2004 14:47 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | G | 15.84 | 315 | Plan | Foreign Request | EUG | 140592 | |
03/04/2004 09:32 | 03/04/2004 14:47 | Lookout Point-Mt. Vernon section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 14.10 | 315 | Plan | Foreign Request | EUG | 140592 | ||
03/04/2004 10:52 | 03/04/2004 11:46 | Longview-Allston No 4 115kV line | 115.0 | L | G | 4.64 | 54 | Plan | Testing | LGV | 140593 | |
03/04/2004 10:52 | 03/04/2004 11:46 | Longview-Donald Nys section of Longview-Allston No 4 115kV line | 115.0 | S | 3.63 | 54 | Plan | Testing | LGV | 140593 | ||
03/04/2004 11:09 | 03/04/2004 14:38 | Lookout Point-Alvey No 2 115kV line | 115.0 | L | O | 15.84 | 209 | Plan | Foreign Request | EUG | 140594 | |
03/04/2004 11:09 | 03/04/2004 14:38 | Mt. Vernon tap to Lookout Point-Alvey No 2 115kV line | 115.0 | T | 4.90 | 209 | Plan | Foreign Request | EUG | 140594 | ||
03/04/2004 11:09 | 03/04/2004 14:38 | Mt. Vernon-Alvey section of Lookout Point-Alvey No 2 115kV line | 115.0 | S | 1.74 | 209 | Plan | Foreign Request | EUG | 140594 | ||
03/05/2004 06:00 | 03/05/2004 17:42 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 702 | Plan | Maintenance | SNO | 140595 | ||
03/05/2004 07:28 | 03/05/2004 15:28 | Chemawa-Hughes section of Chemawa-Salem No 2 115kV line | 115.0 | S | 8.53 | 480 | Plan | Maintenance | SAL | 140607 | ||
03/05/2004 07:28 | 03/05/2004 15:28 | Chemawa-Salem No 2 115kV line | 115.0 | L | G | 10.41 | 480 | Plan | Maintenance | SAL | 140607 | |
03/05/2004 08:13 | 03/05/2004 12:37 | Bandon-Rogue No 1 115kV line | 115.0 | L | G | 46.00 | 264 | Plan | Maintenance | EUG | 140608 | |
03/05/2004 08:13 | 03/05/2004 12:37 | Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line | 115.0 | S | 21.50 | 264 | Plan | Maintenance | EUG | 140608 | ||
03/05/2004 15:02 | 03/05/2004 15:14 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 12 | Auto | Foreign Trouble | TDA RED | 140609 | ||
03/05/2004 15:02 | 03/05/2004 15:14 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 12 | Auto | Foreign Trouble | TDA | 140609 | ||
03/05/2004 15:26 | 03/05/2004 15:27 | North Bonneville-Troutdale No 2 230kV line | 230.0 | L | 27.77 | 1 | Auto | Unknown | Unknown | LGV | 140610 | |
03/05/2004 23:13 | 03/08/2004 21:59 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 4246 | Plan | Foreign Request | OLY | 140611 | ||
03/05/2004 23:13 | 03/08/2004 21:59 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 4246 | Plan | Foreign Request | OLY | 140611 | |
03/06/2004 02:29 | 03/06/2004 02:31 | Dixon tap to Hot Springs-Rattlesnake No 1 230kV line | 230.0 | T | G | 0.10 | 2 | Auto | Unknown | Unknown | KAL | 140612 |
03/06/2004 02:29 | 03/06/2004 02:31 | Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 33.85 | 2 | Auto | Unknown | Unknown | KAL | 140612 |
03/06/2004 02:29 | 03/06/2004 02:31 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 25.06 | 2 | Auto | Unknown | Unknown | KAL | 140612 |
03/06/2004 02:29 | 03/06/2004 02:31 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | 58.91 | 2 | Auto | Unknown | Unknown | KAL | 140612 | |
03/06/2004 05:00 | 03/06/2004 17:24 | Chief Joseph PH-Chief Joseph No 6 500kV line | 500.0 | L | 0.74 | 744 | Plan | Foreign Request | WEN | 140613 | ||
03/06/2004 06:01 | 03/06/2004 17:40 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 699 | Plan | Maintenance | SNO | 140614 | ||
03/06/2004 12:43 | 03/06/2004 13:07 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 24 | Auto | Foreign Trouble | Foreign Trouble | TDA | 140615 | |
03/06/2004 12:43 | 03/06/2004 13:27 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 44 | Auto | Foreign Trouble | TDA RED | 140616 | ||
03/06/2004 12:43 | 03/06/2004 13:27 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 44 | Auto | Foreign Trouble | TDA | 140616 | ||
03/07/2004 02:06 | 03/07/2004 05:52 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 226 | Plan | Voltage Control | TRI TDA RED SAL | 140617 | ||
03/07/2004 06:02 | 03/07/2004 17:01 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 659 | Plan | Maintenance | SNO | 140619 | ||
03/07/2004 12:43 | 03/07/2004 17:40 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 297 | Plan | Voltage Control | RED | 140620 | ||
03/08/2004 00:07 | 03/08/2004 04:57 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 290 | Plan | Voltage Control | TRI TDA RED SAL | 140621 | ||
03/08/2004 01:07 | 03/08/2004 05:31 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 264 | Plan | Voltage Control | RED | 140622 | ||
03/08/2004 01:13 | 03/08/2004 01:44 | Monroe-Custer No 1 500kV line | 500.0 | L | 86.83 | 31 | Plan | Testing | SNO | 140623 | ||
03/08/2004 01:14 | 03/08/2004 01:45 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 31 | Plan | Testing | SNO | 140624 | ||
03/08/2004 07:20 | 03/08/2004 13:36 | Salem-PACW Dallas No 1 115kV line | 115.0 | L | 13.20 | 376 | Plan | Foreign Request | SAL | 140631 | ||
03/08/2004 07:26 | 03/12/2004 18:19 | Olympia-Kitsap No 3 230kV line | 230.0 | L | 50.26 | 6413 | Plan | Construction | OLY | 140632 | ||
03/08/2004 07:48 | 03/08/2004 16:42 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 534 | Plan | Foreign Request | TDA | 140633 | ||
03/08/2004 09:32 | 03/08/2004 10:14 | Dixon tap to Hot Springs-Rattlesnake No 1 230kV line | 230.0 | T | 0.10 | 42 | Auto | Line Material Failure | Line Material Failure | KAL | 140634 | |
03/08/2004 09:32 | 03/08/2004 10:14 | Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | 33.85 | 42 | Auto | Line Material Failure | Line Material Failure | KAL | 140634 | |
03/08/2004 09:32 | 03/08/2004 14:36 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | 25.06 | 304 | Auto | Line Material Failure | Line Material Failure | KAL | 140634 | |
03/08/2004 09:32 | 03/08/2004 14:36 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | G | 58.91 | 304 | Auto | Line Material Failure | Line Material Failure | KAL | 140634 |
03/08/2004 09:58 | 03/08/2004 13:43 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 225 | Auto | Tree cut | Tree cut | OLY LGV | 140635 |
03/08/2004 09:58 | 03/08/2004 13:43 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 225 | Auto | Tree cut | Tree cut | OLY | 140635 |
03/08/2004 09:58 | 03/08/2004 13:43 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 225 | Auto | Tree cut | Tree cut | OLY | 140635 | |
03/08/2004 09:59 | 03/08/2004 10:10 | Raymond-Cosmopolis No 1 115kV line | 115.0 | L | 18.36 | 11 | Auto | Unknown | Terminal Equipment Failure | OLY | 140636 | |
03/08/2004 09:59 | 03/08/2004 10:09 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 10 | Auto | Unknown | Terminal Equipment Failure | OLY | 140637 |
03/08/2004 09:59 | 03/08/2004 10:09 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 10 | Auto | Unknown | Terminal Equipment Failure | OLY | 140637 | |
03/08/2004 09:59 | 03/08/2004 10:19 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 20 | Auto | Unknown | Terminal Equipment Failure | OLY | 140638 | |
03/08/2004 11:10 | 03/08/2004 14:47 | Dayton-Shelton section of Olympia-Shelton No 1 115kV line | 115.0 | S | G | 1.78 | 217 | Auto | Foreign Trouble | Foreign Trouble | OLY | 140639 |
03/08/2004 11:10 | 03/08/2004 14:47 | Olympia-Dayton section of Olympia-Shelton No 1 115kV line | 115.0 | S | G | 17.95 | 217 | Auto | Foreign Trouble | Foreign Trouble | OLY | 140639 |
03/08/2004 11:10 | 03/08/2004 14:47 | Olympia-Shelton No 1 115kV line | 115.0 | L | 19.73 | 217 | Auto | Foreign Trouble | Foreign Trouble | OLY | 140639 | |
03/08/2004 13:43 | 04/02/2004 13:36 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | 1.33 | 35993 | Plan | Maintenance | OLY LGV | 140804 | ||
03/08/2004 13:43 | 04/02/2004 13:36 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | 3.18 | 35993 | Plan | Maintenance | OLY | 140804 | ||
03/08/2004 13:43 | 04/02/2004 13:36 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 35993 | Plan | Maintenance | OLY | 140804 | ||
03/09/2004 01:28 | 03/09/2004 04:43 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 195 | Plan | Voltage Control | RED | 140640 | ||
03/09/2004 06:15 | 03/09/2004 16:37 | Black Canyon-Emmett No 1 69kV line | 69.0 | L | 4.50 | 622 | Plan | Foreign Request | IDF | 140643 | ||
03/09/2004 07:20 | 03/09/2004 17:14 | Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | 19.40 | 594 | Plan | Maintenance | SPK | 140644 | ||
03/09/2004 07:20 | 03/09/2004 17:14 | Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | L | G | 52.68 | 594 | Plan | Maintenance | SPK | 140644 | |
03/09/2004 07:55 | 03/09/2004 14:07 | Lane-Wendson No 2 230kV line | 230.0 | L | 41.03 | 372 | Plan | Maintenance | EUG | 140645 | ||
03/09/2004 08:05 | 03/09/2004 14:19 | Filbert-Carlton section of Forest Grove-McMinnville No 1 115kV line | 115.0 | S | 17.74 | 374 | Plan | Maintenance | SAL | 140646 | ||
03/09/2004 08:05 | 03/09/2004 14:19 | Forest Grove-McMinnville No 1 115kV line | 115.0 | L | G | 23.72 | 374 | Plan | Maintenance | SAL | 140646 | |
03/09/2004 08:06 | 03/12/2004 13:51 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 4665 | Plan | Maintenance | SAL | 140647 | |
03/09/2004 08:06 | 03/12/2004 13:51 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 4665 | Plan | Maintenance | SAL | 140647 | ||
03/09/2004 08:10 | 03/09/2004 15:36 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | 11.60 | 446 | Plan | Maintenance | OLY | 140648 | ||
03/09/2004 08:10 | 03/09/2004 15:36 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | G | 26.79 | 446 | Plan | Maintenance | OLY | 140648 | |
03/09/2004 08:46 | 03/09/2004 15:42 | Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 29.43 | 416 | Plan | Maintenance | WEN TRI | 140649 | ||
03/09/2004 08:46 | 03/09/2004 15:42 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 416 | Plan | Maintenance | WEN TRI | 140649 | |
03/09/2004 10:44 | 03/09/2004 10:49 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Auto | Foreign Trouble | Foreign Trouble | TDA | 140650 | |
03/09/2004 10:44 | 03/09/2004 10:53 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 9 | Auto | Foreign Trouble | TDA RED | 140651 | ||
03/09/2004 10:44 | 03/09/2004 10:53 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 9 | Auto | Foreign Trouble | TDA | 140651 | ||
03/10/2004 06:58 | 03/10/2004 15:55 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 537 | Plan | Maintenance | EUG | 140660 | ||
03/10/2004 07:33 | 03/10/2004 14:50 | Salem-Albany No 1 115kV line | 115.0 | L | 23.90 | 437 | Plan | Foreign Request | SAL EUG | 140661 | ||
03/10/2004 12:17 | 03/10/2004 13:05 | Sacheen-Albeni Falls No 1 115kV line | 115.0 | L | G | 13.72 | 48 | Plan | Maintenance | SPK | 140662 | |
03/10/2004 12:17 | 03/10/2004 13:05 | Sacheen-Diamond Lake section of Sacheen-Albeni Falls No 1 115kV line | 115.0 | S | 5.52 | 48 | Plan | Maintenance | SPK | 140662 | ||
03/10/2004 14:34 | 03/10/2004 14:48 | Black Canyon-Emmett No 1 69kV line | 69.0 | L | 4.50 | 14 | Auto | Sympathetic | IDF | 140663 | ||
03/10/2004 15:13 | 03/10/2004 15:26 | Black Canyon-Emmett No 1 69kV line | 69.0 | L | 4.50 | 13 | Auto | Foreign Utility | IDF | 140664 | ||
03/10/2004 18:50 | 03/10/2004 18:53 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 3 | Auto | Foreign Trouble | TDA RED | 140665 | ||
03/10/2004 18:50 | 03/10/2004 18:53 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 3 | Auto | Foreign Trouble | TDA | 140665 | ||
03/11/2004 01:09 | 03/11/2004 08:31 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 442 | Plan | Voltage Control | RED | 140666 | ||
03/11/2004 07:03 | 03/11/2004 16:14 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 551 | Plan | Maintenance | EUG | 140668 | ||
03/11/2004 07:22 | 03/11/2004 11:43 | Horse Heaven-Harvalum No 1 230kV line | 230.0 | L | 57.18 | 261 | Plan | Maintenance | TRI TDA | 140669 | ||
03/11/2004 07:37 | 03/11/2004 15:39 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | G | 26.79 | 482 | Plan | Maintenance | OLY | 140670 | |
03/11/2004 07:37 | 03/11/2004 15:39 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | 15.19 | 482 | Plan | Maintenance | OLY | 140670 | ||
03/11/2004 07:38 | 03/11/2004 14:59 | St Johns-Keeler No 2 115kV line | 115.0 | L | 9.43 | 441 | Plan | Maintenance | LGV SAL | 140671 | ||
03/11/2004 07:57 | 03/11/2004 14:27 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 390 | Plan | Emergency | EUG | 140672 | |
03/11/2004 07:57 | 03/11/2004 14:27 | Hills Creek-Oakridge section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 4.80 | 390 | Plan | Emergency | EUG | 140672 | ||
03/11/2004 08:52 | 03/11/2004 15:27 | Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 29.43 | 395 | Plan | Maintenance | WEN TRI | 140673 | ||
03/11/2004 08:52 | 03/11/2004 15:27 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 395 | Plan | Maintenance | WEN TRI | 140673 | |
03/11/2004 11:17 | 03/11/2004 13:20 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 123 | Plan | Voltage Control | RED | 140674 | ||
03/11/2004 11:48 | 03/11/2004 15:39 | Harvalum-Big Eddy No 1 230kV line | 230.0 | L | 23.34 | 231 | Plan | Maintenance | TDA | 140675 | ||
03/11/2004 13:25 | 03/11/2004 13:27 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 2 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | KAL | 140676 | |
03/12/2004 01:49 | 03/12/2004 05:40 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 231 | Plan | Voltage Control | RED | 140679 | ||
03/12/2004 02:54 | 03/12/2004 02:58 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 4 | Auto | Unknown | TDA RED | 140677 | ||
03/12/2004 02:54 | 03/12/2004 02:58 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 4 | Auto | Unknown | TDA | 140677 | ||
03/12/2004 06:01 | 03/12/2004 17:57 | Monroe-Custer No 1 500kV line | 500.0 | L | 86.83 | 716 | Plan | Maintenance | SNO | 140680 | ||
03/12/2004 07:36 | 03/12/2004 14:32 | St Johns-Keeler No 2 115kV line | 115.0 | L | 9.43 | 416 | Plan | Maintenance | LGV SAL | 140681 | ||
03/12/2004 13:32 | 03/12/2004 14:17 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 45 | Plan | Switching | WEN COV | 140682 | ||
03/13/2004 04:02 | 03/23/2004 15:37 | Allston-PGE Beaver No 1 230kV line | 230.0 | L | 9.20 | 15095 | Plan | Foreign Request | LGV | 140684 | ||
03/13/2004 04:47 | 03/13/2004 04:47 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 140683 | |
03/13/2004 04:47 | 03/13/2004 04:47 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 140683 | |
03/13/2004 04:47 | 03/13/2004 04:47 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 140683 | ||
03/13/2004 06:00 | 03/13/2004 17:37 | Monroe-Custer No 1 500kV line | 500.0 | L | 86.83 | 697 | Plan | Maintenance | SNO | 140685 | ||
03/13/2004 12:00 | 03/13/2004 19:09 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 429 | Plan | Testing | TDA RED | 140686 | ||
03/13/2004 12:00 | 03/13/2004 19:09 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 429 | Plan | Testing | TDA | 140686 | ||
03/13/2004 12:00 | 03/13/2004 19:09 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 429 | Plan | Testing | TDA RED | 140687 | ||
03/13/2004 12:00 | 03/13/2004 19:09 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 429 | Plan | Testing | TDA | 140687 | ||
03/13/2004 15:24 | 03/13/2004 17:45 | Big Eddy-Ostrander No 1 500kV line | 500.0 | L | 70.56 | 141 | Plan | Emergency | TDA LGV | 140688 | ||
03/14/2004 00:50 | 03/14/2004 07:28 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 398 | Plan | Voltage Control | SAL EUG | 140689 | ||
03/14/2004 05:44 | 03/14/2004 05:44 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 140690 | |
03/14/2004 05:44 | 03/14/2004 05:44 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 140690 | |
03/14/2004 05:44 | 03/14/2004 05:44 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 140690 | ||
03/14/2004 06:00 | 03/14/2004 17:49 | Monroe-Custer No 1 500kV line | 500.0 | L | 86.83 | 709 | Plan | Maintenance | SNO | 140691 | ||
03/14/2004 08:24 | 03/14/2004 09:18 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 54 | Plan | Switching | WEN SNO | 140692 | ||
03/14/2004 09:23 | 03/16/2004 22:33 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 3670 | Plan | Testing | TDA | 140693 | ||
03/14/2004 14:00 | 03/14/2004 14:09 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 9 | Plan | Switching | WEN SNO | 140694 | ||
03/15/2004 06:00 | 03/15/2004 17:39 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 699 | Plan | Maintenance | WEN SNO | 140698 | ||
03/15/2004 07:02 | 03/15/2004 14:45 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 463 | Plan | Maintenance | EUG | 140699 | ||
03/15/2004 07:16 | 03/15/2004 16:50 | Olympia-Dayton section of Olympia-Shelton No 1 115kV line | 115.0 | S | 17.95 | 574 | Plan | Maintenance | OLY | 140700 | ||
03/15/2004 07:16 | 03/15/2004 16:50 | Olympia-Shelton No 1 115kV line | 115.0 | L | G | 19.73 | 574 | Plan | Maintenance | OLY | 140700 | |
03/15/2004 07:43 | 03/25/2004 09:05 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 14482 | Plan | Maintenance | TDA | 140701 | ||
03/15/2004 08:54 | 03/15/2004 10:26 | Grand Coulee City tap to Grand Coulee-Creston No 1 115kV line | 115.0 | T | 0.01 | 92 | Plan | Construction | WEN | 140702 | ||
03/15/2004 08:54 | 03/25/2004 10:46 | Grand Coulee-B212 section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 1.59 | 14512 | Plan | Construction | WEN | 140702 | ||
03/15/2004 08:54 | 03/25/2004 10:46 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | G | 28.27 | 14512 | Plan | Construction | WEN SPK | 140702 | |
03/15/2004 09:46 | 03/15/2004 19:31 | Olympia-Kitsap No 3 230kV line | 230.0 | L | 50.26 | 585 | Plan | Testing | OLY | 140703 | ||
03/15/2004 09:53 | 03/18/2004 12:35 | Midway-Potholes No 1 230kV line | 230.0 | L | 36.87 | 4482 | Plan | Maintenance | TRI WEN | 140704 | ||
03/15/2004 10:29 | 03/19/2004 14:22 | Midway-Benton No 1 115kV line | 115.0 | L | G | 28.75 | 5993 | Plan | Maintenance | TRI | 140705 | |
03/15/2004 10:29 | 03/19/2004 14:22 | Midway-Scooteney section of Midway-Benton No 1 115kV line | 115.0 | S | 13.90 | 5993 | Plan | Maintenance | TRI | 140705 | ||
03/15/2004 10:29 | 04/02/2004 13:46 | Scooteney tap-Sagehill section of Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TS | 15.05 | 26117 | Plan | Maintenance | TRI | 140705 | ||
03/15/2004 10:29 | 03/19/2004 14:22 | Scooteney-Benton section of Midway-Benton No 1 115kV line | 115.0 | S | 14.85 | 5993 | Plan | Maintenance | TRI | 140705 | ||
03/16/2004 06:01 | 03/16/2004 17:15 | Chief Joseph-Snohomish No 3 345kV line | 345.0 | L | 133.05 | 674 | Plan | Maintenance | WEN SNO | 140713 | ||
03/16/2004 07:27 | 03/16/2004 13:43 | Benton-Franklin No 2 115kV line | 115.0 | L | G | 21.03 | 376 | Plan | Maintenance | TRI | 140714 | |
03/16/2004 07:27 | 03/16/2004 13:43 | Glade-Franklin section of Benton-Franklin No 2 115kV line | 115.0 | S | 9.09 | 376 | Plan | Maintenance | TRI | 140714 | ||
03/16/2004 07:27 | 03/16/2004 13:43 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 4.29 | 376 | Plan | Maintenance | TRI | 140715 | ||
03/16/2004 07:27 | 03/16/2004 13:43 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 376 | Plan | Maintenance | TRI | 140715 | |
03/16/2004 07:27 | 03/16/2004 13:43 | Franklin-Foster Wells section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | 2.70 | 376 | Plan | Maintenance | TRI | 140716 | ||
03/16/2004 07:27 | 03/16/2004 13:43 | Franklin-Ruby Street No 1 115kV line | 115.0 | L | G | 4.85 | 376 | Plan | Maintenance | TRI | 140716 | |
03/16/2004 07:27 | 03/16/2004 13:43 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 376 | Plan | Maintenance | TRI | 140717 | |
03/16/2004 07:27 | 03/16/2004 13:43 | Franklin-Gum Street section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 5.56 | 376 | Plan | Maintenance | TRI | 140717 | ||
03/16/2004 07:27 | 03/16/2004 13:43 | Ice Harbor-Franklin No 2 115kV line | 115.0 | L | G | 9.07 | 376 | Plan | Maintenance | TRI | 140718 | |
03/16/2004 07:27 | 03/16/2004 13:43 | Martindale-Franklin section of Ice Harbor-Franklin No 2 115kV line | 115.0 | S | 5.20 | 376 | Plan | Maintenance | TRI | 140718 | ||
03/16/2004 07:57 | 03/23/2004 09:49 | Columbia-Grand Coulee No 1 230kV line | 230.0 | L | 72.61 | 10192 | Plan | Construction | WEN | 140719 | ||
03/16/2004 08:01 | 03/16/2004 14:34 | Santiam-Toledo No 1 230kV line | 230.0 | L | G | 67.62 | 393 | Plan | Maintenance | SAL EUG | 140720 | |
03/16/2004 08:01 | 03/16/2004 14:34 | Wren-Toledo section of Santiam-Toledo No 1 230kV line | 230.0 | S | 25.68 | 393 | Plan | Maintenance | EUG | 140720 | ||
03/16/2004 08:01 | 03/16/2004 15:30 | Olympia-Kitsap No 3 230kV line | 230.0 | L | 50.26 | 449 | Plan | Testing | OLY | 140721 | ||
03/16/2004 09:28 | 03/16/2004 17:58 | Keeler-Allston No 1 500kV line | 500.0 | L | 42.32 | 510 | Plan | Maintenance | SAL LGV | 140722 | ||
03/16/2004 14:31 | 05/03/2004 08:46 | Ely-Highland section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.98 | 68715 | Plan | Normally Out | TRI | 140723 | ||
03/16/2004 14:31 | 05/03/2004 08:46 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 68715 | Plan | Normally Out | TRI | 140723 | |
03/16/2004 15:41 | 03/16/2004 17:59 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | G | 41.05 | 138 | Plan | Maintenance | WEN | 140724 | |
03/16/2004 15:41 | 03/16/2004 17:59 | Keller-Nespelem section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 5.30 | 138 | Plan | Maintenance | WEN | 140724 | ||
03/16/2004 22:00 | 03/16/2004 22:00 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.48 | 0 | Auto | Unknown | Unknown | IDF | 140725 |
03/16/2004 22:00 | 03/16/2004 22:00 | Swan Valley-Teton No 1 115kV line | 115.0 | L | 35.47 | 0 | Auto | Unknown | Unknown | IDF | 140725 | |
03/16/2004 22:00 | 03/16/2004 22:00 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | G | 10.94 | 0 | Auto | Unknown | Unknown | IDF | 140725 |
03/16/2004 22:00 | 03/16/2004 22:00 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.99 | 0 | Auto | Unknown | Unknown | IDF | 140725 |
03/17/2004 00:00 | 04/10/2004 04:20 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 34760 | Plan | Maintenance | TDA RED | 140727 | |
03/17/2004 00:00 | 04/10/2004 04:20 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 34760 | Plan | Maintenance | TDA | 140727 | |||
03/17/2004 00:00 | 03/17/2004 22:28 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 1348 | Plan | Maintenance | TDA | 140727 | |||
03/17/2004 00:00 | 04/10/2004 04:20 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 34760 | Plan | Maintenance | TDA | 140727 | |||
03/17/2004 00:00 | 04/10/2004 04:20 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 34760 | Plan | Maintenance | TDA | 140727 | |||
03/17/2004 00:00 | 03/17/2004 22:22 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 1342 | Plan | Testing | TDA | 140728 | ||
03/17/2004 07:06 | 03/17/2004 14:47 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 461 | Plan | Maintenance | EUG | 140732 | ||
03/17/2004 07:08 | 03/17/2004 15:11 | Olympia-Dayton section of Olympia-Shelton No 1 115kV line | 115.0 | S | 17.95 | 483 | Plan | Maintenance | OLY | 140733 | ||
03/17/2004 07:08 | 03/17/2004 15:11 | Olympia-Shelton No 1 115kV line | 115.0 | L | G | 19.73 | 483 | Plan | Maintenance | OLY | 140733 | |
03/17/2004 07:20 | 03/17/2004 08:01 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 41 | Plan | Foreign Request | SNO | 140734 | ||
03/17/2004 07:20 | 03/17/2004 08:01 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 41 | Plan | Foreign Request | SNO | 140734 | |
03/17/2004 07:58 | 03/17/2004 15:11 | Salem-Grand Ronde No 1 115kV line | 115.0 | L | 27.80 | 433 | Plan | Maintenance | SAL | 140735 | ||
03/17/2004 08:21 | 03/17/2004 14:36 | Albany-Burnt Woods No 1 115kV line | 115.0 | L | 25.77 | 375 | Plan | Maintenance | EUG | 140736 | ||
03/17/2004 08:48 | 03/18/2004 15:25 | John Day PH-John Day No 1 500kV line | 500.0 | L | 3.48 | 1837 | Plan | Foreign Request | TDA | 140737 | ||
03/17/2004 09:01 | 03/17/2004 13:51 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 290 | Plan | Foreign Request | SNO | 140738 | ||
03/17/2004 09:01 | 03/17/2004 13:51 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 290 | Plan | Foreign Request | SNO | 140738 | |
03/17/2004 11:53 | 03/17/2004 15:10 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 197 | Plan | Maintenance | TRI | 140739 | |
03/17/2004 11:53 | 03/17/2004 15:10 | Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 18.21 | 197 | Plan | Maintenance | TRI | 140739 | ||
03/17/2004 13:43 | 03/18/2004 14:05 | Franklin-Hedges No 1 115kV line | 115.0 | L | 5.00 | 1462 | Plan | Maintenance | TRI | 140740 | ||
03/18/2004 01:49 | 04/10/2004 04:20 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 33211 | Plan | Switching | TDA | 140741 | ||
03/18/2004 01:49 | 04/10/2004 04:20 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 33211 | Plan | Maintenance | TDA RED | 140742 | |
03/18/2004 01:49 | 04/10/2004 04:20 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 33211 | Plan | Maintenance | TDA | 140742 | |||
03/18/2004 07:14 | 03/18/2004 11:15 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 241 | Plan | Maintenance | EUG | 140805 | ||
03/18/2004 07:25 | 03/18/2004 14:05 | Baxter-Franklin section of Benton-Franklin No 1 115kV line | 115.0 | S | 15.96 | 400 | Plan | Maintenance | TRI | 140806 | ||
03/18/2004 07:25 | 03/18/2004 14:05 | Benton-Franklin No 1 115kV line | 115.0 | L | G | 21.03 | 400 | Plan | Maintenance | TRI | 140806 | |
03/18/2004 07:25 | 03/18/2004 14:05 | Franklin-Badger Canyon No 1 115kV line | 115.0 | L | 15.77 | 400 | Plan | Maintenance | TRI | 140807 | ||
03/18/2004 07:25 | 03/18/2004 14:05 | Ice Harbor-Franklin No 1 115kV line | 115.0 | L | 9.34 | 400 | Plan | Maintenance | TRI | 140808 | ||
03/18/2004 07:25 | 03/18/2004 14:05 | McNary-Franklin No 2 230kV line | 230.0 | L | 26.88 | 400 | Plan | Maintenance | TRI | 140809 | ||
03/18/2004 08:59 | 03/18/2004 15:25 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 386 | Plan | Maintenance | SAL | 140810 | ||
03/18/2004 10:53 | 03/18/2004 14:54 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 241 | Plan | Maintenance | KAL SPK | 140811 | |
03/18/2004 10:53 | 03/18/2004 14:54 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 241 | Plan | Maintenance | KAL | 140811 | ||
03/18/2004 13:08 | 03/18/2004 13:11 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 3 | Plan | Foreign Request | SNO | 140812 | ||
03/18/2004 13:08 | 03/18/2004 13:11 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 3 | Plan | Foreign Request | SNO | 140812 | |
03/18/2004 14:15 | 03/29/2004 08:27 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | T | 13.35 | 15492 | Plan | Normally Out | TRI | 140813 | |
03/18/2004 14:15 | 03/29/2004 08:27 | Hedges tap to Franklin-Badger Canyon No 2 115kV line | 115.0 | T | 0.33 | 15492 | Plan | Normally Out | TRI | 140813 | ||
03/18/2004 14:52 | 03/29/2004 08:02 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | T | 5.51 | 15430 | Plan | Normally Out | TRI | 140814 | |
03/18/2004 14:52 | 03/29/2004 08:02 | Vista tap to Badger Canyon-Richland No 1 115kV line | 115.0 | T | 0.10 | 15430 | Plan | Normally Out | TRI | 140814 | ||
03/18/2004 15:24 | 03/18/2004 15:24 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 17.09 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140815 | |
03/18/2004 15:24 | 03/18/2004 15:24 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140815 |
03/18/2004 15:24 | 03/18/2004 15:24 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140815 | |
03/18/2004 15:24 | 03/18/2004 15:24 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 6.23 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140815 | |
03/18/2004 15:24 | 03/18/2004 15:24 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140815 | |
03/18/2004 15:24 | 03/18/2004 15:24 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 11.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140815 | |
03/18/2004 17:51 | 03/18/2004 17:51 | Box Canyon tap to Colville-Boundary No 1 115kV line | 115.0 | T | 2.39 | 0 | Auto | Wind | Wind | SPK | 140816 | |
03/18/2004 17:51 | 03/18/2004 17:51 | Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line | 115.0 | S | 4.75 | 0 | Auto | Wind | Wind | SPK | 140816 | |
03/18/2004 17:51 | 03/18/2004 17:51 | Colville-Boundary No 1 115kV line | 115.0 | L | O | 43.06 | 0 | Auto | Wind | Wind | SPK | 140816 |
03/18/2004 17:51 | 03/18/2004 17:51 | Colville-Spirit section of Colville-Boundary No 1 115kV line | 115.0 | S | 17.42 | 0 | Auto | Wind | Wind | SPK | 140816 | |
03/18/2004 17:51 | 03/18/2004 17:51 | Metaline Falls tap to Colville-Boundary No 1 115kV line | 115.0 | T | 1.20 | 0 | Auto | Wind | Wind | SPK | 140816 | |
03/18/2004 17:51 | 03/18/2004 17:51 | Spirit tap to Colville-Boundary No 1 115kV line | 115.0 | T | 5.23 | 0 | Auto | Wind | Wind | SPK | 140816 | |
03/18/2004 17:51 | 03/18/2004 17:51 | Spirit-Box Canyon section of Colville-Boundary No 1 115kV line | 115.0 | S | 11.98 | 0 | Auto | Wind | Wind | SPK | 140816 | |
03/18/2004 20:54 | 03/18/2004 20:54 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140817 |
03/18/2004 20:54 | 03/18/2004 20:54 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140817 | |
03/18/2004 20:54 | 03/18/2004 20:54 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140817 |
03/18/2004 20:54 | 03/18/2004 20:54 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140817 |
03/18/2004 20:54 | 03/18/2004 20:54 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140817 |
03/18/2004 20:54 | 03/18/2004 20:54 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140817 |
03/18/2004 22:53 | 03/18/2004 22:53 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140818 |
03/18/2004 22:53 | 03/18/2004 22:53 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140818 | |
03/18/2004 22:53 | 03/18/2004 22:53 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140818 |
03/18/2004 22:53 | 03/18/2004 22:53 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140818 |
03/18/2004 22:53 | 03/18/2004 22:53 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140818 |
03/18/2004 22:53 | 03/18/2004 22:53 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140818 |
03/18/2004 23:56 | 03/18/2004 23:56 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140819 |
03/18/2004 23:56 | 03/18/2004 23:56 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140819 | |
03/18/2004 23:56 | 03/18/2004 23:56 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140819 |
03/18/2004 23:56 | 03/18/2004 23:56 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140819 |
03/18/2004 23:56 | 03/18/2004 23:56 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140819 |
03/18/2004 23:56 | 03/18/2004 23:56 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140819 |
03/19/2004 00:58 | 03/19/2004 00:58 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140820 |
03/19/2004 00:58 | 03/19/2004 00:58 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140820 | |
03/19/2004 00:58 | 03/19/2004 00:58 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140820 |
03/19/2004 00:58 | 03/19/2004 00:58 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140820 |
03/19/2004 00:58 | 03/19/2004 00:58 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140820 |
03/19/2004 00:58 | 03/19/2004 00:58 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140820 |
03/19/2004 01:01 | 03/19/2004 02:06 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 17.09 | 65 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140821 | |
03/19/2004 01:01 | 03/19/2004 02:06 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 65 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140821 |
03/19/2004 01:01 | 03/19/2004 01:11 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 10 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140821 | |
03/19/2004 01:01 | 03/19/2004 01:02 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 6.23 | 1 | Auto | Foreign Trouble | Foreign Trouble | SPK | 140821 | |
03/19/2004 01:01 | 03/19/2004 01:02 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 1 | Auto | Foreign Trouble | Foreign Trouble | KAL | 140821 | |
03/19/2004 01:01 | 03/19/2004 01:02 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 11.58 | 1 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 140821 | |
03/19/2004 07:23 | 03/19/2004 15:06 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 463 | Plan | Foreign Request | SPK | 140825 | ||
03/19/2004 07:23 | 03/19/2004 15:06 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 463 | Plan | Foreign Request | SPK | 140825 | |
03/19/2004 08:00 | 03/19/2004 15:30 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 450 | Plan | Maintenance | EUG | 140826 | ||
03/19/2004 08:45 | 03/19/2004 13:57 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 312 | Plan | Maintenance | SAL | 140827 | ||
03/20/2004 05:09 | 03/20/2004 05:09 | Slatt-John Day No 1 500kV line | 500.0 | L | 30.32 | 0 | Auto | Unknown | Unknown | TRI TDA | 140828 | |
03/21/2004 02:02 | 03/21/2004 02:02 | Coyote Springs-Slatt No 1 500kV line | 500.0 | L | 28.09 | 0 | Auto | Unknown | Unknown | TRI TDA | 140829 | |
03/21/2004 02:57 | 03/21/2004 09:13 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 376 | Plan | Voltage Control | SAL EUG | 140830 | ||
03/21/2004 17:45 | 03/22/2004 02:09 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 504 | Auto | Malicious | TDA RED | 140831 | ||
03/21/2004 17:45 | 03/22/2004 02:09 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 504 | Auto | Malicious | TDA | 140831 | ||
03/21/2004 18:02 | 03/22/2004 02:09 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 487 | Plan | Maintenance | TDA RED | 140832 | ||
03/21/2004 18:02 | 03/22/2004 02:09 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 487 | Plan | Maintenance | TDA | 140832 | ||
03/22/2004 07:05 | 03/22/2004 15:06 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 481 | Plan | Maintenance | EUG | 140836 | ||
03/22/2004 07:09 | 03/22/2004 09:56 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 167 | Plan | Switching | COV | 140837 | ||
03/22/2004 07:09 | 03/22/2004 09:56 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 167 | Plan | Switching | COV | 140838 | ||
03/22/2004 07:09 | 03/22/2004 09:57 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 168 | Plan | Switching | COV | 140839 | ||
03/22/2004 07:10 | 03/22/2004 09:57 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 167 | Plan | Switching | COV | 140840 | ||
03/22/2004 07:10 | 03/22/2004 09:57 | Covington-Columbia No 3 230kV line | 230.0 | L | 110.00 | 167 | Plan | Switching | COV WEN | 140841 | ||
03/22/2004 07:10 | 03/22/2004 09:56 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 166 | Plan | Switching | COV | 140842 | ||
03/22/2004 07:54 | 03/22/2004 16:14 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 500 | Plan | Maintenance | RED | 140843 | ||
03/22/2004 07:54 | 03/22/2004 16:14 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 500 | Plan | Maintenance | RED | 140843 | ||
03/22/2004 07:54 | 03/22/2004 16:14 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 500 | Plan | Maintenance | RED | 140843 | |
03/22/2004 08:01 | 03/26/2004 14:11 | Midway-Benton No 1 115kV line | 115.0 | L | G | 28.75 | 6130 | Plan | Maintenance | TRI | 140844 | |
03/22/2004 08:01 | 03/26/2004 14:11 | Scooteney-Benton section of Midway-Benton No 1 115kV line | 115.0 | S | 14.85 | 6130 | Plan | Maintenance | TRI | 140844 | ||
03/22/2004 08:03 | 03/24/2004 16:06 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 3363 | Plan | Maintenance | SAL | 140845 | |
03/22/2004 08:03 | 03/24/2004 16:06 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 3363 | Plan | Maintenance | SAL | 140845 | ||
03/22/2004 08:05 | 03/22/2004 12:04 | Chehalis-Centralia No 2 69kV line | 69.0 | L | G | 15.26 | 239 | Plan | Maintenance | OLY | 140846 | |
03/22/2004 08:05 | 03/22/2004 12:04 | Fords Prairie-Centralia section of Chehalis-Centralia No 2 69kV line | 69.0 | S | 3.13 | 239 | Plan | Maintenance | OLY | 140846 | ||
03/22/2004 08:05 | 03/26/2004 14:11 | Midway-Benton No 1 115kV line | 115.0 | L | O | 28.75 | 6126 | Plan | Maintenance | TRI | 140847 | |
03/22/2004 08:05 | 03/26/2004 14:11 | Midway-Scooteney section of Midway-Benton No 1 115kV line | 115.0 | S | 13.90 | 6126 | Plan | Maintenance | TRI | 140847 | ||
03/22/2004 08:10 | 03/22/2004 16:07 | Chief Joseph-Sickler No 1 500kV line | 500.0 | L | 45.02 | 477 | Plan | Maintenance | WEN | 140848 | ||
03/22/2004 08:13 | 03/22/2004 15:00 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 407 | Plan | Maintenance | SAL | 140849 | ||
03/22/2004 08:39 | 03/22/2004 14:51 | Olympia-Kitsap No 3 230kV line | 230.0 | L | 50.26 | 372 | Plan | Maintenance | OLY | 140850 | ||
03/22/2004 08:47 | 03/22/2004 15:34 | Minidoka PH-Canal section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 12.52 | 407 | Plan | Maintenance | IDF | 140851 | ||
03/22/2004 08:47 | 03/22/2004 15:34 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | G | 24.91 | 407 | Plan | Maintenance | IDF | 140851 | |
03/22/2004 11:26 | 03/22/2004 11:40 | Dworshak PH-Dworshak No 1 500kV line | 500.0 | L | 3.67 | 14 | Auto | Foreign Trouble | Foreign Utility | TRI SPK | 140852 | |
03/23/2004 00:30 | 03/23/2004 05:32 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 302 | Plan | Voltage Control | WEN COV | 140853 | ||
03/23/2004 00:35 | 03/23/2004 05:34 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 299 | Plan | Voltage Control | TDA RED SAL | 140854 | ||
03/23/2004 07:02 | 03/25/2004 12:22 | Canal-East Hills section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 6.42 | 3200 | Plan | Maintenance | IDF | 140859 | ||
03/23/2004 07:02 | 03/25/2004 12:22 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | G | 24.91 | 3200 | Plan | Maintenance | IDF | 140859 | |
03/23/2004 07:19 | 03/23/2004 07:19 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 0 | Auto | Unknown | Unknown | WEN TRI | 140860 | |
03/23/2004 07:42 | 03/23/2004 14:48 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 426 | Plan | Maintenance | EUG | 140861 | ||
03/23/2004 08:13 | 03/23/2004 14:48 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 395 | Plan | Maintenance | RED | 140862 | ||
03/23/2004 08:13 | 03/23/2004 14:48 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 395 | Plan | Maintenance | RED | 140862 | |
03/23/2004 08:17 | 03/23/2004 14:41 | Olympia-Kitsap No 3 230kV line | 230.0 | L | 50.26 | 384 | Plan | Maintenance | OLY | 140863 | ||
03/23/2004 08:34 | 03/23/2004 14:17 | Grand Ronde-Boyer No 1 115kV line | 115.0 | L | 5.62 | 343 | Plan | Maintenance | SAL | 140864 | ||
03/23/2004 10:02 | 03/26/2004 10:07 | Anaconda-Silver Bow No 1 115kV line | 115.0 | L | 12.69 | 4325 | Plan | Maintenance | KAL | 140865 | ||
03/24/2004 07:05 | 03/24/2004 14:28 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 443 | Plan | Maintenance | OLY | 140869 | ||
03/24/2004 07:21 | 03/24/2004 15:12 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 471 | Plan | Maintenance | EUG | 140870 | ||
03/24/2004 09:51 | 03/24/2004 15:06 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | 46.50 | 315 | Plan | Maintenance | RED | 140871 | ||
03/24/2004 09:51 | 03/24/2004 15:06 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 315 | Plan | Maintenance | RED | 140871 | |
03/24/2004 12:39 | 03/24/2004 12:39 | Alvey-Dixonville No 1 230kV line | 230.0 | L | 59.40 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140872 | |
03/25/2004 05:40 | 03/25/2004 05:40 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 0 | Auto | Unknown | Unknown | IDF | 140878 | |
03/25/2004 05:51 | 03/25/2004 05:51 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 140879 | |
03/25/2004 05:51 | 03/25/2004 05:51 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 140879 | |
03/25/2004 05:51 | 03/25/2004 05:51 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 140879 | ||
03/25/2004 07:22 | 03/25/2004 14:15 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 413 | Plan | Maintenance | EUG | 140880 | ||
03/25/2004 07:44 | 03/25/2004 14:56 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 432 | Plan | Maintenance | OLY | 140881 | ||
03/25/2004 08:22 | 03/25/2004 15:27 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 425 | Plan | Maintenance | LGV OLY | 140882 | ||
03/25/2004 08:36 | 03/25/2004 15:09 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 393 | Plan | Maintenance | SPK | 140883 | ||
03/25/2004 09:00 | 03/25/2004 11:00 | Jim Creek Service No 1 115kV line | 115.0 | L | 9.57 | 120 | Plan | Foreign Request | SNO | 140884 | ||
03/25/2004 09:15 | 03/25/2004 14:35 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | 46.50 | 320 | Plan | Maintenance | RED | 140885 | ||
03/25/2004 09:15 | 03/25/2004 14:35 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 320 | Plan | Maintenance | RED | 140885 | |
03/25/2004 09:21 | 03/25/2004 11:08 | Schultz-Raver No 1 500kV line | 500.0 | L | 77.24 | 107 | Plan | Maintenance | WEN COV | 140886 | ||
03/25/2004 13:01 | 03/25/2004 14:36 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 95 | Plan | Foreign Request | LGV | 140887 | |
03/25/2004 13:01 | 03/25/2004 14:36 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 95 | Plan | Foreign Request | LGV | 140887 | ||
03/25/2004 23:15 | 03/25/2004 23:15 | Fairview-PACW Coquille No 1 115kV line | 115.0 | L | 6.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140888 | |
03/26/2004 08:00 | 03/26/2004 11:26 | Naselle-Hagen section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 13.00 | 206 | Plan | Maintenance | LGV OLY | 140889 | ||
03/26/2004 08:00 | 03/26/2004 11:26 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 206 | Plan | Maintenance | LGV OLY | 140889 | |
03/26/2004 08:06 | 03/26/2004 13:49 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 343 | Plan | Maintenance | RED | 140890 | ||
03/26/2004 08:06 | 03/26/2004 13:49 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 343 | Plan | Maintenance | RED | 140890 | ||
03/26/2004 08:06 | 03/26/2004 13:49 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 343 | Plan | Maintenance | RED | 140890 | |
03/26/2004 08:08 | 03/26/2004 13:50 | Palisades-Snake River No 1 115kV line | 115.0 | L | 17.50 | 342 | Plan | Foreign Request | IDF | 140891 | ||
03/26/2004 11:46 | 03/26/2004 15:23 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 217 | Plan | Maintenance | LGV OLY | 140892 | ||
03/27/2004 21:20 | 03/27/2004 23:08 | Benton-Scooteney No 1 115kV line | 115.0 | L | T | 20.32 | 108 | Plan | Emergency | TRI | 140898 | |
03/27/2004 21:20 | 03/27/2004 23:08 | Hatton tap to Connell tap to Benton-Scooteney No 1 115kV line | 115.0 | TT | 15.35 | 108 | Plan | Emergency | TRI | 140898 | ||
03/27/2004 21:32 | 03/28/2004 00:10 | Benton-Scooteney No 1 115kV line | 115.0 | L | T | 20.32 | 158 | Plan | Emergency | TRI | 140899 | |
03/27/2004 21:32 | 03/28/2004 00:10 | Hatton tap-Connell section of Connell tap to Benton-Scooteney No 1 115kV line | 115.0 | TS | 3.00 | 158 | Plan | Emergency | TRI | 140899 | ||
03/27/2004 21:57 | 03/27/2004 23:08 | Benton-Scooteney No 1 115kV line | 115.0 | L | T | 20.32 | 71 | Plan | Emergency | TRI | 140900 | |
03/27/2004 21:57 | 03/27/2004 23:08 | Connell tap-Hatton tap section of Connell tap to Benton-Scooteney No 1 115kV line | 115.0 | TS | 4.65 | 71 | Plan | Emergency | TRI | 140900 | ||
03/28/2004 06:00 | 03/28/2004 14:37 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | G | 29.98 | 517 | Plan | Maintenance | COV SNO | 140901 | |
03/28/2004 06:00 | 03/28/2004 14:37 | Echo Lake-Sno-King section of Echo Lake-Monroe No 1 500kV line | 500.0 | S | 21.18 | 517 | Plan | Maintenance | COV SNO | 140901 | ||
03/28/2004 06:00 | 03/28/2004 14:37 | Sno-King-Monroe section of Echo Lake-Monroe No 1 500kV line | 500.0 | S | 8.80 | 517 | Plan | Maintenance | SNO | 140901 | ||
03/28/2004 06:00 | 04/09/2004 19:40 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | T | 29.98 | 18040 | Plan | Testing | COV SNO | 141073 | |
03/28/2004 06:00 | 04/09/2004 19:40 | Sno-King tap to Echo Lake-Monroe No 1 500kV line | 500.0 | T | 12.82 | 18040 | Plan | Testing | SNO | 141073 | ||
03/28/2004 10:00 | 03/28/2004 23:00 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 780 | Plan | Testing | TDA RED | 140902 | ||
03/28/2004 10:00 | 03/28/2004 23:00 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 780 | Plan | Testing | TDA | 140902 | ||
03/28/2004 10:00 | 03/28/2004 23:00 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 780 | Plan | Testing | TDA RED | 140903 | ||
03/28/2004 10:00 | 03/28/2004 23:00 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 780 | Plan | Testing | TDA | 140903 | ||
03/29/2004 04:22 | 03/29/2004 04:22 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.48 | 0 | Auto | Unknown | Bird or Animal | IDF | 140904 |
03/29/2004 04:22 | 03/29/2004 04:22 | Swan Valley-Teton No 1 115kV line | 115.0 | L | 35.47 | 0 | Auto | Unknown | Bird or Animal | IDF | 140904 | |
03/29/2004 04:22 | 03/29/2004 04:22 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | G | 10.94 | 0 | Auto | Unknown | Bird or Animal | IDF | 140904 |
03/29/2004 04:22 | 03/29/2004 04:22 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.99 | 0 | Auto | Unknown | Bird or Animal | IDF | 140904 |
03/29/2004 04:22 | 03/29/2004 04:22 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 0 | Auto | Forced (Configuration) | Power System Condition | IDF | 140905 | |
03/29/2004 06:00 | 03/29/2004 14:24 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 504 | Plan | Testing | TDA RED | 140908 | ||
03/29/2004 06:00 | 03/29/2004 14:24 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 504 | Plan | Testing | TDA | 140908 | ||
03/29/2004 06:05 | 03/29/2004 06:11 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 6 | Plan | Switching | TDA | 140909 | ||
03/29/2004 06:05 | 03/29/2004 14:24 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 499 | Plan | Testing | TDA | 140910 | ||
03/29/2004 07:43 | 03/29/2004 15:04 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 441 | Plan | Maintenance | SAL EUG | 140911 | |
03/29/2004 07:43 | 03/29/2004 15:04 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 441 | Plan | Maintenance | SAL | 140911 | ||
03/29/2004 07:44 | 03/29/2004 14:59 | Hawkins-Alvey No 1 115kV line | 115.0 | L | G | 7.78 | 435 | Plan | Maintenance | EUG | 140912 | |
03/29/2004 07:44 | 03/29/2004 14:59 | Hideaway-Alvey section of Hawkins-Alvey No 1 115kV line | 115.0 | S | 2.46 | 435 | Plan | Maintenance | EUG | 140912 | ||
03/29/2004 08:12 | 04/08/2004 19:03 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 14991 | Plan | Maintenance | KAL | 140913 | ||
03/29/2004 08:14 | 04/02/2004 13:36 | Midway-Benton No 1 115kV line | 115.0 | L | G | 28.75 | 6082 | Plan | Maintenance | TRI | 140914 | |
03/29/2004 08:14 | 04/02/2004 13:36 | Midway-Scooteney section of Midway-Benton No 1 115kV line | 115.0 | S | 13.90 | 6082 | Plan | Maintenance | TRI | 140914 | ||
03/29/2004 08:14 | 04/02/2004 13:36 | Scooteney-Benton section of Midway-Benton No 1 115kV line | 115.0 | S | 14.85 | 6082 | Plan | Maintenance | TRI | 140914 | ||
03/29/2004 08:35 | 03/29/2004 15:40 | Ice Harbor-Franklin No 1 115kV line | 115.0 | L | 9.34 | 425 | Plan | Maintenance | TRI | 140915 | ||
03/29/2004 09:03 | 04/02/2004 09:01 | North Bonneville-Ross No 1 230kV line | 230.0 | L | T | 36.32 | 5758 | Plan | Maintenance | LGV | 140916 | |
03/29/2004 09:03 | 04/02/2004 09:01 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | 1.24 | 5758 | Plan | Maintenance | LGV | 140916 | ||
03/29/2004 09:15 | 03/30/2004 15:22 | Franklin-Hedges No 1 115kV line | 115.0 | L | 5.00 | 1807 | Plan | Maintenance | TRI | 140917 | ||
03/29/2004 09:15 | 03/29/2004 15:28 | Franklin-Badger Canyon No 1 115kV line | 115.0 | L | 15.77 | 373 | Plan | Maintenance | TRI | 140918 | ||
03/29/2004 09:16 | 03/29/2004 15:28 | McNary-Franklin No 2 230kV line | 230.0 | L | 26.88 | 372 | Plan | Maintenance | TRI | 140919 | ||
03/29/2004 09:16 | 03/29/2004 15:27 | Baxter-Franklin section of Benton-Franklin No 1 115kV line | 115.0 | S | 15.96 | 371 | Plan | Maintenance | TRI | 140920 | ||
03/29/2004 09:16 | 03/29/2004 15:27 | Benton-Franklin No 1 115kV line | 115.0 | L | G | 21.03 | 371 | Plan | Maintenance | TRI | 140920 | |
03/29/2004 14:20 | 03/29/2004 14:24 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 4 | Plan | Switching | TDA | 140921 | ||
03/29/2004 15:02 | 03/29/2004 15:52 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 50 | Plan | Testing | TDA RED | 140922 | ||
03/29/2004 15:02 | 03/29/2004 15:52 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 50 | Plan | Testing | TDA | 140922 | ||
03/29/2004 15:02 | 03/29/2004 15:52 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 50 | Plan | Testing | TDA RED | 140923 | ||
03/29/2004 15:02 | 03/29/2004 15:52 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 50 | Plan | Testing | TDA | 140923 | ||
03/29/2004 23:01 | 03/29/2004 23:03 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 2 | Auto | Foreign Trouble | TDA RED | 140924 | ||
03/29/2004 23:01 | 03/29/2004 23:03 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 140924 | ||
03/30/2004 07:28 | 03/30/2004 15:40 | Ice Harbor-Franklin No 1 115kV line | 115.0 | L | 9.34 | 492 | Plan | Maintenance | TRI | 140926 | ||
03/30/2004 07:50 | 03/30/2004 15:22 | McNary-Franklin No 2 230kV line | 230.0 | L | 26.88 | 452 | Plan | Maintenance | TRI | 140927 | ||
03/30/2004 07:50 | 03/30/2004 15:22 | Franklin-Badger Canyon No 1 115kV line | 115.0 | L | 15.77 | 452 | Plan | Maintenance | TRI | 140928 | ||
03/30/2004 07:51 | 03/30/2004 14:47 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 416 | Plan | Maintenance | SAL EUG | 140929 | |
03/30/2004 07:51 | 03/30/2004 14:47 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 416 | Plan | Maintenance | SAL | 140929 | ||
03/30/2004 08:23 | 03/30/2004 08:28 | Alvey-Dixonville No 1 230kV line | 230.0 | L | 59.40 | 5 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140930 | |
03/30/2004 15:44 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | T | 13.35 | still out | Plan | Normally Out | TRI | 140945 | ||
03/30/2004 15:44 | Hedges tap to Franklin-Badger Canyon No 2 115kV line | 115.0 | T | 0.33 | still out | Plan | Normally Out | TRI | 140945 | |||
03/30/2004 15:55 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | T | 5.51 | still out | Plan | Normally Out | TRI | 140946 | ||
03/30/2004 15:55 | Vista tap to Badger Canyon-Richland No 1 115kV line | 115.0 | T | 0.10 | still out | Plan | Normally Out | TRI | 140946 | |||
03/30/2004 22:00 | 04/04/2004 21:14 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 7094 | Plan | Foreign Request | TDA RED | 140931 | ||
03/30/2004 22:00 | 03/31/2004 19:50 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 1310 | Plan | Foreign Request | TDA RED | 140932 | ||
03/30/2004 22:00 | 03/31/2004 19:50 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 1310 | Plan | Foreign Request | TDA | 140932 | ||
03/31/2004 02:09 | 03/31/2004 02:52 | Grand Coulee Switchyard 230-500kV Tie No 1 500kV line | 500.0 | L | 1.25 | 43 | Auto | Equipment/Miscellaneous | WEN | 140933 | ||
03/31/2004 07:54 | 03/31/2004 14:56 | Monmouth-Adair section of Salem-Albany No 2 115kV line | 115.0 | S | 11.30 | 422 | Plan | Maintenance | SAL | 140935 | ||
03/31/2004 07:54 | 03/31/2004 14:56 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 422 | Plan | Maintenance | SAL EUG | 140935 | |
03/31/2004 08:04 | 03/31/2004 14:30 | Paul-Satsop No 1 500kV line | 500.0 | L | 46.47 | 386 | Plan | Maintenance | OLY | 140936 | ||
03/31/2004 08:07 | 03/31/2004 08:09 | Grand Coulee Switchyard 230-500kV Tie No 1 500kV line | 500.0 | L | 1.25 | 2 | Auto | Foreign Trouble | WEN | 140937 | ||
03/31/2004 09:16 | 03/31/2004 09:52 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 36 | Auto | Foreign Trouble | Foreign Trouble | EUG | 140938 | |
03/31/2004 14:02 | 03/31/2004 16:16 | Coyote Springs-PGE No 1 500kV line | 500.0 | L | 0.06 | 134 | Auto | Foreign Trouble | Foreign Utility | TRI | 140939 | |
03/31/2004 19:29 | 03/31/2004 19:34 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 5 | Plan | Switching | TDA | 140940 | ||
03/31/2004 19:29 | 04/04/2004 21:14 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 5805 | Plan | Testing | TDA RED | 140941 | |
03/31/2004 19:29 | 04/04/2004 21:14 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 5805 | Plan | Testing | TDA | 140941 | |||
03/31/2004 19:29 | 04/04/2004 21:04 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5795 | Plan | Forced | TDA | 140942 | ||
04/01/2004 02:40 | 04/01/2004 02:40 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 0 | Auto | Unknown | Unknown | TRI TDA RED SAL | 140943 | |
04/01/2004 07:13 | 04/01/2004 14:43 | Adair-Albany section of Salem-Albany No 2 115kV line | 115.0 | S | 7.45 | 450 | Plan | Maintenance | SAL EUG | 140947 | ||
04/01/2004 07:13 | 04/01/2004 14:43 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 450 | Plan | Maintenance | SAL EUG | 140947 | |
04/01/2004 08:18 | 04/01/2004 14:31 | Redmond-Pilot Butte PACW No 1 230kV line | 230.0 | L | 15.12 | 373 | Plan | Maintenance | RED | 140948 | ||
04/01/2004 08:18 | 04/01/2004 14:32 | Redmond-PGE Round Butte No 1 230kV line | 230.0 | L | 23.60 | 374 | Plan | Maintenance | RED | 140949 | ||
04/01/2004 10:02 | 04/09/2004 15:48 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 11806 | Plan | Construction | SPK | 140950 | ||
04/01/2004 10:03 | 04/12/2004 19:30 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 16347 | Plan | Construction | WEN SPK | 140951 | ||
04/01/2004 12:48 | 04/01/2004 13:24 | Grand Coulee Switchyard 230-500kV Tie No 1 500kV line | 500.0 | L | 1.25 | 36 | Auto | Foreign Trouble | WEN | 140952 | ||
04/01/2004 13:37 | 04/09/2004 11:07 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 11310 | Plan | Construction | WEN SPK | 140953 | |
04/01/2004 13:37 | 04/09/2004 11:07 | Springhill-Bell section of Creston-Bell No 1 115kV line | 115.0 | S | 9.92 | 11310 | Plan | Construction | SPK | 140953 | ||
04/02/2004 06:57 | 04/02/2004 13:54 | Bellingham-PSE Bellingham No 3 115kV line | 115.0 | L | 3.60 | 417 | Plan | Maintenance | SNO | 140955 | ||
04/02/2004 07:29 | 04/02/2004 14:09 | Adair-Albany section of Salem-Albany No 2 115kV line | 115.0 | S | 7.45 | 400 | Plan | Maintenance | SAL EUG | 140956 | ||
04/02/2004 07:29 | 04/02/2004 14:09 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 400 | Plan | Maintenance | SAL EUG | 140956 | |
04/02/2004 08:06 | 04/02/2004 09:54 | Slatt-John Day No 1 500kV line | 500.0 | L | 30.32 | 108 | Plan | Forced | TRI TDA | 140957 | ||
04/02/2004 09:44 | 04/02/2004 12:49 | Albeni Falls-Newport section of Albeni Falls-Pine Street No 1 115kV line | 115.0 | S | 2.11 | 185 | Plan | Maintenance | SPK | 140958 | ||
04/02/2004 09:44 | 04/02/2004 12:49 | Albeni Falls-Pine Street No 1 115kV line | 115.0 | L | G | 2.27 | 185 | Plan | Maintenance | SPK | 140958 | |
04/02/2004 10:05 | 04/02/2004 14:24 | Keeler-Allston No 1 500kV line | 500.0 | L | 42.32 | 259 | Plan | Maintenance | SAL LGV | 140959 | ||
04/02/2004 13:58 | 08/03/2004 12:28 | Benton-Scooteney No 1 115kV line | 115.0 | L | G | 20.32 | 176970 | Plan | Normally Out | TRI | 140960 | |
04/02/2004 13:58 | 08/03/2004 12:28 | Connell-Scooteney section of Benton-Scooteney No 1 115kV line | 115.0 | S | 1.57 | 176970 | Plan | Normally Out | TRI | 140960 | ||
04/03/2004 00:11 | 04/03/2004 06:03 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 352 | Plan | Voltage Control | TRI TDA RED SAL | 140961 | ||
04/03/2004 01:12 | 04/03/2004 06:07 | Schultz-Raver No 3 500kV line | 500.0 | L | 77.47 | 295 | Plan | Voltage Control | WEN COV | 140962 | ||
04/03/2004 01:17 | 04/03/2004 06:16 | Schultz-Raver No 1 500kV line | 500.0 | L | 77.24 | 299 | Plan | Voltage Control | WEN COV | 140963 | ||
04/03/2004 07:46 | 04/03/2004 14:00 | Coyote Springs-PGE No 1 500kV line | 500.0 | L | 0.06 | 374 | Plan | Maintenance | TRI | 140964 | ||
04/03/2004 08:04 | 04/03/2004 14:48 | Boundary-Nelway No 1 230kV line | 230.0 | L | 2.40 | 404 | Plan | Foreign Request | SPK | 140981 | ||
04/03/2004 17:26 | 04/03/2004 17:55 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 29 | Auto | Foreign Trouble | TDA RED | 140965 | ||
04/03/2004 17:26 | 04/03/2004 17:55 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 29 | Auto | Foreign Trouble | TDA | 140965 | ||
04/03/2004 23:46 | 04/04/2004 08:01 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 435 | Plan | Voltage Control | TRI TDA RED SAL | 140966 | ||
04/04/2004 00:19 | 04/04/2004 08:38 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 439 | Plan | Voltage Control | WEN COV | 140967 | ||
04/04/2004 04:36 | 04/04/2004 04:36 | Midway-Benton No 2 230kV line | 230.0 | L | 29.02 | 0 | Auto | Unknown | Unknown | TRI | 140969 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Snyder-Stevens Drive section of White Bluffs-Stevens Drive No 2 115kV line | 115.0 | S | G | 5.00 | 0 | Auto | Unknown | Unknown | TRI | 140982 |
04/04/2004 06:19 | 04/04/2004 06:19 | White Bluffs-Snyder section of White Bluffs-Stevens Drive No 2 115kV line | 115.0 | S | G | 1.90 | 0 | Auto | Unknown | Unknown | TRI | 140982 |
04/04/2004 06:19 | 04/04/2004 06:19 | White Bluffs-Stevens Drive No 2 115kV line | 115.0 | L | 6.90 | 0 | Auto | Unknown | Unknown | TRI | 140982 | |
04/04/2004 06:19 | 04/04/2004 06:19 | First Street tap to White Bluffs-Richland No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 141063 | |
04/04/2004 06:19 | 04/04/2004 06:19 | First Street-Stevens Drive section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 2.68 | 0 | Auto | Unknown | Unknown | TRI | 141063 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Sand Hill Crane-First Street section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 1.10 | 0 | Auto | Unknown | Unknown | TRI | 141063 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Stevens Drive tap to White Bluffs-Richland No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 141063 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Stevens Drive-Thayer Drive section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 1.56 | 0 | Auto | Unknown | Unknown | TRI | 141063 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Thayer Drive tap to White Bluffs-Richland No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 141063 | |
04/04/2004 06:19 | 04/04/2004 06:19 | Thayer Drive-Richland section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 1.38 | 0 | Auto | Unknown | Unknown | TRI | 141063 | |
04/04/2004 06:19 | 04/04/2004 06:19 | White Bluffs-Richland No 1 115kV line | 115.0 | L | G | 11.02 | 0 | Auto | Unknown | Unknown | TRI | 141063 |
04/04/2004 20:59 | 04/04/2004 21:04 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 5 | Plan | Switching | TDA | 140968 | ||
04/05/2004 06:32 | 04/05/2004 06:48 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 16 | Plan | Foreign Request | LGV | 140993 | ||
04/05/2004 06:32 | 04/05/2004 06:48 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 16 | Plan | Foreign Request | LGV | 140993 | |
04/05/2004 06:32 | 04/05/2004 06:48 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 16 | Plan | Foreign Request | LGV | 140993 | |
04/05/2004 06:32 | 04/05/2004 06:48 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 16 | Plan | Foreign Request | LGV | 140993 | |
04/05/2004 07:34 | 04/05/2004 18:02 | Longview-Chehalis 1&3 No 1 230kV line | 230.0 | L | 34.94 | 628 | Plan | Maintenance | LGV OLY | 140994 | ||
04/05/2004 07:34 | 04/05/2004 18:02 | Longview-Chehalis 1&3 No 3 230kV line | 230.0 | L | 31.13 | 628 | Plan | Maintenance | LGV OLY | 140995 | ||
04/05/2004 07:50 | 04/05/2004 15:11 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 441 | Plan | Maintenance | TDA | 140996 | ||
04/05/2004 07:59 | 04/06/2004 15:05 | Salem-Grand Ronde No 1 115kV line | 115.0 | L | 27.80 | 1866 | Plan | Maintenance | SAL | 140997 | ||
04/05/2004 08:02 | 04/05/2004 14:38 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | G | 29.98 | 396 | Plan | PCS Cellular Work | COV SNO | 140983 | |
04/05/2004 08:02 | 04/05/2004 14:38 | Echo Lake-Sno-King section of Echo Lake-Monroe No 1 500kV line | 500.0 | S | 21.18 | 396 | Plan | PCS Cellular Work | COV SNO | 140983 | ||
04/05/2004 08:02 | 04/05/2004 14:38 | Sno-King-Monroe section of Echo Lake-Monroe No 1 500kV line | 500.0 | S | 8.80 | 396 | Plan | PCS Cellular Work | SNO | 140983 | ||
04/05/2004 09:46 | 04/05/2004 16:17 | Columbia-Ancient Lake No 1 115kV line | 115.0 | L | 19.50 | 391 | Plan | Emergency | WEN | 140998 | ||
04/05/2004 09:47 | 05/04/2004 10:31 | Monmouth-Adair section of Salem-Albany No 2 115kV line | 115.0 | S | 11.30 | 41804 | Plan | Construction | SAL | 140999 | ||
04/05/2004 09:47 | 05/04/2004 10:31 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 41804 | Plan | Construction | SAL EUG | 140999 | |
04/05/2004 11:47 | 04/21/2004 13:50 | A539-Albany section of Santiam-Albany No 1 230kV line | 230.0 | S | 28.41 | 23163 | Plan | Maintenance | EUG | 141000 | ||
04/05/2004 11:47 | 04/21/2004 13:50 | Santiam-Albany No 1 230kV line | 230.0 | L | G | 28.54 | 23163 | Plan | Maintenance | SAL EUG | 141000 | |
04/05/2004 11:54 | 04/05/2004 12:00 | Santiam-A539 section of Santiam-Albany No 1 230kV line | 230.0 | S | 0.13 | 6 | Plan | Switching | SAL EUG | 141001 | ||
04/05/2004 11:54 | 04/05/2004 12:00 | Santiam-Albany No 1 230kV line | 230.0 | L | O | 28.54 | 6 | Plan | Switching | SAL EUG | 141001 | |
04/05/2004 13:24 | 04/05/2004 13:24 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0 | Auto | Arc while switching | Unknown | TDA | 141002 | ||
04/05/2004 13:24 | 04/05/2004 13:24 | Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line | 230.0 | S | 136.53 | 0 | Auto | Arc while switching | Unknown | TDA RED | 141002 | |
04/05/2004 13:24 | 04/05/2004 13:24 | McNary-Dalreed section of McNary-Santiam No 2 230kV line | 230.0 | S | 35.95 | 0 | Auto | Arc while switching | Unknown | TRI TDA | 141002 | |
04/05/2004 13:24 | 04/05/2004 13:24 | McNary-Santiam No 2 230kV line | 230.0 | L | G | 200.43 | 0 | Auto | Arc while switching | Unknown | TRI TDA RED SAL | 141002 |
04/05/2004 13:24 | 04/05/2004 13:24 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.10 | 0 | Auto | Arc while switching | Unknown | SAL | 141002 | |
04/05/2004 13:24 | 04/05/2004 13:24 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 0 | Auto | Arc while switching | Unknown | SAL | 141002 | |
04/05/2004 13:24 | 04/05/2004 17:49 | Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line | 230.0 | S | 136.53 | 265 | Plan | Foreign Request | TDA RED | 141010 | ||
04/05/2004 13:24 | 04/05/2004 17:49 | McNary-Santiam No 2 230kV line | 230.0 | L | G | 200.43 | 265 | Plan | Foreign Request | TRI TDA RED SAL | 141010 | |
04/05/2004 13:33 | 04/05/2004 17:31 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 238 | Plan | Foreign Request | TDA | 141003 | |||
04/05/2004 13:33 | 04/05/2004 17:31 | McNary-Dalreed section of McNary-Santiam No 2 230kV line | 230.0 | S | 35.95 | 238 | Plan | Foreign Request | TRI TDA | 141003 | ||
04/05/2004 13:33 | 04/05/2004 17:31 | McNary-Santiam No 2 230kV line | 230.0 | L | O | 200.43 | 238 | Plan | Foreign Request | TRI TDA RED SAL | 141003 | |
04/05/2004 17:11 | 04/05/2004 17:45 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 34 | Plan | Foreign Request | LGV | 141004 | ||
04/05/2004 17:11 | 04/05/2004 17:45 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 34 | Plan | Foreign Request | LGV | 141004 | |
04/05/2004 17:11 | 04/05/2004 17:45 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 34 | Plan | Foreign Request | LGV | 141004 | |
04/05/2004 17:11 | 04/05/2004 17:45 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 34 | Plan | Foreign Request | LGV | 141004 | |
04/05/2004 17:31 | Boardman tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.28 | still out | Plan | Normally Out | TRI | 141017 | |||
04/05/2004 17:31 | McNary-Santiam No 2 230kV line | 230.0 | L | T | 200.43 | still out | Plan | Normally Out | TRI TDA RED SAL | 141017 | ||
04/06/2004 06:37 | 04/06/2004 06:47 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 10 | Plan | Foreign Request | LGV | 141018 | ||
04/06/2004 06:37 | 04/06/2004 06:47 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 10 | Plan | Foreign Request | LGV | 141018 | |
04/06/2004 06:37 | 04/06/2004 06:47 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 10 | Plan | Foreign Request | LGV | 141018 | |
04/06/2004 06:37 | 04/06/2004 06:47 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 10 | Plan | Foreign Request | LGV | 141018 | |
04/06/2004 07:33 | 04/07/2004 14:44 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 1871 | Plan | Maintenance | TDA | 141019 | ||
04/06/2004 07:49 | 04/06/2004 18:55 | Longview-Chehalis 1&3 No 1 230kV line | 230.0 | L | 34.94 | 666 | Plan | Maintenance | LGV OLY | 141020 | ||
04/06/2004 07:49 | 04/06/2004 18:55 | Longview-Chehalis 1&3 No 3 230kV line | 230.0 | L | 31.13 | 666 | Plan | Maintenance | LGV OLY | 141021 | ||
04/06/2004 08:33 | 04/06/2004 19:03 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 630 | Plan | Foreign Request | SNO | 141005 | ||
04/06/2004 14:04 | 04/06/2004 14:43 | Hay Mill-Roe's Corner section of Heyburn-Adelaide No 1 138kV line | 138.0 | S | 4.92 | 39 | Plan | Foreign Request | IDF | 141022 | ||
04/06/2004 14:04 | 04/06/2004 14:43 | Heyburn-Adelaide No 1 138kV line | 138.0 | L | G | 12.35 | 39 | Plan | Foreign Request | IDF | 141022 | |
04/06/2004 14:16 | 04/06/2004 14:32 | Heyburn-Adelaide No 1 138kV line | 138.0 | L | O | 12.35 | 16 | Plan | Foreign Request | IDF | 141023 | |
04/06/2004 14:16 | 04/06/2004 14:32 | Heyburn-Hay Mill section of Heyburn-Adelaide No 1 138kV line | 138.0 | S | 4.51 | 16 | Plan | Foreign Request | IDF | 141023 | ||
04/06/2004 17:07 | 04/06/2004 17:15 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 8 | Plan | Foreign Request | LGV | 141024 | ||
04/06/2004 17:07 | 04/06/2004 17:15 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 8 | Plan | Foreign Request | LGV | 141024 | |
04/06/2004 17:07 | 04/06/2004 17:15 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 8 | Plan | Foreign Request | LGV | 141024 | |
04/06/2004 17:07 | 04/06/2004 17:15 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 8 | Plan | Foreign Request | LGV | 141024 | |
04/07/2004 05:03 | 04/07/2004 05:10 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 7 | Plan | Switching | TDA | 141006 | ||
04/07/2004 05:04 | 04/07/2004 05:27 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 23 | Plan | Foreign Request | TDA RED | 141007 | ||
04/07/2004 05:04 | 04/07/2004 05:27 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 23 | Plan | Foreign Request | TDA | 141007 | ||
04/07/2004 05:04 | 04/07/2004 18:28 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 804 | Plan | Foreign Request | TDA RED | 141008 | ||
04/07/2004 05:04 | 04/07/2004 18:06 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 782 | Plan | Forced | TDA | 141009 | ||
04/07/2004 05:04 | 04/07/2004 18:28 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 804 | Plan | Forced | TDA RED | 141025 | |
04/07/2004 05:04 | 04/07/2004 18:28 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 804 | Plan | Forced | TDA | 141025 | |||
04/07/2004 06:34 | 04/07/2004 06:44 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 10 | Plan | Foreign Request | LGV | 141026 | ||
04/07/2004 06:34 | 04/07/2004 06:44 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 10 | Plan | Foreign Request | LGV | 141026 | |
04/07/2004 06:34 | 04/07/2004 06:44 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 10 | Plan | Foreign Request | LGV | 141026 | |
04/07/2004 06:34 | 04/07/2004 06:44 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 10 | Plan | Foreign Request | LGV | 141026 | |
04/07/2004 07:06 | 04/07/2004 19:03 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 717 | Plan | Foreign Request | WEN SPK | 141027 | ||
04/07/2004 07:15 | 04/07/2004 12:35 | Allston-Clatsop No 1 230kV line | 230.0 | L | T | 42.61 | 320 | Plan | Maintenance | LGV | 141028 | |
04/07/2004 07:15 | 04/07/2004 12:35 | Driscoll tap to Allston-Clatsop No 1 230kV line | 230.0 | T | 0.22 | 320 | Plan | Maintenance | LGV | 141028 | ||
04/07/2004 07:36 | 04/15/2004 13:20 | Rivergate-Keeler No 1&2 230kV line | 230.0 | L | 9.48 | 11864 | Plan | Maintenance | LGV SAL | 141029 | ||
04/07/2004 07:38 | 04/07/2004 16:45 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 547 | Plan | Foreign Request | SNO | 141030 | ||
04/07/2004 08:22 | 04/07/2004 10:33 | Bandon-Rogue No 1 115kV line | 115.0 | L | G | 46.00 | 131 | Plan | Maintenance | EUG | 141031 | |
04/07/2004 08:22 | 04/07/2004 10:33 | Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line | 115.0 | S | 21.50 | 131 | Plan | Maintenance | EUG | 141031 | ||
04/07/2004 08:45 | 04/07/2004 12:32 | Ellensburg-Clymer section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 1.38 | 227 | Plan | Maintenance | WEN | 141032 | ||
04/07/2004 08:45 | 04/07/2004 12:32 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 227 | Plan | Maintenance | WEN TRI | 141032 | |
04/07/2004 12:43 | 04/07/2004 13:11 | East Hills-Unity section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 5.97 | 28 | Plan | Maintenance | IDF | 141033 | ||
04/07/2004 12:43 | 04/07/2004 13:11 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | G | 24.91 | 28 | Plan | Maintenance | IDF | 141033 | |
04/07/2004 16:30 | 04/07/2004 16:47 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 17 | Plan | Foreign Request | LGV | 141034 | ||
04/07/2004 16:30 | 04/07/2004 16:47 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 17 | Plan | Foreign Request | LGV | 141034 | |
04/07/2004 16:30 | 04/07/2004 16:47 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 17 | Plan | Foreign Request | LGV | 141034 | |
04/07/2004 16:30 | 04/07/2004 16:47 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 17 | Plan | Foreign Request | LGV | 141034 | |
04/07/2004 18:01 | 04/07/2004 18:06 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Switching | TDA | 141035 | ||
04/07/2004 18:01 | 04/07/2004 18:28 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 27 | Plan | Foreign Request | TDA RED | 141036 | ||
04/07/2004 18:01 | 04/07/2004 18:28 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 27 | Plan | Foreign Request | TDA | 141036 | ||
04/07/2004 19:03 | 04/07/2004 21:34 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 151 | Plan | Forced | TDA RED | 141037 | ||
04/07/2004 19:03 | 04/07/2004 21:34 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 151 | Plan | Forced | TDA | 141037 | |||
04/07/2004 19:03 | 04/07/2004 21:34 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 151 | Plan | Forced | TDA RED | 141038 | ||
04/07/2004 19:03 | 04/07/2004 21:34 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 151 | Plan | Emergency | TDA RED | 141039 | |
04/07/2004 19:03 | 04/07/2004 21:34 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 151 | Plan | Emergency | TDA | 141039 | |||
04/08/2004 05:07 | 04/08/2004 05:37 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 30 | Plan | Switching | TDA RED | 141040 | ||
04/08/2004 05:07 | 04/08/2004 05:37 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 30 | Plan | Switching | TDA | 141040 | ||
04/08/2004 05:07 | 04/08/2004 17:12 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 725 | Plan | Testing | TDA RED | 141041 | ||
04/08/2004 05:07 | 04/08/2004 05:25 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 18 | Plan | Switching | TDA | 141042 | ||
04/08/2004 05:21 | 04/08/2004 17:12 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 711 | Plan | Testing | TDA | 141043 | ||
04/08/2004 05:21 | 04/08/2004 17:12 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 711 | Plan | Testing | TDA RED | 141044 | |
04/08/2004 05:21 | 04/08/2004 17:12 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 711 | Plan | Testing | TDA | 141044 | |||
04/08/2004 06:30 | 04/08/2004 06:39 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 9 | Plan | Foreign Request | LGV | 141047 | ||
04/08/2004 06:30 | 04/08/2004 06:39 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 9 | Plan | Foreign Request | LGV | 141047 | |
04/08/2004 06:30 | 04/08/2004 06:39 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 9 | Plan | Foreign Request | LGV | 141047 | |
04/08/2004 06:30 | 04/08/2004 06:39 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 9 | Plan | Foreign Request | LGV | 141047 | |
04/08/2004 07:05 | 04/08/2004 16:34 | Custer-Ingledow No 2 500kV line | 500.0 | L | 22.65 | 569 | Plan | Foreign Request | SNO | 141048 | ||
04/08/2004 07:10 | 04/08/2004 14:23 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 433 | Plan | Construction | WEN SPK | 141049 | ||
04/08/2004 07:28 | 04/08/2004 15:12 | Santiam-Chemawa No 1 230kV line | 230.0 | L | 24.40 | 464 | Plan | Maintenance | SAL | 141050 | ||
04/08/2004 07:30 | 04/08/2004 14:02 | Allston-Driscoll No 1 230kV line | 230.0 | L | 20.96 | 392 | Plan | Maintenance | LGV | 141051 | ||
04/08/2004 07:32 | 04/08/2004 12:21 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 289 | Plan | Maintenance | TDA | 141052 | ||
04/08/2004 07:45 | 04/08/2004 12:17 | Burley-Riverton section of West Burley-Heyburn No 1 138kV line | 138.0 | S | 1.59 | 272 | Plan | Construction | IDF | 141062 | ||
04/08/2004 07:45 | 04/08/2004 12:17 | West Burley-Heyburn No 1 138kV line | 138.0 | L | G | 4.43 | 272 | Plan | Construction | IDF | 141062 | |
04/08/2004 08:13 | 04/08/2004 08:13 | Mission-Pendleton section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 6.67 | 0 | Auto | Unknown | Unknown | TRI | 141151 | |
04/08/2004 08:13 | 04/08/2004 08:13 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | O | 38.93 | 0 | Auto | Unknown | Unknown | TRI | 141151 |
04/08/2004 08:15 | 04/08/2004 14:37 | Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 12.44 | 382 | Plan | Maintenance | SAL | 141053 | ||
04/08/2004 08:15 | 04/08/2004 14:37 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 382 | Plan | Maintenance | SAL | 141053 | |
04/08/2004 08:48 | 04/08/2004 14:01 | Grand Coulee Switchyard 230-500kV Tie No 1 500kV line | 500.0 | L | 1.25 | 313 | Plan | Foreign Request | WEN | 141054 | ||
04/08/2004 09:21 | 04/08/2004 10:37 | Hat Rock-PACW Wallula section of McNary-Wallula 230kV line | 230.0 | S | 18.00 | 76 | Auto | Foreign Trouble | Foreign Utility | TRI | 141055 | |
04/08/2004 09:21 | 04/08/2004 10:37 | McNary-Wallula 230kV line | 230.0 | L | G | 30.70 | 76 | Auto | Foreign Trouble | Foreign Utility | TRI | 141055 |
04/08/2004 10:33 | 04/08/2004 10:37 | Cold Springs-Hat Rock section of McNary-Wallula 230kV line | 230.0 | S | 6.50 | 4 | Auto | Foreign Trouble | Foreign Utility | TRI | 141061 | |
04/08/2004 10:33 | 04/08/2004 10:37 | Hat Rock tap to McNary-Wallula 230kV line | 230.0 | T | 0.43 | 4 | Auto | Foreign Trouble | Foreign Utility | TRI | 141061 | |
04/08/2004 10:33 | 04/08/2004 10:37 | McNary-Cold Springs section of McNary-Wallula 230kV line | 230.0 | S | 6.20 | 4 | Auto | Foreign Trouble | Foreign Utility | TRI | 141061 | |
04/08/2004 10:33 | 04/08/2004 10:37 | McNary-Wallula 230kV line | 230.0 | L | O | 30.70 | 4 | Auto | Foreign Trouble | Foreign Utility | TRI | 141061 |
04/08/2004 12:36 | 05/24/2004 11:02 | West Burley-Burley section of West Burley-Heyburn No 1 138kV line | 138.0 | S | 2.22 | 66146 | Plan | Normally Out | IDF | 141056 | ||
04/08/2004 12:36 | 05/24/2004 11:02 | West Burley-Heyburn No 1 138kV line | 138.0 | L | G | 4.43 | 66146 | Plan | Normally Out | IDF | 141056 | |
04/08/2004 17:05 | 04/08/2004 17:12 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 7 | Plan | Switching | TDA RED | 141057 | ||
04/08/2004 17:05 | 04/08/2004 17:12 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 7 | Plan | Switching | TDA | 141057 | ||
04/08/2004 17:05 | 04/08/2004 17:12 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 7 | Plan | Switching | TDA | 141058 | ||
04/08/2004 17:43 | 04/08/2004 17:52 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 9 | Plan | Foreign Request | LGV | 141059 | ||
04/08/2004 17:43 | 04/08/2004 17:52 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 9 | Plan | Foreign Request | LGV | 141059 | |
04/08/2004 17:43 | 04/08/2004 17:52 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 9 | Plan | Foreign Request | LGV | 141059 | |
04/08/2004 17:43 | 04/08/2004 17:52 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 9 | Plan | Foreign Request | LGV | 141059 | |
04/08/2004 19:26 | 04/09/2004 01:08 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 342 | Plan | Voltage Control | KAL | 141060 | ||
04/09/2004 06:24 | 04/09/2004 06:31 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 7 | Plan | Foreign Request | LGV | 141074 | ||
04/09/2004 06:24 | 04/09/2004 06:31 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 7 | Plan | Foreign Request | LGV | 141074 | |
04/09/2004 06:24 | 04/09/2004 06:31 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 7 | Plan | Foreign Request | LGV | 141074 | |
04/09/2004 06:24 | 04/09/2004 06:31 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 7 | Plan | Foreign Request | LGV | 141074 | |
04/09/2004 08:13 | 04/09/2004 15:27 | Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 12.44 | 434 | Plan | Maintenance | SAL | 141075 | ||
04/09/2004 08:13 | 04/09/2004 15:27 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 434 | Plan | Maintenance | SAL | 141075 | |
04/09/2004 10:31 | 04/09/2004 11:28 | Olympia-Shelton No 4 230kV line | 230.0 | L | 20.00 | 57 | Plan | Maintenance | OLY | 141076 | ||
04/09/2004 13:13 | 06/14/2004 08:37 | Baker Creek-Walnut City section of Walnut City tap to Forest Grove-McMinnville No 1 115kV line | 115.0 | TS | 1.20 | 94764 | Plan | Normally Out | SAL | 141077 | ||
04/09/2004 13:13 | 06/14/2004 08:37 | Forest Grove-McMinnville No 1 115kV line | 115.0 | L | T | 23.72 | 94764 | Plan | Normally Out | SAL | 141077 | |
04/09/2004 17:02 | 04/09/2004 17:25 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 23 | Plan | Foreign Request | LGV | 141078 | ||
04/09/2004 17:02 | 04/09/2004 17:25 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 23 | Plan | Foreign Request | LGV | 141078 | |
04/09/2004 17:02 | 04/09/2004 17:25 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 23 | Plan | Foreign Request | LGV | 141078 | |
04/09/2004 17:02 | 04/09/2004 17:25 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 23 | Plan | Foreign Request | LGV | 141078 | |
04/09/2004 22:02 | 04/09/2004 22:14 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 12 | Plan | Switching | TDA RED | 141079 | ||
04/09/2004 22:02 | 04/10/2004 04:20 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 378 | Plan | Maintenance | TDA RED | 141080 | ||
04/09/2004 22:02 | 04/10/2004 04:20 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 378 | Plan | Maintenance | TDA | 141080 | |||
04/09/2004 22:02 | 04/10/2004 04:20 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 378 | Plan | Maintenance | TDA RED | 141081 | |
04/09/2004 22:02 | 04/10/2004 04:20 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 378 | Plan | Maintenance | TDA | 141081 | |||
04/09/2004 22:02 | 04/10/2004 04:09 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 367 | Plan | Switching | TDA | 141082 | ||
04/09/2004 22:02 | 04/10/2004 04:10 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 368 | Plan | Switching | TDA | 141083 | ||
04/10/2004 03:46 | 04/10/2004 09:14 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 328 | Plan | Voltage Control | TRI TDA RED SAL | 141084 | ||
04/10/2004 07:30 | 04/10/2004 08:53 | Chief Joseph PH-Chief Joseph No 6 500kV line | 500.0 | L | 0.74 | 83 | Plan | Foreign Request | WEN | 141085 | ||
04/10/2004 09:08 | 04/10/2004 17:04 | Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 29.43 | 476 | Plan | Fiber Optic Work | WEN TRI | 141086 | ||
04/10/2004 09:08 | 04/10/2004 17:04 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 476 | Plan | Fiber Optic Work | WEN TRI | 141086 | |
04/10/2004 10:14 | 04/10/2004 10:22 | Chief Joseph PH-Chief Joseph No 6 500kV line | 500.0 | L | 0.74 | 8 | Plan | Foreign Request | WEN | 141087 | ||
04/10/2004 18:58 | 04/12/2004 08:22 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 2244 | Plan | Voltage Control | KAL | 141088 | ||
04/11/2004 00:26 | 04/12/2004 05:21 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 1735 | Plan | Voltage Control | WEN COV | 141089 | ||
04/11/2004 00:49 | 04/11/2004 08:53 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 484 | Plan | Voltage Control | TRI TDA RED SAL | 141090 | ||
04/12/2004 01:56 | 04/24/2004 14:54 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 18058 | Plan | Voltage Control | TRI TDA RED SAL | 141091 | ||
04/12/2004 06:43 | 04/12/2004 06:52 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 9 | Plan | Foreign Request | LGV | 141094 | ||
04/12/2004 06:43 | 04/12/2004 06:52 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 9 | Plan | Foreign Request | LGV | 141094 | |
04/12/2004 06:43 | 04/12/2004 06:52 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 9 | Plan | Foreign Request | LGV | 141094 | |
04/12/2004 06:43 | 04/12/2004 06:52 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 9 | Plan | Foreign Request | LGV | 141094 | |
04/12/2004 07:00 | 04/12/2004 15:24 | Snohomish-Bothell No 2 230kV line | 230.0 | L | 7.40 | 504 | Plan | Maintenance | SNO | 141095 | ||
04/12/2004 07:22 | 04/19/2004 15:39 | Satsop-Aberdeen No 3 230kV line | 230.0 | L | 20.51 | 10577 | Plan | Maintenance | OLY | 141096 | ||
04/12/2004 07:59 | 04/12/2004 15:02 | Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line | 115.0 | S | 18.50 | 423 | Plan | Maintenance | SAL | 141097 | ||
04/12/2004 07:59 | 04/12/2004 15:02 | Oregon City-Chemawa No 2 115kV line | 115.0 | L | G | 25.20 | 423 | Plan | Maintenance | SAL | 141097 | |
04/12/2004 08:28 | 04/19/2004 22:40 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 10932 | Plan | Construction | SPK KAL | 141098 | ||
04/12/2004 09:04 | 04/19/2004 13:16 | Court Street-Ruby Street section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | 1.83 | 10332 | Plan | Foreign Request | TRI | 141099 | ||
04/12/2004 09:04 | 04/19/2004 13:16 | Franklin-Ruby Street No 1 115kV line | 115.0 | L | G | 4.85 | 10332 | Plan | Foreign Request | TRI | 141099 | |
04/12/2004 09:06 | 04/19/2004 13:13 | Court Street tap to Franklin-Ruby Street No 1 115kV line | 115.0 | T | 0.10 | 10327 | Plan | Foreign Request | TRI | 141100 | ||
04/12/2004 09:06 | 04/19/2004 13:13 | Foster Wells-Court Street section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | 0.32 | 10327 | Plan | Foreign Request | TRI | 141100 | ||
04/12/2004 09:06 | 04/19/2004 13:13 | Franklin-Ruby Street No 1 115kV line | 115.0 | L | O | 4.85 | 10327 | Plan | Foreign Request | TRI | 141100 | |
04/12/2004 09:12 | 04/15/2004 15:08 | North Bonneville-Ross No 2 230kV line | 230.0 | L | T | 35.99 | 4676 | Plan | Maintenance | LGV | 141101 | |
04/12/2004 09:12 | 04/15/2004 15:08 | Sifton tap to North Bonneville-Ross No 2 230kV line | 230.0 | T | 1.20 | 4676 | Plan | Maintenance | LGV | 141101 | ||
04/12/2004 09:12 | 04/12/2004 12:07 | North Bonneville-Ross No 2 230kV line | 230.0 | L | G | 35.99 | 175 | Plan | Switching | LGV | 141102 | |
04/12/2004 09:12 | 04/12/2004 12:07 | North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 27.51 | 175 | Plan | Switching | LGV | 141102 | ||
04/12/2004 09:12 | 04/12/2004 12:07 | Sifton-Ross section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 8.48 | 175 | Plan | Switching | LGV | 141102 | ||
04/12/2004 15:44 | 04/12/2004 22:16 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 392 | Plan | Voltage Control | KAL | 141103 | ||
04/12/2004 17:25 | 04/12/2004 17:34 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 9 | Plan | Foreign Request | LGV | 141104 | ||
04/12/2004 17:25 | 04/12/2004 17:34 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 9 | Plan | Foreign Request | LGV | 141104 | |
04/12/2004 17:25 | 04/12/2004 17:34 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 9 | Plan | Foreign Request | LGV | 141104 | |
04/12/2004 17:25 | 04/12/2004 17:34 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 9 | Plan | Foreign Request | LGV | 141104 | |
04/13/2004 05:10 | 04/14/2004 23:32 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 2542 | Plan | Voltage Control | KAL | 141105 | ||
04/13/2004 06:05 | 04/23/2004 13:51 | Potholes-Grand Coulee No 1 230kV line | 230.0 | L | 65.66 | 14866 | Plan | Construction | WEN SPK | 141110 | ||
04/13/2004 06:28 | 04/23/2004 12:28 | Rocky Ford-Grand Coulee No 1 230kV line | 230.0 | L | 52.94 | 14760 | Plan | Construction | WEN | 141111 | ||
04/13/2004 07:16 | 04/13/2004 07:23 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 7 | Plan | Foreign Request | LGV | 141112 | ||
04/13/2004 07:16 | 04/13/2004 07:23 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 7 | Plan | Foreign Request | LGV | 141112 | |
04/13/2004 07:16 | 04/13/2004 07:23 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 7 | Plan | Foreign Request | LGV | 141112 | |
04/13/2004 07:16 | 04/13/2004 07:23 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 7 | Plan | Foreign Request | LGV | 141112 | |
04/13/2004 07:20 | 04/26/2004 13:02 | B212-Wilbur section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 16.47 | 19062 | Plan | Construction | WEN | 141113 | ||
04/13/2004 07:20 | 04/26/2004 13:02 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | G | 28.27 | 19062 | Plan | Construction | WEN SPK | 141113 | |
04/13/2004 07:48 | 04/13/2004 13:40 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 352 | Plan | Maintenance | EUG | 141114 | |
04/13/2004 07:48 | 04/13/2004 13:40 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 352 | Plan | Maintenance | EUG | 141114 | ||
04/13/2004 08:07 | 04/13/2004 13:35 | Allston-Driscoll No 1 230kV line | 230.0 | L | 20.96 | 328 | Plan | Maintenance | LGV | 141115 | ||
04/13/2004 08:18 | 04/13/2004 12:51 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 273 | Auto | Bird or Animal | Bird or Animal | OLY | 141116 | |
04/13/2004 16:14 | 04/13/2004 16:14 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Unknown | Unknown | KAL | 141117 |
04/13/2004 16:14 | 04/13/2004 16:14 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Unknown | Unknown | KAL | 141117 |
04/13/2004 16:14 | 04/13/2004 16:14 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Unknown | Unknown | KAL | 141117 | |
04/13/2004 16:14 | 04/13/2004 16:14 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Unknown | Unknown | KAL | 141117 |
04/13/2004 16:14 | 04/13/2004 16:14 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | KAL | 141117 |
04/13/2004 16:14 | 04/13/2004 16:14 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Unknown | Unknown | KAL | 141117 |
04/13/2004 16:14 | 04/13/2004 16:18 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 4 | Auto | RAS Initiated | RAS Initiated | KAL | 141118 | |
04/13/2004 17:00 | 04/13/2004 17:12 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 12 | Plan | Foreign Request | LGV | 141119 | ||
04/13/2004 17:00 | 04/13/2004 17:12 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 12 | Plan | Foreign Request | LGV | 141119 | |
04/13/2004 17:00 | 04/13/2004 17:12 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 12 | Plan | Foreign Request | LGV | 141119 | |
04/13/2004 17:00 | 04/13/2004 17:12 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 12 | Plan | Foreign Request | LGV | 141119 | |
04/14/2004 01:57 | 04/14/2004 04:47 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 170 | Plan | Voltage Control | WEN COV | 141120 | ||
04/14/2004 05:07 | 04/14/2004 05:07 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 0 | Auto | Unknown | Terminal Equipment Failure | IDF | 141126 | |
04/14/2004 05:07 | 04/14/2004 05:10 | Palisades-Swan Valley No 1 115kV line | 115.0 | L | 12.40 | 3 | Auto | Unknown | Terminal Equipment Failure | IDF | 141127 | |
04/14/2004 05:07 | 04/14/2004 05:10 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 3 | Auto | Unknown | Terminal Equipment Failure | IDF | 141128 | |
04/14/2004 05:07 | 04/14/2004 05:11 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 4 | Auto | Unknown | Terminal Equipment Failure | IDF | 141129 | |
04/14/2004 05:07 | 04/14/2004 05:11 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 4 | Auto | Unknown | Terminal Equipment Failure | IDF | 141129 |
04/14/2004 06:27 | 04/14/2004 06:36 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 9 | Plan | Foreign Request | LGV | 141130 | ||
04/14/2004 06:27 | 04/14/2004 06:36 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 9 | Plan | Foreign Request | LGV | 141130 | |
04/14/2004 06:27 | 04/14/2004 06:36 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 9 | Plan | Foreign Request | LGV | 141130 | |
04/14/2004 06:27 | 04/14/2004 06:36 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 9 | Plan | Foreign Request | LGV | 141130 | |
04/14/2004 07:29 | 04/14/2004 12:20 | Chehalis-Centralia No 2 69kV line | 69.0 | L | G | 15.26 | 291 | Plan | Maintenance | OLY | 141131 | |
04/14/2004 07:29 | 04/14/2004 12:20 | Fords Prairie-Centralia section of Chehalis-Centralia No 2 69kV line | 69.0 | S | 3.13 | 291 | Plan | Maintenance | OLY | 141131 | ||
04/14/2004 08:04 | 04/14/2004 14:36 | McNary-Badger Canyon No 1 115kV line | 115.0 | L | G | 28.40 | 392 | Plan | Maintenance | TRI | 141132 | |
04/14/2004 08:04 | 04/14/2004 14:36 | Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 10.81 | 392 | Plan | Maintenance | TRI | 141132 | ||
04/14/2004 08:10 | 04/16/2004 12:42 | Alvey-Lane No 1 230kV line | 230.0 | L | 13.41 | 3152 | Plan | Testing | EUG | 141133 | ||
04/14/2004 08:11 | 04/14/2004 12:33 | Allston-Driscoll No 1 230kV line | 230.0 | L | 20.96 | 262 | Plan | Maintenance | LGV | 141134 | ||
04/14/2004 08:16 | 04/16/2004 14:43 | Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line | 115.0 | S | 18.50 | 3267 | Plan | Maintenance | SAL | 141135 | ||
04/14/2004 08:16 | 04/16/2004 14:43 | Oregon City-Chemawa No 2 115kV line | 115.0 | L | G | 25.20 | 3267 | Plan | Maintenance | SAL | 141135 | |
04/14/2004 08:34 | 04/14/2004 11:50 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 196 | Plan | Switching | COV | 141136 | ||
04/14/2004 08:36 | 04/14/2004 11:51 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 195 | Plan | Switching | COV | 141137 | ||
04/14/2004 08:50 | 04/14/2004 11:38 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 168 | Plan | Switching | COV | 141138 | ||
04/14/2004 08:50 | 04/14/2004 11:43 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 173 | Plan | Switching | COV | 141139 | ||
04/14/2004 08:50 | 04/14/2004 11:43 | Covington-Columbia No 3 230kV line | 230.0 | L | 110.00 | 173 | Plan | Switching | COV WEN | 141140 | ||
04/14/2004 08:50 | 04/14/2004 11:43 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 173 | Plan | Switching | COV | 141141 | ||
04/14/2004 09:10 | 04/14/2004 09:34 | Midway-Grandview No 1 115kV line | 115.0 | L | G | 25.07 | 24 | Plan | Maintenance | TRI WEN | 141142 | |
04/14/2004 09:10 | 04/14/2004 09:34 | Sunnyside Port-Grandview section of Midway-Grandview No 1 115kV line | 115.0 | S | 0.06 | 24 | Plan | Maintenance | WEN TRI | 141142 | ||
04/14/2004 09:13 | 04/14/2004 10:24 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 71 | Plan | Maintenance | IDF | 141143 | ||
04/14/2004 12:50 | 04/14/2004 12:52 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 2 | Auto | Foreign Trouble | TDA RED | 141144 | |
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141144 | |||
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141144 | |||
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141144 | |||
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141144 | |||
04/14/2004 12:50 | 04/14/2004 12:52 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 2 | Auto | Foreign Trouble | TDA RED | 141145 | |
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141145 | |||
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141145 | |||
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141145 | |||
04/14/2004 12:50 | 04/14/2004 12:52 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2 | Auto | Foreign Trouble | TDA | 141145 | |||
04/14/2004 16:21 | 04/14/2004 16:32 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 11 | Plan | Foreign Request | LGV | 141146 | ||
04/14/2004 16:21 | 04/14/2004 16:32 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 11 | Plan | Foreign Request | LGV | 141146 | |
04/14/2004 16:21 | 04/14/2004 16:32 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 11 | Plan | Foreign Request | LGV | 141146 | |
04/14/2004 16:21 | 04/14/2004 16:32 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 11 | Plan | Foreign Request | LGV | 141146 | |
04/14/2004 23:33 | 04/14/2004 23:50 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 17 | Plan | Voltage Control | KAL | 141147 | ||
04/15/2004 05:55 | 04/20/2004 22:48 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 8213 | Plan | Voltage Control | KAL | 141148 | ||
04/15/2004 06:27 | 04/15/2004 06:35 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 8 | Plan | Foreign Request | LGV | 141152 | ||
04/15/2004 06:27 | 04/15/2004 06:35 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 8 | Plan | Foreign Request | LGV | 141152 | |
04/15/2004 06:27 | 04/15/2004 06:35 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 8 | Plan | Foreign Request | LGV | 141152 | |
04/15/2004 06:27 | 04/15/2004 06:35 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 8 | Plan | Foreign Request | LGV | 141152 | |
04/15/2004 07:00 | 04/15/2004 17:02 | Monroe-Sammamish No 1 230kV line | 230.0 | L | 27.18 | 602 | Plan | Foreign Request | SNO COV | 141153 | ||
04/15/2004 07:06 | 04/15/2004 14:52 | Wendson-Berrydale section of Wendson-Tahkenitch No 1 115kV line | 115.0 | S | 6.36 | 466 | Plan | Maintenance | EUG | 141154 | ||
04/15/2004 07:06 | 04/15/2004 14:52 | Wendson-Tahkenitch No 1 115kV line | 115.0 | L | G | 20.34 | 466 | Plan | Maintenance | EUG | 141154 | |
04/15/2004 07:29 | 04/15/2004 13:09 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 340 | Plan | Maintenance | IDF | 141155 | ||
04/15/2004 08:15 | Addy-Cusick No 1 230kV line | 230.0 | L | 25.77 | still out | Plan | Normally Out | SPK | 141156 | |||
04/15/2004 08:20 | 04/15/2004 15:24 | Bellingham-PSE Bellingham No 2 115kV line | 115.0 | L | 3.60 | 424 | Plan | Maintenance | SNO | 141157 | ||
04/15/2004 09:59 | Boundary-Waneta No 1 230kV line | 230.0 | L | 16.50 | still out | Plan | Normally Out | SPK | 141158 | |||
04/15/2004 12:44 | 04/15/2004 17:26 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 282 | Plan | Maintenance | OLY | 141159 | ||
04/15/2004 13:44 | 04/15/2004 14:08 | North Bonneville-Ross No 2 230kV line | 230.0 | L | G | 35.99 | 24 | Plan | Switching | LGV | 141160 | |
04/15/2004 13:44 | 04/15/2004 14:08 | North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 27.51 | 24 | Plan | Switching | LGV | 141160 | ||
04/15/2004 13:44 | 04/15/2004 14:08 | Sifton-Ross section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 8.48 | 24 | Plan | Switching | LGV | 141160 | ||
04/15/2004 14:49 | 04/15/2004 15:00 | Ross-Lexington No 1 230kV line | 230.0 | L | 41.21 | 11 | Plan | Foreign Request | LGV | 141161 | ||
04/15/2004 14:49 | 04/15/2004 15:00 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 19.85 | 11 | Plan | Foreign Request | LGV | 141161 | |
04/15/2004 14:49 | 04/15/2004 15:00 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | G | 26.06 | 11 | Plan | Foreign Request | LGV | 141161 | |
04/15/2004 14:49 | 04/15/2004 15:00 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | G | 21.36 | 11 | Plan | Foreign Request | LGV | 141161 | |
04/15/2004 21:53 | 04/15/2004 21:59 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 6 | Auto | Equipment/Miscellaneous | TDA RED | 141162 | |
04/15/2004 21:53 | 04/15/2004 21:59 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 6 | Auto | Equipment/Miscellaneous | TDA | 141162 | |||
04/15/2004 21:53 | 04/15/2004 21:59 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 6 | Auto | Equipment/Miscellaneous | TDA | 141162 | |||
04/15/2004 21:53 | 04/15/2004 21:59 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 6 | Auto | Equipment/Miscellaneous | TDA | 141162 | |||
04/16/2004 07:00 | 04/16/2004 12:57 | Monroe-Sammamish No 1 230kV line | 230.0 | L | 27.18 | 357 | Plan | Foreign Request | SNO COV | 141166 | ||
04/16/2004 07:44 | 04/16/2004 14:22 | Palisades-Snake River No 1 115kV line | 115.0 | L | 17.50 | 398 | Plan | Foreign Request | IDF | 141167 | ||
04/16/2004 08:06 | 04/16/2004 12:11 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 245 | Plan | Maintenance | EUG | 141168 | ||
04/16/2004 08:19 | 04/16/2004 10:43 | North Bonneville-Ross No 1 230kV line | 230.0 | L | T | 36.32 | 144 | Plan | Maintenance | LGV | 141169 | |
04/16/2004 08:19 | 04/16/2004 10:43 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | 1.24 | 144 | Plan | Maintenance | LGV | 141169 | ||
04/16/2004 13:41 | 04/16/2004 15:53 | Alvey-Lane No 1 230kV line | 230.0 | L | 13.41 | 132 | Plan | Construction | EUG | 141170 | ||
04/17/2004 01:28 | 04/17/2004 06:07 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 279 | Plan | Voltage Control | WEN COV | 141171 | ||
04/17/2004 06:00 | 04/17/2004 17:29 | Sno-King-Maple Valley No 1 230kV line | 230.0 | L | 24.84 | 689 | Plan | Foreign Request | SNO COV | 141172 | ||
04/17/2004 06:01 | 04/17/2004 17:30 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 689 | Plan | Foreign Request | SNO COV | 141173 | ||
04/18/2004 06:00 | 04/18/2004 18:15 | Sno-King-Maple Valley No 1 230kV line | 230.0 | L | 24.84 | 735 | Plan | Foreign Request | SNO COV | 141174 | ||
04/18/2004 06:01 | 04/18/2004 17:33 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 692 | Plan | Foreign Request | SNO COV | 141175 | ||
04/19/2004 06:38 | 04/19/2004 07:36 | Station X-Station H No 1 115kV line | 115.0 | L | 0.26 | 58 | Plan | Foreign Request | OLY | 141179 | ||
04/19/2004 06:45 | 05/14/2004 14:19 | Station H-Station FG No 1 115kV line | 115.0 | L | 1.08 | 36454 | Plan | Foreign Request | OLY | 141572 | ||
04/19/2004 07:00 | 04/23/2004 14:46 | Paul-Allston No 2 500kV line | 500.0 | L | 47.89 | 6226 | Plan | Fiber Optic Work | OLY LGV | 141180 | ||
04/19/2004 07:07 | 04/19/2004 16:48 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 581 | Plan | Foreign Request | SNO | 141181 | ||
04/19/2004 07:07 | 04/19/2004 16:48 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 581 | Plan | Foreign Request | SNO | 141181 | |
04/19/2004 07:43 | 04/30/2004 08:58 | Harvalum-Big Eddy No 1 230kV line | 230.0 | L | 23.34 | 15915 | Plan | Maintenance | TDA | 141182 | ||
04/19/2004 08:10 | 04/19/2004 14:57 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 407 | Plan | Maintenance | EUG | 141183 | |
04/19/2004 08:10 | 04/19/2004 14:57 | Noti Creek-Walton section of Lane-Wendson No 1 115kV line | 115.0 | S | 9.52 | 407 | Plan | Maintenance | EUG | 141183 | ||
04/19/2004 08:49 | 04/22/2004 12:57 | Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 14.45 | 4568 | Plan | Maintenance | SAL | 141184 | ||
04/19/2004 08:49 | 04/22/2004 12:57 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 4568 | Plan | Maintenance | SAL | 141184 | |
04/19/2004 09:32 | 04/19/2004 11:15 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 103 | Plan | Switching | IDF | 141185 | ||
04/19/2004 09:43 | 04/19/2004 13:21 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 218 | Plan | Switching | IDF | 141186 | ||
04/19/2004 09:43 | 04/19/2004 13:21 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 218 | Plan | Switching | IDF | 141186 | |
04/19/2004 09:43 | 04/19/2004 13:21 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.99 | 218 | Plan | Switching | IDF | 141186 | ||
04/19/2004 09:43 | 04/22/2004 16:15 | Swan Valley-Teton No 1 115kV line | 115.0 | L | T | 35.47 | 4712 | Plan | Maintenance | IDF | 141187 | |
04/19/2004 09:43 | 04/22/2004 16:15 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | 10.94 | 4712 | Plan | Maintenance | IDF | 141187 | ||
04/19/2004 11:48 | 04/20/2004 13:58 | John Day PH-John Day No 1 500kV line | 500.0 | L | 3.48 | 1570 | Plan | Maintenance | TDA | 141188 | ||
04/19/2004 13:37 | 04/19/2004 13:37 | McMinnville-PGE Dayton No 1 115kV line | 115.0 | L | 4.50 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 141189 | |
04/19/2004 13:54 | 04/19/2004 14:06 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 12 | Auto | Foreign Trouble | Foreign Trouble | EUG | 141190 | |
04/20/2004 01:13 | 04/20/2004 01:13 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 141191 | |
04/20/2004 01:13 | 04/20/2004 01:13 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 141191 | |
04/20/2004 01:13 | 04/20/2004 01:13 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 141191 | ||
04/20/2004 02:55 | 04/20/2004 05:02 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 127 | Plan | Voltage Control | RED | 141192 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 173 | Plan | Foreign Request | TDA RED | 141193 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141193 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141193 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141193 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141193 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141193 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 173 | Plan | Foreign Request | TDA RED | 141194 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141194 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141194 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141194 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141194 | ||
04/20/2004 03:00 | 04/20/2004 05:53 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 173 | Plan | Foreign Request | TDA | 141194 | ||
04/20/2004 07:50 | 04/20/2004 07:50 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 0 | Auto | Lightning | Lightning | EUG | 141212 | |
04/20/2004 08:07 | 04/20/2004 08:30 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 23 | Auto | Foreign Trouble | Foreign Utility | TDA | 141213 | |
04/20/2004 09:22 | 04/20/2004 17:19 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 477 | Plan | Maintenance | SAL | 141214 | |
04/20/2004 09:22 | 04/20/2004 17:19 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 477 | Plan | Maintenance | SAL | 141214 | ||
04/20/2004 09:22 | 04/20/2004 17:46 | Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 504 | Plan | Maintenance | SAL | 141215 | ||
04/20/2004 09:22 | 04/20/2004 17:46 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | G | 57.70 | 504 | Plan | Maintenance | SAL | 141215 | |
04/20/2004 09:30 | 04/20/2004 09:30 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Unknown | RED | 141216 |
04/20/2004 09:30 | 04/20/2004 09:30 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 141216 |
04/20/2004 09:30 | 04/20/2004 09:30 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Unknown | RED | 141216 |
04/20/2004 09:30 | 04/20/2004 09:30 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Unknown | RED | 141216 |
04/20/2004 09:30 | 04/20/2004 09:30 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Unknown | RED | 141216 | |
04/20/2004 09:30 | 04/20/2004 09:30 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 141216 |
04/20/2004 09:30 | 04/20/2004 09:30 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Unknown | RED | 141216 |
04/20/2004 11:47 | 04/20/2004 11:50 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | IDF | 141217 | |
04/20/2004 11:47 | 04/20/2004 11:50 | Bear Gulch-Chick Creek section of Drummond-Macks Inn No 1 115kV line | 115.0 | S | G | 17.85 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | IDF | 141218 |
04/20/2004 11:47 | 04/20/2004 11:50 | Chick Creek-Macks Inn section of Drummond-Macks Inn No 1 115kV line | 115.0 | S | G | 6.47 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | IDF | 141218 |
04/20/2004 11:47 | 04/20/2004 11:50 | Drummond-Bear Gulch section of Drummond-Macks Inn No 1 115kV line | 115.0 | S | G | 13.44 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | IDF | 141218 |
04/20/2004 11:47 | 04/20/2004 11:50 | Drummond-Macks Inn No 1 115kV line | 115.0 | L | 37.76 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | IDF | 141218 | |
04/20/2004 11:47 | 04/20/2004 11:50 | Macks Inn-Madison No 1 115kV line | 115.0 | L | 17.12 | 3 | Auto | Forced (Configuration) | Forced (Configuration) | IDF | 141219 | |
04/20/2004 11:47 | 04/20/2004 11:50 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 3 | Auto | Lightning | Lightning | IDF | 141220 | |
04/21/2004 01:12 | 04/26/2004 07:33 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 7581 | Plan | Voltage Control | KAL | 141221 | ||
04/21/2004 02:29 | 04/21/2004 05:05 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 156 | Plan | Voltage Control | RED | 141222 | ||
04/21/2004 08:00 | 04/21/2004 10:17 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 137 | Plan | Maintenance | OLY | 141224 | ||
04/21/2004 08:45 | 04/21/2004 18:19 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 574 | Plan | Maintenance | SAL | 141225 | |
04/21/2004 08:45 | 04/21/2004 18:19 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 574 | Plan | Maintenance | SAL | 141225 | ||
04/21/2004 08:45 | 04/21/2004 18:39 | Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 594 | Plan | Maintenance | SAL | 141226 | ||
04/21/2004 08:45 | 04/21/2004 18:39 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | G | 57.70 | 594 | Plan | Maintenance | SAL | 141226 | |
04/21/2004 08:52 | 04/21/2004 18:32 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 580 | Plan | Maintenance | SAL | 141227 | ||
04/21/2004 12:38 | 04/21/2004 12:50 | Santiam-A539 section of Santiam-Albany No 1 230kV line | 230.0 | S | 0.13 | 12 | Plan | Switching | SAL EUG | 141228 | ||
04/21/2004 12:38 | 04/21/2004 12:50 | Santiam-Albany No 1 230kV line | 230.0 | L | O | 28.54 | 12 | Plan | Switching | SAL EUG | 141228 | |
04/21/2004 13:59 | 04/21/2004 17:45 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 226 | Auto | Equipment/Miscellaneous | TDA RED | 141229 | |
04/21/2004 13:59 | 04/21/2004 17:45 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 226 | Auto | Equipment/Miscellaneous | TDA | 141229 | |||
04/21/2004 13:59 | 04/21/2004 17:45 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 226 | Auto | Forced (Configuration) | Terminal Equipment Failure | TDA | 141230 | |
04/21/2004 14:09 | 05/12/2004 07:39 | Albany-Eugene No 1 115kV line | 115.0 | L | G | 39.80 | 29850 | Plan | Normally Out | EUG | 141231 | |
04/21/2004 14:09 | 05/12/2004 07:39 | Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line | 115.0 | S | 5.53 | 29850 | Plan | Normally Out | EUG | 141231 | ||
04/22/2004 10:31 | 04/22/2004 10:36 | Vantage-Wanapum No 3 230kV line | 230.0 | L | 1.50 | 5 | Plan | Maintenance | WEN | 141236 | ||
04/22/2004 11:32 | 04/22/2004 16:05 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 273 | Plan | Maintenance | IDF | 141237 | ||
04/22/2004 11:32 | 04/22/2004 16:05 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 273 | Plan | Maintenance | IDF | 141237 | |
04/22/2004 11:32 | 04/22/2004 16:05 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.99 | 273 | Plan | Maintenance | IDF | 141237 | ||
04/22/2004 12:39 | 04/22/2004 13:21 | Eugene-Bertelsen No 1 115kV line | 115.0 | L | 2.28 | 42 | Plan | Foreign Request | EUG | 141238 | ||
04/22/2004 14:49 | 04/22/2004 16:13 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 84 | Plan | Maintenance | IDF | 141239 | ||
04/22/2004 16:24 | 04/22/2004 16:25 | Swan Valley-Teton No 1 115kV line | 115.0 | L | T | 35.47 | 1 | Plan | Testing | IDF | 141240 | |
04/22/2004 16:24 | 04/22/2004 16:25 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | 10.94 | 1 | Plan | Testing | IDF | 141240 | ||
04/23/2004 08:52 | 04/23/2004 12:22 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 210 | Plan | Emergency | EUG | 141245 | |
04/23/2004 08:52 | 04/23/2004 12:22 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 210 | Plan | Emergency | EUG | 141245 | ||
04/23/2004 08:57 | 04/23/2004 11:30 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 153 | Auto | Malicious | Malicious | OLY | 141246 | |
04/23/2004 08:57 | 04/23/2004 11:30 | Potlatch tap to Shelton-Fairmount No 1 115kV line | 115.0 | T | 0.03 | 153 | Auto | Malicious | Malicious | OLY | 141246 | |
04/23/2004 08:57 | 04/23/2004 11:30 | Potlatch-Duckabush section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 23.01 | 153 | Auto | Malicious | Malicious | OLY | 141246 | |
04/23/2004 08:57 | 04/23/2004 08:57 | Quilcene-Fairmount section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 11.04 | 0 | Auto | Malicious | Malicious | OLY | 141246 | |
04/23/2004 08:57 | 04/23/2004 13:53 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 296 | Auto | Malicious | Malicious | OLY | 141246 |
04/23/2004 08:57 | 04/23/2004 13:53 | Shelton-Potlatch section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 13.33 | 296 | Auto | Malicious | Malicious | OLY | 141246 | |
04/23/2004 09:26 | 04/23/2004 13:15 | Ponderosa-PACW Bank No 1 230kV line | 230.0 | L | 0.10 | 229 | Plan | Maintenance | RED | 141247 | ||
04/23/2004 10:47 | 04/23/2004 14:10 | Olympia-Shelton No 4 230kV line | 230.0 | L | 20.00 | 203 | Plan | Switching | OLY | 141248 | ||
04/24/2004 04:00 | 04/24/2004 19:38 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 938 | Plan | Foreign Request | TDA RED | 141249 | ||
04/24/2004 04:00 | 04/24/2004 19:38 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 938 | Plan | Foreign Request | TDA | 141249 | |||
04/24/2004 04:00 | 04/24/2004 19:38 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 938 | Plan | Foreign Request | TDA | 141249 | |||
04/24/2004 04:00 | 04/24/2004 19:38 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 938 | Plan | Foreign Request | TDA | 141249 | |||
04/24/2004 04:00 | 04/24/2004 19:38 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 938 | Plan | Foreign Request | TDA | 141249 | |||
04/24/2004 04:00 | 04/24/2004 19:38 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 938 | Plan | Foreign Request | TDA | 141249 | |||
04/24/2004 04:00 | 04/24/2004 04:15 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 15 | Plan | Foreign Request | TDA RED | 141261 | ||
04/24/2004 04:00 | 04/24/2004 04:15 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 141261 | ||
04/24/2004 04:00 | 04/24/2004 04:15 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 141261 | ||
04/24/2004 04:00 | 04/24/2004 04:15 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 141261 | ||
04/24/2004 04:00 | 04/24/2004 04:15 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 141261 | ||
04/24/2004 04:00 | 04/24/2004 04:15 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 141261 | ||
04/24/2004 04:01 | 04/24/2004 04:06 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 5 | Plan | Switching | TDA | 141250 | ||
04/24/2004 04:01 | 04/24/2004 19:10 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 909 | Plan | Forced | TDA | 141251 | ||
04/24/2004 07:16 | 04/24/2004 07:16 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 0 | Auto | Unknown | Unknown | COV | 141262 | |
04/24/2004 07:58 | 04/24/2004 09:04 | Alfalfa-Outlook section of North Bonneville-Midway No 1 230kV line | 230.0 | S | 8.57 | 66 | Plan | Switching | WEN | 141263 | ||
04/24/2004 07:58 | 04/24/2004 09:04 | North Bonneville-Midway No 1 230kV line | 230.0 | L | G | 134.71 | 66 | Plan | Switching | LGV TDA WEN TRI | 141263 | |
04/24/2004 08:04 | 04/24/2004 09:21 | North Bonneville-Midway No 1 230kV line | 230.0 | L | T | 134.71 | 77 | Plan | Switching | LGV TDA WEN TRI | 141264 | |
04/24/2004 08:04 | 04/24/2004 09:21 | Outlook tap to North Bonneville-Midway No 1 230kV line | 230.0 | T | 0.10 | 77 | Plan | Switching | TRI | 141264 | ||
04/24/2004 08:04 | 05/14/2004 12:29 | North Bonneville-Midway No 1 230kV line | 230.0 | L | O | 134.71 | 29065 | Plan | Fiber Optic Work | LGV TDA WEN TRI | 141265 | |
04/24/2004 08:04 | 05/14/2004 12:29 | Outlook-Midway section of North Bonneville-Midway No 1 230kV line | 230.0 | S | 22.53 | 29065 | Plan | Fiber Optic Work | WEN TRI | 141265 | ||
04/24/2004 09:09 | 04/24/2004 09:09 | Grand Coulee-Bell No 5 230kV line | 230.0 | L | 83.06 | 0 | Auto | Unknown | Unknown | WEN SPK | 141266 | |
04/24/2004 19:00 | 04/24/2004 19:38 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 38 | Plan | Switching | TDA RED | 141267 | ||
04/24/2004 19:00 | 04/24/2004 19:38 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 38 | Plan | Switching | TDA | 141267 | ||
04/24/2004 19:00 | 04/24/2004 19:38 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 38 | Plan | Switching | TDA | 141267 | ||
04/24/2004 19:00 | 04/24/2004 19:38 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 38 | Plan | Switching | TDA | 141267 | ||
04/24/2004 19:00 | 04/24/2004 19:38 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 38 | Plan | Switching | TDA | 141267 | ||
04/24/2004 19:00 | 04/24/2004 19:38 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 38 | Plan | Switching | TDA | 141267 | ||
04/24/2004 19:02 | 04/24/2004 19:11 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 9 | Plan | Switching | TDA | 141268 | ||
04/24/2004 23:54 | 04/25/2004 07:10 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 436 | Plan | Voltage Control | SAL EUG | 141269 | ||
04/25/2004 00:49 | 04/26/2004 11:21 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | G | 22.12 | 2072 | Plan | Maintenance | LGV | 141270 | |
04/25/2004 00:49 | 04/26/2004 11:21 | Bonneville-Underwood section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 0.92 | 2072 | Plan | Maintenance | LGV | 141270 | ||
04/25/2004 00:49 | 04/25/2004 03:39 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | G | 45.05 | 170 | Plan | Maintenance | LGV | 141271 | |
04/25/2004 00:49 | 04/25/2004 03:39 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 0.93 | 170 | Plan | Maintenance | LGV | 141271 | ||
04/25/2004 00:49 | 04/25/2004 03:33 | Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 40.44 | 164 | Plan | Maintenance | LGV | 141271 | ||
04/25/2004 01:10 | 09/24/2004 08:28 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | T | 22.12 | 219318 | Plan | Normally Out | LGV | 141272 | |
04/25/2004 01:10 | 09/24/2004 08:28 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 15.35 | 219318 | Plan | Normally Out | LGV TDA | 141272 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 0.99 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | T | 22.12 | 219267 | Plan | Normally Out | LGV | 141273 | |
04/25/2004 02:01 | 09/24/2004 08:28 | Carson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 1.24 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.10 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 5.30 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | Stevenson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.10 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 3.60 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 25.00 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 09/24/2004 08:28 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 0.10 | 219267 | Plan | Normally Out | LGV TDA | 141273 | ||
04/25/2004 02:01 | 04/25/2004 02:07 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | O | 22.12 | 6 | Plan | Maintenance | LGV | 141274 | |
04/25/2004 02:01 | 04/25/2004 02:07 | Cape Horn tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 0.10 | 6 | Plan | Maintenance | LGV | 141274 | ||
04/25/2004 02:01 | 04/25/2004 02:07 | Cape Horn-Evans section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 7.65 | 6 | Plan | Maintenance | LGV | 141274 | ||
04/25/2004 02:01 | 04/25/2004 02:07 | Evans tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 1.60 | 6 | Plan | Maintenance | LGV | 141274 | ||
04/25/2004 02:01 | 04/25/2004 02:07 | Evans-North Camas section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 1.96 | 6 | Plan | Maintenance | LGV | 141274 | ||
04/25/2004 02:01 | 04/25/2004 02:07 | Underwood-Cape Horn section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 11.59 | 6 | Plan | Maintenance | LGV | 141274 | ||
04/25/2004 02:07 | 04/26/2004 11:21 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | O | 22.12 | 1994 | Plan | Maintenance | LGV | 141287 | |
04/25/2004 02:07 | 04/26/2004 11:21 | Underwood-Cape Horn section of Bonneville PH 1-North Camas No 1 115kV line | 115.0 | S | 11.59 | 1994 | Plan | Maintenance | LGV | 141287 | ||
04/25/2004 02:29 | 04/25/2004 07:45 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 316 | Plan | Voltage Control | TDA RED SAL | 141275 | ||
04/25/2004 04:00 | 09/24/2004 08:28 | Bald Mountain tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.38 | 219148 | Plan | Normally Out | LGV TDA | 141276 | ||
04/25/2004 04:00 | 09/24/2004 08:28 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | T | 22.12 | 219148 | Plan | Normally Out | LGV | 141276 | |
04/26/2004 00:26 | 04/26/2004 05:22 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 296 | Plan | Voltage Control | SAL EUG | 141288 | ||
04/26/2004 04:10 | 04/26/2004 12:57 | Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line | 230.0 | S | 35.80 | 527 | Auto | Foreign Trouble | Foreign Trouble | OLY COV | 141289 | |
04/26/2004 04:10 | 04/26/2004 12:52 | Centralia tap to Chehalis-Covington No 1 230kV line | 230.0 | T | 2.87 | 522 | Auto | Foreign Trouble | Foreign Trouble | OLY | 141289 | |
04/26/2004 04:10 | 04/26/2004 12:52 | Chehalis-Centralia Switching Station section of Chehalis-Covington No 1 230kV line | 230.0 | S | 10.30 | 522 | Auto | Foreign Trouble | Foreign Trouble | OLY | 141289 | |
04/26/2004 04:10 | 04/26/2004 12:57 | Chehalis-Covington No 1 230kV line | 230.0 | L | G | 69.40 | 527 | Auto | Foreign Trouble | Foreign Trouble | OLY COV | 141289 |
04/26/2004 04:10 | 04/26/2004 05:46 | Cowlitz tap to Chehalis-Covington No 1 230kV line | 230.0 | T | 6.30 | 96 | Auto | Foreign Trouble | Foreign Trouble | COV | 141289 | |
04/26/2004 04:10 | 04/26/2004 05:42 | TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line | 230.0 | S | 23.30 | 92 | Auto | Foreign Trouble | Foreign Trouble | COV | 141289 | |
04/26/2004 06:19 | 04/26/2004 06:19 | Chehalis-Covington No 1 230kV line | 230.0 | L | O | 69.40 | 0 | Auto | Foreign Trouble | Foreign Trouble | OLY COV | 141290 |
04/26/2004 06:19 | 04/26/2004 06:19 | Cowlitz tap to Chehalis-Covington No 1 230kV line | 230.0 | T | 6.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | COV | 141290 | |
04/26/2004 06:19 | 04/26/2004 06:19 | TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line | 230.0 | S | 23.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | COV | 141290 | |
04/26/2004 07:39 | 05/04/2004 15:44 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 12005 | Plan | Maintenance | KAL | 141291 | ||
04/26/2004 07:46 | 04/28/2004 15:21 | Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line | 115.0 | S | 18.50 | 3335 | Plan | Maintenance | SAL | 141292 | ||
04/26/2004 07:46 | 04/28/2004 15:21 | Oregon City-Chemawa No 2 115kV line | 115.0 | L | G | 25.20 | 3335 | Plan | Maintenance | SAL | 141292 | |
04/26/2004 08:02 | 04/29/2004 14:10 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 4688 | Plan | Maintenance | KAL SPK | 141293 | |
04/26/2004 08:02 | 04/29/2004 14:10 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 11.58 | 4688 | Plan | Maintenance | KAL SPK | 141293 | ||
04/26/2004 08:06 | 04/27/2004 17:26 | Ashe-Slatt No 1 500kV line | 500.0 | L | 72.24 | 2000 | Plan | Maintenance | TRI TDA | 141294 | ||
04/26/2004 08:06 | 04/26/2004 14:41 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 395 | Plan | Maintenance | EUG | 141295 | ||
04/26/2004 08:15 | 04/26/2004 08:15 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 17.09 | 0 | Auto | Unknown | Unknown | KAL | 141296 | |
04/26/2004 08:15 | 04/26/2004 08:15 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 0 | Auto | Unknown | Unknown | KAL SPK | 141296 |
04/26/2004 08:15 | 04/26/2004 08:15 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 0 | Auto | Unknown | Unknown | KAL | 141296 | |
04/26/2004 08:15 | 04/26/2004 08:15 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 0 | Auto | Unknown | Unknown | KAL | 141296 | |
04/26/2004 08:31 | 05/10/2004 10:42 | Westside-Sugar Mill No 1 161kV line | 161.0 | L | G | 12.50 | 20291 | Plan | Foreign Request | IDF | 141297 | |
04/26/2004 08:31 | 05/10/2004 10:42 | York Road-Sugar Mill section of Westside-Sugar Mill No 1 161kV line | 161.0 | S | 2.50 | 20291 | Plan | Foreign Request | IDF | 141297 | ||
04/26/2004 08:35 | 04/26/2004 12:59 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 264 | Plan | Maintenance | OLY LGV | 141298 | |
04/26/2004 08:35 | 04/26/2004 12:59 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 264 | Plan | Maintenance | OLY | 141298 | |
04/26/2004 08:35 | 04/26/2004 12:59 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 264 | Plan | Maintenance | OLY | 141298 | ||
04/26/2004 11:04 | 04/26/2004 16:47 | Grandview-Prosser section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 5.47 | 343 | Plan | Maintenance | TRI WEN | 141299 | ||
04/26/2004 11:04 | 04/26/2004 16:47 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 343 | Plan | Maintenance | TRI WEN | 141299 | |
04/26/2004 13:55 | 04/26/2004 13:56 | Grand Coulee Switchyard 230-500kV Tie No 1 500kV line | 500.0 | L | 1.25 | 1 | Auto | Foreign Trouble | WEN | 141300 | ||
04/26/2004 14:11 | 04/26/2004 14:11 | Benton-Othello No 1 115kV line | 115.0 | L | 37.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI SPK | 141301 | |
04/26/2004 14:11 | 04/26/2004 14:11 | Benton-South Othello section of Benton-Othello No 1 115kV line | 115.0 | S | G | 34.20 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 141301 |
04/26/2004 14:11 | 04/26/2004 14:11 | South Othello-Othello AVA section of Benton-Othello No 1 115kV line | 115.0 | S | G | 2.80 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 141301 |
04/27/2004 00:33 | 04/27/2004 05:39 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 306 | Plan | Voltage Control | TDA RED SAL | 141302 | ||
04/27/2004 02:57 | 04/27/2004 05:43 | Schultz-Raver No 1 500kV line | 500.0 | L | 77.24 | 166 | Plan | Voltage Control | WEN COV | 141303 | ||
04/27/2004 07:01 | 04/27/2004 16:52 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 591 | Plan | Testing | WEN SNO | 141334 | ||
04/27/2004 07:13 | 04/27/2004 15:19 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 486 | Plan | Maintenance | IDF | 141335 | ||
04/27/2004 07:48 | 04/27/2004 16:59 | Grandview-Prosser section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 5.47 | 551 | Plan | Maintenance | TRI WEN | 141336 | ||
04/27/2004 07:48 | 04/27/2004 16:59 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 551 | Plan | Maintenance | TRI WEN | 141336 | |
04/27/2004 08:03 | 04/28/2004 13:22 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 1759 | Plan | Foreign Request | RED | 141337 | |
04/27/2004 08:03 | 04/28/2004 13:22 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 1759 | Plan | Foreign Request | IDF RED | 141337 | |
04/27/2004 08:03 | 04/28/2004 13:22 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 1759 | Plan | Foreign Request | IDF RED | 141337 | ||
04/27/2004 08:05 | 04/27/2004 15:15 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 430 | Plan | Maintenance | EUG | 141338 | ||
04/27/2004 08:07 | 04/27/2004 10:28 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 9.22 | 141 | Plan | Maintenance | OLY | 141339 | ||
04/27/2004 08:07 | 04/27/2004 10:28 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | G | 15.32 | 141 | Plan | Maintenance | OLY | 141339 | |
04/27/2004 08:07 | 04/27/2004 14:20 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | G | 5.51 | 373 | Plan | Maintenance | TRI | 141340 | |
04/27/2004 08:07 | 04/27/2004 14:20 | Badger Canyon-Vista section of Badger Canyon-Richland No 1 115kV line | 115.0 | S | 0.97 | 373 | Plan | Maintenance | TRI | 141340 | ||
04/27/2004 08:47 | 04/27/2004 16:50 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 483 | Plan | Maintenance | TDA | 141341 | ||
04/27/2004 08:47 | 04/27/2004 16:50 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 483 | Plan | Maintenance | TDA RED | 141341 | |
04/27/2004 14:29 | 04/27/2004 14:29 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 17.09 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 141342 | |
04/27/2004 14:29 | 04/27/2004 14:29 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL SPK | 141342 |
04/27/2004 14:29 | 04/27/2004 14:29 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 141342 | |
04/27/2004 14:29 | 04/27/2004 14:29 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 141342 | |
04/27/2004 16:36 | 04/27/2004 21:42 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 306 | Auto | Lightning | Tree blown | SNO | 141343 |
04/27/2004 16:36 | 04/27/2004 21:42 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 306 | Auto | Lightning | Tree blown | SNO | 141343 | |
04/27/2004 16:36 | 04/27/2004 22:11 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | 0.17 | 335 | Auto | Lightning | Tree blown | SNO | 141343 | |
04/27/2004 16:36 | 04/27/2004 21:42 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | 37.72 | 306 | Auto | Lightning | Tree blown | SNO | 141343 | |
04/27/2004 16:54 | 04/27/2004 17:16 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 22 | Auto | Foreign Trouble | SNO | 141344 | ||
04/27/2004 16:54 | 04/27/2004 17:16 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 22 | Auto | Foreign Trouble | SNO | 141344 | |
04/27/2004 17:22 | 04/27/2004 17:25 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 3 | Auto | Lightning | Lightning | COV | 141345 | |
04/27/2004 18:34 | 04/27/2004 18:34 | Benton-Othello No 1 115kV line | 115.0 | L | 37.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI SPK | 141346 | |
04/27/2004 18:34 | 04/27/2004 18:34 | Benton-South Othello section of Benton-Othello No 1 115kV line | 115.0 | S | G | 34.20 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 141346 |
04/27/2004 18:34 | 04/27/2004 18:34 | South Othello-Othello AVA section of Benton-Othello No 1 115kV line | 115.0 | S | G | 2.80 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 141346 |
04/27/2004 18:58 | 04/27/2004 18:58 | Columbia-Rocky Ford No 1 115kV line | 115.0 | L | 30.40 | 0 | Auto | Foreign Trouble | Foreign Trouble | WEN | 141347 | |
04/27/2004 19:45 | 04/28/2004 00:14 | Mission-Pendleton section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 6.67 | 269 | Auto | Foreign Trouble | Foreign Utility | TRI | 141348 | |
04/27/2004 19:45 | 04/28/2004 00:14 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | O | 38.93 | 269 | Auto | Foreign Trouble | Foreign Utility | TRI | 141348 |
04/27/2004 21:12 | 04/27/2004 21:12 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 17.09 | 0 | Auto | Wind | Wind | KAL | 141349 | |
04/27/2004 21:12 | 04/27/2004 21:12 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 0 | Auto | Wind | Wind | KAL SPK | 141349 |
04/27/2004 21:12 | 04/27/2004 21:12 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 0 | Auto | Wind | Wind | KAL | 141349 | |
04/27/2004 21:12 | 04/27/2004 21:12 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 0 | Auto | Wind | Wind | KAL | 141349 | |
04/28/2004 01:52 | 04/28/2004 05:08 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 196 | Plan | Voltage Control | RED | 141350 | ||
04/28/2004 04:33 | 04/28/2004 15:10 | Garrison-NWE Ovando No 1 230kV line | 230.0 | L | 32.60 | 637 | Plan | Foreign Request | KAL | 141351 | ||
04/28/2004 07:22 | 04/28/2004 15:04 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 462 | Plan | Maintenance | IDF | 141352 | ||
04/28/2004 07:47 | 04/28/2004 10:36 | Covington-White River No 1 230kV line | 230.0 | L | 9.55 | 169 | Plan | Foreign Request | COV | 141353 | ||
04/28/2004 07:48 | 04/28/2004 10:45 | South Tacoma-White River No 1 230kV line | 230.0 | L | 14.95 | 177 | Plan | Foreign Request | COV | 141354 | ||
04/28/2004 07:57 | 04/28/2004 13:35 | Tahkenitch-Reedsport No 1 115kV line | 115.0 | L | 4.38 | 338 | Plan | Maintenance | EUG | 141355 | ||
04/28/2004 07:59 | 04/28/2004 14:36 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 397 | Plan | Maintenance | EUG | 141356 | ||
04/28/2004 08:00 | 04/28/2004 13:32 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | G | 5.51 | 332 | Plan | Maintenance | TRI | 141357 | |
04/28/2004 08:00 | 04/28/2004 13:32 | Badger Canyon-Vista section of Badger Canyon-Richland No 1 115kV line | 115.0 | S | 0.97 | 332 | Plan | Maintenance | TRI | 141357 | ||
04/28/2004 08:35 | 04/28/2004 15:28 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 413 | Plan | Maintenance | TDA | 141358 | ||
04/28/2004 08:35 | 04/28/2004 15:28 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 413 | Plan | Maintenance | TDA RED | 141358 | |
04/28/2004 08:40 | 04/28/2004 08:40 | Benton-Othello No 1 115kV line | 115.0 | L | 37.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI SPK | 141359 | |
04/28/2004 08:40 | 04/28/2004 08:40 | Benton-South Othello section of Benton-Othello No 1 115kV line | 115.0 | S | G | 34.20 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 141359 |
04/28/2004 08:40 | 04/28/2004 08:40 | South Othello-Othello AVA section of Benton-Othello No 1 115kV line | 115.0 | S | G | 2.80 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 141359 |
04/28/2004 08:51 | 05/10/2004 11:04 | Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 13.40 | 17413 | Plan | Normally Out | TRI | 141501 | ||
04/28/2004 08:51 | 05/10/2004 11:04 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | G | 38.93 | 17413 | Plan | Normally Out | TRI | 141501 | |
04/28/2004 09:07 | 04/30/2004 15:17 | Ashe-Slatt No 1 500kV line | 500.0 | L | 72.24 | 3250 | Plan | Maintenance | TRI TDA | 141360 | ||
04/28/2004 10:49 | 04/28/2004 14:32 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 223 | Plan | Foreign Request | COV | 141361 | ||
04/28/2004 11:33 | 04/28/2004 12:37 | Big Eddy-Ostrander No 1 500kV line | 500.0 | L | 70.56 | 64 | Auto | Smoke | Smoke | TDA LGV | 141362 | |
04/28/2004 11:33 | 04/28/2004 11:33 | Big Eddy-McLoughlin No 1&2 230kV line | 230.0 | L | 117.77 | 0 | Auto | Smoke | Improper Relaying | TDA LGV | 141363 | |
04/29/2004 00:12 | 04/29/2004 05:38 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 326 | Plan | Voltage Control | TDA RED SAL | 141364 | ||
04/29/2004 07:11 | 04/29/2004 14:18 | Olympia-Grand Coulee No 1 287kV line | 287.0 | L | 229.12 | 427 | Plan | Switching | OLY COV WEN | 141366 | ||
04/29/2004 07:12 | 05/01/2004 14:57 | Raver-Covington No 2 500kV line | 500.0 | L | 10.33 | 3345 | Plan | Maintenance | COV | 141367 | ||
04/29/2004 07:17 | 04/29/2004 13:27 | Olympia-Satsop No 3 230kV line | 230.0 | L | 26.19 | 370 | Plan | Maintenance | OLY | 141368 | ||
04/29/2004 07:18 | 04/29/2004 13:27 | Olympia-South Tacoma No 1 230kV line | 230.0 | L | 36.94 | 369 | Plan | Maintenance | OLY COV | 141369 | ||
04/29/2004 07:18 | 04/29/2004 14:47 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 449 | Plan | Maintenance | IDF | 141370 | ||
04/29/2004 07:18 | 04/29/2004 13:26 | Olympia-Shelton No 3 230kV line | 230.0 | L | 19.96 | 368 | Plan | Maintenance | OLY | 141371 | ||
04/29/2004 07:55 | 04/29/2004 16:38 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 523 | Plan | Maintenance | TRI WEN | 141372 | |
04/29/2004 07:55 | 04/29/2004 16:38 | Prosser-Snipes section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 4.85 | 523 | Plan | Maintenance | WEN | 141372 | ||
04/29/2004 07:58 | 04/30/2004 15:34 | Salem-Grand Ronde No 1 115kV line | 115.0 | L | 27.80 | 1896 | Plan | Maintenance | SAL | 141373 | ||
04/29/2004 08:14 | 04/29/2004 14:35 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 381 | Plan | Maintenance | TDA | 141374 | ||
04/29/2004 08:14 | 04/29/2004 14:35 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 381 | Plan | Maintenance | TDA RED | 141374 | |
04/30/2004 00:07 | 04/30/2004 06:03 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 356 | Plan | Voltage Control | TDA RED SAL | 141375 | ||
04/30/2004 06:12 | 04/30/2004 06:12 | Clymer tap to Ellensburg-Moxee No 1 115kV line | 115.0 | T | G | 0.02 | 0 | Auto | Unknown | Unknown | WEN TRI | 141380 |
04/30/2004 06:12 | 04/30/2004 06:12 | Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | G | 29.43 | 0 | Auto | Unknown | Unknown | WEN TRI | 141380 |
04/30/2004 06:12 | 04/30/2004 06:12 | Ellensburg-Clymer section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | G | 1.38 | 0 | Auto | Unknown | Unknown | WEN | 141380 |
04/30/2004 06:12 | 04/30/2004 06:12 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | 30.81 | 0 | Auto | Unknown | Unknown | WEN TRI | 141380 | |
04/30/2004 08:15 | 04/30/2004 14:30 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 375 | Plan | Maintenance | TDA | 141381 | ||
04/30/2004 08:15 | 04/30/2004 14:30 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 375 | Plan | Maintenance | TDA RED | 141381 | |
04/30/2004 14:15 | 04/30/2004 14:15 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Unknown | TDA RED | 141382 | ||
04/30/2004 14:15 | 04/30/2004 14:15 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141382 | ||
04/30/2004 14:15 | 04/30/2004 14:15 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141382 | ||
04/30/2004 14:15 | 04/30/2004 14:15 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141382 | ||
04/30/2004 14:15 | 04/30/2004 14:15 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141382 | ||
04/30/2004 14:15 | 04/30/2004 14:15 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141382 | ||
04/30/2004 21:56 | 04/30/2004 22:13 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 17 | Auto | Terminal Equipment Failure | TDA RED | 141383 | ||
04/30/2004 21:56 | 04/30/2004 22:13 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 17 | Auto | Terminal Equipment Failure | TDA | 141383 | ||
04/30/2004 21:56 | 04/30/2004 22:13 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 17 | Auto | Terminal Equipment Failure | TDA | 141383 | ||
04/30/2004 21:56 | 04/30/2004 22:13 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 17 | Auto | Terminal Equipment Failure | TDA | 141383 | |||
04/30/2004 21:56 | 04/30/2004 22:13 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 17 | Auto | Terminal Equipment Failure | TDA | 141383 | ||
04/30/2004 21:56 | 04/30/2004 22:13 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 17 | Auto | Terminal Equipment Failure | TDA | 141383 | |||
04/30/2004 21:58 | 04/30/2004 22:13 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 15 | Auto | Equipment/Miscellaneous | TDA RED | 141384 | |
04/30/2004 21:58 | 04/30/2004 22:13 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 15 | Auto | Equipment/Miscellaneous | TDA | 141384 | |||
04/30/2004 22:02 | 04/30/2004 22:13 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 11 | Plan | Foreign Request | TDA RED | 141385 | ||
04/30/2004 22:02 | 04/30/2004 22:13 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 11 | Plan | Foreign Request | TDA | 141385 | ||
04/30/2004 22:02 | 04/30/2004 22:13 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 11 | Plan | Foreign Request | TDA | 141385 | ||
04/30/2004 22:02 | 04/30/2004 22:13 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 11 | Plan | Foreign Request | TDA | 141385 | ||
04/30/2004 22:02 | 04/30/2004 22:13 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 11 | Plan | Foreign Request | TDA | 141385 | ||
04/30/2004 22:02 | 04/30/2004 22:13 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 11 | Plan | Foreign Request | TDA | 141385 | ||
04/30/2004 23:43 | 06/07/2004 15:48 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 54245 | Plan | Foreign Request | OLY | 141386 | ||
05/01/2004 00:10 | 05/01/2004 04:22 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | G | 29.67 | 252 | Plan | Maintenance | SPK | 141387 | |
05/01/2004 00:10 | 05/01/2004 04:22 | Priest River AVA-Priest River section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | 1.93 | 252 | Plan | Maintenance | SPK | 141387 | ||
05/01/2004 00:25 | 05/01/2004 04:22 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | T | 29.67 | 237 | Plan | Maintenance | SPK | 141388 | |
05/01/2004 00:25 | 05/01/2004 04:22 | Priest River tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | 3.05 | 237 | Plan | Maintenance | SPK | 141388 | ||
05/01/2004 00:33 | 05/02/2004 09:55 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 2002 | Plan | Voltage Control | TDA RED SAL | 141389 | ||
05/01/2004 02:28 | 05/01/2004 07:24 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 296 | Plan | Voltage Control | RED | 141390 | ||
05/01/2004 05:25 | 05/01/2004 05:27 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 2 | Plan | Foreign Request | TDA | 141391 | |||
05/01/2004 05:25 | 05/01/2004 05:27 | Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line | 230.0 | S | 136.53 | 2 | Plan | Foreign Request | TDA RED | 141391 | ||
05/01/2004 05:25 | 05/01/2004 13:40 | McNary-Dalreed section of McNary-Santiam No 2 230kV line | 230.0 | S | 35.95 | 495 | Plan | Foreign Request | TRI TDA | 141391 | ||
05/01/2004 05:25 | 05/01/2004 13:40 | McNary-Santiam No 2 230kV line | 230.0 | L | G | 200.43 | 495 | Plan | Foreign Request | TRI TDA RED SAL | 141391 | |
05/01/2004 05:25 | 05/01/2004 05:27 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.10 | 2 | Plan | Foreign Request | SAL | 141391 | ||
05/01/2004 05:25 | 05/01/2004 05:27 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 2 | Plan | Foreign Request | SAL | 141391 | ||
05/01/2004 16:07 | 05/01/2004 16:13 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 6 | Plan | Foreign Request | SNO | 141393 | ||
05/01/2004 16:07 | 05/01/2004 16:13 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 6 | Plan | Foreign Request | SNO | 141393 | |
05/01/2004 16:25 | 07/24/2004 11:16 | Slatt-PGE Boardman No 1 500kV line | 500.0 | L | 17.83 | 120651 | Plan | Foreign Request | TRI | 141394 | ||
05/02/2004 01:13 | 05/02/2004 11:19 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 606 | Plan | Voltage Control | WEN COV | 141395 | ||
05/02/2004 04:51 | 05/02/2004 07:01 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 130 | Plan | Voltage Control | RED | 141396 | ||
05/03/2004 00:28 | 05/03/2004 05:47 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 319 | Plan | Voltage Control | WEN COV | 141397 | ||
05/03/2004 00:58 | 05/03/2004 05:46 | Buckley-Marion No 1 500kV line | 500.0 | L | 99.33 | 288 | Plan | Voltage Control | TDA RED SAL | 141398 | ||
05/03/2004 05:58 | 05/03/2004 16:10 | Murray-Custer No 1 230kV line | 230.0 | L | T | 63.39 | 612 | Plan | Maintenance | SNO | 141407 | |
05/03/2004 05:58 | 05/03/2004 16:10 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | 0.17 | 612 | Plan | Maintenance | SNO | 141407 | ||
05/03/2004 06:01 | 05/07/2004 11:00 | Maple Valley-Massachusetts No 1 230kV line | 230.0 | L | 12.14 | 6059 | Plan | Foreign Request | COV | 141408 | ||
05/03/2004 06:03 | 05/03/2004 15:45 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 582 | Plan | Maintenance | SNO | 141409 | |
05/03/2004 06:03 | 05/03/2004 15:45 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 582 | Plan | Maintenance | SNO | 141409 | ||
05/03/2004 06:03 | 05/03/2004 15:45 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | 37.72 | 582 | Plan | Maintenance | SNO | 141409 | ||
05/03/2004 06:40 | 05/03/2004 14:18 | Station X-Station H No 1 115kV line | 115.0 | L | 0.26 | 458 | Plan | Foreign Request | OLY | 141410 | ||
05/03/2004 07:27 | 05/03/2004 17:33 | Big Eddy-Chenoweth No 1 115kV line | 115.0 | L | 6.50 | 606 | Plan | Maintenance | TDA | 141411 | ||
05/03/2004 07:55 | 05/06/2004 16:35 | Grandview-Prosser section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 5.47 | 4840 | Plan | Maintenance | TRI WEN | 141412 | ||
05/03/2004 07:55 | 05/06/2004 16:35 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 4840 | Plan | Maintenance | TRI WEN | 141412 | |
05/03/2004 07:59 | 05/10/2004 22:01 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 10922 | Plan | Maintenance | TDA RED | 141413 | |
05/03/2004 07:59 | 05/10/2004 22:01 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 10922 | Plan | Maintenance | TDA | 141413 | |||
05/03/2004 08:04 | 05/13/2004 14:48 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 14804 | Plan | Construction | KAL SPK | 141414 | ||
05/03/2004 08:06 | 05/04/2004 18:05 | Grand Coulee-Schultz No 1 500kV line | 500.0 | L | 97.01 | 2039 | Plan | Maintenance | WEN | 141415 | ||
05/03/2004 08:11 | 05/03/2004 15:47 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 456 | Plan | Maintenance | TDA RED | 141416 | |
05/03/2004 08:11 | 05/03/2004 15:47 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 456 | Plan | Maintenance | TDA RED | 141416 | ||
05/03/2004 08:18 | 07/16/2004 09:17 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 106619 | Plan | Maintenance | WEN SPK | 141417 | |
05/03/2004 08:18 | 07/16/2004 09:17 | Larene-Springhill section of Creston-Bell No 1 115kV line | 115.0 | S | 27.16 | 106619 | Plan | Maintenance | SPK | 141417 | ||
05/03/2004 08:27 | 05/04/2004 13:14 | North Bonneville-Ross No 1 230kV line | 230.0 | L | T | 36.32 | 1727 | Plan | Maintenance | LGV | 141418 | |
05/03/2004 08:27 | 05/04/2004 13:14 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | 1.24 | 1727 | Plan | Maintenance | LGV | 141418 | ||
05/03/2004 08:50 | 05/03/2004 14:11 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 321 | Plan | Maintenance | EUG | 141419 | ||
05/03/2004 08:50 | 05/03/2004 14:11 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 321 | Plan | Maintenance | EUG | 141419 | |
05/03/2004 09:41 | 05/03/2004 11:24 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 103 | Plan | Maintenance | IDF | 141420 | ||
05/03/2004 09:52 | 05/06/2004 12:35 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 4483 | Plan | Maintenance | TRI | 141421 | |
05/03/2004 09:52 | 05/06/2004 12:35 | Orchard View-Badger Canyon section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 2.07 | 4483 | Plan | Maintenance | TRI | 141421 | ||
05/03/2004 10:20 | 05/04/2004 03:17 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 1017 | Plan | Maintenance | TDA RED | 141422 | |
05/03/2004 10:20 | 05/04/2004 03:17 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 1017 | Plan | Maintenance | TDA | 141422 | |||
05/03/2004 15:39 | 05/03/2004 15:39 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | G | 29.67 | 0 | Auto | Unknown | Unknown | SPK | 141423 |
05/03/2004 15:39 | 05/03/2004 15:39 | Sandpoint-Sand Creek section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | 7.26 | 0 | Auto | Unknown | Unknown | SPK | 141423 | |
05/03/2004 22:00 | 05/04/2004 03:17 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 317 | Plan | Maintenance | TDA RED | 141424 | |
05/03/2004 22:00 | 05/04/2004 03:17 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 317 | Plan | Maintenance | TDA | 141424 | |||
05/03/2004 22:00 | 05/04/2004 03:17 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 317 | Plan | Maintenance | TDA | 141424 | |||
05/03/2004 22:00 | 05/04/2004 03:17 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 317 | Plan | Maintenance | TDA | 141424 | |||
05/03/2004 22:00 | 05/04/2004 03:17 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 317 | Plan | Maintenance | TDA RED | 141425 | |
05/03/2004 22:00 | 05/04/2004 03:17 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 317 | Plan | Maintenance | TDA | 141425 | |||
05/03/2004 22:00 | 05/04/2004 03:17 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 317 | Plan | Maintenance | TDA | 141425 | |||
05/03/2004 22:00 | 05/04/2004 03:17 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 317 | Plan | Maintenance | TDA | 141425 | |||
05/04/2004 01:06 | 05/04/2004 05:15 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 249 | Plan | Voltage Control | RED | 141427 | ||
05/04/2004 05:52 | 05/05/2004 19:19 | Chief Joseph PH-Chief Joseph No 3 230kV line | 230.0 | L | 0.95 | 2247 | Plan | Foreign Request | WEN | 141428 | ||
05/04/2004 06:00 | 05/04/2004 17:09 | Murray-Custer No 1 230kV line | 230.0 | L | T | 63.39 | 669 | Plan | Maintenance | SNO | 141429 | |
05/04/2004 06:00 | 05/04/2004 17:09 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | 0.17 | 669 | Plan | Maintenance | SNO | 141429 | ||
05/04/2004 06:16 | 05/04/2004 16:49 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 633 | Plan | Maintenance | SNO | 141430 | |
05/04/2004 06:16 | 05/04/2004 16:49 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 633 | Plan | Maintenance | SNO | 141430 | ||
05/04/2004 06:16 | 05/04/2004 16:49 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | 37.72 | 633 | Plan | Maintenance | SNO | 141430 | ||
05/04/2004 06:42 | 05/05/2004 14:14 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 1892 | Plan | Foreign Request | TDA | 141431 | ||
05/04/2004 07:00 | 05/07/2004 07:56 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4376 | Plan | Maintenance | IDF | 141432 | ||
05/04/2004 07:38 | 05/04/2004 16:20 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 522 | Plan | Maintenance | OLY | 141433 | ||
05/04/2004 07:38 | 05/04/2004 16:20 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 522 | Plan | Maintenance | OLY | 141433 | |
05/04/2004 07:39 | 05/04/2004 14:43 | Big Eddy-Chenoweth No 1 115kV line | 115.0 | L | 6.50 | 424 | Plan | Maintenance | TDA | 141434 | ||
05/04/2004 07:57 | 05/04/2004 08:07 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 10 | Auto | Foreign Trouble | RED | 141435 | |
05/04/2004 07:57 | 05/04/2004 08:07 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 10 | Auto | Foreign Trouble | IDF RED | 141435 | |
05/04/2004 07:57 | 05/04/2004 08:07 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 10 | Auto | Foreign Trouble | IDF RED | 141435 | ||
05/04/2004 08:28 | 05/05/2004 14:42 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 1814 | Plan | Maintenance | SAL | 141436 | |
05/04/2004 08:28 | 05/05/2004 14:42 | Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 8.04 | 1814 | Plan | Maintenance | SAL | 141436 | ||
05/04/2004 08:35 | 05/04/2004 14:09 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 334 | Plan | Maintenance | EUG | 141437 | ||
05/04/2004 08:35 | 05/04/2004 14:09 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 334 | Plan | Maintenance | EUG | 141437 | |
05/04/2004 11:30 | 05/04/2004 11:31 | Shelton-Fairmount No 3 230kV line | 230.0 | L | 60.06 | 1 | Plan | Testing | OLY | 141438 | ||
05/04/2004 19:58 | 05/13/2004 12:25 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 12507 | Plan | Maintenance | KAL | 141439 | ||
05/04/2004 21:00 | 05/05/2004 04:51 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 471 | Plan | Maintenance | TDA RED | 141440 | |
05/04/2004 21:00 | 05/05/2004 04:51 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 471 | Plan | Maintenance | TDA | 141440 | |||
05/04/2004 21:00 | 05/05/2004 04:51 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 471 | Plan | Maintenance | TDA | 141440 | |||
05/04/2004 21:00 | 05/05/2004 04:51 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 471 | Plan | Maintenance | TDA | 141440 | |||
05/04/2004 23:05 | 05/05/2004 05:41 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 396 | Plan | Voltage Control | RED | 141441 | ||
05/05/2004 00:14 | 05/05/2004 05:43 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 329 | Plan | Voltage Control | TDA RED SAL | 141442 | ||
05/05/2004 01:51 | 05/05/2004 05:45 | Schultz-Raver No 3 500kV line | 500.0 | L | 77.47 | 234 | Plan | Voltage Control | WEN COV | 141443 | ||
05/05/2004 05:55 | 05/05/2004 17:29 | Murray-Custer No 1 230kV line | 230.0 | L | T | 63.39 | 694 | Plan | Maintenance | SNO | 141444 | |
05/05/2004 05:55 | 05/05/2004 17:29 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | 0.17 | 694 | Plan | Maintenance | SNO | 141444 | ||
05/05/2004 05:58 | 05/05/2004 17:09 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 671 | Plan | Maintenance | SNO | 141445 | |
05/05/2004 05:58 | 05/05/2004 17:09 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 671 | Plan | Maintenance | SNO | 141445 | ||
05/05/2004 05:58 | 05/05/2004 17:09 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | 37.72 | 671 | Plan | Maintenance | SNO | 141445 | ||
05/05/2004 07:33 | 05/05/2004 15:52 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 499 | Plan | Maintenance | OLY | 141447 | ||
05/05/2004 07:33 | 05/05/2004 15:52 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 499 | Plan | Maintenance | OLY | 141447 | |
05/05/2004 07:44 | 05/05/2004 08:07 | Big Eddy-Chenoweth No 1 115kV line | 115.0 | L | 6.50 | 23 | Plan | Maintenance | TDA | 141448 | ||
05/05/2004 08:15 | 05/05/2004 22:20 | Napavine-Chehalis Power No 1 500kV line | 500.0 | L | 0.08 | 845 | Plan | Foreign Request | OLY | 141449 | ||
05/05/2004 08:15 | 05/05/2004 22:20 | Napavine-Chehalis Power No 2 500kV line | 500.0 | L | 0.07 | 845 | Plan | Foreign Request | OLY | 141450 | ||
05/05/2004 08:15 | 05/05/2004 22:20 | Napavine-Chehalis Power No 3 500kV line | 500.0 | L | 0.08 | 845 | Plan | Foreign Request | OLY | 141451 | ||
05/05/2004 08:18 | 05/05/2004 14:41 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 383 | Plan | Maintenance | TDA RED | 141452 | |
05/05/2004 08:18 | 05/05/2004 14:41 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 383 | Plan | Maintenance | TDA RED | 141452 | ||
05/05/2004 08:36 | 05/05/2004 08:48 | Troutdale-PACW Linneman No 1 230kV line | 230.0 | L | 6.54 | 12 | Auto | Foreign Trouble | Foreign Utility | LGV | 141453 | |
05/05/2004 08:39 | 05/05/2004 14:20 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 341 | Plan | Maintenance | EUG | 141454 | ||
05/05/2004 08:39 | 05/05/2004 14:20 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 341 | Plan | Maintenance | EUG | 141454 | |
05/05/2004 08:45 | 05/06/2004 12:27 | Grand Coulee-Schultz No 2 500kV line | 500.0 | L | 97.02 | 1662 | Plan | Maintenance | WEN | 141455 | ||
05/05/2004 18:19 | 05/06/2004 06:01 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 702 | Plan | Voltage Control | RED | 141456 | ||
05/05/2004 21:00 | 05/06/2004 04:51 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 471 | Plan | Maintenance | TDA RED | 141457 | |
05/05/2004 21:00 | 05/06/2004 04:51 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 471 | Plan | Maintenance | TDA | 141457 | |||
05/05/2004 21:00 | 05/06/2004 04:51 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 471 | Plan | Maintenance | TDA | 141457 | |||
05/05/2004 21:00 | 05/06/2004 04:51 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 471 | Plan | Maintenance | TDA | 141457 | |||
05/05/2004 22:06 | 05/05/2004 22:23 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 17 | Auto | Improper Relaying | Improper Relaying | TDA | 141458 | |
05/05/2004 22:06 | 05/05/2004 22:23 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 17 | Auto | Improper Relaying | TDA RED | 141459 | |
05/05/2004 22:06 | 05/05/2004 22:23 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 17 | Auto | Improper Relaying | TDA | 141459 | |||
05/05/2004 22:06 | 05/05/2004 22:23 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 17 | Auto | Improper Relaying | TDA | 141459 | |||
05/05/2004 22:06 | 05/05/2004 22:23 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 17 | Auto | Improper Relaying | TDA | 141459 | |||
05/05/2004 22:06 | 05/05/2004 22:23 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 17 | Auto | Improper Relaying | TDA | 141459 | |||
05/06/2004 06:09 | 05/06/2004 16:45 | Murray-Custer No 1 230kV line | 230.0 | L | T | 63.39 | 636 | Plan | Maintenance | SNO | 141462 | |
05/06/2004 06:09 | 05/06/2004 16:45 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | 0.17 | 636 | Plan | Maintenance | SNO | 141462 | ||
05/06/2004 06:11 | 05/06/2004 16:40 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 629 | Plan | Maintenance | SNO | 141463 | |
05/06/2004 06:11 | 05/06/2004 16:40 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 629 | Plan | Maintenance | SNO | 141463 | ||
05/06/2004 06:11 | 05/06/2004 16:40 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | 37.72 | 629 | Plan | Maintenance | SNO | 141463 | ||
05/06/2004 07:26 | 05/06/2004 15:25 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 479 | Plan | Maintenance | OLY | 141464 | ||
05/06/2004 07:50 | 05/06/2004 15:08 | Big Eddy-Chenoweth No 1 115kV line | 115.0 | L | 6.50 | 438 | Plan | Maintenance | TDA | 141465 | ||
05/06/2004 08:18 | 05/06/2004 14:38 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 380 | Plan | Maintenance | OLY LGV | 141466 | |
05/06/2004 08:18 | 05/06/2004 14:38 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 380 | Plan | Maintenance | OLY | 141466 | |
05/06/2004 08:18 | 05/06/2004 14:38 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 380 | Plan | Maintenance | OLY | 141466 | ||
05/06/2004 08:21 | 05/06/2004 14:50 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 389 | Plan | Maintenance | TDA RED | 141467 | |
05/06/2004 08:21 | 05/06/2004 14:50 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 389 | Plan | Maintenance | TDA RED | 141467 | ||
05/06/2004 08:34 | 05/06/2004 16:09 | Keeler-Tillamook No 1 115kV line | 115.0 | L | T | 57.81 | 455 | Plan | Maintenance | SAL | 141468 | |
05/06/2004 08:34 | 05/06/2004 16:09 | Timber tap to Keeler-Tillamook No 1 115kV line | 115.0 | T | 11.21 | 455 | Plan | Maintenance | SAL | 141468 | ||
05/06/2004 08:47 | 05/06/2004 14:29 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 342 | Plan | Maintenance | EUG | 141469 | ||
05/06/2004 08:47 | 05/06/2004 14:29 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 342 | Plan | Maintenance | EUG | 141469 | |
05/06/2004 09:00 | 05/06/2004 12:31 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 211 | Plan | Maintenance | EUG | 141470 | |
05/06/2004 09:00 | 05/06/2004 12:31 | Mapleton-Wendson section of Lane-Wendson No 1 115kV line | 115.0 | S | 8.00 | 211 | Plan | Maintenance | EUG | 141470 | ||
05/06/2004 13:18 | 06/02/2004 07:54 | Ely-Highland section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.98 | 38556 | Plan | Normally Out | TRI | 141471 | ||
05/06/2004 13:18 | 06/02/2004 07:54 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 38556 | Plan | Normally Out | TRI | 141471 | |
05/06/2004 14:15 | 05/10/2004 10:07 | Rogue-Gold Beach No 2 115kV line | 115.0 | L | 5.49 | 5512 | Plan | Foreign Request | EUG | 141472 | ||
05/06/2004 22:00 | 05/07/2004 04:52 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 412 | Plan | Maintenance | TDA RED | 141473 | |
05/06/2004 22:00 | 05/07/2004 04:52 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 412 | Plan | Maintenance | TDA | 141473 | |||
05/06/2004 22:00 | 05/07/2004 04:52 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 412 | Plan | Maintenance | TDA | 141473 | |||
05/06/2004 22:00 | 05/07/2004 04:52 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 412 | Plan | Maintenance | TDA | 141473 | |||
05/06/2004 23:02 | 05/07/2004 05:53 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 411 | Plan | Voltage Control | RED | 141474 | ||
05/07/2004 02:07 | 05/07/2004 05:46 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 219 | Plan | Voltage Control | WEN COV | 141475 | ||
05/07/2004 02:10 | 05/07/2004 05:43 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 213 | Plan | Voltage Control | TRI TDA RED SAL | 141476 | ||
05/07/2004 06:02 | 05/07/2004 14:52 | Murray-Custer No 1 230kV line | 230.0 | L | T | 63.39 | 530 | Plan | Maintenance | SNO | 141478 | |
05/07/2004 06:02 | 05/07/2004 14:52 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | 0.17 | 530 | Plan | Maintenance | SNO | 141478 | ||
05/07/2004 06:03 | 05/07/2004 14:35 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 512 | Plan | Maintenance | SNO | 141479 | |
05/07/2004 06:03 | 05/07/2004 14:35 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 512 | Plan | Maintenance | SNO | 141479 | ||
05/07/2004 06:03 | 05/07/2004 14:35 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | 37.72 | 512 | Plan | Maintenance | SNO | 141479 | ||
05/07/2004 07:33 | 05/07/2004 14:08 | Big Eddy-Chenoweth No 1 115kV line | 115.0 | L | 6.50 | 395 | Plan | Maintenance | TDA | 141480 | ||
05/07/2004 08:02 | 05/07/2004 16:32 | North Camas-Oak Park No 1 115kV line | 115.0 | L | 1.65 | 510 | Plan | Maintenance | LGV | 141481 | ||
05/07/2004 08:06 | 05/07/2004 14:18 | Santiam-Alvey No 1&2 230kV line | 230.0 | L | G | 118.50 | 372 | Plan | Maintenance | SAL EUG | 141482 | |
05/07/2004 08:06 | 05/07/2004 14:18 | Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line | 230.0 | S | 46.81 | 372 | Plan | Maintenance | SAL EUG | 141482 | ||
05/07/2004 08:20 | 05/07/2004 15:25 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 425 | Plan | Maintenance | TDA RED | 141483 | |
05/07/2004 08:20 | 05/07/2004 15:25 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 425 | Plan | Maintenance | TDA RED | 141483 | ||
05/07/2004 08:21 | 05/07/2004 15:28 | North Bonneville-Troutdale No 1 230kV line | 230.0 | L | 27.74 | 427 | Plan | Maintenance | LGV | 141484 | ||
05/07/2004 08:25 | 05/07/2004 15:01 | Keeler-Tillamook No 1 115kV line | 115.0 | L | T | 57.81 | 396 | Plan | Maintenance | SAL | 141485 | |
05/07/2004 08:25 | 05/07/2004 15:01 | Timber tap to Keeler-Tillamook No 1 115kV line | 115.0 | T | 11.21 | 396 | Plan | Maintenance | SAL | 141485 | ||
05/07/2004 19:47 | 05/07/2004 19:47 | Custer-Ingledow No 2 500kV line | 500.0 | L | 22.65 | 0 | Auto | Foreign Trouble | Foreign Trouble | SNO | 141486 | |
05/08/2004 01:25 | 05/08/2004 07:12 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 347 | Plan | Voltage Control | SAL EUG | 141487 | ||
05/08/2004 01:45 | 05/08/2004 06:11 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 266 | Plan | Voltage Control | RED | 141488 | ||
05/08/2004 04:02 | 05/08/2004 04:05 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 3 | Auto | Lightning | Lightning | KAL | 141492 | |
05/08/2004 04:02 | 05/08/2004 04:07 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 5 | Auto | RAS Initiated | RAS Initiated | KAL | 141493 | |
05/08/2004 05:02 | 05/08/2004 05:02 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 141494 |
05/08/2004 05:02 | 05/08/2004 05:02 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 141494 |
05/08/2004 05:02 | 05/08/2004 05:02 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 141494 | |
05/08/2004 05:02 | 05/08/2004 05:02 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 141494 |
05/08/2004 05:02 | 05/08/2004 05:02 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 141494 |
05/08/2004 05:02 | 05/08/2004 05:02 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 141494 |
05/08/2004 05:02 | 05/08/2004 05:03 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 1 | Auto | RAS Initiated | RAS Initiated | KAL | 141495 | |
05/08/2004 07:01 | 05/09/2004 17:11 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 2050 | Plan | Construction | COV | 141496 | ||
05/08/2004 15:17 | 05/08/2004 22:10 | Potholes-Grand Coulee No 1 230kV line | 230.0 | L | 65.66 | 413 | Auto | Lightning | Lightning | WEN SPK | 141497 | |
05/08/2004 23:28 | 05/09/2004 10:06 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 638 | Plan | Voltage Control | RED | 141498 | ||
05/09/2004 00:43 | 05/09/2004 07:04 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 381 | Plan | Voltage Control | TRI TDA RED SAL | 141499 | ||
05/10/2004 00:00 | 05/10/2004 00:02 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 2 | Auto | Foreign Trouble | TDA RED | 141502 | ||
05/10/2004 00:00 | 05/10/2004 00:02 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 141502 | ||
05/10/2004 00:00 | 05/10/2004 00:02 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 141502 | ||
05/10/2004 00:00 | 05/10/2004 00:02 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 141502 | ||
05/10/2004 00:00 | 05/10/2004 00:02 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 141502 | ||
05/10/2004 00:00 | 05/10/2004 00:02 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 141502 | ||
05/10/2004 00:03 | 05/10/2004 05:49 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 346 | Plan | Voltage Control | RED | 141503 | ||
05/10/2004 02:27 | 05/10/2004 05:07 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 160 | Plan | Voltage Control | TRI TDA RED SAL | 141504 | ||
05/10/2004 07:00 | 05/14/2004 10:00 | Raver-Echo Lake No 1 500kV line | 500.0 | L | 11.93 | 5940 | Plan | Maintenance | COV | 141509 | ||
05/10/2004 07:26 | 05/10/2004 16:49 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 563 | Plan | Maintenance | OLY | 141510 | |
05/10/2004 07:26 | 05/10/2004 16:49 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 563 | Plan | Maintenance | OLY | 141510 | ||
05/10/2004 07:34 | 05/10/2004 18:04 | Longview-Chehalis 1&3 No 1 230kV line | 230.0 | L | 34.94 | 630 | Plan | Construction | LGV OLY | 141511 | ||
05/10/2004 07:37 | 05/10/2004 16:09 | Hanford-Ostrander No 1 500kV line | 500.0 | L | 180.30 | 512 | Plan | Maintenance | TRI WEN TDA LGV | 141512 | ||
05/10/2004 08:10 | 05/10/2004 15:19 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 429 | Plan | Maintenance | TDA | 141513 | ||
05/10/2004 08:10 | 05/10/2004 15:19 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 429 | Plan | Maintenance | TDA RED | 141513 | |
05/10/2004 08:13 | 05/10/2004 16:49 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 516 | Plan | Maintenance | SAL EUG | 141514 | ||
05/10/2004 08:22 | 05/14/2004 14:17 | Fairview-PACW Isthmus No 2 230kV line | 230.0 | L | 11.90 | 6115 | Plan | Foreign Request | EUG | 141515 | ||
05/10/2004 08:29 | 05/10/2004 15:53 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 444 | Plan | Maintenance | SAL | 141516 | |
05/10/2004 08:29 | 05/10/2004 15:53 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 444 | Plan | Maintenance | SAL | 141516 | ||
05/10/2004 08:37 | 05/14/2004 15:29 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 6172 | Plan | Maintenance | EUG | 141517 | |
05/10/2004 08:37 | 05/14/2004 15:29 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 6172 | Plan | Maintenance | EUG | 141517 | ||
05/10/2004 10:34 | 05/28/2004 11:48 | Mission-Pendleton section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 6.67 | 25994 | Plan | Maintenance | TRI | 141518 | ||
05/10/2004 10:34 | 05/28/2004 11:48 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | O | 38.93 | 25994 | Plan | Maintenance | TRI | 141518 | |
05/10/2004 21:00 | 05/10/2004 22:01 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 61 | Plan | Testing | TDA RED | 141519 | |
05/10/2004 21:00 | 05/10/2004 22:01 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 61 | Plan | Testing | TDA | 141519 | |||
05/10/2004 21:00 | 05/10/2004 22:01 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 61 | Plan | Testing | TDA | 141519 | |||
05/10/2004 21:00 | 05/10/2004 22:01 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 61 | Plan | Testing | TDA | 141519 | |||
05/11/2004 00:28 | 05/11/2004 05:47 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 319 | Plan | Voltage Control | RED | 141520 | ||
05/11/2004 04:10 | 05/11/2004 09:54 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 344 | Auto | Tree | Tree | EUG | 141525 |
05/11/2004 04:10 | 05/11/2004 07:51 | Hills Creek-Oakridge section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 4.80 | 221 | Auto | Tree | Tree | EUG | 141525 | |
05/11/2004 04:10 | 05/11/2004 07:51 | Oakridge tap to Hills Creek-Lookout Point No 1 115kV line | 115.0 | T | 0.10 | 221 | Auto | Tree | Tree | EUG | 141525 | |
05/11/2004 04:10 | 05/11/2004 09:54 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 344 | Auto | Tree | Tree | EUG | 141525 | |
05/11/2004 05:10 | 05/11/2004 10:32 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 322 | Plan | Foreign Request | TDA RED | 141522 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141522 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141522 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141522 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141522 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141522 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 322 | Plan | Foreign Request | TDA RED | 141523 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141523 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141523 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141523 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141523 | ||
05/11/2004 05:10 | 05/11/2004 10:32 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 322 | Plan | Foreign Request | TDA | 141523 | ||
05/11/2004 05:39 | 05/11/2004 05:39 | Lower Monumental-Ashe No 1 500kV line | 500.0 | L | 39.58 | 0 | Auto | Unknown | Unknown | TRI | 141524 | |
05/11/2004 07:01 | 05/11/2004 20:12 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 791 | Plan | Foreign Request | EUG | 141526 | ||
05/11/2004 07:09 | 05/11/2004 07:31 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 22 | Plan | Switching | EUG | 141552 | ||
05/11/2004 07:22 | 05/11/2004 15:27 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 485 | Plan | Maintenance | OLY | 141528 | |
05/11/2004 07:22 | 05/11/2004 15:27 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 485 | Plan | Maintenance | OLY | 141528 | ||
05/11/2004 07:41 | 05/11/2004 15:38 | Longview-Chehalis 1&3 No 3 230kV line | 230.0 | L | 31.13 | 477 | Plan | Maintenance | LGV OLY | 141529 | ||
05/11/2004 07:48 | 05/11/2004 15:29 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 461 | Plan | Maintenance | OLY | 141530 | ||
05/11/2004 07:51 | 05/11/2004 14:51 | Hanford-Ostrander No 1 500kV line | 500.0 | L | 180.30 | 420 | Plan | Maintenance | TRI WEN TDA LGV | 141531 | ||
05/11/2004 08:45 | 05/11/2004 15:55 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 430 | Plan | Maintenance | TDA RED | 141532 | |
05/11/2004 08:45 | 05/11/2004 15:55 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 430 | Plan | Maintenance | TDA RED | 141532 | ||
05/11/2004 08:49 | 05/14/2004 13:44 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 4615 | Plan | Maintenance | SAL | 141533 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 56 | Auto | Foreign Trouble | TDA RED | 141534 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141534 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141534 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141534 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141534 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141534 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 56 | Auto | Foreign Trouble | TDA RED | 141535 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141535 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141535 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141535 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141535 | ||
05/11/2004 13:33 | 05/11/2004 14:29 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 56 | Auto | Foreign Trouble | TDA | 141535 | ||
05/11/2004 19:46 | 05/11/2004 20:09 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 23 | Plan | Switching | EUG | 141537 | ||
05/12/2004 06:00 | 05/12/2004 16:25 | Snohomish-Murray No 1 230kV line | 230.0 | L | 17.38 | 625 | Plan | Maintenance | SNO | 141538 | ||
05/12/2004 06:34 | 05/12/2004 15:58 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 564 | Plan | Foreign Request | EUG | 141539 | ||
05/12/2004 06:37 | 05/12/2004 06:49 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 12 | Plan | Switching | EUG | 141540 | ||
05/12/2004 07:25 | 05/12/2004 16:45 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 560 | Plan | Maintenance | OLY | 141541 | |
05/12/2004 07:25 | 05/12/2004 16:45 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 560 | Plan | Maintenance | OLY | 141541 | ||
05/12/2004 07:47 | 05/12/2004 16:06 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 499 | Plan | Maintenance | OLY | 141542 | ||
05/12/2004 08:02 | 05/12/2004 14:25 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | G | 5.51 | 383 | Plan | Maintenance | TRI | 141543 | |
05/12/2004 08:02 | 05/12/2004 14:25 | Badger Canyon-Vista section of Badger Canyon-Richland No 1 115kV line | 115.0 | S | 0.97 | 383 | Plan | Maintenance | TRI | 141543 | ||
05/12/2004 08:15 | 05/12/2004 15:50 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 455 | Plan | Maintenance | TDA RED | 141544 | |
05/12/2004 08:15 | 05/12/2004 15:50 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 455 | Plan | Maintenance | TDA RED | 141544 | ||
05/12/2004 08:23 | 05/20/2004 11:30 | Albany-Eugene No 1 115kV line | 115.0 | L | G | 39.80 | 11707 | Plan | Construction | EUG | 141545 | |
05/12/2004 08:23 | 05/20/2004 11:30 | Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line | 115.0 | S | 8.28 | 11707 | Plan | Construction | EUG | 141545 | ||
05/12/2004 09:00 | 05/12/2004 11:40 | Hot Springs-NWE Ovando No 1 230kV line | 230.0 | L | 89.70 | 160 | Plan | Foreign Request | KAL | 141546 | ||
05/12/2004 10:27 | 05/12/2004 13:25 | Fidalgo-Lopez Island No 5 69kV line | 69.0 | L | 8.49 | 178 | Plan | Maintenance | SNO | 141547 | ||
05/12/2004 12:59 | 05/12/2004 13:06 | Dworshak PH-Dworshak No 1 500kV line | 500.0 | L | 3.67 | 7 | Auto | Imp Install/Design/Applica | Imp Install/Design/Applica | TRI SPK | 141548 | |
05/12/2004 15:27 | 05/12/2004 15:58 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 31 | Plan | Switching | EUG | 141549 | ||
05/13/2004 00:03 | 05/13/2004 05:41 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 338 | Plan | Voltage Control | TRI TDA RED SAL | 141550 | ||
05/13/2004 04:00 | 05/13/2004 04:14 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 14 | Auto | Foreign Trouble | TDA RED | 141551 | ||
05/13/2004 04:00 | 05/13/2004 04:14 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 14 | Auto | Foreign Trouble | TDA | 141551 | ||
05/13/2004 04:00 | 05/13/2004 04:14 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 14 | Auto | Foreign Trouble | TDA | 141551 | ||
05/13/2004 04:00 | 05/13/2004 04:14 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 14 | Auto | Foreign Trouble | TDA | 141551 | ||
05/13/2004 04:00 | 05/13/2004 04:14 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 14 | Auto | Foreign Trouble | TDA | 141551 | ||
05/13/2004 04:00 | 05/13/2004 04:14 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 14 | Auto | Foreign Trouble | TDA | 141551 | ||
05/13/2004 06:00 | 05/13/2004 15:37 | Snohomish-Murray No 1 230kV line | 230.0 | L | 17.38 | 577 | Plan | Maintenance | SNO | 141555 | ||
05/13/2004 07:20 | 05/13/2004 16:25 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 545 | Plan | Maintenance | OLY | 141556 | |
05/13/2004 07:20 | 05/13/2004 16:25 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 545 | Plan | Maintenance | OLY | 141556 | ||
05/13/2004 07:45 | 05/13/2004 16:14 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 509 | Plan | Maintenance | OLY | 141557 | ||
05/13/2004 08:19 | 05/13/2004 16:30 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 491 | Plan | Maintenance | TDA RED | 141558 | |
05/13/2004 08:19 | 05/13/2004 16:30 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 491 | Plan | Maintenance | TDA RED | 141558 | ||
05/13/2004 13:28 | 05/14/2004 15:10 | E. E. Clouse-Harvalum No 1 230kV line | 230.0 | L | 10.10 | 1542 | Plan | Foreign Request | RED TDA | 141559 | ||
05/13/2004 16:03 | 05/13/2004 16:06 | Dworshak PH-Dworshak No 1 500kV line | 500.0 | L | 3.67 | 3 | Plan | Maintenance | TRI SPK | 141560 | ||
05/13/2004 16:29 | 05/13/2004 19:35 | Dworshak PH-Dworshak No 1 500kV line | 500.0 | L | 3.67 | 186 | Plan | Maintenance | TRI SPK | 141561 | ||
05/14/2004 00:01 | 05/17/2004 06:08 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 4687 | Plan | Foreign Request | OLY | 141562 | ||
05/14/2004 00:01 | 05/17/2004 06:08 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 4687 | Plan | Foreign Request | OLY | 141562 | |
05/14/2004 00:01 | 05/14/2004 05:06 | Fidalgo-Lopez Island No 4 115kV line | 115.0 | L | 8.48 | 305 | Plan | Foreign Request | SNO | 141563 | ||
05/14/2004 00:01 | 05/14/2004 05:05 | Fidalgo-Lopez Island No 5 69kV line | 69.0 | L | 8.49 | 304 | Plan | Foreign Request | SNO | 141564 | ||
05/14/2004 01:18 | 05/14/2004 05:13 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 235 | Plan | Voltage Control | TRI TDA RED SAL | 141565 | ||
05/14/2004 01:25 | 05/14/2004 05:16 | Schultz-Raver No 1 500kV line | 500.0 | L | 77.24 | 231 | Plan | Voltage Control | WEN COV | 141566 | ||
05/14/2004 08:16 | 05/14/2004 18:11 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 595 | Plan | Maintenance | TDA RED | 141573 | |
05/14/2004 08:16 | 05/14/2004 18:11 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 595 | Plan | Maintenance | TDA RED | 141573 | ||
05/14/2004 09:26 | 05/14/2004 16:07 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 401 | Auto | Foreign Trouble | Foreign Trouble | OLY | 141574 | |
05/14/2004 09:26 | 05/14/2004 16:01 | Paul-Big Hanaford section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.54 | 395 | Auto | Foreign Trouble | Foreign Trouble | OLY | 141574 | |
05/14/2004 09:26 | 05/14/2004 16:01 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | O | 0.78 | 395 | Auto | Foreign Trouble | Foreign Trouble | OLY | 141574 |
05/14/2004 11:53 | 05/14/2004 12:57 | Alfalfa-Outlook section of North Bonneville-Midway No 1 230kV line | 230.0 | S | 8.57 | 64 | Plan | Switching | WEN | 141575 | ||
05/14/2004 11:53 | 05/14/2004 12:57 | North Bonneville-Midway No 1 230kV line | 230.0 | L | O | 134.71 | 64 | Plan | Switching | LGV TDA WEN TRI | 141575 | |
05/14/2004 11:53 | 05/14/2004 12:29 | Outlook tap to North Bonneville-Midway No 1 230kV line | 230.0 | T | 0.10 | 36 | Plan | Switching | TRI | 141575 | ||
05/14/2004 14:33 | 05/14/2004 14:33 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 141576 |
05/14/2004 14:33 | 05/14/2004 14:33 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 141576 |
05/14/2004 14:33 | 05/14/2004 14:33 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 141576 | |
05/14/2004 14:33 | 05/14/2004 14:33 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 141576 |
05/14/2004 14:33 | 05/14/2004 14:33 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 141576 |
05/14/2004 14:33 | 05/14/2004 14:33 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 141576 |
05/14/2004 14:33 | 05/14/2004 14:35 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 2 | Auto | RAS Initiated | RAS Initiated | KAL | 141577 | |
05/14/2004 15:11 | 08/09/2004 08:26 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | G | 24.08 | 124875 | Plan | Normally Out | TDA | 141578 | |
05/14/2004 15:11 | 08/09/2004 08:26 | Spearfish-Goldendale section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 20.24 | 124875 | Plan | Normally Out | TDA | 141578 | ||
05/14/2004 15:53 | 05/14/2004 16:03 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 10 | Auto | Foreign Trouble | TDA RED | 141579 | ||
05/14/2004 15:53 | 05/14/2004 16:03 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 141579 | ||
05/14/2004 15:53 | 05/14/2004 16:03 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 141579 | ||
05/14/2004 15:53 | 05/14/2004 16:03 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 141579 | ||
05/14/2004 15:53 | 05/14/2004 16:03 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 141579 | ||
05/14/2004 15:53 | 05/14/2004 16:03 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 141579 | ||
05/15/2004 01:09 | 05/15/2004 06:15 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 306 | Plan | Voltage Control | TRI TDA RED SAL | 141580 | ||
05/15/2004 01:37 | 05/15/2004 06:51 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 314 | Plan | Voltage Control | WEN COV | 141581 | ||
05/15/2004 05:02 | 05/16/2004 17:54 | Tacoma-TPWR Cowlitz No 2 230kV line | 230.0 | L | 6.00 | 2212 | Plan | Foreign Request | COV | 141582 | ||
05/15/2004 06:04 | 05/15/2004 11:45 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | T | 29.98 | 341 | Plan | Maintenance | COV SNO | 141583 | |
05/15/2004 06:04 | 05/15/2004 11:45 | Sno-King tap to Echo Lake-Monroe No 1 500kV line | 500.0 | T | 12.82 | 341 | Plan | Maintenance | SNO | 141583 | ||
05/15/2004 07:59 | 05/28/2004 17:31 | Big Eddy-Midway No 1 230kV line | 230.0 | L | G | 102.80 | 19292 | Plan | Fiber Optic Work | TDA TRI | 141585 | |
05/15/2004 07:59 | 05/28/2004 17:31 | Mabton-Midway section of Big Eddy-Midway No 1 230kV line | 230.0 | S | 31.10 | 19292 | Plan | Fiber Optic Work | TRI | 141585 | ||
05/15/2004 08:00 | 05/15/2004 08:01 | Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line | 230.0 | S | 71.70 | 1 | Plan | Maintenance | TDA TRI | 141586 | ||
05/15/2004 08:00 | 05/15/2004 08:01 | Big Eddy-Midway No 1 230kV line | 230.0 | L | O | 102.80 | 1 | Plan | Maintenance | TDA TRI | 141586 | |
05/15/2004 08:00 | 05/15/2004 08:01 | Mabton tap to Big Eddy-Midway No 1 230kV line | 230.0 | T | 0.10 | 1 | Plan | Maintenance | TRI | 141586 | ||
05/16/2004 00:04 | 05/16/2004 08:17 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 493 | Plan | Voltage Control | TRI TDA RED SAL | 141587 | ||
05/16/2004 01:12 | 05/16/2004 06:49 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 337 | Plan | Voltage Control | RED | 141588 | ||
05/16/2004 15:14 | 05/16/2004 15:14 | Cusick-Boundary section of Usk-Boundary No 1 230kV line | 230.0 | S | G | 48.18 | 0 | Auto | Lightning | Weather | SPK | 141593 |
05/16/2004 15:14 | 05/16/2004 15:14 | Usk-Boundary No 1 230kV line | 230.0 | L | 55.04 | 0 | Auto | Lightning | Weather | SPK | 141593 | |
05/16/2004 15:14 | 05/16/2004 15:14 | Usk-Cusick section of Usk-Boundary No 1 230kV line | 230.0 | S | G | 6.86 | 0 | Auto | Lightning | Weather | SPK | 141593 |
05/16/2004 15:43 | 05/16/2004 15:47 | Grand Coulee-Chief Joseph No 1 230kV line | 230.0 | L | 32.73 | 4 | Auto | Lightning | Lightning | WEN | 141594 | |
05/16/2004 15:43 | 05/16/2004 15:43 | East Omak tap to Grand Coulee-Foster Creek No 1 115kV line | 115.0 | T | G | 34.24 | 0 | Auto | Lightning | Lightning | WEN | 141595 |
05/16/2004 15:43 | 05/16/2004 15:43 | East Omak-Foster Creek section of Grand Coulee-Foster Creek No 1 115kV line | 115.0 | S | G | 1.05 | 0 | Auto | Lightning | Lightning | WEN | 141595 |
05/16/2004 15:43 | 05/16/2004 15:43 | Grand Coulee-Foster Creek No 1 115kV line | 115.0 | L | 32.57 | 0 | Auto | Lightning | Lightning | WEN | 141595 | |
05/16/2004 15:43 | 05/16/2004 15:43 | Grand Coulee-Nilles Corner section of Grand Coulee-Foster Creek No 1 115kV line | 115.0 | S | G | 20.23 | 0 | Auto | Lightning | Lightning | WEN | 141595 |
05/16/2004 15:43 | 05/16/2004 15:43 | Nilles Corner-East Omak section of Grand Coulee-Foster Creek No 1 115kV line | 115.0 | S | G | 11.29 | 0 | Auto | Lightning | Lightning | WEN | 141595 |
05/16/2004 15:46 | 05/16/2004 15:46 | East Omak tap to Grand Coulee-Foster Creek No 1 115kV line | 115.0 | T | G | 34.24 | 0 | Auto | Lightning | Lightning | WEN | 141596 |
05/16/2004 15:46 | 05/16/2004 15:46 | East Omak-Foster Creek section of Grand Coulee-Foster Creek No 1 115kV line | 115.0 | S | G | 1.05 | 0 | Auto | Lightning | Lightning | WEN | 141596 |
05/16/2004 15:46 | 05/16/2004 15:46 | Grand Coulee-Foster Creek No 1 115kV line | 115.0 | L | 32.57 | 0 | Auto | Lightning | Lightning | WEN | 141596 | |
05/16/2004 15:46 | 05/16/2004 15:46 | Grand Coulee-Nilles Corner section of Grand Coulee-Foster Creek No 1 115kV line | 115.0 | S | G | 20.23 | 0 | Auto | Lightning | Lightning | WEN | 141596 |
05/16/2004 15:46 | 05/16/2004 15:46 | Nilles Corner-East Omak section of Grand Coulee-Foster Creek No 1 115kV line | 115.0 | S | G | 11.29 | 0 | Auto | Lightning | Lightning | WEN | 141596 |
05/16/2004 17:29 | 05/16/2004 17:29 | Bell-Boundary No 1 230kV line | 230.0 | L | 91.66 | 0 | Auto | Lightning | Weather | SPK | 141597 | |
05/16/2004 17:29 | 05/16/2004 17:29 | Bell-Sacheen section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 31.60 | 0 | Auto | Lightning | Weather | SPK | 141597 |
05/16/2004 17:29 | 05/16/2004 17:29 | Sacheen tap to Bell-Boundary No 1 230kV line | 230.0 | T | G | 0.70 | 0 | Auto | Lightning | Weather | SPK | 141597 |
05/16/2004 17:29 | 05/16/2004 17:29 | Sacheen-Boundary section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 60.06 | 0 | Auto | Lightning | Weather | SPK | 141597 |
05/16/2004 17:30 | 05/16/2004 17:30 | Cusick-Boundary section of Usk-Boundary No 1 230kV line | 230.0 | S | G | 48.18 | 0 | Auto | Lightning | Weather | SPK | 141598 |
05/16/2004 17:30 | 05/16/2004 17:30 | Usk-Boundary No 1 230kV line | 230.0 | L | 55.04 | 0 | Auto | Lightning | Weather | SPK | 141598 | |
05/16/2004 17:30 | 05/16/2004 17:30 | Usk-Cusick section of Usk-Boundary No 1 230kV line | 230.0 | S | G | 6.86 | 0 | Auto | Lightning | Weather | SPK | 141598 |
05/16/2004 19:15 | 05/16/2004 19:15 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 141599 |
05/16/2004 19:15 | 05/16/2004 19:15 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 141599 |
05/16/2004 19:15 | 05/16/2004 19:15 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 141599 |
05/16/2004 19:15 | 05/16/2004 19:15 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 141599 | |
05/16/2004 19:18 | 05/16/2004 19:18 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 141600 |
05/16/2004 19:18 | 05/16/2004 19:18 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 141600 |
05/16/2004 19:18 | 05/16/2004 19:18 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 141600 |
05/16/2004 19:18 | 05/16/2004 19:18 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 141600 | |
05/16/2004 23:40 | 05/17/2004 05:15 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 335 | Plan | Voltage Control | TRI TDA RED SAL | 141601 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 374 | Plan | Foreign Request | TDA RED | 141608 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141608 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141608 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141608 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141608 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141608 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 374 | Plan | Foreign Request | TDA RED | 141609 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141609 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141609 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141609 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141609 | ||
05/17/2004 05:00 | 05/17/2004 11:14 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 374 | Plan | Foreign Request | TDA | 141609 | ||
05/17/2004 07:00 | 05/21/2004 15:50 | Raver-Echo Lake No 1 500kV line | 500.0 | L | 11.93 | 6290 | Plan | Maintenance | COV | 141610 | ||
05/17/2004 07:20 | 05/28/2004 13:49 | Allston-Clatsop No 1 230kV line | 230.0 | L | T | 42.61 | 16229 | Plan | Maintenance | LGV | 141611 | |
05/17/2004 07:20 | 05/28/2004 13:49 | Driscoll tap to Allston-Clatsop No 1 230kV line | 230.0 | T | 0.22 | 16229 | Plan | Maintenance | LGV | 141611 | ||
05/17/2004 07:27 | 05/20/2004 16:08 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 4841 | Plan | Maintenance | OLY LGV | 141612 | |
05/17/2004 07:27 | 05/20/2004 16:08 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 4841 | Plan | Maintenance | OLY LGV | 141612 | ||
05/17/2004 07:35 | 05/20/2004 11:35 | Frederickson-South Tacoma No 1 230kV line | 230.0 | L | 0.50 | 4560 | Plan | Foreign Request | SNO COV | 141613 | ||
05/17/2004 07:35 | 05/19/2004 14:07 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 3272 | Plan | Maintenance | EUG | 141614 | |
05/17/2004 07:35 | 05/19/2004 14:07 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 3272 | Plan | Maintenance | EUG | 141614 | ||
05/17/2004 07:38 | 05/21/2004 11:03 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5965 | Plan | Maintenance | IDF | 141615 | ||
05/17/2004 07:48 | 05/18/2004 15:39 | Chemawa-Salem No 2 115kV line | 115.0 | L | G | 10.41 | 1911 | Plan | Maintenance | SAL | 141616 | |
05/17/2004 07:48 | 05/18/2004 15:39 | Hughes-Salem section of Chemawa-Salem No 2 115kV line | 115.0 | S | 1.88 | 1911 | Plan | Maintenance | SAL | 141616 | ||
05/17/2004 07:54 | 05/28/2004 12:39 | Allston-Clatsop No 1 230kV line | 230.0 | L | G | 42.61 | 16125 | Plan | Maintenance | LGV | 141617 | |
05/17/2004 07:54 | 05/28/2004 12:39 | Allston-Driscoll section of Allston-Clatsop No 1 230kV line | 230.0 | S | 20.84 | 16125 | Plan | Maintenance | LGV | 141617 | ||
05/17/2004 07:54 | 05/28/2004 12:39 | Driscoll-Clatsop section of Allston-Clatsop No 1 230kV line | 230.0 | S | 21.77 | 16125 | Plan | Maintenance | LGV | 141617 | ||
05/17/2004 08:30 | 05/17/2004 15:18 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 408 | Plan | Maintenance | TDA RED | 141618 | |
05/17/2004 08:30 | 05/17/2004 15:18 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 408 | Plan | Maintenance | TDA RED | 141618 | ||
05/17/2004 08:43 | 05/17/2004 08:50 | Chief Joseph PH-Chief Joseph No 4 230kV line | 230.0 | L | 0.90 | 7 | Auto | Foreign Trouble | Foreign Trouble | WEN | 141619 | |
05/17/2004 14:05 | 05/17/2004 14:12 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 7 | Auto | Foreign Trouble | RED | 141620 | |
05/17/2004 14:05 | 05/17/2004 14:12 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 7 | Auto | Foreign Trouble | IDF RED | 141620 | |
05/17/2004 14:05 | 05/17/2004 14:12 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 7 | Auto | Foreign Trouble | IDF RED | 141620 | ||
05/17/2004 14:05 | 05/17/2004 14:12 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | G | 103.37 | 7 | Auto | Forced (Configuration) | Forced (Configuration) | RED | 141621 |
05/17/2004 14:05 | 05/17/2004 14:12 | Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | 85.11 | 7 | Auto | Forced (Configuration) | Forced (Configuration) | RED | 141621 | |
05/17/2004 14:05 | 05/17/2004 14:12 | Summer Lake-Malin No 1 500kV line | 500.0 | L | 75.12 | 7 | Auto | Forced (Configuration) | Forced (Configuration) | RED | 141622 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Goose Lake tap to Grand Coulee-Okanogan No 2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | WEN | 141623 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Goose Lake-Okanogan section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | G | 20.00 | 0 | Auto | Lightning | WEN | 141623 | |
05/17/2004 17:07 | 05/17/2004 17:11 | Grand Coulee-Keller section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 1.25 | 4 | Auto | Lightning | WEN | 141623 | ||
05/17/2004 17:07 | 05/17/2004 17:11 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | 41.05 | 4 | Auto | Lightning | WEN | 141623 | ||
05/17/2004 17:07 | 05/17/2004 17:07 | Keller tap to Grand Coulee-Okanogan No 2 115kV line | 115.0 | T | G | 20.14 | 0 | Auto | Lightning | WEN | 141623 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Keller-Nespelem section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | G | 5.30 | 0 | Auto | Lightning | WEN | 141623 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Nespelem tap to Grand Coulee-Okanogan No 2 115kV line | 115.0 | T | G | 10.20 | 0 | Auto | Lightning | WEN | 141623 | |
05/17/2004 17:07 | 05/17/2004 17:07 | Nespelem-Goose Lake section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | G | 14.50 | 0 | Auto | Lightning | WEN | 141623 | |
05/17/2004 17:24 | 05/17/2004 17:24 | Chief Joseph-East Omak No 1 230kV line | 230.0 | L | 33.99 | 0 | Auto | Lightning | Lightning | WEN | 141624 | |
05/17/2004 17:35 | 05/17/2004 17:35 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 0 | Auto | Lightning | Lightning | SPK | 141625 | |
05/17/2004 17:35 | 05/17/2004 17:38 | Bell-Boundary No 1 230kV line | 230.0 | L | 91.66 | 3 | Auto | Lightning | Lightning | SPK | 141626 | |
05/17/2004 17:35 | 05/17/2004 17:38 | Bell-Sacheen section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 31.60 | 3 | Auto | Lightning | Lightning | SPK | 141626 |
05/17/2004 17:35 | 05/17/2004 17:38 | Sacheen tap to Bell-Boundary No 1 230kV line | 230.0 | T | G | 0.70 | 3 | Auto | Lightning | Lightning | SPK | 141626 |
05/17/2004 17:35 | 05/17/2004 17:38 | Sacheen-Boundary section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 60.06 | 3 | Auto | Lightning | Lightning | SPK | 141626 |
05/17/2004 17:50 | 05/17/2004 17:50 | Chief Joseph-East Omak No 1 230kV line | 230.0 | L | 33.99 | 0 | Auto | Lightning | Lightning | WEN | 141627 | |
05/17/2004 18:19 | 05/17/2004 18:19 | Pearl-Marion No 1 500kV line | 500.0 | L | 39.38 | 0 | Auto | Lightning | Lightning | SAL | 141656 | |
05/17/2004 18:35 | 05/17/2004 20:42 | Goose Lake-Okanogan section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 20.00 | 127 | Auto | Foreign Trouble | WEN | 141628 | ||
05/17/2004 18:35 | 05/17/2004 20:42 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | G | 41.05 | 127 | Auto | Foreign Trouble | WEN | 141628 | |
05/17/2004 19:21 | 05/17/2004 19:21 | McMinnville-PGE Dayton No 1 115kV line | 115.0 | L | 4.50 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 141629 | |
05/17/2004 23:54 | 05/18/2004 05:36 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 342 | Plan | Voltage Control | TRI TDA RED SAL | 141630 | ||
05/18/2004 08:13 | 05/18/2004 16:21 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 488 | Plan | Maintenance | TDA RED | 141645 | |
05/18/2004 08:13 | 05/18/2004 16:21 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 488 | Plan | Maintenance | TDA RED | 141645 | ||
05/18/2004 08:44 | 05/18/2004 16:02 | McNary-Santiam No 2 230kV line | 230.0 | L | G | 200.43 | 438 | Plan | Maintenance | TRI TDA RED SAL | 141646 | |
05/18/2004 08:44 | 05/18/2004 16:02 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 438 | Plan | Maintenance | SAL | 141646 | ||
05/18/2004 13:34 | 05/18/2004 13:34 | Slatt-John Day No 1 500kV line | 500.0 | L | 30.32 | 0 | Auto | Lightning | Lightning | TRI TDA | 141647 | |
05/18/2004 13:37 | 05/18/2004 13:37 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | O | 24.08 | 0 | Auto | Lightning | Lightning | TDA | 141648 |
05/18/2004 13:37 | 05/18/2004 13:37 | Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 3.84 | 0 | Auto | Lightning | Lightning | TDA | 141648 | |
05/18/2004 13:37 | 05/18/2004 13:37 | Spearfish tap to Chenoweth-Goldendale No 1 115kV line | 115.0 | T | 3.22 | 0 | Auto | Lightning | Lightning | TDA | 141648 | |
05/18/2004 13:39 | 05/18/2004 13:39 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | O | 24.08 | 0 | Auto | Lightning | Lightning | TDA | 141649 |
05/18/2004 13:39 | 05/18/2004 13:39 | Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 3.84 | 0 | Auto | Lightning | Lightning | TDA | 141649 | |
05/18/2004 13:39 | 05/18/2004 13:39 | Spearfish tap to Chenoweth-Goldendale No 1 115kV line | 115.0 | T | 3.22 | 0 | Auto | Lightning | Lightning | TDA | 141649 | |
05/18/2004 13:41 | 05/18/2004 13:41 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | O | 24.08 | 0 | Auto | Lightning | Lightning | TDA | 141650 |
05/18/2004 13:41 | 05/18/2004 13:41 | Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 3.84 | 0 | Auto | Lightning | Lightning | TDA | 141650 | |
05/18/2004 13:41 | 05/18/2004 13:41 | Spearfish tap to Chenoweth-Goldendale No 1 115kV line | 115.0 | T | 3.22 | 0 | Auto | Lightning | Lightning | TDA | 141650 | |
05/18/2004 13:44 | 05/18/2004 13:44 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | O | 24.08 | 0 | Auto | Lightning | Lightning | TDA | 141651 |
05/18/2004 13:44 | 05/18/2004 13:44 | Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 3.84 | 0 | Auto | Lightning | Lightning | TDA | 141651 | |
05/18/2004 13:44 | 05/18/2004 13:44 | Spearfish tap to Chenoweth-Goldendale No 1 115kV line | 115.0 | T | 3.22 | 0 | Auto | Lightning | Lightning | TDA | 141651 | |
05/18/2004 17:25 | 05/20/2004 01:36 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 1931 | Plan | Foreign Request | OLY | 141652 | ||
05/18/2004 17:25 | 05/20/2004 01:36 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 1931 | Plan | Foreign Request | OLY | 141652 | |
05/18/2004 20:32 | 05/18/2004 20:34 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 2 | Auto | Lightning | Lightning | WEN SNO | 141653 | |
05/19/2004 01:24 | 05/19/2004 01:24 | Clarkston tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 141654 |
05/19/2004 01:24 | 05/19/2004 01:24 | Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 3.71 | 0 | Auto | Lightning | Lightning | TRI | 141654 |
05/19/2004 01:24 | 05/19/2004 01:24 | Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 141654 |
05/19/2004 01:24 | 05/19/2004 01:24 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 24.00 | 0 | Auto | Lightning | Lightning | TRI | 141654 |
05/19/2004 01:24 | 05/19/2004 01:24 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | 80.80 | 0 | Auto | Lightning | Lightning | TRI | 141654 | |
05/19/2004 01:24 | 05/19/2004 01:24 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 53.10 | 0 | Auto | Lightning | Lightning | TRI | 141654 |
05/19/2004 01:54 | 05/19/2004 05:32 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 218 | Plan | Voltage Control | TRI TDA RED SAL | 141655 | ||
05/19/2004 07:45 | 05/21/2004 13:50 | Shelton-Kitsap No 4 230kV line | 230.0 | L | 30.29 | 3245 | Plan | Maintenance | OLY | 141672 | ||
05/19/2004 07:57 | 05/21/2004 15:01 | Keeler-Oregon City No 2 115kV line | 115.0 | L | 21.43 | 3304 | Plan | Maintenance | SAL LGV | 141673 | ||
05/19/2004 08:17 | 05/19/2004 15:50 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 453 | Plan | Maintenance | TDA | 141674 | ||
05/19/2004 08:17 | 05/19/2004 15:50 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 453 | Plan | Maintenance | TDA RED | 141674 | |
05/19/2004 08:45 | 05/19/2004 15:01 | Columbia Generating Station-Ashe No 2 230kV line | 230.0 | L | 0.49 | 376 | Plan | Foreign Request | TRI | 141675 | ||
05/19/2004 08:54 | 05/21/2004 16:23 | Columbia-Ancient Lake No 1 115kV line | 115.0 | L | 19.50 | 3329 | Plan | Maintenance | WEN | 141676 | ||
05/19/2004 10:30 | 05/19/2004 10:30 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 0 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | WEN TRI | 141677 | |
05/19/2004 12:19 | 05/19/2004 20:09 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 470 | Plan | Emergency | WEN TRI | 141678 | ||
05/19/2004 14:47 | 05/19/2004 14:47 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Lightning | Lightning | KAL | 141679 |
05/19/2004 14:47 | 05/19/2004 14:47 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 141679 | |
05/19/2004 14:47 | 05/19/2004 14:47 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Lightning | Lightning | KAL | 141679 |
05/19/2004 14:47 | 05/19/2004 14:47 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Lightning | Lightning | SPK | 141679 |
05/19/2004 14:47 | 05/19/2004 14:47 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Lightning | Lightning | KAL | 141679 |
05/19/2004 14:47 | 05/19/2004 14:47 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 141679 |
05/19/2004 15:45 | 05/21/2004 11:41 | Rogue-Gold Beach No 2 115kV line | 115.0 | L | 5.49 | 2636 | Plan | Foreign Request | EUG | 141680 | ||
05/19/2004 15:57 | 05/19/2004 15:57 | Lancaster-Noxon No 1 230kV line | 230.0 | L | 72.72 | 0 | Auto | Lightning | Lightning | SPK KAL | 141681 | |
05/19/2004 17:43 | 05/19/2004 17:43 | Box Canyon tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 2.39 | 0 | Auto | Lightning | Lightning | SPK | 141682 |
05/19/2004 17:43 | 05/19/2004 17:43 | Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 4.75 | 0 | Auto | Lightning | Lightning | SPK | 141682 |
05/19/2004 17:43 | 05/19/2004 17:43 | Colville-Boundary No 1 115kV line | 115.0 | L | O | 43.06 | 0 | Auto | Lightning | Lightning | SPK | 141682 |
05/19/2004 17:43 | 05/19/2004 17:43 | Colville-Spirit section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 17.42 | 0 | Auto | Lightning | Lightning | SPK | 141682 |
05/19/2004 17:43 | 05/19/2004 17:43 | Metaline Falls tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 1.20 | 0 | Auto | Lightning | Lightning | SPK | 141682 |
05/19/2004 17:43 | 05/19/2004 17:43 | Spirit tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 5.23 | 0 | Auto | Lightning | Lightning | SPK | 141682 |
05/19/2004 17:43 | 05/19/2004 17:43 | Spirit-Box Canyon section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 11.98 | 0 | Auto | Lightning | Lightning | SPK | 141682 |
05/19/2004 18:44 | 05/19/2004 18:44 | Addy-AVA Kettle Falls No 1 115kV line | 115.0 | L | 27.10 | 0 | Auto | Lightning | Lightning | SPK | 141683 | |
05/19/2004 18:44 | 05/19/2004 18:44 | Addy-Colville No 1 115kV line | 115.0 | L | 15.22 | 0 | Auto | Lightning | Lightning | SPK | 141684 | |
05/19/2004 19:37 | 05/19/2004 19:37 | Clymer tap to Ellensburg-Moxee No 1 115kV line | 115.0 | T | 0.02 | 0 | Auto | Lightning | Lightning | WEN TRI | 141685 | |
05/19/2004 19:37 | 05/19/2004 20:28 | Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 29.43 | 51 | Auto | Lightning | Lightning | WEN TRI | 141685 | |
05/19/2004 19:37 | 05/19/2004 19:37 | Ellensburg-Clymer section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 1.38 | 0 | Auto | Lightning | Lightning | WEN | 141685 | |
05/19/2004 19:37 | 05/19/2004 20:28 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 51 | Auto | Lightning | Lightning | WEN TRI | 141685 |
05/20/2004 00:16 | 05/20/2004 05:28 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 312 | Plan | Voltage Control | TRI TDA RED SAL | 141686 | ||
05/20/2004 05:31 | 05/20/2004 05:31 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Lightning | RED | 141742 |
05/20/2004 05:31 | 05/20/2004 05:31 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Lightning | RED | 141742 |
05/20/2004 05:31 | 05/20/2004 05:31 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Lightning | RED | 141742 |
05/20/2004 05:31 | 05/20/2004 05:31 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Lightning | RED | 141742 |
05/20/2004 05:31 | 05/20/2004 05:31 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Lightning | RED | 141742 | |
05/20/2004 05:31 | 05/20/2004 05:31 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Lightning | RED | 141742 |
05/20/2004 05:31 | 05/20/2004 05:31 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Lightning | RED | 141742 |
05/20/2004 08:12 | 05/20/2004 14:28 | Fairview-Bandon No 1 115kV line | 115.0 | L | G | 25.16 | 376 | Plan | Fiber Optic Work | EUG | 141743 | |
05/20/2004 08:12 | 05/20/2004 14:28 | Morrison-Bandon section of Fairview-Bandon No 1 115kV line | 115.0 | S | 2.31 | 376 | Plan | Fiber Optic Work | EUG | 141743 | ||
05/20/2004 08:36 | 05/20/2004 14:37 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 361 | Plan | Maintenance | TDA | 141744 | ||
05/20/2004 08:36 | 05/20/2004 14:37 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 361 | Plan | Maintenance | TDA RED | 141744 | |
05/20/2004 11:30 | 09/29/2004 13:49 | Albany-Eugene No 1 115kV line | 115.0 | L | G | 39.80 | 190219 | Plan | Construction | EUG | 141745 | |
05/20/2004 11:30 | 09/29/2004 13:49 | Alderwood-Junction City section of Albany-Eugene No 1 115kV line | 115.0 | S | 2.04 | 190219 | Plan | Construction | EUG | 141745 | ||
05/20/2004 11:35 | 05/20/2004 13:22 | Court Street-Ruby Street section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | 1.83 | 107 | Plan | Maintenance | TRI | 141746 | ||
05/20/2004 11:35 | 05/20/2004 13:22 | Franklin-Ruby Street No 1 115kV line | 115.0 | L | G | 4.85 | 107 | Plan | Maintenance | TRI | 141746 | |
05/20/2004 12:21 | 05/20/2004 12:21 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 0 | Auto | Lightning | Lightning | TRI TDA RED SAL | 141747 | |
05/20/2004 12:21 | 05/20/2004 12:21 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0 | Auto | Lightning | Lightning | TDA | 141749 | ||
05/20/2004 12:21 | 05/20/2004 12:21 | Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line | 230.0 | S | G | 136.53 | 0 | Auto | Lightning | Lightning | TDA RED | 141749 |
05/20/2004 12:21 | 05/20/2004 12:21 | McNary-Dalreed section of McNary-Santiam No 2 230kV line | 230.0 | S | G | 35.95 | 0 | Auto | Lightning | Lightning | TRI TDA | 141749 |
05/20/2004 12:21 | 05/20/2004 12:21 | McNary-Santiam No 2 230kV line | 230.0 | L | 200.43 | 0 | Auto | Lightning | Lightning | TRI TDA RED SAL | 141749 | |
05/20/2004 12:21 | 05/20/2004 12:21 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SAL | 141749 |
05/20/2004 12:21 | 05/20/2004 12:21 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | G | 27.95 | 0 | Auto | Lightning | Lightning | SAL | 141749 |
05/20/2004 13:45 | 05/20/2004 13:47 | La Grande-IPC Brownlee No 1 230kV line | 230.0 | L | 79.30 | 2 | Plan | Foreign Request | TRI | 141750 | ||
05/20/2004 13:45 | 05/20/2004 13:47 | Quartz tap to La Grande-IPC Brownlee No 1 230kV line | 230.0 | T | G | 10.30 | 2 | Plan | Foreign Request | TRI | 141750 | |
05/20/2004 13:51 | 05/20/2004 13:54 | Olympia-Grand Coulee No 1 287kV line | 287.0 | L | 229.12 | 3 | Auto | Lightning | Weather | OLY COV WEN | 141751 | |
05/20/2004 13:52 | 05/20/2004 13:56 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 4 | Auto | Lightning | Lightning | KAL | 141752 |
05/20/2004 13:52 | 05/20/2004 13:56 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 4 | Auto | Lightning | Lightning | KAL | 141752 |
05/20/2004 13:52 | 05/20/2004 13:56 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 4 | Auto | Lightning | Lightning | KAL | 141752 | |
05/20/2004 13:52 | 05/20/2004 13:56 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 4 | Auto | Lightning | Lightning | KAL | 141752 |
05/20/2004 13:52 | 05/20/2004 13:56 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 4 | Auto | Lightning | Lightning | KAL | 141752 |
05/20/2004 13:52 | 05/20/2004 13:56 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 4 | Auto | Lightning | Lightning | KAL | 141752 |
05/20/2004 13:52 | 05/20/2004 14:01 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 9 | Auto | RAS Initiated | RAS Initiated | KAL | 141753 | |
05/20/2004 13:52 | 05/20/2004 13:52 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 0 | Auto | Lightning | Lightning | KAL | 141819 | |
05/20/2004 13:57 | 05/20/2004 13:59 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 2 | Auto | Lightning | Lightning | KAL | 141754 | |
05/20/2004 14:43 | 05/20/2004 14:43 | Grand Coulee-Bell No 5 230kV line | 230.0 | L | 83.06 | 0 | Auto | Lightning | Lightning | WEN SPK | 141755 | |
05/20/2004 15:26 | 05/20/2004 15:26 | Bell-Addy No 1 115kV line | 115.0 | L | 51.18 | 0 | Auto | Lightning | Lightning | SPK | 141756 | |
05/20/2004 15:26 | 05/20/2004 15:26 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | G | 2.95 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | G | 6.27 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Colbert tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Colbert-Half Moon section of Bell-Addy No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.19 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Half Moon tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Half Moon-Tum Tum section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.75 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Loon Lake tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | G | 22.34 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Mead tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.18 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | G | 4.95 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Milan tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 8.22 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.97 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Tum Tum tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 10.50 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:26 | 05/20/2004 15:26 | Tum Tum-Milan section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.72 | 0 | Auto | Lightning | Lightning | SPK | 141756 |
05/20/2004 15:29 | 05/21/2004 11:47 | Lancaster-Noxon No 1 230kV line | 230.0 | L | 72.72 | 1218 | Auto | Lightning | Weather | SPK KAL | 141757 | |
05/20/2004 16:10 | 05/20/2004 16:10 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 141758 | |
05/20/2004 16:10 | 05/20/2004 16:10 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 141758 | |
05/20/2004 16:10 | 05/20/2004 16:13 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | 50.34 | 3 | Auto | Lightning | Lightning | SPK | 141758 | |
05/20/2004 16:10 | 05/20/2004 16:13 | Bell-Boundary No 3 230kV line | 230.0 | L | G | 108.07 | 3 | Auto | Lightning | Lightning | SPK | 141758 |
05/20/2004 16:10 | 05/20/2004 16:10 | Bell-Addy No 1 115kV line | 115.0 | L | 51.18 | 0 | Auto | Lightning | Lightning | SPK | 141759 | |
05/20/2004 16:10 | 05/20/2004 16:10 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | G | 2.95 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | G | 6.27 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Colbert tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Colbert-Half Moon section of Bell-Addy No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.19 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Half Moon tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Half Moon-Tum Tum section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.75 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Loon Lake tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | G | 22.34 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Mead tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.18 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | G | 4.95 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Milan tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 8.22 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.97 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Tum Tum tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 10.50 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:10 | 05/20/2004 16:10 | Tum Tum-Milan section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.72 | 0 | Auto | Lightning | Lightning | SPK | 141759 |
05/20/2004 16:22 | 05/20/2004 16:22 | Bell-Addy No 1 115kV line | 115.0 | L | 51.18 | 0 | Auto | Lightning | Lightning | SPK | 141760 | |
05/20/2004 16:22 | 05/20/2004 16:22 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | G | 2.95 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | G | 6.27 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Colbert tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Colbert-Half Moon section of Bell-Addy No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.19 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Half Moon tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Half Moon-Tum Tum section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.75 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Loon Lake tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | G | 22.34 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Mead tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.18 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | G | 4.95 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Milan tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 8.22 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.97 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Tum Tum tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 10.50 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:22 | 05/20/2004 16:22 | Tum Tum-Milan section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.72 | 0 | Auto | Lightning | Lightning | SPK | 141760 |
05/20/2004 16:35 | 05/20/2004 16:35 | Bell-Bigelow section of Bell-Trentwood No 2 115kV line | 115.0 | S | G | 6.60 | 0 | Auto | Lightning | Lightning | SPK | 141761 |
05/20/2004 16:35 | 05/20/2004 16:35 | Bell-Trentwood No 2 115kV line | 115.0 | L | 11.30 | 0 | Auto | Lightning | Lightning | SPK | 141761 | |
05/20/2004 16:35 | 05/20/2004 16:35 | Bigelow tap to Bell-Trentwood No 2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141761 |
05/20/2004 16:35 | 05/20/2004 16:35 | Bigelow-Trentwood section of Bell-Trentwood No 2 115kV line | 115.0 | S | G | 4.70 | 0 | Auto | Lightning | Lightning | SPK | 141761 |
05/20/2004 16:35 | 05/20/2004 16:35 | Green Bluff tap to Bell-Trentwood No 2 115kV line | 115.0 | T | G | 7.35 | 0 | Auto | Lightning | Lightning | SPK | 141761 |
05/20/2004 16:40 | 05/20/2004 16:40 | Ancient Lake tap to Columbia-Wanapum No 2 230kV line | 230.0 | T | 4.30 | 0 | Auto | Lightning | Lightning | WEN | 141762 | |
05/20/2004 16:40 | 05/20/2004 16:43 | Ancient Lake-Wanapum section of Columbia-Wanapum No 2 230kV line | 230.0 | S | 19.70 | 3 | Auto | Lightning | Lightning | WEN | 141762 | |
05/20/2004 16:40 | 05/20/2004 16:40 | Columbia-Ancient Lake section of Columbia-Wanapum No 2 230kV line | 230.0 | S | 11.20 | 0 | Auto | Lightning | Lightning | WEN | 141762 | |
05/20/2004 16:40 | 05/20/2004 16:43 | Columbia-Wanapum No 2 230kV line | 230.0 | L | G | 30.90 | 3 | Auto | Lightning | Lightning | WEN | 141762 |
05/20/2004 16:47 | 05/20/2004 16:47 | Sickler-Schultz No 1 500kV line | 500.0 | L | 38.43 | 0 | Auto | Lightning | Lightning | WEN | 141763 | |
05/20/2004 18:27 | 05/20/2004 18:27 | Hatwai-AVA North Lewiston No 1 230kV line | 230.0 | L | 7.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 141764 | |
05/20/2004 18:43 | 05/20/2004 18:43 | B-1345-B-1605 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 0.34 | 0 | Auto | Lightning | Lightning | TRI | 141765 |
05/20/2004 18:43 | 05/20/2004 18:43 | B-1605-B-1014 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 2.14 | 0 | Auto | Lightning | Lightning | TRI | 141765 |
05/20/2004 18:43 | 05/20/2004 18:43 | H2F-Nine Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 12.58 | 0 | Auto | Lightning | Lightning | TRI | 141765 |
05/20/2004 18:43 | 05/20/2004 18:43 | McNary-B-1345 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 2.53 | 0 | Auto | Lightning | Lightning | TRI | 141765 |
05/20/2004 18:43 | 05/20/2004 18:43 | McNary-Badger Canyon No 1 115kV line | 115.0 | L | 28.40 | 0 | Auto | Lightning | Lightning | TRI | 141765 | |
05/20/2004 18:43 | 05/20/2004 18:43 | Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 10.81 | 0 | Auto | Lightning | Lightning | TRI | 141765 |
05/20/2004 18:57 | 05/20/2004 18:57 | Benton-Franklin No 2 115kV line | 115.0 | L | 21.03 | 0 | Auto | Lightning | Lightning | TRI | 141766 | |
05/20/2004 18:57 | 05/20/2004 18:57 | Benton-Glade section of Benton-Franklin No 2 115kV line | 115.0 | S | G | 11.94 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/20/2004 18:57 | 05/20/2004 18:57 | Broadmoor-Taylor Flats section of Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TS | G | 2.44 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/20/2004 18:57 | 05/20/2004 18:57 | Glade tap to Benton-Franklin No 2 115kV line | 115.0 | T | G | 0.03 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/20/2004 18:57 | 05/20/2004 18:57 | Glade-Franklin section of Benton-Franklin No 2 115kV line | 115.0 | S | G | 9.09 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/20/2004 18:57 | 05/20/2004 18:57 | North Pasco tap to Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TT | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/20/2004 18:57 | 05/20/2004 18:57 | North Pasco-Broadmoor section of Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TS | G | 4.67 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/20/2004 18:57 | 05/20/2004 18:57 | Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | T | G | 8.63 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/20/2004 18:57 | 05/20/2004 18:57 | Taylor Flats tap-North Pasco section of Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TS | G | 1.52 | 0 | Auto | Lightning | Lightning | TRI | 141766 |
05/21/2004 00:00 | 05/21/2004 04:58 | Fidalgo-Lopez Island No 4 115kV line | 115.0 | L | 8.48 | 298 | Plan | Foreign Request | SNO | 141767 | ||
05/21/2004 00:00 | 05/21/2004 04:58 | Fidalgo-Lopez Island No 5 69kV line | 69.0 | L | 8.49 | 298 | Plan | Foreign Request | SNO | 141768 | ||
05/21/2004 00:03 | 05/21/2004 04:33 | Burrows Bay PSE-Fidalgo No 1 115kV line | 115.0 | L | 2.34 | 270 | Plan | Maintenance | SNO | 141769 | ||
05/21/2004 06:01 | 05/21/2004 16:56 | Maple Valley-Massachusetts No 1 230kV line | 230.0 | L | 12.14 | 655 | Plan | Foreign Request | COV | 141820 | ||
05/21/2004 08:21 | 05/21/2004 15:11 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 410 | Plan | Maintenance | TDA | 141821 | ||
05/21/2004 08:21 | 05/21/2004 15:11 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 410 | Plan | Maintenance | TDA RED | 141821 | |
05/21/2004 12:54 | 05/21/2004 13:10 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 16 | Auto | Lightning | Forced (Configuration) | SPK | 141822 | |
05/21/2004 12:54 | 05/21/2004 13:07 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | 50.34 | 13 | Auto | Lightning | Forced (Configuration) | SPK | 141823 | |
05/21/2004 12:54 | 05/21/2004 13:07 | Bell-Boundary No 3 230kV line | 230.0 | L | G | 108.07 | 13 | Auto | Lightning | Forced (Configuration) | SPK | 141823 |
05/21/2004 12:54 | 05/21/2004 13:09 | Bell-Lancaster No 1 230kV line | 230.0 | L | 23.52 | 15 | Auto | Lightning | Forced (Configuration) | SPK | 141824 | |
05/21/2004 12:54 | 05/21/2004 15:19 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 145 | Auto | Lightning | Lightning | WEN SPK | 141825 | |
05/21/2004 13:09 | 05/22/2004 01:37 | Bell-AVA Northeast No 3 115kV line | 115.0 | L | 1.60 | 748 | Auto | Foreign Trouble | Foreign Trouble | SPK | 141826 | |
05/21/2004 13:23 | 05/21/2004 13:23 | Bell-AVA Beacon No 4 230kV line | 230.0 | L | 5.90 | 0 | Auto | Lightning | Lightning | SPK | 141827 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Sullivan tap to Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TT | 0.04 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141828 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Sullivan-Vera section of Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TS | 2.52 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141828 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood-Valley Way No 1 115kV line | 115.0 | L | G | 2.72 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141828 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood-Vera section of Trentwood-Valley Way No 1 115kV line | 115.0 | S | 0.78 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141828 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | T | 3.80 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141828 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Vera tap-Sullivan section of Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TS | 1.28 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141828 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Vera-Valley Way section of Trentwood-Valley Way No 1 115kV line | 115.0 | S | 1.94 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141828 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Creston-Bell No 1 115kV line | 115.0 | L | O | 53.80 | 0 | Auto | Lightning | Unknown | WEN SPK | 141829 |
05/21/2004 13:28 | 05/21/2004 13:28 | Springhill tap to Creston-Bell No 1 115kV line | 115.0 | T | 0.01 | 0 | Auto | Lightning | Unknown | SPK | 141829 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Springhill-Bell section of Creston-Bell No 1 115kV line | 115.0 | S | 9.92 | 0 | Auto | Lightning | Unknown | SPK | 141829 | |
05/21/2004 13:28 | 05/22/2004 15:40 | Bell-AVA Beacon No 1 115kV line | 115.0 | L | 6.60 | 1572 | Auto | Foreign Trouble | Foreign Trouble | SPK | 141830 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | G | 11.23 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141831 |
05/21/2004 13:28 | 05/21/2004 13:28 | Bell-Trentwood No 1 115kV line | 115.0 | L | 11.27 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141831 | |
05/21/2004 13:28 | 05/21/2004 13:28 | IPL Trentwood-Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141831 |
05/21/2004 13:28 | 05/21/2004 13:28 | Trentwood IPL tap to Bell-Trentwood No 1 115kV line | 115.0 | T | G | 0.06 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141831 |
05/21/2004 13:28 | 05/21/2004 13:28 | Bell-Bigelow section of Bell-Trentwood No 2 115kV line | 115.0 | S | G | 6.60 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141832 |
05/21/2004 13:28 | 05/21/2004 13:28 | Bell-Trentwood No 2 115kV line | 115.0 | L | 11.30 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141832 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Bigelow tap to Bell-Trentwood No 2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141832 |
05/21/2004 13:28 | 05/21/2004 13:28 | Bigelow-Trentwood section of Bell-Trentwood No 2 115kV line | 115.0 | S | G | 4.70 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141832 |
05/21/2004 13:28 | 05/21/2004 13:28 | Green Bluff tap to Bell-Trentwood No 2 115kV line | 115.0 | T | G | 7.35 | 0 | Auto | Lightning | Forced (Configuration) | SPK | 141832 |
05/21/2004 13:28 | 05/21/2004 13:28 | Bell-AVA Beacon No 4 230kV line | 230.0 | L | 5.90 | 0 | Auto | Lightning | Lightning | SPK | 141833 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Bell-Addy No 1 115kV line | 115.0 | L | 51.18 | 0 | Auto | Lightning | Lightning | SPK | 141834 | |
05/21/2004 13:28 | 05/21/2004 13:28 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | G | 2.95 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | G | 6.27 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Colbert tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Colbert-Half Moon section of Bell-Addy No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.19 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Half Moon tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Half Moon-Tum Tum section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.75 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Loon Lake tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | G | 22.34 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Mead tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.18 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | G | 4.95 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Milan tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 8.22 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.97 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Tum Tum tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 10.50 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:28 | 05/21/2004 13:28 | Tum Tum-Milan section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.72 | 0 | Auto | Lightning | Lightning | SPK | 141834 |
05/21/2004 13:50 | 05/21/2004 13:50 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 141835 | |
05/21/2004 14:11 | 05/21/2004 14:11 | Grand Coulee-Bell No 5 230kV line | 230.0 | L | 83.06 | 0 | Auto | Lightning | Lightning | WEN SPK | 141837 | |
05/21/2004 14:11 | 05/21/2004 14:11 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 0 | Auto | Lightning | Lightning | SPK | 141838 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Sullivan tap to Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TT | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 141839 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Sullivan-Vera section of Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TS | 2.52 | 0 | Auto | Lightning | Lightning | SPK | 141839 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Trentwood-Valley Way No 1 115kV line | 115.0 | L | G | 2.72 | 0 | Auto | Lightning | Lightning | SPK | 141839 |
05/21/2004 14:21 | 05/21/2004 14:21 | Trentwood-Vera section of Trentwood-Valley Way No 1 115kV line | 115.0 | S | 0.78 | 0 | Auto | Lightning | Lightning | SPK | 141839 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | T | 3.80 | 0 | Auto | Lightning | Lightning | SPK | 141839 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Vera tap-Sullivan section of Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TS | 1.28 | 0 | Auto | Lightning | Lightning | SPK | 141839 | |
05/21/2004 14:21 | 05/21/2004 14:21 | Vera-Valley Way section of Trentwood-Valley Way No 1 115kV line | 115.0 | S | 1.94 | 0 | Auto | Lightning | Lightning | SPK | 141839 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Sullivan tap to Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TT | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 141840 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Sullivan-Vera section of Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TS | 2.52 | 0 | Auto | Lightning | Lightning | SPK | 141840 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Trentwood-Valley Way No 1 115kV line | 115.0 | L | G | 2.72 | 0 | Auto | Lightning | Lightning | SPK | 141840 |
05/21/2004 14:22 | 05/21/2004 14:22 | Trentwood-Vera section of Trentwood-Valley Way No 1 115kV line | 115.0 | S | 0.78 | 0 | Auto | Lightning | Lightning | SPK | 141840 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | T | 3.80 | 0 | Auto | Lightning | Lightning | SPK | 141840 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Vera tap-Sullivan section of Vera tap to Trentwood-Valley Way No 1 115kV line | 115.0 | TS | 1.28 | 0 | Auto | Lightning | Lightning | SPK | 141840 | |
05/21/2004 14:22 | 05/21/2004 14:22 | Vera-Valley Way section of Trentwood-Valley Way No 1 115kV line | 115.0 | S | 1.94 | 0 | Auto | Lightning | Lightning | SPK | 141840 | |
05/21/2004 16:04 | 05/21/2004 16:17 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 13 | Auto | Lightning | WEN SPK | 141841 | ||
05/21/2004 16:09 | 05/21/2004 16:11 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 2 | Auto | Lightning | Lightning | WEN SPK | 141842 | |
05/21/2004 17:06 | 05/21/2004 17:06 | Bell-Addy No 1 115kV line | 115.0 | L | 51.18 | 0 | Auto | Lightning | Lightning | SPK | 141843 | |
05/21/2004 17:06 | 05/21/2004 17:06 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | G | 2.95 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | G | 6.27 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Colbert tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Colbert-Half Moon section of Bell-Addy No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.19 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Half Moon tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Half Moon-Tum Tum section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.75 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Loon Lake tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | G | 22.34 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Mead tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.18 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | G | 4.95 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Milan tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 8.22 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.97 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Tum Tum tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 10.50 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:06 | 05/21/2004 17:06 | Tum Tum-Milan section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.72 | 0 | Auto | Lightning | Lightning | SPK | 141843 |
05/21/2004 17:11 | 05/21/2004 17:11 | Bell-Lancaster No 1 230kV line | 230.0 | L | 23.52 | 0 | Auto | Lightning | Lightning | SPK | 141844 | |
05/21/2004 17:26 | 05/21/2004 17:26 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | G | 13.30 | 0 | Auto | Lightning | Lightning | SPK | 141845 |
05/21/2004 17:26 | 05/21/2004 17:26 | Colville-Republic No 1 115kV line | 115.0 | L | 44.47 | 0 | Auto | Lightning | Lightning | SPK | 141845 | |
05/21/2004 17:26 | 05/21/2004 17:26 | Kettle Falls-Republic section of Colville-Republic No 1 115kV line | 115.0 | S | G | 31.17 | 0 | Auto | Lightning | Lightning | SPK | 141845 |
05/21/2004 21:00 | 05/21/2004 21:00 | Grand Coulee-Bell No 5 230kV line | 230.0 | L | 83.06 | 0 | Auto | Lightning | Lightning | WEN SPK | 141846 | |
05/21/2004 22:00 | 05/22/2004 06:08 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 488 | Plan | Testing | TDA RED | 141847 | |
05/21/2004 22:00 | 05/22/2004 06:08 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 488 | Plan | Testing | TDA | 141847 | |||
05/22/2004 01:00 | 05/22/2004 06:08 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 308 | Plan | Testing | TDA RED | 141848 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141848 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141848 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141848 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141848 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 308 | Plan | Testing | TDA RED | 141849 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141849 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141849 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141849 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141849 | ||
05/22/2004 01:00 | 05/22/2004 06:08 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 308 | Plan | Testing | TDA | 141849 | ||
05/22/2004 02:49 | 05/22/2004 06:05 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 196 | Plan | Voltage Control | TDA RED SAL | 141850 | ||
05/22/2004 21:07 | 05/22/2004 21:07 | Ancient Lake tap to Columbia-Wanapum No 2 230kV line | 230.0 | T | 4.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | WEN | 141851 | |
05/22/2004 21:07 | 05/22/2004 21:10 | Ancient Lake-Wanapum section of Columbia-Wanapum No 2 230kV line | 230.0 | S | 19.70 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 141851 | |
05/22/2004 21:07 | 05/22/2004 21:07 | Columbia-Ancient Lake section of Columbia-Wanapum No 2 230kV line | 230.0 | S | 11.20 | 0 | Auto | Foreign Trouble | Foreign Trouble | WEN | 141851 | |
05/22/2004 21:07 | 05/22/2004 21:10 | Columbia-Wanapum No 2 230kV line | 230.0 | L | G | 30.90 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 141851 |
05/22/2004 23:47 | 05/23/2004 10:06 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 619 | Plan | Voltage Control | TDA RED SAL | 141852 | ||
05/23/2004 15:29 | 05/24/2004 17:12 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 1543 | Plan | Foreign Request | KAL | 141854 | ||
05/23/2004 16:20 | 05/23/2004 16:20 | Midway-Moxee No 1 115kV line | 115.0 | L | 33.98 | 0 | Auto | Lightning | Lightning | TRI WEN | 141855 | |
05/23/2004 16:20 | 05/23/2004 16:20 | Midway-Rattlesnake section of Midway-Moxee No 1 115kV line | 115.0 | S | G | 16.61 | 0 | Auto | Lightning | Lightning | TRI WEN | 141855 |
05/23/2004 16:20 | 05/23/2004 16:20 | Rattlesnake tap to Midway-Moxee No 1 115kV line | 115.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | WEN | 141855 |
05/23/2004 16:20 | 05/23/2004 16:20 | Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line | 115.0 | S | G | 17.37 | 0 | Auto | Lightning | Lightning | WEN | 141855 |
05/23/2004 16:39 | 05/23/2004 16:39 | North Bonneville-Ross No 1 230kV line | 230.0 | L | 36.32 | 0 | Auto | Lightning | Lightning | LGV | 141856 | |
05/23/2004 16:39 | 05/23/2004 16:39 | North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 27.65 | 0 | Auto | Lightning | Lightning | LGV | 141856 |
05/23/2004 16:39 | 05/23/2004 16:39 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | G | 1.24 | 0 | Auto | Lightning | Lightning | LGV | 141856 |
05/23/2004 16:39 | 05/23/2004 16:39 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 8.67 | 0 | Auto | Lightning | Lightning | LGV | 141856 |
05/23/2004 16:43 | 05/23/2004 16:43 | McNary-Ross No 1 345kV line | 345.0 | L | 174.57 | 0 | Auto | Lightning | Lightning | TRI TDA LGV | 141857 | |
05/23/2004 17:25 | 05/23/2004 17:25 | Roundup-LaGrande No 1 230kV line | 230.0 | L | 45.02 | 0 | Auto | Lightning | Lightning | TRI | 141858 | |
05/24/2004 06:56 | 07/12/2004 20:43 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 71387 | Auto | Terminal Equipment Failure | TDA RED | 141861 | |
05/24/2004 06:56 | 07/12/2004 20:43 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 71387 | Auto | Terminal Equipment Failure | TDA | 141861 | |||
05/24/2004 07:01 | 05/27/2004 15:36 | Raver-Echo Lake No 1 500kV line | 500.0 | L | 11.93 | 4835 | Plan | Maintenance | COV | 141862 | ||
05/24/2004 07:18 | 05/27/2004 07:53 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4355 | Plan | Maintenance | IDF | 141863 | ||
05/24/2004 07:28 | 05/27/2004 16:26 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 4858 | Plan | Maintenance | OLY LGV | 141864 | |
05/24/2004 07:28 | 05/27/2004 16:26 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 4858 | Plan | Maintenance | OLY LGV | 141864 | ||
05/24/2004 07:39 | 05/24/2004 15:10 | Chemawa-Salem No 2 115kV line | 115.0 | L | G | 10.41 | 451 | Plan | Maintenance | SAL | 141865 | |
05/24/2004 07:39 | 05/24/2004 15:10 | Hughes-Salem section of Chemawa-Salem No 2 115kV line | 115.0 | S | 1.88 | 451 | Plan | Maintenance | SAL | 141865 | ||
05/24/2004 08:37 | 05/24/2004 15:27 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 410 | Plan | Maintenance | OLY | 141866 | ||
05/24/2004 08:38 | 05/24/2004 16:33 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 475 | Plan | Maintenance | TDA RED | 141867 | |
05/24/2004 08:38 | 05/24/2004 16:33 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 475 | Plan | Maintenance | TDA RED | 141867 | ||
05/24/2004 11:26 | 05/24/2004 11:59 | Unity-Heyburn No 1 138kV line | 138.0 | L | 6.56 | 33 | Plan | Maintenance | IDF | 141868 | ||
05/24/2004 15:13 | 07/08/2004 06:44 | West Burley-Burley section of West Burley-Heyburn No 1 138kV line | 138.0 | S | 2.22 | 64291 | Plan | Normally Out | IDF | 141869 | ||
05/24/2004 15:13 | 07/08/2004 06:44 | West Burley-Heyburn No 1 138kV line | 138.0 | L | G | 4.43 | 64291 | Plan | Normally Out | IDF | 141869 | |
05/24/2004 15:27 | 05/25/2004 07:24 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 957 | Plan | Foreign Request | OLY | 141870 | ||
05/24/2004 22:08 | 05/24/2004 22:11 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 3 | Plan | Switching | TDA RED | 141871 | |
05/24/2004 22:08 | 05/24/2004 22:11 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 3 | Plan | Switching | TDA | 141871 | |||
05/24/2004 22:08 | 05/24/2004 22:11 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 3 | Plan | Switching | TDA | 141871 | |||
05/24/2004 22:08 | 05/24/2004 22:11 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 3 | Plan | Switching | TDA | 141871 | |||
05/25/2004 05:32 | 05/25/2004 05:32 | Burbank tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.02 | 0 | Auto | Unknown | Unknown | TRI | 141878 |
05/25/2004 05:32 | 05/25/2004 05:32 | Burbank-Joso section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 9.79 | 0 | Auto | Unknown | Unknown | TRI | 141878 |
05/25/2004 05:32 | 05/25/2004 05:32 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 4.29 | 0 | Auto | Unknown | Unknown | TRI | 141878 |
05/25/2004 05:32 | 05/25/2004 05:32 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | 35.95 | 0 | Auto | Unknown | Unknown | TRI | 141878 | |
05/25/2004 05:32 | 05/25/2004 05:32 | Joso tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 141878 |
05/25/2004 05:32 | 05/25/2004 05:32 | Joso-Nine Mile section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 3.66 | 0 | Auto | Unknown | Unknown | TRI | 141878 |
05/25/2004 05:32 | 05/25/2004 05:32 | Nine Mile tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 6.00 | 0 | Auto | Unknown | Unknown | TRI | 141878 |
05/25/2004 05:32 | 05/25/2004 05:32 | Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 18.21 | 0 | Auto | Unknown | Unknown | TRI | 141878 |
05/25/2004 06:14 | 05/25/2004 06:14 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 141879 | |
05/25/2004 07:24 | 05/25/2004 15:14 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 470 | Plan | Maintenance | OLY | 141880 | ||
05/25/2004 07:33 | 05/25/2004 16:04 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 511 | Plan | Maintenance | OLY | 141881 | ||
05/25/2004 07:46 | 05/26/2004 14:45 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 1859 | Plan | Maintenance | SAL EUG | 141882 | |
05/25/2004 07:46 | 05/26/2004 14:45 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 1859 | Plan | Maintenance | SAL | 141882 | ||
05/25/2004 08:07 | 05/26/2004 15:42 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 17.09 | 1895 | Plan | Maintenance | KAL | 141883 | ||
05/25/2004 08:07 | 05/26/2004 15:42 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 1895 | Plan | Maintenance | KAL SPK | 141883 | |
05/25/2004 08:21 | 05/25/2004 16:15 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 474 | Plan | Maintenance | TDA RED | 141884 | |
05/25/2004 08:21 | 05/25/2004 16:15 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 474 | Plan | Maintenance | TDA RED | 141884 | ||
05/25/2004 09:15 | 09/29/2004 13:49 | Albany-Eugene No 1 115kV line | 115.0 | L | T | 39.80 | 183154 | Plan | Construction | EUG | 141885 | |
05/25/2004 09:15 | 09/29/2004 13:49 | Junction City tap to Albany-Eugene No 1 115kV line | 115.0 | T | 0.05 | 183154 | Plan | Construction | EUG | 141885 | ||
05/25/2004 10:40 | 05/28/2004 15:53 | Maple Valley-Talbot No 1 230kV line | 230.0 | L | 0.20 | 4633 | Plan | Maintenance | COV | 141886 | ||
05/26/2004 05:13 | 05/26/2004 05:13 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Unknown | TDA RED | 141887 | ||
05/26/2004 05:13 | 05/26/2004 05:13 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141887 | ||
05/26/2004 05:13 | 05/26/2004 05:13 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141887 | ||
05/26/2004 05:13 | 05/26/2004 05:13 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141887 | ||
05/26/2004 05:13 | 05/26/2004 05:13 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 141887 | ||
05/26/2004 06:45 | 05/26/2004 13:58 | Adelaide-Minidoka PH No 1 138kV line | 138.0 | L | 11.90 | 433 | Plan | Foreign Request | IDF | 141889 | ||
05/26/2004 07:38 | 05/26/2004 16:33 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 535 | Plan | Maintenance | OLY | 141890 | ||
05/26/2004 07:38 | 05/26/2004 16:33 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 535 | Plan | Maintenance | OLY | 141890 | |
05/26/2004 08:17 | 05/26/2004 16:17 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 480 | Plan | Maintenance | TDA RED | 141891 | |
05/26/2004 08:17 | 05/26/2004 16:17 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 480 | Plan | Maintenance | TDA RED | 141891 | ||
05/26/2004 08:42 | 05/26/2004 15:13 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | G | 22.51 | 391 | Plan | Foreign Request | EUG | 141892 | |
05/26/2004 08:42 | 05/26/2004 15:13 | Goshen-Creswell section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 3.36 | 391 | Plan | Foreign Request | EUG | 141892 | ||
05/26/2004 09:11 | 05/26/2004 15:30 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 379 | Plan | Maintenance | OLY LGV | 141893 | |
05/26/2004 09:11 | 05/26/2004 15:30 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 379 | Plan | Maintenance | OLY | 141893 | |
05/26/2004 09:11 | 05/26/2004 15:30 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 379 | Plan | Maintenance | OLY | 141893 | ||
05/26/2004 15:13 | 10/04/2004 08:46 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | G | 22.51 | 188253 | Plan | Normally Out | EUG | 141894 | |
05/26/2004 15:13 | 10/04/2004 08:46 | Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.89 | 188253 | Plan | Normally Out | EUG | 141894 | ||
05/26/2004 16:25 | 05/27/2004 14:18 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 1313 | Plan | Maintenance | TDA RED | 141895 | |
05/26/2004 16:25 | 05/27/2004 14:18 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 1313 | Plan | Maintenance | TDA RED | 141895 | ||
05/26/2004 17:37 | 05/26/2004 17:37 | Bell-Boundary No 1 230kV line | 230.0 | L | 91.66 | 0 | Auto | Lightning | Lightning | SPK | 141896 | |
05/26/2004 17:37 | 05/26/2004 17:37 | Bell-Sacheen section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 31.60 | 0 | Auto | Lightning | Lightning | SPK | 141896 |
05/26/2004 17:37 | 05/26/2004 17:37 | Sacheen tap to Bell-Boundary No 1 230kV line | 230.0 | T | G | 0.70 | 0 | Auto | Lightning | Lightning | SPK | 141896 |
05/26/2004 17:37 | 05/26/2004 17:37 | Sacheen-Boundary section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 60.06 | 0 | Auto | Lightning | Lightning | SPK | 141896 |
05/27/2004 07:33 | 05/27/2004 07:36 | Potholes-Sand Dunes No 1 230kV line | 230.0 | L | 14.00 | 3 | Plan | Switching | WEN | 141902 | ||
05/27/2004 07:34 | 05/27/2004 07:36 | Midway-Potholes No 1 230kV line | 230.0 | L | 36.87 | 2 | Plan | Switching | TRI WEN | 141903 | ||
05/27/2004 07:34 | 05/27/2004 14:30 | Potholes-Grand Coulee No 1 230kV line | 230.0 | L | 65.66 | 416 | Plan | Maintenance | WEN SPK | 141904 | ||
05/27/2004 07:53 | 05/27/2004 15:36 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 463 | Plan | Maintenance | OLY | 141905 | ||
05/27/2004 07:53 | 05/27/2004 15:36 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 463 | Plan | Maintenance | OLY | 141905 | |
05/27/2004 08:29 | 05/27/2004 10:50 | Fairview-PACW Coquille No 1 115kV line | 115.0 | L | 6.00 | 141 | Plan | Foreign Request | EUG | 141906 | ||
05/27/2004 08:30 | 05/27/2004 11:09 | Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 29.43 | 159 | Plan | Maintenance | WEN TRI | 141907 | ||
05/27/2004 08:30 | 05/27/2004 11:09 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 159 | Plan | Maintenance | WEN TRI | 141907 | |
05/27/2004 09:03 | 05/27/2004 16:26 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 443 | Plan | Foreign Request | OLY | 141908 | |
05/27/2004 09:03 | 05/27/2004 16:26 | Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 1.17 | 443 | Plan | Foreign Request | OLY | 141908 | ||
05/27/2004 09:55 | 05/27/2004 10:04 | A539-Albany section of Santiam-Albany No 1 230kV line | 230.0 | S | G | 28.41 | 9 | Plan | Maintenance | EUG | 141909 | |
05/27/2004 09:55 | 05/27/2004 10:04 | Santiam-A539 section of Santiam-Albany No 1 230kV line | 230.0 | S | G | 0.13 | 9 | Plan | Maintenance | SAL EUG | 141909 | |
05/27/2004 09:55 | 05/27/2004 10:04 | Santiam-Albany No 1 230kV line | 230.0 | L | 28.54 | 9 | Plan | Maintenance | SAL EUG | 141909 | ||
05/27/2004 11:06 | 05/28/2004 14:32 | Monmouth-Adair section of Salem-Albany No 2 115kV line | 115.0 | S | 11.30 | 1646 | Plan | Maintenance | SAL | 141910 | ||
05/27/2004 11:06 | 05/28/2004 14:32 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 1646 | Plan | Maintenance | SAL EUG | 141910 | |
05/27/2004 11:21 | 05/27/2004 21:04 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 583 | Auto | Line Material Failure | Weather | OLY | 141911 |
05/27/2004 11:21 | 05/27/2004 12:32 | Olympia-Skookum section of Olympia-Shelton No 2 115kV line | 115.0 | S | 12.77 | 71 | Auto | Line Material Failure | Weather | OLY | 141911 | |
05/27/2004 11:21 | 05/27/2004 21:04 | Skookum-Shelton section of Olympia-Shelton No 2 115kV line | 115.0 | S | 6.96 | 583 | Auto | Line Material Failure | Weather | OLY | 141911 | |
05/27/2004 12:00 | 05/27/2004 12:03 | Potholes-Sand Dunes No 1 230kV line | 230.0 | L | 14.00 | 3 | Plan | Switching | WEN | 141912 | ||
05/27/2004 12:00 | 05/27/2004 12:02 | Midway-Potholes No 1 230kV line | 230.0 | L | 36.87 | 2 | Plan | Switching | TRI WEN | 141913 | ||
05/27/2004 15:17 | 05/27/2004 15:19 | Longview-Chehalis 1&3 No 1 230kV line | 230.0 | L | 34.94 | 2 | Auto | Construction | Construction | LGV OLY | 141914 | |
05/27/2004 15:17 | 05/27/2004 15:19 | Longview-Chehalis 1&3 No 3 230kV line | 230.0 | L | 31.13 | 2 | Auto | Construction | Construction | LGV OLY | 141915 | |
05/28/2004 00:01 | 05/28/2004 05:36 | Fidalgo-Lopez Island No 5 69kV line | 69.0 | L | 8.49 | 335 | Plan | Foreign Request | SNO | 141916 | ||
05/28/2004 00:01 | 05/28/2004 05:37 | Fidalgo-Lopez Island No 4 115kV line | 115.0 | L | 8.48 | 336 | Plan | Foreign Request | SNO | 141917 | ||
05/28/2004 00:03 | 05/28/2004 04:39 | Burrows Bay PSE-Fidalgo No 1 115kV line | 115.0 | L | 2.34 | 276 | Plan | Maintenance | SNO | 141918 | ||
05/28/2004 05:36 | 05/28/2004 17:55 | Calpine-McNary No 1 500kV line | 500.0 | L | 14.52 | 739 | Plan | Foreign Request | TRI | 141924 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 4929 | Plan | Foreign Request | TDA RED | 141925 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141925 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141925 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141925 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141925 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141925 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 4929 | Plan | Foreign Request | TDA RED | 141926 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141926 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141926 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141926 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141926 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 4929 | Plan | Foreign Request | TDA | 141926 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 4929 | Plan | Foreign Request | TDA | 141927 | ||
05/28/2004 06:00 | 05/31/2004 16:09 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 4929 | Plan | Foreign Request | TDA | 141928 | ||
05/28/2004 06:02 | 05/31/2004 16:19 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 4937 | Plan | Foreign Request | TDA | 141929 | ||
05/28/2004 06:02 | 05/31/2004 16:19 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 4937 | Plan | Foreign Request | TDA | 141930 | ||
05/28/2004 08:20 | 05/28/2004 14:28 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 368 | Plan | Maintenance | TDA RED | 141931 | |
05/28/2004 08:20 | 05/28/2004 14:28 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 368 | Plan | Maintenance | TDA RED | 141931 | ||
05/28/2004 09:16 | 05/28/2004 09:16 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 141932 | |
05/28/2004 11:16 | Vansycle-Mission section of Walla Walla-Pendleton No 1 69kV line | 69.0 | S | 13.40 | still out | Plan | Normally Out | TRI | 141933 | |||
05/28/2004 11:16 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | O | 38.93 | still out | Plan | Normally Out | TRI | 141933 | ||
05/28/2004 12:18 | 05/28/2004 12:26 | Boardman-Ione No 1 69kV line | 69.0 | L | 30.09 | 8 | Auto | Foreign Trouble | Foreign Trouble | TRI | 141934 | |
05/28/2004 17:30 | 05/28/2004 17:31 | Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line | 230.0 | S | 71.70 | 1 | Plan | Switching | TDA TRI | 141935 | ||
05/28/2004 17:30 | 05/28/2004 17:31 | Big Eddy-Midway No 1 230kV line | 230.0 | L | O | 102.80 | 1 | Plan | Switching | TDA TRI | 141935 | |
05/28/2004 17:30 | 05/28/2004 17:31 | Mabton tap to Big Eddy-Midway No 1 230kV line | 230.0 | T | 0.10 | 1 | Plan | Switching | TRI | 141935 | ||
05/29/2004 00:18 | 05/30/2004 04:43 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 1705 | Plan | Foreign Request | OLY | 141936 | ||
05/29/2004 00:18 | 05/30/2004 04:43 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 1705 | Plan | Foreign Request | OLY | 141936 | |
05/29/2004 01:07 | 05/29/2004 07:47 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 400 | Plan | Voltage Control | SAL EUG | 141937 | ||
05/29/2004 08:17 | 05/30/2004 20:53 | Cusick-Boundary section of Usk-Boundary No 1 230kV line | 230.0 | S | 48.18 | 2196 | Auto | Line Material Failure | Line Material Failure | SPK | 141939 | |
05/29/2004 08:17 | 05/30/2004 20:53 | Usk-Boundary No 1 230kV line | 230.0 | L | G | 55.04 | 2196 | Auto | Line Material Failure | Line Material Failure | SPK | 141939 |
05/29/2004 08:17 | 05/29/2004 09:14 | Usk-Cusick section of Usk-Boundary No 1 230kV line | 230.0 | S | 6.86 | 57 | Auto | Line Material Failure | Line Material Failure | SPK | 141939 | |
05/29/2004 23:29 | 05/30/2004 07:53 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 504 | Plan | Voltage Control | SAL EUG | 141940 | ||
05/30/2004 03:56 | 05/30/2004 04:13 | Bonneville PH 1-North Bonneville No 1 230kV line | 230.0 | L | 0.84 | 17 | Auto | Foreign Trouble | Foreign Trouble | LGV | 141941 | |
05/30/2004 08:55 | 05/30/2004 08:58 | Bothell-Sno-King No 2 230kV line | 230.0 | L | 3.58 | 3 | Auto | Foreign Trouble | SNO | 141942 | ||
05/30/2004 16:51 | 05/30/2004 16:51 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 0 | Auto | Lightning | Lightning | KAL SPK | 141943 | |
05/30/2004 16:51 | 05/30/2004 16:51 | Bell-Lancaster No 1 230kV line | 230.0 | L | 23.52 | 0 | Auto | Lightning | Improper Relaying | SPK | 141944 | |
05/31/2004 09:17 | 05/31/2004 10:54 | Chief Joseph PH-Chief Joseph No 5 500kV line | 500.0 | L | 0.80 | 97 | Plan | Foreign Request | WEN | 141945 | ||
06/01/2004 01:46 | 06/01/2004 05:55 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 249 | Plan | Voltage Control | SAL EUG | 141946 | ||
06/01/2004 04:01 | 06/09/2004 21:33 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 12572 | Plan | Construction | COV | 141947 | ||
06/01/2004 06:29 | 06/01/2004 09:02 | Midway-PACW Union Gap No 1 230kV line | 230.0 | L | 39.10 | 153 | Plan | Foreign Request | TRI | 141954 | ||
06/01/2004 07:41 | 06/14/2004 12:15 | Cold Creek-Blackrock section of Midway-Grandview No 1 115kV line | 115.0 | S | 4.55 | 18994 | Plan | Fiber Optic Work | WEN | 141955 | ||
06/01/2004 07:41 | 06/14/2004 12:15 | Midway-Grandview No 1 115kV line | 115.0 | L | G | 25.07 | 18994 | Plan | Fiber Optic Work | TRI WEN | 141955 | |
06/01/2004 07:42 | 06/03/2004 15:18 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 3336 | Plan | Maintenance | OLY LGV | 141956 | |
06/01/2004 07:42 | 06/03/2004 15:18 | Holcomb-Oxbow section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 1.48 | 3336 | Plan | Maintenance | OLY | 141956 | ||
06/01/2004 07:45 | 06/04/2004 14:25 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4720 | Plan | Maintenance | IDF | 141957 | ||
06/01/2004 08:01 | 06/04/2004 14:20 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 4699 | Plan | Maintenance | SAL | 141958 | |
06/01/2004 08:01 | 06/04/2004 14:20 | Timber-South Fork section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 12.20 | 4699 | Plan | Maintenance | SAL | 141958 | ||
06/01/2004 08:30 | 06/01/2004 08:34 | Boardman-Ione No 1 69kV line | 69.0 | L | 30.09 | 4 | Auto | Unknown | Unknown | TRI | 141959 | |
06/01/2004 08:33 | 06/01/2004 14:32 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 359 | Plan | Maintenance | TDA RED | 141960 | |
06/01/2004 08:33 | 06/01/2004 14:32 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 359 | Plan | Maintenance | TDA RED | 141960 | ||
06/01/2004 09:25 | 06/05/2004 11:01 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 5856 | Plan | Maintenance | COV | 141961 | ||
06/01/2004 12:05 | 06/04/2004 18:23 | Station X-Station H No 1 115kV line | 115.0 | L | 0.26 | 4698 | Plan | Foreign Request | OLY | 141962 | ||
06/01/2004 12:23 | 06/04/2004 18:24 | Kitsap-Station X No 1 115kV line | 115.0 | L | 3.63 | 4681 | Plan | Foreign Request | OLY | 141963 | ||
06/01/2004 13:32 | 06/01/2004 13:32 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Unknown | Lightning | KAL | 141964 | |
06/02/2004 06:33 | 06/02/2004 07:06 | Chief Joseph PH-Chief Joseph No 5 500kV line | 500.0 | L | 0.80 | 33 | Plan | Foreign Request | WEN | 141966 | ||
06/02/2004 08:16 | 06/02/2004 15:03 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 407 | Plan | Maintenance | TDA RED | 141967 | |
06/02/2004 08:16 | 06/02/2004 15:03 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 407 | Plan | Maintenance | TDA RED | 141967 | ||
06/02/2004 08:29 | 06/04/2004 12:15 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 3106 | Plan | Maintenance | TRI | 141968 | |
06/02/2004 08:29 | 06/04/2004 12:15 | Highland-Orchard View section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.48 | 3106 | Plan | Maintenance | TRI | 141968 | ||
06/02/2004 08:49 | 06/02/2004 13:45 | De Moss-Fossil No 1 69kV line | 69.0 | L | G | 52.93 | 296 | Plan | Maintenance | TDA | 141969 | |
06/02/2004 08:49 | 06/02/2004 13:45 | Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line | 69.0 | S | 32.93 | 296 | Plan | Maintenance | TDA | 141969 | ||
06/02/2004 09:17 | 06/02/2004 14:22 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 305 | Plan | Maintenance | EUG | 141970 | |
06/02/2004 09:17 | 06/02/2004 14:22 | Hills Creek-Oakridge section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 4.80 | 305 | Plan | Maintenance | EUG | 141970 | ||
06/02/2004 15:31 | 06/02/2004 15:31 | Allston-PGE Beaver No 1 230kV line | 230.0 | L | 9.20 | 0 | Auto | Foreign Trouble | Foreign Trouble | LGV | 141971 | |
06/03/2004 05:21 | 06/03/2004 05:35 | Chief Joseph PH-Chief Joseph No 5 500kV line | 500.0 | L | 0.80 | 14 | Plan | Foreign Request | WEN | 141972 | ||
06/03/2004 07:00 | 06/03/2004 11:26 | Snohomish-Bothell No 1 230kV line | 230.0 | L | 7.64 | 266 | Plan | Maintenance | SNO | 141974 | ||
06/03/2004 07:17 | 06/03/2004 11:54 | Potholes-Grand Coulee No 1 230kV line | 230.0 | L | 65.66 | 277 | Plan | Maintenance | WEN SPK | 141975 | ||
06/03/2004 07:53 | 06/03/2004 16:50 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 537 | Plan | Foreign Request | OLY | 141976 | |
06/03/2004 07:53 | 06/03/2004 16:50 | Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 1.17 | 537 | Plan | Foreign Request | OLY | 141976 | ||
06/03/2004 08:00 | 06/03/2004 14:26 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 9.22 | 386 | Plan | Maintenance | OLY | 141977 | ||
06/03/2004 08:00 | 06/03/2004 14:26 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | G | 15.32 | 386 | Plan | Maintenance | OLY | 141977 | |
06/03/2004 08:15 | 06/03/2004 15:26 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 431 | Plan | Maintenance | TDA RED | 141978 | |
06/03/2004 08:15 | 06/03/2004 15:26 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 431 | Plan | Maintenance | TDA RED | 141978 | ||
06/03/2004 16:56 | 06/03/2004 16:56 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 141979 |
06/03/2004 16:56 | 06/03/2004 16:56 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 141979 |
06/03/2004 16:56 | 06/03/2004 16:56 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 141979 |
06/03/2004 16:56 | 06/03/2004 16:56 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 141979 |
06/03/2004 16:56 | 06/03/2004 16:56 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 141979 | |
06/03/2004 16:56 | 06/03/2004 16:56 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 141979 |
06/03/2004 16:56 | 06/03/2004 16:56 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 141979 |
06/03/2004 16:58 | 06/03/2004 16:58 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 141980 |
06/03/2004 16:58 | 06/03/2004 16:58 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 141980 |
06/03/2004 16:58 | 06/03/2004 16:58 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 141980 |
06/03/2004 16:58 | 06/03/2004 16:58 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 141980 |
06/03/2004 16:58 | 06/03/2004 16:58 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 141980 | |
06/03/2004 16:58 | 06/03/2004 16:58 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 141980 |
06/03/2004 16:58 | 06/03/2004 16:58 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 141980 |
06/03/2004 17:31 | 06/03/2004 17:32 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 1 | Auto | Lightning | Lightning | RED | 141981 |
06/03/2004 17:31 | 06/03/2004 17:32 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 1 | Auto | Lightning | Lightning | RED | 141981 |
06/03/2004 17:31 | 06/03/2004 17:32 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 1 | Auto | Lightning | Lightning | RED | 141981 |
06/03/2004 17:31 | 06/03/2004 17:32 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 1 | Auto | Lightning | Lightning | RED | 141981 |
06/03/2004 17:31 | 06/03/2004 17:32 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 1 | Auto | Lightning | Lightning | RED | 141981 | |
06/03/2004 17:31 | 06/03/2004 17:32 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 1 | Auto | Lightning | Lightning | RED | 141981 |
06/03/2004 17:31 | 06/03/2004 17:32 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 1 | Auto | Lightning | Lightning | RED | 141981 |
06/03/2004 17:31 | 06/03/2004 17:31 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 31.20 | 0 | Auto | Lightning | Lightning | RED | 142040 |
06/03/2004 17:31 | 06/03/2004 17:31 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142040 |
06/03/2004 17:31 | 06/03/2004 17:31 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142040 |
06/03/2004 17:31 | 06/03/2004 17:31 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142040 |
06/03/2004 17:31 | 06/03/2004 17:31 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142040 |
06/03/2004 17:31 | 06/03/2004 17:31 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142040 | |
06/03/2004 17:31 | 06/03/2004 17:31 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142040 |
06/03/2004 17:31 | 06/03/2004 17:31 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142040 |
06/04/2004 07:05 | 06/04/2004 15:26 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 501 | Plan | Maintenance | EUG | 141997 | ||
06/04/2004 07:43 | 06/04/2004 15:37 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 474 | Plan | Foreign Request | OLY | 141998 | |
06/04/2004 07:43 | 06/04/2004 15:37 | Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 1.17 | 474 | Plan | Foreign Request | OLY | 141998 | ||
06/04/2004 08:27 | 06/04/2004 14:04 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 337 | Plan | Maintenance | TDA | 141999 | ||
06/04/2004 08:27 | 06/04/2004 14:04 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 337 | Plan | Maintenance | TDA RED | 141999 | |
06/04/2004 12:50 | 06/21/2004 07:57 | Ely-Highland section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.98 | 24187 | Plan | Normally Out | TRI | 142000 | ||
06/04/2004 12:50 | 06/21/2004 07:57 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 24187 | Plan | Normally Out | TRI | 142000 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Benton City tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | WEN | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Benton City-Red Mountain section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 4.46 | 0 | Auto | Lightning | Lightning | TRI | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Chandler tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | 2.87 | 0 | Auto | Lightning | Lightning | WEN | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Chandler-Benton City section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 4.86 | 0 | Auto | Lightning | Lightning | WEN | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:15 | Grandview-Prosser section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 5.47 | 1 | Auto | Lightning | Lightning | TRI WEN | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:15 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 1 | Auto | Lightning | Lightning | TRI WEN | 142001 |
06/05/2004 02:14 | 06/05/2004 02:14 | Prosser tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | 6.34 | 0 | Auto | Lightning | Lightning | WEN | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Prosser-Snipes section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 4.85 | 0 | Auto | Lightning | Lightning | WEN | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Snipes tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | WEN | 142001 | |
06/05/2004 02:14 | 06/05/2004 02:14 | Snipes-Chandler section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 3.16 | 0 | Auto | Lightning | Lightning | WEN | 142001 | |
06/05/2004 02:30 | 06/05/2004 02:30 | City View-Richland section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 1.38 | 0 | Auto | Lightning | Lightning | TRI | 142002 |
06/05/2004 02:30 | 06/05/2004 02:30 | Kennedy-Ledbeder section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 2.03 | 0 | Auto | Lightning | Lightning | TRI | 142002 |
06/05/2004 02:30 | 06/05/2004 02:30 | Ledbeder tap to Red Mountain-Richland No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 142002 |
06/05/2004 02:30 | 06/05/2004 02:30 | Ledbeder-City View section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 1.82 | 0 | Auto | Lightning | Lightning | TRI | 142002 |
06/05/2004 02:30 | 06/05/2004 02:30 | Red Mountain-Kennedy section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 0.77 | 0 | Auto | Lightning | Lightning | TRI | 142002 |
06/05/2004 02:30 | 06/05/2004 02:30 | Red Mountain-Richland No 1 115kV line | 115.0 | L | 6.00 | 0 | Auto | Lightning | Lightning | TRI | 142002 | |
06/05/2004 02:30 | 06/05/2004 02:30 | Horn Rapids tap to Red Mountain-White Bluffs No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 142003 |
06/05/2004 02:30 | 06/05/2004 02:30 | Horn Rapids-White Bluffs section of Red Mountain-White Bluffs No 1 115kV line | 115.0 | S | G | 5.76 | 0 | Auto | Lightning | Lightning | TRI | 142003 |
06/05/2004 02:30 | 06/05/2004 02:30 | Red Mountain-Horn Rapids section of Red Mountain-White Bluffs No 1 115kV line | 115.0 | S | G | 4.05 | 0 | Auto | Lightning | Lightning | TRI | 142003 |
06/05/2004 02:30 | 06/05/2004 02:30 | Red Mountain-White Bluffs No 1 115kV line | 115.0 | L | 9.81 | 0 | Auto | Lightning | Lightning | TRI | 142003 | |
06/05/2004 02:58 | 06/05/2004 02:58 | Lower Monumental-Hanford No 1 500kV line | 500.0 | L | 53.47 | 0 | Auto | Lightning | Lightning | TRI | 142004 | |
06/05/2004 02:59 | 06/05/2004 06:30 | Lower Monumental-Hanford No 1 500kV line | 500.0 | L | 53.47 | 211 | Auto | Equipment/Miscellaneous | Improper Relaying | TRI | 142005 | |
06/05/2004 05:23 | 06/05/2004 05:24 | Olympia-Grand Coulee No 1 287kV line | 287.0 | L | 229.12 | 1 | Auto | Lightning | Lightning | OLY COV WEN | 142006 | |
06/05/2004 13:36 | 06/05/2004 14:22 | Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | 0.10 | 46 | Plan | Emergency | SPK | 142020 | ||
06/05/2004 13:36 | 06/05/2004 14:38 | Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | 19.40 | 62 | Plan | Emergency | SPK | 142020 | ||
06/05/2004 13:36 | 06/05/2004 14:38 | Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | L | G | 52.68 | 62 | Plan | Emergency | SPK | 142020 | |
06/05/2004 13:36 | 06/05/2004 14:22 | Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | 1.30 | 46 | Plan | Emergency | SPK | 142020 | ||
06/05/2004 13:36 | 06/05/2004 14:22 | Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | 0.10 | 46 | Plan | Emergency | SPK | 142020 | ||
06/05/2004 13:36 | 06/05/2004 14:22 | Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | 5.80 | 46 | Plan | Emergency | SPK | 142020 | ||
06/05/2004 13:36 | 06/05/2004 14:46 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 70 | Plan | Emergency | KAL SPK | 142021 | |
06/05/2004 13:36 | 06/05/2004 14:46 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 6.23 | 70 | Plan | Emergency | SPK | 142021 | ||
06/05/2004 14:10 | 06/05/2004 14:10 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 142022 |
06/05/2004 14:10 | 06/05/2004 14:10 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 142022 |
06/05/2004 14:10 | 06/05/2004 14:10 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 142022 | |
06/05/2004 14:10 | 06/05/2004 14:10 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 142022 |
06/05/2004 14:10 | 06/05/2004 14:10 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142022 |
06/05/2004 14:10 | 06/05/2004 14:10 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 142022 |
06/05/2004 14:10 | 06/05/2004 14:10 | Columbia Falls-Flathead No 1 230kV line | 230.0 | L | 14.46 | 0 | Auto | Lightning | Lightning | KAL | 142023 | |
06/05/2004 14:10 | 06/05/2004 14:12 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 2 | Auto | RAS Initiated | RAS Initiated | KAL | 142024 | |
06/05/2004 17:59 | 06/05/2004 17:59 | Moxee-Roza No 1 115kV line | 115.0 | L | 5.30 | 0 | Auto | Lightning | Lightning | TRI WEN | 142025 | |
06/05/2004 18:19 | 06/05/2004 18:19 | Murray-Custer No 1 230kV line | 230.0 | L | 63.39 | 0 | Auto | Lightning | Lightning | SNO | 142026 | |
06/05/2004 18:19 | 06/05/2004 18:19 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | G | 25.67 | 0 | Auto | Lightning | Lightning | SNO | 142026 |
06/05/2004 18:19 | 06/05/2004 18:19 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | G | 0.17 | 0 | Auto | Lightning | Lightning | SNO | 142026 |
06/05/2004 18:19 | 06/05/2004 18:19 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | G | 37.72 | 0 | Auto | Lightning | Lightning | SNO | 142026 |
06/05/2004 19:20 | 06/06/2004 02:03 | Moxee-Roza No 1 115kV line | 115.0 | L | 5.30 | 403 | Plan | Emergency | TRI WEN | 142027 | ||
06/05/2004 20:40 | 06/05/2004 20:41 | McMinnville-PGE Dayton No 1 115kV line | 115.0 | L | 4.50 | 1 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142028 | |
06/06/2004 02:22 | 06/06/2004 08:16 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 354 | Plan | Voltage Control | SAL EUG | 142029 | ||
06/06/2004 03:49 | 06/06/2004 04:06 | Bonneville PH 1-North Bonneville No 1 230kV line | 230.0 | L | 0.84 | 17 | Auto | Foreign Utility | Foreign Utility | LGV | 142030 | |
06/07/2004 05:09 | 06/07/2004 16:33 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 684 | Plan | Foreign Request | RED | 142031 | ||
06/07/2004 07:37 | 06/07/2004 16:42 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 545 | Plan | Foreign Request | OLY | 142032 | |
06/07/2004 07:37 | 06/07/2004 16:42 | Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 1.17 | 545 | Plan | Foreign Request | OLY | 142032 | ||
06/07/2004 08:18 | 06/07/2004 15:02 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 404 | Plan | Maintenance | WEN SNO | 142033 | ||
06/07/2004 08:20 | 06/07/2004 14:55 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 395 | Plan | Maintenance | TDA RED | 142034 | |
06/07/2004 08:20 | 06/07/2004 14:55 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 395 | Plan | Maintenance | TDA RED | 142034 | ||
06/07/2004 08:32 | 06/10/2004 11:15 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4483 | Plan | Maintenance | IDF | 142035 | ||
06/07/2004 08:32 | 06/10/2004 11:26 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 24.00 | 4494 | Plan | Maintenance | TRI | 142036 | ||
06/07/2004 08:32 | 06/10/2004 11:26 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 4494 | Plan | Maintenance | TRI | 142036 | |
06/07/2004 11:45 | 06/07/2004 15:40 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 235 | Plan | Maintenance | OLY | 142037 | ||
06/07/2004 17:14 | 06/07/2004 17:14 | Big Eddy-Chemawa No 1 230kV line | 230.0 | L | 116.41 | 0 | Auto | Lightning | Lightning | TDA LGV SAL | 142038 | |
06/08/2004 05:06 | 06/08/2004 10:44 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 338 | Plan | Foreign Request | RED | 142039 | ||
06/08/2004 06:28 | 06/08/2004 06:30 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 2 | Plan | Foreign Request | TDA | 142045 | ||
06/08/2004 07:00 | 06/08/2004 07:48 | Chief Joseph-Snohomish No 3 345kV line | 345.0 | L | 133.05 | 48 | Plan | Switching | WEN SNO | 142046 | ||
06/08/2004 07:01 | 06/08/2004 07:11 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 10 | Plan | Foreign Request | TDA | 142047 | ||
06/08/2004 07:02 | 06/08/2004 12:02 | McLoughlin-Pearl section of McLoughlin-Sherwood No 1 230kV line | 230.0 | S | G | 11.67 | 300 | Plan | Foreign Request | LGV SAL | 142048 | |
06/08/2004 07:02 | 06/08/2004 12:02 | McLoughlin-Sherwood No 1 230kV line | 230.0 | L | 16.24 | 300 | Plan | Foreign Request | LGV SAL | 142048 | ||
06/08/2004 07:02 | 06/08/2004 12:02 | Pearl tap to McLoughlin-Sherwood No 1 230kV line | 230.0 | T | G | 0.26 | 300 | Plan | Foreign Request | LGV SAL | 142048 | |
06/08/2004 07:02 | 06/08/2004 12:02 | Pearl-Sherwood section of McLoughlin-Sherwood No 1 230kV line | 230.0 | S | G | 4.57 | 300 | Plan | Foreign Request | SAL | 142048 | |
06/08/2004 07:27 | 06/09/2004 15:10 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 1903 | Plan | Maintenance | LGV OLY | 142049 | |
06/08/2004 07:27 | 06/09/2004 15:10 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | 6.15 | 1903 | Plan | Maintenance | LGV OLY | 142049 | ||
06/08/2004 07:32 | 06/08/2004 16:21 | Midway-PACW Union Gap No 1 230kV line | 230.0 | L | 39.10 | 529 | Plan | Foreign Request | TRI | 142050 | ||
06/08/2004 07:45 | 06/10/2004 17:00 | Santiam-Toledo No 1 230kV line | 230.0 | L | G | 67.62 | 3435 | Plan | Maintenance | SAL EUG | 142051 | |
06/08/2004 07:45 | 06/10/2004 17:00 | Santiam-Wren section of Santiam-Toledo No 1 230kV line | 230.0 | S | 41.94 | 3435 | Plan | Maintenance | SAL EUG | 142051 | ||
06/08/2004 07:51 | 06/08/2004 16:31 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 520 | Plan | Maintenance | OLY | 142052 | ||
06/08/2004 07:51 | 06/08/2004 16:31 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 520 | Plan | Maintenance | OLY | 142052 | |
06/08/2004 08:17 | 06/08/2004 16:05 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 468 | Plan | Maintenance | TDA RED | 142053 | |
06/08/2004 08:17 | 06/08/2004 16:05 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 468 | Plan | Maintenance | TDA RED | 142053 | ||
06/08/2004 08:30 | 06/08/2004 16:55 | Hines-Harney No 1 115kV line | 115.0 | L | 3.40 | 505 | Plan | Maintenance | RED | 142054 | ||
06/08/2004 08:44 | 06/08/2004 08:50 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 6 | Plan | Switching | WEN COV | 142055 | ||
06/08/2004 08:55 | 06/08/2004 15:21 | Berrydale-Tahkenitch section of Wendson-Tahkenitch No 1 115kV line | 115.0 | S | 13.98 | 386 | Plan | Maintenance | EUG | 142056 | ||
06/08/2004 08:55 | 06/08/2004 15:21 | Wendson-Tahkenitch No 1 115kV line | 115.0 | L | G | 20.34 | 386 | Plan | Maintenance | EUG | 142056 | |
06/08/2004 08:55 | 06/09/2004 15:30 | Salem-Albany No 1 115kV line | 115.0 | L | 23.90 | 1835 | Plan | Maintenance | SAL EUG | 142057 | ||
06/08/2004 10:15 | 06/10/2004 13:08 | Rocky Ford-Grand Coulee No 1 230kV line | 230.0 | L | 52.94 | 3053 | Plan | Foreign Request | WEN | 142058 | ||
06/08/2004 10:31 | 06/08/2004 14:45 | North Bonneville-Ross No 1 230kV line | 230.0 | L | 36.32 | 254 | Plan | Emergency | LGV | 142059 | ||
06/08/2004 10:31 | 06/08/2004 14:45 | North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 27.65 | 254 | Plan | Emergency | LGV | 142059 | |
06/08/2004 10:31 | 06/08/2004 14:45 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | G | 1.24 | 254 | Plan | Emergency | LGV | 142059 | |
06/08/2004 10:31 | 06/08/2004 14:45 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 8.67 | 254 | Plan | Emergency | LGV | 142059 | |
06/08/2004 16:02 | 06/08/2004 16:04 | Olympia-South Tacoma No 1 230kV line | 230.0 | L | 36.94 | 2 | Auto | Construction | Construction | OLY COV | 142060 | |
06/08/2004 16:02 | 06/08/2004 16:04 | Olympia-Satsop No 3 230kV line | 230.0 | L | 26.19 | 2 | Auto | Construction | Construction | OLY | 142061 | |
06/08/2004 16:02 | 06/08/2004 16:05 | Olympia-Kitsap No 3 230kV line | 230.0 | L | 50.26 | 3 | Auto | Construction | Construction | OLY | 142062 | |
06/08/2004 16:02 | 06/08/2004 16:05 | Olympia-Shelton No 3 230kV line | 230.0 | L | 19.96 | 3 | Auto | Construction | Construction | OLY | 142063 | |
06/08/2004 16:02 | 06/08/2004 16:04 | Olympia-Grand Coulee No 1 287kV line | 287.0 | L | 229.12 | 2 | Auto | Construction | Construction | OLY COV WEN | 142064 | |
06/09/2004 04:41 | 06/09/2004 04:44 | Slatt-Buckley No 1 500kV line | 500.0 | L | 52.32 | 3 | Auto | Unknown | Unknown | TRI TDA | 142065 | |
06/09/2004 05:02 | 06/09/2004 15:44 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 642 | Plan | Foreign Request | RED | 142066 | ||
06/09/2004 07:45 | 06/09/2004 15:38 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 473 | Plan | Maintenance | OLY | 142071 | ||
06/09/2004 07:45 | 06/09/2004 15:38 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 473 | Plan | Maintenance | OLY | 142071 | |
06/09/2004 08:38 | 06/09/2004 14:59 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 381 | Plan | Maintenance | TDA RED | 142072 | |
06/09/2004 08:38 | 06/09/2004 14:59 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 381 | Plan | Maintenance | TDA RED | 142072 | ||
06/09/2004 12:22 | 06/09/2004 12:50 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 28 | Auto | Foreign Trouble | Foreign Trouble | TDA | 142073 | |
06/09/2004 12:42 | 06/09/2004 12:43 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 1 | Auto | Human Element | Maintenance | SNO | 142074 | |
06/09/2004 15:16 | 06/09/2004 15:55 | Redmond-PGE Round Butte No 1 230kV line | 230.0 | L | 23.60 | 39 | Auto | Foreign Trouble | Foreign Trouble | RED | 142075 | |
06/09/2004 22:39 | 06/09/2004 22:39 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 0 | Auto | Staged Test | Staged Test | SPK KAL | 142076 | |
06/09/2004 23:16 | 06/09/2004 23:16 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 0 | Auto | Staged Test | Staged Test | SPK KAL | 142077 | |
06/10/2004 00:18 | 06/10/2004 00:18 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 0 | Auto | Staged Test | Staged Test | SPK KAL | 142078 | |
06/10/2004 00:52 | 06/10/2004 00:52 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 0 | Auto | Staged Test | Staged Test | SPK KAL | 142079 | |
06/10/2004 01:34 | 06/10/2004 01:34 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 0 | Auto | Staged Test | Staged Test | SPK KAL | 142080 | |
06/10/2004 04:55 | 06/10/2004 04:55 | Lower Monumental-Ashe No 1 500kV line | 500.0 | L | 39.58 | 0 | Auto | Unknown | Unknown | TRI | 142081 | |
06/10/2004 05:18 | 06/10/2004 17:04 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 706 | Plan | Foreign Request | RED | 142082 | ||
06/10/2004 06:25 | 06/10/2004 16:19 | Midway-PACW Union Gap No 1 230kV line | 230.0 | L | 39.10 | 594 | Plan | Foreign Request | TRI | 142092 | ||
06/10/2004 08:12 | 06/10/2004 14:04 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 352 | Plan | Maintenance | TDA RED | 142093 | |
06/10/2004 08:12 | 06/10/2004 14:04 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 352 | Plan | Maintenance | TDA RED | 142093 | ||
06/10/2004 08:31 | 06/10/2004 14:49 | Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 12.44 | 378 | Plan | Maintenance | SAL | 142094 | ||
06/10/2004 08:31 | 06/10/2004 14:49 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 378 | Plan | Maintenance | SAL | 142094 | |
06/10/2004 11:04 | 06/10/2004 11:07 | Benton City tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | G | 0.10 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Benton City-Red Mountain section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | G | 4.46 | 3 | Auto | Foreign Trouble | Foreign Trouble | TRI | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Chandler tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | G | 2.87 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Chandler-Benton City section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | G | 4.86 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Grandview-Prosser section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | G | 5.47 | 3 | Auto | Foreign Trouble | Foreign Trouble | TRI WEN | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | 22.80 | 3 | Auto | Foreign Trouble | Foreign Trouble | TRI WEN | 142095 | |
06/10/2004 11:04 | 06/10/2004 11:07 | Prosser tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | G | 6.34 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Prosser-Snipes section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | G | 4.85 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Snipes tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | G | 0.10 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 142095 |
06/10/2004 11:04 | 06/10/2004 11:07 | Snipes-Chandler section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | G | 3.16 | 3 | Auto | Foreign Trouble | Foreign Trouble | WEN | 142095 |
06/10/2004 13:56 | 06/10/2004 14:20 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 24 | Plan | Switching | WEN COV | 142096 | ||
06/13/2004 00:16 | 06/13/2004 00:16 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 0 | Auto | Unknown | Unknown | IDF | 142101 | |
06/13/2004 03:43 | 06/13/2004 07:33 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 230 | Plan | Voltage Control | SAL EUG | 142102 | ||
06/13/2004 22:08 | 06/13/2004 22:08 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | O | 22.51 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142106 |
06/13/2004 22:08 | 06/13/2004 22:08 | Dorena tap to Alvey-Martin Creek No 1 115kV line | 115.0 | T | 4.67 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142106 | |
06/13/2004 22:08 | 06/13/2004 22:08 | Dorena-Latham section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 3.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142106 | |
06/13/2004 22:08 | 06/13/2004 22:08 | Latham tap to Alvey-Martin Creek No 1 115kV line | 115.0 | T | 2.06 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142106 | |
06/13/2004 22:08 | 06/13/2004 22:08 | Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.03 | 0 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142106 | |
06/14/2004 01:59 | 06/14/2004 01:59 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 142107 | |
06/14/2004 05:04 | 06/14/2004 10:00 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 296 | Plan | Foreign Request | RED | 142108 | ||
06/14/2004 06:00 | 06/14/2004 17:58 | Snohomish-Bothell No 1 230kV line | 230.0 | L | 7.64 | 718 | Plan | Maintenance | SNO | 142117 | ||
06/14/2004 06:04 | 06/16/2004 13:38 | Grizzly-PGE Round Butte No 1 500kV line | 500.0 | L | 15.60 | 3334 | Plan | Foreign Request | RED | 142118 | ||
06/14/2004 07:19 | 06/15/2004 15:19 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 1920 | Plan | Maintenance | IDF | 142119 | ||
06/14/2004 08:01 | 06/14/2004 19:16 | Quilcene-Fairmount section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 11.04 | 675 | Plan | Maintenance | OLY | 142120 | ||
06/14/2004 08:01 | 06/14/2004 19:16 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 675 | Plan | Maintenance | OLY | 142120 | |
06/14/2004 08:02 | 06/14/2004 19:21 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 679 | Plan | Maintenance | OLY | 142121 | ||
06/14/2004 08:07 | 06/14/2004 16:02 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 475 | Plan | Maintenance | LGV OLY | 142122 | |
06/14/2004 08:07 | 06/14/2004 16:02 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | 6.15 | 475 | Plan | Maintenance | LGV OLY | 142122 | ||
06/14/2004 08:13 | 06/14/2004 15:50 | North Bonneville-Ross No 2 230kV line | 230.0 | L | 35.99 | 457 | Plan | Maintenance | LGV | 142123 | ||
06/14/2004 08:13 | 06/14/2004 15:50 | North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line | 230.0 | S | G | 27.51 | 457 | Plan | Maintenance | LGV | 142123 | |
06/14/2004 08:13 | 06/14/2004 15:50 | Sifton tap to North Bonneville-Ross No 2 230kV line | 230.0 | T | G | 1.20 | 457 | Plan | Maintenance | LGV | 142123 | |
06/14/2004 08:13 | 06/14/2004 15:50 | Sifton-Ross section of North Bonneville-Ross No 2 230kV line | 230.0 | S | G | 8.48 | 457 | Plan | Maintenance | LGV | 142123 | |
06/14/2004 08:14 | 06/24/2004 07:31 | Bell-AVA Northeast No 3 115kV line | 115.0 | L | 1.60 | 14357 | Plan | Construction | SPK | 142124 | ||
06/14/2004 08:16 | 06/14/2004 15:50 | North Bonneville-Ross No 1 230kV line | 230.0 | L | 36.32 | 454 | Plan | Maintenance | LGV | 142125 | ||
06/14/2004 08:16 | 06/14/2004 15:50 | North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 27.65 | 454 | Plan | Maintenance | LGV | 142125 | |
06/14/2004 08:16 | 06/14/2004 15:50 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | G | 1.24 | 454 | Plan | Maintenance | LGV | 142125 | |
06/14/2004 08:16 | 06/14/2004 15:50 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 8.67 | 454 | Plan | Maintenance | LGV | 142125 | |
06/14/2004 08:24 | 06/16/2004 14:24 | Salem-Albany No 1 115kV line | 115.0 | L | 23.90 | 3240 | Plan | Maintenance | SAL EUG | 142169 | ||
06/14/2004 08:58 | 06/14/2004 09:06 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 8 | Plan | Switching | WEN COV | 142126 | ||
06/14/2004 09:15 | 06/18/2004 15:21 | Clymer-Moxee section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 29.43 | 6126 | Plan | Maintenance | WEN TRI | 142127 | ||
06/14/2004 09:15 | 06/18/2004 15:21 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 6126 | Plan | Maintenance | WEN TRI | 142127 | |
06/14/2004 09:35 | 06/14/2004 09:41 | Chief Joseph PH-Chief Joseph No 4 230kV line | 230.0 | L | 0.90 | 6 | Auto | RAS Initiated | RAS Initiated | WEN | 142128 | |
06/14/2004 09:35 | 06/14/2004 09:38 | Marion-Alvey No 1 500kV line | 500.0 | L | 64.88 | 3 | Auto | Maintenance | Human Element | SAL EUG | 142129 | |
06/14/2004 09:35 | 06/14/2004 09:39 | Alvey-Dixonville No 1 500kV line | 500.0 | L | 57.95 | 4 | Auto | Maintenance | Maintenance | EUG | 142130 | |
06/14/2004 10:50 | 06/23/2004 08:21 | Dworshak PH-Ahsahka section of Dworshak PH-Orofino No 1 115kV line | 115.0 | S | 0.83 | 12811 | Auto | Foreign Trouble | TRI SPK | 142131 | ||
06/14/2004 10:50 | 06/23/2004 08:21 | Dworshak PH-Orofino No 1 115kV line | 115.0 | L | G | 4.45 | 12811 | Auto | Foreign Trouble | TRI SPK | 142131 | |
06/14/2004 11:36 | 06/14/2004 13:27 | North Bonneville-Alfalfa section of North Bonneville-Midway No 1 230kV line | 230.0 | S | 103.61 | 111 | Plan | Load Control | LGV TDA WEN | 142132 | ||
06/14/2004 11:36 | 06/14/2004 13:27 | North Bonneville-Midway No 1 230kV line | 230.0 | L | G | 134.71 | 111 | Plan | Load Control | LGV TDA WEN TRI | 142132 | |
06/14/2004 13:07 | 06/14/2004 13:07 | Murray-Custer No 1 230kV line | 230.0 | L | 63.39 | 0 | Auto | Unknown | Lightning | SNO | 142133 | |
06/14/2004 13:07 | 06/14/2004 13:07 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | G | 25.67 | 0 | Auto | Unknown | Lightning | SNO | 142133 |
06/14/2004 13:07 | 06/14/2004 13:07 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | G | 0.17 | 0 | Auto | Unknown | Lightning | SNO | 142133 |
06/14/2004 13:07 | 06/14/2004 13:07 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | G | 37.72 | 0 | Auto | Unknown | Lightning | SNO | 142133 |
06/15/2004 01:20 | 06/15/2004 05:53 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 273 | Plan | Voltage Control | SAL EUG | 142138 | ||
06/15/2004 04:40 | 06/15/2004 04:40 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 142134 | |
06/15/2004 04:40 | 06/15/2004 04:40 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 142134 | |
06/15/2004 04:40 | 06/15/2004 04:40 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 142134 | ||
06/15/2004 05:57 | 06/15/2004 16:25 | Snohomish-Bothell No 1 230kV line | 230.0 | L | 7.64 | 628 | Plan | Maintenance | SNO | 142139 | ||
06/15/2004 07:15 | 06/15/2004 15:15 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 480 | Plan | Maintenance | EUG | 142140 | |
06/15/2004 07:15 | 06/15/2004 15:15 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 480 | Plan | Maintenance | EUG | 142140 | ||
06/15/2004 07:28 | 06/15/2004 16:18 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 530 | Plan | Foreign Request | OLY | 142141 | |
06/15/2004 07:28 | 06/15/2004 16:18 | Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 1.17 | 530 | Plan | Foreign Request | OLY | 142141 | ||
06/15/2004 07:50 | 06/15/2004 09:36 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 106 | Plan | Maintenance | EUG | 142142 | ||
06/15/2004 08:04 | 06/15/2004 14:20 | Big Eddy-Ostrander No 1 500kV line | 500.0 | L | 70.56 | 376 | Plan | Maintenance | TDA LGV | 142143 | ||
06/15/2004 08:10 | 06/15/2004 14:28 | North Bonneville-Ross No 2 230kV line | 230.0 | L | T | 35.99 | 378 | Plan | Maintenance | LGV | 142144 | |
06/15/2004 08:10 | 06/15/2004 14:28 | Sifton tap to North Bonneville-Ross No 2 230kV line | 230.0 | T | 1.20 | 378 | Plan | Maintenance | LGV | 142144 | ||
06/15/2004 08:11 | 06/15/2004 15:47 | North Bonneville-Ross No 1 230kV line | 230.0 | L | T | 36.32 | 456 | Plan | Maintenance | LGV | 142145 | |
06/15/2004 08:11 | 06/15/2004 15:47 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | 1.24 | 456 | Plan | Maintenance | LGV | 142145 | ||
06/15/2004 08:16 | 06/15/2004 14:28 | North Bonneville-Ross No 2 230kV line | 230.0 | L | G | 35.99 | 372 | Plan | Maintenance | LGV | 142146 | |
06/15/2004 08:16 | 06/15/2004 14:28 | Sifton-Ross section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 8.48 | 372 | Plan | Maintenance | LGV | 142146 | ||
06/15/2004 08:17 | 06/15/2004 14:35 | North Bonneville-Ross No 2 230kV line | 230.0 | L | O | 35.99 | 378 | Plan | Maintenance | LGV | 142147 | |
06/15/2004 08:17 | 06/15/2004 14:35 | North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 27.51 | 378 | Plan | Maintenance | LGV | 142147 | ||
06/15/2004 08:35 | 06/16/2004 13:26 | Ice Harbor-Franklin No 3 115kV line | 115.0 | L | 9.08 | 1731 | Plan | Maintenance | TRI | 142148 | ||
06/15/2004 08:35 | 06/16/2004 13:26 | Ice Harbor-Levey section of Ice Harbor-Franklin No 3 115kV line | 115.0 | S | G | 0.88 | 1731 | Plan | Maintenance | TRI | 142148 | |
06/15/2004 08:35 | 06/16/2004 13:26 | Levey tap to Ice Harbor-Franklin No 3 115kV line | 115.0 | T | G | 0.10 | 1731 | Plan | Maintenance | TRI | 142148 | |
06/15/2004 08:35 | 06/16/2004 13:26 | Levey-Franklin section of Ice Harbor-Franklin No 3 115kV line | 115.0 | S | G | 8.20 | 1731 | Plan | Maintenance | TRI | 142148 | |
06/15/2004 08:49 | 06/16/2004 13:15 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 4.29 | 1706 | Plan | Maintenance | TRI | 142149 | ||
06/15/2004 08:49 | 06/16/2004 13:15 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 1706 | Plan | Maintenance | TRI | 142149 | |
06/15/2004 08:51 | 06/15/2004 09:18 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 27 | Plan | Emergency | TDA | 142150 | ||
06/15/2004 08:51 | 06/15/2004 11:33 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 162 | Plan | Emergency | TDA LGV | 142150 | |
06/15/2004 08:51 | 06/15/2004 09:18 | Parkdale tap to Big Eddy-Troutdale No 1 230kV line | 230.0 | T | 0.10 | 27 | Plan | Emergency | TDA | 142150 | ||
06/15/2004 08:51 | 06/15/2004 11:33 | Parkdale-Troutdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 53.99 | 162 | Plan | Emergency | TDA LGV | 142150 | ||
06/15/2004 08:56 | 11/02/2004 16:25 | Raymond-Cosmopolis No 1 115kV line | 115.0 | L | 18.36 | 202109 | Plan | Construction | OLY | 142151 | ||
06/15/2004 09:04 | 06/15/2004 15:30 | North Bonneville-Ross No 1 230kV line | 230.0 | L | G | 36.32 | 386 | Plan | Maintenance | LGV | 142152 | |
06/15/2004 09:04 | 06/15/2004 15:30 | North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line | 230.0 | S | 27.65 | 386 | Plan | Maintenance | LGV | 142152 | ||
06/15/2004 09:04 | 06/15/2004 15:30 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | 8.67 | 386 | Plan | Maintenance | LGV | 142152 | ||
06/15/2004 09:10 | 06/15/2004 09:31 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 21 | Plan | Switching | LGV | 142153 | |
06/15/2004 09:10 | 06/15/2004 09:31 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 21 | Plan | Switching | LGV | 142153 | ||
06/15/2004 09:11 | 06/15/2004 09:32 | Lexington-Longview No 2 230kV line | 230.0 | L | 9.38 | 21 | Plan | Switching | LGV OLY | 142154 | ||
06/15/2004 09:13 | 06/15/2004 09:13 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Unknown | TDA RED | 142155 | ||
06/15/2004 09:13 | 06/15/2004 09:13 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142155 | ||
06/15/2004 09:13 | 06/15/2004 09:13 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142155 | ||
06/15/2004 09:13 | 06/15/2004 09:13 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142155 | ||
06/15/2004 09:13 | 06/15/2004 09:13 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142155 | ||
06/15/2004 09:13 | 06/15/2004 09:13 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142155 | ||
06/15/2004 09:19 | 06/15/2004 15:21 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 9.22 | 362 | Plan | Switching | OLY | 142156 | ||
06/15/2004 09:19 | 06/15/2004 15:21 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | G | 15.32 | 362 | Plan | Switching | OLY | 142156 | |
06/15/2004 10:37 | 06/15/2004 11:01 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 24 | Plan | Maintenance | EUG | 142157 | ||
06/15/2004 11:36 | 06/17/2004 14:23 | Baleville tap to Raymond-Willapa River No 1 115kV line | 115.0 | T | G | 4.75 | 3047 | Plan | Emergency | OLY | 142158 | |
06/15/2004 11:36 | 06/17/2004 14:23 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 3047 | Plan | Emergency | OLY LGV | 142158 | |
06/15/2004 11:36 | 06/17/2004 14:23 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 3047 | Plan | Emergency | OLY | 142158 | |
06/15/2004 11:36 | 06/17/2004 14:23 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 3047 | Plan | Emergency | OLY | 142158 | ||
06/15/2004 14:55 | 06/15/2004 15:18 | Lexington-Longview No 2 230kV line | 230.0 | L | 9.38 | 23 | Plan | Switching | LGV OLY | 142159 | ||
06/15/2004 14:57 | 06/15/2004 15:14 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 17 | Plan | Switching | LGV | 142160 | |
06/15/2004 14:57 | 06/15/2004 15:14 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 17 | Plan | Switching | LGV | 142160 | ||
06/16/2004 01:27 | 06/16/2004 05:58 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 271 | Plan | Voltage Control | SAL EUG | 142161 | ||
06/16/2004 05:05 | 06/16/2004 17:46 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 761 | Plan | Foreign Request | RED | 142162 | ||
06/16/2004 06:44 | 06/16/2004 15:55 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 551 | Plan | Maintenance | KAL SPK | 142170 | |
06/16/2004 06:44 | 06/16/2004 15:55 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 551 | Plan | Maintenance | KAL | 142170 | ||
06/16/2004 07:18 | 06/16/2004 08:02 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 44 | Plan | Foreign Request | OLY | 143355 | ||
06/16/2004 07:18 | 06/16/2004 08:02 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 44 | Plan | Foreign Request | OLY | 143355 | |
06/16/2004 07:29 | 06/16/2004 13:46 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 377 | Plan | Foreign Request | OLY | 142171 | |
06/16/2004 07:29 | 06/16/2004 13:46 | Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 1.17 | 377 | Plan | Foreign Request | OLY | 142171 | ||
06/16/2004 07:32 | 06/16/2004 15:58 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 506 | Plan | Maintenance | OLY | 142172 | ||
06/16/2004 07:32 | 06/16/2004 15:58 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 506 | Plan | Maintenance | OLY | 142172 | |
06/16/2004 07:39 | 06/16/2004 16:20 | Olympia-Grand Coulee No 1 287kV line | 287.0 | L | 229.12 | 521 | Plan | Maintenance | OLY COV WEN | 142173 | ||
06/16/2004 07:47 | 06/16/2004 07:47 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 0 | Auto | Unknown | Unknown | IDF | 142174 | |
06/16/2004 07:48 | 06/17/2004 15:21 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 1893 | Plan | Maintenance | LGV OLY | 142175 | |
06/16/2004 07:48 | 06/17/2004 15:21 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | 6.15 | 1893 | Plan | Maintenance | LGV OLY | 142175 | ||
06/16/2004 13:58 | Ice Harbor-Franklin No 2 115kV line | 115.0 | L | T | 9.07 | still out | Plan | Normally Out | TRI | 142176 | ||
06/16/2004 13:58 | Martindale tap to Ice Harbor-Franklin No 2 115kV line | 115.0 | T | 0.10 | still out | Plan | Normally Out | TRI | 142176 | |||
06/17/2004 01:08 | 06/17/2004 05:48 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 280 | Plan | Voltage Control | SAL EUG | 142177 | ||
06/17/2004 05:09 | 06/17/2004 17:54 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 765 | Plan | Foreign Request | RED | 142178 | ||
06/17/2004 06:34 | 06/17/2004 15:37 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 543 | Plan | Maintenance | KAL SPK | 142186 | |
06/17/2004 06:34 | 06/17/2004 15:37 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 543 | Plan | Maintenance | KAL | 142186 | ||
06/17/2004 07:45 | 06/17/2004 15:45 | Quilcene-Fairmount section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 11.04 | 480 | Plan | Maintenance | OLY | 142187 | ||
06/17/2004 07:45 | 06/17/2004 15:45 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 480 | Plan | Maintenance | OLY | 142187 | |
06/17/2004 08:08 | 06/17/2004 14:19 | Court Street-Ruby Street section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | 1.83 | 371 | Plan | Maintenance | TRI | 142188 | ||
06/17/2004 08:08 | 06/17/2004 14:19 | Franklin-Ruby Street No 1 115kV line | 115.0 | L | G | 4.85 | 371 | Plan | Maintenance | TRI | 142188 | |
06/17/2004 08:08 | 06/17/2004 15:05 | Carmen Smith tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 18.00 | 417 | Plan | Maintenance | EUG | 142189 | ||
06/17/2004 08:08 | 06/17/2004 15:05 | Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line | 115.0 | S | 3.63 | 417 | Plan | Maintenance | EUG | 142189 | ||
06/17/2004 08:08 | 06/17/2004 15:05 | Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line | 115.0 | S | 2.12 | 417 | Plan | Maintenance | EUG | 142189 | ||
06/17/2004 08:08 | 06/17/2004 15:05 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 417 | Plan | Maintenance | EUG | 142189 | |
06/17/2004 08:20 | 06/18/2004 15:18 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 1858 | Plan | Maintenance | TDA RED | 142190 | |
06/17/2004 08:20 | 06/18/2004 15:18 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 1858 | Plan | Maintenance | TDA RED | 142190 | ||
06/17/2004 08:23 | 06/18/2004 16:29 | Paul-Satsop No 1 500kV line | 500.0 | L | 46.47 | 1926 | Plan | Maintenance | OLY | 142191 | ||
06/17/2004 08:44 | 06/18/2004 14:43 | Boyer-Nestucca section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 12.44 | 1799 | Plan | Maintenance | SAL | 142192 | ||
06/17/2004 08:44 | 06/18/2004 14:43 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 1799 | Plan | Maintenance | SAL | 142192 | |
06/17/2004 09:02 | 06/17/2004 11:05 | Jim Creek Service No 1 115kV line | 115.0 | L | 9.57 | 123 | Plan | Foreign Request | SNO | 143356 | ||
06/17/2004 09:47 | 06/17/2004 10:39 | Pearl-Keeler No 1 500kV line | 500.0 | L | 18.33 | 52 | Plan | Testing | SAL | 142193 | ||
06/17/2004 10:00 | 06/17/2004 11:44 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 104 | Plan | Maintenance | SPK | 142194 | |
06/17/2004 10:00 | 06/17/2004 11:44 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 104 | Plan | Maintenance | SPK | 142194 | |
06/17/2004 10:00 | 06/17/2004 11:44 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 104 | Plan | Maintenance | SPK | 142194 | |
06/17/2004 10:00 | 06/17/2004 11:44 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 104 | Plan | Maintenance | SPK | 142194 | ||
06/18/2004 00:10 | 06/18/2004 00:10 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 0 | Auto | Lightning | Lightning | SNO COV | 142195 | |
06/18/2004 04:49 | 06/18/2004 04:49 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Unknown | TDA RED | 142196 | ||
06/18/2004 04:49 | 06/18/2004 04:49 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142196 | ||
06/18/2004 04:49 | 06/18/2004 04:49 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142196 | ||
06/18/2004 04:49 | 06/18/2004 04:49 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142196 | ||
06/18/2004 04:49 | 06/18/2004 04:49 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142196 | ||
06/18/2004 04:49 | 06/18/2004 04:49 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142196 | ||
06/18/2004 05:06 | 06/18/2004 17:43 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 757 | Plan | Foreign Request | RED | 142204 | ||
06/18/2004 06:32 | 06/18/2004 12:51 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 379 | Plan | Maintenance | KAL SPK | 142205 | |
06/18/2004 06:32 | 06/18/2004 12:51 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 379 | Plan | Maintenance | KAL | 142205 | ||
06/18/2004 07:37 | 06/18/2004 13:41 | North Bonneville-Ross No 1 230kV line | 230.0 | L | 36.32 | 364 | Plan | Maintenance | LGV | 142206 | ||
06/18/2004 07:37 | 06/18/2004 13:41 | North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 27.65 | 364 | Plan | Maintenance | LGV | 142206 | |
06/18/2004 07:37 | 06/18/2004 13:41 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | G | 1.24 | 364 | Plan | Maintenance | LGV | 142206 | |
06/18/2004 07:37 | 06/18/2004 13:41 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 8.67 | 364 | Plan | Maintenance | LGV | 142206 | |
06/18/2004 08:01 | 06/18/2004 10:37 | McMinnville-PGE Dayton No 1 115kV line | 115.0 | L | 4.50 | 156 | Plan | Foreign Request | SAL | 142207 | ||
06/18/2004 08:50 | Baker Creek-Walnut City section of Walnut City tap to Forest Grove-McMinnville No 1 115kV line | 115.0 | TS | 1.20 | still out | Plan | Normally Out | SAL | 142208 | |||
06/18/2004 08:50 | Forest Grove-McMinnville No 1 115kV line | 115.0 | L | T | 23.72 | still out | Plan | Normally Out | SAL | 142208 | ||
06/18/2004 14:29 | 06/18/2004 15:10 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 41 | Plan | Switching | WEN COV | 142209 | ||
06/18/2004 18:33 | 06/18/2004 18:33 | Keeler-Allston No 1 500kV line | 500.0 | L | 42.32 | 0 | Auto | Lightning | Lightning | SAL LGV | 142210 | |
06/18/2004 19:20 | 06/19/2004 00:51 | Keeler-Forest Grove No 2 115kV line | 115.0 | L | 10.51 | 331 | Auto | Lightning | Lightning | SAL | 142211 | |
06/19/2004 18:00 | 06/19/2004 18:00 | Olympia-Kitsap No 3 230kV line | 230.0 | L | 50.26 | 0 | Auto | Lightning | Lightning | OLY | 142212 | |
06/19/2004 18:03 | 06/19/2004 18:03 | Shelton-South Bremerton No 1 230kV line | 230.0 | L | 31.14 | 0 | Auto | Lightning | Improper Relaying | OLY | 142213 | |
06/19/2004 18:03 | 06/19/2004 18:03 | Olympia-Shelton No 4 230kV line | 230.0 | L | 20.00 | 0 | Auto | Lightning | Lightning | OLY | 142214 | |
06/19/2004 18:14 | 06/19/2004 18:14 | Olympia-Shelton No 3 230kV line | 230.0 | L | 19.96 | 0 | Auto | Lightning | Lightning | OLY | 142215 | |
06/19/2004 18:14 | 06/19/2004 18:14 | Shelton-South Bremerton No 1 230kV line | 230.0 | L | 31.14 | 0 | Auto | Lightning | Improper Relaying | OLY | 142216 | |
06/19/2004 22:01 | 06/21/2004 03:40 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 1779 | Plan | Foreign Request | OLY | 142217 | ||
06/21/2004 05:07 | 06/21/2004 16:24 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 677 | Plan | Foreign Request | RED | 142218 | ||
06/21/2004 06:47 | 06/25/2004 08:40 | Snohomish-Beverly Park No 3 115kV line | 115.0 | L | 4.59 | 5873 | Plan | Foreign Request | SNO | 142220 | ||
06/21/2004 06:47 | 06/25/2004 08:40 | Snohomish-Beverly Park No 4 115kV line | 115.0 | L | 5.00 | 5873 | Plan | Foreign Request | SNO | 142221 | ||
06/21/2004 07:04 | 06/25/2004 15:02 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 6238 | Plan | Maintenance | TRI TDA RED SAL | 142222 | ||
06/21/2004 07:13 | 06/21/2004 15:04 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 471 | Plan | Maintenance | EUG | 142223 | ||
06/21/2004 07:17 | 06/25/2004 08:22 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5825 | Plan | Maintenance | IDF | 142224 | ||
06/21/2004 07:21 | 06/22/2004 03:22 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 1201 | Auto | Foreign Trouble | Foreign Trouble | OLY | 142225 | |
06/21/2004 07:21 | 06/21/2004 15:01 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 460 | Auto | Foreign Trouble | Foreign Trouble | OLY | 142226 | |
06/21/2004 07:21 | 06/21/2004 15:01 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 460 | Auto | Foreign Trouble | Foreign Trouble | OLY | 142226 |
06/21/2004 07:45 | 06/23/2004 13:45 | White Bluffs-451B No 1 115kV line | 115.0 | L | 6.19 | 3240 | Plan | Maintenance | TRI | 142227 | ||
06/21/2004 07:56 | 06/24/2004 16:59 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 4863 | Plan | Maintenance | LGV OLY | 142228 | |
06/21/2004 07:56 | 06/24/2004 16:59 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | 6.15 | 4863 | Plan | Maintenance | LGV OLY | 142228 | ||
06/21/2004 07:57 | 06/21/2004 12:50 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 293 | Plan | Maintenance | TRI | 142229 | |
06/21/2004 07:57 | 06/21/2004 12:50 | Orchard View-Badger Canyon section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 2.07 | 293 | Plan | Maintenance | TRI | 142229 | ||
06/21/2004 08:13 | 06/21/2004 12:50 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | G | 5.51 | 277 | Plan | Maintenance | TRI | 142230 | |
06/21/2004 08:13 | 06/21/2004 12:50 | Badger Canyon-Vista section of Badger Canyon-Richland No 1 115kV line | 115.0 | S | 0.97 | 277 | Plan | Maintenance | TRI | 142230 | ||
06/21/2004 08:13 | 06/21/2004 12:49 | McNary-Badger Canyon No 1 115kV line | 115.0 | L | G | 28.40 | 276 | Plan | Maintenance | TRI | 142231 | |
06/21/2004 08:13 | 06/21/2004 12:49 | Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 10.81 | 276 | Plan | Maintenance | TRI | 142231 | ||
06/21/2004 08:20 | 06/24/2004 13:08 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 24.00 | 4608 | Plan | Maintenance | TRI | 142232 | ||
06/21/2004 08:20 | 06/24/2004 13:08 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 4608 | Plan | Maintenance | TRI | 142232 | |
06/21/2004 08:40 | 06/25/2004 14:39 | Grand Coulee-Chief Joseph No 1 230kV line | 230.0 | L | 32.73 | 6119 | Plan | Maintenance | WEN | 142233 | ||
06/21/2004 13:44 | 07/07/2004 07:43 | Ely-Highland section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.98 | 22679 | Plan | Normally Out | TRI | 142234 | ||
06/21/2004 13:44 | 07/07/2004 07:43 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | 22679 | Plan | Normally Out | TRI | 142234 | |
06/21/2004 18:53 | 06/22/2004 15:25 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 1232 | Auto | Foreign Trouble | Foreign Trouble | OLY | 142235 | |
06/21/2004 18:53 | 06/22/2004 15:25 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 1232 | Auto | Foreign Trouble | Foreign Trouble | OLY | 142235 |
06/22/2004 05:07 | 06/22/2004 16:51 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 704 | Plan | Foreign Request | RED | 142236 | ||
06/22/2004 06:05 | 06/22/2004 13:42 | Carrolls-Cardwell section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 3.60 | 457 | Plan | Foreign Request | OLY | 142242 | ||
06/22/2004 06:05 | 06/22/2004 13:42 | East Kelso-South Kelso section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 1.50 | 457 | Plan | Foreign Request | OLY | 142242 | ||
06/22/2004 06:05 | 06/22/2004 13:42 | Lexington-Cardwell No 1 115kV line | 115.0 | L | G | 11.60 | 457 | Plan | Foreign Request | LGV OLY | 142242 | |
06/22/2004 06:05 | 06/22/2004 13:42 | South Kelso-Carrolls section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 3.50 | 457 | Plan | Foreign Request | OLY | 142242 | ||
06/22/2004 07:05 | 06/22/2004 16:33 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 568 | Plan | Maintenance | EUG | 142243 | ||
06/22/2004 07:57 | 06/22/2004 16:05 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 488 | Plan | Maintenance | KAL SPK | 142244 | |
06/22/2004 07:57 | 06/22/2004 16:05 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 488 | Plan | Maintenance | KAL | 142244 | ||
06/22/2004 08:14 | 06/22/2004 08:23 | Libby PH-Libby No 1 230kV line | 230.0 | L | 1.35 | 9 | Auto | Human Element | Human Element | KAL | 142245 | |
06/22/2004 08:14 | 06/22/2004 08:23 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 9 | Auto | Human Element | Human Element | KAL | 142246 | |
06/22/2004 08:16 | 06/22/2004 11:58 | Midway-Moxee No 1 115kV line | 115.0 | L | G | 33.98 | 222 | Plan | Maintenance | TRI WEN | 142247 | |
06/22/2004 08:16 | 06/22/2004 11:58 | Midway-Rattlesnake section of Midway-Moxee No 1 115kV line | 115.0 | S | 16.61 | 222 | Plan | Maintenance | TRI WEN | 142247 | ||
06/22/2004 08:29 | 06/22/2004 15:08 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 399 | Plan | Maintenance | OLY | 142248 | ||
06/22/2004 08:38 | 06/22/2004 13:43 | Grandview-Prosser section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 5.47 | 305 | Plan | Forced | TRI WEN | 142249 | ||
06/22/2004 08:38 | 06/22/2004 13:43 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 305 | Plan | Forced | TRI WEN | 142249 | |
06/22/2004 08:40 | 06/22/2004 08:44 | Midway-Moxee No 1 115kV line | 115.0 | L | O | 33.98 | 4 | Auto | Arc while switching | Arc while switching | TRI WEN | 142250 |
06/22/2004 08:40 | 06/22/2004 08:44 | Rattlesnake tap to Midway-Moxee No 1 115kV line | 115.0 | T | 0.01 | 4 | Auto | Arc while switching | Arc while switching | WEN | 142250 | |
06/22/2004 08:40 | 06/22/2004 08:44 | Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line | 115.0 | S | 17.37 | 4 | Auto | Arc while switching | Arc while switching | WEN | 142250 | |
06/22/2004 10:08 | 06/22/2004 10:16 | Libby PH-Libby No 1 230kV line | 230.0 | L | 1.35 | 8 | Auto | Human Element | Human Element | KAL | 142251 | |
06/22/2004 10:08 | 06/22/2004 10:16 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 8 | Auto | Human Element | Human Element | KAL | 142252 | |
06/22/2004 14:04 | 06/22/2004 14:04 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | 56.45 | 0 | Auto | Lightning | Lightning | KAL | 142253 | |
06/22/2004 14:04 | 06/22/2004 14:04 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 13.50 | 0 | Auto | Lightning | Lightning | KAL | 142253 |
06/22/2004 14:04 | 06/22/2004 14:04 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142253 |
06/22/2004 14:04 | 06/22/2004 14:04 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 42.95 | 0 | Auto | Lightning | Lightning | KAL | 142253 |
06/22/2004 14:04 | 06/22/2004 14:05 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 1 | Auto | RAS Initiated | RAS Initiated | KAL | 142254 | |
06/22/2004 14:07 | 06/22/2004 14:07 | Columbia Falls-Flathead No 1 230kV line | 230.0 | L | 14.46 | 0 | Auto | Lightning | Lightning | KAL | 142255 | |
06/22/2004 14:07 | 06/22/2004 14:12 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 5 | Auto | RAS Initiated | RAS Initiated | KAL | 142256 | |
06/22/2004 16:00 | 06/22/2004 18:35 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 155 | Plan | Emergency | SNO | 142257 | ||
06/22/2004 17:44 | 06/22/2004 17:44 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 0 | Auto | Lightning | Lightning | TDA RED SAL | 142258 | |
06/23/2004 05:07 | 06/23/2004 17:02 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 715 | Plan | Foreign Request | RED | 142259 | ||
06/23/2004 06:36 | 06/23/2004 15:38 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 542 | Plan | Maintenance | KAL SPK | 142275 | |
06/23/2004 06:36 | 06/23/2004 15:38 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 542 | Plan | Maintenance | KAL | 142275 | ||
06/23/2004 07:03 | 06/23/2004 15:25 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 502 | Plan | Maintenance | EUG | 142276 | ||
06/23/2004 07:09 | 06/23/2004 13:12 | Schultz-Raver No 3 500kV line | 500.0 | L | 77.47 | 363 | Plan | Maintenance | WEN COV | 142277 | ||
06/23/2004 08:02 | 06/23/2004 17:46 | Summer Lake-Malin No 1 500kV line | 500.0 | L | 75.12 | 584 | Plan | Foreign Request | RED | 142278 | ||
06/23/2004 08:09 | 06/23/2004 15:01 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 412 | Plan | Maintenance | OLY | 142279 | ||
06/23/2004 18:09 | 06/23/2004 18:09 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Lightning | Lightning | KAL | 142280 |
06/23/2004 18:09 | 06/23/2004 18:09 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 142280 | |
06/23/2004 18:09 | 06/23/2004 18:09 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Lightning | Lightning | KAL | 142280 |
06/23/2004 18:09 | 06/23/2004 18:09 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Lightning | Lightning | SPK | 142280 |
06/23/2004 18:09 | 06/23/2004 18:09 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Lightning | Lightning | KAL | 142280 |
06/23/2004 18:09 | 06/23/2004 18:09 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 142280 |
06/24/2004 05:05 | 06/24/2004 15:03 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 598 | Plan | Foreign Request | RED | 142303 | ||
06/24/2004 07:05 | 06/24/2004 11:17 | Custer-Intalco No 1 230kV line | 230.0 | L | 6.70 | 252 | Plan | Maintenance | SNO | 142304 | ||
06/24/2004 07:05 | 06/24/2004 15:02 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 477 | Plan | Maintenance | EUG | 142305 | ||
06/24/2004 09:26 | 06/25/2004 12:55 | Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | 33.85 | 1649 | Plan | Emergency | KAL | 142306 | ||
06/24/2004 09:26 | 06/25/2004 12:55 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | G | 58.91 | 1649 | Plan | Emergency | KAL | 142306 | |
06/24/2004 09:50 | 06/24/2004 23:02 | Maple Valley-Talbot No 2 230kV line | 230.0 | L | 0.10 | 792 | Plan | Foreign Request | COV | 142307 | ||
06/24/2004 17:03 | 06/24/2004 17:03 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 142308 |
06/24/2004 17:03 | 06/24/2004 17:03 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 142308 |
06/24/2004 17:03 | 06/24/2004 17:03 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 142308 |
06/24/2004 17:03 | 06/24/2004 17:03 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 142308 | |
06/24/2004 17:36 | 06/24/2004 17:36 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Lightning | Lightning | KAL | 142309 |
06/24/2004 17:36 | 06/24/2004 17:36 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 142309 | |
06/24/2004 17:36 | 06/24/2004 17:36 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Lightning | Lightning | KAL | 142309 |
06/24/2004 17:36 | 06/24/2004 17:36 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Lightning | Lightning | SPK | 142309 |
06/24/2004 17:36 | 06/24/2004 17:36 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Lightning | Lightning | KAL | 142309 |
06/24/2004 17:36 | 06/24/2004 17:36 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 142309 |
06/24/2004 17:45 | 06/24/2004 17:45 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Lightning | Lightning | KAL | 142310 |
06/24/2004 17:45 | 06/24/2004 17:45 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 142310 | |
06/24/2004 17:45 | 06/24/2004 17:45 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Lightning | Lightning | KAL | 142310 |
06/24/2004 17:45 | 06/24/2004 17:45 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Lightning | Lightning | SPK | 142310 |
06/24/2004 17:45 | 06/24/2004 17:45 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Lightning | Lightning | KAL | 142310 |
06/24/2004 17:45 | 06/24/2004 17:45 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 142310 |
06/25/2004 01:13 | 06/25/2004 01:13 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 0 | Auto | Unknown | Unknown | WEN TRI | 142311 | |
06/25/2004 06:58 | 06/25/2004 13:04 | Carrolls-Cardwell section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 3.60 | 366 | Plan | Foreign Request | OLY | 142326 | ||
06/25/2004 06:58 | 06/25/2004 13:04 | Lexington-Cardwell No 1 115kV line | 115.0 | L | G | 11.60 | 366 | Plan | Foreign Request | LGV OLY | 142326 | |
06/25/2004 06:58 | 06/25/2004 13:04 | South Kelso-Carrolls section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 3.50 | 366 | Plan | Foreign Request | OLY | 142326 | ||
06/25/2004 08:05 | 06/25/2004 14:21 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 376 | Plan | Maintenance | OLY | 142327 | ||
06/25/2004 08:40 | 06/25/2004 12:08 | Alvey-Diamond Hill No 3 230kV line | 230.0 | L | G | 20.30 | 208 | Plan | Foreign Request | EUG | 142328 | |
06/25/2004 08:40 | 06/25/2004 12:08 | Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line | 230.0 | S | 9.60 | 208 | Plan | Foreign Request | EUG | 142328 | ||
06/25/2004 09:25 | 06/25/2004 09:25 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Unknown | Unknown | SPK | 142329 |
06/25/2004 09:25 | 06/25/2004 09:25 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Unknown | Unknown | SPK | 142329 |
06/25/2004 09:25 | 06/25/2004 09:25 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Unknown | Unknown | SPK | 142329 |
06/25/2004 09:25 | 06/25/2004 09:25 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Unknown | Unknown | SPK | 142329 | |
06/25/2004 15:58 | 06/25/2004 18:06 | Malin-PACW 500/230kV Tie No 1 500kV line | 500.0 | L | 0.10 | 128 | Auto | Foreign Trouble | Foreign Trouble | RED | 142330 | |
06/25/2004 16:13 | 06/25/2004 16:13 | Noxon AVA-Hot Springs No 2 230kV line | 230.0 | L | 70.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 142331 | |
06/25/2004 16:18 | 06/25/2004 16:18 | Macks Inn-Madison No 1 115kV line | 115.0 | L | 17.12 | 0 | Auto | Lightning | Lightning | IDF | 142332 | |
06/25/2004 17:59 | 06/25/2004 17:59 | Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 4.43 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | 29.67 | 0 | Auto | Lightning | Lightning | SPK | 142333 | |
06/25/2004 17:59 | 06/25/2004 17:59 | Dover tap to Sandpoint tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | TT | G | 9.96 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Laclede tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Laclede-Sandpoint section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 9.77 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Priest River AVA tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Priest River AVA-Priest River section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 1.93 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Priest River tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 3.05 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Priest River-Laclede section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 6.28 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Sandpoint tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 17:59 | 06/25/2004 17:59 | Sandpoint-Sand Creek section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 7.26 | 0 | Auto | Lightning | Lightning | SPK | 142333 |
06/25/2004 19:09 | 06/25/2004 19:09 | Elmo tap to Kalispell-Kerr No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142334 |
06/25/2004 19:09 | 06/25/2004 19:09 | Elmo-Kerr section of Kalispell-Kerr No 1 115kV line | 115.0 | S | G | 12.80 | 0 | Auto | Lightning | Lightning | KAL | 142334 |
06/25/2004 19:09 | 06/25/2004 19:09 | Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line | 115.0 | S | G | 28.59 | 0 | Auto | Lightning | Lightning | KAL | 142334 |
06/25/2004 19:09 | 06/25/2004 19:09 | Kalispell-Kerr No 1 115kV line | 115.0 | L | 41.39 | 0 | Auto | Lightning | Lightning | KAL | 142334 | |
06/25/2004 19:56 | 06/25/2004 19:56 | Columbia Falls-Kalispell No 1 115kV line | 115.0 | L | 10.80 | 0 | Auto | Lightning | Lightning | KAL | 142335 | |
06/25/2004 19:56 | 06/25/2004 19:56 | Columbia Falls-Kalispell No 1 115kV line | 115.0 | L | 10.80 | 0 | Auto | Lightning | KAL | 142387 | ||
06/25/2004 23:36 | 06/25/2004 23:37 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 1 | Auto | Lightning | Lightning | WEN SPK | 142336 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Creston-Bell No 1 115kV line | 115.0 | L | O | 53.80 | 3 | Auto | Lightning | Lightning | WEN SPK | 142337 |
06/25/2004 23:37 | 06/25/2004 23:40 | Creston-Larene section of Creston-Bell No 1 115kV line | 115.0 | S | 16.73 | 3 | Auto | Lightning | Lightning | WEN | 142337 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Larene tap to Creston-Bell No 1 115kV line | 115.0 | T | 0.01 | 3 | Auto | Lightning | Lightning | WEN | 142337 | |
06/25/2004 23:37 | 06/25/2004 23:40 | B212-Wilbur section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 16.47 | 3 | Auto | Lightning | Lightning | WEN | 142338 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Grand Coulee City tap to Grand Coulee-Creston No 1 115kV line | 115.0 | T | 0.01 | 3 | Auto | Lightning | Lightning | WEN | 142338 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Grand Coulee-B212 section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 1.59 | 3 | Auto | Lightning | Lightning | WEN | 142338 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | G | 28.27 | 3 | Auto | Lightning | Lightning | WEN SPK | 142338 |
06/25/2004 23:37 | 06/25/2004 23:40 | Wagner Lake tap to Wilbur tap to Grand Coulee-Creston No 1 115kV line | 115.0 | TT | 10.63 | 3 | Auto | Lightning | Lightning | WEN | 142338 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Wilbur tap to Grand Coulee-Creston No 1 115kV line | 115.0 | T | 5.35 | 3 | Auto | Lightning | Lightning | WEN | 142338 | |
06/25/2004 23:37 | 06/25/2004 23:40 | Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 10.21 | 3 | Auto | Lightning | Lightning | WEN SPK | 142338 | |
06/25/2004 23:38 | 06/25/2004 23:39 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 1 | Auto | Lightning | Lightning | WEN SPK | 142339 | |
06/26/2004 08:30 | 06/26/2004 08:30 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 142352 | |
06/26/2004 10:30 | 06/26/2004 10:32 | Grand Coulee-Chief Joseph No 2 230kV line | 230.0 | L | 32.59 | 2 | Auto | Lightning | Weather | WEN | 142353 | |
06/26/2004 10:54 | 06/26/2004 11:02 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 8 | Auto | Lightning | WEN SPK | 142354 | ||
06/26/2004 11:19 | 06/26/2004 11:19 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 0 | Auto | Lightning | Lightning | WEN SPK | 142355 | |
06/26/2004 11:28 | 06/26/2004 11:28 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 142356 | |
06/26/2004 11:45 | 06/26/2004 11:45 | Grand Coulee-Bell No 5 230kV line | 230.0 | L | 83.06 | 0 | Auto | Lightning | Lightning | WEN SPK | 142357 | |
06/26/2004 12:04 | 06/26/2004 12:04 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 142358 |
06/26/2004 12:04 | 06/26/2004 12:04 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 142358 |
06/26/2004 12:04 | 06/26/2004 12:04 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 142358 |
06/26/2004 12:04 | 06/26/2004 12:04 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 142358 | |
06/26/2004 12:09 | 06/26/2004 12:09 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 142359 |
06/26/2004 12:09 | 06/26/2004 12:09 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 142359 |
06/26/2004 12:09 | 06/26/2004 12:09 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 142359 |
06/26/2004 12:09 | 06/26/2004 12:09 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 142359 | |
06/26/2004 12:17 | 06/26/2004 12:17 | East Omak-Oroville No 1 115kV line | 115.0 | L | 39.01 | 0 | Auto | Lightning | Weather | WEN | 142360 | |
06/26/2004 12:17 | 06/26/2004 12:17 | East Omak-Tonasket section of East Omak-Oroville No 1 115kV line | 115.0 | S | G | 20.20 | 0 | Auto | Lightning | Weather | WEN | 142360 |
06/26/2004 12:18 | 06/26/2004 12:19 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 1 | Auto | Lightning | Lightning | SPK | 142361 | |
06/26/2004 12:20 | 06/26/2004 12:20 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 0 | Auto | Lightning | Lightning | SPK | 142362 | |
06/26/2004 12:20 | 06/26/2004 12:25 | Bell-Boundary No 1 230kV line | 230.0 | L | G | 91.66 | 5 | Auto | Lightning | Lightning | SPK | 142363 |
06/26/2004 12:20 | 06/26/2004 12:25 | Bell-Sacheen section of Bell-Boundary No 1 230kV line | 230.0 | S | 31.60 | 5 | Auto | Lightning | Lightning | SPK | 142363 | |
06/26/2004 12:20 | 06/26/2004 12:26 | Sacheen tap to Bell-Boundary No 1 230kV line | 230.0 | T | 0.70 | 6 | Auto | Lightning | Lightning | SPK | 142363 | |
06/26/2004 12:20 | 06/26/2004 12:25 | Sacheen-Boundary section of Bell-Boundary No 1 230kV line | 230.0 | S | 60.06 | 5 | Auto | Lightning | Lightning | SPK | 142363 | |
06/26/2004 12:20 | 06/26/2004 12:24 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 4 | Auto | Lightning | Forced (Configuration) | SPK | 142364 | |
06/26/2004 12:21 | 06/26/2004 12:28 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 7 | Auto | Lightning | Lightning | SPK | 142365 | |
06/26/2004 13:08 | 06/26/2004 13:08 | Creston-Bell No 1 115kV line | 115.0 | L | O | 53.80 | 0 | Auto | Lightning | Lightning | WEN SPK | 142366 |
06/26/2004 13:08 | 06/26/2004 13:08 | Springhill tap to Creston-Bell No 1 115kV line | 115.0 | T | 0.01 | 0 | Auto | Lightning | Lightning | SPK | 142366 | |
06/26/2004 13:08 | 06/26/2004 13:08 | Springhill-Bell section of Creston-Bell No 1 115kV line | 115.0 | S | 9.92 | 0 | Auto | Lightning | Lightning | SPK | 142366 | |
06/26/2004 13:16 | 06/26/2004 13:16 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 0 | Auto | Lightning | Lightning | SPK | 142367 | |
06/26/2004 16:50 | 06/26/2004 16:50 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Lightning | Lightning | KAL | 142368 | |
06/26/2004 16:50 | 06/26/2004 16:50 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 0 | Auto | Lightning | Lightning | KAL | 142369 | |
06/26/2004 23:12 | 06/26/2004 23:12 | East Omak-Oroville No 1 115kV line | 115.0 | L | 39.01 | 0 | Auto | Lightning | Weather | WEN | 142370 | |
06/26/2004 23:12 | 06/26/2004 23:12 | East Omak-Tonasket section of East Omak-Oroville No 1 115kV line | 115.0 | S | G | 20.20 | 0 | Auto | Lightning | Weather | WEN | 142370 |
06/26/2004 23:12 | 06/26/2004 23:12 | East Omak-Tonasket No 2 115kV line | 115.0 | L | 20.31 | 0 | Auto | Lightning | Weather | WEN | 142371 | |
06/26/2004 23:37 | 06/26/2004 23:37 | Chief Joseph-East Omak No 1 230kV line | 230.0 | L | 33.99 | 0 | Auto | Lightning | Weather | WEN | 142372 | |
06/27/2004 03:00 | 06/27/2004 06:34 | Columbia Falls-Stillwater section of Columbia Falls-Trego No 1 115kV line | 115.0 | S | G | 18.58 | 214 | Plan | Maintenance | KAL | 142373 | |
06/27/2004 03:00 | 06/27/2004 06:34 | Columbia Falls-Trego No 1 115kV line | 115.0 | L | 45.96 | 214 | Plan | Maintenance | KAL | 142373 | ||
06/27/2004 03:00 | 06/27/2004 06:34 | Stillwater tap to Columbia Falls-Trego No 1 115kV line | 115.0 | T | G | 0.10 | 214 | Plan | Maintenance | KAL | 142373 | |
06/27/2004 03:00 | 06/27/2004 06:34 | Stillwater-Trego section of Columbia Falls-Trego No 1 115kV line | 115.0 | S | G | 27.38 | 214 | Plan | Maintenance | KAL | 142373 | |
06/27/2004 04:00 | 06/27/2004 13:31 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 571 | Plan | Foreign Request | TDA RED | 142374 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142374 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142374 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142374 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142374 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142374 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 571 | Plan | Foreign Request | TDA RED | 142375 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142375 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142375 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142375 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142375 | ||
06/27/2004 04:00 | 06/27/2004 13:31 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 571 | Plan | Foreign Request | TDA | 142375 | ||
06/27/2004 04:03 | 06/27/2004 13:29 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 566 | Plan | Switching | TDA | 142376 | ||
06/27/2004 04:03 | 06/27/2004 13:30 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 567 | Plan | Switching | TDA | 142377 | ||
06/27/2004 05:51 | 06/27/2004 08:12 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 141 | Plan | Voltage Control | TDA RED SAL | 142378 | ||
06/27/2004 07:01 | 06/27/2004 07:01 | Diamond Lake tap to Sacheen-Albeni Falls No 1 115kV line | 115.0 | T | G | 2.20 | 0 | Auto | Lightning | Lightning | SPK | 142383 |
06/27/2004 07:01 | 06/27/2004 07:01 | Diamond Lake-Albeni Falls section of Sacheen-Albeni Falls No 1 115kV line | 115.0 | S | G | 8.20 | 0 | Auto | Lightning | Lightning | SPK | 142383 |
06/27/2004 07:01 | 06/27/2004 07:01 | Sacheen-Albeni Falls No 1 115kV line | 115.0 | L | 13.72 | 0 | Auto | Lightning | Lightning | SPK | 142383 | |
06/27/2004 07:01 | 06/27/2004 07:01 | Sacheen-Diamond Lake section of Sacheen-Albeni Falls No 1 115kV line | 115.0 | S | G | 5.52 | 0 | Auto | Lightning | Lightning | SPK | 142383 |
06/27/2004 08:34 | 06/27/2004 13:48 | Captain Jack-Klamath Cogen No 1 500kV line | 500.0 | L | 26.30 | 314 | Plan | Emergency | RED | 142384 | ||
06/27/2004 10:22 | 06/27/2004 10:22 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 0 | Auto | Lightning | Lightning | KAL | 142385 | |
06/28/2004 05:06 | 06/28/2004 17:12 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 726 | Plan | Foreign Request | RED | 142386 | ||
06/28/2004 06:42 | 07/02/2004 09:46 | Snohomish-Beverly Park No 3 115kV line | 115.0 | L | 4.59 | 5944 | Plan | Foreign Request | SNO | 142402 | ||
06/28/2004 06:42 | 07/02/2004 10:08 | Snohomish-Beverly Park No 4 115kV line | 115.0 | L | 5.00 | 5966 | Plan | Foreign Request | SNO | 142403 | ||
06/28/2004 07:00 | 06/28/2004 14:19 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 439 | Plan | Maintenance | EUG | 142404 | |
06/28/2004 07:00 | 06/28/2004 14:19 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 439 | Plan | Maintenance | EUG | 142404 | ||
06/28/2004 07:07 | 06/28/2004 14:49 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 462 | Plan | Maintenance | EUG | 142405 | ||
06/28/2004 08:03 | 07/02/2004 08:05 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5762 | Plan | Maintenance | IDF | 142406 | ||
06/28/2004 08:08 | 07/01/2004 15:26 | Grand Coulee-Chief Joseph No 1 230kV line | 230.0 | L | 32.73 | 4758 | Plan | Maintenance | WEN | 142407 | ||
06/28/2004 08:09 | 06/28/2004 16:49 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 520 | Plan | Maintenance | TDA RED | 142408 | |
06/28/2004 08:09 | 06/28/2004 16:49 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 520 | Plan | Maintenance | TDA RED | 142408 | ||
06/28/2004 08:17 | 07/02/2004 15:12 | Buckley-Marion No 1 500kV line | 500.0 | L | 99.33 | 6175 | Plan | Maintenance | TDA RED SAL | 142409 | ||
06/28/2004 08:27 | 07/02/2004 11:00 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 24.00 | 5913 | Plan | Maintenance | TRI | 142410 | ||
06/28/2004 08:27 | 07/02/2004 11:00 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 5913 | Plan | Maintenance | TRI | 142410 | |
06/28/2004 08:47 | 06/30/2004 14:59 | Kitsap-South Bremerton No 1 115kV line | 115.0 | L | 0.70 | 3252 | Plan | Maintenance | OLY | 142411 | ||
06/28/2004 13:26 | 06/28/2004 13:26 | Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 4.43 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | 29.67 | 0 | Auto | Lightning | Lightning | SPK | 142412 | |
06/28/2004 13:26 | 06/28/2004 13:26 | Dover tap to Sandpoint tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | TT | G | 9.96 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Laclede tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Laclede-Sandpoint section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 9.77 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Priest River AVA tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Priest River AVA-Priest River section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 1.93 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Priest River tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 3.05 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Priest River-Laclede section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 6.28 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Sandpoint tap to Albeni Falls-Sand Creek No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 13:26 | 06/28/2004 13:26 | Sandpoint-Sand Creek section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | G | 7.26 | 0 | Auto | Lightning | Lightning | SPK | 142412 |
06/28/2004 14:03 | 06/28/2004 14:03 | Lost River-Spar Canyon No 1 230kV line | 230.0 | L | 53.19 | 0 | Auto | Lightning | Lightning | IDF | 142413 | |
06/28/2004 14:58 | 06/30/2004 13:56 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 2818 | Plan | Foreign Request | OLY | 142414 | ||
06/28/2004 14:58 | 06/30/2004 13:56 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 2818 | Plan | Foreign Request | OLY | 142414 | |
06/28/2004 15:01 | 06/28/2004 15:01 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Lightning | Lightning | KAL | 142415 | |
06/28/2004 18:50 | 06/28/2004 18:58 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 8 | Auto | Lightning | Lightning | KAL SPK | 142416 | |
06/28/2004 18:50 | 06/28/2004 18:56 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 6 | Auto | Lightning | Improper Relaying | KAL | 142417 | |
06/28/2004 18:50 | 06/28/2004 18:54 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 4 | Auto | Lightning | Improper Relaying | KAL | 142418 | |
06/28/2004 19:48 | 06/28/2004 19:48 | Captain Jack-Malin No 2 500kV line | 500.0 | L | 6.90 | 0 | Auto | Lightning | Lightning | RED | 142419 | |
06/28/2004 19:50 | 06/28/2004 19:52 | Captain Jack-Malin No 2 500kV line | 500.0 | L | 6.90 | 2 | Auto | Lightning | Lightning | RED | 142420 | |
06/28/2004 20:38 | 06/28/2004 20:38 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142421 |
06/28/2004 20:38 | 06/28/2004 20:38 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142421 |
06/28/2004 20:38 | 06/28/2004 20:38 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142421 |
06/28/2004 20:38 | 06/28/2004 20:38 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142421 |
06/28/2004 20:38 | 06/28/2004 20:38 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142421 | |
06/28/2004 20:38 | 06/28/2004 20:38 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142421 |
06/28/2004 20:38 | 06/28/2004 20:38 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142421 |
06/28/2004 23:25 | 06/29/2004 00:54 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 89 | Plan | Emergency | RED | 142422 | ||
06/28/2004 23:25 | 06/29/2004 04:24 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 299 | Plan | Emergency | RED | 142422 | ||
06/28/2004 23:25 | 06/29/2004 00:54 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 89 | Plan | Emergency | RED | 142422 | ||
06/28/2004 23:25 | 06/29/2004 00:54 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 89 | Plan | Emergency | RED | 142422 | |
06/29/2004 04:11 | 06/29/2004 04:24 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 13 | Plan | Switching | RED | 142423 | ||
06/29/2004 04:11 | 06/29/2004 04:24 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 13 | Plan | Switching | RED | 142423 | ||
06/29/2004 04:11 | 06/29/2004 04:24 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 13 | Plan | Switching | RED | 142423 | |
06/29/2004 07:00 | 06/29/2004 16:10 | Chief Joseph-Snohomish No 3 345kV line | 345.0 | L | 133.05 | 550 | Plan | Maintenance | WEN SNO | 142438 | ||
06/29/2004 07:00 | 06/29/2004 14:59 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 479 | Plan | Maintenance | EUG | 142439 | ||
06/29/2004 07:27 | 06/29/2004 13:53 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 386 | Plan | Switching | TDA | 142440 | ||
06/29/2004 07:38 | 07/01/2004 17:35 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 3477 | Plan | Maintenance | LGV OLY | 142441 | |
06/29/2004 07:38 | 07/01/2004 17:35 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | 6.15 | 3477 | Plan | Maintenance | LGV OLY | 142441 | ||
06/29/2004 07:48 | 06/29/2004 16:46 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 538 | Plan | Maintenance | OLY | 142442 | ||
06/29/2004 08:01 | 06/29/2004 11:02 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 181 | Plan | Foreign Request | SPK | 142443 | ||
06/29/2004 08:15 | 06/29/2004 15:43 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 448 | Plan | Maintenance | TDA RED | 142444 | |
06/29/2004 08:15 | 06/29/2004 15:43 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 448 | Plan | Maintenance | TDA RED | 142444 | ||
06/29/2004 09:00 | 06/29/2004 16:04 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 424 | Plan | Maintenance | KAL SPK | 142445 | |
06/29/2004 09:00 | 06/29/2004 16:04 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 424 | Plan | Maintenance | KAL | 142445 | ||
06/29/2004 13:20 | 06/29/2004 13:20 | Roundup-LaGrande No 1 230kV line | 230.0 | L | 45.02 | 0 | Auto | Lightning | Lightning | TRI | 142446 | |
06/29/2004 13:56 | 06/29/2004 13:56 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142447 |
06/29/2004 13:56 | 06/29/2004 13:56 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142447 |
06/29/2004 13:56 | 06/29/2004 13:56 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142447 |
06/29/2004 13:56 | 06/29/2004 13:56 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142447 |
06/29/2004 13:56 | 06/29/2004 13:56 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142447 | |
06/29/2004 13:56 | 06/29/2004 13:56 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142447 |
06/29/2004 13:56 | 06/29/2004 13:56 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142447 |
06/29/2004 14:32 | 06/29/2004 14:32 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142448 |
06/29/2004 14:32 | 06/29/2004 14:32 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142448 |
06/29/2004 14:32 | 06/29/2004 14:32 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142448 |
06/29/2004 14:32 | 06/29/2004 14:32 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142448 |
06/29/2004 14:32 | 06/29/2004 14:32 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142448 | |
06/29/2004 14:32 | 06/29/2004 14:32 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142448 |
06/29/2004 14:32 | 06/29/2004 14:32 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142448 |
06/29/2004 14:37 | 06/29/2004 14:37 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142449 |
06/29/2004 14:37 | 06/29/2004 14:37 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142449 |
06/29/2004 14:37 | 06/29/2004 14:37 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142449 |
06/29/2004 14:37 | 06/29/2004 14:37 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142449 |
06/29/2004 14:37 | 06/29/2004 14:37 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142449 | |
06/29/2004 14:37 | 06/29/2004 14:37 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142449 |
06/29/2004 14:37 | 06/29/2004 14:37 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142449 |
06/29/2004 15:32 | 06/29/2004 15:32 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 0 | Auto | Lightning | Lightning | KAL | 142450 | |
06/29/2004 16:25 | 06/29/2004 22:33 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 368 | Auto | Lightning | Lightning | TDA | 142451 | |
06/29/2004 16:25 | 06/29/2004 22:33 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 368 | Auto | Lightning | Lightning | TDA RED | 142451 |
06/29/2004 16:25 | 06/29/2004 22:33 | Maupin tap to Big Eddy-Redmond No 1 230kV line | 230.0 | T | 0.10 | 368 | Auto | Lightning | Lightning | TDA | 142451 | |
06/29/2004 16:25 | 06/29/2004 22:33 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 368 | Auto | Lightning | Lightning | TDA RED | 142451 | |
06/29/2004 16:25 | 06/29/2004 18:55 | Antelope tap to Fossil-Maupin 69kV line | 69.0 | T | 0.10 | 150 | Auto | Lightning | Terminal Equipment Failure | TDA | 142452 | |
06/29/2004 16:25 | 06/29/2004 18:55 | Antelope-Bakeoven section of Fossil-Maupin 69kV line | 69.0 | S | 21.40 | 150 | Auto | Lightning | Terminal Equipment Failure | RED | 142452 | |
06/29/2004 16:25 | 06/29/2004 18:55 | Bakeoven tap to Fossil-Maupin 69kV line | 69.0 | T | 0.10 | 150 | Auto | Lightning | Terminal Equipment Failure | RED | 142452 | |
06/29/2004 16:25 | 06/29/2004 18:55 | Bakeoven-Maupin section of Fossil-Maupin 69kV line | 69.0 | S | 7.00 | 150 | Auto | Lightning | Terminal Equipment Failure | RED | 142452 | |
06/29/2004 16:25 | 06/29/2004 18:55 | Fossil-Maupin 69kV line | 69.0 | L | G | 56.93 | 150 | Auto | Lightning | Terminal Equipment Failure | TDA | 142452 |
06/29/2004 16:25 | 06/29/2004 18:55 | Fossil-Muddy Ranch section of Fossil-Maupin 69kV line | 69.0 | S | 14.77 | 150 | Auto | Lightning | Terminal Equipment Failure | TDA | 142452 | |
06/29/2004 16:25 | 06/29/2004 18:55 | Muddy Ranch tap to Fossil-Maupin 69kV line | 69.0 | T | 8.00 | 150 | Auto | Lightning | Terminal Equipment Failure | TDA | 142452 | |
06/29/2004 16:25 | 06/29/2004 18:55 | Muddy Ranch-Antelope section of Fossil-Maupin 69kV line | 69.0 | S | 13.87 | 150 | Auto | Lightning | Terminal Equipment Failure | TDA | 142452 | |
06/29/2004 21:48 | 06/29/2004 21:50 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 2 | Auto | Lightning | WEN SPK | 142453 | ||
06/30/2004 02:01 | 06/30/2004 02:01 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 0 | Auto | Lightning | Lightning | KAL | 142454 | |
06/30/2004 03:14 | 06/30/2004 03:14 | Columbia Falls-Kalispell No 1 115kV line | 115.0 | L | 10.80 | 0 | Auto | Lightning | Lightning | KAL | 142455 | |
06/30/2004 03:29 | 06/30/2004 03:30 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 1 | Auto | RAS Initiated | RAS Initiated | KAL | 142456 | |
06/30/2004 03:29 | 06/30/2004 03:29 | Columbia Falls-Flathead No 1 230kV line | 230.0 | L | 14.46 | 0 | Auto | Lightning | Lightning | KAL | 142457 | |
06/30/2004 04:17 | 06/30/2004 04:17 | Captain Jack-Malin No 2 500kV line | 500.0 | L | 6.90 | 0 | Auto | Foreign Trouble | Foreign Trouble | RED | 142458 | |
06/30/2004 04:17 | 06/30/2004 04:17 | Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | G | 18.26 | 0 | Auto | Unknown | Unknown | RED | 142459 |
06/30/2004 04:17 | 06/30/2004 04:17 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | 103.37 | 0 | Auto | Unknown | Unknown | RED | 142459 | |
06/30/2004 04:17 | 06/30/2004 04:17 | Ponderosa tap to Grizzly-Summer Lake No 1 500kV line | 500.0 | T | G | 0.01 | 0 | Auto | Unknown | Unknown | RED | 142459 |
06/30/2004 04:17 | 06/30/2004 04:17 | Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | G | 85.11 | 0 | Auto | Unknown | Unknown | RED | 142459 |
06/30/2004 04:42 | 06/30/2004 15:40 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 658 | Auto | Malicious | Malicious | COV | 142460 | |
06/30/2004 05:08 | 06/30/2004 16:31 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 683 | Plan | Foreign Request | RED | 142461 | ||
06/30/2004 06:35 | 06/30/2004 15:14 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 519 | Plan | Maintenance | KAL SPK | 142512 | |
06/30/2004 06:35 | 06/30/2004 15:14 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 519 | Plan | Maintenance | KAL | 142512 | ||
06/30/2004 07:02 | 06/30/2004 14:40 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 458 | Plan | Maintenance | EUG | 142513 | |
06/30/2004 07:02 | 06/30/2004 14:40 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 458 | Plan | Maintenance | EUG | 142513 | ||
06/30/2004 07:05 | 06/30/2004 15:00 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 475 | Plan | Maintenance | EUG | 142514 | ||
06/30/2004 07:26 | 06/30/2004 16:53 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 567 | Plan | Maintenance | OLY | 142515 | ||
06/30/2004 07:26 | 06/30/2004 16:53 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 567 | Plan | Maintenance | OLY | 142515 | |
06/30/2004 07:31 | 07/01/2004 10:32 | Bellingham-Custer No 1 230kV line | 230.0 | L | 12.64 | 1621 | Plan | Maintenance | SNO | 142516 | ||
06/30/2004 07:44 | 06/30/2004 11:13 | Benton-451B No 1 115kV line | 115.0 | L | G | 4.75 | 209 | Plan | Maintenance | TRI | 142517 | |
06/30/2004 07:44 | 06/30/2004 11:13 | Hanford 2 Construction-451B section of Benton-451B No 1 115kV line | 115.0 | S | 2.97 | 209 | Plan | Maintenance | TRI | 142517 | ||
06/30/2004 08:27 | 06/30/2004 15:37 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 430 | Plan | Maintenance | TDA RED | 142518 | |
06/30/2004 08:27 | 06/30/2004 15:37 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 430 | Plan | Maintenance | TDA RED | 142518 | ||
06/30/2004 09:04 | 06/30/2004 16:44 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 460 | Plan | Forced | TDA | 142519 | ||
06/30/2004 13:12 | 06/30/2004 15:42 | Goose Lake-Okanogan section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 20.00 | 150 | Plan | Emergency | WEN | 142520 | ||
06/30/2004 13:12 | 06/30/2004 15:42 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | G | 41.05 | 150 | Plan | Emergency | WEN | 142520 | |
06/30/2004 13:33 | 06/30/2004 13:41 | Alvey-Fairview No 1 230kV line | 230.0 | L | O | 97.46 | 8 | Auto | Human Element | Substation Operations | EUG | 142521 |
06/30/2004 13:33 | 06/30/2004 13:41 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 8 | Auto | Human Element | Substation Operations | EUG | 142521 | |
06/30/2004 13:33 | 06/30/2004 13:41 | Martin Creek tap to Alvey-Fairview No 1 230kV line | 230.0 | T | 0.27 | 8 | Auto | Human Element | Substation Operations | EUG | 142521 | |
06/30/2004 13:33 | 06/30/2004 13:41 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 8 | Auto | Human Element | Substation Operations | EUG | 142521 | |
06/30/2004 13:48 | 06/30/2004 13:48 | Allston-Astoria No 1 115kV line | 115.0 | L | 41.98 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 | |
06/30/2004 13:48 | 06/30/2004 13:48 | Allston-Delena section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 3.31 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | G | 18.27 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV OLY | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Clatskanie-Mist section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 4.80 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Delena-Clatskanie section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 6.66 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Fern Hill-Astoria section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 3.95 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | G | 10.32 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV OLY | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Knappa-Fern Hill section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 6.62 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Mist-Naselle section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 7.90 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | T | G | 33.17 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV OLY | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Naselle tap-Cathlamet section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | G | 4.58 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 13:48 | 06/30/2004 13:48 | Naselle-Knappa section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 8.74 | 0 | Auto | Machinery, Logging | Machinery, Logging | LGV | 142522 |
06/30/2004 14:09 | 06/30/2004 14:10 | Alvey PACW-Goshen section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 2.39 | 1 | Auto | Human Element | Substation Operations | EUG | 142523 | |
06/30/2004 14:09 | 06/30/2004 14:10 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | O | 22.51 | 1 | Auto | Human Element | Substation Operations | EUG | 142523 |
06/30/2004 14:09 | 06/30/2004 14:10 | Creswell-Village Green section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 10.13 | 1 | Auto | Human Element | Substation Operations | EUG | 142523 | |
06/30/2004 14:09 | 06/30/2004 14:10 | Goshen-Creswell section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 3.36 | 1 | Auto | Human Element | Substation Operations | EUG | 142523 | |
06/30/2004 15:59 | 06/30/2004 15:59 | Canby tap to Malin-Hilltop No 1 230kV line | 230.0 | T | G | 7.85 | 0 | Auto | Lightning | Lightning | RED | 142524 |
06/30/2004 15:59 | 06/30/2004 15:59 | Canby-Hilltop section of Malin-Hilltop No 1 230kV line | 230.0 | S | G | 18.72 | 0 | Auto | Lightning | Lightning | RED | 142524 |
06/30/2004 15:59 | 06/30/2004 15:59 | Malin-Canby section of Malin-Hilltop No 1 230kV line | 230.0 | S | G | 43.54 | 0 | Auto | Lightning | Lightning | RED | 142524 |
06/30/2004 15:59 | 06/30/2004 15:59 | Malin-Hilltop No 1 230kV line | 230.0 | L | 62.26 | 0 | Auto | Lightning | Lightning | RED | 142524 | |
06/30/2004 16:38 | 06/30/2004 16:41 | Bell-Boundary No 1 230kV line | 230.0 | L | G | 91.66 | 3 | Auto | Lightning | Lightning | SPK | 142525 |
06/30/2004 16:38 | 06/30/2004 16:41 | Bell-Sacheen section of Bell-Boundary No 1 230kV line | 230.0 | S | 31.60 | 3 | Auto | Lightning | Lightning | SPK | 142525 | |
06/30/2004 16:38 | 06/30/2004 16:44 | Sacheen tap to Bell-Boundary No 1 230kV line | 230.0 | T | 0.70 | 6 | Auto | Lightning | Lightning | SPK | 142525 | |
06/30/2004 16:38 | 06/30/2004 16:41 | Sacheen-Boundary section of Bell-Boundary No 1 230kV line | 230.0 | S | 60.06 | 3 | Auto | Lightning | Lightning | SPK | 142525 | |
06/30/2004 17:33 | 06/30/2004 17:33 | Bell-Addy No 1 115kV line | 115.0 | L | 51.18 | 0 | Auto | Lightning | Lightning | SPK | 142526 | |
06/30/2004 17:33 | 06/30/2004 17:33 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | G | 2.95 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | G | 6.27 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Colbert tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Colbert-Half Moon section of Bell-Addy No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.19 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Half Moon tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Half Moon-Tum Tum section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.75 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Loon Lake tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | G | 22.34 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Mead tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.18 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | G | 4.95 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Milan tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 8.22 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.97 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Tum Tum tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 10.50 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:33 | 06/30/2004 17:33 | Tum Tum-Milan section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.72 | 0 | Auto | Lightning | Lightning | SPK | 142526 |
06/30/2004 17:54 | 06/30/2004 17:58 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 4 | Auto | Lightning | WEN SPK | 142527 | ||
06/30/2004 17:54 | 06/30/2004 17:58 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 4 | Auto | Lightning | Lightning | WEN SPK | 142528 | |
06/30/2004 18:16 | 06/30/2004 18:16 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142529 | |
06/30/2004 18:16 | 06/30/2004 18:16 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142529 | |
06/30/2004 18:16 | 06/30/2004 18:16 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142529 | |
06/30/2004 18:16 | 06/30/2004 18:16 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142529 | |
06/30/2004 18:16 | 06/30/2004 18:16 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142529 |
06/30/2004 18:16 | 06/30/2004 18:16 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142529 | |
06/30/2004 18:16 | 06/30/2004 18:16 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142529 | |
06/30/2004 18:16 | 06/30/2004 18:17 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 1 | Auto | Lightning | Lightning | WEN SPK | 142530 | |
06/30/2004 18:23 | 06/30/2004 18:23 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142531 | |
06/30/2004 18:23 | 06/30/2004 18:23 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142531 | |
06/30/2004 18:23 | 06/30/2004 18:23 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142531 | |
06/30/2004 18:23 | 06/30/2004 18:23 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142531 | |
06/30/2004 18:23 | 06/30/2004 18:23 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142531 |
06/30/2004 18:23 | 06/30/2004 18:23 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142531 | |
06/30/2004 18:23 | 06/30/2004 18:23 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142531 | |
06/30/2004 18:24 | 06/30/2004 18:24 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142532 | |
06/30/2004 18:24 | 06/30/2004 18:24 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142532 | |
06/30/2004 18:24 | 06/30/2004 18:24 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142532 | |
06/30/2004 18:24 | 06/30/2004 18:24 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142532 | |
06/30/2004 18:24 | 06/30/2004 18:24 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142532 |
06/30/2004 18:24 | 06/30/2004 18:24 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142532 | |
06/30/2004 18:24 | 06/30/2004 18:24 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142532 | |
06/30/2004 18:33 | 07/01/2004 16:10 | Allston-Astoria No 1 115kV line | 115.0 | L | G | 41.98 | 1297 | Plan | Maintenance | LGV | 142533 | |
06/30/2004 18:33 | 07/01/2004 16:10 | Allston-Delena section of Allston-Astoria No 1 115kV line | 115.0 | S | 3.31 | 1297 | Plan | Maintenance | LGV | 142533 | ||
06/30/2004 19:54 | 06/30/2004 19:56 | B212-Wilbur section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | G | 16.47 | 2 | Auto | Lightning | Lightning | WEN | 142534 |
06/30/2004 19:54 | 06/30/2004 19:56 | Grand Coulee City tap to Grand Coulee-Creston No 1 115kV line | 115.0 | T | G | 0.01 | 2 | Auto | Lightning | Lightning | WEN | 142534 |
06/30/2004 19:54 | 06/30/2004 19:56 | Grand Coulee-B212 section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | G | 1.59 | 2 | Auto | Lightning | Lightning | WEN | 142534 |
06/30/2004 19:54 | 06/30/2004 19:56 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | 28.27 | 2 | Auto | Lightning | Lightning | WEN SPK | 142534 | |
06/30/2004 19:54 | 06/30/2004 19:56 | Wagner Lake tap to Wilbur tap to Grand Coulee-Creston No 1 115kV line | 115.0 | TT | G | 10.63 | 2 | Auto | Lightning | Lightning | WEN | 142534 |
06/30/2004 19:54 | 06/30/2004 19:56 | Wilbur tap to Grand Coulee-Creston No 1 115kV line | 115.0 | T | G | 5.35 | 2 | Auto | Lightning | Lightning | WEN | 142534 |
06/30/2004 19:54 | 06/30/2004 19:56 | Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | G | 10.21 | 2 | Auto | Lightning | Lightning | WEN SPK | 142534 |
06/30/2004 19:54 | 06/30/2004 19:56 | Creston-Bell No 1 115kV line | 115.0 | L | O | 53.80 | 2 | Auto | Lightning | Lightning | WEN SPK | 142535 |
06/30/2004 19:54 | 06/30/2004 19:56 | Creston-Larene section of Creston-Bell No 1 115kV line | 115.0 | S | 16.73 | 2 | Auto | Lightning | Lightning | WEN | 142535 | |
06/30/2004 19:54 | 06/30/2004 19:56 | Larene tap to Creston-Bell No 1 115kV line | 115.0 | T | 0.01 | 2 | Auto | Lightning | Lightning | WEN | 142535 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Athol tap to Pine Street-Rathdrum 115kV line | 115.0 | T | G | 5.82 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Athol-Scarcello section of Pine Street-Rathdrum 115kV line | 115.0 | S | G | 5.60 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Blanchard-Hoodoo section of Pine Street-Rathdrum 115kV line | 115.0 | S | G | 6.50 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Hoodoo-Spirit Lake section of Pine Street-Rathdrum 115kV line | 115.0 | S | G | 6.40 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Pine Street-Blanchard section of Pine Street-Rathdrum 115kV line | 115.0 | S | G | 6.60 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Pine Street-Rathdrum 115kV line | 115.0 | L | 33.20 | 0 | Auto | Foreign Trouble | SPK | 142536 | ||
06/30/2004 21:22 | 06/30/2004 21:22 | Scarcello tap to Pine Street-Rathdrum 115kV line | 115.0 | T | G | 0.04 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Scarcello-Rathdrum section of Pine Street-Rathdrum 115kV line | 115.0 | S | G | 6.10 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:22 | 06/30/2004 21:22 | Spirit Lake-Athol section of Pine Street-Rathdrum 115kV line | 115.0 | S | G | 2.00 | 0 | Auto | Foreign Trouble | SPK | 142536 | |
06/30/2004 21:53 | 06/30/2004 21:53 | Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142537 |
06/30/2004 21:53 | 06/30/2004 21:53 | Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 19.40 | 0 | Auto | Lightning | Lightning | SPK | 142537 |
06/30/2004 21:53 | 06/30/2004 21:53 | Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | L | 52.68 | 0 | Auto | Lightning | Lightning | SPK | 142537 | |
06/30/2004 21:53 | 06/30/2004 21:53 | Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 1.30 | 0 | Auto | Lightning | Lightning | SPK | 142537 |
06/30/2004 21:53 | 06/30/2004 21:53 | Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142537 |
06/30/2004 21:53 | 06/30/2004 21:53 | Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 5.80 | 0 | Auto | Lightning | Lightning | SPK | 142537 |
06/30/2004 22:02 | 06/30/2004 23:24 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 82 | Plan | Maintenance | TDA RED | 142538 | |
06/30/2004 22:02 | 06/30/2004 23:24 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 82 | Plan | Maintenance | TDA | 142538 | |||
06/30/2004 22:02 | 06/30/2004 23:24 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 82 | Plan | Maintenance | TDA | 142538 | |||
06/30/2004 22:02 | 06/30/2004 23:24 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 82 | Plan | Maintenance | TDA | 142538 | |||
06/30/2004 22:02 | 06/30/2004 23:24 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 82 | Plan | Maintenance | TDA | 142538 | |||
07/01/2004 00:42 | 07/01/2004 00:42 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 0 | Auto | Lightning | Lightning | KAL | 142545 | |
07/01/2004 00:42 | 07/01/2004 00:42 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 142546 |
07/01/2004 00:42 | 07/01/2004 00:42 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 142546 |
07/01/2004 00:42 | 07/01/2004 00:42 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 142546 | |
07/01/2004 00:42 | 07/01/2004 00:42 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 142546 |
07/01/2004 00:42 | 07/01/2004 00:42 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142546 |
07/01/2004 00:42 | 07/01/2004 00:42 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 142546 |
07/01/2004 00:42 | 07/01/2004 00:44 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 2 | Auto | RAS Initiated | RAS Initiated | KAL | 142547 | |
07/01/2004 06:02 | 07/01/2004 15:39 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 577 | Plan | Maintenance | TDA RED | 142548 | |
07/01/2004 06:02 | 07/01/2004 15:39 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 577 | Plan | Maintenance | TDA RED | 142548 | ||
07/01/2004 06:20 | 07/01/2004 12:39 | Minidoka PH-Canal section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 12.52 | 379 | Plan | Foreign Request | IDF | 142549 | ||
07/01/2004 06:20 | 07/01/2004 12:39 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | G | 24.91 | 379 | Plan | Foreign Request | IDF | 142549 | |
07/01/2004 06:34 | 07/01/2004 11:32 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 298 | Plan | Maintenance | KAL SPK | 142550 | |
07/01/2004 06:34 | 07/01/2004 11:32 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 298 | Plan | Maintenance | KAL | 142550 | ||
07/01/2004 06:50 | 07/01/2004 15:12 | Palisades-Snake River No 1 115kV line | 115.0 | L | 17.50 | 502 | Plan | Foreign Request | IDF | 142551 | ||
07/01/2004 07:03 | 07/01/2004 14:50 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 467 | Plan | Maintenance | EUG | 142552 | ||
07/01/2004 07:21 | 07/01/2004 14:13 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 412 | Plan | Maintenance | EUG | 142553 | |
07/01/2004 07:21 | 07/01/2004 14:13 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 412 | Plan | Maintenance | EUG | 142553 | ||
07/01/2004 07:47 | 07/01/2004 07:52 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 5 | Auto | Foreign Utility | Foreign Utility | EUG | 142554 | |
07/01/2004 07:58 | 07/01/2004 14:22 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 384 | Plan | Construction | TDA | 142555 | ||
07/01/2004 08:42 | 07/01/2004 15:04 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 382 | Plan | Maintenance | OLY | 142556 | ||
07/01/2004 14:30 | 07/01/2004 14:30 | Roundup-LaGrande No 1 230kV line | 230.0 | L | 45.02 | 0 | Auto | Lightning | Lightning | TRI | 142557 | |
07/01/2004 15:18 | 07/01/2004 15:18 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | 56.45 | 0 | Auto | Lightning | Lightning | KAL | 142558 | |
07/01/2004 15:18 | 07/01/2004 15:18 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 13.50 | 0 | Auto | Lightning | Lightning | KAL | 142558 |
07/01/2004 15:18 | 07/01/2004 15:18 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142558 |
07/01/2004 15:18 | 07/01/2004 15:18 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 42.95 | 0 | Auto | Lightning | Lightning | KAL | 142558 |
07/01/2004 15:18 | 07/01/2004 15:19 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 1 | Auto | RAS Initiated | RAS Initiated | KAL | 142559 | |
07/01/2004 15:30 | 07/01/2004 15:30 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | 56.45 | 0 | Auto | Lightning | Lightning | KAL | 142560 | |
07/01/2004 15:30 | 07/01/2004 15:30 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 13.50 | 0 | Auto | Lightning | Lightning | KAL | 142560 |
07/01/2004 15:30 | 07/01/2004 15:30 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142560 |
07/01/2004 15:30 | 07/01/2004 15:30 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 42.95 | 0 | Auto | Lightning | Lightning | KAL | 142560 |
07/01/2004 15:30 | 07/01/2004 15:31 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 1 | Auto | RAS Initiated | RAS Initiated | KAL | 142561 | |
07/01/2004 15:50 | 07/01/2004 16:46 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 56 | Auto | Foreign Trouble | Foreign Trouble | LGV | 142562 |
07/01/2004 15:50 | 07/01/2004 16:46 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 56 | Auto | Foreign Trouble | Foreign Trouble | LGV | 142562 | |
07/01/2004 15:50 | 07/01/2004 16:47 | Lexington-Longview No 2 230kV line | 230.0 | L | 9.38 | 57 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 142563 | |
07/01/2004 16:48 | 07/01/2004 16:56 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 8 | Plan | Switching | TDA | 142564 | ||
07/01/2004 17:04 | 07/01/2004 17:08 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 4 | Plan | Switching | TDA | 142565 | ||
07/01/2004 17:42 | 07/01/2004 19:37 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 115 | Auto | Foreign Trouble | Foreign Trouble | TDA | 142566 | |
07/01/2004 18:52 | 07/01/2004 18:53 | Rattlesnake-Garrison No 1 230kV line | 230.0 | L | 60.94 | 1 | Auto | Lightning | Lightning | KAL | 142567 | |
07/01/2004 23:49 | 07/02/2004 03:08 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 199 | Auto | Equipment/Miscellaneous | TDA RED | 142568 | |
07/01/2004 23:49 | 07/02/2004 03:08 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 199 | Auto | Equipment/Miscellaneous | TDA | 142568 | |||
07/01/2004 23:49 | 07/02/2004 03:08 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 199 | Auto | Equipment/Miscellaneous | TDA | 142568 | |||
07/01/2004 23:49 | 07/02/2004 03:08 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 199 | Auto | Equipment/Miscellaneous | TDA | 142568 | |||
07/01/2004 23:49 | 07/02/2004 03:08 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 199 | Auto | Equipment/Miscellaneous | TDA | 142568 | |||
07/02/2004 07:07 | 07/02/2004 13:46 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 399 | Plan | Maintenance | EUG | 142575 | |
07/02/2004 07:07 | 07/02/2004 13:46 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 399 | Plan | Maintenance | EUG | 142575 | ||
07/02/2004 08:18 | 07/02/2004 14:10 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 352 | Plan | Maintenance | OLY | 142576 | ||
07/02/2004 12:24 | 07/02/2004 12:24 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | 56.45 | 0 | Auto | Lightning | Lightning | KAL | 142577 | |
07/02/2004 12:24 | 07/02/2004 12:24 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 13.50 | 0 | Auto | Lightning | Lightning | KAL | 142577 |
07/02/2004 12:24 | 07/02/2004 12:24 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142577 |
07/02/2004 12:24 | 07/02/2004 12:24 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 42.95 | 0 | Auto | Lightning | Lightning | KAL | 142577 |
07/02/2004 12:24 | 07/02/2004 12:27 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 3 | Auto | RAS Initiated | RAS Initiated | KAL | 142578 | |
07/02/2004 12:41 | 07/02/2004 12:41 | Lost River-Spar Canyon No 1 230kV line | 230.0 | L | 53.19 | 0 | Auto | Lightning | Lightning | IDF | 142579 | |
07/02/2004 23:14 | 07/03/2004 04:18 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 304 | Plan | Voltage Control | TRI TDA RED SAL | 142580 | ||
07/03/2004 04:15 | 07/03/2004 09:26 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 311 | Plan | Voltage Control | SAL EUG | 142581 | ||
07/03/2004 04:19 | 07/05/2004 09:14 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 3175 | Plan | Voltage Control | TDA RED SAL | 142582 | ||
07/03/2004 12:45 | 07/03/2004 12:51 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 6 | Plan | Foreign Request | TDA | 142593 | ||
07/03/2004 13:20 | 07/03/2004 14:05 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 45 | Auto | Foreign Trouble | Foreign Trouble | TDA | 142594 | |
07/03/2004 14:09 | 07/03/2004 14:22 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 13 | Auto | Foreign Trouble | Foreign Trouble | TDA | 142595 | |
07/03/2004 15:57 | 07/03/2004 15:57 | Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142596 |
07/03/2004 15:57 | 07/03/2004 15:57 | Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 19.40 | 0 | Auto | Lightning | Lightning | SPK | 142596 |
07/03/2004 15:57 | 07/03/2004 15:57 | Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | L | 52.68 | 0 | Auto | Lightning | Lightning | SPK | 142596 | |
07/03/2004 15:57 | 07/03/2004 15:57 | Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 1.30 | 0 | Auto | Lightning | Lightning | SPK | 142596 |
07/03/2004 15:57 | 07/03/2004 15:57 | Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142596 |
07/03/2004 15:57 | 07/03/2004 15:57 | Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 5.80 | 0 | Auto | Lightning | Lightning | SPK | 142596 |
07/03/2004 16:48 | 07/03/2004 16:48 | Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142597 |
07/03/2004 16:48 | 07/03/2004 16:48 | Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 19.40 | 0 | Auto | Lightning | Lightning | SPK | 142597 |
07/03/2004 16:48 | 07/03/2004 16:48 | Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | L | 52.68 | 0 | Auto | Lightning | Lightning | SPK | 142597 | |
07/03/2004 16:48 | 07/03/2004 16:48 | Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 1.30 | 0 | Auto | Lightning | Lightning | SPK | 142597 |
07/03/2004 16:48 | 07/03/2004 16:48 | Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142597 |
07/03/2004 16:48 | 07/03/2004 16:48 | Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 5.80 | 0 | Auto | Lightning | Lightning | SPK | 142597 |
07/04/2004 00:22 | 07/05/2004 13:05 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 2203 | Plan | Foreign Request | OLY | 142598 | ||
07/04/2004 01:52 | 07/04/2004 10:16 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 504 | Plan | Voltage Control | SAL EUG | 142599 | ||
07/04/2004 11:01 | 07/04/2004 11:01 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 142615 |
07/04/2004 11:01 | 07/04/2004 11:01 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 142615 |
07/04/2004 11:01 | 07/04/2004 11:01 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 142615 |
07/04/2004 11:01 | 07/04/2004 11:01 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 142615 | |
07/04/2004 11:01 | 07/04/2004 11:01 | Bell-Addy No 1 115kV line | 115.0 | L | 51.18 | 0 | Auto | Lightning | Lightning | SPK | 142616 | |
07/04/2004 11:01 | 07/04/2004 11:01 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | G | 2.95 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | G | 6.27 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Colbert tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Colbert-Half Moon section of Bell-Addy No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.19 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Half Moon tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Half Moon-Tum Tum section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.75 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Loon Lake tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | G | 22.34 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Mead tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 0.18 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | G | 4.95 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Milan tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 8.22 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | G | 1.97 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Tum Tum tap to Bell-Addy No 1 115kV line | 115.0 | T | G | 10.50 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:01 | 07/04/2004 11:01 | Tum Tum-Milan section of Bell-Addy No 1 115kV line | 115.0 | S | G | 5.72 | 0 | Auto | Lightning | Lightning | SPK | 142616 |
07/04/2004 11:02 | 07/04/2004 11:02 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 142617 | |
07/04/2004 11:38 | 07/06/2004 19:03 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 3325 | Plan | Foreign Request | SPK | 142618 | ||
07/04/2004 12:34 | 07/04/2004 12:34 | Noxon AVA-Hot Springs No 2 230kV line | 230.0 | L | 70.00 | 0 | Auto | Lightning | Lightning | KAL | 142619 | |
07/04/2004 16:11 | 07/04/2004 16:11 | Box Canyon tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 2.39 | 0 | Auto | Lightning | Lightning | SPK | 142620 |
07/04/2004 16:11 | 07/04/2004 16:11 | Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 4.75 | 0 | Auto | Lightning | Lightning | SPK | 142620 |
07/04/2004 16:11 | 07/04/2004 16:11 | Colville-Boundary No 1 115kV line | 115.0 | L | O | 43.06 | 0 | Auto | Lightning | Lightning | SPK | 142620 |
07/04/2004 16:11 | 07/04/2004 16:11 | Colville-Spirit section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 17.42 | 0 | Auto | Lightning | Lightning | SPK | 142620 |
07/04/2004 16:11 | 07/04/2004 16:11 | Metaline Falls tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 1.20 | 0 | Auto | Lightning | Lightning | SPK | 142620 |
07/04/2004 16:11 | 07/04/2004 16:11 | Spirit tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 5.23 | 0 | Auto | Lightning | Lightning | SPK | 142620 |
07/04/2004 16:11 | 07/04/2004 16:11 | Spirit-Box Canyon section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 11.98 | 0 | Auto | Lightning | Lightning | SPK | 142620 |
07/04/2004 16:12 | 07/04/2004 16:12 | Addy-AVA Kettle Falls No 1 115kV line | 115.0 | L | 27.10 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 142621 | |
07/04/2004 20:08 | 07/04/2004 20:16 | Alvey-Dixonville No 1 230kV line | 230.0 | L | 59.40 | 8 | Auto | Improper Relaying | Improper Relaying | EUG | 142622 | |
07/04/2004 20:08 | 07/05/2004 12:29 | Alvey-Diamond Hill No 3 230kV line | 230.0 | L | G | 20.30 | 981 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142623 |
07/04/2004 20:08 | 07/05/2004 00:06 | Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line | 230.0 | S | 9.60 | 238 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142623 | |
07/04/2004 20:08 | 07/05/2004 12:29 | McKenzie-Diamond Hill section of Alvey-Diamond Hill No 3 230kV line | 230.0 | S | 10.70 | 981 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142623 | |
07/04/2004 22:32 | 07/05/2004 08:25 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 593 | Plan | Voltage Control | SAL EUG | 142624 | ||
07/05/2004 12:14 | 07/05/2004 12:29 | Alvey-Diamond Hill No 3 230kV line | 230.0 | L | O | 20.30 | 15 | Plan | Foreign Request | EUG | 142625 | |
07/05/2004 12:14 | 07/05/2004 12:29 | Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line | 230.0 | S | 9.60 | 15 | Plan | Foreign Request | EUG | 142625 | ||
07/06/2004 01:08 | 07/06/2004 06:22 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 314 | Plan | Voltage Control | SAL EUG | 142626 | ||
07/06/2004 06:57 | 07/29/2004 15:05 | Snohomish-Beverly Park No 3 115kV line | 115.0 | L | 4.59 | 33608 | Plan | Foreign Request | SNO | 142630 | ||
07/06/2004 06:58 | 07/30/2004 11:51 | Snohomish-Beverly Park No 4 115kV line | 115.0 | L | 5.00 | 34853 | Plan | Foreign Request | SNO | 142631 | ||
07/06/2004 07:52 | 07/09/2004 08:33 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 4361 | Plan | Maintenance | LGV OLY | 142632 | |
07/06/2004 07:52 | 07/09/2004 08:33 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | 3.28 | 4361 | Plan | Maintenance | OLY LGV | 142632 | ||
07/06/2004 07:59 | 07/06/2004 18:07 | Bellingham PSE-Whatcom No 1 115kV line | 115.0 | L | 20.60 | 608 | Plan | Foreign Request | SNO | 142633 | ||
07/06/2004 08:01 | 07/09/2004 16:35 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4834 | Plan | Maintenance | IDF | 142634 | ||
07/06/2004 08:13 | 07/06/2004 09:01 | Carrolls-Cardwell section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 3.60 | 48 | Plan | Foreign Request | OLY | 142635 | ||
07/06/2004 08:13 | 07/06/2004 09:12 | Lexington-Cardwell No 1 115kV line | 115.0 | L | G | 11.60 | 59 | Plan | Foreign Request | LGV OLY | 142635 | |
07/06/2004 08:13 | 07/06/2004 09:12 | South Kelso-Carrolls section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 3.50 | 59 | Plan | Foreign Request | OLY | 142635 | ||
07/06/2004 08:25 | 07/06/2004 15:27 | Redmond-Pilot Butte PACW No 1 230kV line | 230.0 | L | 15.12 | 422 | Plan | Maintenance | RED | 142636 | ||
07/06/2004 08:58 | 07/06/2004 14:21 | Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line | 115.0 | S | 28.59 | 323 | Plan | Foreign Request | KAL | 142637 | ||
07/06/2004 08:58 | 07/06/2004 14:21 | Kalispell-Kerr No 1 115kV line | 115.0 | L | G | 41.39 | 323 | Plan | Foreign Request | KAL | 142637 | |
07/06/2004 09:55 | 07/11/2004 10:13 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 7218 | Plan | Maintenance | COV | 142638 | ||
07/06/2004 10:53 | 07/06/2004 17:38 | Hat Rock-PACW Wallula section of McNary-Wallula 230kV line | 230.0 | S | 18.00 | 405 | Plan | Foreign Request | TRI | 142639 | ||
07/06/2004 10:53 | 07/06/2004 17:38 | McNary-Wallula 230kV line | 230.0 | L | G | 30.70 | 405 | Plan | Foreign Request | TRI | 142639 | |
07/06/2004 21:22 | 07/08/2004 10:25 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 2223 | Plan | Foreign Request | OLY | 142640 | ||
07/06/2004 21:22 | 07/08/2004 10:25 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 2223 | Plan | Foreign Request | OLY | 142640 | |
07/07/2004 02:49 | 07/07/2004 05:47 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 178 | Plan | Voltage Control | SAL EUG | 142645 | ||
07/07/2004 05:59 | 07/11/2004 03:58 | Elmo-Kerr section of Kalispell-Kerr No 1 115kV line | 115.0 | S | 12.80 | 5639 | Plan | Construction | KAL | 142646 | ||
07/07/2004 05:59 | 07/11/2004 03:58 | Kalispell-Kerr No 1 115kV line | 115.0 | L | G | 41.39 | 5639 | Plan | Construction | KAL | 142646 | |
07/07/2004 07:19 | 07/07/2004 14:36 | Albany-Burnt Woods No 1 115kV line | 115.0 | L | 25.77 | 437 | Plan | Maintenance | EUG | 142647 | ||
07/07/2004 07:35 | 07/07/2004 08:53 | Benton-Franklin No 2 115kV line | 115.0 | L | G | 21.03 | 78 | Plan | Maintenance | TRI | 142648 | |
07/07/2004 07:35 | 07/07/2004 08:53 | Benton-Glade section of Benton-Franklin No 2 115kV line | 115.0 | S | 11.94 | 78 | Plan | Maintenance | TRI | 142648 | ||
07/07/2004 07:37 | 07/07/2004 16:39 | Redmond-Pilot Butte PACW No 1 230kV line | 230.0 | L | 15.12 | 542 | Plan | Maintenance | RED | 142649 | ||
07/07/2004 07:38 | 07/07/2004 17:58 | Bell-AVA Beacon No 4 230kV line | 230.0 | L | 5.90 | 620 | Plan | Maintenance | SPK | 142650 | ||
07/07/2004 07:43 | 07/07/2004 08:32 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 4.29 | 49 | Plan | Maintenance | TRI | 142651 | ||
07/07/2004 07:43 | 07/07/2004 08:32 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 49 | Plan | Maintenance | TRI | 142651 | |
07/07/2004 07:57 | 07/07/2004 15:31 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 454 | Plan | Construction | SPK | 142652 | |
07/07/2004 07:57 | 07/07/2004 15:31 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 454 | Plan | Construction | SPK | 142652 | ||
07/07/2004 08:09 | 07/07/2004 08:27 | Walla Walla-PACW Walla Walla No 1 69kV line | 69.0 | L | 1.40 | 18 | Plan | Load Control | TRI | 142653 | ||
07/07/2004 09:03 | Ely-Highland section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.98 | still out | Plan | Normally Out | TRI | 142654 | |||
07/07/2004 09:03 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | G | 13.35 | still out | Plan | Normally Out | TRI | 142654 | ||
07/07/2004 09:38 | 07/07/2004 09:49 | The Dalles PH-Big Eddy No 1 115kV line | 115.0 | L | 0.81 | 11 | Plan | Foreign Request | TDA | 142655 | ||
07/07/2004 13:07 | 07/07/2004 13:10 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 3 | Auto | Foreign Trouble | Foreign Trouble | EUG | 142656 | |
07/08/2004 01:19 | 07/08/2004 06:37 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 318 | Plan | Voltage Control | SAL EUG | 142657 | ||
07/08/2004 04:40 | 07/08/2004 04:40 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Unknown | TDA RED | 142658 | ||
07/08/2004 04:40 | 07/08/2004 04:40 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142658 | ||
07/08/2004 04:40 | 07/08/2004 04:40 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142658 | ||
07/08/2004 04:40 | 07/08/2004 04:40 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142658 | ||
07/08/2004 04:40 | 07/08/2004 04:40 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 142658 | ||
07/08/2004 06:30 | 07/08/2004 14:30 | Olympia-PSE No 2 115kV line | 115.0 | L | 2.40 | 480 | Plan | Maintenance | OLY | 142674 | ||
07/08/2004 07:17 | 07/08/2004 10:13 | Riverton-Heyburn section of West Burley-Heyburn No 1 138kV line | 138.0 | S | 0.62 | 176 | Plan | Maintenance | IDF | 142675 | ||
07/08/2004 07:17 | 07/08/2004 10:13 | West Burley-Heyburn No 1 138kV line | 138.0 | L | G | 4.43 | 176 | Plan | Maintenance | IDF | 142675 | |
07/08/2004 07:25 | 07/08/2004 15:21 | Bell-Bigelow section of Bell-Trentwood No 2 115kV line | 115.0 | S | 6.60 | 476 | Plan | Construction | SPK | 142676 | ||
07/08/2004 07:25 | 07/08/2004 15:21 | Bell-Trentwood No 2 115kV line | 115.0 | L | G | 11.30 | 476 | Plan | Construction | SPK | 142676 | |
07/08/2004 07:31 | 07/08/2004 15:51 | Redmond-Pilot Butte PACW No 1 230kV line | 230.0 | L | 15.12 | 500 | Plan | Maintenance | RED | 142677 | ||
07/08/2004 08:05 | 07/08/2004 14:41 | Keeler-Oregon City No 2 115kV line | 115.0 | L | 21.43 | 396 | Plan | Maintenance | SAL LGV | 142678 | ||
07/08/2004 08:14 | 07/08/2004 14:51 | Midway-Moxee No 1 115kV line | 115.0 | L | G | 33.98 | 397 | Plan | Maintenance | TRI WEN | 142679 | |
07/08/2004 08:14 | 07/08/2004 14:51 | Midway-Rattlesnake section of Midway-Moxee No 1 115kV line | 115.0 | S | 16.61 | 397 | Plan | Maintenance | TRI WEN | 142679 | ||
07/08/2004 08:42 | 07/09/2004 11:03 | Bell-AVA Beacon No 4 230kV line | 230.0 | L | 5.90 | 1581 | Plan | Maintenance | SPK | 142680 | ||
07/08/2004 08:52 | 07/08/2004 13:08 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 256 | Plan | Maintenance | TRI | 142681 | |
07/08/2004 08:52 | 07/08/2004 13:08 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 53.10 | 256 | Plan | Maintenance | TRI | 142681 | ||
07/08/2004 08:59 | 07/08/2004 12:58 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 239 | Plan | Maintenance | TRI | 142682 | |
07/08/2004 08:59 | 07/08/2004 12:58 | Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 18.21 | 239 | Plan | Maintenance | TRI | 142682 | ||
07/08/2004 09:33 | 07/08/2004 14:00 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 267 | Plan | Foreign Request | WEN TRI | 142683 | ||
07/08/2004 09:49 | 10/12/2004 09:29 | Cowlitz-LaGrande No 1,2 115kV lines | 115.0 | L | T | 25.69 | 138220 | Plan | Normally Out | COV | 142684 | |
07/08/2004 09:49 | 10/12/2004 09:29 | McCullough tap to Cowlitz-LaGrande No 1,2 115kV lines | 115.0 | T | 2.18 | 138220 | Plan | Normally Out | COV | 142684 | ||
07/08/2004 10:20 | 07/08/2004 13:54 | Heyburn-Adelaide No 1 138kV line | 138.0 | L | G | 12.35 | 214 | Plan | Maintenance | IDF | 142685 | |
07/08/2004 10:20 | 07/08/2004 13:54 | Heyburn-Hay Mill section of Heyburn-Adelaide No 1 138kV line | 138.0 | S | 4.51 | 214 | Plan | Maintenance | IDF | 142685 | ||
07/08/2004 11:20 | 07/08/2004 12:32 | Fairview-Bandon No 1 115kV line | 115.0 | L | G | 25.16 | 72 | Plan | Foreign Request | EUG | 142686 | |
07/08/2004 11:20 | 07/08/2004 12:32 | Morrison-Bandon section of Fairview-Bandon No 1 115kV line | 115.0 | S | 2.31 | 72 | Plan | Foreign Request | EUG | 142686 | ||
07/08/2004 13:20 | 07/08/2004 14:29 | Dayton-Shelton section of Olympia-Shelton No 1 115kV line | 115.0 | S | 1.78 | 69 | Auto | Tree cut | Tree cut | OLY | 142687 | |
07/08/2004 13:20 | 07/15/2004 07:32 | Olympia-Dayton section of Olympia-Shelton No 1 115kV line | 115.0 | S | 17.95 | 9732 | Auto | Tree cut | Tree cut | OLY | 142687 | |
07/08/2004 13:20 | 07/15/2004 07:32 | Olympia-Shelton No 1 115kV line | 115.0 | L | G | 19.73 | 9732 | Auto | Tree cut | Tree cut | OLY | 142687 |
07/08/2004 14:14 | 12/13/2004 09:33 | West Burley-Burley section of West Burley-Heyburn No 1 138kV line | 138.0 | S | 2.22 | 227299 | Plan | Normally Out | IDF | 142688 | ||
07/08/2004 14:14 | 12/13/2004 09:33 | West Burley-Heyburn No 1 138kV line | 138.0 | L | G | 4.43 | 227299 | Plan | Normally Out | IDF | 142688 | |
07/08/2004 19:56 | 07/09/2004 10:57 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 901 | Auto | Malicious | Malicious | EUG | 142689 | |
07/09/2004 01:07 | 07/09/2004 06:01 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 294 | Plan | Voltage Control | SAL EUG | 142690 | ||
07/09/2004 04:11 | 07/12/2004 20:41 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 5310 | Plan | Switching | TDA | 142691 | ||
07/09/2004 04:11 | 07/12/2004 20:41 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 5310 | Plan | Switching | TDA | 142692 | ||
07/09/2004 04:30 | 07/09/2004 04:30 | Eagle Lake tap to Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TT | G | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Eagle Lake-Radar section of Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TS | G | 1.92 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Midway-Benton No 1 115kV line | 115.0 | L | 28.75 | 0 | Auto | Unknown | Unknown | TRI | 142693 | |
07/09/2004 04:30 | 07/09/2004 04:30 | Midway-Scooteney section of Midway-Benton No 1 115kV line | 115.0 | S | G | 13.90 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Radar USBR tap to Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TT | G | 1.94 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Radar-Scooteney section of Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TS | G | 7.25 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Sagehill tap to Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TT | G | 3.20 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Sagehill-Eagle Lake section of Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TS | G | 4.24 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | T | G | 28.46 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Scooteney tap-Sagehill section of Scooteney tap to Midway-Benton No 1 115kV line | 115.0 | TS | G | 15.05 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 04:30 | 07/09/2004 04:30 | Scooteney-Benton section of Midway-Benton No 1 115kV line | 115.0 | S | G | 14.85 | 0 | Auto | Unknown | Unknown | TRI | 142693 |
07/09/2004 05:00 | 07/12/2004 20:43 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 5263 | Plan | Foreign Request | TDA RED | 142694 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142694 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142694 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142694 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142694 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142694 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 5263 | Plan | Foreign Request | TDA RED | 142695 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142695 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142695 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142695 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142695 | ||
07/09/2004 05:00 | 07/12/2004 20:43 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5263 | Plan | Foreign Request | TDA | 142695 | ||
07/09/2004 05:01 | 07/12/2004 19:14 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5173 | Plan | Switching | TDA | 142696 | ||
07/09/2004 05:01 | 07/12/2004 19:14 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 5173 | Plan | Switching | TDA | 142697 | ||
07/09/2004 07:42 | 07/09/2004 10:56 | Chief Joseph-Snohomish No 3 345kV line | 345.0 | L | 133.05 | 194 | Plan | Switching | WEN SNO | 142702 | ||
07/09/2004 07:46 | 07/09/2004 14:37 | Keeler-Oregon City No 2 115kV line | 115.0 | L | 21.43 | 411 | Plan | Maintenance | SAL LGV | 142703 | ||
07/09/2004 08:09 | 07/09/2004 12:53 | Ross-Alcoa No 2&4 115kV line | 115.0 | L | 8.23 | 284 | Plan | Maintenance | LGV | 142704 | ||
07/09/2004 08:34 | 07/09/2004 14:33 | Chandler tap to Grandview-Red Mountain No 1 115kV line | 115.0 | T | 2.87 | 359 | Plan | Maintenance | WEN | 142705 | ||
07/09/2004 08:34 | 07/09/2004 14:33 | Chandler-Benton City section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 4.86 | 359 | Plan | Maintenance | WEN | 142705 | ||
07/09/2004 08:34 | 07/09/2004 14:33 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 359 | Plan | Maintenance | TRI WEN | 142705 | |
07/09/2004 08:34 | 07/09/2004 14:33 | Snipes-Chandler section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 3.16 | 359 | Plan | Maintenance | WEN | 142705 | ||
07/09/2004 13:48 | 07/09/2004 14:48 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 60 | Plan | Testing | LGV | 142706 | ||
07/10/2004 02:22 | 07/10/2004 09:01 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 399 | Plan | Voltage Control | SAL EUG | 142707 | ||
07/10/2004 06:04 | 07/10/2004 07:09 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 65 | Plan | Voltage Control | TDA RED SAL | 142715 | ||
07/10/2004 12:16 | 07/10/2004 12:26 | Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 10 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line | 115.0 | T | 0.10 | 10 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 10.90 | 10 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 2.50 | 10 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 11.60 | 10 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 12:16 | 07/10/2004 19:58 | Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 12.80 | 462 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 12:16 | 07/10/2004 12:26 | Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 10 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 12:16 | 07/10/2004 19:58 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | G | 57.70 | 462 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 |
07/10/2004 12:16 | 07/10/2004 19:57 | Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 2.70 | 461 | Auto | Foreign Trouble | Foreign Trouble | SAL | 142716 | |
07/10/2004 23:16 | 07/11/2004 06:42 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 446 | Auto | Foreign Trouble | Foreign Trouble | WEN TRI | 142717 | |
07/10/2004 23:38 | 07/11/2004 13:06 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 808 | Plan | Voltage Control | SAL EUG | 142718 | ||
07/11/2004 01:30 | 07/11/2004 03:51 | Elmo tap to Kalispell-Kerr No 1 115kV line | 115.0 | T | 0.10 | 141 | Plan | Construction | KAL | 142719 | ||
07/11/2004 01:30 | 07/11/2004 03:51 | Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line | 115.0 | S | 28.59 | 141 | Plan | Construction | KAL | 142719 | ||
07/11/2004 01:30 | 07/11/2004 03:51 | Kalispell-Kerr No 1 115kV line | 115.0 | L | O | 41.39 | 141 | Plan | Construction | KAL | 142719 | |
07/11/2004 02:26 | 07/11/2004 09:26 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 420 | Plan | Voltage Control | TDA RED SAL | 142720 | ||
07/11/2004 19:15 | 07/11/2004 21:07 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 112 | Plan | Foreign Request | WEN TRI | 142721 | ||
07/12/2004 00:34 | 07/12/2004 06:02 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 328 | Plan | Voltage Control | SAL EUG | 142722 | ||
07/12/2004 07:35 | 07/12/2004 15:25 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 470 | Plan | Foreign Request | RED | 142730 | ||
07/12/2004 07:57 | 07/16/2004 13:59 | Grand Coulee-Chief Joseph No 2 230kV line | 230.0 | L | 32.59 | 6122 | Plan | Maintenance | WEN | 142731 | ||
07/12/2004 08:10 | 07/12/2004 21:21 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | 23.98 | 791 | Plan | Maintenance | TDA | 142732 | ||
07/12/2004 08:10 | 07/12/2004 21:21 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 23.97 | 791 | Plan | Maintenance | TDA | 142732 | |
07/12/2004 08:10 | 07/12/2004 21:21 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | 9.25 | 791 | Plan | Maintenance | TDA | 142732 | ||
07/12/2004 08:10 | 07/12/2004 21:21 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 0.01 | 791 | Plan | Maintenance | TDA | 142732 | |
07/12/2004 08:12 | 07/15/2004 13:39 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 24.00 | 4647 | Plan | Maintenance | TRI | 142733 | ||
07/12/2004 08:12 | 07/15/2004 13:39 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 4647 | Plan | Maintenance | TRI | 142733 | |
07/12/2004 09:04 | 07/15/2004 09:28 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 4344 | Plan | Maintenance | SAL | 142734 | ||
07/12/2004 09:13 | 07/16/2004 11:34 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5901 | Plan | Maintenance | IDF | 142735 | ||
07/12/2004 09:49 | 07/12/2004 13:15 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 206 | Plan | Maintenance | OLY | 142736 | |
07/12/2004 09:49 | 07/12/2004 13:15 | Skookum-Shelton section of Olympia-Shelton No 2 115kV line | 115.0 | S | 6.96 | 206 | Plan | Maintenance | OLY | 142736 | ||
07/12/2004 13:12 | 07/12/2004 13:15 | Olympia-Shelton No 2 115kV line | 115.0 | L | O | 19.73 | 3 | Plan | Emergency | OLY | 142737 | |
07/12/2004 13:12 | 07/12/2004 13:15 | Olympia-Skookum section of Olympia-Shelton No 2 115kV line | 115.0 | S | 12.77 | 3 | Plan | Emergency | OLY | 142737 | ||
07/12/2004 14:23 | 07/12/2004 14:33 | Longview-Allston No 4 115kV line | 115.0 | L | G | 4.64 | 10 | Auto | Construction | Construction | LGV | 142738 |
07/12/2004 14:23 | 07/12/2004 14:33 | Longview-Donald Nys section of Longview-Allston No 4 115kV line | 115.0 | S | 3.63 | 10 | Auto | Construction | Construction | LGV | 142738 | |
07/12/2004 14:23 | 07/12/2004 14:33 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 10 | Auto | Construction | Construction | LGV | 142739 | |
07/12/2004 14:23 | 07/12/2004 14:33 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 10 | Auto | Construction | Construction | LGV OLY | 142740 |
07/12/2004 14:23 | 07/12/2004 14:33 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | 3.28 | 10 | Auto | Construction | Construction | OLY LGV | 142740 | |
07/12/2004 20:59 | 07/19/2004 21:17 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 10098 | Auto | Terminal Equipment Failure | TDA RED | 142741 | |
07/12/2004 20:59 | 07/19/2004 21:17 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 10098 | Auto | Terminal Equipment Failure | TDA | 142741 | |||
07/13/2004 01:06 | 07/13/2004 06:19 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 313 | Plan | Voltage Control | SAL EUG | 142742 | ||
07/13/2004 03:26 | 07/13/2004 03:26 | Blue River tap to Cougar-Thurston No 1 115kV line | 115.0 | T | G | 0.32 | 0 | Auto | Lightning | Lightning | EUG | 142743 |
07/13/2004 03:26 | 07/13/2004 03:26 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | G | 34.24 | 0 | Auto | Lightning | Lightning | EUG | 142743 |
07/13/2004 03:26 | 07/13/2004 03:26 | Carmen Smith tap to Cougar-Thurston No 1 115kV line | 115.0 | T | G | 18.00 | 0 | Auto | Lightning | Lightning | EUG | 142743 |
07/13/2004 03:26 | 07/13/2004 03:26 | Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line | 115.0 | S | G | 3.63 | 0 | Auto | Lightning | Lightning | EUG | 142743 |
07/13/2004 03:26 | 07/13/2004 03:26 | Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line | 115.0 | S | G | 2.12 | 0 | Auto | Lightning | Lightning | EUG | 142743 |
07/13/2004 03:26 | 07/13/2004 03:26 | Cougar-Thurston No 1 115kV line | 115.0 | L | 39.99 | 0 | Auto | Lightning | Lightning | EUG | 142743 | |
07/13/2004 07:02 | 07/13/2004 16:51 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 589 | Plan | Maintenance | EUG | 142747 | ||
07/13/2004 07:54 | 07/13/2004 10:32 | Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 18.35 | 158 | Plan | Emergency | OLY | 142748 | ||
07/13/2004 07:54 | 07/13/2004 10:32 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 158 | Plan | Emergency | OLY | 142748 | |
07/13/2004 08:28 | 07/13/2004 17:08 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 520 | Plan | Foreign Request | RED | 142749 | ||
07/13/2004 09:00 | 07/13/2004 12:15 | Baleville tap to Raymond-Willapa River No 1 115kV line | 115.0 | T | 4.75 | 195 | Plan | Maintenance | OLY | 142750 | ||
07/13/2004 09:00 | 07/13/2004 12:15 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 195 | Plan | Maintenance | OLY LGV | 142750 | |
07/13/2004 09:00 | 07/13/2004 12:15 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 195 | Plan | Maintenance | OLY | 142750 | |
07/13/2004 09:00 | 07/13/2004 12:15 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 195 | Plan | Maintenance | OLY | 142750 | ||
07/13/2004 09:08 | 07/13/2004 16:51 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 463 | Plan | Switching | TDA | 142751 | ||
07/13/2004 10:29 | 07/13/2004 11:57 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 88 | Plan | Foreign Request | TDA | 142752 | ||
07/13/2004 10:33 | 07/13/2004 14:29 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | 23.98 | 236 | Plan | Maintenance | TDA | 142753 | ||
07/13/2004 10:33 | 07/13/2004 14:29 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 23.97 | 236 | Plan | Maintenance | TDA | 142753 | |
07/13/2004 10:33 | 07/13/2004 14:29 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | G | 9.25 | 236 | Plan | Maintenance | TDA | 142753 | |
07/13/2004 10:33 | 07/13/2004 14:29 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 0.01 | 236 | Plan | Maintenance | TDA | 142753 | |
07/13/2004 16:00 | 07/13/2004 16:00 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 0 | Auto | Lightning | Lightning | IDF | 142754 | |
07/13/2004 16:14 | 07/13/2004 16:14 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 0 | Auto | Lightning | Lightning | IDF | 142755 | |
07/14/2004 01:03 | 07/14/2004 06:11 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 308 | Plan | Voltage Control | SAL EUG | 142756 | ||
07/14/2004 07:00 | 07/15/2004 17:48 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 2088 | Plan | Maintenance | TDA RED | 142759 | |
07/14/2004 07:00 | 07/15/2004 17:48 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2088 | Plan | Maintenance | TDA | 142759 | |||
07/14/2004 07:00 | 07/15/2004 17:48 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 2088 | Plan | Maintenance | TDA RED | 142760 | |
07/14/2004 07:00 | 07/15/2004 17:48 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2088 | Plan | Maintenance | TDA | 142760 | |||
07/14/2004 07:01 | 07/15/2004 17:45 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 2084 | Plan | Switching | TDA | 142761 | ||
07/14/2004 07:01 | 07/15/2004 17:46 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 2085 | Plan | Switching | TDA | 142762 | ||
07/14/2004 07:05 | 07/14/2004 15:04 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 479 | Plan | Maintenance | EUG | 142763 | ||
07/14/2004 07:58 | 07/14/2004 15:01 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | G | 23.98 | 423 | Plan | Maintenance | TDA | 142764 | |
07/14/2004 07:58 | 07/14/2004 15:01 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | 23.97 | 423 | Plan | Maintenance | TDA | 142764 | ||
07/14/2004 07:58 | 07/14/2004 15:01 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | 9.25 | 423 | Plan | Maintenance | TDA | 142764 | ||
07/14/2004 07:58 | 07/14/2004 15:01 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | 0.01 | 423 | Plan | Maintenance | TDA | 142764 | ||
07/14/2004 08:02 | 07/14/2004 14:34 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 392 | Plan | Maintenance | LGV | 142765 | |
07/14/2004 08:02 | 07/14/2004 14:34 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 392 | Plan | Maintenance | LGV | 142765 | ||
07/14/2004 08:49 | 07/14/2004 14:59 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 370 | Plan | Maintenance | EUG | 142766 | ||
07/14/2004 08:49 | 07/14/2004 14:59 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 370 | Plan | Maintenance | EUG | 142766 | |
07/14/2004 09:00 | 07/15/2004 14:25 | John Day PH-John Day No 4 500kV line | 500.0 | L | 3.48 | 1765 | Plan | Foreign Request | TDA | 142767 | ||
07/15/2004 01:18 | 07/15/2004 06:16 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 298 | Plan | Voltage Control | TRI TDA RED SAL | 142768 | ||
07/15/2004 01:21 | 07/15/2004 06:46 | Schultz-Raver No 1 500kV line | 500.0 | L | 77.24 | 325 | Plan | Voltage Control | WEN COV | 142769 | ||
07/15/2004 01:44 | 07/15/2004 01:44 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | 56.45 | 0 | Auto | Lightning | Lightning | KAL | 142770 | |
07/15/2004 01:44 | 07/15/2004 01:44 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 13.50 | 0 | Auto | Lightning | Lightning | KAL | 142770 |
07/15/2004 01:44 | 07/15/2004 01:44 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142770 |
07/15/2004 01:44 | 07/15/2004 01:44 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 42.95 | 0 | Auto | Lightning | Lightning | KAL | 142770 |
07/15/2004 01:44 | 07/15/2004 01:46 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 2 | Auto | RAS Initiated | RAS Initiated | KAL | 142771 | |
07/15/2004 07:00 | 07/15/2004 15:31 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 511 | Plan | Maintenance | EUG | 142775 | ||
07/15/2004 07:07 | 07/15/2004 14:18 | Creston-Bell No 1 115kV line | 115.0 | L | T | 53.80 | 431 | Plan | Maintenance | WEN SPK | 142795 | |
07/15/2004 07:07 | 07/15/2004 14:18 | Springhill tap to Creston-Bell No 1 115kV line | 115.0 | T | 0.01 | 431 | Plan | Maintenance | SPK | 142795 | ||
07/15/2004 07:38 | 07/15/2004 17:01 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 563 | Plan | Foreign Request | RED | 142776 | ||
07/15/2004 07:42 | 07/15/2004 16:21 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 519 | Plan | Maintenance | OLY | 142777 | |
07/15/2004 07:42 | 07/15/2004 16:21 | Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 20.20 | 519 | Plan | Maintenance | OLY | 142777 | ||
07/15/2004 07:54 | 07/15/2004 14:35 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 401 | Plan | Maintenance | LGV | 142778 | |
07/15/2004 07:54 | 07/15/2004 14:35 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 401 | Plan | Maintenance | LGV | 142778 | ||
07/15/2004 08:48 | 07/15/2004 13:31 | Walla Walla-Freewater No 1 69kV line | 69.0 | L | G | 11.74 | 283 | Plan | Maintenance | TRI | 142779 | |
07/15/2004 08:48 | 07/15/2004 13:31 | Whitman-Freewater section of Walla Walla-Freewater No 1 69kV line | 69.0 | S | 7.94 | 283 | Plan | Maintenance | TRI | 142779 | ||
07/15/2004 08:48 | 07/15/2004 14:28 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 340 | Plan | Maintenance | EUG | 142780 | ||
07/15/2004 08:48 | 07/15/2004 14:28 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 340 | Plan | Maintenance | EUG | 142780 | |
07/15/2004 08:59 | 07/15/2004 14:25 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 326 | Plan | Switching | TDA | 142781 | |||
07/15/2004 08:59 | 07/15/2004 14:25 | McNary-Santiam No 2 230kV line | 230.0 | L | T | 200.43 | 326 | Plan | Switching | TRI TDA RED SAL | 142781 | |
07/15/2004 13:27 | 07/15/2004 13:41 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 14 | Auto | Foreign Trouble | Foreign Trouble | TDA | 142782 | |
07/15/2004 13:37 | 09/27/2004 09:46 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | T | 38.93 | 106329 | Plan | Normally Out | TRI | 142783 | |
07/15/2004 13:37 | 09/27/2004 09:46 | Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | TS | 0.48 | 106329 | Plan | Normally Out | TRI | 142783 | ||
07/16/2004 02:08 | 07/16/2004 07:01 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 293 | Plan | Voltage Control | TRI TDA RED SAL | 142784 | ||
07/16/2004 05:01 | 07/19/2004 20:44 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5263 | Plan | Switching | TDA | 142785 | ||
07/16/2004 05:01 | 07/19/2004 20:54 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 5273 | Plan | Switching | TDA | 142786 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 5296 | Plan | Foreign Request | TDA RED | 142787 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142787 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142787 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142787 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142787 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142787 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 5296 | Plan | Foreign Request | TDA RED | 142788 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142788 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142788 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142788 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142788 | ||
07/16/2004 05:01 | 07/19/2004 21:17 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5296 | Plan | Foreign Request | TDA | 142788 | ||
07/16/2004 05:08 | 07/19/2004 21:12 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 5284 | Plan | Switching | TDA | 142789 | ||
07/16/2004 05:36 | 07/19/2004 21:12 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 5256 | Plan | Switching | TDA | 142790 | ||
07/16/2004 07:59 | 07/16/2004 14:20 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 381 | Plan | Maintenance | LGV | 142796 | |
07/16/2004 07:59 | 07/16/2004 14:20 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 381 | Plan | Maintenance | LGV | 142796 | ||
07/16/2004 08:07 | 07/16/2004 15:45 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 458 | Plan | Foreign Request | RED | 142797 | ||
07/16/2004 08:58 | 07/16/2004 16:14 | Troutdale-PACW Linneman No 1 230kV line | 230.0 | L | 6.54 | 436 | Plan | Foreign Request | LGV | 142798 | ||
07/17/2004 02:01 | 07/17/2004 09:11 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 430 | Plan | Voltage Control | TDA RED SAL | 142799 | ||
07/17/2004 02:25 | 07/17/2004 02:25 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 0 | Auto | Unknown | Unknown | IDF | 142800 | |
07/17/2004 05:12 | 07/17/2004 05:12 | Milton tap to Walla Walla-Freewater No 1 69kV line | 69.0 | T | G | 3.70 | 0 | Auto | Unknown | Unknown | TRI | 142801 |
07/17/2004 05:12 | 07/17/2004 05:12 | Walla Walla-Freewater No 1 69kV line | 69.0 | L | 11.74 | 0 | Auto | Unknown | Unknown | TRI | 142801 | |
07/17/2004 05:12 | 07/17/2004 05:12 | Walla Walla-Whitman section of Walla Walla-Freewater No 1 69kV line | 69.0 | S | G | 3.80 | 0 | Auto | Unknown | Unknown | TRI | 142801 |
07/17/2004 05:12 | 07/17/2004 05:12 | Whitman tap to Walla Walla-Freewater No 1 69kV line | 69.0 | T | G | 0.01 | 0 | Auto | Unknown | Unknown | TRI | 142801 |
07/17/2004 05:12 | 07/17/2004 05:12 | Whitman-Freewater section of Walla Walla-Freewater No 1 69kV line | 69.0 | S | G | 7.94 | 0 | Auto | Unknown | Unknown | TRI | 142801 |
07/17/2004 07:00 | 07/17/2004 16:37 | Echo Lake-Monroe No 1 500kV line | 500.0 | L | T | 29.98 | 577 | Plan | Forced | COV SNO | 142807 | |
07/17/2004 07:00 | 07/17/2004 16:37 | Sno-King tap to Echo Lake-Monroe No 1 500kV line | 500.0 | T | 12.82 | 577 | Plan | Forced | SNO | 142807 | ||
07/17/2004 19:29 | 07/17/2004 21:37 | North Mountain-Snohomish No 1 230kV line | 230.0 | L | 40.28 | 128 | Auto | Foreign Trouble | Foreign Trouble | SNO | 142808 | |
07/17/2004 19:51 | 07/17/2004 19:51 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Lightning | RED | 142809 |
07/17/2004 19:51 | 07/17/2004 19:51 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Lightning | RED | 142809 |
07/17/2004 19:51 | 07/17/2004 19:51 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Lightning | RED | 142809 |
07/17/2004 19:51 | 07/17/2004 19:51 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Lightning | RED | 142809 |
07/17/2004 19:51 | 07/17/2004 19:51 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Lightning | RED | 142809 | |
07/17/2004 19:51 | 07/17/2004 19:51 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Lightning | RED | 142809 |
07/17/2004 19:51 | 07/17/2004 19:51 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Lightning | RED | 142809 |
07/18/2004 01:02 | 07/18/2004 01:02 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | O | 13.35 | 0 | Auto | Unknown | Unknown | TRI | 142810 |
07/18/2004 01:02 | 07/18/2004 01:02 | Highland tap to Franklin-Badger Canyon No 2 115kV line | 115.0 | T | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 142810 | |
07/18/2004 01:02 | 07/18/2004 01:02 | Highland-Orchard View section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.48 | 0 | Auto | Unknown | Unknown | TRI | 142810 | |
07/18/2004 01:02 | 07/18/2004 01:02 | Orchard View-Badger Canyon section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 2.07 | 0 | Auto | Unknown | Unknown | TRI | 142810 | |
07/18/2004 01:32 | 07/18/2004 01:32 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 142811 | |
07/18/2004 01:32 | 07/18/2004 01:32 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 142811 | |
07/18/2004 01:32 | 07/18/2004 01:32 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 142811 | ||
07/18/2004 01:40 | 07/18/2004 09:19 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 459 | Plan | Voltage Control | TRI TDA RED SAL | 142812 | ||
07/18/2004 07:58 | 07/18/2004 07:59 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 1 | Auto | Lightning | Lightning | WEN SPK | 142820 | |
07/18/2004 08:23 | 07/18/2004 08:23 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 142821 | |
07/18/2004 15:03 | 07/18/2004 19:49 | Foster tap to Green Peter-Lebanon No 1 115kV line | 115.0 | T | 3.77 | 286 | Auto | Malicious | Malicious | EUG | 142822 | |
07/18/2004 15:03 | 07/18/2004 22:26 | Foster tap-Lebanon section of Green Peter-Lebanon No 1 115kV line | 115.0 | S | 11.78 | 443 | Auto | Malicious | Malicious | EUG | 142822 | |
07/18/2004 15:03 | 07/18/2004 19:49 | Foster tap-North Butte tap section of Foster tap to Green Peter-Lebanon No 1 115kV line | 115.0 | TS | 3.43 | 286 | Auto | Malicious | Malicious | EUG | 142822 | |
07/18/2004 15:03 | 07/18/2004 19:49 | Green Peter-Foster tap section of Green Peter-Lebanon No 1 115kV line | 115.0 | S | 6.31 | 286 | Auto | Malicious | Malicious | EUG | 142822 | |
07/18/2004 15:03 | 07/18/2004 22:26 | Green Peter-Lebanon No 1 115kV line | 115.0 | L | G | 18.09 | 443 | Auto | Malicious | Malicious | EUG | 142822 |
07/18/2004 15:03 | 07/18/2004 19:49 | North Butte tap-Foster section of Foster tap to Green Peter-Lebanon No 1 115kV line | 115.0 | TS | 0.34 | 286 | Auto | Malicious | Malicious | EUG | 142822 | |
07/19/2004 00:04 | 07/19/2004 00:04 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Unknown | RED | 142823 |
07/19/2004 00:04 | 07/19/2004 00:04 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Unknown | RED | 142823 |
07/19/2004 00:04 | 07/19/2004 00:04 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Unknown | RED | 142823 |
07/19/2004 00:04 | 07/19/2004 00:04 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Unknown | RED | 142823 |
07/19/2004 00:04 | 07/19/2004 00:04 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Unknown | RED | 142823 | |
07/19/2004 00:04 | 07/19/2004 00:04 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Unknown | RED | 142823 |
07/19/2004 00:04 | 07/19/2004 00:04 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Unknown | RED | 142823 |
07/19/2004 00:23 | 07/19/2004 06:18 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 355 | Plan | Voltage Control | SAL EUG | 142824 | ||
07/19/2004 03:41 | 07/19/2004 03:41 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | O | 24.08 | 0 | Auto | Lightning | Lightning | TDA | 142825 |
07/19/2004 03:41 | 07/19/2004 03:41 | Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 3.84 | 0 | Auto | Lightning | Lightning | TDA | 142825 | |
07/19/2004 03:41 | 07/19/2004 03:41 | Spearfish tap to Chenoweth-Goldendale No 1 115kV line | 115.0 | T | 3.22 | 0 | Auto | Lightning | Lightning | TDA | 142825 | |
07/19/2004 04:40 | 07/19/2004 04:40 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 0 | Auto | Lightning | Lightning | TDA RED SAL | 142826 | |
07/19/2004 04:43 | 07/19/2004 04:43 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 0 | Auto | Lightning | Lightning | TDA RED SAL | 142827 | |
07/19/2004 05:05 | 07/19/2004 05:08 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 3 | Plan | Foreign Request | TDA | 142828 | ||
07/19/2004 05:08 | 07/19/2004 05:14 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 6 | Plan | Foreign Request | TDA | 142829 | ||
07/19/2004 06:08 | 07/19/2004 06:08 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 0 | Auto | Lightning | Lightning | TDA RED SAL | 142846 | |
07/19/2004 06:25 | 07/19/2004 06:25 | Roundup-LaGrande No 1 230kV line | 230.0 | L | 45.02 | 0 | Auto | Lightning | Lightning | TRI | 142847 | |
07/19/2004 07:22 | 09/10/2004 17:13 | Taft-Hot Springs No 1 500kV line | 500.0 | L | 53.83 | 76911 | Plan | Maintenance | KAL | 142848 | ||
07/19/2004 07:37 | 07/19/2004 14:40 | Eugene-Alvey No 2 115kV line | 115.0 | L | G | 12.67 | 423 | Plan | Maintenance | EUG | 142849 | |
07/19/2004 07:37 | 07/19/2004 14:40 | Eugene-Dillard section of Eugene-Alvey No 2 115kV line | 115.0 | S | 9.36 | 423 | Plan | Maintenance | EUG | 142849 | ||
07/19/2004 07:41 | 07/19/2004 14:52 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 431 | Plan | Maintenance | LGV | 142850 | |
07/19/2004 07:41 | 07/19/2004 14:52 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 431 | Plan | Maintenance | LGV | 142850 | ||
07/19/2004 07:41 | 07/19/2004 16:20 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 519 | Plan | Foreign Request | RED | 142851 | ||
07/19/2004 07:48 | 07/23/2004 08:31 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5803 | Plan | Maintenance | IDF | 142852 | ||
07/19/2004 07:58 | 07/19/2004 15:24 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 446 | Plan | Maintenance | SAL EUG | 142853 | |
07/19/2004 07:58 | 07/19/2004 15:24 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 446 | Plan | Maintenance | SAL | 142853 | ||
07/19/2004 08:02 | 07/19/2004 14:30 | Cardwell-Cowlitz No 1 115kV line | 115.0 | L | 7.65 | 388 | Plan | Maintenance | LGV | 142854 | ||
07/19/2004 08:05 | 07/23/2004 15:05 | Grand Coulee-Chief Joseph No 2 230kV line | 230.0 | L | 32.59 | 6180 | Plan | Maintenance | WEN | 142855 | ||
07/19/2004 08:05 | 07/19/2004 14:46 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 401 | Plan | Maintenance | EUG | 142856 | ||
07/19/2004 08:15 | 07/22/2004 14:43 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 24.00 | 4708 | Plan | Maintenance | TRI | 142857 | ||
07/19/2004 08:15 | 07/22/2004 14:43 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 4708 | Plan | Maintenance | TRI | 142857 | |
07/19/2004 08:21 | 07/21/2004 14:47 | Wendson-Berrydale section of Wendson-Tahkenitch No 1 115kV line | 115.0 | S | 6.36 | 3266 | Plan | Maintenance | EUG | 142858 | ||
07/19/2004 08:21 | 07/21/2004 14:47 | Wendson-Tahkenitch No 1 115kV line | 115.0 | L | G | 20.34 | 3266 | Plan | Maintenance | EUG | 142858 | |
07/19/2004 09:23 | 07/19/2004 14:35 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 312 | Plan | Switching | TDA | 142859 | ||
07/19/2004 09:50 | 07/19/2004 14:37 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | O | 80.80 | 287 | Plan | Foreign Request | TRI | 142860 | |
07/19/2004 09:50 | 07/19/2004 14:37 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 53.10 | 287 | Plan | Foreign Request | TRI | 142860 | ||
07/19/2004 10:09 | 08/21/2004 08:07 | Fairmount-Port Angeles No 1 230kV line | 230.0 | L | 26.70 | 47398 | Plan | Construction | OLY | 142861 | ||
07/19/2004 10:10 | 07/19/2004 10:10 | Hatwai-AVA Lolo No 2 230kV line | 230.0 | L | 8.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 142862 | |
07/19/2004 10:13 | 07/19/2004 18:32 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | 23.98 | 499 | Plan | Maintenance | TDA | 142863 | ||
07/19/2004 10:13 | 07/19/2004 18:32 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 23.97 | 499 | Plan | Maintenance | TDA | 142863 | |
07/19/2004 10:13 | 07/19/2004 18:32 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | G | 9.25 | 499 | Plan | Maintenance | TDA | 142863 | |
07/19/2004 10:13 | 07/19/2004 18:32 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 0.01 | 499 | Plan | Maintenance | TDA | 142863 | |
07/19/2004 10:28 | 07/19/2004 14:30 | Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | 0.10 | 242 | Plan | Foreign Request | TRI | 142923 | ||
07/19/2004 10:28 | 07/19/2004 14:30 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | T | 80.80 | 242 | Plan | Foreign Request | TRI | 142923 | |
07/19/2004 11:29 | 07/19/2004 11:29 | B-891-Sand Creek section of Bronx-Sand Creek No 1 115kV line | 115.0 | S | G | 6.67 | 0 | Auto | Lightning | Lightning | SPK | 142864 |
07/19/2004 11:29 | 07/19/2004 11:29 | Bronx-B-891 section of Bronx-Sand Creek No 1 115kV line | 115.0 | S | G | 6.62 | 0 | Auto | Lightning | Lightning | SPK | 142864 |
07/19/2004 11:29 | 07/19/2004 11:29 | Bronx-Sand Creek No 1 115kV line | 115.0 | L | 13.29 | 0 | Auto | Lightning | Lightning | SPK | 142864 | |
07/19/2004 13:49 | 07/19/2004 13:49 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142865 |
07/19/2004 13:49 | 07/19/2004 13:49 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142865 |
07/19/2004 13:49 | 07/19/2004 13:49 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142865 |
07/19/2004 13:49 | 07/19/2004 13:49 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142865 |
07/19/2004 13:49 | 07/19/2004 13:49 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142865 | |
07/19/2004 13:49 | 07/19/2004 13:49 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142865 |
07/19/2004 13:49 | 07/19/2004 13:49 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142865 |
07/19/2004 14:17 | 07/19/2004 14:17 | Elmo tap to Kalispell-Kerr No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142866 |
07/19/2004 14:17 | 07/19/2004 14:17 | Elmo-Kerr section of Kalispell-Kerr No 1 115kV line | 115.0 | S | G | 12.80 | 0 | Auto | Lightning | Lightning | KAL | 142866 |
07/19/2004 14:17 | 07/19/2004 14:17 | Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line | 115.0 | S | G | 28.59 | 0 | Auto | Lightning | Lightning | KAL | 142866 |
07/19/2004 14:17 | 07/19/2004 14:17 | Kalispell-Kerr No 1 115kV line | 115.0 | L | 41.39 | 0 | Auto | Lightning | Lightning | KAL | 142866 | |
07/19/2004 14:17 | 07/19/2004 14:19 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | 56.45 | 2 | Auto | Lightning | Lightning | KAL | 142899 | |
07/19/2004 14:17 | 07/19/2004 14:19 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 13.50 | 2 | Auto | Lightning | Lightning | KAL | 142899 |
07/19/2004 14:17 | 07/19/2004 14:19 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | G | 0.10 | 2 | Auto | Lightning | Lightning | KAL | 142899 |
07/19/2004 14:17 | 07/19/2004 14:19 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 42.95 | 2 | Auto | Lightning | Lightning | KAL | 142899 |
07/19/2004 14:17 | 07/19/2004 14:21 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 4 | Auto | RAS Initiated | RAS Initiated | KAL | 142900 | |
07/19/2004 14:18 | 07/19/2004 14:20 | Dixon tap to Hot Springs-Rattlesnake No 1 230kV line | 230.0 | T | G | 0.10 | 2 | Auto | Lightning | Lightning | KAL | 142867 |
07/19/2004 14:18 | 07/19/2004 14:20 | Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 33.85 | 2 | Auto | Lightning | Lightning | KAL | 142867 |
07/19/2004 14:18 | 07/19/2004 14:20 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 25.06 | 2 | Auto | Lightning | Lightning | KAL | 142867 |
07/19/2004 14:18 | 07/19/2004 14:20 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | 58.91 | 2 | Auto | Lightning | Lightning | KAL | 142867 | |
07/19/2004 15:47 | 07/19/2004 15:47 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Unknown | RED | 142868 |
07/19/2004 15:47 | 07/19/2004 15:47 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Unknown | RED | 142868 |
07/19/2004 15:47 | 07/19/2004 15:47 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Unknown | RED | 142868 |
07/19/2004 15:47 | 07/19/2004 15:47 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Unknown | RED | 142868 |
07/19/2004 15:47 | 07/19/2004 15:47 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Unknown | RED | 142868 | |
07/19/2004 15:47 | 07/19/2004 15:47 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Unknown | RED | 142868 |
07/19/2004 15:47 | 07/19/2004 15:47 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Unknown | RED | 142868 |
07/19/2004 16:12 | 07/19/2004 16:12 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 0 | Auto | Lightning | Lightning | KAL | 142869 | |
07/19/2004 17:32 | 07/19/2004 17:32 | Burley tap to West Burley-Heyburn No 1 138kV line | 138.0 | T | G | 0.07 | 0 | Auto | Lightning | Lightning | IDF | 142870 |
07/19/2004 17:32 | 07/19/2004 17:32 | Burley-Riverton section of West Burley-Heyburn No 1 138kV line | 138.0 | S | G | 1.59 | 0 | Auto | Lightning | Lightning | IDF | 142870 |
07/19/2004 17:32 | 07/19/2004 17:32 | Riverton tap to West Burley-Heyburn No 1 138kV line | 138.0 | T | G | 0.17 | 0 | Auto | Lightning | Lightning | IDF | 142870 |
07/19/2004 17:32 | 07/19/2004 17:32 | Riverton-Heyburn section of West Burley-Heyburn No 1 138kV line | 138.0 | S | G | 0.62 | 0 | Auto | Lightning | Lightning | IDF | 142870 |
07/19/2004 17:32 | 07/19/2004 17:32 | West Burley-Heyburn No 1 138kV line | 138.0 | L | O | 4.43 | 0 | Auto | Lightning | Lightning | IDF | 142870 |
07/19/2004 19:09 | 07/19/2004 19:09 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 142871 | |
07/20/2004 01:21 | 07/20/2004 01:21 | Columbia Falls-Stillwater section of Columbia Falls-Trego No 1 115kV line | 115.0 | S | G | 18.58 | 0 | Auto | Lightning | Lightning | KAL | 142901 |
07/20/2004 01:21 | 07/20/2004 01:21 | Columbia Falls-Trego No 1 115kV line | 115.0 | L | 45.96 | 0 | Auto | Lightning | Lightning | KAL | 142901 | |
07/20/2004 01:21 | 07/20/2004 01:21 | Stillwater tap to Columbia Falls-Trego No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 142901 |
07/20/2004 01:21 | 07/20/2004 01:21 | Stillwater-Trego section of Columbia Falls-Trego No 1 115kV line | 115.0 | S | G | 27.38 | 0 | Auto | Lightning | Lightning | KAL | 142901 |
07/20/2004 01:51 | 07/20/2004 01:51 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 0 | Auto | Improper Relaying | Improper Relaying | OLY LGV | 142902 |
07/20/2004 01:51 | 07/20/2004 01:51 | Holcomb-Oxbow section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 1.48 | 0 | Auto | Improper Relaying | Improper Relaying | OLY | 142902 | |
07/20/2004 01:51 | 07/20/2004 01:51 | Baleville tap to Raymond-Willapa River No 1 115kV line | 115.0 | T | G | 4.75 | 0 | Auto | Unknown | Improper Relaying | OLY | 142903 |
07/20/2004 01:51 | 07/20/2004 01:51 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 0 | Auto | Unknown | Improper Relaying | OLY LGV | 142903 |
07/20/2004 01:51 | 07/20/2004 01:51 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 0 | Auto | Unknown | Improper Relaying | OLY | 142903 |
07/20/2004 01:51 | 07/20/2004 01:51 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 0 | Auto | Unknown | Improper Relaying | OLY | 142903 | |
07/20/2004 02:07 | 07/20/2004 06:16 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 249 | Plan | Voltage Control | RED | 142872 | ||
07/20/2004 03:04 | 07/20/2004 03:04 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 142873 | |
07/20/2004 07:13 | 07/20/2004 09:07 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 114 | Auto | Tree cut | Tree cut | EUG | 142904 | |
07/20/2004 07:42 | 07/20/2004 17:59 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 617 | Plan | Maintenance | RED | 142905 | ||
07/20/2004 07:54 | 07/23/2004 14:32 | Monmouth-Adair section of Salem-Albany No 2 115kV line | 115.0 | S | 11.30 | 4718 | Plan | Maintenance | SAL | 142906 | ||
07/20/2004 07:54 | 07/23/2004 14:32 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 4718 | Plan | Maintenance | SAL EUG | 142906 | |
07/20/2004 07:58 | 07/20/2004 15:01 | Toledo-Wendson No 1 230kV line | 230.0 | L | 49.64 | 423 | Plan | Maintenance | EUG | 142907 | ||
07/20/2004 08:01 | 07/20/2004 14:41 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 400 | Plan | Maintenance | LGV | 142908 | |
07/20/2004 08:01 | 07/20/2004 14:41 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 400 | Plan | Maintenance | LGV | 142908 | ||
07/20/2004 08:14 | 07/20/2004 14:25 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | 23.98 | 371 | Plan | Maintenance | TDA | 142909 | ||
07/20/2004 08:14 | 07/20/2004 14:25 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 23.97 | 371 | Plan | Maintenance | TDA | 142909 | |
07/20/2004 08:14 | 07/20/2004 14:25 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | G | 9.25 | 371 | Plan | Maintenance | TDA | 142909 | |
07/20/2004 08:14 | 07/20/2004 14:25 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 0.01 | 371 | Plan | Maintenance | TDA | 142909 | |
07/20/2004 08:48 | 07/20/2004 09:08 | Grand Coulee-Keller section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 1.25 | 20 | Plan | Switching | WEN | 142910 | ||
07/20/2004 08:48 | 07/20/2004 09:08 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | G | 41.05 | 20 | Plan | Switching | WEN | 142910 | |
07/20/2004 08:48 | 07/20/2004 09:08 | Keller-Nespelem section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 5.30 | 20 | Plan | Switching | WEN | 142910 | ||
07/20/2004 08:48 | 07/20/2004 15:37 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | T | 41.05 | 409 | Plan | Maintenance | WEN | 142911 | |
07/20/2004 08:48 | 07/20/2004 15:37 | Keller tap to Grand Coulee-Okanogan No 2 115kV line | 115.0 | T | 20.14 | 409 | Plan | Maintenance | WEN | 142911 | ||
07/20/2004 08:54 | 07/20/2004 14:54 | Eugene-Alvey No 2 115kV line | 115.0 | L | G | 12.67 | 360 | Plan | Maintenance | EUG | 142912 | |
07/20/2004 08:54 | 07/20/2004 14:54 | Eugene-Dillard section of Eugene-Alvey No 2 115kV line | 115.0 | S | 9.36 | 360 | Plan | Maintenance | EUG | 142912 | ||
07/20/2004 09:34 | 07/20/2004 18:00 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 506 | Plan | Testing | KAL | 142913 | ||
07/20/2004 10:11 | 07/20/2004 18:43 | Big Eddy 500/230kV Tie No 1 500kV line | 500.0 | L | 0.57 | 512 | Plan | Emergency | TDA | 142914 | ||
07/20/2004 10:26 | 07/21/2004 08:05 | Malin-Round Mountain No 2 500kV line | 500.0 | L | 94.40 | 1299 | Auto | Foreign Trouble | Foreign Trouble | RED | 142915 | |
07/20/2004 13:36 | 07/20/2004 14:11 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 35 | Auto | Foreign Trouble | Foreign Trouble | TDA | 142916 | |
07/20/2004 15:27 | 07/20/2004 15:42 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | G | 41.05 | 15 | Plan | Switching | WEN | 142917 | |
07/20/2004 15:27 | 07/20/2004 15:42 | Keller-Nespelem section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 5.30 | 15 | Plan | Switching | WEN | 142917 | ||
07/20/2004 15:36 | 07/20/2004 15:37 | Grand Coulee-Keller section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 1.25 | 1 | Plan | Switching | WEN | 142918 | ||
07/20/2004 15:36 | 07/20/2004 15:37 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | O | 41.05 | 1 | Plan | Switching | WEN | 142918 | |
07/20/2004 16:02 | 07/20/2004 16:03 | Bear Gulch-Chick Creek section of Drummond-Macks Inn No 1 115kV line | 115.0 | S | G | 17.85 | 1 | Auto | Lightning | Lightning | IDF | 142919 |
07/20/2004 16:02 | 07/20/2004 16:03 | Chick Creek-Macks Inn section of Drummond-Macks Inn No 1 115kV line | 115.0 | S | G | 6.47 | 1 | Auto | Lightning | Lightning | IDF | 142919 |
07/20/2004 16:02 | 07/20/2004 16:03 | Drummond-Bear Gulch section of Drummond-Macks Inn No 1 115kV line | 115.0 | S | G | 13.44 | 1 | Auto | Lightning | Lightning | IDF | 142919 |
07/20/2004 16:02 | 07/20/2004 16:03 | Drummond-Macks Inn No 1 115kV line | 115.0 | L | 37.76 | 1 | Auto | Lightning | Lightning | IDF | 142919 | |
07/20/2004 16:02 | 07/20/2004 16:03 | Macks Inn-Madison No 1 115kV line | 115.0 | L | 17.12 | 1 | Auto | Lightning | Forced (Configuration) | IDF | 142920 | |
07/20/2004 18:09 | 07/20/2004 23:18 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 309 | Plan | Emergency | COV | 142921 | ||
07/20/2004 22:41 | 07/20/2004 22:41 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 0 | Auto | Unknown | Unknown | EUG | 142922 | |
07/21/2004 07:26 | 07/21/2004 17:48 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 622 | Plan | Maintenance | RED | 142933 | ||
07/21/2004 07:28 | 07/21/2004 14:46 | Eugene-Alvey No 2 115kV line | 115.0 | L | G | 12.67 | 438 | Plan | Maintenance | EUG | 142934 | |
07/21/2004 07:28 | 07/21/2004 14:46 | Eugene-Dillard section of Eugene-Alvey No 2 115kV line | 115.0 | S | 9.36 | 438 | Plan | Maintenance | EUG | 142934 | ||
07/21/2004 07:56 | 07/21/2004 15:53 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 477 | Plan | Maintenance | LGV | 142935 | |
07/21/2004 07:56 | 07/21/2004 15:53 | St Helens-Goble section of St Helens-Allston No 1 115kV line | 115.0 | S | 13.67 | 477 | Plan | Maintenance | LGV | 142935 | ||
07/21/2004 08:11 | 07/21/2004 15:23 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | 23.98 | 432 | Plan | Maintenance | TDA | 142936 | ||
07/21/2004 08:11 | 07/21/2004 15:23 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 23.97 | 432 | Plan | Maintenance | TDA | 142936 | |
07/21/2004 08:11 | 07/21/2004 15:23 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | G | 9.25 | 432 | Plan | Maintenance | TDA | 142936 | |
07/21/2004 08:11 | 07/21/2004 15:23 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 0.01 | 432 | Plan | Maintenance | TDA | 142936 | |
07/21/2004 09:01 | 07/21/2004 17:09 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 488 | Plan | Testing | KAL | 142937 | ||
07/21/2004 09:45 | 07/21/2004 10:59 | Midway-Moxee No 1 115kV line | 115.0 | L | G | 33.98 | 74 | Plan | Emergency | TRI WEN | 142938 | |
07/21/2004 09:45 | 07/21/2004 10:59 | Rattlesnake-Moxee section of Midway-Moxee No 1 115kV line | 115.0 | S | 17.37 | 74 | Plan | Emergency | WEN | 142938 | ||
07/21/2004 12:38 | 07/21/2004 19:44 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 426 | Plan | Emergency | EUG | 142939 | ||
07/22/2004 00:56 | 07/22/2004 01:09 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 13 | Plan | Switching | SNO | 142940 | ||
07/22/2004 02:50 | 07/22/2004 05:43 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 173 | Plan | Voltage Control | TRI TDA RED SAL | 142941 | ||
07/22/2004 06:02 | 07/22/2004 08:17 | La Grande-IPC Brownlee No 1 230kV line | 230.0 | L | 79.30 | 135 | Plan | Foreign Request | TRI | 142945 | ||
07/22/2004 06:02 | 07/22/2004 08:17 | Quartz tap to La Grande-IPC Brownlee No 1 230kV line | 230.0 | T | 10.30 | 135 | Plan | Foreign Request | TRI | 142945 | ||
07/22/2004 07:18 | 07/22/2004 09:29 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | 13.30 | 131 | Plan | Maintenance | SPK | 142946 | ||
07/22/2004 07:18 | 07/22/2004 09:29 | Colville-Republic No 1 115kV line | 115.0 | L | G | 44.47 | 131 | Plan | Maintenance | SPK | 142946 | |
07/22/2004 07:20 | 07/22/2004 17:17 | Bellingham-PSE Bellingham No 2 115kV line | 115.0 | L | 3.60 | 597 | Plan | Forced | SNO | 142947 | ||
07/22/2004 07:21 | 07/22/2004 17:17 | Bellingham-PSE Bellingham No 3 115kV line | 115.0 | L | 3.60 | 596 | Plan | Forced | SNO | 142948 | ||
07/22/2004 07:22 | 07/22/2004 17:17 | Bellingham PSE-Whatcom No 1 115kV line | 115.0 | L | 20.60 | 595 | Plan | Forced | SNO | 142949 | ||
07/22/2004 07:39 | 07/22/2004 15:28 | Ross-Alcoa No 2&4 115kV line | 115.0 | L | 8.23 | 469 | Plan | Maintenance | LGV | 142950 | ||
07/22/2004 08:00 | 07/22/2004 16:08 | Albany-Lebanon No 1 115kV line | 115.0 | L | G | 17.01 | 488 | Plan | Maintenance | EUG | 142951 | |
07/22/2004 08:00 | 07/22/2004 16:08 | Albany-Lochner section of Albany-Lebanon No 1 115kV line | 115.0 | S | 2.43 | 488 | Plan | Maintenance | EUG | 142951 | ||
07/22/2004 08:27 | 07/22/2004 14:36 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | 23.98 | 369 | Plan | Maintenance | TDA | 142952 | ||
07/22/2004 08:27 | 07/22/2004 14:36 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 23.97 | 369 | Plan | Maintenance | TDA | 142952 | |
07/22/2004 08:27 | 07/22/2004 14:36 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | G | 9.25 | 369 | Plan | Maintenance | TDA | 142952 | |
07/22/2004 08:27 | 07/22/2004 14:36 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 0.01 | 369 | Plan | Maintenance | TDA | 142952 | |
07/22/2004 08:33 | 07/22/2004 14:23 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 350 | Plan | Forced | RED | 142953 | ||
07/22/2004 08:37 | 07/23/2004 10:18 | Lane-Wendson No 2 230kV line | 230.0 | L | 41.03 | 1541 | Plan | Maintenance | EUG | 142954 | ||
07/22/2004 09:44 | 07/22/2004 12:01 | Colville-Boundary No 1 115kV line | 115.0 | L | O | 43.06 | 137 | Plan | Maintenance | SPK | 142955 | |
07/22/2004 09:44 | 07/22/2004 12:01 | Colville-Spirit section of Colville-Boundary No 1 115kV line | 115.0 | S | 17.42 | 137 | Plan | Maintenance | SPK | 142955 | ||
07/22/2004 12:13 | 07/22/2004 13:23 | Addy-Colville No 1 115kV line | 115.0 | L | 15.22 | 70 | Plan | Maintenance | SPK | 142956 | ||
07/22/2004 12:45 | 07/22/2004 13:12 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 27 | Auto | Foreign Trouble | TDA RED | 142957 | ||
07/22/2004 12:45 | 07/22/2004 13:12 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 27 | Auto | Foreign Trouble | TDA | 142957 | |||
07/22/2004 12:45 | 07/22/2004 13:12 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 27 | Auto | Foreign Trouble | TDA | 142957 | |||
07/22/2004 12:45 | 07/22/2004 13:12 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 27 | Auto | Foreign Trouble | TDA | 142957 | |||
07/22/2004 12:45 | 07/22/2004 13:12 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 27 | Auto | Foreign Trouble | TDA | 142957 | |||
07/22/2004 12:45 | 07/22/2004 13:12 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 27 | Auto | Foreign Trouble | TDA | 142957 | |||
07/22/2004 14:53 | 07/22/2004 14:57 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 4 | Plan | Foreign Request | TDA | 142958 | ||
07/23/2004 07:36 | 07/23/2004 17:01 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 565 | Plan | Foreign Request | RED | 142961 | ||
07/23/2004 07:43 | 07/23/2004 16:46 | Ross-Alcoa No 2&4 115kV line | 115.0 | L | 8.23 | 543 | Plan | Maintenance | LGV | 142962 | ||
07/23/2004 08:41 | 07/23/2004 13:47 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | 23.98 | 306 | Plan | Maintenance | TDA | 142963 | ||
07/23/2004 08:41 | 07/23/2004 13:47 | Big Eddy-Klondike Schoolhouse section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 23.97 | 306 | Plan | Maintenance | TDA | 142963 | |
07/23/2004 08:41 | 07/23/2004 13:47 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | G | 9.25 | 306 | Plan | Maintenance | TDA | 142963 | |
07/23/2004 08:41 | 07/23/2004 13:47 | Klondike Schoolhouse-De Moss section of Big Eddy-De Moss No 1 115kV line | 115.0 | S | G | 0.01 | 306 | Plan | Maintenance | TDA | 142963 | |
07/23/2004 09:00 | 07/23/2004 17:12 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 492 | Plan | Maintenance | TDA RED | 142964 | |
07/23/2004 09:00 | 07/23/2004 17:12 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 492 | Plan | Maintenance | TDA | 142964 | |||
07/23/2004 09:05 | 07/23/2004 15:26 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 381 | Auto | Equipment/Miscellaneous | TDA RED | 142965 | |
07/23/2004 09:05 | 07/23/2004 15:26 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 381 | Auto | Equipment/Miscellaneous | TDA | 142965 | |||
07/23/2004 17:27 | 07/23/2004 20:52 | Paul-Olympia No 1 500kV line | 500.0 | L | 20.24 | 205 | Plan | Emergency | OLY | 142966 | ||
07/24/2004 11:22 | 07/24/2004 13:42 | Slatt-PGE Boardman No 1 500kV line | 500.0 | L | 17.83 | 140 | Plan | Foreign Request | TRI | 142972 | ||
07/24/2004 18:04 | 07/24/2004 18:04 | La Pine-Fort Rock No 1 115kV line | 115.0 | L | 47.03 | 0 | Auto | Foreign Trouble | Foreign Trouble | RED | 142973 | |
07/24/2004 18:59 | 07/24/2004 22:01 | Slatt-PGE Boardman No 1 500kV line | 500.0 | L | 17.83 | 182 | Auto | Foreign Trouble | Foreign Trouble | TRI | 142974 | |
07/24/2004 20:05 | 07/24/2004 20:05 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 142975 |
07/24/2004 20:05 | 07/24/2004 20:05 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142975 |
07/24/2004 20:05 | 07/24/2004 20:05 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 142975 |
07/24/2004 20:05 | 07/24/2004 20:05 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 142975 |
07/24/2004 20:05 | 07/24/2004 20:05 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 142975 | |
07/24/2004 20:05 | 07/24/2004 20:05 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 142975 |
07/24/2004 20:05 | 07/24/2004 20:05 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 142975 |
07/24/2004 23:15 | 07/24/2004 23:15 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 142976 | |
07/25/2004 00:50 | 07/25/2004 01:28 | Midway-Priest Rapids No 2 230kV line | 230.0 | L | 7.50 | 38 | Plan | Foreign Request | TRI | 142978 | ||
07/25/2004 15:50 | 07/25/2004 15:52 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 2 | Auto | Unknown | Unknown | SPK | 142979 |
07/25/2004 15:50 | 07/25/2004 15:52 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 2 | Auto | Unknown | Unknown | SPK | 142979 |
07/25/2004 15:50 | 07/25/2004 15:52 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 2 | Auto | Unknown | Unknown | SPK | 142979 |
07/25/2004 15:50 | 07/25/2004 15:52 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 2 | Auto | Unknown | Unknown | SPK | 142979 | |
07/25/2004 22:38 | 07/26/2004 00:16 | Slatt-PGE Boardman No 1 500kV line | 500.0 | L | 17.83 | 98 | Auto | Foreign Trouble | Foreign Trouble | TRI | 142980 | |
07/26/2004 01:13 | 07/26/2004 03:56 | Slatt-PGE Boardman No 1 500kV line | 500.0 | L | 17.83 | 163 | Auto | Foreign Trouble | Foreign Trouble | TRI | 142981 | |
07/26/2004 04:52 | 08/13/2004 09:17 | John Day PH-John Day No 4 500kV line | 500.0 | L | 3.48 | 26185 | Plan | Foreign Request | TDA | 142982 | ||
07/26/2004 05:43 | 07/26/2004 06:21 | Paul-Olympia No 1 500kV line | 500.0 | L | 20.24 | 38 | Plan | Emergency | OLY | 142983 | ||
07/26/2004 07:13 | 07/30/2004 11:27 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 6014 | Plan | Maintenance | IDF | 142997 | ||
07/26/2004 07:47 | 07/26/2004 16:42 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 535 | Plan | Foreign Request | RED | 142998 | ||
07/26/2004 08:05 | 07/26/2004 14:31 | Bandon-Rogue No 1 115kV line | 115.0 | L | G | 46.00 | 386 | Plan | Maintenance | EUG | 142999 | |
07/26/2004 08:05 | 07/26/2004 14:31 | Two Mile-Langlois section of Bandon-Rogue No 1 115kV line | 115.0 | S | 9.70 | 386 | Plan | Maintenance | EUG | 142999 | ||
07/26/2004 08:09 | 07/26/2004 08:09 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Machinery, Logging | Machinery, Logging | KAL | 143000 |
07/26/2004 08:09 | 07/26/2004 08:09 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Machinery, Logging | Machinery, Logging | KAL SPK | 143000 | |
07/26/2004 08:09 | 07/26/2004 08:09 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Machinery, Logging | Machinery, Logging | KAL | 143000 |
07/26/2004 08:09 | 07/26/2004 08:09 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Machinery, Logging | Machinery, Logging | SPK | 143000 |
07/26/2004 08:09 | 07/26/2004 08:09 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Machinery, Logging | Machinery, Logging | KAL | 143000 |
07/26/2004 08:09 | 07/26/2004 08:09 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Machinery, Logging | Machinery, Logging | KAL SPK | 143000 |
07/26/2004 08:10 | 07/26/2004 15:03 | Goble-Rainier section of St Helens-Allston No 1 115kV line | 115.0 | S | 5.30 | 413 | Plan | Maintenance | LGV | 143001 | ||
07/26/2004 08:10 | 07/26/2004 15:03 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 413 | Plan | Maintenance | LGV | 143001 | |
07/26/2004 08:19 | 07/30/2004 14:15 | Grand Coulee-Chief Joseph No 2 230kV line | 230.0 | L | 32.59 | 6116 | Plan | Maintenance | WEN | 143002 | ||
07/26/2004 08:36 | 07/26/2004 15:04 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 388 | Plan | Maintenance | SAL | 143003 | |
07/26/2004 08:36 | 07/26/2004 15:04 | Hebo-Beaver section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 4.53 | 388 | Plan | Maintenance | SAL | 143003 | ||
07/26/2004 08:42 | 07/26/2004 09:38 | Sacheen-Albeni Falls No 1 115kV line | 115.0 | L | G | 13.72 | 56 | Plan | Maintenance | SPK | 143004 | |
07/26/2004 08:42 | 07/26/2004 09:38 | Sacheen-Diamond Lake section of Sacheen-Albeni Falls No 1 115kV line | 115.0 | S | 5.52 | 56 | Plan | Maintenance | SPK | 143004 | ||
07/26/2004 09:00 | 08/12/2004 14:05 | Detroit PH-Detroit No 2 230kV line | 230.0 | L | 0.48 | 24785 | Plan | Foreign Request | SAL | 143005 | ||
07/26/2004 09:09 | 07/26/2004 15:10 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 361 | Plan | Maintenance | TDA RED | 143006 | |
07/26/2004 09:09 | 07/26/2004 15:10 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 361 | Plan | Maintenance | TDA | 143006 | |||
07/26/2004 09:22 | 07/26/2004 13:55 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 273 | Plan | Maintenance | IDF | 143007 | ||
07/26/2004 13:20 | 07/26/2004 13:44 | Sacheen-Albeni Falls No 1 115kV line | 115.0 | L | G | 13.72 | 24 | Plan | Maintenance | SPK | 143008 | |
07/26/2004 13:20 | 07/26/2004 13:44 | Sacheen-Diamond Lake section of Sacheen-Albeni Falls No 1 115kV line | 115.0 | S | 5.52 | 24 | Plan | Maintenance | SPK | 143008 | ||
07/27/2004 07:21 | 07/27/2004 10:36 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 195 | Plan | Maintenance | IDF | 143014 | ||
07/27/2004 07:21 | 07/27/2004 10:36 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 195 | Plan | Maintenance | IDF | 143014 | |
07/27/2004 07:48 | 07/27/2004 15:02 | Goble-Rainier section of St Helens-Allston No 1 115kV line | 115.0 | S | 5.30 | 434 | Plan | Maintenance | LGV | 143015 | ||
07/27/2004 07:48 | 07/27/2004 15:02 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 434 | Plan | Maintenance | LGV | 143015 | |
07/27/2004 07:53 | 07/27/2004 17:17 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 564 | Plan | Foreign Request | RED | 143016 | ||
07/27/2004 08:08 | 07/27/2004 14:31 | Bandon-Rogue No 1 115kV line | 115.0 | L | G | 46.00 | 383 | Plan | Maintenance | EUG | 143017 | |
07/27/2004 08:08 | 07/27/2004 14:31 | Two Mile-Langlois section of Bandon-Rogue No 1 115kV line | 115.0 | S | 9.70 | 383 | Plan | Maintenance | EUG | 143017 | ||
07/27/2004 08:38 | 07/27/2004 14:48 | Shelton-South Bremerton No 1 230kV line | 230.0 | L | 31.14 | 370 | Plan | Maintenance | OLY | 143018 | ||
07/27/2004 10:00 | 07/27/2004 15:12 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 312 | Plan | Maintenance | TDA RED | 143019 | |
07/27/2004 10:00 | 07/27/2004 15:12 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 312 | Plan | Maintenance | TDA | 143019 | |||
07/27/2004 12:04 | 07/27/2004 18:49 | Allston-Astoria No 1 115kV line | 115.0 | L | T | 41.98 | 405 | Plan | Maintenance | LGV | 143020 | |
07/27/2004 12:04 | 07/27/2004 18:49 | Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | 10.32 | 405 | Plan | Maintenance | LGV OLY | 143020 | ||
07/28/2004 04:25 | 07/28/2004 17:58 | Hot Springs-NWE Ovando No 1 230kV line | 230.0 | L | 89.70 | 813 | Plan | Foreign Request | KAL | 143021 | ||
07/28/2004 07:04 | 07/28/2004 14:53 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 469 | Plan | Maintenance | TDA RED | 143022 | |
07/28/2004 07:04 | 07/28/2004 14:53 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 469 | Plan | Maintenance | TDA | 143022 | |||
07/28/2004 07:22 | 07/28/2004 14:33 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 431 | Plan | Maintenance | IDF | 143023 | ||
07/28/2004 07:28 | 07/28/2004 13:33 | Ross-Alcoa No 2&4 115kV line | 115.0 | L | 8.23 | 365 | Plan | Maintenance | LGV | 143024 | ||
07/28/2004 07:31 | 07/28/2004 14:57 | Longview-Allston No 4 115kV line | 115.0 | L | G | 4.64 | 446 | Plan | Maintenance | LGV | 143025 | |
07/28/2004 07:31 | 07/28/2004 14:57 | Longview-Donald Nys section of Longview-Allston No 4 115kV line | 115.0 | S | 3.63 | 446 | Plan | Maintenance | LGV | 143025 | ||
07/28/2004 07:36 | 07/28/2004 16:38 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 542 | Plan | Foreign Request | RED | 143026 | ||
07/28/2004 07:58 | 07/28/2004 14:51 | Bandon-Rogue No 1 115kV line | 115.0 | L | G | 46.00 | 413 | Plan | Maintenance | EUG | 143027 | |
07/28/2004 07:58 | 07/28/2004 14:51 | Two Mile-Langlois section of Bandon-Rogue No 1 115kV line | 115.0 | S | 9.70 | 413 | Plan | Maintenance | EUG | 143027 | ||
07/28/2004 08:12 | 07/28/2004 08:12 | North Camas-Oak Park No 1 115kV line | 115.0 | L | 1.65 | 0 | Auto | Foreign Trouble | LGV | 143028 | ||
07/28/2004 08:43 | 07/28/2004 14:52 | Shelton-South Bremerton No 1 230kV line | 230.0 | L | 31.14 | 369 | Plan | Maintenance | OLY | 143029 | ||
07/28/2004 18:50 | 08/01/2004 14:32 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 5502 | Plan | Emergency | TDA | 143030 | |||
07/28/2004 18:50 | 08/01/2004 14:32 | McNary-Santiam No 2 230kV line | 230.0 | L | T | 200.43 | 5502 | Plan | Emergency | TRI TDA RED SAL | 143030 | |
07/28/2004 18:58 | 08/01/2004 15:54 | Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line | 230.0 | S | 136.53 | 5576 | Plan | Emergency | TDA RED | 143031 | ||
07/28/2004 18:58 | 08/01/2004 15:54 | McNary-Santiam No 2 230kV line | 230.0 | L | G | 200.43 | 5576 | Plan | Emergency | TRI TDA RED SAL | 143031 | |
07/28/2004 19:00 | 07/28/2004 20:06 | McNary-Santiam No 2 230kV line | 230.0 | L | O | 200.43 | 66 | Plan | Emergency | TRI TDA RED SAL | 143339 | |
07/28/2004 19:00 | 07/28/2004 20:06 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.10 | 66 | Plan | Emergency | SAL | 143339 | ||
07/28/2004 19:00 | 07/28/2004 20:06 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 66 | Plan | Emergency | SAL | 143339 | ||
07/28/2004 20:02 | 07/28/2004 20:02 | Garrison-NWE Mill Creek No 1 230kV line | 230.0 | L | 30.40 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 143033 | |
07/28/2004 20:02 | 07/28/2004 20:02 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Staged Test | Staged Test | KAL | 143166 | |
07/28/2004 20:40 | 07/28/2004 20:40 | Garrison-NWE Mill Creek No 1 230kV line | 230.0 | L | 30.40 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 143035 | |
07/28/2004 20:40 | 07/28/2004 20:40 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Staged Test | Staged Test | KAL | 143167 | |
07/28/2004 23:35 | 07/31/2004 20:13 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 4118 | Plan | Foreign Request | OLY | 143036 | ||
07/28/2004 23:35 | 07/31/2004 20:13 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 4118 | Plan | Foreign Request | OLY | 143036 | |
07/28/2004 23:50 | 07/28/2004 23:50 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Staged Test | Staged Test | KAL | 143037 | |
07/29/2004 00:30 | 07/29/2004 00:30 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Staged Test | Staged Test | KAL | 143038 | |
07/29/2004 01:00 | 07/29/2004 01:00 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Staged Test | Staged Test | KAL | 143039 | |
07/29/2004 01:20 | 07/29/2004 01:20 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Staged Test | Staged Test | KAL | 143040 | |
07/29/2004 01:45 | 07/29/2004 01:45 | Garrison-Taft No 1 500kV line | 500.0 | L | 159.38 | 0 | Auto | Staged Test | Staged Test | KAL | 143041 | |
07/29/2004 01:50 | 07/29/2004 01:51 | Lower Monumental-Hanford No 1 500kV line | 500.0 | L | 53.47 | 1 | Auto | Unknown | Unknown | TRI | 143042 | |
07/29/2004 05:47 | 07/29/2004 08:28 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 161 | Plan | Maintenance | TDA RED | 143043 | |
07/29/2004 05:47 | 07/29/2004 08:28 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 161 | Plan | Maintenance | TDA | 143043 | |||
07/29/2004 07:36 | 07/29/2004 16:15 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 519 | Plan | Foreign Request | RED | 143044 | ||
07/29/2004 07:55 | 07/29/2004 15:03 | Goble-Rainier section of St Helens-Allston No 1 115kV line | 115.0 | S | 5.30 | 428 | Plan | Maintenance | LGV | 143045 | ||
07/29/2004 07:55 | 07/29/2004 15:03 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 428 | Plan | Maintenance | LGV | 143045 | |
07/29/2004 08:00 | 07/29/2004 15:41 | Bandon-Rogue No 1 115kV line | 115.0 | L | G | 46.00 | 461 | Plan | Maintenance | EUG | 143046 | |
07/29/2004 08:00 | 07/29/2004 15:41 | Two Mile-Langlois section of Bandon-Rogue No 1 115kV line | 115.0 | S | 9.70 | 461 | Plan | Maintenance | EUG | 143046 | ||
07/29/2004 09:46 | 07/29/2004 15:22 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 336 | Plan | Maintenance | TDA RED | 143047 | |
07/29/2004 09:46 | 07/29/2004 15:22 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 336 | Plan | Maintenance | TDA | 143047 | |||
07/29/2004 14:19 | 07/29/2004 14:26 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 7 | Plan | Emergency | KAL | 143048 | ||
07/29/2004 15:30 | 07/29/2004 20:06 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 276 | Plan | Emergency | SNO | 143049 | |
07/29/2004 15:30 | 07/29/2004 20:06 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 276 | Plan | Emergency | SNO | 143049 | ||
07/29/2004 15:30 | 07/29/2004 20:08 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | 0.17 | 278 | Plan | Emergency | SNO | 143049 | ||
07/29/2004 15:30 | 07/29/2004 20:06 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | 37.72 | 276 | Plan | Emergency | SNO | 143049 | ||
07/30/2004 06:21 | 07/30/2004 16:30 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 609 | Plan | Foreign Request | TDA | 143060 | ||
07/30/2004 07:16 | 07/30/2004 15:28 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 492 | Plan | Foreign Request | RED | 143061 | ||
07/30/2004 07:45 | 07/30/2004 12:39 | Albany-Lebanon No 1 115kV line | 115.0 | L | G | 17.01 | 294 | Plan | Maintenance | EUG | 143062 | |
07/30/2004 07:45 | 07/30/2004 12:39 | Albany-Lochner section of Albany-Lebanon No 1 115kV line | 115.0 | S | 2.43 | 294 | Plan | Maintenance | EUG | 143062 | ||
07/30/2004 07:57 | 07/30/2004 16:27 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 510 | Plan | Foreign Request | EUG | 143063 | ||
07/30/2004 08:00 | 07/30/2004 14:12 | Goble-Rainier section of St Helens-Allston No 1 115kV line | 115.0 | S | 5.30 | 372 | Plan | Maintenance | LGV | 143064 | ||
07/30/2004 08:00 | 07/30/2004 14:12 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 372 | Plan | Maintenance | LGV | 143064 | |
07/30/2004 08:18 | 07/30/2004 11:19 | Satsop-Aberdeen No 2 230kV line | 230.0 | L | 20.51 | 181 | Plan | Forced | OLY | 143065 | ||
07/30/2004 09:24 | 08/17/2004 03:47 | Columbia Generating Station-Ashe No 1 500kV line | 500.0 | L | 0.55 | 25583 | Auto | Foreign Trouble | Foreign Trouble | TRI | 143066 | |
07/30/2004 11:04 | 07/30/2004 14:30 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 206 | Plan | Voltage Control | KAL | 143067 | ||
07/30/2004 11:20 | 07/30/2004 11:35 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 15 | Plan | Emergency | SPK KAL | 143068 | ||
07/30/2004 11:37 | 07/30/2004 13:58 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 141 | Plan | Switching | TDA RED | 143069 | |
07/30/2004 11:37 | 07/30/2004 13:58 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 141 | Plan | Switching | TDA | 143069 | |||
07/30/2004 12:32 | 07/30/2004 15:21 | Eugene-Lane No 1 115kV line | 115.0 | L | 5.47 | 169 | Plan | Maintenance | EUG | 143070 | ||
07/30/2004 13:36 | 07/30/2004 13:36 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 0 | Auto | Substation Operations | Substation Operations | OLY | 143071 |
07/30/2004 13:36 | 07/30/2004 13:36 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 0 | Auto | Substation Operations | Substation Operations | OLY | 143071 | |
07/30/2004 13:36 | 07/30/2004 13:36 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Substation Operations | Substation Operations | OLY | 143071 |
07/30/2004 13:36 | 07/30/2004 13:36 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 0 | Auto | Substation Operations | Substation Operations | OLY | 143071 |
07/30/2004 13:36 | 07/30/2004 13:36 | Port Angeles-Sappho No 1 115kV line | 115.0 | L | 42.03 | 0 | Auto | Forced (Configuration) | Substation Operations | OLY | 143072 | |
07/30/2004 14:17 | 07/30/2004 14:23 | Schultz-Raver No 3 500kV line | 500.0 | L | 77.47 | 6 | Auto | Smoke | Smoke | WEN COV | 143073 | |
07/30/2004 14:17 | 07/30/2004 14:23 | Vantage-Schultz No 1 500kV line | 500.0 | L | 34.65 | 6 | Auto | Forced (Configuration) | Forced (Configuration) | WEN | 143909 | |
07/30/2004 17:56 | 07/30/2004 17:56 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143074 | |
07/31/2004 07:03 | 07/31/2004 10:54 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 231 | Plan | Maintenance | COV | 143077 | ||
07/31/2004 18:14 | 07/31/2004 18:17 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 3 | Plan | Switching | KAL | 143078 | ||
08/01/2004 02:01 | 08/01/2004 08:58 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 417 | Plan | Voltage Control | TDA RED SAL | 143079 | ||
08/01/2004 05:19 | 08/01/2004 05:19 | Goshen-Eagle Rock No 1 161kV line | 161.0 | L | 11.60 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143083 | |
08/01/2004 05:19 | 08/01/2004 05:19 | Westside tap to Goshen-Eagle Rock No 1 161kV line | 161.0 | T | G | 0.10 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143083 |
08/01/2004 08:41 | 08/03/2004 11:39 | Rogue-Gold Beach No 2 115kV line | 115.0 | L | 5.49 | 3058 | Plan | Foreign Request | EUG | 143084 | ||
08/01/2004 14:17 | 08/01/2004 14:19 | McNary-Santiam No 2 230kV line | 230.0 | L | O | 200.43 | 2 | Plan | Emergency | TRI TDA RED SAL | 143085 | |
08/01/2004 14:17 | 08/01/2004 14:19 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.10 | 2 | Plan | Emergency | SAL | 143085 | ||
08/01/2004 14:17 | 08/01/2004 14:19 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 2 | Plan | Emergency | SAL | 143085 | ||
08/01/2004 18:17 | 08/01/2004 18:17 | Lower Monumental-Ashe No 1 500kV line | 500.0 | L | 39.58 | 0 | Auto | Unknown | Unknown | TRI | 143086 | |
08/01/2004 21:21 | 08/02/2004 11:06 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 825 | Plan | Emergency | WEN SPK | 143087 | |
08/01/2004 21:21 | 08/02/2004 11:06 | Larene-Springhill section of Creston-Bell No 1 115kV line | 115.0 | S | 27.16 | 825 | Plan | Emergency | SPK | 143087 | ||
08/01/2004 23:10 | 08/02/2004 02:29 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 199 | Plan | Emergency | TDA RED | 143088 | |
08/01/2004 23:10 | 08/02/2004 02:29 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 199 | Plan | Emergency | TDA | 143088 | |||
08/02/2004 03:05 | 08/02/2004 05:23 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 138 | Plan | Voltage Control | TDA RED SAL | 143089 | ||
08/02/2004 05:05 | 08/05/2004 14:04 | Bonneville PH 2-North Bonneville No 4 230kV line | 230.0 | L | 1.33 | 4859 | Plan | Foreign Request | LGV | 143100 | ||
08/02/2004 06:06 | 08/03/2004 17:04 | Columbia-Grand Coulee No 1 230kV line | 230.0 | L | 72.61 | 2098 | Plan | Foreign Request | WEN | 143101 | ||
08/02/2004 07:38 | 08/06/2004 15:06 | Fargo-Chemawa section of Oregon City-Chemawa No 2 115kV line | 115.0 | S | 18.50 | 6208 | Plan | Maintenance | SAL | 143102 | ||
08/02/2004 07:38 | 08/06/2004 15:06 | Oregon City-Chemawa No 2 115kV line | 115.0 | L | G | 25.20 | 6208 | Plan | Maintenance | SAL | 143102 | |
08/02/2004 07:40 | 08/02/2004 08:34 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 54 | Plan | Maintenance | EUG | 143103 | |
08/02/2004 07:40 | 08/02/2004 08:34 | Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.66 | 54 | Plan | Maintenance | EUG | 143103 | ||
08/02/2004 07:50 | 08/06/2004 07:52 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5762 | Plan | Maintenance | IDF | 143104 | ||
08/02/2004 07:55 | 08/02/2004 16:35 | Pilot Butte-La Pine No 1 230kV line | 230.0 | L | 29.60 | 520 | Plan | Maintenance | RED | 143105 | ||
08/02/2004 08:00 | 08/03/2004 10:50 | Bonneville PH 1-Hood River No 1 115kV line | 115.0 | L | G | 22.61 | 1610 | Plan | Maintenance | LGV TDA | 143106 | |
08/02/2004 08:00 | 08/03/2004 10:50 | Cascade Locks-Hood River section of Bonneville PH 1-Hood River No 1 115kV line | 115.0 | S | 16.64 | 1610 | Plan | Maintenance | TDA | 143106 | ||
08/02/2004 08:14 | 08/02/2004 08:18 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 4 | Auto | Foreign Trouble | Foreign Trouble | KAL | 143107 | |
08/02/2004 08:17 | 08/02/2004 08:17 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 29.39 | 0 | Auto | Unknown | Lightning | TDA | 143108 |
08/02/2004 08:17 | 08/02/2004 08:17 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | 97.46 | 0 | Auto | Unknown | Lightning | TDA RED | 143108 | |
08/02/2004 08:17 | 08/02/2004 08:17 | Maupin tap to Big Eddy-Redmond No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Unknown | Lightning | TDA | 143108 |
08/02/2004 08:17 | 08/02/2004 08:17 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 68.07 | 0 | Auto | Unknown | Lightning | TDA RED | 143108 |
08/02/2004 08:17 | 08/02/2004 08:39 | Bakeoven-Maupin section of Fossil-Maupin 69kV line | 69.0 | S | 7.00 | 22 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | RED | 143109 | |
08/02/2004 08:17 | 08/02/2004 08:39 | Fossil-Maupin 69kV line | 69.0 | L | G | 56.93 | 22 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | TDA | 143109 |
08/02/2004 08:18 | 08/02/2004 08:19 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 29.39 | 1 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | TDA | 143165 |
08/02/2004 08:18 | 08/02/2004 08:19 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | 97.46 | 1 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | TDA RED | 143165 | |
08/02/2004 08:18 | 08/02/2004 08:19 | Maupin tap to Big Eddy-Redmond No 1 230kV line | 230.0 | T | G | 0.10 | 1 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | TDA | 143165 |
08/02/2004 08:18 | 08/02/2004 08:19 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 68.07 | 1 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | TDA RED | 143165 |
08/02/2004 08:20 | 08/02/2004 14:07 | Goble-Rainier section of St Helens-Allston No 1 115kV line | 115.0 | S | 5.30 | 347 | Plan | Maintenance | LGV | 143110 | ||
08/02/2004 08:20 | 08/02/2004 14:07 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 347 | Plan | Maintenance | LGV | 143110 | |
08/02/2004 09:02 | 08/03/2004 15:06 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 1804 | Plan | Maintenance | TRI | 143111 | |
08/02/2004 09:02 | 08/03/2004 15:06 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 53.10 | 1804 | Plan | Maintenance | TRI | 143111 | ||
08/02/2004 11:39 | 08/06/2004 13:52 | B212-Wilbur section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 16.47 | 5893 | Plan | Maintenance | WEN | 143112 | ||
08/02/2004 11:39 | 08/06/2004 13:52 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | G | 28.27 | 5893 | Plan | Maintenance | WEN SPK | 143112 | |
08/02/2004 14:05 | 08/02/2004 14:16 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 11 | Auto | Human Element | Human Element | KAL | 143113 | |
08/02/2004 14:58 | 08/02/2004 23:35 | Roundup-LaGrande No 1 230kV line | 230.0 | L | 45.02 | 517 | Auto | Lightning | Lightning | TRI | 143114 | |
08/02/2004 17:06 | 08/02/2004 17:06 | Macks Inn-Madison No 1 115kV line | 115.0 | L | 17.12 | 0 | Auto | Lightning | Lightning | IDF | 143115 | |
08/02/2004 17:26 | 08/02/2004 17:29 | John Day-Grizzly No 1 500kV line | 500.0 | L | 88.41 | 3 | Auto | Lightning | Lightning | TDA RED | 143116 | |
08/02/2004 17:41 | 08/02/2004 17:41 | Hatwai-AVA Moscow No 3 230kV line | 230.0 | L | 18.10 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143117 | |
08/02/2004 18:22 | 08/02/2004 18:22 | Hanford-Ostrander No 1 500kV line | 500.0 | L | 180.30 | 0 | Auto | Lightning | Lightning | TRI WEN TDA LGV | 143118 | |
08/02/2004 19:27 | 08/02/2004 19:27 | Midway-PACW Union Gap No 1 230kV line | 230.0 | L | 39.10 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 143119 | |
08/02/2004 23:30 | 08/03/2004 17:16 | Hatwai-AVA Moscow No 3 230kV line | 230.0 | L | 18.10 | 1066 | Plan | Foreign Request | SPK | 143120 | ||
08/03/2004 01:43 | 08/03/2004 02:43 | Dixon tap to Hot Springs-Rattlesnake No 1 230kV line | 230.0 | T | 0.10 | 60 | Auto | Unknown | Weather | KAL | 143121 | |
08/03/2004 01:43 | 08/03/2004 02:43 | Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | 33.85 | 60 | Auto | Unknown | Weather | KAL | 143121 | |
08/03/2004 01:43 | 08/03/2004 14:13 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | 25.06 | 750 | Auto | Unknown | Weather | KAL | 143121 | |
08/03/2004 01:43 | 08/03/2004 14:13 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | G | 58.91 | 750 | Auto | Unknown | Weather | KAL | 143121 |
08/03/2004 06:14 | 08/03/2004 06:14 | Clarkston tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Unknown | TRI | 143149 | ||
08/03/2004 06:14 | 08/03/2004 06:14 | Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 3.71 | 0 | Auto | Unknown | TRI | 143149 | ||
08/03/2004 06:14 | 08/03/2004 06:14 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 0 | Auto | Unknown | TRI | 143149 | |
08/03/2004 06:51 | 08/03/2004 12:15 | Garrison-NWE Ovando No 1 230kV line | 230.0 | L | 32.60 | 324 | Plan | Foreign Request | KAL | 143150 | ||
08/03/2004 07:20 | 08/03/2004 15:56 | Pilot Butte-La Pine No 1 230kV line | 230.0 | L | 29.60 | 516 | Plan | Maintenance | RED | 143151 | ||
08/03/2004 07:43 | 08/03/2004 14:51 | Rainier-Allston section of St Helens-Allston No 1 115kV line | 115.0 | S | 6.25 | 428 | Plan | Maintenance | LGV | 143152 | ||
08/03/2004 07:43 | 08/03/2004 14:51 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 428 | Plan | Maintenance | LGV | 143152 | |
08/03/2004 07:50 | 08/04/2004 09:53 | Goose Lake-Okanogan section of Grand Coulee-Okanogan No 2 115kV line | 115.0 | S | 20.00 | 1563 | Plan | Foreign Request | WEN | 143153 | ||
08/03/2004 07:50 | 08/04/2004 09:53 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | G | 41.05 | 1563 | Plan | Foreign Request | WEN | 143153 | |
08/03/2004 11:29 | 08/03/2004 11:29 | Bandon-Rogue No 1 115kV line | 115.0 | L | 46.00 | 0 | Auto | Unknown | Tree cut | EUG | 143154 | |
08/03/2004 11:29 | 08/03/2004 11:29 | Bandon-Two Mile section of Bandon-Rogue No 1 115kV line | 115.0 | S | G | 4.40 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Geisel Monument tap to Bandon-Rogue No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Geisel Monument-Rogue section of Bandon-Rogue No 1 115kV line | 115.0 | S | G | 0.40 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Langlois tap to Bandon-Rogue No 1 115kV line | 115.0 | T | G | 0.28 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Langlois-Port Orford section of Bandon-Rogue No 1 115kV line | 115.0 | S | G | 10.00 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Port Orford tap to Bandon-Rogue No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Port Orford-Geisel Monument section of Bandon-Rogue No 1 115kV line | 115.0 | S | G | 21.50 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Two Mile tap to Bandon-Rogue No 1 115kV line | 115.0 | T | G | 0.02 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 11:29 | 08/03/2004 11:29 | Two Mile-Langlois section of Bandon-Rogue No 1 115kV line | 115.0 | S | G | 9.70 | 0 | Auto | Unknown | Tree cut | EUG | 143154 |
08/03/2004 12:28 | 08/03/2004 19:20 | Benton-Ringold section of Benton-Scooteney No 1 115kV line | 115.0 | S | 7.84 | 412 | Plan | Maintenance | TRI | 143155 | ||
08/03/2004 12:28 | 08/03/2004 19:20 | Benton-Scooteney No 1 115kV line | 115.0 | L | O | 20.32 | 412 | Plan | Maintenance | TRI | 143155 | |
08/03/2004 13:58 | 08/03/2004 13:59 | Benton-Franklin No 2 115kV line | 115.0 | L | G | 21.03 | 1 | Auto | Substation Operations | Substation Operations | TRI | 143156 |
08/03/2004 13:58 | 08/03/2004 13:59 | Glade-Franklin section of Benton-Franklin No 2 115kV line | 115.0 | S | 9.09 | 1 | Auto | Substation Operations | Substation Operations | TRI | 143156 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Court Street tap to Franklin-Ruby Street No 1 115kV line | 115.0 | T | G | 0.10 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143157 |
08/03/2004 13:58 | 08/03/2004 14:00 | Court Street-Ruby Street section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | G | 1.83 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143157 |
08/03/2004 13:58 | 08/03/2004 14:00 | Foster Wells tap to Franklin-Ruby Street No 1 115kV line | 115.0 | T | G | 0.31 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143157 |
08/03/2004 13:58 | 08/03/2004 14:00 | Foster Wells-Court Street section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | G | 0.32 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143157 |
08/03/2004 13:58 | 08/03/2004 14:00 | Franklin-Foster Wells section of Franklin-Ruby Street No 1 115kV line | 115.0 | S | G | 2.70 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143157 |
08/03/2004 13:58 | 08/03/2004 14:00 | Franklin-Ruby Street No 1 115kV line | 115.0 | L | 4.85 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143157 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | 4.29 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143158 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | G | 35.95 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143158 |
08/03/2004 13:58 | 08/03/2004 14:15 | Ice Harbor-Franklin No 2 115kV line | 115.0 | L | G | 9.07 | 17 | Auto | Substation Operations | Substation Operations | TRI | 143159 |
08/03/2004 13:58 | 08/03/2004 14:15 | Martindale-Franklin section of Ice Harbor-Franklin No 2 115kV line | 115.0 | S | 5.20 | 17 | Auto | Substation Operations | Substation Operations | TRI | 143159 | |
08/03/2004 13:58 | 08/03/2004 14:15 | Ice Harbor-Franklin No 3 115kV line | 115.0 | L | 9.08 | 17 | Auto | Substation Operations | Substation Operations | TRI | 143160 | |
08/03/2004 13:58 | 08/03/2004 14:15 | Ice Harbor-Levey section of Ice Harbor-Franklin No 3 115kV line | 115.0 | S | G | 0.88 | 17 | Auto | Substation Operations | Substation Operations | TRI | 143160 |
08/03/2004 13:58 | 08/03/2004 14:15 | Levey tap to Ice Harbor-Franklin No 3 115kV line | 115.0 | T | G | 0.10 | 17 | Auto | Substation Operations | Substation Operations | TRI | 143160 |
08/03/2004 13:58 | 08/03/2004 14:15 | Levey-Franklin section of Ice Harbor-Franklin No 3 115kV line | 115.0 | S | G | 8.20 | 17 | Auto | Substation Operations | Substation Operations | TRI | 143160 |
08/03/2004 13:58 | 08/03/2004 14:00 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | O | 13.35 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143161 |
08/03/2004 13:58 | 08/03/2004 14:00 | Franklin-Gum Street section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 5.56 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143161 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Gum Street-Kennewick section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 0.56 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143161 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Kennewick tap to Franklin-Badger Canyon No 2 115kV line | 115.0 | T | 0.54 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143161 | |
08/03/2004 13:58 | 08/03/2004 14:00 | Kennewick-Ely section of Franklin-Badger Canyon No 2 115kV line | 115.0 | S | 1.70 | 2 | Auto | Substation Operations | Substation Operations | TRI | 143161 | |
08/03/2004 19:20 | Benton-Scooteney No 1 115kV line | 115.0 | L | G | 20.32 | still out | Plan | Normally Out | TRI | 143242 | ||
08/03/2004 19:20 | Connell-Scooteney section of Benton-Scooteney No 1 115kV line | 115.0 | S | 1.57 | still out | Plan | Normally Out | TRI | 143242 | |||
08/03/2004 21:00 | 08/03/2004 22:43 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 103 | Plan | Testing | TDA RED | 143162 | |
08/03/2004 21:00 | 08/03/2004 22:43 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 103 | Plan | Testing | TDA | 143162 | |||
08/03/2004 21:00 | 08/03/2004 22:43 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 103 | Plan | Testing | TDA | 143162 | |||
08/03/2004 23:16 | 08/03/2004 23:16 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Lightning | RED | 143163 |
08/03/2004 23:16 | 08/03/2004 23:16 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Lightning | RED | 143163 |
08/03/2004 23:16 | 08/03/2004 23:16 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Lightning | RED | 143163 |
08/03/2004 23:16 | 08/03/2004 23:16 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Lightning | RED | 143163 |
08/03/2004 23:16 | 08/03/2004 23:16 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Lightning | RED | 143163 | |
08/03/2004 23:16 | 08/03/2004 23:16 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Lightning | RED | 143163 |
08/03/2004 23:16 | 08/03/2004 23:16 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Lightning | RED | 143163 |
08/04/2004 04:19 | 08/04/2004 05:46 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 87 | Auto | Terminal Equipment Failure | TDA RED | 143164 | ||
08/04/2004 04:19 | 08/04/2004 05:46 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 87 | Auto | Terminal Equipment Failure | TDA | 143164 | |||
08/04/2004 04:19 | 08/04/2004 05:46 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 87 | Auto | Terminal Equipment Failure | TDA | 143164 | |||
08/04/2004 04:19 | 08/04/2004 05:46 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 87 | Auto | Terminal Equipment Failure | TDA | 143164 | |||
08/04/2004 04:19 | 08/04/2004 05:46 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 87 | Auto | Terminal Equipment Failure | TDA | 143164 | |||
08/04/2004 04:19 | 08/04/2004 05:46 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 87 | Auto | Terminal Equipment Failure | TDA | 143164 | |||
08/04/2004 06:02 | 08/06/2004 12:23 | Columbia-Grand Coulee No 3 230kV line | 230.0 | L | 72.94 | 3261 | Plan | Foreign Request | WEN | 143191 | ||
08/04/2004 07:03 | 08/04/2004 14:58 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 475 | Plan | Maintenance | KAL | 143192 | ||
08/04/2004 07:41 | 08/06/2004 14:55 | Bonneville PH 1-Hood River No 1 115kV line | 115.0 | L | G | 22.61 | 3314 | Plan | Maintenance | LGV TDA | 143193 | |
08/04/2004 07:41 | 08/06/2004 14:55 | Cascade Locks-Hood River section of Bonneville PH 1-Hood River No 1 115kV line | 115.0 | S | 16.64 | 3314 | Plan | Maintenance | TDA | 143193 | ||
08/04/2004 07:43 | 08/04/2004 16:24 | Rainier-Allston section of St Helens-Allston No 1 115kV line | 115.0 | S | 6.25 | 521 | Plan | Maintenance | LGV | 143194 | ||
08/04/2004 07:43 | 08/04/2004 16:24 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 521 | Plan | Maintenance | LGV | 143194 | |
08/04/2004 07:55 | 08/04/2004 13:20 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 325 | Plan | Testing | EUG | 143195 | ||
08/04/2004 08:15 | 08/31/2004 09:45 | Shelton-Kitsap No 4 230kV line | 230.0 | L | 30.29 | 38970 | Plan | Maintenance | OLY | 143196 | ||
08/04/2004 08:25 | 08/04/2004 12:12 | Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | 8.60 | 227 | Plan | Foreign Request | SAL | 143197 | ||
08/04/2004 08:25 | 08/04/2004 12:12 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | G | 57.70 | 227 | Plan | Foreign Request | SAL | 143197 | |
08/04/2004 12:03 | 08/04/2004 12:03 | Maupin-Tygh Valley No 1 69kV line | 69.0 | L | 3.26 | 0 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143300 | |
08/04/2004 12:03 | 08/04/2004 12:03 | Wamic tap to Maupin-Tygh Valley No 1 69kV line | 69.0 | T | G | 11.25 | 0 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143300 |
08/04/2004 13:37 | 08/04/2004 13:55 | Moxee-Union Gap No 1 115kV line | 115.0 | L | 6.50 | 18 | Plan | Load Control | TRI | 143198 | ||
08/04/2004 14:26 | 08/04/2004 20:43 | Walla Walla-PACW Walla Walla No 1 69kV line | 69.0 | L | 1.40 | 377 | Auto | Foreign Trouble | TRI | 143199 | ||
08/04/2004 18:03 | 08/04/2004 18:04 | Rattlesnake-Garrison No 1 230kV line | 230.0 | L | 60.94 | 1 | Auto | Lightning | Lightning | KAL | 143200 | |
08/04/2004 18:15 | 08/04/2004 18:15 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 0 | Auto | Lightning | Lightning | WEN SNO | 143201 | |
08/04/2004 19:22 | 08/04/2004 19:22 | B408-Jenkins section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | G | 23.63 | 0 | Auto | Lightning | Lightning | WEN | 143202 |
08/04/2004 19:22 | 08/04/2004 19:22 | Columbia-B408 section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | G | 0.04 | 0 | Auto | Lightning | Lightning | WEN | 143202 |
08/04/2004 19:22 | 08/04/2004 19:22 | Columbia-Ellensburg No 1 115kV line | 115.0 | L | 34.98 | 0 | Auto | Lightning | Lightning | WEN | 143202 | |
08/04/2004 19:22 | 08/04/2004 19:22 | East Ellensburg tap to Columbia-Ellensburg No 1 115kV line | 115.0 | T | G | 3.21 | 0 | Auto | Lightning | Lightning | WEN | 143202 |
08/04/2004 19:22 | 08/04/2004 19:22 | East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | G | 1.09 | 0 | Auto | Lightning | Lightning | WEN | 143202 |
08/04/2004 19:22 | 08/04/2004 19:22 | Jenkins tap to Columbia-Ellensburg No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | WEN | 143202 |
08/04/2004 19:22 | 08/04/2004 19:22 | Jenkins-East Ellensburg section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | G | 10.22 | 0 | Auto | Lightning | Lightning | WEN | 143202 |
08/04/2004 19:26 | 08/04/2004 19:26 | Condon tap to De Moss-Fossil No 1 69kV line | 69.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TDA | 143203 |
08/04/2004 19:26 | 08/04/2004 19:26 | Condon Wind tap to De Moss-Fossil No 1 69kV line | 69.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | TDA | 143203 |
08/04/2004 19:26 | 08/04/2004 19:26 | Condon Wind-Condon section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 1.46 | 0 | Auto | Lightning | Lightning | TDA | 143203 |
08/04/2004 19:26 | 08/04/2004 19:26 | Condon-Fossil section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 18.43 | 0 | Auto | Lightning | Lightning | TDA | 143203 |
08/04/2004 19:26 | 08/04/2004 19:26 | De Moss-Fossil No 1 69kV line | 69.0 | L | 52.93 | 0 | Auto | Lightning | Lightning | TDA | 143203 | |
08/04/2004 19:26 | 08/04/2004 19:26 | De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 0.11 | 0 | Auto | Lightning | Lightning | TDA | 143203 |
08/04/2004 19:26 | 08/04/2004 19:26 | Gordon Hollow tap to De Moss-Fossil No 1 69kV line | 69.0 | T | G | 0.11 | 0 | Auto | Lightning | Lightning | TDA | 143203 |
08/04/2004 19:26 | 08/04/2004 19:26 | Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 32.93 | 0 | Auto | Lightning | Lightning | TDA | 143203 |
08/04/2004 20:09 | 08/04/2004 20:09 | Burbank tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | TRI | 143204 |
08/04/2004 20:09 | 08/04/2004 20:09 | Burbank-Joso section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 9.79 | 0 | Auto | Lightning | Lightning | TRI | 143204 |
08/04/2004 20:09 | 08/04/2004 20:09 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 4.29 | 0 | Auto | Lightning | Lightning | TRI | 143204 |
08/04/2004 20:09 | 08/04/2004 20:09 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | 35.95 | 0 | Auto | Lightning | Lightning | TRI | 143204 | |
08/04/2004 20:09 | 08/04/2004 20:09 | Joso tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 143204 |
08/04/2004 20:09 | 08/04/2004 20:09 | Joso-Nine Mile section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 3.66 | 0 | Auto | Lightning | Lightning | TRI | 143204 |
08/04/2004 20:09 | 08/04/2004 20:09 | Nine Mile tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 6.00 | 0 | Auto | Lightning | Lightning | TRI | 143204 |
08/04/2004 20:09 | 08/04/2004 20:09 | Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 18.21 | 0 | Auto | Lightning | Lightning | TRI | 143204 |
08/04/2004 20:13 | 08/04/2004 20:13 | Burbank tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | TRI | 143205 |
08/04/2004 20:13 | 08/04/2004 20:13 | Burbank-Joso section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 9.79 | 0 | Auto | Lightning | Lightning | TRI | 143205 |
08/04/2004 20:13 | 08/04/2004 20:13 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 4.29 | 0 | Auto | Lightning | Lightning | TRI | 143205 |
08/04/2004 20:13 | 08/04/2004 20:13 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | 35.95 | 0 | Auto | Lightning | Lightning | TRI | 143205 | |
08/04/2004 20:13 | 08/04/2004 20:13 | Joso tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 143205 |
08/04/2004 20:13 | 08/04/2004 20:13 | Joso-Nine Mile section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 3.66 | 0 | Auto | Lightning | Lightning | TRI | 143205 |
08/04/2004 20:13 | 08/04/2004 20:13 | Nine Mile tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 6.00 | 0 | Auto | Lightning | Lightning | TRI | 143205 |
08/04/2004 20:13 | 08/04/2004 20:13 | Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 18.21 | 0 | Auto | Lightning | Lightning | TRI | 143205 |
08/04/2004 20:16 | 08/04/2004 20:16 | Burbank tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | TRI | 143206 |
08/04/2004 20:16 | 08/04/2004 20:16 | Burbank-Joso section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 9.79 | 0 | Auto | Lightning | Lightning | TRI | 143206 |
08/04/2004 20:16 | 08/04/2004 20:16 | Franklin-Burbank section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 4.29 | 0 | Auto | Lightning | Lightning | TRI | 143206 |
08/04/2004 20:16 | 08/04/2004 20:16 | Franklin-Walla Walla No 1 115kV line | 115.0 | L | 35.95 | 0 | Auto | Lightning | Lightning | TRI | 143206 | |
08/04/2004 20:16 | 08/04/2004 20:16 | Joso tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 143206 |
08/04/2004 20:16 | 08/04/2004 20:16 | Joso-Nine Mile section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 3.66 | 0 | Auto | Lightning | Lightning | TRI | 143206 |
08/04/2004 20:16 | 08/04/2004 20:16 | Nine Mile tap to Franklin-Walla Walla No 1 115kV line | 115.0 | T | G | 6.00 | 0 | Auto | Lightning | Lightning | TRI | 143206 |
08/04/2004 20:16 | 08/04/2004 20:16 | Nine Mile-Walla Walla section of Franklin-Walla Walla No 1 115kV line | 115.0 | S | G | 18.21 | 0 | Auto | Lightning | Lightning | TRI | 143206 |
08/04/2004 20:34 | 08/04/2004 20:34 | Sickler-Schultz No 1 500kV line | 500.0 | L | 38.43 | 0 | Auto | Lightning | Lightning | WEN | 143207 | |
08/04/2004 20:46 | 08/04/2004 20:46 | Lower Monumental-Hanford No 1 500kV line | 500.0 | L | 53.47 | 0 | Auto | Lightning | Lightning | TRI | 143208 | |
08/04/2004 20:46 | 08/04/2004 20:46 | Page tap to Sacajawea-Sun Harbor No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 143209 | |
08/04/2004 20:46 | 08/04/2004 20:46 | Sacajawea-Sun Harbor No 1 115kV line | 115.0 | L | 2.14 | 0 | Auto | Lightning | Lightning | TRI | 143209 | |
08/04/2004 23:14 | 08/04/2004 23:16 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 2 | Auto | Lightning | Lightning | WEN SPK | 143210 | |
08/05/2004 00:10 | 08/05/2004 00:13 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 3 | Auto | Lightning | Lightning | RED | 143211 | |
08/05/2004 00:10 | 08/05/2004 00:10 | La Pine-Fort Rock No 1 115kV line | 115.0 | L | 47.03 | 0 | Auto | Lightning | Lightning | RED | 143212 | |
08/05/2004 01:44 | 08/05/2004 02:53 | Palisades-Goshen No 1 115kV line | 115.0 | L | 51.71 | 69 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143213 | |
08/05/2004 01:44 | 08/05/2004 03:54 | Palisades-Swan Valley No 1 115kV line | 115.0 | L | 12.40 | 130 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143214 | |
08/05/2004 01:44 | 08/05/2004 03:53 | Palisades-Snake River No 1 115kV line | 115.0 | L | 17.50 | 129 | Auto | Foreign Trouble | IDF | 143215 | ||
08/05/2004 02:56 | 08/05/2004 02:56 | McNary-Ross No 1 345kV line | 345.0 | L | 174.57 | 0 | Auto | Lightning | Lightning | TRI TDA LGV | 143216 | |
08/05/2004 04:36 | 08/05/2004 04:36 | Lower Monumental-Hanford No 1 500kV line | 500.0 | L | 53.47 | 0 | Auto | Lightning | Lightning | TRI | 143217 | |
08/05/2004 04:44 | 08/05/2004 04:44 | Hanford-John Day No 1 500kV line | 500.0 | L | 97.27 | 0 | Auto | Lightning | Lightning | TRI WEN TDA | 143218 | |
08/05/2004 05:43 | 08/05/2004 05:43 | Benton-Franklin No 2 115kV line | 115.0 | L | 21.03 | 0 | Auto | Lightning | Lightning | TRI | 143243 | |
08/05/2004 05:43 | 08/05/2004 05:43 | Benton-Glade section of Benton-Franklin No 2 115kV line | 115.0 | S | G | 11.94 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 05:43 | 08/05/2004 05:43 | Broadmoor-Taylor Flats section of Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TS | G | 2.44 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 05:43 | 08/05/2004 05:43 | Glade tap to Benton-Franklin No 2 115kV line | 115.0 | T | G | 0.03 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 05:43 | 08/05/2004 05:43 | Glade-Franklin section of Benton-Franklin No 2 115kV line | 115.0 | S | G | 9.09 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 05:43 | 08/05/2004 05:43 | North Pasco tap to Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TT | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 05:43 | 08/05/2004 05:43 | North Pasco-Broadmoor section of Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TS | G | 4.67 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 05:43 | 08/05/2004 05:43 | Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | T | G | 8.63 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 05:43 | 08/05/2004 05:43 | Taylor Flats tap-North Pasco section of Taylor Flats tap to Benton-Franklin No 2 115kV line | 115.0 | TS | G | 1.52 | 0 | Auto | Lightning | Lightning | TRI | 143243 |
08/05/2004 07:31 | 08/05/2004 15:20 | Snohomish-Beverly Park No 3 115kV line | 115.0 | L | 4.59 | 469 | Plan | Maintenance | SNO | 143244 | ||
08/05/2004 07:49 | 08/05/2004 14:04 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 375 | Plan | Maintenance | EUG | 143245 | |
08/05/2004 07:49 | 08/05/2004 14:04 | Rainbow-Fern Ridge section of Lane-Wendson No 1 115kV line | 115.0 | S | 5.58 | 375 | Plan | Maintenance | EUG | 143245 | ||
08/05/2004 08:39 | 08/05/2004 12:29 | Fairview-PACW Isthmus No 2 230kV line | 230.0 | L | 11.90 | 230 | Plan | Construction | EUG | 143246 | ||
08/05/2004 09:34 | 08/05/2004 14:33 | Fairview-Bandon No 1 115kV line | 115.0 | L | T | 25.16 | 299 | Plan | Foreign Request | EUG | 143247 | |
08/05/2004 09:34 | 08/05/2004 14:33 | Morrison tap to Fairview-Bandon No 1 115kV line | 115.0 | T | 0.10 | 299 | Plan | Foreign Request | EUG | 143247 | ||
08/05/2004 09:34 | 08/05/2004 14:33 | Fairview-Bandon No 1 115kV line | 115.0 | L | G | 25.16 | 299 | Plan | Switching | EUG | 143248 | |
08/05/2004 09:34 | 08/05/2004 14:33 | Morrison-Bandon section of Fairview-Bandon No 1 115kV line | 115.0 | S | 2.31 | 299 | Plan | Switching | EUG | 143248 | ||
08/05/2004 11:16 | 08/05/2004 11:24 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 8 | Plan | Foreign Request | TDA | 143249 | ||
08/05/2004 11:47 | 08/05/2004 11:47 | Cosmopolis-Aberdeen No 1 115kV line | 115.0 | L | 6.79 | 0 | Auto | Unknown | Unknown | OLY | 143250 | |
08/05/2004 14:05 | 08/05/2004 17:23 | Midway-Priest Rapids No 2 230kV line | 230.0 | L | 7.50 | 198 | Auto | Foreign Trouble | Foreign Trouble | TRI | 143251 | |
08/05/2004 14:26 | 08/05/2004 14:30 | Bonneville PH 2-North Bonneville No 4 230kV line | 230.0 | L | 1.33 | 4 | Auto | Foreign Trouble | Foreign Trouble | LGV | 143252 | |
08/05/2004 16:16 | 08/05/2004 16:56 | Bonneville PH 2-North Bonneville No 4 230kV line | 230.0 | L | 1.33 | 40 | Auto | Foreign Trouble | Foreign Trouble | LGV | 143253 | |
08/06/2004 05:04 | 08/06/2004 10:15 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 311 | Plan | Foreign Request | TDA | 143276 | ||
08/06/2004 05:04 | 08/06/2004 10:15 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 311 | Plan | Foreign Request | TDA | 143277 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 338 | Plan | Foreign Request | TDA RED | 143278 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143278 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143278 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143278 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143278 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143278 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 338 | Plan | Foreign Request | TDA RED | 143279 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143279 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143279 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143279 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143279 | ||
08/06/2004 05:04 | 08/06/2004 10:42 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 338 | Plan | Foreign Request | TDA | 143279 | ||
08/06/2004 07:54 | 08/06/2004 13:23 | Rainier-Allston section of St Helens-Allston No 1 115kV line | 115.0 | S | 6.25 | 329 | Plan | Maintenance | LGV | 143280 | ||
08/06/2004 07:54 | 08/06/2004 13:23 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 329 | Plan | Maintenance | LGV | 143280 | |
08/06/2004 08:26 | 08/06/2004 10:25 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 119 | Plan | Construction | EUG | 143281 | ||
08/06/2004 08:28 | 08/06/2004 08:28 | Bell-AVA Beacon No 1 115kV line | 115.0 | L | 6.60 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143282 | |
08/06/2004 17:59 | 08/06/2004 19:03 | Tacoma-Raver No 1&2 500kV line | 500.0 | L | 33.06 | 64 | Auto | Lightning | Lightning | COV | 143283 | |
08/06/2004 18:00 | 08/08/2004 22:17 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 3137 | Plan | Foreign Request | TDA RED | 143284 | ||
08/06/2004 18:00 | 08/08/2004 22:17 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 3137 | Plan | Foreign Request | TDA | 143284 | ||
08/06/2004 18:00 | 08/08/2004 22:17 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 3137 | Plan | Foreign Request | TDA | 143284 | ||
08/06/2004 18:00 | 08/08/2004 22:17 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 3137 | Plan | Foreign Request | TDA | 143284 | ||
08/06/2004 18:00 | 08/08/2004 22:17 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 3137 | Plan | Foreign Request | TDA | 143284 | ||
08/06/2004 18:00 | 08/08/2004 22:17 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 3137 | Plan | Foreign Request | TDA | 143284 | ||
08/06/2004 18:00 | 08/06/2004 18:50 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 50 | Plan | Foreign Request | TDA RED | 143285 | ||
08/06/2004 18:00 | 08/06/2004 18:50 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 50 | Plan | Foreign Request | TDA | 143285 | ||
08/06/2004 18:00 | 08/06/2004 18:50 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 50 | Plan | Foreign Request | TDA | 143285 | ||
08/06/2004 18:00 | 08/06/2004 18:50 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 50 | Plan | Foreign Request | TDA | 143285 | ||
08/06/2004 18:00 | 08/06/2004 18:50 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 50 | Plan | Foreign Request | TDA | 143285 | ||
08/06/2004 18:00 | 08/06/2004 18:50 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 50 | Plan | Foreign Request | TDA | 143285 | ||
08/06/2004 18:02 | 08/06/2004 18:02 | Boardman-Ione No 1 69kV line | 69.0 | L | 30.09 | 0 | Auto | Unknown | Lightning | TRI | 143414 | |
08/06/2004 18:30 | 08/08/2004 22:10 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 3100 | Plan | Foreign Request | TDA | 143286 | ||
08/06/2004 18:30 | 08/06/2004 18:35 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Foreign Request | TDA | 143287 | ||
08/06/2004 18:50 | 08/06/2004 18:52 | B-1345-B-1605 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 0.34 | 2 | Auto | Lightning | Lightning | TRI | 143288 |
08/06/2004 18:50 | 08/06/2004 18:52 | B-1605-B-1014 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 2.14 | 2 | Auto | Lightning | Lightning | TRI | 143288 |
08/06/2004 18:50 | 08/06/2004 18:52 | H2F-Nine Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 12.58 | 2 | Auto | Lightning | Lightning | TRI | 143288 |
08/06/2004 18:50 | 08/06/2004 18:52 | McNary-B-1345 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 2.53 | 2 | Auto | Lightning | Lightning | TRI | 143288 |
08/06/2004 18:50 | 08/06/2004 18:52 | McNary-Badger Canyon No 1 115kV line | 115.0 | L | 28.40 | 2 | Auto | Lightning | Lightning | TRI | 143288 | |
08/06/2004 18:50 | 08/06/2004 18:52 | Nine Canyon-Badger Canyon section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | G | 10.81 | 2 | Auto | Lightning | Lightning | TRI | 143288 |
08/06/2004 20:26 | 08/06/2004 20:26 | Columbia-Rocky Ford No 1 115kV line | 115.0 | L | 30.40 | 0 | Auto | Lightning | Lightning | WEN | 143289 | |
08/06/2004 22:32 | 08/07/2004 15:33 | Chief Joseph-East Omak No 1 230kV line | 230.0 | L | 33.99 | 1021 | Auto | Lightning | Lightning | WEN | 143290 | |
08/06/2004 22:46 | 08/06/2004 22:46 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 143291 | |
08/07/2004 01:08 | 08/08/2004 16:06 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 2338 | Plan | Voltage Control | TDA RED SAL | 143292 | ||
08/07/2004 02:05 | 08/07/2004 02:07 | Condon tap to De Moss-Fossil No 1 69kV line | 69.0 | T | G | 0.10 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 |
08/07/2004 02:05 | 08/07/2004 02:07 | Condon Wind tap to De Moss-Fossil No 1 69kV line | 69.0 | T | G | 0.01 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 |
08/07/2004 02:05 | 08/07/2004 02:07 | Condon Wind-Condon section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 1.46 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 |
08/07/2004 02:05 | 08/07/2004 02:07 | Condon-Fossil section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 18.43 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 |
08/07/2004 02:05 | 08/07/2004 02:07 | De Moss-Fossil No 1 69kV line | 69.0 | L | 52.93 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 | |
08/07/2004 02:05 | 08/07/2004 02:07 | De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 0.11 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 |
08/07/2004 02:05 | 08/07/2004 02:07 | Gordon Hollow tap to De Moss-Fossil No 1 69kV line | 69.0 | T | G | 0.11 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 |
08/07/2004 02:05 | 08/07/2004 02:07 | Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line | 69.0 | S | G | 32.93 | 2 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143293 |
08/07/2004 02:05 | 08/07/2004 02:07 | Antelope tap to Fossil-Maupin 69kV line | 69.0 | T | G | 0.10 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143294 |
08/07/2004 02:05 | 08/07/2004 02:07 | Antelope-Bakeoven section of Fossil-Maupin 69kV line | 69.0 | S | G | 21.40 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | RED | 143294 |
08/07/2004 02:05 | 08/07/2004 02:07 | Bakeoven tap to Fossil-Maupin 69kV line | 69.0 | T | G | 0.10 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | RED | 143294 |
08/07/2004 02:05 | 08/07/2004 02:07 | Bakeoven-Maupin section of Fossil-Maupin 69kV line | 69.0 | S | G | 7.00 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | RED | 143294 |
08/07/2004 02:05 | 08/07/2004 02:07 | Fossil-Maupin 69kV line | 69.0 | L | 56.93 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143294 | |
08/07/2004 02:05 | 08/07/2004 02:07 | Fossil-Muddy Ranch section of Fossil-Maupin 69kV line | 69.0 | S | G | 14.77 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143294 |
08/07/2004 02:05 | 08/07/2004 02:07 | Muddy Ranch tap to Fossil-Maupin 69kV line | 69.0 | T | G | 8.00 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143294 |
08/07/2004 02:05 | 08/07/2004 02:07 | Muddy Ranch-Antelope section of Fossil-Maupin 69kV line | 69.0 | S | G | 13.87 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143294 |
08/07/2004 02:05 | 08/07/2004 02:07 | Maupin-Tygh Valley No 1 69kV line | 69.0 | L | 3.26 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143295 | |
08/07/2004 02:05 | 08/07/2004 02:07 | Wamic tap to Maupin-Tygh Valley No 1 69kV line | 69.0 | T | 11.25 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143295 | |
08/07/2004 14:25 | 08/08/2004 14:58 | Westside-Sugar Mill No 1 161kV line | 161.0 | L | G | 12.50 | 1473 | Plan | Foreign Request | IDF | 143297 | |
08/07/2004 14:25 | 08/08/2004 14:58 | York Road-Sugar Mill section of Westside-Sugar Mill No 1 161kV line | 161.0 | S | 2.50 | 1473 | Plan | Foreign Request | IDF | 143297 | ||
08/08/2004 04:33 | 08/08/2004 11:30 | Klamath Cogen-Meridian No 1 500kV line | 500.0 | L | 57.99 | 417 | Plan | Foreign Request | RED | 143296 | ||
08/08/2004 22:00 | 08/08/2004 22:17 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 17 | Plan | Foreign Request | TDA RED | 143298 | ||
08/08/2004 22:00 | 08/08/2004 22:17 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 17 | Plan | Foreign Request | TDA | 143298 | ||
08/08/2004 22:00 | 08/08/2004 22:17 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 17 | Plan | Foreign Request | TDA | 143298 | ||
08/08/2004 22:00 | 08/08/2004 22:17 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 17 | Plan | Foreign Request | TDA | 143298 | ||
08/08/2004 22:00 | 08/08/2004 22:17 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 17 | Plan | Foreign Request | TDA | 143298 | ||
08/08/2004 22:00 | 08/08/2004 22:17 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 17 | Plan | Foreign Request | TDA | 143298 | ||
08/08/2004 22:05 | 08/08/2004 22:10 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Foreign Request | TDA | 143299 | ||
08/09/2004 05:26 | 08/09/2004 05:26 | Clarkston tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 143306 |
08/09/2004 05:26 | 08/09/2004 05:26 | Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 3.71 | 0 | Auto | Unknown | Unknown | TRI | 143306 |
08/09/2004 05:26 | 08/09/2004 05:26 | Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 143306 |
08/09/2004 05:26 | 08/09/2004 05:26 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 24.00 | 0 | Auto | Unknown | Unknown | TRI | 143306 |
08/09/2004 05:26 | 08/09/2004 05:26 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | 80.80 | 0 | Auto | Unknown | Unknown | TRI | 143306 | |
08/09/2004 05:26 | 08/09/2004 05:26 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 53.10 | 0 | Auto | Unknown | Unknown | TRI | 143306 |
08/09/2004 07:06 | 08/09/2004 14:25 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 439 | Plan | Maintenance | EUG | 143307 | ||
08/09/2004 07:06 | 08/09/2004 14:25 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 439 | Plan | Maintenance | EUG | 143308 | ||
08/09/2004 07:20 | 08/12/2004 13:54 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4714 | Plan | Maintenance | IDF | 143309 | ||
08/09/2004 08:07 | 08/13/2004 14:52 | B212-Wilbur section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 16.47 | 6165 | Plan | Maintenance | WEN | 143310 | ||
08/09/2004 08:07 | 08/13/2004 14:52 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | G | 28.27 | 6165 | Plan | Maintenance | WEN SPK | 143310 | |
08/09/2004 08:14 | 08/09/2004 14:19 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 365 | Plan | Maintenance | EUG | 143311 | |
08/09/2004 08:14 | 08/09/2004 14:19 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 365 | Plan | Maintenance | EUG | 143311 | ||
08/09/2004 08:38 | 08/12/2004 13:31 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 4613 | Plan | Maintenance | TRI | 143358 | |
08/09/2004 08:38 | 08/12/2004 13:31 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 53.10 | 4613 | Plan | Maintenance | TRI | 143358 | ||
08/09/2004 08:47 | 08/16/2004 08:44 | Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 4.30 | 10077 | Plan | Maintenance | LGV OLY | 143359 | ||
08/09/2004 08:47 | 08/12/2004 16:16 | Naselle-Hagen section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 13.00 | 4769 | Plan | Maintenance | LGV OLY | 143359 | ||
08/09/2004 08:47 | 08/16/2004 08:44 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 10077 | Plan | Maintenance | LGV OLY | 143359 | |
08/09/2004 08:57 | 08/19/2004 12:59 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 14642 | Plan | Maintenance | EUG | 143313 | ||
08/09/2004 09:52 | 08/13/2004 13:33 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | G | 24.08 | 5981 | Plan | Maintenance | TDA | 143314 | |
08/09/2004 09:52 | 08/13/2004 13:33 | Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 3.84 | 5981 | Plan | Maintenance | TDA | 143314 | ||
08/09/2004 10:23 | 08/09/2004 10:31 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 8 | Plan | Foreign Request | TDA | 143315 | ||
08/09/2004 14:58 | 08/09/2004 21:26 | Longview-Allston No 4 115kV line | 115.0 | L | G | 4.64 | 388 | Plan | Load Control | LGV | 143316 | |
08/09/2004 14:58 | 08/09/2004 21:26 | Longview-Donald Nys section of Longview-Allston No 4 115kV line | 115.0 | S | 3.63 | 388 | Plan | Load Control | LGV | 143316 | ||
08/09/2004 15:28 | 08/09/2004 15:52 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 24 | Plan | Foreign Request | TDA | 143317 | ||
08/10/2004 03:08 | 08/10/2004 05:40 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 152 | Plan | Voltage Control | WEN COV | 143318 | ||
08/10/2004 06:55 | 08/10/2004 14:43 | Noxon AVA-Hot Springs No 2 230kV line | 230.0 | L | 70.00 | 468 | Plan | Maintenance | KAL | 143321 | ||
08/10/2004 06:58 | 08/10/2004 20:13 | Chief Joseph PH-Chief Joseph No 5 500kV line | 500.0 | L | 0.80 | 795 | Plan | Maintenance | WEN | 143322 | ||
08/10/2004 07:04 | 08/10/2004 19:41 | Tacoma-TPWR Cowlitz No 1 230kV line | 230.0 | L | 6.00 | 757 | Plan | Foreign Request | COV | 143323 | ||
08/10/2004 07:12 | 08/10/2004 14:07 | Anaconda-NWE Mill Creek No 1 230kV line | 230.0 | L | 0.40 | 415 | Plan | Maintenance | KAL | 143324 | ||
08/10/2004 08:02 | 08/13/2004 14:50 | Salem-Grand Ronde No 1 115kV line | 115.0 | L | 27.80 | 4728 | Plan | Maintenance | SAL | 143325 | ||
08/10/2004 08:18 | 08/10/2004 14:07 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 349 | Plan | Maintenance | EUG | 143326 | |
08/10/2004 08:18 | 08/10/2004 14:07 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 349 | Plan | Maintenance | EUG | 143326 | ||
08/10/2004 10:10 | 08/11/2004 10:49 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 1479 | Plan | Maintenance | TDA RED | 143327 | |
08/10/2004 10:10 | 08/10/2004 18:15 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 485 | Plan | Maintenance | TDA | 143327 | |||
08/10/2004 10:10 | 08/10/2004 18:15 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 485 | Plan | Maintenance | TDA | 143327 | |||
08/10/2004 10:10 | 08/10/2004 18:15 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 485 | Plan | Maintenance | TDA | 143327 | |||
08/10/2004 10:10 | 08/11/2004 10:49 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 1479 | Plan | Maintenance | TDA | 143327 | |||
08/10/2004 12:55 | 08/11/2004 01:48 | Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.74 | 773 | Plan | Maintenance | EUG | 143328 | ||
08/10/2004 12:55 | 08/11/2004 01:48 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 773 | Plan | Maintenance | EUG | 143328 | |
08/10/2004 13:11 | 08/10/2004 13:19 | Palisades-Snake River No 1 115kV line | 115.0 | L | 17.50 | 8 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143329 | |
08/10/2004 15:03 | 08/10/2004 15:06 | Palisades-Snake River No 1 115kV line | 115.0 | L | 17.50 | 3 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143330 | |
08/10/2004 15:03 | 08/10/2004 15:07 | Palisades-Goshen No 1 115kV line | 115.0 | L | 51.71 | 4 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143331 | |
08/10/2004 15:03 | 08/10/2004 15:07 | Palisades-Swan Valley No 1 115kV line | 115.0 | L | 12.40 | 4 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143332 | |
08/10/2004 15:10 | 08/10/2004 16:40 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 90 | Plan | Foreign Request | RED | 143333 | ||
08/10/2004 19:55 | 08/10/2004 20:08 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 13 | Auto | Foreign Trouble | TDA RED | 143334 | ||
08/10/2004 19:55 | 08/10/2004 20:08 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 13 | Auto | Foreign Trouble | TDA | 143334 | ||
08/10/2004 19:55 | 08/10/2004 20:08 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 13 | Auto | Foreign Trouble | TDA | 143334 | ||
08/10/2004 19:55 | 08/10/2004 20:08 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 13 | Auto | Foreign Trouble | TDA | 143334 | ||
08/10/2004 19:55 | 08/10/2004 20:08 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 13 | Auto | Foreign Trouble | TDA | 143334 | ||
08/10/2004 19:55 | 08/10/2004 20:08 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 13 | Auto | Foreign Trouble | TDA | 143334 | ||
08/10/2004 19:55 | 08/10/2004 20:04 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 9 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143335 | |
08/11/2004 00:44 | 08/12/2004 14:48 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | O | 15.77 | 2284 | Plan | Maintenance | EUG | 143336 | |
08/11/2004 00:44 | 08/12/2004 14:48 | Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.66 | 2284 | Plan | Maintenance | EUG | 143336 | ||
08/11/2004 02:41 | 08/11/2004 06:33 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 232 | Plan | Voltage Control | WEN COV | 143337 | ||
08/11/2004 05:12 | 08/11/2004 05:17 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 5 | Auto | Foreign Trouble | RED | 143338 | |
08/11/2004 05:12 | 08/11/2004 05:17 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 5 | Auto | Foreign Trouble | IDF RED | 143338 | |
08/11/2004 05:12 | 08/11/2004 05:17 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 5 | Auto | Foreign Trouble | IDF RED | 143338 | ||
08/11/2004 05:28 | 08/11/2004 18:21 | Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line | 115.0 | S | 28.59 | 773 | Plan | Maintenance | KAL | 143344 | ||
08/11/2004 05:28 | 08/11/2004 18:21 | Kalispell-Kerr No 1 115kV line | 115.0 | L | G | 41.39 | 773 | Plan | Maintenance | KAL | 143344 | |
08/11/2004 06:57 | 08/11/2004 14:02 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 425 | Plan | Maintenance | EUG | 143345 | ||
08/11/2004 06:57 | 08/11/2004 14:02 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 425 | Plan | Switching | EUG | 143346 | ||
08/11/2004 07:11 | 08/11/2004 11:14 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 243 | Plan | Maintenance | OLY | 143347 | |
08/11/2004 07:11 | 08/11/2004 11:14 | Olympia-Skookum section of Olympia-Shelton No 2 115kV line | 115.0 | S | 12.77 | 243 | Plan | Maintenance | OLY | 143347 | ||
08/11/2004 10:56 | 08/11/2004 21:08 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 612 | Plan | Foreign Request | TDA | 143348 | ||
08/11/2004 14:33 | 08/11/2004 14:35 | Dexter tap to Lookout Point-Alvey No 1 115kV line | 115.0 | T | 0.76 | 2 | Auto | Arc while switching | Arc while switching | EUG | 143349 | |
08/11/2004 14:33 | 08/11/2004 14:35 | Dexter-Pleasant Hill section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.74 | 2 | Auto | Arc while switching | Arc while switching | EUG | 143349 | |
08/11/2004 14:33 | 08/11/2004 14:35 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 2 | Auto | Arc while switching | Arc while switching | EUG | 143349 |
08/11/2004 14:33 | 08/11/2004 14:35 | Lookout Point-Dexter section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 2.37 | 2 | Auto | Arc while switching | Arc while switching | EUG | 143349 | |
08/11/2004 15:25 | 08/11/2004 17:00 | Rainier-Allston section of St Helens-Allston No 1 115kV line | 115.0 | S | 6.25 | 95 | Plan | Load Control | LGV | 143350 | ||
08/11/2004 15:25 | 08/11/2004 17:00 | St Helens-Allston No 1 115kV line | 115.0 | L | G | 25.22 | 95 | Plan | Load Control | LGV | 143350 | |
08/12/2004 02:34 | 08/12/2004 05:42 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 188 | Plan | Voltage Control | WEN COV | 143360 | ||
08/12/2004 04:16 | 08/12/2004 04:26 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 10 | Plan | Switching | LGV | 143351 | |
08/12/2004 04:16 | 08/12/2004 04:26 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 10 | Plan | Switching | LGV | 143351 | ||
08/12/2004 04:17 | 08/12/2004 08:41 | Lexington-Longview No 2 230kV line | 230.0 | L | 9.38 | 264 | Plan | Maintenance | LGV OLY | 143352 | ||
08/12/2004 06:02 | 08/12/2004 16:10 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 608 | Plan | Maintenance | TDA | 143361 | ||
08/12/2004 06:02 | 08/12/2004 16:41 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 639 | Plan | Maintenance | TDA RED | 143362 | |
08/12/2004 06:02 | 08/12/2004 16:41 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 639 | Plan | Maintenance | TDA | 143362 | |||
08/12/2004 06:02 | 08/12/2004 16:41 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 639 | Plan | Maintenance | TDA | 143362 | |||
08/12/2004 06:02 | 08/12/2004 16:41 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 639 | Plan | Maintenance | TDA | 143362 | |||
08/12/2004 06:02 | 08/12/2004 16:41 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 639 | Plan | Maintenance | TDA | 143362 | |||
08/12/2004 06:33 | 08/12/2004 15:57 | Columbia Falls-Kalispell No 1 115kV line | 115.0 | L | 10.80 | 564 | Plan | Maintenance | KAL | 143363 | ||
08/12/2004 07:08 | 08/12/2004 14:14 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 426 | Plan | Maintenance | EUG | 143364 | ||
08/12/2004 07:14 | 08/12/2004 14:14 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 420 | Plan | Maintenance | EUG | 143365 | ||
08/12/2004 07:50 | 08/12/2004 14:43 | Satsop-Aberdeen No 2 230kV line | 230.0 | L | 20.51 | 413 | Plan | Maintenance | OLY | 143366 | ||
08/12/2004 07:54 | 08/12/2004 12:24 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 270 | Plan | Foreign Request | KAL | 143367 | ||
08/12/2004 08:16 | 08/12/2004 08:44 | Schultz-Raver No 1 500kV line | 500.0 | L | 77.24 | 28 | Plan | Load Control | WEN COV | 143368 | ||
08/12/2004 08:33 | 08/12/2004 08:39 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 6 | Plan | Switching | LGV | 143369 | |
08/12/2004 08:33 | 08/12/2004 08:39 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 6 | Plan | Switching | LGV | 143369 | ||
08/12/2004 08:38 | 08/12/2004 14:37 | Walla Walla-PACW Walla Walla No 1 69kV line | 69.0 | L | 1.40 | 359 | Plan | Maintenance | TRI | 143370 | ||
08/13/2004 06:46 | 08/13/2004 07:41 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 55 | Auto | Foreign Trouble | TDA RED | 143375 | ||
08/13/2004 06:46 | 08/13/2004 07:41 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 55 | Auto | Foreign Trouble | TDA | 143375 | ||
08/13/2004 06:46 | 08/13/2004 07:41 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 55 | Auto | Foreign Trouble | TDA | 143375 | ||
08/13/2004 06:46 | 08/13/2004 07:41 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 55 | Auto | Foreign Trouble | TDA | 143375 | ||
08/13/2004 06:46 | 08/13/2004 07:41 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 55 | Auto | Foreign Trouble | TDA | 143375 | ||
08/13/2004 06:46 | 08/13/2004 07:41 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 55 | Auto | Foreign Trouble | TDA | 143375 | ||
08/13/2004 07:01 | 08/13/2004 13:36 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 395 | Plan | Maintenance | EUG | 143376 | ||
08/13/2004 07:02 | 08/13/2004 13:36 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 394 | Plan | Maintenance | EUG | 143377 | ||
08/13/2004 08:26 | 08/13/2004 14:50 | Eugene-Alvey No 2 115kV line | 115.0 | L | G | 12.67 | 384 | Plan | Maintenance | EUG | 143378 | |
08/13/2004 08:26 | 08/13/2004 14:50 | Eugene-Dillard section of Eugene-Alvey No 2 115kV line | 115.0 | S | 9.36 | 384 | Plan | Maintenance | EUG | 143378 | ||
08/13/2004 12:54 | 10/20/2004 10:20 | Rogue-Gold Beach No 2 115kV line | 115.0 | L | 5.49 | 97766 | Plan | Foreign Request | EUG | 143379 | ||
08/13/2004 13:38 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | G | 24.08 | still out | Plan | Normally Out | TDA | 144507 | ||
08/13/2004 13:38 | Spearfish-Goldendale section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 20.24 | still out | Plan | Normally Out | TDA | 144507 | |||
08/13/2004 14:08 | 08/14/2004 06:36 | Allston-Astoria No 1 115kV line | 115.0 | L | T | 41.98 | 988 | Plan | Maintenance | LGV | 143380 | |
08/13/2004 14:08 | 08/14/2004 06:36 | Naselle tap-Cathlamet section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | 4.58 | 988 | Plan | Maintenance | LGV | 143380 | ||
08/13/2004 18:11 | 08/13/2004 18:16 | North Mountain-Snohomish No 1 230kV line | 230.0 | L | 40.28 | 5 | Auto | Foreign Trouble | Foreign Trouble | SNO | 143381 | |
08/14/2004 00:16 | 08/14/2004 08:17 | Allston-Astoria No 1 115kV line | 115.0 | L | T | 41.98 | 481 | Plan | Maintenance | LGV | 143382 | |
08/14/2004 00:16 | 08/14/2004 08:17 | Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | 18.27 | 481 | Plan | Maintenance | LGV OLY | 143382 | ||
08/14/2004 06:12 | 08/15/2004 16:33 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 2061 | Plan | PCS Cellular Work | COV | 143388 | ||
08/14/2004 07:27 | 08/14/2004 07:32 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 5 | Auto | Foreign Trouble | TDA RED | 143389 | ||
08/14/2004 07:27 | 08/14/2004 07:32 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5 | Auto | Foreign Trouble | TDA | 143389 | ||
08/14/2004 07:27 | 08/14/2004 07:32 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5 | Auto | Foreign Trouble | TDA | 143389 | ||
08/14/2004 07:27 | 08/14/2004 07:32 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5 | Auto | Foreign Trouble | TDA | 143389 | ||
08/14/2004 07:27 | 08/14/2004 07:32 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5 | Auto | Foreign Trouble | TDA | 143389 | ||
08/14/2004 07:27 | 08/14/2004 07:32 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 5 | Auto | Foreign Trouble | TDA | 143389 | ||
08/14/2004 13:15 | 08/14/2004 13:15 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 0 | Auto | Lightning | Lightning | LGV OLY | 143390 | |
08/14/2004 15:44 | 08/14/2004 15:44 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143391 | |
08/14/2004 17:01 | 08/14/2004 17:01 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143392 | |
08/14/2004 17:34 | 08/14/2004 17:34 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143393 | |
08/14/2004 18:51 | 08/14/2004 18:51 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143394 | |
08/14/2004 18:59 | 08/14/2004 18:59 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143395 | |
08/14/2004 19:08 | 08/14/2004 19:08 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143396 | |
08/14/2004 19:24 | 08/14/2004 19:24 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 0 | Auto | Lightning | Lightning | RED | 143397 | |
08/15/2004 16:55 | 08/15/2004 16:55 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 143400 |
08/15/2004 16:55 | 08/15/2004 16:55 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 143400 |
08/15/2004 16:55 | 08/15/2004 16:55 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 143400 |
08/15/2004 16:55 | 08/15/2004 16:55 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 143400 |
08/15/2004 16:55 | 08/15/2004 16:55 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 143400 | |
08/15/2004 16:55 | 08/15/2004 16:55 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 143400 |
08/15/2004 16:55 | 08/15/2004 16:55 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 143400 |
08/16/2004 07:53 | 08/16/2004 17:48 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 595 | Plan | Maintenance | EUG | 143415 | |
08/16/2004 07:53 | 08/16/2004 17:48 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 595 | Plan | Maintenance | EUG | 143415 | ||
08/16/2004 07:57 | 08/18/2004 15:02 | Keeler-Forest Grove section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 10.53 | 3305 | Plan | Maintenance | SAL | 143416 | ||
08/16/2004 07:57 | 08/18/2004 15:02 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 3305 | Plan | Maintenance | SAL | 143416 | |
08/16/2004 08:01 | 08/16/2004 17:48 | Alvey-Fairview No 1 230kV line | 230.0 | L | O | 97.46 | 587 | Plan | Maintenance | EUG | 143417 | |
08/16/2004 08:01 | 08/16/2004 17:48 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 587 | Plan | Maintenance | EUG | 143417 | ||
08/16/2004 08:04 | 08/20/2004 13:10 | Grand Coulee-Chief Joseph No 2 230kV line | 230.0 | L | 32.59 | 6066 | Plan | Construction | WEN | 143419 | ||
08/16/2004 08:32 | 08/16/2004 09:16 | North Bonneville-Ross No 2 230kV line | 230.0 | L | G | 35.99 | 44 | Plan | Switching | LGV | 143420 | |
08/16/2004 08:32 | 08/16/2004 09:16 | North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 27.51 | 44 | Plan | Switching | LGV | 143420 | ||
08/16/2004 08:32 | 08/16/2004 09:16 | Sifton-Ross section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 8.48 | 44 | Plan | Switching | LGV | 143420 | ||
08/16/2004 08:32 | 08/23/2004 14:47 | North Bonneville-Ross No 2 230kV line | 230.0 | L | T | 35.99 | 10455 | Plan | Maintenance | LGV | 143421 | |
08/16/2004 08:32 | 08/23/2004 14:47 | Sifton tap to North Bonneville-Ross No 2 230kV line | 230.0 | T | 1.20 | 10455 | Plan | Maintenance | LGV | 143421 | ||
08/16/2004 08:44 | 08/19/2004 14:24 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 4660 | Plan | Maintenance | LGV OLY | 143422 | ||
08/16/2004 09:39 | 08/17/2004 14:58 | Grand Avenue tap to Ross-Vancouver Shipyard No 1 115kV line | 115.0 | T | 0.10 | 1759 | Plan | Maintenance | LGV | 143423 | ||
08/16/2004 09:39 | 08/17/2004 14:58 | Ross-Mill Plain section of Ross-Vancouver Shipyard No 1 115kV line | 115.0 | S | 3.66 | 1759 | Plan | Maintenance | LGV | 143423 | ||
08/16/2004 09:39 | 08/17/2004 14:58 | Ross-Vancouver Shipyard No 1 115kV line | 115.0 | L | G | 4.73 | 1759 | Plan | Maintenance | LGV | 143423 | |
08/16/2004 15:21 | 08/16/2004 15:23 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 2 | Plan | Foreign Request | SPK | 143424 | ||
08/16/2004 15:55 | 08/16/2004 15:55 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Lightning | Lightning | RED | 143425 |
08/16/2004 15:55 | 08/16/2004 15:55 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 143425 |
08/16/2004 15:55 | 08/16/2004 15:55 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Lightning | Lightning | RED | 143425 |
08/16/2004 15:55 | 08/16/2004 15:55 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Lightning | Lightning | RED | 143425 |
08/16/2004 15:55 | 08/16/2004 15:55 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Lightning | Lightning | RED | 143425 | |
08/16/2004 15:55 | 08/16/2004 15:55 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | RED | 143425 |
08/16/2004 15:55 | 08/16/2004 15:55 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Lightning | Lightning | RED | 143425 |
08/16/2004 16:00 | 08/16/2004 16:00 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Lightning | TDA RED | 143426 | ||
08/16/2004 16:00 | 08/16/2004 16:00 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Lightning | TDA | 143426 | ||
08/16/2004 16:00 | 08/16/2004 16:00 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Lightning | TDA | 143426 | ||
08/16/2004 16:00 | 08/16/2004 16:00 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Lightning | TDA | 143426 | ||
08/16/2004 16:00 | 08/16/2004 16:00 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Lightning | TDA | 143426 | ||
08/16/2004 16:00 | 08/16/2004 16:00 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Lightning | TDA | 143426 | ||
08/16/2004 16:00 | 08/19/2004 14:10 | John Day PH-John Day No 4 500kV line | 500.0 | L | 3.48 | 4210 | Plan | Foreign Request | TDA | 143427 | ||
08/16/2004 18:57 | 08/16/2004 21:22 | Cardwell-Cowlitz No 1 115kV line | 115.0 | L | 7.65 | 145 | Plan | Load Control | LGV | 143428 | ||
08/16/2004 21:53 | 08/16/2004 21:53 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 143429 |
08/16/2004 21:53 | 08/16/2004 21:53 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 143429 |
08/16/2004 21:53 | 08/16/2004 21:53 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 143429 | |
08/16/2004 21:53 | 08/16/2004 21:53 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 143429 |
08/16/2004 21:53 | 08/16/2004 21:53 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143429 |
08/16/2004 21:53 | 08/16/2004 21:53 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 143429 |
08/16/2004 21:53 | 08/16/2004 21:56 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 3 | Auto | RAS Initiated | RAS Initiated | KAL | 143430 | |
08/16/2004 22:00 | 08/17/2004 07:16 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 556 | Plan | Foreign Request | TDA RED | 143431 | ||
08/16/2004 22:00 | 08/17/2004 07:16 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 556 | Plan | Foreign Request | TDA | 143431 | ||
08/16/2004 22:00 | 08/17/2004 07:16 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 556 | Plan | Foreign Request | TDA | 143431 | ||
08/16/2004 22:00 | 08/17/2004 07:16 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 556 | Plan | Foreign Request | TDA | 143431 | ||
08/16/2004 22:00 | 08/17/2004 07:16 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 556 | Plan | Foreign Request | TDA | 143431 | ||
08/16/2004 22:00 | 08/17/2004 07:16 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 556 | Plan | Foreign Request | TDA | 143431 | ||
08/16/2004 22:00 | 08/16/2004 23:00 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 60 | Plan | Foreign Request | TDA RED | 143432 | ||
08/16/2004 22:00 | 08/16/2004 23:00 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 60 | Plan | Foreign Request | TDA | 143432 | ||
08/16/2004 22:00 | 08/16/2004 23:00 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 60 | Plan | Foreign Request | TDA | 143432 | ||
08/16/2004 22:00 | 08/16/2004 23:00 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 60 | Plan | Foreign Request | TDA | 143432 | ||
08/16/2004 22:00 | 08/16/2004 23:00 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 60 | Plan | Foreign Request | TDA | 143432 | ||
08/16/2004 22:00 | 08/16/2004 23:00 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 60 | Plan | Foreign Request | TDA | 143432 | ||
08/16/2004 22:10 | 08/17/2004 00:11 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 121 | Plan | Foreign Request | TDA | 143433 | ||
08/16/2004 22:11 | 08/16/2004 22:19 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 8 | Plan | Foreign Request | TDA | 143434 | ||
08/16/2004 22:21 | 08/16/2004 22:21 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 143435 |
08/16/2004 22:21 | 08/16/2004 22:21 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 143435 |
08/16/2004 22:21 | 08/16/2004 22:21 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 143435 | |
08/16/2004 22:21 | 08/16/2004 22:21 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 143435 |
08/16/2004 22:21 | 08/16/2004 22:21 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143435 |
08/16/2004 22:21 | 08/16/2004 22:21 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 143435 |
08/16/2004 22:21 | 08/16/2004 22:23 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 2 | Auto | RAS Initiated | RAS Initiated | KAL | 143436 | |
08/17/2004 00:02 | 08/17/2004 00:02 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 0 | Auto | Lightning | Lightning | IDF | 143437 | |
08/17/2004 01:42 | 08/17/2004 07:08 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 326 | Plan | Switching | TDA | 143438 | ||
08/17/2004 04:31 | 08/17/2004 04:31 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 143439 | |
08/17/2004 04:31 | 08/17/2004 04:31 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 143439 | |
08/17/2004 04:31 | 08/17/2004 04:31 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 143439 | ||
08/17/2004 05:30 | 08/22/2004 20:18 | Columbia Generating Station-Ashe No 1 500kV line | 500.0 | L | 0.55 | 8088 | Auto | Foreign Trouble | Foreign Trouble | TRI | 143440 | |
08/17/2004 07:00 | 08/17/2004 07:16 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 16 | Plan | Foreign Request | TDA RED | 143464 | ||
08/17/2004 07:00 | 08/17/2004 07:16 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Plan | Foreign Request | TDA | 143464 | ||
08/17/2004 07:00 | 08/17/2004 07:16 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Plan | Foreign Request | TDA | 143464 | ||
08/17/2004 07:00 | 08/17/2004 07:16 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Plan | Foreign Request | TDA | 143464 | ||
08/17/2004 07:00 | 08/17/2004 07:16 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Plan | Foreign Request | TDA | 143464 | ||
08/17/2004 07:00 | 08/17/2004 07:16 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Plan | Foreign Request | TDA | 143464 | ||
08/17/2004 07:02 | 08/17/2004 07:08 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 6 | Plan | Switching | TDA | 143465 | ||
08/17/2004 07:12 | 08/17/2004 17:16 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 604 | Plan | Maintenance | RED | 143466 | ||
08/17/2004 07:13 | 08/17/2004 07:13 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 0 | Auto | Unknown | Unknown | IDF | 143467 | |
08/17/2004 07:27 | 08/17/2004 16:49 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 562 | Plan | Construction | SPK | 143468 | ||
08/17/2004 07:27 | 08/17/2004 16:49 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 562 | Plan | Construction | SPK | 143468 | |
08/17/2004 07:32 | 08/17/2004 15:04 | Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line | 115.0 | T | 14.58 | 452 | Plan | Maintenance | OLY | 143469 | ||
08/17/2004 07:32 | 08/17/2004 15:04 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | T | 15.32 | 452 | Plan | Maintenance | OLY | 143469 | |
08/17/2004 07:38 | 08/17/2004 07:40 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 2 | Auto | Foreign Trouble | TDA RED | 143470 | ||
08/17/2004 07:38 | 08/17/2004 07:40 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 143470 | ||
08/17/2004 07:38 | 08/17/2004 07:40 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 143470 | ||
08/17/2004 07:38 | 08/17/2004 07:40 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 143470 | ||
08/17/2004 07:38 | 08/17/2004 07:40 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 143470 | ||
08/17/2004 07:38 | 08/17/2004 07:40 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2 | Auto | Foreign Trouble | TDA | 143470 | ||
08/17/2004 07:41 | 08/17/2004 15:07 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 446 | Plan | Maintenance | EUG | 143471 | |
08/17/2004 07:41 | 08/17/2004 15:07 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 446 | Plan | Maintenance | EUG | 143471 | ||
08/17/2004 07:43 | 08/17/2004 15:55 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 492 | Plan | Construction | SPK | 143472 | |
08/17/2004 07:43 | 08/17/2004 15:55 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 492 | Plan | Construction | SPK | 143472 | ||
08/17/2004 07:48 | 08/17/2004 14:53 | Alvey-Fairview No 1 230kV line | 230.0 | L | O | 97.46 | 425 | Plan | Maintenance | EUG | 143473 | |
08/17/2004 07:48 | 08/17/2004 14:53 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 425 | Plan | Maintenance | EUG | 143473 | ||
08/17/2004 08:11 | 08/17/2004 12:44 | Lookout Point PH-Lookout Point No 1 115kV line | 115.0 | L | 0.21 | 273 | Plan | Foreign Request | EUG | 143474 | ||
08/17/2004 14:44 | 08/17/2004 15:00 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 29.39 | 16 | Plan | Construction | TDA | 143475 | |
08/17/2004 14:44 | 08/17/2004 15:00 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | 97.46 | 16 | Plan | Construction | TDA RED | 143475 | ||
08/17/2004 14:44 | 08/17/2004 15:00 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 68.07 | 16 | Plan | Construction | TDA RED | 143475 | |
08/17/2004 15:11 | 08/18/2004 10:26 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 1155 | Auto | Terminal Equipment Failure | TDA RED | 143476 | |
08/17/2004 15:11 | 08/18/2004 10:26 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 1155 | Auto | Terminal Equipment Failure | TDA | 143476 | |||
08/17/2004 15:11 | 08/17/2004 15:15 | Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line | 115.0 | T | G | 14.58 | 4 | Plan | Maintenance | OLY | 143477 | |
08/17/2004 15:11 | 08/17/2004 15:15 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | G | 9.22 | 4 | Plan | Maintenance | OLY | 143477 | |
08/17/2004 15:11 | 08/17/2004 15:15 | Satsop Park-Aberdeen tap section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | G | 6.10 | 4 | Plan | Maintenance | OLY | 143477 | |
08/17/2004 15:11 | 08/17/2004 15:15 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | 15.32 | 4 | Plan | Maintenance | OLY | 143477 | ||
08/18/2004 00:58 | 08/18/2004 00:58 | Dixon tap to Hot Springs-Rattlesnake No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Weather | KAL | 143478 |
08/18/2004 00:58 | 08/18/2004 00:58 | Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 33.85 | 0 | Auto | Lightning | Weather | KAL | 143478 |
08/18/2004 00:58 | 08/18/2004 00:58 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 25.06 | 0 | Auto | Lightning | Weather | KAL | 143478 |
08/18/2004 00:58 | 08/18/2004 00:58 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | 58.91 | 0 | Auto | Lightning | Weather | KAL | 143478 | |
08/18/2004 02:31 | 08/18/2004 02:31 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 143479 |
08/18/2004 02:31 | 08/18/2004 02:31 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 143479 |
08/18/2004 02:31 | 08/18/2004 02:31 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 143479 | |
08/18/2004 02:31 | 08/18/2004 02:31 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 143479 |
08/18/2004 02:31 | 08/18/2004 02:31 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143479 |
08/18/2004 02:31 | 08/18/2004 02:31 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 143479 |
08/18/2004 02:31 | 08/18/2004 02:34 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 3 | Auto | Lightning | Lightning | KAL | 143480 | |
08/18/2004 02:31 | 08/18/2004 02:38 | Libby PH-Libby No 1 230kV line | 230.0 | L | 1.35 | 7 | Auto | RAS Initiated | RAS Initiated | KAL | 143481 | |
08/18/2004 02:31 | 08/18/2004 02:38 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 7 | Auto | RAS Initiated | RAS Initiated | KAL | 143482 | |
08/18/2004 02:38 | 08/18/2004 02:38 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 143483 |
08/18/2004 02:38 | 08/18/2004 02:38 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 143483 |
08/18/2004 02:38 | 08/18/2004 02:38 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 143483 | |
08/18/2004 02:38 | 08/18/2004 02:38 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 143483 |
08/18/2004 02:38 | 08/18/2004 02:38 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143483 |
08/18/2004 02:38 | 08/18/2004 02:38 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 143483 |
08/18/2004 02:38 | 08/18/2004 02:40 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 2 | Auto | Lightning | RAS Initiated | KAL | 143484 | |
08/18/2004 02:38 | 08/18/2004 02:44 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 6 | Auto | RAS Initiated | RAS Initiated | KAL | 143485 | |
08/18/2004 02:38 | 08/18/2004 02:44 | Libby PH-Libby No 1 230kV line | 230.0 | L | 1.35 | 6 | Auto | RAS Initiated | RAS Initiated | KAL | 143486 | |
08/18/2004 04:06 | 08/18/2004 04:06 | Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 143487 |
08/18/2004 04:06 | 08/18/2004 04:06 | Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 19.40 | 0 | Auto | Lightning | Lightning | SPK | 143487 |
08/18/2004 04:06 | 08/18/2004 04:06 | Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | L | 52.68 | 0 | Auto | Lightning | Lightning | SPK | 143487 | |
08/18/2004 04:06 | 08/18/2004 04:06 | Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 1.30 | 0 | Auto | Lightning | Lightning | SPK | 143487 |
08/18/2004 04:06 | 08/18/2004 04:06 | Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 143487 |
08/18/2004 04:06 | 08/18/2004 04:06 | Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 5.80 | 0 | Auto | Lightning | Lightning | SPK | 143487 |
08/18/2004 04:58 | 08/18/2004 04:58 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 0 | Auto | Unknown | Lightning | TRI TDA RED SAL | 143489 | |
08/18/2004 05:00 | 08/18/2004 05:00 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Lightning | Lightning | KAL | 143490 |
08/18/2004 05:00 | 08/18/2004 05:00 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 143490 | |
08/18/2004 05:00 | 08/18/2004 05:00 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Lightning | Lightning | KAL | 143490 |
08/18/2004 05:00 | 08/18/2004 05:00 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Lightning | Lightning | SPK | 143490 |
08/18/2004 05:00 | 08/18/2004 05:00 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Lightning | Lightning | KAL | 143490 |
08/18/2004 05:00 | 08/18/2004 05:00 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 143490 |
08/18/2004 06:50 | 08/18/2004 06:50 | Columbia-Valhalla No 1 115kV line | 115.0 | L | 5.26 | 0 | Auto | Unknown | Unknown | WEN | 143507 | |
08/18/2004 07:06 | 08/18/2004 07:09 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 3 | Auto | Lightning | Lightning | KAL | 143508 | |
08/18/2004 07:06 | 08/18/2004 07:13 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 7 | Auto | Lightning | RAS Initiated | KAL | 143509 | |
08/18/2004 07:08 | 08/18/2004 17:21 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 613 | Plan | Maintenance | RED | 143510 | ||
08/18/2004 07:37 | 08/18/2004 14:31 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 414 | Plan | Maintenance | EUG | 143511 | |
08/18/2004 07:37 | 08/18/2004 14:31 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 414 | Plan | Maintenance | EUG | 143511 | ||
08/18/2004 07:37 | 08/18/2004 14:31 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 414 | Plan | Maintenance | EUG | 143511 | ||
08/18/2004 07:55 | 08/18/2004 09:29 | Camp-Trout Creek section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | 10.90 | 94 | Auto | Lightning | Lightning | KAL | 143512 | |
08/18/2004 07:55 | 08/18/2004 09:29 | Noxon-Camp section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | 0.20 | 94 | Auto | Lightning | Lightning | KAL | 143512 | |
08/18/2004 07:55 | 08/18/2004 17:26 | Noxon-Hot Springs No 1 230kV line | 230.0 | L | G | 68.28 | 571 | Auto | Lightning | Lightning | KAL | 143512 |
08/18/2004 07:55 | 08/18/2004 17:26 | Trout Creek-Hot Springs section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | 57.18 | 571 | Auto | Lightning | Lightning | KAL | 143512 | |
08/18/2004 08:03 | 08/18/2004 17:16 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 553 | Plan | Maintenance | SPK | 143514 | ||
08/18/2004 08:10 | 08/18/2004 14:20 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 370 | Plan | Maintenance | WEN SPK | 143515 | ||
08/18/2004 08:11 | 08/18/2004 14:16 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | 50.34 | 365 | Plan | Maintenance | SPK | 143516 | ||
08/18/2004 08:11 | 08/18/2004 14:16 | Bell-Boundary No 3 230kV line | 230.0 | L | G | 108.07 | 365 | Plan | Maintenance | SPK | 143516 | |
08/18/2004 10:10 | 08/30/2004 09:08 | Detroit PH-Detroit No 1 230kV line | 230.0 | L | 0.48 | 17218 | Plan | Foreign Request | SAL | 143517 | ||
08/18/2004 10:26 | 08/18/2004 12:33 | Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | 0.10 | 127 | Plan | Maintenance | TRI | 143518 | ||
08/18/2004 10:26 | 08/18/2004 12:33 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 24.00 | 127 | Plan | Maintenance | TRI | 143518 | ||
08/18/2004 10:26 | 08/18/2004 12:33 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 127 | Plan | Maintenance | TRI | 143518 | |
08/18/2004 10:26 | 08/18/2004 12:33 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 53.10 | 127 | Plan | Maintenance | TRI | 143518 | ||
08/18/2004 11:57 | 08/18/2004 14:28 | Keeler-Oregon City No 2 115kV line | 115.0 | L | 21.43 | 151 | Auto | Machinery, Construction | Machinery, Construction | SAL LGV | 143519 | |
08/18/2004 15:14 | 08/18/2004 15:14 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 143520 |
08/18/2004 15:14 | 08/18/2004 15:14 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 143520 |
08/18/2004 15:14 | 08/18/2004 15:14 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 143520 |
08/18/2004 15:14 | 08/18/2004 15:14 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 143520 | |
08/18/2004 15:16 | 08/18/2004 15:16 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 0 | Auto | Lightning | Lightning | IDF | 143521 | |
08/18/2004 16:25 | 08/18/2004 16:25 | Addy-Colville No 1 115kV line | 115.0 | L | 15.22 | 0 | Auto | Lightning | Lightning | SPK | 143522 | |
08/18/2004 16:59 | 08/18/2004 16:59 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | G | 13.30 | 0 | Auto | Lightning | Lightning | SPK | 143523 |
08/18/2004 16:59 | 08/18/2004 16:59 | Colville-Republic No 1 115kV line | 115.0 | L | 44.47 | 0 | Auto | Lightning | Lightning | SPK | 143523 | |
08/18/2004 16:59 | 08/18/2004 16:59 | Kettle Falls-Republic section of Colville-Republic No 1 115kV line | 115.0 | S | G | 31.17 | 0 | Auto | Lightning | Lightning | SPK | 143523 |
08/18/2004 17:12 | 08/18/2004 17:12 | Addy-Colville No 1 115kV line | 115.0 | L | 15.22 | 0 | Auto | Lightning | Lightning | SPK | 143524 | |
08/18/2004 17:14 | 08/18/2004 17:14 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 143525 |
08/18/2004 17:14 | 08/18/2004 17:14 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 143525 |
08/18/2004 17:14 | 08/18/2004 17:14 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 143525 |
08/18/2004 17:14 | 08/18/2004 17:14 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 143525 | |
08/18/2004 17:23 | 08/18/2004 17:23 | Addy-AVA Gifford No 1 115kV line | 115.0 | L | 20.70 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143526 | |
08/18/2004 17:33 | 08/18/2004 17:33 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143527 | |
08/18/2004 17:45 | 08/18/2004 17:45 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 143528 |
08/18/2004 17:45 | 08/18/2004 17:45 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 143528 |
08/18/2004 17:45 | 08/18/2004 17:45 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 143528 |
08/18/2004 17:45 | 08/18/2004 17:45 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 143528 | |
08/18/2004 18:15 | 08/18/2004 18:15 | Bell-Boundary No 1 230kV line | 230.0 | L | 91.66 | 0 | Auto | Lightning | Lightning | SPK | 143529 | |
08/18/2004 18:15 | 08/18/2004 18:15 | Bell-Sacheen section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 31.60 | 0 | Auto | Lightning | Lightning | SPK | 143529 |
08/18/2004 18:15 | 08/18/2004 18:15 | Sacheen tap to Bell-Boundary No 1 230kV line | 230.0 | T | G | 0.70 | 0 | Auto | Lightning | Lightning | SPK | 143529 |
08/18/2004 18:15 | 08/18/2004 18:15 | Sacheen-Boundary section of Bell-Boundary No 1 230kV line | 230.0 | S | G | 60.06 | 0 | Auto | Lightning | Lightning | SPK | 143529 |
08/19/2004 01:20 | 08/19/2004 01:20 | Camp-Trout Creek section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | G | 10.90 | 0 | Auto | Unknown | Unknown | KAL | 143546 |
08/19/2004 01:20 | 08/19/2004 01:20 | Noxon-Camp section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | G | 0.20 | 0 | Auto | Unknown | Unknown | KAL | 143546 |
08/19/2004 01:20 | 08/19/2004 01:20 | Noxon-Hot Springs No 1 230kV line | 230.0 | L | 68.28 | 0 | Auto | Unknown | Unknown | KAL | 143546 | |
08/19/2004 01:20 | 08/19/2004 01:20 | Trout Creek-Hot Springs section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | G | 57.18 | 0 | Auto | Unknown | Unknown | KAL | 143546 |
08/19/2004 06:55 | 08/19/2004 14:55 | Ice Harbor-Franklin No 1 115kV line | 115.0 | L | 9.34 | 480 | Plan | Foreign Request | TRI | 143547 | ||
08/19/2004 07:12 | 08/19/2004 16:50 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 578 | Plan | Maintenance | OLY | 143548 | ||
08/19/2004 07:12 | 08/19/2004 16:50 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 578 | Plan | Maintenance | OLY | 143548 | |
08/19/2004 07:38 | 08/19/2004 14:49 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 431 | Plan | Maintenance | EUG | 143549 | |
08/19/2004 07:38 | 08/19/2004 14:49 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 431 | Plan | Maintenance | EUG | 143549 | ||
08/19/2004 07:38 | 08/19/2004 14:49 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 431 | Plan | Maintenance | EUG | 143549 | ||
08/19/2004 07:56 | 08/20/2004 14:22 | Keeler-Forest Grove No 2 115kV line | 115.0 | L | 10.51 | 1826 | Plan | Maintenance | SAL | 143550 | ||
08/19/2004 08:32 | 08/19/2004 14:01 | Lower Monumental-Ashe No 1 500kV line | 500.0 | L | 39.58 | 329 | Plan | Maintenance | TRI | 143551 | ||
08/19/2004 09:33 | 08/19/2004 11:34 | Lexington-Longview No 1 115kV line | 115.0 | L | 9.43 | 121 | Plan | Foreign Request | LGV OLY | 143552 | ||
08/19/2004 09:33 | 08/19/2004 11:34 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | G | 6.15 | 121 | Plan | Foreign Request | LGV OLY | 143552 | |
08/19/2004 09:33 | 08/19/2004 11:34 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | G | 3.28 | 121 | Plan | Foreign Request | OLY LGV | 143552 | |
08/19/2004 10:42 | 08/20/2004 15:19 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 1717 | Auto | Foreign Trouble | Foreign Trouble | OLY | 143553 | |
08/19/2004 12:28 | 08/19/2004 12:28 | Maple Valley-East Pine No 1 230kV line | 230.0 | L | 14.08 | 0 | Auto | Foreign Trouble | Foreign Trouble | COV | 143554 | |
08/19/2004 13:08 | 08/19/2004 13:08 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | 56.45 | 0 | Auto | Lightning | Lightning | KAL | 143555 | |
08/19/2004 13:08 | 08/19/2004 13:08 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 13.50 | 0 | Auto | Lightning | Lightning | KAL | 143555 |
08/19/2004 13:08 | 08/19/2004 13:08 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143555 |
08/19/2004 13:08 | 08/19/2004 13:08 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | G | 42.95 | 0 | Auto | Lightning | Lightning | KAL | 143555 |
08/19/2004 14:25 | 08/19/2004 14:45 | Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 4.30 | 20 | Plan | Switching | LGV OLY | 143556 | ||
08/19/2004 14:25 | 08/19/2004 14:45 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 20 | Plan | Switching | LGV OLY | 143556 | |
08/19/2004 15:14 | 08/19/2004 15:14 | Hatwai-AVA Moscow No 3 230kV line | 230.0 | L | 18.10 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143557 | |
08/19/2004 17:58 | 08/19/2004 17:58 | Columbia Falls-Stillwater section of Columbia Falls-Trego No 1 115kV line | 115.0 | S | G | 18.58 | 0 | Auto | Lightning | Lightning | KAL | 143558 |
08/19/2004 17:58 | 08/19/2004 17:58 | Columbia Falls-Trego No 1 115kV line | 115.0 | L | 45.96 | 0 | Auto | Lightning | Lightning | KAL | 143558 | |
08/19/2004 17:58 | 08/19/2004 17:58 | Stillwater tap to Columbia Falls-Trego No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143558 |
08/19/2004 17:58 | 08/19/2004 17:58 | Stillwater-Trego section of Columbia Falls-Trego No 1 115kV line | 115.0 | S | G | 27.38 | 0 | Auto | Lightning | Lightning | KAL | 143558 |
08/20/2004 05:54 | 08/20/2004 14:48 | Lexington-Longview No 1 115kV line | 115.0 | L | 9.43 | 534 | Plan | Foreign Request | LGV OLY | 143565 | ||
08/20/2004 05:54 | 08/20/2004 14:48 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | G | 6.15 | 534 | Plan | Foreign Request | LGV OLY | 143565 | |
08/20/2004 05:54 | 08/20/2004 14:48 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | G | 3.28 | 534 | Plan | Foreign Request | OLY LGV | 143565 | |
08/20/2004 07:11 | 08/20/2004 16:35 | Duckabush-Quilcene section of Shelton-Fairmount No 1 115kV line | 115.0 | S | 12.85 | 564 | Plan | Maintenance | OLY | 143566 | ||
08/20/2004 07:11 | 08/20/2004 16:35 | Shelton-Fairmount No 1 115kV line | 115.0 | L | G | 60.23 | 564 | Plan | Maintenance | OLY | 143566 | |
08/20/2004 07:41 | 08/20/2004 14:12 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 391 | Plan | Maintenance | EUG | 143567 | |
08/20/2004 07:41 | 08/20/2004 14:12 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 391 | Plan | Maintenance | EUG | 143567 | ||
08/20/2004 07:41 | 08/20/2004 14:12 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 391 | Plan | Maintenance | EUG | 143567 | ||
08/20/2004 14:27 | 08/20/2004 14:56 | Keeler-Forest Grove No 2 115kV line | 115.0 | L | 10.51 | 29 | Plan | Maintenance | SAL | 143568 | ||
08/20/2004 19:29 | 08/20/2004 19:29 | Allston-Astoria No 1 115kV line | 115.0 | L | 41.98 | 0 | Auto | Unknown | Unknown | LGV | 143569 | |
08/20/2004 19:29 | 08/20/2004 19:29 | Allston-Delena section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 3.31 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Cathlamet-Grays River section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | G | 18.27 | 0 | Auto | Unknown | Unknown | LGV OLY | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Clatskanie-Mist section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 4.80 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Delena-Clatskanie section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 6.66 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Fern Hill-Astoria section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 3.95 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Grays River-Naselle section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | G | 10.32 | 0 | Auto | Unknown | Unknown | LGV OLY | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Knappa-Fern Hill section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 6.62 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Mist-Naselle section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 7.90 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | T | G | 33.17 | 0 | Auto | Unknown | Unknown | LGV OLY | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Naselle tap-Cathlamet section of Naselle tap to Allston-Astoria No 1 115kV line | 115.0 | TS | G | 4.58 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/20/2004 19:29 | 08/20/2004 19:29 | Naselle-Knappa section of Allston-Astoria No 1 115kV line | 115.0 | S | G | 8.74 | 0 | Auto | Unknown | Unknown | LGV | 143569 |
08/21/2004 06:29 | 08/22/2004 22:27 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 2398 | Plan | Fiber Optic Work | TDA RED | 143574 | |
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143574 | |||
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143574 | |||
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143574 | |||
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143574 | |||
08/21/2004 06:29 | 08/22/2004 22:27 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 2398 | Plan | Fiber Optic Work | TDA RED | 143575 | |
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143575 | |||
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143575 | |||
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143575 | |||
08/21/2004 06:29 | 08/22/2004 22:27 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 2398 | Plan | Fiber Optic Work | TDA | 143575 | |||
08/21/2004 06:29 | 08/22/2004 15:55 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 2006 | Plan | Switching | TDA | 143576 | ||
08/21/2004 06:29 | 08/22/2004 15:55 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 2006 | Plan | Switching | TDA | 143577 | ||
08/21/2004 07:03 | 08/21/2004 13:06 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 363 | Plan | Maintenance | COV | 143578 | ||
08/21/2004 19:50 | 08/21/2004 19:50 | Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line | 115.0 | S | G | 18.35 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143579 |
08/21/2004 19:50 | 08/21/2004 19:50 | Chehalis-Raymond No 1 115kV line | 115.0 | L | 45.44 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143579 | |
08/21/2004 19:50 | 08/21/2004 19:50 | Holcomb tap to Chehalis-Raymond No 1 115kV line | 115.0 | T | G | 0.01 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143579 |
08/21/2004 19:50 | 08/21/2004 19:50 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | G | 12.18 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143579 |
08/21/2004 19:50 | 08/21/2004 19:50 | Pe Ell tap to Chehalis-Raymond No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143579 |
08/21/2004 19:50 | 08/21/2004 19:50 | Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line | 115.0 | S | G | 14.91 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143579 |
08/21/2004 19:50 | 08/21/2004 19:50 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143580 | |
08/21/2004 19:50 | 08/21/2004 19:50 | Baleville tap to Raymond-Willapa River No 1 115kV line | 115.0 | T | G | 4.75 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143581 |
08/21/2004 19:50 | 08/21/2004 19:50 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY LGV | 143581 |
08/21/2004 19:50 | 08/21/2004 19:50 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143581 |
08/21/2004 19:50 | 08/21/2004 19:50 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 0 | Auto | Terminal Equipment Failure | Forced (Configuration) | OLY | 143581 | |
08/21/2004 20:43 | 08/31/2004 03:22 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 13359 | Plan | Emergency | OLY LGV | 143582 | |
08/21/2004 20:43 | 08/31/2004 03:22 | Holcomb-Oxbow section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 1.48 | 13359 | Plan | Emergency | OLY | 143582 | ||
08/21/2004 20:43 | 08/21/2004 20:45 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 2 | Plan | Emergency | OLY LGV | 143582 | ||
08/21/2004 21:11 | 08/21/2004 21:12 | Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line | 115.0 | S | G | 18.35 | 1 | Plan | Emergency | OLY | 143583 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Chehalis-Raymond No 1 115kV line | 115.0 | L | 45.44 | 1 | Plan | Emergency | OLY | 143583 | ||
08/21/2004 21:11 | 08/21/2004 21:12 | Holcomb tap to Chehalis-Raymond No 1 115kV line | 115.0 | T | G | 0.01 | 1 | Plan | Emergency | OLY | 143583 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | G | 12.18 | 1 | Plan | Emergency | OLY | 143583 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Pe Ell tap to Chehalis-Raymond No 1 115kV line | 115.0 | T | G | 0.10 | 1 | Plan | Emergency | OLY | 143583 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line | 115.0 | S | G | 14.91 | 1 | Plan | Emergency | OLY | 143583 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 1 | Plan | Emergency | OLY | 143584 | ||
08/21/2004 21:11 | 08/21/2004 21:12 | Baleville tap to Raymond-Willapa River No 1 115kV line | 115.0 | T | G | 4.75 | 1 | Plan | Emergency | OLY | 143585 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 1 | Plan | Emergency | OLY LGV | 143585 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 1 | Plan | Emergency | OLY | 143585 | |
08/21/2004 21:11 | 08/21/2004 21:12 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 1 | Plan | Emergency | OLY | 143585 | ||
08/22/2004 04:17 | 08/22/2004 07:57 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 220 | Plan | Voltage Control | TRI TDA RED SAL | 143586 | ||
08/22/2004 05:12 | 08/22/2004 05:12 | Lower Monumental-Hanford No 1 500kV line | 500.0 | L | 53.47 | 0 | Auto | Unknown | Unknown | TRI | 143587 | |
08/22/2004 05:43 | 08/22/2004 05:43 | Condon tap to De Moss-Fossil No 1 69kV line | 69.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | TDA | 143594 | |
08/22/2004 05:43 | 08/22/2004 06:47 | Condon Wind tap to De Moss-Fossil No 1 69kV line | 69.0 | T | 0.01 | 64 | Auto | Lightning | Lightning | TDA | 143594 | |
08/22/2004 05:43 | 08/22/2004 05:43 | Condon Wind-Condon section of De Moss-Fossil No 1 69kV line | 69.0 | S | 1.46 | 0 | Auto | Lightning | Lightning | TDA | 143594 | |
08/22/2004 05:43 | 08/22/2004 05:43 | Condon-Fossil section of De Moss-Fossil No 1 69kV line | 69.0 | S | 18.43 | 0 | Auto | Lightning | Lightning | TDA | 143594 | |
08/22/2004 05:43 | 08/22/2004 05:43 | De Moss-Fossil No 1 69kV line | 69.0 | L | G | 52.93 | 0 | Auto | Lightning | Lightning | TDA | 143594 |
08/22/2004 05:43 | 08/22/2004 05:43 | De Moss-Gordon Hollow section of De Moss-Fossil No 1 69kV line | 69.0 | S | 0.11 | 0 | Auto | Lightning | Lightning | TDA | 143594 | |
08/22/2004 05:43 | 08/22/2004 05:43 | Gordon Hollow tap to De Moss-Fossil No 1 69kV line | 69.0 | T | 0.11 | 0 | Auto | Lightning | Lightning | TDA | 143594 | |
08/22/2004 05:43 | 08/22/2004 05:43 | Gordon Hollow-Condon Wind section of De Moss-Fossil No 1 69kV line | 69.0 | S | 32.93 | 0 | Auto | Lightning | Lightning | TDA | 143594 | |
08/22/2004 05:55 | 08/22/2004 05:55 | Buckley-Grizzly No 1 500kV line | 500.0 | L | 53.60 | 0 | Auto | Lightning | Lightning | TDA RED | 143588 | |
08/22/2004 07:40 | 08/22/2004 09:13 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 93 | Plan | Maintenance | TDA RED | 143595 | |
08/22/2004 07:40 | 08/22/2004 09:13 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 93 | Plan | Maintenance | TDA | 143595 | |||
08/22/2004 07:40 | 08/22/2004 09:13 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 93 | Plan | Maintenance | TDA RED | 143596 | |
08/22/2004 07:40 | 08/22/2004 09:13 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 93 | Plan | Maintenance | TDA | 143596 | |||
08/22/2004 19:48 | 08/22/2004 19:48 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Lightning | Lightning | KAL | 143597 | |
08/22/2004 23:33 | 08/23/2004 05:52 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 379 | Plan | Voltage Control | TRI TDA RED SAL | 143598 | ||
08/23/2004 04:10 | 08/23/2004 04:48 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 38 | Plan | Foreign Request | TDA RED | 143599 | ||
08/23/2004 04:10 | 08/23/2004 04:48 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 38 | Plan | Foreign Request | TDA | 143599 | ||
08/23/2004 04:10 | 08/23/2004 04:48 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 38 | Plan | Foreign Request | TDA | 143599 | ||
08/23/2004 04:10 | 08/23/2004 04:48 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 38 | Plan | Foreign Request | TDA | 143599 | ||
08/23/2004 04:10 | 08/23/2004 04:48 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 38 | Plan | Foreign Request | TDA | 143599 | ||
08/23/2004 04:10 | 08/23/2004 04:48 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 38 | Plan | Foreign Request | TDA | 143599 | ||
08/23/2004 04:10 | 08/23/2004 20:06 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 956 | Plan | Foreign Request | TDA RED | 143600 | ||
08/23/2004 04:10 | 08/23/2004 20:06 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143600 | ||
08/23/2004 04:10 | 08/23/2004 20:06 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143600 | ||
08/23/2004 04:10 | 08/23/2004 20:06 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143600 | ||
08/23/2004 04:10 | 08/23/2004 20:06 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143600 | ||
08/23/2004 04:10 | 08/23/2004 20:06 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143600 | ||
08/23/2004 04:18 | 08/23/2004 04:24 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 6 | Plan | Foreign Request | TDA | 143601 | ||
08/23/2004 04:18 | 08/23/2004 20:05 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 947 | Plan | Foreign Request | TDA | 143602 | ||
08/23/2004 05:01 | 08/26/2004 15:01 | Bonneville PH 2-North Bonneville No 3 230kV line | 230.0 | L | 1.36 | 4920 | Plan | Foreign Request | LGV | 143603 | ||
08/23/2004 06:43 | 08/24/2004 15:13 | Libby PH-Libby No 1 230kV line | 230.0 | L | 1.35 | 1950 | Plan | Foreign Request | KAL | 143609 | ||
08/23/2004 07:27 | 08/27/2004 17:13 | Maple Valley-Duwamish No 1 230kV line | 230.0 | L | 7.68 | 6346 | Plan | Foreign Request | COV | 143610 | ||
08/23/2004 07:42 | 08/27/2004 13:57 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 6135 | Plan | Maintenance | EUG | 143611 | |
08/23/2004 07:42 | 08/27/2004 13:57 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 6135 | Plan | Maintenance | EUG | 143611 | ||
08/23/2004 07:42 | 08/27/2004 13:57 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 6135 | Plan | Maintenance | EUG | 143611 | ||
08/23/2004 07:54 | 08/27/2004 07:45 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5751 | Plan | Maintenance | IDF | 143612 | ||
08/23/2004 08:04 | 08/30/2004 14:40 | Little Goose-Lower Granite No 1 500kV line | 500.0 | L | 32.80 | 10476 | Plan | Maintenance | SPK TRI | 143613 | ||
08/23/2004 08:33 | 08/27/2004 14:12 | Filbert-Carlton section of Forest Grove-McMinnville No 1 115kV line | 115.0 | S | 17.74 | 6099 | Plan | Maintenance | SAL | 143614 | ||
08/23/2004 08:33 | 08/27/2004 14:12 | Forest Grove-McMinnville No 1 115kV line | 115.0 | L | G | 23.72 | 6099 | Plan | Maintenance | SAL | 143614 | |
08/23/2004 08:54 | 10/08/2004 13:05 | Chief Joseph PH-Chief Joseph No 6 500kV line | 500.0 | L | 0.74 | 66491 | Plan | Foreign Request | WEN | 143615 | ||
08/23/2004 08:55 | 08/23/2004 16:14 | Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 4.30 | 439 | Plan | Foreign Request | LGV OLY | 143626 | ||
08/23/2004 08:55 | 08/23/2004 16:14 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 439 | Plan | Foreign Request | LGV OLY | 143626 | |
08/23/2004 09:43 | 08/23/2004 09:43 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 0 | Auto | Unknown | Tree cut | EUG | 143616 | |
08/23/2004 10:20 | 08/23/2004 15:50 | Naselle-Tarlett No 1 115kV line | 115.0 | L | 15.86 | 330 | Plan | Foreign Request | LGV OLY | 143617 | ||
08/23/2004 14:06 | 08/23/2004 14:45 | North Bonneville-Ross No 2 230kV line | 230.0 | L | G | 35.99 | 39 | Plan | Switching | LGV | 143618 | |
08/23/2004 14:06 | 08/23/2004 14:45 | North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 27.51 | 39 | Plan | Switching | LGV | 143618 | ||
08/23/2004 14:06 | 08/23/2004 14:45 | Sifton-Ross section of North Bonneville-Ross No 2 230kV line | 230.0 | S | 8.48 | 39 | Plan | Switching | LGV | 143618 | ||
08/23/2004 20:00 | 08/23/2004 20:06 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 6 | Plan | Foreign Request | TDA RED | 143619 | ||
08/23/2004 20:00 | 08/23/2004 20:06 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 6 | Plan | Foreign Request | TDA | 143619 | ||
08/23/2004 20:00 | 08/23/2004 20:06 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 6 | Plan | Foreign Request | TDA | 143619 | ||
08/23/2004 20:00 | 08/23/2004 20:06 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 6 | Plan | Foreign Request | TDA | 143619 | ||
08/23/2004 20:00 | 08/23/2004 20:06 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 6 | Plan | Foreign Request | TDA | 143619 | ||
08/23/2004 20:00 | 08/23/2004 20:06 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 6 | Plan | Foreign Request | TDA | 143619 | ||
08/23/2004 20:01 | 08/23/2004 20:05 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 4 | Plan | Foreign Request | TDA | 143620 | ||
08/24/2004 01:57 | 08/24/2004 06:04 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 247 | Plan | Voltage Control | TDA RED SAL | 143621 | ||
08/24/2004 04:12 | 08/24/2004 04:32 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 20 | Plan | Switching | TDA RED | 143622 | ||
08/24/2004 04:12 | 08/24/2004 04:32 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 20 | Plan | Switching | TDA | 143622 | ||
08/24/2004 04:12 | 08/24/2004 04:32 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 20 | Plan | Switching | TDA | 143622 | ||
08/24/2004 04:12 | 08/24/2004 04:32 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 20 | Plan | Switching | TDA | 143622 | ||
08/24/2004 04:12 | 08/24/2004 04:32 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 20 | Plan | Switching | TDA | 143622 | ||
08/24/2004 04:12 | 08/24/2004 04:32 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 20 | Plan | Switching | TDA | 143622 | ||
08/24/2004 04:12 | 08/24/2004 20:08 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 956 | Plan | Foreign Request | TDA RED | 143623 | ||
08/24/2004 04:12 | 08/24/2004 20:08 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143623 | ||
08/24/2004 04:12 | 08/24/2004 20:08 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143623 | ||
08/24/2004 04:12 | 08/24/2004 20:08 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143623 | ||
08/24/2004 04:12 | 08/24/2004 20:08 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143623 | ||
08/24/2004 04:12 | 08/24/2004 20:08 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 956 | Plan | Foreign Request | TDA | 143623 | ||
08/24/2004 04:14 | 08/24/2004 04:19 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Switching | TDA | 143624 | ||
08/24/2004 04:14 | 08/24/2004 20:06 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 952 | Plan | Foreign Request | TDA | 143625 | ||
08/24/2004 07:28 | 08/24/2004 19:43 | North Bonneville-Ross No 1 230kV line | 230.0 | L | 36.32 | 735 | Plan | PCS Cellular Work | LGV | 143628 | ||
08/24/2004 07:28 | 08/24/2004 19:43 | North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 27.65 | 735 | Plan | PCS Cellular Work | LGV | 143628 | |
08/24/2004 07:28 | 08/24/2004 19:43 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | G | 1.24 | 735 | Plan | PCS Cellular Work | LGV | 143628 | |
08/24/2004 07:28 | 08/24/2004 19:43 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 8.67 | 735 | Plan | PCS Cellular Work | LGV | 143628 | |
08/24/2004 08:13 | 08/24/2004 15:41 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 448 | Plan | Maintenance | OLY | 143629 | ||
08/24/2004 13:00 | 08/24/2004 13:09 | Albeni Falls-Newport section of Albeni Falls-Pine Street No 1 115kV line | 115.0 | S | 2.11 | 9 | Auto | Foreign Utility | Foreign Utility | SPK | 143630 | |
08/24/2004 13:00 | 08/24/2004 13:09 | Albeni Falls-Pine Street No 1 115kV line | 115.0 | L | G | 2.27 | 9 | Auto | Foreign Utility | Foreign Utility | SPK | 143630 |
08/24/2004 13:00 | 08/24/2004 13:06 | Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | 4.43 | 6 | Auto | Foreign Utility | Foreign Utility | SPK | 143631 | |
08/24/2004 13:00 | 08/24/2004 13:06 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | G | 29.67 | 6 | Auto | Foreign Utility | Foreign Utility | SPK | 143631 |
08/24/2004 13:00 | 08/24/2004 13:04 | Diamond Lake-Albeni Falls section of Sacheen-Albeni Falls No 1 115kV line | 115.0 | S | 8.20 | 4 | Auto | Foreign Utility | Foreign Utility | SPK | 143632 | |
08/24/2004 13:00 | 08/24/2004 13:04 | Sacheen-Albeni Falls No 1 115kV line | 115.0 | L | G | 13.72 | 4 | Auto | Foreign Utility | Foreign Utility | SPK | 143632 |
08/24/2004 20:00 | 08/24/2004 20:08 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 8 | Plan | Foreign Request | TDA RED | 143633 | ||
08/24/2004 20:00 | 08/24/2004 20:08 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Plan | Foreign Request | TDA | 143633 | ||
08/24/2004 20:00 | 08/24/2004 20:08 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Plan | Foreign Request | TDA | 143633 | ||
08/24/2004 20:00 | 08/24/2004 20:08 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Plan | Foreign Request | TDA | 143633 | ||
08/24/2004 20:00 | 08/24/2004 20:08 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Plan | Foreign Request | TDA | 143633 | ||
08/24/2004 20:00 | 08/24/2004 20:08 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Plan | Foreign Request | TDA | 143633 | ||
08/24/2004 20:01 | 08/24/2004 20:06 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Foreign Request | TDA | 143634 | ||
08/25/2004 05:50 | 08/25/2004 05:50 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | 2.40 | 0 | Auto | Unknown | Unknown | RED | 143645 | |
08/25/2004 05:50 | 08/25/2004 05:50 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Unknown | Unknown | RED | 143645 | |
08/25/2004 05:50 | 08/25/2004 05:50 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | 46.50 | 0 | Auto | Unknown | Unknown | RED | 143645 | |
08/25/2004 05:50 | 08/25/2004 05:50 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 0 | Auto | Unknown | Unknown | RED | 143645 | |
08/25/2004 05:50 | 08/25/2004 05:50 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 0 | Auto | Unknown | Unknown | RED | 143645 |
08/25/2004 05:50 | 08/25/2004 05:50 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 0.10 | 0 | Auto | Unknown | Unknown | RED | 143645 | |
08/25/2004 05:50 | 08/25/2004 05:50 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | 21.80 | 0 | Auto | Unknown | Unknown | RED | 143645 | |
08/25/2004 08:32 | 08/25/2004 15:38 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 426 | Plan | Maintenance | OLY | 143646 | ||
08/25/2004 09:02 | 08/27/2004 11:20 | Allston-Clatsop No 1 230kV line | 230.0 | L | G | 42.61 | 3018 | Plan | Maintenance | LGV | 143647 | |
08/25/2004 09:02 | 08/27/2004 11:20 | Driscoll-Clatsop section of Allston-Clatsop No 1 230kV line | 230.0 | S | 21.77 | 3018 | Plan | Maintenance | LGV | 143647 | ||
08/25/2004 09:04 | 08/25/2004 09:24 | Allston-Clatsop No 1 230kV line | 230.0 | L | O | 42.61 | 20 | Plan | Switching | LGV | 143648 | |
08/25/2004 09:04 | 08/25/2004 09:24 | Allston-Driscoll section of Allston-Clatsop No 1 230kV line | 230.0 | S | 20.84 | 20 | Plan | Switching | LGV | 143648 | ||
08/25/2004 09:04 | 08/25/2004 09:24 | Driscoll tap to Allston-Clatsop No 1 230kV line | 230.0 | T | 0.22 | 20 | Plan | Switching | LGV | 143648 | ||
08/25/2004 16:16 | 08/25/2004 16:16 | Bell-Bigelow section of Bell-Trentwood No 2 115kV line | 115.0 | S | G | 6.60 | 0 | Auto | Lightning | Lightning | SPK | 143649 |
08/25/2004 16:16 | 08/25/2004 16:16 | Bell-Trentwood No 2 115kV line | 115.0 | L | 11.30 | 0 | Auto | Lightning | Lightning | SPK | 143649 | |
08/25/2004 16:16 | 08/25/2004 16:16 | Bigelow tap to Bell-Trentwood No 2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 143649 |
08/25/2004 16:16 | 08/25/2004 16:16 | Bigelow-Trentwood section of Bell-Trentwood No 2 115kV line | 115.0 | S | G | 4.70 | 0 | Auto | Lightning | Lightning | SPK | 143649 |
08/25/2004 16:16 | 08/25/2004 16:16 | Green Bluff tap to Bell-Trentwood No 2 115kV line | 115.0 | T | G | 7.35 | 0 | Auto | Lightning | Lightning | SPK | 143649 |
08/26/2004 02:00 | 08/26/2004 03:34 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 94 | Plan | Maintenance | OLY | 143659 | |
08/26/2004 02:00 | 08/31/2004 03:22 | Holcomb tap to Chehalis-Raymond No 1 115kV line | 115.0 | T | 0.01 | 7282 | Plan | Maintenance | OLY | 143659 | ||
08/26/2004 02:00 | 08/26/2004 03:34 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 94 | Plan | Maintenance | OLY | 143659 | ||
08/26/2004 02:00 | 08/26/2004 03:34 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 94 | Plan | Forced | OLY | 143660 | ||
08/26/2004 02:00 | 08/26/2004 03:34 | Baleville tap to Raymond-Willapa River No 1 115kV line | 115.0 | T | G | 4.75 | 94 | Plan | Forced | OLY | 143661 | |
08/26/2004 02:00 | 08/26/2004 03:34 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 94 | Plan | Forced | OLY LGV | 143661 | |
08/26/2004 02:00 | 08/26/2004 03:34 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 94 | Plan | Forced | OLY | 143661 | |
08/26/2004 02:00 | 08/26/2004 03:34 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 94 | Plan | Forced | OLY | 143661 | ||
08/26/2004 08:19 | 08/26/2004 15:10 | Shelton-Fairmount No 2 115kV line | 115.0 | L | 60.17 | 411 | Plan | Maintenance | OLY | 143662 | ||
08/26/2004 13:05 | 08/26/2004 14:06 | B-891-Sand Creek section of Bronx-Sand Creek No 1 115kV line | 115.0 | S | 6.67 | 61 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143663 | |
08/26/2004 13:05 | 08/26/2004 14:06 | Bronx-B-891 section of Bronx-Sand Creek No 1 115kV line | 115.0 | S | 6.62 | 61 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143663 | |
08/26/2004 13:05 | 08/26/2004 14:06 | Bronx-Sand Creek No 1 115kV line | 115.0 | L | G | 13.29 | 61 | Auto | Foreign Trouble | Foreign Trouble | SPK | 143663 |
08/27/2004 06:38 | 08/27/2004 10:52 | WNP 1-Ashe No 2 230kV line | 230.0 | L | 2.26 | 254 | Plan | Foreign Request | TRI | 143673 | ||
08/27/2004 07:22 | 08/27/2004 14:22 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 420 | Plan | Switching | SPK | 143674 | ||
08/27/2004 07:43 | 08/27/2004 14:04 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | 50.34 | 381 | Plan | Switching | SPK | 143675 | ||
08/27/2004 07:43 | 08/27/2004 14:04 | Bell-Boundary No 3 230kV line | 230.0 | L | G | 108.07 | 381 | Plan | Switching | SPK | 143675 | |
08/27/2004 07:43 | 08/27/2004 14:04 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 381 | Plan | Switching | WEN SPK | 143676 | ||
08/27/2004 10:23 | 08/30/2004 11:33 | North Bonneville-Ross No 2 230kV line | 230.0 | L | 35.99 | 4390 | Plan | PCS Cellular Work | LGV | 143677 | ||
08/27/2004 10:23 | 08/30/2004 11:33 | North Bonneville-Sifton section of North Bonneville-Ross No 2 230kV line | 230.0 | S | G | 27.51 | 4390 | Plan | PCS Cellular Work | LGV | 143677 | |
08/27/2004 10:23 | 08/30/2004 11:33 | Sifton tap to North Bonneville-Ross No 2 230kV line | 230.0 | T | G | 1.20 | 4390 | Plan | PCS Cellular Work | LGV | 143677 | |
08/27/2004 10:23 | 08/30/2004 11:33 | Sifton-Ross section of North Bonneville-Ross No 2 230kV line | 230.0 | S | G | 8.48 | 4390 | Plan | PCS Cellular Work | LGV | 143677 | |
08/27/2004 11:06 | 08/27/2004 11:20 | Allston-Clatsop No 1 230kV line | 230.0 | L | O | 42.61 | 14 | Plan | Switching | LGV | 143678 | |
08/27/2004 11:06 | 08/27/2004 11:20 | Allston-Driscoll section of Allston-Clatsop No 1 230kV line | 230.0 | S | 20.84 | 14 | Plan | Switching | LGV | 143678 | ||
08/27/2004 11:06 | 08/27/2004 11:20 | Driscoll tap to Allston-Clatsop No 1 230kV line | 230.0 | T | 0.22 | 14 | Plan | Switching | LGV | 143678 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 143665 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 143665 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 143665 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 143665 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 143665 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 143665 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 143667 | ||
08/27/2004 16:20 | 08/27/2004 20:19 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 239 | Auto | Foreign Trouble | TDA | 143667 | |||
08/27/2004 16:20 | 08/27/2004 20:19 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 239 | Auto | Foreign Trouble | TDA | 143667 | |||
08/27/2004 16:20 | 08/27/2004 16:20 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 143667 | ||
08/27/2004 16:20 | 08/27/2004 16:20 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 143667 | ||
08/27/2004 16:20 | 08/27/2004 20:19 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 239 | Auto | Foreign Trouble | TDA | 143667 | |||
08/27/2004 20:18 | 08/27/2004 20:19 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 1 | Plan | Switching | TDA RED | 143668 | ||
08/27/2004 20:18 | 08/27/2004 20:19 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1 | Plan | Switching | TDA | 143668 | ||
08/27/2004 20:18 | 08/27/2004 20:19 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1 | Plan | Switching | TDA | 143668 | ||
08/27/2004 20:18 | 08/27/2004 20:19 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1 | Plan | Switching | TDA | 143668 | ||
08/27/2004 20:18 | 08/27/2004 20:19 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1 | Plan | Switching | TDA | 143668 | ||
08/27/2004 20:18 | 08/27/2004 20:19 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1 | Plan | Switching | TDA | 143668 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 978 | Plan | Foreign Request | TDA RED | 143679 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143679 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143679 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143679 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143679 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143679 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 978 | Plan | Foreign Request | TDA RED | 143680 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143680 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143680 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143680 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143680 | ||
08/28/2004 04:00 | 08/28/2004 20:18 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 978 | Plan | Foreign Request | TDA | 143680 | ||
08/29/2004 04:00 | 08/29/2004 04:15 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 15 | Plan | Foreign Request | TDA RED | 143681 | ||
08/29/2004 04:00 | 08/29/2004 04:15 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 143681 | ||
08/29/2004 04:00 | 08/29/2004 04:15 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 143681 | ||
08/29/2004 04:00 | 08/29/2004 04:15 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 143681 | ||
08/29/2004 04:00 | 08/29/2004 04:15 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 143681 | ||
08/29/2004 04:00 | 08/29/2004 04:15 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 15 | Plan | Foreign Request | TDA | 143681 | ||
08/29/2004 04:00 | 08/29/2004 20:24 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 984 | Plan | Foreign Request | TDA RED | 143682 | ||
08/29/2004 04:00 | 08/29/2004 20:24 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 984 | Plan | Foreign Request | TDA | 143682 | ||
08/29/2004 04:00 | 08/29/2004 20:24 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 984 | Plan | Foreign Request | TDA | 143682 | ||
08/29/2004 04:00 | 08/29/2004 20:24 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 984 | Plan | Foreign Request | TDA | 143682 | ||
08/29/2004 04:00 | 08/29/2004 20:24 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 984 | Plan | Foreign Request | TDA | 143682 | ||
08/29/2004 04:00 | 08/29/2004 20:24 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 984 | Plan | Foreign Request | TDA | 143682 | ||
08/29/2004 04:03 | 08/29/2004 04:08 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Foreign Request | TDA | 143683 | ||
08/29/2004 04:03 | 08/29/2004 20:24 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 981 | Plan | Switching | TDA | 143684 | ||
08/29/2004 04:59 | 08/29/2004 07:41 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 162 | Plan | Voltage Control | TRI TDA RED SAL | 143685 | ||
08/29/2004 05:44 | 08/29/2004 05:47 | Lower Monumental-Ashe No 1 500kV line | 500.0 | L | 39.58 | 3 | Auto | Unknown | Unknown | TRI | 143686 | |
08/29/2004 20:10 | 08/29/2004 20:24 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 14 | Plan | Foreign Request | TDA RED | 143690 | ||
08/29/2004 20:10 | 08/29/2004 20:24 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 143690 | ||
08/29/2004 20:10 | 08/29/2004 20:24 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 143690 | ||
08/29/2004 20:10 | 08/29/2004 20:24 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 143690 | ||
08/29/2004 20:10 | 08/29/2004 20:24 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 143690 | ||
08/29/2004 20:10 | 08/29/2004 20:24 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 143690 | ||
08/29/2004 20:13 | 08/29/2004 20:24 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 11 | Plan | Switching | TDA | 143691 | ||
08/30/2004 00:46 | 08/30/2004 00:46 | Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | G | 18.26 | 0 | Auto | Unknown | Unknown | RED | 143692 |
08/30/2004 00:46 | 08/30/2004 00:46 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | 103.37 | 0 | Auto | Unknown | Unknown | RED | 143692 | |
08/30/2004 00:46 | 08/30/2004 00:46 | Ponderosa tap to Grizzly-Summer Lake No 1 500kV line | 500.0 | T | G | 0.01 | 0 | Auto | Unknown | Unknown | RED | 143692 |
08/30/2004 00:46 | 08/30/2004 00:46 | Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | G | 85.11 | 0 | Auto | Unknown | Unknown | RED | 143692 |
08/30/2004 06:29 | 09/10/2004 15:48 | Columbia-Rocky Ford No 1 115kV line | 115.0 | L | 30.40 | 16399 | Plan | Construction | WEN | 143701 | ||
08/30/2004 06:56 | 08/30/2004 07:06 | Ice Harbor-Franklin No 1 115kV line | 115.0 | L | 9.34 | 10 | Plan | Foreign Request | TRI | 143702 | ||
08/30/2004 06:57 | 09/05/2004 17:03 | Tacoma-TPWR Cowlitz No 1 230kV line | 230.0 | L | 6.00 | 9246 | Plan | Foreign Request | COV | 143703 | ||
08/30/2004 07:00 | 09/03/2004 14:44 | Lower Monumental PH-Lower Monumental No 1 500kV line | 500.0 | L | 0.97 | 6224 | Plan | Foreign Request | TRI | 143704 | ||
08/30/2004 07:36 | 08/30/2004 14:53 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 437 | Plan | Maintenance | LGV OLY | 143705 | |
08/30/2004 07:36 | 08/30/2004 14:53 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | 3.28 | 437 | Plan | Maintenance | OLY LGV | 143705 | ||
08/30/2004 07:41 | 09/02/2004 08:02 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4341 | Plan | Maintenance | IDF | 143706 | ||
08/30/2004 07:47 | 08/30/2004 14:26 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 399 | Plan | Maintenance | EUG | 143707 | |
08/30/2004 07:47 | 08/30/2004 14:26 | Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.66 | 399 | Plan | Maintenance | EUG | 143707 | ||
08/30/2004 08:47 | 09/03/2004 14:43 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | G | 28.27 | 6116 | Plan | Maintenance | WEN SPK | 143708 | |
08/30/2004 08:47 | 09/03/2004 14:43 | Wilbur-Creston section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 10.21 | 6116 | Plan | Maintenance | WEN SPK | 143708 | ||
08/30/2004 08:50 | 08/30/2004 14:47 | Big Eddy-De Moss No 1 115kV line | 115.0 | L | T | 23.98 | 357 | Plan | Maintenance | TDA | 143709 | |
08/30/2004 08:50 | 08/30/2004 14:47 | Klondike Schoolhouse tap to Big Eddy-De Moss No 1 115kV line | 115.0 | T | 9.25 | 357 | Plan | Maintenance | TDA | 143709 | ||
08/30/2004 08:51 | 10/01/2004 11:37 | Paul-PSE Tono No 1 500kV line | 500.0 | L | 0.10 | 46246 | Plan | Forced | OLY | 143710 | ||
08/30/2004 08:59 | 09/01/2004 15:37 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 3278 | Plan | Maintenance | SAL | 143774 | ||
08/30/2004 09:23 | 09/02/2004 13:41 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | G | 5.51 | 4578 | Plan | Maintenance | TRI | 143711 | |
08/30/2004 09:23 | 09/02/2004 13:41 | Tapteal-Richland section of Badger Canyon-Richland No 1 115kV line | 115.0 | S | 2.45 | 4578 | Plan | Maintenance | TRI | 143711 | ||
08/30/2004 12:13 | 08/30/2004 12:20 | McNary PH-McNary No 6 115kV line | 115.0 | L | 1.39 | 7 | Plan | Foreign Request | TRI | 143712 | ||
08/30/2004 14:58 | 08/30/2004 15:00 | Covington-Creston SCL No 1 230kV line | 230.0 | L | 13.40 | 2 | Auto | Dispatcher | Dispatcher | COV | 143713 | |
08/30/2004 15:26 | 09/03/2004 12:19 | Lower Monumental-Little Goose No 2 500kV line | 500.0 | L | 24.32 | 5573 | Plan | Maintenance | TRI SPK | 143714 | ||
08/31/2004 02:00 | 08/31/2004 03:15 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 75 | Plan | Forced | OLY | 143715 | |
08/31/2004 02:00 | 08/31/2004 03:15 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 75 | Plan | Forced | OLY | 143715 | ||
08/31/2004 02:00 | 08/31/2004 03:13 | Pe Ell-Holcomb section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 14.91 | 73 | Plan | Forced | OLY | 143715 | ||
08/31/2004 02:00 | 08/31/2004 03:16 | Raymond-Henkle St. No 1 115kV line | 115.0 | L | 2.51 | 76 | Plan | Forced | OLY | 143716 | ||
08/31/2004 02:00 | 08/31/2004 03:16 | Baleville tap to Raymond-Willapa River No 1 115kV line | 115.0 | T | G | 4.75 | 76 | Plan | Forced | OLY | 143717 | |
08/31/2004 02:00 | 08/31/2004 03:16 | Baleville-Willapa River section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 1.33 | 76 | Plan | Forced | OLY LGV | 143717 | |
08/31/2004 02:00 | 08/31/2004 03:16 | Raymond-Baleville section of Raymond-Willapa River No 1 115kV line | 115.0 | S | G | 3.18 | 76 | Plan | Forced | OLY | 143717 | |
08/31/2004 02:00 | 08/31/2004 03:16 | Raymond-Willapa River No 1 115kV line | 115.0 | L | 4.51 | 76 | Plan | Forced | OLY | 143717 | ||
08/31/2004 03:50 | 08/31/2004 03:51 | Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line | 230.0 | S | G | 71.70 | 1 | Auto | Lightning | Lightning | TDA TRI | 143729 |
08/31/2004 03:50 | 08/31/2004 03:51 | Big Eddy-Midway No 1 230kV line | 230.0 | L | 102.80 | 1 | Auto | Lightning | Lightning | TDA TRI | 143729 | |
08/31/2004 03:50 | 08/31/2004 03:51 | Mabton tap to Big Eddy-Midway No 1 230kV line | 230.0 | T | G | 0.10 | 1 | Auto | Lightning | Lightning | TRI | 143729 |
08/31/2004 03:50 | 08/31/2004 03:51 | Mabton-Midway section of Big Eddy-Midway No 1 230kV line | 230.0 | S | G | 31.10 | 1 | Auto | Lightning | Lightning | TRI | 143729 |
08/31/2004 06:00 | 08/31/2004 18:55 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 775 | Plan | Maintenance | TDA RED | 143718 | |
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143718 | |||
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143718 | |||
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143718 | |||
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143718 | |||
08/31/2004 06:00 | 08/31/2004 18:55 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 775 | Plan | Maintenance | TDA RED | 143719 | |
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143719 | |||
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143719 | |||
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143719 | |||
08/31/2004 06:00 | 08/31/2004 18:55 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 775 | Plan | Maintenance | TDA | 143719 | |||
08/31/2004 06:03 | 08/31/2004 18:54 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 771 | Plan | Maintenance | TDA | 143730 | ||
08/31/2004 06:03 | 08/31/2004 18:54 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 771 | Plan | Maintenance | TDA | 143731 | ||
08/31/2004 07:01 | 08/31/2004 19:10 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 729 | Plan | Maintenance | SPK | 143732 | |
08/31/2004 07:01 | 08/31/2004 19:10 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 729 | Plan | Maintenance | SPK | 143732 | ||
08/31/2004 07:16 | 08/31/2004 19:00 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 704 | Plan | Maintenance | SPK | 143733 | ||
08/31/2004 07:16 | 08/31/2004 19:00 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 704 | Plan | Maintenance | SPK | 143733 | |
08/31/2004 07:31 | 08/31/2004 14:15 | Lexington-Longview No 1 115kV line | 115.0 | L | 9.43 | 404 | Plan | Foreign Request | LGV OLY | 143734 | ||
08/31/2004 07:31 | 08/31/2004 14:15 | Lexington-Pacific Way section of Lexington-Longview No 1 115kV line | 115.0 | S | G | 6.15 | 404 | Plan | Foreign Request | LGV OLY | 143734 | |
08/31/2004 07:31 | 08/31/2004 14:15 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | G | 3.28 | 404 | Plan | Foreign Request | OLY LGV | 143734 | |
08/31/2004 07:40 | 08/31/2004 14:14 | Lookout Point-Alvey No 1 115kV line | 115.0 | L | G | 15.77 | 394 | Plan | Maintenance | EUG | 143735 | |
08/31/2004 07:40 | 08/31/2004 14:14 | Pleasant Hill-Alvey section of Lookout Point-Alvey No 1 115kV line | 115.0 | S | 6.66 | 394 | Plan | Maintenance | EUG | 143735 | ||
08/31/2004 07:40 | 09/01/2004 16:31 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 1971 | Plan | Construction | SPK | 143736 | ||
08/31/2004 07:49 | 08/31/2004 13:20 | Diamond Lake-Albeni Falls section of Sacheen-Albeni Falls No 1 115kV line | 115.0 | S | 8.20 | 331 | Plan | Maintenance | SPK | 143737 | ||
08/31/2004 07:49 | 08/31/2004 13:20 | Sacheen-Albeni Falls No 1 115kV line | 115.0 | L | G | 13.72 | 331 | Plan | Maintenance | SPK | 143737 | |
08/31/2004 07:49 | 08/31/2004 13:21 | Albeni Falls-Priest River AVA section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | 4.43 | 332 | Plan | Maintenance | SPK | 143738 | ||
08/31/2004 07:49 | 08/31/2004 13:21 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | G | 29.67 | 332 | Plan | Maintenance | SPK | 143738 | |
08/31/2004 07:49 | 08/31/2004 13:21 | Albeni Falls-Newport section of Albeni Falls-Pine Street No 1 115kV line | 115.0 | S | 2.11 | 332 | Plan | Maintenance | SPK | 143739 | ||
08/31/2004 07:49 | 08/31/2004 13:21 | Albeni Falls-Pine Street No 1 115kV line | 115.0 | L | G | 2.27 | 332 | Plan | Maintenance | SPK | 143739 | |
08/31/2004 09:13 | 08/31/2004 09:13 | Midway-Rocky Ford No 1 230kV line | 230.0 | L | 47.57 | 0 | Auto | Lightning | Lightning | TRI WEN | 143740 | |
08/31/2004 12:31 | 08/31/2004 14:56 | Shelton-Kitsap No 4 230kV line | 230.0 | L | 30.29 | 145 | Plan | Maintenance | OLY | 143741 | ||
08/31/2004 13:24 | 08/31/2004 16:32 | Ostrander-McLoughlin No 1 230kV line | 230.0 | L | 8.82 | 188 | Plan | Maintenance | LGV | 143742 | ||
08/31/2004 17:30 | 08/31/2004 17:32 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 29.39 | 2 | Auto | Lightning | Lightning | TDA | 143743 |
08/31/2004 17:30 | 08/31/2004 17:32 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | 97.46 | 2 | Auto | Lightning | Lightning | TDA RED | 143743 | |
08/31/2004 17:30 | 08/31/2004 17:32 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 68.07 | 2 | Auto | Lightning | Lightning | TDA RED | 143743 |
08/31/2004 17:30 | 08/31/2004 19:21 | Bakeoven-Maupin section of Fossil-Maupin 69kV line | 69.0 | S | 7.00 | 111 | Auto | Lightning | Equipment/Miscellaneous | RED | 143744 | |
08/31/2004 17:30 | 08/31/2004 19:21 | Fossil-Maupin 69kV line | 69.0 | L | G | 56.93 | 111 | Auto | Lightning | Equipment/Miscellaneous | TDA | 143744 |
08/31/2004 17:30 | 08/31/2004 18:42 | Maupin-Tygh Valley No 1 69kV line | 69.0 | L | 3.26 | 72 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143745 | |
08/31/2004 17:30 | 08/31/2004 18:42 | Wamic tap to Maupin-Tygh Valley No 1 69kV line | 69.0 | T | G | 11.25 | 72 | Auto | Forced (Configuration) | Forced (Configuration) | TDA | 143745 |
08/31/2004 18:12 | 08/31/2004 18:12 | Rattlesnake-Garrison No 1 230kV line | 230.0 | L | 60.94 | 0 | Auto | Lightning | Lightning | KAL | 143746 | |
08/31/2004 23:03 | 08/31/2004 23:05 | Lower Monumental-Little Goose No 1 500kV line | 500.0 | L | 24.04 | 2 | Auto | Equipment/Miscellaneous | Terminal Equipment Failure | TRI SPK | 143747 | |
08/31/2004 23:03 | 08/31/2004 23:10 | Libby PH-Libby No 1 230kV line | 230.0 | L | 1.35 | 7 | Auto | RAS Initiated | RAS Initiated | KAL | 143748 | |
08/31/2004 23:03 | 08/31/2004 23:10 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 7 | Auto | RAS Initiated | RAS Initiated | KAL | 143749 | |
09/01/2004 05:08 | 09/01/2004 05:08 | Shelton-Fairmount No 4 230kV line | 230.0 | L | 60.05 | 0 | Auto | Lightning | Lightning | OLY | 143775 | |
09/01/2004 06:00 | 09/01/2004 22:28 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 988 | Plan | Maintenance | TDA RED | 143776 | |
09/01/2004 06:00 | 09/01/2004 22:28 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 988 | Plan | Maintenance | TDA | 143776 | |||
09/01/2004 06:00 | 09/01/2004 22:28 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 988 | Plan | Maintenance | TDA | 143776 | |||
09/01/2004 06:00 | 09/01/2004 22:28 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 988 | Plan | Maintenance | TDA | 143776 | |||
09/01/2004 06:00 | 09/01/2004 22:28 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 988 | Plan | Maintenance | TDA | 143776 | |||
09/01/2004 06:01 | 09/01/2004 16:48 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 647 | Plan | Switching | TDA | 143750 | ||
09/01/2004 06:03 | 09/01/2004 06:08 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143777 | |
09/01/2004 06:03 | 09/01/2004 06:11 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 8 | Auto | Foreign Trouble | TDA RED | 143778 | ||
09/01/2004 06:03 | 09/01/2004 06:11 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Auto | Foreign Trouble | TDA | 143778 | ||
09/01/2004 06:03 | 09/01/2004 06:11 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Auto | Foreign Trouble | TDA | 143778 | ||
09/01/2004 06:03 | 09/01/2004 06:11 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Auto | Foreign Trouble | TDA | 143778 | ||
09/01/2004 06:03 | 09/01/2004 06:11 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Auto | Foreign Trouble | TDA | 143778 | ||
09/01/2004 06:03 | 09/01/2004 06:11 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 8 | Auto | Foreign Trouble | TDA | 143778 | ||
09/01/2004 07:12 | 09/01/2004 07:12 | Box Canyon tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 2.39 | 0 | Auto | Lightning | Lightning | SPK | 143779 |
09/01/2004 07:12 | 09/01/2004 07:12 | Box Canyon-Metaline Falls section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 4.75 | 0 | Auto | Lightning | Lightning | SPK | 143779 |
09/01/2004 07:12 | 09/01/2004 07:12 | Colville-Boundary No 1 115kV line | 115.0 | L | O | 43.06 | 0 | Auto | Lightning | Lightning | SPK | 143779 |
09/01/2004 07:12 | 09/01/2004 07:12 | Colville-Spirit section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 17.42 | 0 | Auto | Lightning | Lightning | SPK | 143779 |
09/01/2004 07:12 | 09/01/2004 07:12 | Metaline Falls tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 1.20 | 0 | Auto | Lightning | Lightning | SPK | 143779 |
09/01/2004 07:12 | 09/01/2004 07:12 | Spirit tap to Colville-Boundary No 1 115kV line | 115.0 | T | G | 5.23 | 0 | Auto | Lightning | Lightning | SPK | 143779 |
09/01/2004 07:12 | 09/01/2004 07:12 | Spirit-Box Canyon section of Colville-Boundary No 1 115kV line | 115.0 | S | G | 11.98 | 0 | Auto | Lightning | Lightning | SPK | 143779 |
09/01/2004 07:12 | 09/01/2004 07:12 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | G | 0.02 | 0 | Auto | Lightning | Lightning | SPK | 143780 |
09/01/2004 07:12 | 09/01/2004 07:12 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 57.73 | 0 | Auto | Lightning | Lightning | SPK | 143780 |
09/01/2004 07:12 | 09/01/2004 07:12 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | G | 50.34 | 0 | Auto | Lightning | Lightning | SPK | 143780 |
09/01/2004 07:12 | 09/01/2004 07:12 | Bell-Boundary No 3 230kV line | 230.0 | L | 108.07 | 0 | Auto | Lightning | Lightning | SPK | 143780 | |
09/01/2004 07:21 | 09/01/2004 07:49 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 28 | Plan | Construction | SPK | 143781 | |
09/01/2004 07:21 | 09/01/2004 07:49 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 28 | Plan | Construction | SPK | 143781 | ||
09/01/2004 07:24 | 09/03/2004 14:45 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 3321 | Plan | Maintenance | LGV OLY | 143782 | |
09/01/2004 07:24 | 09/03/2004 14:45 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | 3.28 | 3321 | Plan | Maintenance | OLY LGV | 143782 | ||
09/01/2004 07:25 | 09/01/2004 07:29 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 4 | Plan | Construction | SPK | 143783 | ||
09/01/2004 07:25 | 09/01/2004 07:29 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 4 | Plan | Construction | SPK | 143783 | |
09/01/2004 07:28 | 09/01/2004 07:28 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 17.09 | 0 | Auto | Lightning | Lightning | KAL | 143784 |
09/01/2004 07:28 | 09/01/2004 07:28 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | 59.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 143784 | |
09/01/2004 07:28 | 09/01/2004 07:28 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.27 | 0 | Auto | Lightning | Lightning | KAL | 143784 |
09/01/2004 07:28 | 09/01/2004 07:28 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 6.23 | 0 | Auto | Lightning | Lightning | SPK | 143784 |
09/01/2004 07:28 | 09/01/2004 07:28 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 12.41 | 0 | Auto | Lightning | Lightning | KAL | 143784 |
09/01/2004 07:28 | 09/01/2004 07:28 | Yaak-Moyie Springs section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | G | 11.58 | 0 | Auto | Lightning | Lightning | KAL SPK | 143784 |
09/01/2004 07:29 | 09/03/2004 13:22 | Alvey-Dixonville No 1 230kV line | 230.0 | L | 59.40 | 3233 | Plan | Foreign Request | EUG | 143786 | ||
09/01/2004 07:54 | 09/01/2004 14:55 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 421 | Plan | Maintenance | EUG | 143787 | |
09/01/2004 07:54 | 09/01/2004 14:55 | Rainbow-Fern Ridge section of Lane-Wendson No 1 115kV line | 115.0 | S | 5.58 | 421 | Plan | Maintenance | EUG | 143787 | ||
09/01/2004 08:41 | 09/01/2004 09:30 | Elmo-Kerr section of Kalispell-Kerr No 1 115kV line | 115.0 | S | 12.80 | 49 | Plan | Maintenance | KAL | 143788 | ||
09/01/2004 08:41 | 09/01/2004 09:30 | Kalispell-Kerr No 1 115kV line | 115.0 | L | G | 41.39 | 49 | Plan | Maintenance | KAL | 143788 | |
09/01/2004 10:54 | 09/01/2004 12:14 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.99 | 80 | Plan | Maintenance | LGV TDA | 143789 | ||
09/01/2004 10:54 | 09/01/2004 12:14 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | T | 45.05 | 80 | Plan | Maintenance | LGV | 143789 | |
09/01/2004 11:32 | 09/01/2004 11:32 | Samuels tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 143790 |
09/01/2004 11:32 | 09/01/2004 11:32 | Samuels-Bonners Ferry section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 19.40 | 0 | Auto | Lightning | Lightning | SPK | 143790 |
09/01/2004 11:32 | 09/01/2004 11:32 | Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | L | 52.68 | 0 | Auto | Lightning | Lightning | SPK | 143790 | |
09/01/2004 11:32 | 09/01/2004 11:32 | Sand Creek-Selle section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 1.30 | 0 | Auto | Lightning | Lightning | SPK | 143790 |
09/01/2004 11:32 | 09/01/2004 11:32 | Selle tap to Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | SPK | 143790 |
09/01/2004 11:32 | 09/01/2004 11:32 | Selle-Samuels section of Sand Creek-Bonners Ferry No 1&2 115kV line | 115.0 | S | G | 5.80 | 0 | Auto | Lightning | Lightning | SPK | 143790 |
09/01/2004 12:13 | 09/01/2004 12:13 | Dixon tap to Hot Springs-Rattlesnake No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143792 |
09/01/2004 12:13 | 09/01/2004 12:13 | Dixon-Rattlesnake section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 33.85 | 0 | Auto | Lightning | Lightning | KAL | 143792 |
09/01/2004 12:13 | 09/01/2004 12:13 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | G | 25.06 | 0 | Auto | Lightning | Lightning | KAL | 143792 |
09/01/2004 12:13 | 09/01/2004 12:13 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | 58.91 | 0 | Auto | Lightning | Lightning | KAL | 143792 | |
09/01/2004 12:18 | 09/01/2004 12:22 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 4 | Auto | RAS Initiated | RAS Initiated | KAL | 143793 | |
09/01/2004 12:18 | 09/01/2004 12:18 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Lightning | KAL | 143794 |
09/01/2004 12:18 | 09/01/2004 12:18 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Lightning | KAL | 143794 |
09/01/2004 12:18 | 09/01/2004 12:18 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Lightning | KAL | 143794 | |
09/01/2004 12:18 | 09/01/2004 12:18 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Lightning | KAL | 143794 |
09/01/2004 12:18 | 09/01/2004 12:18 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143794 |
09/01/2004 12:18 | 09/01/2004 12:18 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Lightning | KAL | 143794 |
09/01/2004 12:37 | 09/01/2004 12:37 | Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line | 230.0 | S | G | 35.80 | 0 | Auto | Lightning | Tree | OLY COV | 143795 |
09/01/2004 12:37 | 09/01/2004 12:37 | Centralia tap to Chehalis-Covington No 1 230kV line | 230.0 | T | G | 2.87 | 0 | Auto | Lightning | Tree | OLY | 143795 |
09/01/2004 12:37 | 09/01/2004 12:37 | Chehalis-Centralia Switching Station section of Chehalis-Covington No 1 230kV line | 230.0 | S | G | 10.30 | 0 | Auto | Lightning | Tree | OLY | 143795 |
09/01/2004 12:37 | 09/01/2004 12:37 | Chehalis-Covington No 1 230kV line | 230.0 | L | 69.40 | 0 | Auto | Lightning | Tree | OLY COV | 143795 | |
09/01/2004 12:37 | 09/01/2004 12:37 | Cowlitz tap to Chehalis-Covington No 1 230kV line | 230.0 | T | G | 6.30 | 0 | Auto | Lightning | Tree | COV | 143795 |
09/01/2004 12:37 | 09/01/2004 12:37 | TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line | 230.0 | S | G | 23.30 | 0 | Auto | Lightning | Tree | COV | 143795 |
09/01/2004 12:38 | 09/01/2004 12:39 | Flathead-Hot Springs No 1 230kV line | 230.0 | L | G | 56.45 | 1 | Auto | Lightning | Lightning | KAL | 143796 |
09/01/2004 12:38 | 09/01/2004 12:38 | Flathead-Lion Mountain section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | 13.50 | 0 | Auto | Lightning | Lightning | KAL | 143796 | |
09/01/2004 12:38 | 09/01/2004 12:38 | Lion Mountain tap to Flathead-Hot Springs No 1 230kV line | 230.0 | T | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143796 | |
09/01/2004 12:38 | 09/01/2004 12:39 | Lion Mountain-Hot Springs section of Flathead-Hot Springs No 1 230kV line | 230.0 | S | 42.95 | 1 | Auto | Lightning | Lightning | KAL | 143796 | |
09/01/2004 12:42 | 09/01/2004 12:42 | Elmo tap to Kalispell-Kerr No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | KAL | 143797 |
09/01/2004 12:42 | 09/01/2004 12:42 | Elmo-Kerr section of Kalispell-Kerr No 1 115kV line | 115.0 | S | G | 12.80 | 0 | Auto | Lightning | Lightning | KAL | 143797 |
09/01/2004 12:42 | 09/01/2004 12:42 | Kalispell-Elmo section of Kalispell-Kerr No 1 115kV line | 115.0 | S | G | 28.59 | 0 | Auto | Lightning | Lightning | KAL | 143797 |
09/01/2004 12:42 | 09/01/2004 12:42 | Kalispell-Kerr No 1 115kV line | 115.0 | L | 41.39 | 0 | Auto | Lightning | Lightning | KAL | 143797 | |
09/01/2004 15:44 | 09/03/2004 13:05 | Beaver-Tillamook section of Boyer-Tillamook No 1 115kV line | 115.0 | S | 14.45 | 2721 | Plan | Maintenance | SAL | 143798 | ||
09/01/2004 15:44 | 09/03/2004 13:05 | Boyer-Tillamook No 1 115kV line | 115.0 | L | G | 31.91 | 2721 | Plan | Maintenance | SAL | 143798 | |
09/01/2004 19:27 | 09/01/2004 19:27 | Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line | 230.0 | S | G | 15.65 | 0 | Auto | Lightning | Lightning | COV | 143799 |
09/01/2004 19:27 | 09/01/2004 19:27 | Sammamish-Klahanie section of Sammamish-Maple Valley No 1 230kV line | 230.0 | S | G | 16.38 | 0 | Auto | Lightning | Lightning | COV | 143799 |
09/01/2004 19:27 | 09/01/2004 19:27 | Sammamish-Maple Valley No 1 230kV line | 230.0 | L | 32.03 | 0 | Auto | Lightning | Lightning | COV | 143799 | |
09/02/2004 03:33 | 09/02/2004 15:02 | Columbia Generating Station-Ashe No 2 230kV line | 230.0 | L | 0.49 | 689 | Plan | Maintenance | TRI | 143800 | ||
09/02/2004 05:44 | 09/02/2004 05:44 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 143801 | |
09/02/2004 06:07 | 09/02/2004 17:14 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 667 | Plan | Foreign Request | KAL | 143804 | ||
09/02/2004 06:22 | 09/02/2004 19:02 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 760 | Plan | Maintenance | SPK | 143805 | |
09/02/2004 06:22 | 09/02/2004 19:02 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 760 | Plan | Maintenance | SPK | 143805 | ||
09/02/2004 06:33 | 09/02/2004 18:50 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 737 | Plan | Maintenance | SPK | 143806 | |
09/02/2004 06:33 | 09/02/2004 18:50 | IPL Trentwood-Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 0.04 | 737 | Plan | Maintenance | SPK | 143806 | ||
09/02/2004 06:45 | 09/03/2004 16:26 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 2021 | Plan | Construction | SPK | 143807 | ||
09/02/2004 07:00 | 09/02/2004 09:07 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 127 | Plan | Maintenance | TDA RED | 143808 | |
09/02/2004 07:00 | 09/02/2004 09:07 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 127 | Plan | Maintenance | TDA | 143808 | |||
09/02/2004 07:44 | 09/02/2004 13:45 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 361 | Plan | Maintenance | EUG | 143809 | |
09/02/2004 07:44 | 09/02/2004 13:45 | Rainbow-Fern Ridge section of Lane-Wendson No 1 115kV line | 115.0 | S | 5.58 | 361 | Plan | Maintenance | EUG | 143809 | ||
09/02/2004 19:00 | 09/02/2004 19:00 | Lower Monumental-McNary No 1 500kV line | 500.0 | L | 64.75 | 0 | Auto | Lightning | Lightning | TRI | 143810 | |
09/02/2004 19:00 | 09/02/2004 19:00 | Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line | 500.0 | S | G | 26.64 | 0 | Auto | Lightning | Lightning | TRI | 143810 |
09/02/2004 19:00 | 09/02/2004 19:00 | Sacajawea tap to Lower Monumental-McNary No 1 500kV line | 500.0 | T | G | 6.07 | 0 | Auto | Lightning | Lightning | TRI | 143810 |
09/02/2004 19:00 | 09/02/2004 19:00 | Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line | 500.0 | S | G | 38.11 | 0 | Auto | Lightning | Lightning | TRI | 143810 |
09/02/2004 22:03 | 09/03/2004 00:05 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 122 | Plan | Maintenance | TDA RED | 143811 | |
09/02/2004 22:03 | 09/03/2004 00:05 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 122 | Plan | Maintenance | TDA | 143811 | |||
09/02/2004 22:09 | 09/02/2004 22:38 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 29 | Auto | Forced (Configuration) | Human Element | TDA | 143812 | |
09/02/2004 22:09 | 09/02/2004 22:38 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 29 | Auto | Unknown | TDA RED | 143813 | |
09/02/2004 22:09 | 09/02/2004 22:38 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 29 | Auto | Unknown | TDA | 143813 | |||
09/02/2004 22:09 | 09/02/2004 22:38 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 29 | Auto | Unknown | TDA | 143813 | |||
09/02/2004 22:09 | 09/02/2004 22:38 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 29 | Auto | Unknown | TDA | 143813 | |||
09/02/2004 22:09 | 09/02/2004 22:38 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 29 | Auto | Unknown | TDA | 143813 | |||
09/02/2004 22:09 | 09/02/2004 22:16 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 7 | Auto | Forced (Configuration) | Human Element | TDA | 143814 | |
09/02/2004 22:09 | 09/02/2004 22:16 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 7 | Auto | Unknown | TDA RED | 143815 | |
09/02/2004 22:09 | 09/02/2004 22:16 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 7 | Auto | Unknown | TDA | 143815 | |||
09/02/2004 22:09 | 09/02/2004 22:16 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 7 | Auto | Unknown | TDA | 143815 | |||
09/02/2004 22:09 | 09/02/2004 22:16 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 7 | Auto | Unknown | TDA | 143815 | |||
09/02/2004 22:09 | 09/02/2004 22:16 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 7 | Auto | Unknown | TDA | 143815 | |||
09/02/2004 22:13 | 09/03/2004 00:57 | Malin-PACW 500/230kV Tie No 1 500kV line | 500.0 | L | 0.10 | 164 | Auto | Foreign Trouble | Foreign Trouble | RED | 143816 | |
09/03/2004 02:39 | 09/03/2004 02:53 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 14 | Auto | Unknown | TDA RED | 143817 | |
09/03/2004 02:39 | 09/03/2004 02:53 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 14 | Auto | Unknown | TDA | 143817 | |||
09/03/2004 02:39 | 09/03/2004 02:53 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 14 | Auto | Unknown | TDA | 143817 | |||
09/03/2004 02:39 | 09/03/2004 02:53 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 14 | Auto | Unknown | TDA | 143817 | |||
09/03/2004 02:39 | 09/03/2004 02:53 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 14 | Auto | Unknown | TDA | 143817 | |||
09/03/2004 03:14 | 09/03/2004 03:14 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 0 | Auto | Lightning | Lightning | IDF | 143818 | |
09/03/2004 06:00 | 09/03/2004 18:45 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 765 | Plan | Foreign Request | KAL | 143820 | ||
09/03/2004 06:17 | 09/03/2004 15:25 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 548 | Plan | Construction | SPK | 143821 | |
09/03/2004 06:17 | 09/03/2004 15:25 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 548 | Plan | Construction | SPK | 143821 | ||
09/03/2004 06:25 | 09/03/2004 16:06 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 581 | Plan | Construction | SPK | 143822 | ||
09/03/2004 06:25 | 09/03/2004 16:06 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 581 | Plan | Construction | SPK | 143822 | |
09/03/2004 07:00 | 09/03/2004 15:14 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 494 | Plan | Maintenance | TDA RED | 143823 | |
09/03/2004 07:00 | 09/03/2004 15:14 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 494 | Plan | Maintenance | TDA | 143823 | |||
09/03/2004 07:00 | 09/03/2004 15:14 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 494 | Plan | Maintenance | TDA | 143823 | |||
09/03/2004 07:00 | 09/03/2004 15:14 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 494 | Plan | Maintenance | TDA | 143823 | |||
09/03/2004 07:00 | 09/03/2004 15:14 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 494 | Plan | Maintenance | TDA | 143823 | |||
09/03/2004 07:00 | 09/03/2004 14:54 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 474 | Plan | Maintenance | TDA RED | 143824 | |
09/03/2004 07:00 | 09/03/2004 14:54 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 474 | Plan | Maintenance | TDA | 143824 | |||
09/03/2004 07:00 | 09/03/2004 14:54 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 474 | Plan | Maintenance | TDA | 143824 | |||
09/03/2004 07:00 | 09/03/2004 14:54 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 474 | Plan | Maintenance | TDA | 143824 | |||
09/03/2004 07:00 | 09/03/2004 14:54 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 474 | Plan | Maintenance | TDA | 143824 | |||
09/03/2004 07:13 | 09/03/2004 14:23 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 430 | Plan | Switching | TDA | 143825 | ||
09/03/2004 07:13 | 09/03/2004 14:54 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 461 | Plan | Switching | TDA | 143826 | ||
09/03/2004 07:36 | 09/03/2004 14:58 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 442 | Plan | Maintenance | EUG | 143827 | |
09/03/2004 07:36 | 09/03/2004 14:58 | Rainbow-Fern Ridge section of Lane-Wendson No 1 115kV line | 115.0 | S | 5.58 | 442 | Plan | Maintenance | EUG | 143827 | ||
09/03/2004 08:34 | 09/03/2004 13:38 | Santiam-Alvey No 1&2 230kV line | 230.0 | L | G | 118.50 | 304 | Plan | Maintenance | SAL EUG | 143828 | |
09/03/2004 08:34 | 09/03/2004 13:38 | Santiam-Marcola A500 section of Santiam-Alvey No 1&2 230kV line | 230.0 | S | 46.81 | 304 | Plan | Maintenance | SAL EUG | 143828 | ||
09/03/2004 11:59 | 09/03/2004 14:44 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 165 | Plan | Maintenance | TDA RED | 143829 | |
09/03/2004 11:59 | 09/03/2004 14:44 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 165 | Plan | Maintenance | TDA RED | 143829 | ||
09/03/2004 14:23 | 09/03/2004 15:14 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 51 | Auto | Equipment/Miscellaneous | Improper Relaying | TDA | 143830 | |
09/03/2004 23:06 | 09/04/2004 04:03 | Canal-East Hills section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 6.42 | 297 | Plan | Maintenance | IDF | 143831 | ||
09/03/2004 23:06 | 09/04/2004 04:03 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | G | 24.91 | 297 | Plan | Maintenance | IDF | 143831 | |
09/03/2004 23:31 | 09/04/2004 02:33 | East Hills tap to Minidoka PH-Unity No 1 138kV line | 138.0 | T | 0.10 | 182 | Plan | Maintenance | IDF | 143832 | ||
09/03/2004 23:31 | 09/04/2004 02:33 | East Hills-Unity section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 5.97 | 182 | Plan | Maintenance | IDF | 143832 | ||
09/03/2004 23:31 | 09/04/2004 02:33 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | O | 24.91 | 182 | Plan | Maintenance | IDF | 143832 | |
09/04/2004 02:40 | 09/04/2004 02:50 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 10 | Auto | Foreign Trouble | TDA RED | 143833 | ||
09/04/2004 02:40 | 09/04/2004 02:50 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 143833 | ||
09/04/2004 02:40 | 09/04/2004 02:50 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 143833 | ||
09/04/2004 02:40 | 09/04/2004 02:50 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 143833 | ||
09/04/2004 02:40 | 09/04/2004 02:50 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 143833 | ||
09/04/2004 02:40 | 09/04/2004 02:50 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 10 | Auto | Foreign Trouble | TDA | 143833 | ||
09/04/2004 06:00 | 09/04/2004 17:29 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 689 | Plan | Foreign Request | KAL | 143836 | ||
09/04/2004 18:46 | 09/04/2004 20:41 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | 0.01 | 115 | Auto | Malicious | Malicious | KAL | 143837 | |
09/04/2004 18:46 | 09/04/2004 20:41 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | 31.50 | 115 | Auto | Malicious | Malicious | KAL | 143837 | |
09/04/2004 18:46 | 09/05/2004 03:40 | Libby-Conkelley No 1 230kV line | 230.0 | L | G | 83.94 | 534 | Auto | Malicious | Malicious | KAL | 143837 |
09/04/2004 18:46 | 09/05/2004 03:40 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | 45.10 | 534 | Auto | Malicious | Malicious | KAL | 143837 | |
09/04/2004 18:46 | 09/04/2004 20:41 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | 0.10 | 115 | Auto | Malicious | Malicious | KAL | 143837 | |
09/04/2004 18:46 | 09/04/2004 20:41 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | 7.34 | 115 | Auto | Malicious | Malicious | KAL | 143837 | |
09/04/2004 18:46 | 09/05/2004 02:58 | Noxon-Libby No 1 230kV line | 230.0 | L | 70.17 | 492 | Auto | Malicious | Malicious | KAL | 143838 | |
09/04/2004 18:46 | 09/05/2004 03:14 | Libby PH-Libby No 1 230kV line | 230.0 | L | 1.35 | 508 | Auto | RAS Initiated | RAS Initiated | KAL | 143839 | |
09/04/2004 18:46 | 09/04/2004 20:08 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 82 | Auto | RAS Initiated | RAS Initiated | KAL | 143840 | |
09/05/2004 02:00 | 09/05/2004 08:16 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 376 | Plan | Voltage Control | TDA RED SAL | 143841 | ||
09/06/2004 00:23 | 09/06/2004 10:15 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 592 | Plan | Voltage Control | TRI TDA RED SAL | 143842 | ||
09/06/2004 17:23 | 09/06/2004 18:35 | Coyote Springs-AVA No 2 500kV line | 500.0 | L | 0.06 | 72 | Auto | Foreign Trouble | Foreign Trouble | TRI | 143843 | |
09/07/2004 02:01 | 09/15/2004 15:18 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 12317 | Plan | Maintenance | SAL EUG | 143844 | ||
09/07/2004 05:53 | 09/09/2004 09:45 | Grand Coulee-Bell No 3 230kV line | 230.0 | L | 82.92 | 3112 | Plan | Foreign Request | WEN SPK | 143853 | ||
09/07/2004 06:00 | 09/07/2004 16:26 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 626 | Plan | Maintenance | SNO | 143854 | ||
09/07/2004 06:23 | 09/07/2004 18:52 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 749 | Plan | Construction | SPK | 143855 | |
09/07/2004 06:23 | 09/07/2004 18:52 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 749 | Plan | Construction | SPK | 143855 | ||
09/07/2004 06:27 | 09/07/2004 18:16 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 709 | Plan | Construction | SPK | 143856 | ||
09/07/2004 06:27 | 09/07/2004 18:16 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 709 | Plan | Construction | SPK | 143856 | |
09/07/2004 07:01 | 09/17/2004 16:56 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 14995 | Plan | Foreign Request | COV | 143857 | ||
09/07/2004 07:30 | 09/09/2004 08:43 | Fairview-PACW Coquille No 1 115kV line | 115.0 | L | 6.00 | 2953 | Plan | Foreign Request | EUG | 143858 | ||
09/07/2004 07:37 | 09/10/2004 14:02 | Lexington-Longview No 1 115kV line | 115.0 | L | G | 9.43 | 4705 | Plan | Maintenance | LGV OLY | 143859 | |
09/07/2004 07:37 | 09/10/2004 14:02 | Pacific Way-Longview section of Lexington-Longview No 1 115kV line | 115.0 | S | 3.28 | 4705 | Plan | Maintenance | OLY LGV | 143859 | ||
09/07/2004 07:43 | 09/09/2004 14:38 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 3295 | Plan | Maintenance | SAL EUG | 143860 | |
09/07/2004 07:43 | 09/09/2004 14:38 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 3295 | Plan | Maintenance | SAL | 143860 | ||
09/07/2004 07:54 | 09/09/2004 14:30 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 3276 | Plan | Construction | SPK | 143861 | ||
09/07/2004 07:56 | 09/07/2004 15:11 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 435 | Plan | Maintenance | EUG | 143862 | |
09/07/2004 07:56 | 09/07/2004 15:11 | Rainbow-Fern Ridge section of Lane-Wendson No 1 115kV line | 115.0 | S | 5.58 | 435 | Plan | Maintenance | EUG | 143862 | ||
09/07/2004 08:02 | 09/10/2004 08:31 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 4349 | Plan | Maintenance | TDA | 143863 | ||
09/07/2004 08:21 | 09/07/2004 14:35 | Horn Rapids-White Bluffs section of Red Mountain-White Bluffs No 1 115kV line | 115.0 | S | 5.76 | 374 | Plan | Maintenance | TRI | 143864 | ||
09/07/2004 08:21 | 09/07/2004 14:35 | Red Mountain-White Bluffs No 1 115kV line | 115.0 | L | G | 9.81 | 374 | Plan | Maintenance | TRI | 143864 | |
09/07/2004 08:21 | 09/07/2004 14:34 | White Bluffs-Snyder section of White Bluffs-Stevens Drive No 2 115kV line | 115.0 | S | 1.90 | 373 | Plan | Maintenance | TRI | 143865 | ||
09/07/2004 08:21 | 09/07/2004 14:34 | White Bluffs-Stevens Drive No 2 115kV line | 115.0 | L | G | 6.90 | 373 | Plan | Maintenance | TRI | 143865 | |
09/07/2004 08:21 | 09/07/2004 14:40 | DOE B3-S4-White Bluffs No 1 115kV line | 115.0 | L | 5.04 | 379 | Plan | Maintenance | TRI | 143866 | ||
09/07/2004 08:21 | 09/07/2004 14:30 | White Bluffs-451B No 1 115kV line | 115.0 | L | 6.19 | 369 | Plan | Maintenance | TRI | 143867 | ||
09/07/2004 08:22 | 09/10/2004 15:19 | Columbia-B408 section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | 0.04 | 4737 | Plan | Maintenance | WEN | 143868 | ||
09/07/2004 08:22 | 09/10/2004 15:19 | Columbia-Ellensburg No 1 115kV line | 115.0 | L | G | 34.98 | 4737 | Plan | Maintenance | WEN | 143868 | |
09/07/2004 08:43 | 09/22/2004 08:09 | Raver-Covington No 2 500kV line | 500.0 | L | 10.33 | 21566 | Plan | Maintenance | COV | 143869 | ||
09/07/2004 08:49 | 09/17/2004 17:16 | Ostrander-McLoughlin No 1 230kV line | 230.0 | L | 8.82 | 14907 | Plan | Maintenance | LGV | 143870 | ||
09/07/2004 09:00 | 09/07/2004 14:44 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | 46.50 | 344 | Plan | Maintenance | RED | 143871 | ||
09/07/2004 09:00 | 09/07/2004 14:44 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 344 | Plan | Maintenance | RED | 143871 | |
09/07/2004 10:47 | 09/07/2004 11:34 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 47 | Plan | Foreign Request | TDA | 143872 | ||
09/07/2004 13:07 | 09/07/2004 16:30 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 203 | Plan | Maintenance | OLY | 143873 | |
09/07/2004 13:07 | 09/07/2004 16:30 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 203 | Plan | Maintenance | OLY | 143873 | ||
09/07/2004 13:07 | 09/07/2004 16:30 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 203 | Plan | Maintenance | OLY | 143873 | |
09/07/2004 13:07 | 09/07/2004 16:30 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 203 | Plan | Maintenance | OLY | 143873 | |
09/08/2004 06:00 | 09/08/2004 16:21 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 621 | Plan | Maintenance | SNO | 143879 | ||
09/08/2004 06:26 | 09/08/2004 17:40 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 674 | Plan | Construction | SPK | 143880 | ||
09/08/2004 06:26 | 09/08/2004 17:40 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 674 | Plan | Construction | SPK | 143880 | |
09/08/2004 07:06 | 09/08/2004 17:01 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 595 | Plan | Maintenance | SPK | 143881 | |
09/08/2004 07:06 | 09/08/2004 14:41 | Deer Park tap to Bell-Addy No 1 115kV line | 115.0 | T | 0.10 | 455 | Plan | Maintenance | SPK | 143881 | ||
09/08/2004 07:06 | 09/08/2004 17:01 | Milan-Deer Park section of Bell-Addy No 1 115kV line | 115.0 | S | 1.97 | 595 | Plan | Maintenance | SPK | 143881 | ||
09/08/2004 07:06 | 09/08/2004 14:41 | Bell-Addy No 1 115kV line | 115.0 | L | O | 51.18 | 455 | Plan | Switching | SPK | 143882 | |
09/08/2004 07:06 | 09/08/2004 14:41 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | 5.19 | 455 | Plan | Switching | SPK | 143882 | ||
09/08/2004 07:45 | 09/08/2004 14:10 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 385 | Plan | Maintenance | EUG | 143883 | |
09/08/2004 07:45 | 09/08/2004 14:10 | Rainbow-Fern Ridge section of Lane-Wendson No 1 115kV line | 115.0 | S | 5.58 | 385 | Plan | Maintenance | EUG | 143883 | ||
09/08/2004 07:51 | 09/08/2004 15:16 | McNary-Horse Heaven No 1 230kV line | 230.0 | L | 16.84 | 445 | Plan | Maintenance | TRI | 143884 | ||
09/08/2004 08:01 | 09/08/2004 16:00 | Captain Jack-Malin No 1 500kV line | 500.0 | L | 7.35 | 479 | Plan | Maintenance | RED | 143885 | ||
09/08/2004 08:39 | 09/08/2004 14:45 | Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line | 115.0 | T | 14.58 | 366 | Plan | Maintenance | OLY | 143886 | ||
09/08/2004 08:39 | 09/08/2004 17:38 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 9.22 | 539 | Plan | Maintenance | OLY | 143886 | ||
09/08/2004 08:39 | 09/08/2004 14:45 | Satsop Park-Aberdeen tap section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | 6.10 | 366 | Plan | Maintenance | OLY | 143886 | ||
09/08/2004 08:39 | 09/08/2004 17:38 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | G | 15.32 | 539 | Plan | Maintenance | OLY | 143886 | |
09/08/2004 09:12 | 09/10/2004 16:13 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 3301 | Plan | Maintenance | IDF | 143887 | ||
09/08/2004 09:12 | 09/10/2004 16:31 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 3319 | Plan | Maintenance | IDF | 143887 | ||
09/08/2004 09:40 | 09/08/2004 16:45 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 425 | Plan | Maintenance | OLY | 143888 | |
09/08/2004 09:40 | 09/08/2004 16:45 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 425 | Plan | Maintenance | OLY | 143888 | ||
09/08/2004 09:40 | 09/08/2004 16:45 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 425 | Plan | Maintenance | OLY | 143888 | |
09/08/2004 09:40 | 09/08/2004 16:45 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 425 | Plan | Maintenance | OLY | 143888 | |
09/08/2004 12:00 | 09/08/2004 14:31 | Lower Granite PH-Lower Granite No 1 500kV line | 500.0 | L | 0.75 | 151 | Plan | Foreign Request | TRI SPK | 143889 | ||
09/08/2004 15:39 | 09/08/2004 15:45 | Longview-Allston No 4 115kV line | 115.0 | L | G | 4.64 | 6 | Auto | Construction | Construction | LGV | 143890 |
09/08/2004 15:39 | 09/08/2004 15:45 | Longview-Donald Nys section of Longview-Allston No 4 115kV line | 115.0 | S | 3.63 | 6 | Auto | Construction | Construction | LGV | 143890 | |
09/08/2004 15:39 | 09/08/2004 15:45 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 6 | Auto | Construction | Construction | LGV | 143891 | |
09/09/2004 05:06 | 09/09/2004 05:06 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 143892 | |
09/09/2004 05:20 | 09/09/2004 20:45 | Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line | 115.0 | S | 15.50 | 925 | Plan | Foreign Request | LGV | 143896 | ||
09/09/2004 05:20 | 09/09/2004 20:45 | Cardwell-PACW Merwin No 1 115kV line | 115.0 | L | G | 16.30 | 925 | Plan | Foreign Request | LGV | 143896 | |
09/09/2004 05:49 | 09/09/2004 06:08 | Captain Jack-Klamath Cogen No 1 500kV line | 500.0 | L | 26.30 | 19 | Auto | Foreign Trouble | Foreign Trouble | RED | 143893 | |
09/09/2004 06:00 | 09/09/2004 16:07 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 607 | Plan | Maintenance | SNO | 143897 | ||
09/09/2004 06:18 | 09/09/2004 15:11 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 533 | Plan | Construction | SPK | 143898 | |
09/09/2004 06:18 | 09/09/2004 15:11 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 533 | Plan | Construction | SPK | 143898 | ||
09/09/2004 06:24 | 09/09/2004 14:32 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 488 | Plan | Construction | SPK | 143899 | ||
09/09/2004 06:24 | 09/09/2004 14:32 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 488 | Plan | Construction | SPK | 143899 | |
09/09/2004 07:42 | 09/09/2004 14:42 | McNary PH-McNary No 6 115kV line | 115.0 | L | 1.39 | 420 | Plan | Maintenance | TRI | 143900 | ||
09/09/2004 07:54 | 09/09/2004 13:30 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 336 | Plan | Maintenance | OLY | 143901 | |
09/09/2004 07:54 | 09/09/2004 13:30 | Skookum-Shelton section of Olympia-Shelton No 2 115kV line | 115.0 | S | 6.96 | 336 | Plan | Maintenance | OLY | 143901 | ||
09/09/2004 08:00 | 09/09/2004 17:19 | Captain Jack-Malin No 1 500kV line | 500.0 | L | 7.35 | 559 | Plan | Maintenance | RED | 143902 | ||
09/09/2004 08:02 | 09/10/2004 15:21 | Eugene-Lane No 1 115kV line | 115.0 | L | 5.47 | 1879 | Plan | Maintenance | EUG | 143903 | ||
09/09/2004 08:29 | 09/09/2004 16:55 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 506 | Plan | Maintenance | OLY | 143904 | |
09/09/2004 08:29 | 09/09/2004 16:55 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 506 | Plan | Maintenance | OLY | 143904 | ||
09/09/2004 08:29 | 09/09/2004 16:55 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 506 | Plan | Maintenance | OLY | 143904 | |
09/09/2004 08:29 | 09/09/2004 16:55 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 506 | Plan | Maintenance | OLY | 143904 | |
09/09/2004 13:51 | 09/09/2004 13:57 | Olympia-Shelton No 2 115kV line | 115.0 | L | G | 19.73 | 6 | Plan | Maintenance | OLY | 143905 | |
09/09/2004 13:51 | 09/09/2004 13:57 | Olympia-Skookum section of Olympia-Shelton No 2 115kV line | 115.0 | S | 12.77 | 6 | Plan | Maintenance | OLY | 143905 | ||
09/09/2004 16:05 | 09/09/2004 16:05 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 0 | Plan | Testing | IDF | 143906 | ||
09/09/2004 16:06 | 09/09/2004 16:06 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 0 | Plan | Testing | IDF | 143907 | |
09/09/2004 16:06 | 09/09/2004 16:06 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.99 | 0 | Plan | Testing | IDF | 143907 | ||
09/10/2004 05:55 | 09/10/2004 20:30 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 875 | Plan | Construction | WEN SPK | 143913 | ||
09/10/2004 06:00 | 09/10/2004 06:36 | Paul-Olympia No 1 500kV line | 500.0 | L | 20.24 | 36 | Plan | Emergency | OLY | 143914 | ||
09/10/2004 06:04 | 09/10/2004 14:15 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 491 | Plan | Maintenance | SNO | 143915 | ||
09/10/2004 06:04 | 09/10/2004 20:29 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 865 | Plan | Construction | SPK | 143916 | ||
09/10/2004 07:03 | 09/10/2004 18:19 | Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line | 115.0 | S | 15.50 | 676 | Plan | Foreign Request | LGV | 143917 | ||
09/10/2004 07:03 | 09/10/2004 18:19 | Cardwell-PACW Merwin No 1 115kV line | 115.0 | L | G | 16.30 | 676 | Plan | Foreign Request | LGV | 143917 | |
09/10/2004 07:40 | 09/10/2004 15:54 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 494 | Plan | Maintenance | OLY | 143918 | |
09/10/2004 07:40 | 09/10/2004 15:54 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 494 | Plan | Maintenance | OLY | 143918 | ||
09/10/2004 07:40 | 09/10/2004 15:54 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 494 | Plan | Maintenance | OLY | 143918 | |
09/10/2004 07:40 | 09/10/2004 15:54 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 494 | Plan | Maintenance | OLY | 143918 | |
09/10/2004 07:46 | 09/10/2004 15:11 | Monmouth-Adair section of Salem-Albany No 2 115kV line | 115.0 | S | 11.30 | 445 | Plan | Maintenance | SAL | 143919 | ||
09/10/2004 07:46 | 09/10/2004 15:11 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 445 | Plan | Maintenance | SAL EUG | 143919 | |
09/10/2004 08:01 | 09/10/2004 13:17 | Captain Jack-Malin No 1 500kV line | 500.0 | L | 7.35 | 316 | Plan | Maintenance | RED | 143920 | ||
09/10/2004 08:15 | 09/10/2004 12:09 | City View-Richland section of Red Mountain-Richland No 1 115kV line | 115.0 | S | 1.38 | 234 | Plan | Foreign Request | TRI | 143921 | ||
09/10/2004 08:15 | 09/10/2004 12:09 | Red Mountain-Richland No 1 115kV line | 115.0 | L | G | 6.00 | 234 | Plan | Foreign Request | TRI | 143921 | |
09/10/2004 08:33 | 09/10/2004 09:13 | Vantage-Wanapum No 3 230kV line | 230.0 | L | 1.50 | 40 | Plan | Foreign Request | WEN | 143922 | ||
09/10/2004 08:40 | 09/10/2004 11:45 | Ledbeder-City View section of Red Mountain-Richland No 1 115kV line | 115.0 | S | 1.82 | 185 | Plan | Foreign Request | TRI | 143923 | ||
09/10/2004 08:40 | 09/10/2004 11:45 | Red Mountain-Richland No 1 115kV line | 115.0 | L | O | 6.00 | 185 | Plan | Foreign Request | TRI | 143923 | |
09/10/2004 11:35 | 09/10/2004 14:55 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 200 | Plan | Maintenance | IDF | 143924 | ||
09/10/2004 16:13 | 09/14/2004 11:30 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 5477 | Plan | Construction | IDF | 143925 | ||
09/10/2004 16:37 | 09/14/2004 11:16 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | T | 17.88 | 5439 | Plan | Maintenance | IDF | 143969 | |
09/10/2004 16:37 | 09/14/2004 11:16 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 5439 | Plan | Maintenance | IDF | 143969 | ||
09/10/2004 18:30 | 09/10/2004 19:41 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 71 | Plan | Voltage Control | KAL SPK | 143926 | ||
09/11/2004 01:30 | 09/11/2004 15:40 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 850 | Auto | Foreign Trouble | Foreign Trouble | OLY | 143927 | |
09/11/2004 05:49 | 09/11/2004 17:51 | Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line | 115.0 | S | 15.50 | 722 | Plan | Foreign Request | LGV | 143929 | ||
09/11/2004 05:49 | 09/11/2004 17:51 | Cardwell-PACW Merwin No 1 115kV line | 115.0 | L | G | 16.30 | 722 | Plan | Foreign Request | LGV | 143929 | |
09/11/2004 06:01 | 09/11/2004 17:46 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 705 | Plan | Construction | WEN SPK | 143930 | ||
09/11/2004 06:01 | 09/11/2004 17:34 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 693 | Plan | Construction | SPK | 143931 | ||
09/11/2004 08:03 | 10/08/2004 00:01 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 38398 | Plan | Construction | KAL SPK | 143932 | ||
09/11/2004 08:09 | 09/11/2004 12:04 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 235 | Plan | Construction | OLY | 143933 | |
09/11/2004 08:09 | 09/11/2004 12:04 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 235 | Plan | Construction | OLY | 143933 | ||
09/11/2004 08:09 | 09/11/2004 12:04 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 235 | Plan | Construction | OLY | 143933 | |
09/11/2004 08:09 | 09/11/2004 12:04 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 235 | Plan | Construction | OLY | 143933 | |
09/11/2004 14:05 | 09/11/2004 14:15 | Lower Monumental PH-Lower Monumental No 1 500kV line | 500.0 | L | 0.97 | 10 | Plan | Foreign Request | TRI | 143934 | ||
09/11/2004 23:31 | 09/13/2004 10:44 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 2113 | Plan | Maintenance | TDA | 143935 | |||
09/11/2004 23:31 | 09/13/2004 10:44 | McNary-Santiam No 2 230kV line | 230.0 | L | T | 200.43 | 2113 | Plan | Maintenance | TRI TDA RED SAL | 143935 | |
09/11/2004 23:50 | 09/12/2004 04:07 | Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line | 230.0 | S | 136.53 | 257 | Plan | Maintenance | TDA RED | 143936 | ||
09/11/2004 23:50 | 09/12/2004 04:07 | McNary-Santiam No 2 230kV line | 230.0 | L | G | 200.43 | 257 | Plan | Maintenance | TRI TDA RED SAL | 143936 | |
09/12/2004 00:00 | 09/12/2004 03:39 | McNary-Santiam No 2 230kV line | 230.0 | L | O | 200.43 | 219 | Plan | Maintenance | TRI TDA RED SAL | 143937 | |
09/12/2004 00:00 | 09/12/2004 03:39 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.10 | 219 | Plan | Maintenance | SAL | 143937 | ||
09/12/2004 00:00 | 09/12/2004 03:39 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 219 | Plan | Maintenance | SAL | 143937 | ||
09/12/2004 03:02 | 09/12/2004 07:12 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 250 | Plan | Voltage Control | WEN COV | 143938 | ||
09/12/2004 05:49 | 09/12/2004 17:46 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 717 | Plan | Construction | WEN SPK | 143943 | ||
09/12/2004 05:50 | 09/12/2004 17:35 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 705 | Plan | Construction | SPK | 143944 | ||
09/12/2004 06:03 | 09/12/2004 19:08 | Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line | 115.0 | S | 15.50 | 785 | Plan | Foreign Request | LGV | 143945 | ||
09/12/2004 06:03 | 09/12/2004 19:08 | Cardwell-PACW Merwin No 1 115kV line | 115.0 | L | G | 16.30 | 785 | Plan | Foreign Request | LGV | 143945 | |
09/13/2004 05:58 | 09/13/2004 13:08 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 430 | Plan | Construction | WEN SPK | 143951 | ||
09/13/2004 05:59 | 09/13/2004 13:09 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 430 | Plan | Construction | SPK | 143952 | ||
09/13/2004 07:04 | 09/15/2004 07:46 | Tacoma-TPWR Cowlitz No 2 230kV line | 230.0 | L | 6.00 | 2922 | Plan | Foreign Request | COV | 143953 | ||
09/13/2004 07:58 | 09/16/2004 17:41 | Columbia-B408 section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | 0.04 | 4903 | Plan | Construction | WEN | 143954 | ||
09/13/2004 07:58 | 09/16/2004 17:41 | Columbia-Ellensburg No 1 115kV line | 115.0 | L | G | 34.98 | 4903 | Plan | Construction | WEN | 143954 | |
09/13/2004 08:36 | 11/23/2004 14:41 | Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line | 230.0 | S | 71.70 | 102665 | Plan | Construction | TDA TRI | 143955 | ||
09/13/2004 08:36 | 11/23/2004 14:41 | Big Eddy-Midway No 1 230kV line | 230.0 | L | G | 102.80 | 102665 | Plan | Construction | TDA TRI | 143955 | |
09/13/2004 08:37 | 09/17/2004 11:44 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 5947 | Plan | Maintenance | WEN SPK | 143956 | |
09/13/2004 08:37 | 09/17/2004 11:44 | Creston-Larene section of Creston-Bell No 1 115kV line | 115.0 | S | 16.73 | 5947 | Plan | Maintenance | WEN | 143956 | ||
09/13/2004 09:29 | 09/13/2004 09:53 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 24 | Plan | Switching | KAL | 143957 | ||
09/13/2004 09:29 | 09/13/2004 09:53 | Anaconda-NWE Mill Creek No 1 230kV line | 230.0 | L | 0.40 | 24 | Plan | Switching | KAL | 143958 | ||
09/13/2004 09:29 | 09/29/2004 11:16 | Anaconda-Silver Bow No 1 115kV line | 115.0 | L | 12.69 | 23147 | Plan | Maintenance | KAL | 143959 | ||
09/13/2004 11:22 | 09/14/2004 18:06 | Horse Ranch tap to Monroe-Snohomish No 1&2 230kV line | 230.0 | T | 4.43 | 1844 | Auto | Foreign Trouble | SNO | 143960 | ||
09/13/2004 11:22 | 09/14/2004 18:06 | Monroe-Snohomish No 1&2 230kV line | 230.0 | L | T | 22.17 | 1844 | Auto | Foreign Trouble | SNO | 143960 | |
09/13/2004 13:10 | 09/13/2004 13:10 | McNary-Ross No 1 345kV line | 345.0 | L | 174.57 | 0 | Auto | Lightning | Lightning | TRI TDA LGV | 143961 | |
09/13/2004 15:15 | 09/13/2004 15:15 | Clarkston tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 143962 |
09/13/2004 15:15 | 09/13/2004 15:15 | Clarkston-North Lewiston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 3.71 | 0 | Auto | Lightning | Lightning | TRI | 143962 |
09/13/2004 15:15 | 09/13/2004 15:15 | Pomeroy tap to Walla Walla-North Lewiston No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Lightning | Lightning | TRI | 143962 |
09/13/2004 15:15 | 09/13/2004 15:15 | Pomeroy-Clarkston section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 24.00 | 0 | Auto | Lightning | Lightning | TRI | 143962 |
09/13/2004 15:15 | 09/13/2004 15:15 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | 80.80 | 0 | Auto | Lightning | Lightning | TRI | 143962 | |
09/13/2004 15:15 | 09/13/2004 15:15 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | G | 53.10 | 0 | Auto | Lightning | Lightning | TRI | 143962 |
09/13/2004 15:18 | 09/13/2004 15:30 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 12 | Auto | Foreign Trouble | Foreign Trouble | TDA | 143963 | |
09/13/2004 15:18 | 09/13/2004 15:34 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 16 | Auto | Foreign Trouble | TDA RED | 143964 | ||
09/13/2004 15:18 | 09/13/2004 15:34 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 143964 | ||
09/13/2004 15:18 | 09/13/2004 15:34 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 143964 | ||
09/13/2004 15:18 | 09/13/2004 15:34 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 143964 | ||
09/13/2004 15:18 | 09/13/2004 15:34 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 143964 | ||
09/13/2004 15:18 | 09/13/2004 15:34 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 143964 | ||
09/14/2004 07:04 | 09/14/2004 16:10 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 546 | Plan | Forced | KAL | 143970 | ||
09/14/2004 07:05 | 09/14/2004 17:04 | Rattlesnake-Garrison No 1 230kV line | 230.0 | L | 60.94 | 599 | Plan | Maintenance | KAL | 143971 | ||
09/14/2004 07:16 | 09/17/2004 08:44 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 4408 | Plan | Maintenance | IDF | 143972 | ||
09/14/2004 07:19 | 09/14/2004 16:48 | Captain Jack-Olinda No 1 500kV line | 500.0 | L | 148.86 | 569 | Plan | Foreign Request | RED | 143973 | ||
09/14/2004 07:33 | 09/14/2004 14:47 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 434 | Plan | Maintenance | OLY | 143974 | |
09/14/2004 07:33 | 09/14/2004 14:47 | Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 20.20 | 434 | Plan | Maintenance | OLY | 143974 | ||
09/14/2004 07:39 | 09/17/2004 08:40 | Monmouth-Adair section of Salem-Albany No 2 115kV line | 115.0 | S | 11.30 | 4381 | Plan | Maintenance | SAL | 143975 | ||
09/14/2004 07:39 | 09/17/2004 08:40 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 4381 | Plan | Maintenance | SAL EUG | 143975 | |
09/14/2004 10:23 | 09/14/2004 10:31 | McNary PH-McNary No 6 115kV line | 115.0 | L | 1.39 | 8 | Plan | Foreign Request | TRI | 143976 | ||
09/14/2004 14:21 | 09/14/2004 14:41 | Boundary-Nelway No 1 230kV line | 230.0 | L | 2.40 | 20 | Auto | Foreign Trouble | SPK | 144055 | ||
09/15/2004 02:49 | 09/15/2004 03:02 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 13 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143993 | |
09/15/2004 02:49 | 09/15/2004 03:02 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 13 | Auto | Foreign Trouble | Foreign Trouble | IDF | 143993 | |
09/15/2004 06:08 | 09/15/2004 18:32 | Rattlesnake-Garrison No 1 230kV line | 230.0 | L | 60.94 | 744 | Plan | Maintenance | KAL | 143994 | ||
09/15/2004 06:22 | 09/15/2004 17:54 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 692 | Plan | Forced | KAL | 143995 | ||
09/15/2004 07:41 | 09/15/2004 14:48 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 427 | Plan | Maintenance | OLY | 143996 | |
09/15/2004 07:41 | 09/15/2004 14:48 | Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 20.20 | 427 | Plan | Maintenance | OLY | 143996 | ||
09/15/2004 07:58 | 09/16/2004 17:02 | South Tacoma-Cowlitz No 1 230kV line | 230.0 | L | 6.19 | 1984 | Plan | Maintenance | COV | 143997 | ||
09/15/2004 07:59 | 09/15/2004 13:40 | Fidalgo-Lopez Island No 5 69kV line | 69.0 | L | 8.49 | 341 | Plan | Maintenance | SNO | 143998 | ||
09/15/2004 08:32 | 09/17/2004 11:04 | Kennedy-Ledbeder section of Red Mountain-Richland No 1 115kV line | 115.0 | S | 2.03 | 3032 | Plan | Maintenance | TRI | 143999 | ||
09/15/2004 08:32 | 09/17/2004 10:21 | Red Mountain-Kennedy section of Red Mountain-Richland No 1 115kV line | 115.0 | S | 0.77 | 2989 | Plan | Maintenance | TRI | 143999 | ||
09/15/2004 08:32 | 09/17/2004 11:04 | Red Mountain-Richland No 1 115kV line | 115.0 | L | G | 6.00 | 3032 | Plan | Maintenance | TRI | 143999 | |
09/15/2004 08:45 | 09/15/2004 19:08 | Captain Jack-Olinda No 1 500kV line | 500.0 | L | 148.86 | 623 | Plan | Foreign Request | RED | 144000 | ||
09/15/2004 10:15 | B-389 Tie tap to Eugene-Alderwood No 1 115kV line | 115.0 | T | 9.27 | still out | Plan | Normally Out | EUG | 146655 | |||
09/15/2004 10:15 | Eugene-Alderwood No 1 115kV line | 115.0 | L | T | 18.17 | still out | Plan | Normally Out | EUG | 146655 | ||
09/15/2004 11:10 | 09/30/2004 08:39 | Albany-Eugene No 1 115kV line | 115.0 | L | O | 39.80 | 21449 | Plan | Switching | EUG | 144001 | |
09/15/2004 11:10 | 09/30/2004 08:39 | Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line | 115.0 | S | 8.28 | 21449 | Plan | Switching | EUG | 144001 | ||
09/15/2004 12:10 | 09/16/2004 10:58 | Santiam-Toledo No 1 230kV line | 230.0 | L | G | 67.62 | 1368 | Plan | Maintenance | SAL EUG | 144002 | |
09/15/2004 12:10 | 09/16/2004 10:58 | Santiam-Wren section of Santiam-Toledo No 1 230kV line | 230.0 | S | 41.94 | 1368 | Plan | Maintenance | SAL EUG | 144002 | ||
09/15/2004 22:32 | 09/15/2004 22:40 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 8 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144003 | |
09/15/2004 22:32 | 09/15/2004 22:40 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 8 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144003 | |
09/16/2004 02:26 | 09/16/2004 02:31 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 5 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144010 | |
09/16/2004 02:26 | 09/16/2004 02:31 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 5 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144010 | |
09/16/2004 04:16 | 09/16/2004 04:24 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 8 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144011 | |
09/16/2004 04:16 | 09/16/2004 04:24 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 8 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144011 | |
09/16/2004 06:09 | 09/16/2004 13:07 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 418 | Plan | Maintenance | SNO | 144012 | ||
09/16/2004 06:19 | 09/16/2004 17:06 | Rattlesnake-Garrison No 1 230kV line | 230.0 | L | 60.94 | 647 | Plan | Maintenance | KAL | 144013 | ||
09/16/2004 07:28 | 09/16/2004 14:53 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 445 | Plan | Maintenance | OLY | 144014 | |
09/16/2004 07:28 | 09/16/2004 14:53 | Chehalis-Silver Creek section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 20.20 | 445 | Plan | Maintenance | OLY | 144014 | ||
09/16/2004 07:30 | 09/16/2004 15:14 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 464 | Plan | Foreign Request | LGV | 144015 | ||
09/16/2004 08:04 | 09/17/2004 14:50 | Grand Coulee-Bell No 5 230kV line | 230.0 | L | 83.06 | 1846 | Plan | Foreign Request | WEN SPK | 144016 | ||
09/16/2004 08:54 | 09/17/2004 11:01 | Ashe-White Bluffs No 1 230kV line | 230.0 | L | 9.52 | 1567 | Plan | Maintenance | TRI | 144017 | ||
09/16/2004 09:11 | 09/16/2004 11:33 | Jim Creek Service No 1 115kV line | 115.0 | L | 9.57 | 142 | Plan | Foreign Request | SNO | 144018 | ||
09/16/2004 10:12 | 09/16/2004 11:50 | Albany-Lebanon No 1 115kV line | 115.0 | L | G | 17.01 | 98 | Plan | Maintenance | EUG | 144019 | |
09/16/2004 10:12 | 09/16/2004 11:50 | Froman-Lebanon section of Albany-Lebanon No 1 115kV line | 115.0 | S | 11.26 | 98 | Plan | Maintenance | EUG | 144019 | ||
09/16/2004 10:24 | 09/16/2004 13:48 | WNP 1-Ashe No 2 230kV line | 230.0 | L | 2.26 | 204 | Plan | Foreign Request | TRI | 144020 | ||
09/17/2004 05:23 | 09/17/2004 05:23 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144021 | |
09/17/2004 06:00 | 09/17/2004 15:53 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 593 | Plan | Construction | SPK | 144027 | |
09/17/2004 06:00 | 09/17/2004 15:53 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 593 | Plan | Construction | SPK | 144027 | ||
09/17/2004 06:21 | 09/17/2004 15:51 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 570 | Plan | Construction | SPK | 144028 | ||
09/17/2004 06:21 | 09/17/2004 15:51 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 570 | Plan | Construction | SPK | 144028 | |
09/17/2004 06:32 | 09/17/2004 15:56 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 564 | Plan | Construction | SPK | 144029 | ||
09/17/2004 06:57 | 09/17/2004 15:27 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 510 | Plan | Maintenance | KAL SPK | 144030 | |
09/17/2004 06:57 | 09/17/2004 15:27 | Troy-Yaak section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.41 | 510 | Plan | Maintenance | KAL | 144030 | ||
09/17/2004 07:44 | 09/17/2004 14:03 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 379 | Plan | Maintenance | EUG | 144031 | |
09/17/2004 07:44 | 09/17/2004 14:03 | Sumner-Fairview section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 5.36 | 379 | Plan | Maintenance | EUG | 144031 | ||
09/17/2004 07:46 | 09/17/2004 15:01 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 435 | Plan | Foreign Request | LGV | 144032 | ||
09/17/2004 09:01 | 09/17/2004 14:32 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 331 | Plan | Maintenance | SAL EUG | 144033 | |
09/17/2004 09:01 | 09/17/2004 14:32 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 331 | Plan | Maintenance | SAL | 144033 | ||
09/17/2004 10:47 | 09/17/2004 10:54 | John Day-Big Eddy No 1 500kV line | 500.0 | L | 18.94 | 7 | Auto | Equipment/Miscellaneous | Equipment/Miscellaneous | TDA | 144034 | |
09/17/2004 10:47 | 09/17/2004 10:55 | John Day-Big Eddy No 2 500kV line | 500.0 | L | 18.96 | 8 | Auto | Equipment/Miscellaneous | Equipment/Miscellaneous | TDA | 144035 | |
09/17/2004 11:59 | 10/26/2004 17:43 | White Bluffs-Richland No 1 115kV line | 115.0 | L | G | 11.02 | 56504 | Plan | Normally Out | TRI | 144036 | |
09/17/2004 11:59 | 10/26/2004 17:43 | White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 4.30 | 56504 | Plan | Normally Out | TRI | 144036 | ||
09/17/2004 12:12 | 09/17/2004 15:27 | Chehalis-Centralia No 2 69kV line | 69.0 | L | G | 15.26 | 195 | Plan | Maintenance | OLY | 144037 | |
09/17/2004 12:12 | 09/17/2004 15:27 | Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line | 69.0 | S | 11.79 | 195 | Plan | Maintenance | OLY | 144037 | ||
09/17/2004 15:56 | 09/18/2004 06:32 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 876 | Plan | Foreign Request | SPK | 144038 | ||
09/17/2004 16:36 | 09/17/2004 16:36 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 0 | Auto | Unknown | Unknown | OLY | 144039 |
09/17/2004 16:36 | 09/17/2004 16:36 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 0 | Auto | Unknown | Unknown | OLY | 144039 | |
09/17/2004 16:36 | 09/17/2004 16:36 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | OLY | 144039 |
09/17/2004 16:36 | 09/17/2004 16:36 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 0 | Auto | Unknown | Unknown | OLY | 144039 |
09/17/2004 20:38 | 09/17/2004 20:38 | Murray-Custer No 1 230kV line | 230.0 | L | 63.39 | 0 | Auto | Unknown | Unknown | SNO | 144040 | |
09/17/2004 20:38 | 09/17/2004 20:38 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | G | 25.67 | 0 | Auto | Unknown | Unknown | SNO | 144040 |
09/17/2004 20:38 | 09/17/2004 20:38 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | G | 0.17 | 0 | Auto | Unknown | Unknown | SNO | 144040 |
09/17/2004 20:38 | 09/17/2004 20:38 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | G | 37.72 | 0 | Auto | Unknown | Unknown | SNO | 144040 |
09/18/2004 00:44 | 09/18/2004 07:51 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 427 | Plan | Voltage Control | TRI TDA RED SAL | 144041 | ||
09/18/2004 06:03 | 09/18/2004 16:30 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 627 | Plan | Construction | SPK | 144043 | ||
09/18/2004 06:03 | 09/18/2004 16:30 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 627 | Plan | Construction | SPK | 144043 | |
09/18/2004 06:16 | 09/18/2004 16:22 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 606 | Plan | Construction | SPK | 144044 | |
09/18/2004 06:16 | 09/18/2004 16:22 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 606 | Plan | Construction | SPK | 144044 | ||
09/18/2004 06:32 | 09/18/2004 16:32 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 600 | Plan | Construction | SPK | 144045 | ||
09/18/2004 06:55 | 09/18/2004 17:29 | Maple Valley-Massachusetts No 1 230kV line | 230.0 | L | 12.14 | 634 | Plan | Foreign Request | COV | 144046 | ||
09/18/2004 07:05 | 09/18/2004 16:48 | Redmond-Pilot Butte PACW No 1 230kV line | 230.0 | L | 15.12 | 583 | Plan | Maintenance | RED | 144047 | ||
09/18/2004 07:05 | 09/18/2004 16:49 | Redmond-PGE Round Butte No 1 230kV line | 230.0 | L | 23.60 | 584 | Plan | Maintenance | RED | 144048 | ||
09/18/2004 11:00 | 09/18/2004 13:05 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 125 | Plan | Maintenance | TDA RED | 144049 | |
09/18/2004 11:00 | 09/18/2004 13:05 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 125 | Plan | Maintenance | TDA | 144049 | |||
09/18/2004 16:32 | 09/19/2004 06:18 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 826 | Plan | Foreign Request | SPK | 144050 | ||
09/19/2004 00:25 | 09/19/2004 11:37 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 672 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144051 | |
09/19/2004 00:25 | 09/19/2004 11:37 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 672 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144051 | |
09/19/2004 01:19 | 09/19/2004 09:05 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 466 | Plan | Voltage Control | TRI TDA RED SAL | 144052 | ||
09/19/2004 05:57 | 09/19/2004 16:44 | Bell-IPL Trentwood section of Bell-Trentwood No 1 115kV line | 115.0 | S | 11.23 | 647 | Plan | Construction | SPK | 144056 | ||
09/19/2004 05:57 | 09/19/2004 16:44 | Bell-Trentwood No 1 115kV line | 115.0 | L | G | 11.27 | 647 | Plan | Construction | SPK | 144056 | |
09/19/2004 06:00 | 09/19/2004 16:57 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 657 | Plan | Construction | SPK | 144057 | |
09/19/2004 06:00 | 09/19/2004 16:57 | Bell-Mead section of Bell-Addy No 1 115kV line | 115.0 | S | 2.95 | 657 | Plan | Construction | SPK | 144057 | ||
09/19/2004 06:18 | 09/19/2004 16:52 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 634 | Plan | Construction | SPK | 144058 | ||
09/19/2004 12:52 | 09/19/2004 12:52 | Goshen-Drummond No 1 161kV line | 161.0 | L | 72.75 | 0 | Auto | Lightning | Lightning | IDF | 144059 | |
09/19/2004 16:52 | 09/20/2004 07:50 | Bell-AVA Beacon No 5 230kV line | 230.0 | L | 6.00 | 898 | Plan | Foreign Request | SPK | 144060 | ||
09/19/2004 18:37 | 09/19/2004 18:37 | North Bonneville-Ross No 1 230kV line | 230.0 | L | 36.32 | 0 | Auto | Lightning | Lightning | LGV | 144061 | |
09/19/2004 18:37 | 09/19/2004 18:37 | North Bonneville-Sifton section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 27.65 | 0 | Auto | Lightning | Lightning | LGV | 144061 |
09/19/2004 18:37 | 09/19/2004 18:37 | Sifton tap to North Bonneville-Ross No 1 230kV line | 230.0 | T | G | 1.24 | 0 | Auto | Lightning | Lightning | LGV | 144061 |
09/19/2004 18:37 | 09/19/2004 18:37 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | G | 8.67 | 0 | Auto | Lightning | Lightning | LGV | 144061 |
09/19/2004 18:37 | 09/19/2004 18:37 | North Camas-Sifton No 1 115kV line | 115.0 | L | 7.68 | 0 | Auto | Lightning | Lightning | LGV | 144062 | |
09/19/2004 23:00 | 09/20/2004 05:08 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 368 | Plan | Voltage Control | TRI TDA RED SAL | 144063 | ||
09/20/2004 03:47 | 09/20/2004 03:47 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 144064 | ||
09/20/2004 03:47 | 09/20/2004 03:47 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144064 | ||
09/20/2004 03:47 | 09/20/2004 03:47 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144064 | ||
09/20/2004 03:47 | 09/20/2004 03:47 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144064 | ||
09/20/2004 03:47 | 09/20/2004 03:47 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144064 | ||
09/20/2004 03:47 | 09/20/2004 03:47 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144064 | ||
09/20/2004 06:01 | 09/26/2004 19:04 | Grizzly-Malin PGE No 2 500kV line | 500.0 | L | 178.50 | 9423 | Plan | Foreign Request | RED | 144072 | ||
09/20/2004 06:10 | 09/27/2004 15:24 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 10634 | Plan | Maintenance | TDA | 144073 | ||
09/20/2004 06:10 | 09/27/2004 15:24 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 10634 | Plan | Maintenance | TDA | 144074 | ||
09/20/2004 06:10 | 09/28/2004 04:51 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 11441 | Plan | Maintenance | TDA RED | 144075 | |
09/20/2004 06:10 | 09/28/2004 04:51 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 11441 | Plan | Maintenance | TDA | 144075 | |||
09/20/2004 06:10 | 09/28/2004 04:51 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 11441 | Plan | Maintenance | TDA RED | 144076 | |
09/20/2004 06:10 | 09/28/2004 04:51 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 11441 | Plan | Maintenance | TDA | 144076 | |||
09/20/2004 07:01 | 09/20/2004 17:33 | Lower Granite PH-Lower Granite No 1 500kV line | 500.0 | L | 0.75 | 632 | Plan | Foreign Request | TRI SPK | 144077 | ||
09/20/2004 07:09 | 09/24/2004 12:57 | Chehalis-Olympia No 1 230kV line | 230.0 | L | 30.03 | 6108 | Plan | Maintenance | OLY | 144078 | ||
09/20/2004 07:16 | 09/24/2004 16:11 | Maple Valley-Massachusetts No 1 230kV line | 230.0 | L | 12.14 | 6295 | Plan | Foreign Request | COV | 144079 | ||
09/20/2004 07:16 | 09/24/2004 13:25 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 6129 | Plan | Maintenance | IDF | 144080 | ||
09/20/2004 07:50 | 09/20/2004 13:29 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 339 | Plan | Foreign Request | LGV | 144081 | ||
09/20/2004 07:58 | 09/20/2004 14:40 | Keeler-Oregon City No 2 115kV line | 115.0 | L | 21.43 | 402 | Plan | Maintenance | SAL LGV | 144082 | ||
09/20/2004 07:59 | 09/23/2004 17:18 | B408-Jenkins section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | 23.63 | 4879 | Plan | Construction | WEN | 144083 | ||
09/20/2004 07:59 | 09/23/2004 17:18 | Columbia-Ellensburg No 1 115kV line | 115.0 | L | G | 34.98 | 4879 | Plan | Construction | WEN | 144083 | |
09/20/2004 08:13 | 09/21/2004 15:31 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 1878 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144084 | |
09/20/2004 08:13 | 09/21/2004 15:31 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 1878 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144084 | |
09/20/2004 08:15 | 09/20/2004 08:15 | Olympia-PSE No 2 115kV line | 115.0 | L | 2.40 | 0 | Auto | Substation Operations | Substation Operations | OLY | 144085 | |
09/20/2004 08:16 | 09/23/2004 17:01 | Columbia-B408 section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | 0.04 | 4845 | Plan | Maintenance | WEN | 144086 | ||
09/20/2004 08:16 | 09/23/2004 17:01 | Columbia-Ellensburg No 1 115kV line | 115.0 | L | O | 34.98 | 4845 | Plan | Maintenance | WEN | 144086 | |
09/20/2004 08:24 | 09/28/2004 14:49 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 11905 | Plan | Construction | WEN COV | 144087 | ||
09/20/2004 08:54 | 09/23/2004 11:20 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 4466 | Plan | Maintenance | WEN SPK | 144088 | |
09/20/2004 08:54 | 09/23/2004 11:20 | Creston-Larene section of Creston-Bell No 1 115kV line | 115.0 | S | 16.73 | 4466 | Plan | Maintenance | WEN | 144088 | ||
09/20/2004 09:36 | 09/20/2004 14:18 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 282 | Plan | Maintenance | EUG | 144089 | |
09/20/2004 09:36 | 09/20/2004 14:18 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 282 | Plan | Maintenance | EUG | 144089 | ||
09/20/2004 09:42 | 09/20/2004 15:00 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 318 | Plan | Maintenance | KAL SPK | 144090 | |
09/20/2004 09:42 | 09/20/2004 15:00 | Moyie Springs-Bonners Ferry section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 6.23 | 318 | Plan | Maintenance | SPK | 144090 | ||
09/20/2004 10:17 | 09/20/2004 14:35 | McNary-Ross No 1 345kV line | 345.0 | L | 174.57 | 258 | Auto | Tree cut | Tree cut | TRI TDA LGV | 144091 | |
09/20/2004 12:27 | 09/20/2004 12:27 | Haskill tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.01 | 0 | Auto | Lightning | Unknown | KAL | 144092 |
09/20/2004 12:27 | 09/20/2004 12:27 | Haskill-Trumbull Creek section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 31.50 | 0 | Auto | Lightning | Unknown | KAL | 144092 |
09/20/2004 12:27 | 09/20/2004 12:27 | Libby-Conkelley No 1 230kV line | 230.0 | L | 83.94 | 0 | Auto | Lightning | Unknown | KAL | 144092 | |
09/20/2004 12:27 | 09/20/2004 12:27 | Libby-Haskill section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 45.10 | 0 | Auto | Lightning | Unknown | KAL | 144092 |
09/20/2004 12:27 | 09/20/2004 12:27 | Trumbull Creek tap to Libby-Conkelley No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Lightning | Unknown | KAL | 144092 |
09/20/2004 12:27 | 09/20/2004 12:27 | Trumbull Creek-Conkelley section of Libby-Conkelley No 1 230kV line | 230.0 | S | G | 7.34 | 0 | Auto | Lightning | Unknown | KAL | 144092 |
09/20/2004 12:27 | 09/20/2004 12:29 | Libby PH-Libby No 2 230kV line | 230.0 | L | 1.29 | 2 | Auto | RAS Initiated | RAS Initiated | KAL | 144093 | |
09/20/2004 23:41 | 09/21/2004 05:35 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 354 | Plan | Voltage Control | TRI TDA RED SAL | 144094 | ||
09/21/2004 02:53 | 09/21/2004 02:57 | Monroe-Custer No 2 500kV line | 500.0 | L | 85.81 | 4 | Auto | Forced (Configuration) | Forced (Configuration) | SNO | 144095 | |
09/21/2004 02:53 | 09/21/2004 03:04 | Custer-Ingledow No 2 500kV line | 500.0 | L | 22.65 | 11 | Auto | Unknown | Unknown | SNO | 144096 | |
09/21/2004 06:01 | 09/21/2004 17:17 | Lower Granite PH-Lower Granite No 1 500kV line | 500.0 | L | 0.75 | 676 | Plan | Foreign Request | TRI SPK | 144103 | ||
09/21/2004 06:40 | 09/21/2004 15:21 | Bell-Trentwood No 2 115kV line | 115.0 | L | T | 11.30 | 521 | Plan | Maintenance | SPK | 144104 | |
09/21/2004 06:40 | 09/21/2004 15:21 | Bigelow tap to Bell-Trentwood No 2 115kV line | 115.0 | T | 0.10 | 521 | Plan | Maintenance | SPK | 144104 | ||
09/21/2004 06:40 | 09/21/2004 15:21 | Green Bluff tap to Bell-Trentwood No 2 115kV line | 115.0 | T | 7.35 | 521 | Plan | Maintenance | SPK | 144104 | ||
09/21/2004 07:00 | 09/21/2004 09:58 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 178 | Plan | Maintenance | TDA RED | 144105 | |
09/21/2004 07:00 | 09/21/2004 09:58 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 178 | Plan | Maintenance | TDA | 144105 | |||
09/21/2004 07:17 | 09/21/2004 15:18 | Bell-Bigelow section of Bell-Trentwood No 2 115kV line | 115.0 | S | 6.60 | 481 | Plan | Maintenance | SPK | 144106 | ||
09/21/2004 07:17 | 09/21/2004 15:18 | Bell-Trentwood No 2 115kV line | 115.0 | L | G | 11.30 | 481 | Plan | Maintenance | SPK | 144106 | |
09/21/2004 07:17 | 09/21/2004 15:18 | Bigelow-Trentwood section of Bell-Trentwood No 2 115kV line | 115.0 | S | 4.70 | 481 | Plan | Maintenance | SPK | 144106 | ||
09/21/2004 07:32 | 09/21/2004 14:51 | Keeler-Forest Grove No 2 115kV line | 115.0 | L | 10.51 | 439 | Plan | Maintenance | SAL | 144107 | ||
09/21/2004 07:49 | 09/21/2004 14:20 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 391 | Plan | Maintenance | EUG | 144108 | |
09/21/2004 07:49 | 09/21/2004 14:20 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 391 | Plan | Maintenance | EUG | 144108 | ||
09/21/2004 08:06 | 09/21/2004 17:27 | Big Eddy-McLoughlin No 1&2 230kV line | 230.0 | L | 117.77 | 561 | Plan | Maintenance | TDA LGV | 144109 | ||
09/21/2004 08:13 | 09/21/2004 14:48 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | G | 5.51 | 395 | Plan | Maintenance | TRI | 144110 | |
09/21/2004 08:13 | 09/21/2004 14:48 | Tapteal-Richland section of Badger Canyon-Richland No 1 115kV line | 115.0 | S | 2.45 | 395 | Plan | Maintenance | TRI | 144110 | ||
09/21/2004 09:14 | 09/21/2004 18:10 | Salem-PACW Dallas No 1 115kV line | 115.0 | L | 13.20 | 536 | Plan | Foreign Request | SAL | 144111 | ||
09/21/2004 10:50 | 09/21/2004 13:32 | Condon-Fossil section of De Moss-Fossil No 1 69kV line | 69.0 | S | 18.43 | 162 | Plan | Maintenance | TDA | 144112 | ||
09/21/2004 10:50 | 09/21/2004 13:32 | De Moss-Fossil No 1 69kV line | 69.0 | L | G | 52.93 | 162 | Plan | Maintenance | TDA | 144112 | |
09/21/2004 21:29 | 09/22/2004 17:23 | Lower Granite PH-Lower Granite No 1 500kV line | 500.0 | L | 0.75 | 1194 | Plan | Foreign Request | TRI SPK | 144113 | ||
09/21/2004 23:19 | 09/22/2004 09:24 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 605 | Plan | Maintenance | TDA RED | 144114 | |
09/21/2004 23:19 | 09/22/2004 09:24 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 605 | Plan | Maintenance | TDA | 144114 | |||
09/22/2004 00:20 | 09/22/2004 05:41 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 321 | Plan | Voltage Control | TRI TDA RED SAL | 144115 | ||
09/22/2004 04:21 | 09/22/2004 04:21 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144116 | |
09/22/2004 06:00 | 09/22/2004 06:00 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 144120 | ||
09/22/2004 06:00 | 09/22/2004 06:00 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144120 | ||
09/22/2004 06:00 | 09/22/2004 06:00 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144120 | ||
09/22/2004 06:00 | 09/22/2004 06:00 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144120 | ||
09/22/2004 06:00 | 09/22/2004 06:10 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 10 | Auto | Foreign Trouble | TDA | 144120 | |||
09/22/2004 07:33 | 09/22/2004 15:02 | Keeler-Forest Grove No 2 115kV line | 115.0 | L | 10.51 | 449 | Plan | Maintenance | SAL | 144121 | ||
09/22/2004 07:51 | 09/22/2004 08:04 | Alvey-Diamond Hill No 3 230kV line | 230.0 | L | G | 20.30 | 13 | Plan | Foreign Request | EUG | 144122 | |
09/22/2004 07:51 | 09/22/2004 08:04 | Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line | 230.0 | S | 9.60 | 13 | Plan | Foreign Request | EUG | 144122 | ||
09/22/2004 08:06 | 09/22/2004 14:43 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 397 | Plan | Maintenance | EUG | 144123 | |
09/22/2004 08:06 | 09/22/2004 14:43 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 397 | Plan | Maintenance | EUG | 144123 | ||
09/22/2004 08:27 | 09/22/2004 19:37 | Carmen Smith tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 18.00 | 670 | Plan | Maintenance | EUG | 144124 | ||
09/22/2004 08:27 | 09/22/2004 09:06 | Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line | 115.0 | S | 3.63 | 39 | Plan | Maintenance | EUG | 144124 | ||
09/22/2004 08:27 | 09/22/2004 09:06 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 39 | Plan | Maintenance | EUG | 144124 | |
09/22/2004 08:29 | 09/22/2004 14:12 | Cusick-Boundary section of Usk-Boundary No 1 230kV line | 230.0 | S | 48.18 | 343 | Plan | Maintenance | SPK | 144125 | ||
09/22/2004 08:29 | 09/22/2004 14:12 | Usk-Boundary No 1 230kV line | 230.0 | L | G | 55.04 | 343 | Plan | Maintenance | SPK | 144125 | |
09/22/2004 09:10 | 09/22/2004 13:50 | Condon Wind-Condon section of De Moss-Fossil No 1 69kV line | 69.0 | S | 1.46 | 280 | Plan | Maintenance | TDA | 144126 | ||
09/22/2004 09:10 | 09/22/2004 13:50 | De Moss-Fossil No 1 69kV line | 69.0 | L | G | 52.93 | 280 | Plan | Maintenance | TDA | 144126 | |
09/22/2004 09:52 | 09/22/2004 15:44 | Fidalgo-Lopez Island No 4 115kV line | 115.0 | L | 8.48 | 352 | Plan | Maintenance | SNO | 144127 | ||
09/22/2004 11:27 | 10/01/2004 14:51 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 13164 | Plan | Maintenance | COV | 144128 | ||
09/22/2004 19:17 | 09/22/2004 19:37 | Alvey-Diamond Hill No 3 230kV line | 230.0 | L | G | 20.30 | 20 | Plan | Foreign Request | EUG | 144129 | |
09/22/2004 19:17 | 09/22/2004 19:37 | Alvey-McKenzie section of Alvey-Diamond Hill No 3 230kV line | 230.0 | S | 9.60 | 20 | Plan | Foreign Request | EUG | 144129 | ||
09/22/2004 23:30 | 09/23/2004 05:57 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 387 | Plan | Voltage Control | TRI TDA RED SAL | 144130 | ||
09/23/2004 06:19 | 09/23/2004 16:49 | Lower Granite PH-Lower Granite No 1 500kV line | 500.0 | L | 0.75 | 630 | Plan | Foreign Request | TRI SPK | 144134 | ||
09/23/2004 08:11 | 09/23/2004 12:57 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 286 | Plan | Maintenance | SAL | 144135 | |
09/23/2004 08:11 | 09/23/2004 12:57 | Timber-South Fork section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 12.20 | 286 | Plan | Maintenance | SAL | 144135 | ||
09/23/2004 08:28 | 09/23/2004 16:49 | Schultz-Raver No 3 500kV line | 500.0 | L | 77.47 | 501 | Plan | Forced | WEN COV | 144136 | ||
09/23/2004 09:07 | 09/23/2004 13:44 | Keeler-Tillamook No 1 115kV line | 115.0 | L | T | 57.81 | 277 | Plan | Maintenance | SAL | 144137 | |
09/23/2004 09:07 | 09/23/2004 13:44 | South Fork tap to Keeler-Tillamook No 1 115kV line | 115.0 | T | 0.10 | 277 | Plan | Maintenance | SAL | 144137 | ||
09/23/2004 09:20 | 09/23/2004 12:50 | Keeler-Tillamook No 1 115kV line | 115.0 | L | O | 57.81 | 210 | Plan | Maintenance | SAL | 144138 | |
09/23/2004 09:20 | 09/23/2004 12:50 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 210 | Plan | Maintenance | SAL | 144138 | ||
09/23/2004 09:20 | 09/23/2004 09:25 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | G | 45.05 | 5 | Plan | Foreign Request | LGV | 144139 | |
09/23/2004 09:20 | 09/23/2004 09:25 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 0.93 | 5 | Plan | Foreign Request | LGV | 144139 | ||
09/23/2004 09:33 | 09/23/2004 09:38 | Bonneville PH 1-North Bonneville No 1 230kV line | 230.0 | L | 0.84 | 5 | Plan | Foreign Request | LGV | 144140 | ||
09/23/2004 09:39 | 09/23/2004 09:50 | Bonneville PH 1-North Bonneville No 2 230kV line | 230.0 | L | 0.83 | 11 | Plan | Foreign Request | LGV | 144141 | ||
09/23/2004 09:50 | 09/23/2004 12:39 | Fossil-Maupin 69kV line | 69.0 | L | G | 56.93 | 169 | Plan | Maintenance | TDA | 144142 | |
09/23/2004 09:50 | 09/23/2004 12:39 | Fossil-Muddy Ranch section of Fossil-Maupin 69kV line | 69.0 | S | 14.77 | 169 | Plan | Maintenance | TDA | 144142 | ||
09/23/2004 13:23 | 09/23/2004 13:37 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 14 | Plan | Testing | SAL | 144143 | |
09/23/2004 13:23 | 09/23/2004 13:37 | South Fork-Tillamook section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 25.14 | 14 | Plan | Testing | SAL | 144143 | ||
09/23/2004 15:22 | 09/23/2004 16:07 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 45 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144144 | |
09/23/2004 22:43 | 09/24/2004 05:24 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 401 | Plan | Voltage Control | TRI TDA RED SAL | 144145 | ||
09/23/2004 22:58 | 09/23/2004 22:58 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 144146 | ||
09/23/2004 22:58 | 09/23/2004 22:58 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144146 | ||
09/23/2004 22:58 | 09/23/2004 22:58 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144146 | ||
09/23/2004 22:58 | 09/23/2004 22:58 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144146 | ||
09/23/2004 22:58 | 09/23/2004 22:58 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144146 | ||
09/24/2004 04:49 | 09/24/2004 09:25 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 276 | Plan | Maintenance | TDA RED | 144147 | |
09/24/2004 04:49 | 09/24/2004 09:25 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 276 | Plan | Maintenance | TDA | 144147 | |||
09/24/2004 07:16 | 09/24/2004 14:01 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 405 | Plan | Forced | KAL | 144149 | ||
09/24/2004 07:16 | 09/24/2004 14:04 | Anaconda-NWE Mill Creek No 1 230kV line | 230.0 | L | 0.40 | 408 | Plan | Forced | KAL | 144150 | ||
09/24/2004 07:30 | 09/24/2004 14:30 | Keeler-Oregon City No 2 115kV line | 115.0 | L | 21.43 | 420 | Plan | Maintenance | SAL LGV | 144151 | ||
09/24/2004 07:43 | 09/24/2004 13:58 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 375 | Plan | Maintenance | EUG | 144152 | |
09/24/2004 07:43 | 09/24/2004 13:58 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 375 | Plan | Maintenance | EUG | 144152 | ||
09/24/2004 08:25 | 09/24/2004 11:19 | Hay Mill-Roe's Corner section of Heyburn-Adelaide No 1 138kV line | 138.0 | S | G | 4.92 | 174 | Plan | Forced | IDF | 144153 | |
09/24/2004 08:25 | 09/24/2004 11:19 | Heyburn-Adelaide No 1 138kV line | 138.0 | L | 12.35 | 174 | Plan | Forced | IDF | 144153 | ||
09/24/2004 08:25 | 09/24/2004 11:19 | Heyburn-Hay Mill section of Heyburn-Adelaide No 1 138kV line | 138.0 | S | G | 4.51 | 174 | Plan | Forced | IDF | 144153 | |
09/24/2004 08:25 | 09/24/2004 11:19 | Roe's Corner tap to Heyburn-Adelaide No 1 138kV line | 138.0 | T | G | 3.11 | 174 | Plan | Forced | IDF | 144153 | |
09/24/2004 08:25 | 09/24/2004 11:19 | Roe's Corner-Adelaide section of Heyburn-Adelaide No 1 138kV line | 138.0 | S | G | 2.92 | 174 | Plan | Forced | IDF | 144153 | |
09/24/2004 08:28 | 09/24/2004 14:33 | Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.38 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.99 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | G | 45.05 | 365 | Plan | Maintenance | LGV | 144154 | |
09/24/2004 08:28 | 09/24/2004 14:33 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 0.93 | 365 | Plan | Maintenance | LGV | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 1.24 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 15.35 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 5.30 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 3.60 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | T | 25.00 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 08:28 | 09/24/2004 14:33 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.10 | 365 | Plan | Maintenance | LGV TDA | 144154 | ||
09/24/2004 10:00 | 09/24/2004 10:01 | White Bluffs-451B No 1 115kV line | 115.0 | L | 6.19 | 1 | Plan | Testing | TRI | 144155 | ||
09/24/2004 10:06 | 09/24/2004 10:06 | Benton-451B No 1 115kV line | 115.0 | L | G | 4.75 | 0 | Plan | Testing | TRI | 144156 | |
09/24/2004 10:06 | 09/24/2004 10:06 | Hanford 2 Construction-451B section of Benton-451B No 1 115kV line | 115.0 | S | 2.97 | 0 | Plan | Testing | TRI | 144156 | ||
09/24/2004 14:33 | Bald Mountain tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.38 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 0.99 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | Bonneville PH 1-North Camas No 1 115kV line | 115.0 | L | T | 22.12 | still out | Plan | Normally Out | LGV | 144157 | ||
09/24/2004 14:33 | Carson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 1.24 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 15.35 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.10 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 5.30 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | Stevenson tap to Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TT | 0.10 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 3.60 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | T | 25.00 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/24/2004 14:33 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-North Camas No 1 115kV line | 115.0 | TS | 0.10 | still out | Plan | Normally Out | LGV TDA | 144157 | |||
09/25/2004 02:01 | 09/25/2004 08:07 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 366 | Plan | Voltage Control | TRI TDA RED SAL | 144158 | ||
09/25/2004 07:03 | 09/26/2004 20:45 | Maple Valley-Massachusetts No 1 230kV line | 230.0 | L | 12.14 | 2262 | Plan | Foreign Request | COV | 144160 | ||
09/25/2004 07:06 | 09/25/2004 16:03 | Sickler-Schultz No 1 500kV line | 500.0 | L | 38.43 | 537 | Plan | Maintenance | WEN | 144161 | ||
09/26/2004 01:15 | 09/26/2004 08:08 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 413 | Plan | Voltage Control | TRI TDA RED SAL | 144162 | ||
09/26/2004 02:02 | 09/26/2004 02:04 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 2 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144163 | |
09/26/2004 08:29 | 09/26/2004 09:17 | Slatt-PGE Boardman No 1 500kV line | 500.0 | L | 17.83 | 48 | Auto | Foreign Trouble | Foreign Trouble | TRI | 144164 | |
09/27/2004 00:19 | 09/27/2004 05:15 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 296 | Plan | Voltage Control | TRI TDA RED SAL | 144165 | ||
09/27/2004 07:02 | 10/04/2004 19:23 | Cardwell-Ariel section of Cardwell-PACW Merwin No 1 115kV line | 115.0 | S | 15.50 | 10821 | Plan | Foreign Request | LGV | 144169 | ||
09/27/2004 07:02 | 10/04/2004 19:23 | Cardwell-PACW Merwin No 1 115kV line | 115.0 | L | G | 16.30 | 10821 | Plan | Foreign Request | LGV | 144169 | |
09/27/2004 07:28 | 09/29/2004 15:26 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 3358 | Plan | Maintenance | SPK | 144170 | |
09/27/2004 07:28 | 09/29/2004 15:26 | Mead-Colbert section of Bell-Addy No 1 115kV line | 115.0 | S | 4.95 | 3358 | Plan | Maintenance | SPK | 144170 | ||
09/27/2004 07:44 | 10/08/2004 17:01 | Tacoma-TPWR Northeast No 2 230kV line | 230.0 | L | 0.10 | 16397 | Plan | Foreign Request | COV | 144187 | ||
09/27/2004 07:45 | 09/27/2004 14:30 | Oregon City-Chemawa No 2 115kV line | 115.0 | L | G | 25.20 | 405 | Plan | Maintenance | SAL | 144171 | |
09/27/2004 07:45 | 09/27/2004 14:30 | Oregon City-Fargo section of Oregon City-Chemawa No 2 115kV line | 115.0 | S | 6.70 | 405 | Plan | Maintenance | SAL | 144171 | ||
09/27/2004 07:52 | 09/27/2004 14:42 | Allston-Astoria No 1 115kV line | 115.0 | L | G | 41.98 | 410 | Plan | Maintenance | LGV | 144172 | |
09/27/2004 07:52 | 09/27/2004 14:42 | Mist-Naselle section of Allston-Astoria No 1 115kV line | 115.0 | S | 7.90 | 410 | Plan | Maintenance | LGV | 144172 | ||
09/27/2004 08:00 | 09/27/2004 17:27 | McNary-Coyote Springs No 1 500kV line | 500.0 | L | 19.44 | 567 | Plan | Maintenance | TRI | 144173 | ||
09/27/2004 08:15 | 10/03/2004 16:16 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 9121 | Plan | Maintenance | EUG | 144174 | |
09/27/2004 08:15 | 10/03/2004 16:16 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 9121 | Plan | Maintenance | EUG | 144174 | ||
09/27/2004 08:25 | 10/01/2004 11:05 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | T | 103.37 | 5920 | Plan | Maintenance | RED | 144175 | |
09/27/2004 08:25 | 10/01/2004 11:05 | Ponderosa tap to Grizzly-Summer Lake No 1 500kV line | 500.0 | T | 0.01 | 5920 | Plan | Maintenance | RED | 144175 | ||
09/27/2004 08:28 | 09/29/2004 15:20 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | 0.02 | 3292 | Plan | Maintenance | SPK | 144176 | ||
09/27/2004 08:28 | 09/29/2004 15:20 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | 57.73 | 3292 | Plan | Maintenance | SPK | 144176 | ||
09/27/2004 08:28 | 09/29/2004 15:22 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | 50.34 | 3294 | Plan | Maintenance | SPK | 144176 | ||
09/27/2004 08:28 | 09/29/2004 15:22 | Bell-Boundary No 3 230kV line | 230.0 | L | G | 108.07 | 3294 | Plan | Maintenance | SPK | 144176 | |
09/27/2004 09:01 | 09/28/2004 08:40 | Ellensburg-Clymer section of Ellensburg-Moxee No 1 115kV line | 115.0 | S | 1.38 | 1419 | Plan | Maintenance | WEN | 144178 | ||
09/27/2004 09:01 | 09/28/2004 08:40 | Ellensburg-Moxee No 1 115kV line | 115.0 | L | G | 30.81 | 1419 | Plan | Maintenance | WEN TRI | 144178 | |
09/27/2004 09:10 | 10/09/2004 14:24 | Ostrander-Troutdale No 1 500kV line | 500.0 | L | 23.82 | 17594 | Plan | Maintenance | LGV | 144179 | ||
09/27/2004 10:01 | 09/30/2004 11:53 | Milton tap-Weston Mountain section of Milton tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | TS | 4.99 | 4432 | Plan | Maintenance | TRI | 144180 | ||
09/27/2004 10:01 | 09/30/2004 11:53 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | T | 38.93 | 4432 | Plan | Maintenance | TRI | 144180 | |
09/27/2004 12:30 | 10/01/2004 16:22 | Boundary-Nelway No 1 230kV line | 230.0 | L | 2.40 | 5992 | Plan | Foreign Request | SPK | 144181 | ||
09/27/2004 13:56 | 09/27/2004 13:56 | Cold Springs-Hat Rock section of McNary-Wallula 230kV line | 230.0 | S | G | 6.50 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 144182 |
09/27/2004 13:56 | 09/27/2004 13:56 | Hat Rock tap to McNary-Wallula 230kV line | 230.0 | T | G | 0.43 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 144182 |
09/27/2004 13:56 | 09/27/2004 13:56 | Hat Rock-PACW Wallula section of McNary-Wallula 230kV line | 230.0 | S | G | 18.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 144182 |
09/27/2004 13:56 | 09/27/2004 13:56 | McNary-Cold Springs section of McNary-Wallula 230kV line | 230.0 | S | G | 6.20 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 144182 |
09/27/2004 13:56 | 09/27/2004 13:56 | McNary-Wallula 230kV line | 230.0 | L | 30.70 | 0 | Auto | Foreign Trouble | Foreign Trouble | TRI | 144182 | |
09/28/2004 06:08 | 09/28/2004 22:10 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 962 | Plan | Maintenance | TDA | 144188 | ||
09/28/2004 06:08 | 09/28/2004 22:10 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 962 | Plan | Maintenance | TDA | 144189 | ||
09/28/2004 06:08 | 09/29/2004 05:00 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 1372 | Plan | Testing | TDA RED | 144190 | |
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144190 | |||
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144190 | |||
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144190 | |||
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144190 | |||
09/28/2004 06:08 | 09/29/2004 05:00 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 1372 | Plan | Testing | TDA RED | 144191 | |
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144191 | |||
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144191 | |||
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144191 | |||
09/28/2004 06:08 | 09/29/2004 05:00 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 1372 | Plan | Testing | TDA | 144191 | |||
09/28/2004 07:08 | 09/28/2004 10:33 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 205 | Plan | Maintenance | IDF | 144192 | ||
09/28/2004 07:19 | 09/28/2004 07:20 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 1 | Plan | Foreign Request | TDA | 144193 | ||
09/28/2004 08:05 | 09/28/2004 14:23 | Allston-Astoria No 1 115kV line | 115.0 | L | G | 41.98 | 378 | Plan | Maintenance | LGV | 144194 | |
09/28/2004 08:05 | 09/28/2004 14:23 | Mist-Naselle section of Allston-Astoria No 1 115kV line | 115.0 | S | 7.90 | 378 | Plan | Maintenance | LGV | 144194 | ||
09/28/2004 08:16 | 10/01/2004 14:34 | Salem-Albany No 1 115kV line | 115.0 | L | 23.90 | 4698 | Plan | Maintenance | SAL EUG | 144195 | ||
09/28/2004 08:41 | 09/28/2004 14:40 | Columbia-Ellensburg No 1 115kV line | 115.0 | L | G | 34.98 | 359 | Plan | Maintenance | WEN | 144196 | |
09/28/2004 08:41 | 09/28/2004 14:40 | East Ellensburg-Ellensburg section of Columbia-Ellensburg No 1 115kV line | 115.0 | S | 1.09 | 359 | Plan | Maintenance | WEN | 144196 | ||
09/28/2004 08:42 | 09/28/2004 08:42 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Unknown | TDA RED | 144197 | ||
09/28/2004 08:42 | 09/28/2004 08:42 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 144197 | ||
09/28/2004 08:42 | 09/28/2004 08:42 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 144197 | ||
09/28/2004 08:42 | 09/28/2004 08:42 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 144197 | ||
09/28/2004 08:42 | 09/28/2004 08:42 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 144197 | ||
09/28/2004 08:42 | 09/28/2004 08:42 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Unknown | TDA | 144197 | ||
09/28/2004 09:19 | 09/28/2004 09:21 | La Grande-IPC Brownlee No 1 230kV line | 230.0 | L | 79.30 | 2 | Plan | Foreign Request | TRI | 144198 | ||
09/28/2004 09:19 | 09/28/2004 09:21 | Quartz tap to La Grande-IPC Brownlee No 1 230kV line | 230.0 | T | G | 10.30 | 2 | Plan | Foreign Request | TRI | 144198 | |
09/28/2004 10:35 | 09/28/2004 14:55 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 260 | Plan | Maintenance | IDF | 144199 | ||
09/28/2004 10:35 | 09/28/2004 14:55 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 260 | Plan | Maintenance | IDF | 144199 | |
09/28/2004 11:18 | 09/28/2004 11:46 | Naselle-Hagen section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 13.00 | 28 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 144200 | |
09/28/2004 11:18 | 09/28/2004 11:46 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 28 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 144200 |
09/28/2004 12:05 | 09/28/2004 12:05 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 0 | Auto | Unknown | Unknown | SPK | 144201 | |
09/28/2004 23:56 | 09/29/2004 00:56 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 60 | Plan | Emergency | SAL EUG | 144203 | ||
09/29/2004 03:05 | 09/29/2004 05:15 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 130 | Plan | Voltage Control | TRI TDA RED SAL | 144204 | ||
09/29/2004 06:47 | 09/29/2004 15:10 | Swan Valley-Teton No 1 115kV line | 115.0 | L | T | 35.47 | 503 | Plan | Maintenance | IDF | 144211 | |
09/29/2004 06:47 | 09/29/2004 15:10 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | 10.94 | 503 | Plan | Maintenance | IDF | 144211 | ||
09/29/2004 07:02 | 10/15/2004 19:29 | Sickler-Schultz No 1 500kV line | 500.0 | L | 38.43 | 23787 | Plan | Construction | WEN | 144212 | ||
09/29/2004 08:01 | 09/29/2004 13:25 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 324 | Plan | Maintenance | RED | 144213 | ||
09/29/2004 08:27 | 09/29/2004 14:27 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 360 | Plan | Maintenance | IDF | 144214 | ||
09/29/2004 15:28 | 09/29/2004 16:52 | Westside AVA-Bell No 1 230kV line | 230.0 | L | 9.40 | 84 | Plan | Emergency | SPK | 144216 | ||
09/29/2004 16:11 | 09/29/2004 16:47 | Palisades-Goshen No 1 115kV line | 115.0 | L | 51.71 | 36 | Auto | Lightning | Lightning | IDF | 144217 | |
09/29/2004 18:05 | 09/30/2004 07:52 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 827 | Plan | Testing | TDA RED | 144218 | |
09/29/2004 18:05 | 09/30/2004 07:52 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 827 | Plan | Testing | TDA | 144218 | |||
09/29/2004 18:05 | 09/30/2004 07:52 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 827 | Plan | Testing | TDA | 144218 | |||
09/29/2004 18:05 | 09/30/2004 07:52 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 827 | Plan | Testing | TDA | 144218 | |||
09/29/2004 18:05 | 09/30/2004 07:52 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 827 | Plan | Testing | TDA | 144218 | |||
09/29/2004 22:06 | 09/30/2004 07:52 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 586 | Plan | Testing | TDA RED | 144219 | |
09/29/2004 22:06 | 09/30/2004 07:52 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 586 | Plan | Testing | TDA | 144219 | |||
09/29/2004 22:06 | 09/30/2004 07:52 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 586 | Plan | Testing | TDA | 144219 | |||
09/29/2004 22:06 | 09/30/2004 07:52 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 586 | Plan | Testing | TDA | 144219 | |||
09/29/2004 22:06 | 09/30/2004 07:52 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 586 | Plan | Testing | TDA | 144219 | |||
09/30/2004 02:48 | 09/30/2004 05:19 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 151 | Plan | Voltage Control | TRI TDA RED SAL | 144220 | ||
09/30/2004 07:52 | 09/30/2004 07:52 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Plan | Foreign Request | TDA RED | 144222 | ||
09/30/2004 07:52 | 10/18/2004 18:01 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 26529 | Plan | Testing | TDA RED | 144223 | ||
09/30/2004 07:52 | 10/18/2004 18:01 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 26529 | Plan | Testing | TDA | 144223 | ||
09/30/2004 07:52 | 11/04/2004 19:42 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 51170 | Plan | Maintenance | TDA RED | 144492 | |
09/30/2004 07:52 | 11/04/2004 19:42 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 51170 | Plan | Maintenance | TDA | 144492 | |||
09/30/2004 07:52 | 11/04/2004 19:42 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 51170 | Plan | Maintenance | TDA | 144492 | |||
09/30/2004 07:52 | 11/04/2004 19:42 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 51170 | Plan | Maintenance | TDA | 144492 | |||
09/30/2004 07:52 | 11/04/2004 19:42 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 51170 | Plan | Maintenance | TDA | 144492 | |||
09/30/2004 07:52 | 11/04/2004 19:42 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 51170 | Plan | Maintenance | TDA | 144492 | |||
09/30/2004 07:53 | 11/02/2004 21:18 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 48385 | Plan | Foreign Request | TDA RED | 144562 | ||
09/30/2004 07:55 | 11/04/2004 18:10 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 51075 | Plan | Maintenance | TDA | 144224 | ||
09/30/2004 07:55 | 11/04/2004 19:42 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 51167 | Plan | Maintenance | TDA | 144225 | ||
09/30/2004 07:55 | 11/05/2004 11:33 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 52118 | Plan | Maintenance | TDA RED | 144493 | |
09/30/2004 07:55 | 11/05/2004 11:33 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 52118 | Plan | Maintenance | TDA | 144493 | |||
09/30/2004 07:55 | 11/05/2004 11:33 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 52118 | Plan | Maintenance | TDA | 144493 | |||
09/30/2004 07:55 | 11/05/2004 11:33 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 52118 | Plan | Maintenance | TDA | 144493 | |||
09/30/2004 07:55 | 11/05/2004 11:33 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 52118 | Plan | Maintenance | TDA | 144493 | |||
09/30/2004 07:56 | 10/16/2004 16:30 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 23554 | Plan | Maintenance | TDA | 144226 | ||
09/30/2004 07:56 | 10/16/2004 16:30 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 23554 | Plan | Maintenance | TDA | 144227 | ||
09/30/2004 08:40 | 12/13/2004 08:29 | Albany-Eugene No 1 115kV line | 115.0 | L | O | 39.80 | 106609 | Plan | Normally Out | EUG | 144228 | |
09/30/2004 08:40 | 12/13/2004 08:29 | Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line | 115.0 | S | 5.53 | 106609 | Plan | Normally Out | EUG | 144228 | ||
09/30/2004 12:01 | Walla Walla-Pendleton No 1 69kV line | 69.0 | L | T | 38.93 | still out | Plan | Normally Out | TRI | 144229 | ||
09/30/2004 12:01 | Weston Mountain-Milton section of Milton tap to Walla Walla-Pendleton No 1 69kV line | 69.0 | TS | 0.48 | still out | Plan | Normally Out | TRI | 144229 | |||
09/30/2004 18:01 | 09/30/2004 18:01 | Goshen-Eagle Rock No 1 161kV line | 161.0 | L | 11.60 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144230 | |
09/30/2004 18:01 | 09/30/2004 18:01 | Westside tap to Goshen-Eagle Rock No 1 161kV line | 161.0 | T | 0.10 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144230 | |
10/01/2004 00:49 | 10/01/2004 05:36 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 287 | Plan | Voltage Control | TRI TDA RED SAL | 144231 | ||
10/01/2004 01:41 | 10/01/2004 03:00 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 79 | Auto | Foreign Trouble | RED | 144232 | |
10/01/2004 01:41 | 10/01/2004 03:00 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 79 | Auto | Foreign Trouble | IDF RED | 144232 | |
10/01/2004 01:41 | 10/01/2004 03:00 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 79 | Auto | Foreign Trouble | IDF RED | 144232 | ||
10/01/2004 07:28 | 10/01/2004 12:41 | Olympia-South Tacoma No 1 230kV line | 230.0 | L | 36.94 | 313 | Plan | Maintenance | OLY COV | 144234 | ||
10/01/2004 08:02 | 10/01/2004 12:51 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 289 | Plan | Maintenance | SPK | 144235 | |
10/01/2004 08:02 | 10/01/2004 12:51 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | 22.34 | 289 | Plan | Maintenance | SPK | 144235 | ||
10/01/2004 13:49 | 10/01/2004 16:35 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 166 | Plan | Maintenance | COV | 144236 | ||
10/01/2004 21:04 | 10/03/2004 21:45 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 2921 | Plan | Construction | WEN COV | 144237 | ||
10/01/2004 23:51 | 10/01/2004 23:51 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144238 | |
10/01/2004 23:51 | 10/01/2004 23:51 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144238 | |
10/01/2004 23:51 | 10/01/2004 23:51 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144238 | ||
10/02/2004 01:11 | 10/02/2004 07:41 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 390 | Plan | Voltage Control | TRI TDA RED SAL | 144239 | ||
10/02/2004 09:05 | 10/02/2004 15:48 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | T | 41.05 | 403 | Plan | Foreign Request | WEN | 144241 | |
10/02/2004 09:05 | 10/02/2004 15:48 | Nespelem tap to Grand Coulee-Okanogan No 2 115kV line | 115.0 | T | 10.20 | 403 | Plan | Foreign Request | WEN | 144241 | ||
10/02/2004 23:17 | 10/08/2004 05:29 | Dalreed-Tumble Creek section of McNary-Santiam No 2 230kV line | 230.0 | S | 136.53 | 7572 | Plan | Maintenance | TDA RED | 144242 | ||
10/02/2004 23:17 | 10/08/2004 05:29 | McNary-Santiam No 2 230kV line | 230.0 | L | G | 200.43 | 7572 | Plan | Maintenance | TRI TDA RED SAL | 144242 | |
10/03/2004 00:14 | 10/03/2004 08:19 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 485 | Plan | Voltage Control | TRI TDA RED SAL | 144243 | ||
10/03/2004 01:57 | 10/08/2004 10:49 | Buckley Station Service tap to McNary-Santiam No 2 230kV line | 230.0 | T | 7732 | Plan | Maintenance | TDA | 144244 | |||
10/03/2004 01:57 | 10/03/2004 04:23 | McNary-Santiam No 2 230kV line | 230.0 | L | O | 200.43 | 146 | Plan | Maintenance | TRI TDA RED SAL | 144244 | |
10/03/2004 01:57 | 10/03/2004 04:23 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.10 | 146 | Plan | Maintenance | SAL | 144244 | ||
10/03/2004 01:57 | 10/03/2004 04:23 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 146 | Plan | Maintenance | SAL | 144244 | ||
10/03/2004 02:52 | 10/03/2004 03:34 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 42 | Auto | Foreign Trouble | RED | 144245 | |
10/03/2004 02:52 | 10/03/2004 03:34 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 42 | Auto | Foreign Trouble | IDF RED | 144245 | |
10/03/2004 02:52 | 10/03/2004 03:34 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 42 | Auto | Foreign Trouble | IDF RED | 144245 | ||
10/03/2004 02:56 | 10/03/2004 03:04 | Malin-PACW 500/230kV Tie No 1 500kV line | 500.0 | L | 0.10 | 8 | Auto | Foreign Trouble | Foreign Trouble | RED | 144246 | |
10/03/2004 03:13 | 10/03/2004 05:57 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 164 | Plan | Voltage Control | RED | 144247 | ||
10/04/2004 00:12 | 10/04/2004 05:15 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 303 | Plan | Voltage Control | TRI TDA RED SAL | 144249 | ||
10/04/2004 06:25 | 10/07/2004 08:24 | Midway-Priest Rapids No 3 230kV line | 230.0 | L | 7.20 | 4439 | Plan | Foreign Request | TRI | 144254 | ||
10/04/2004 07:19 | 10/07/2004 20:11 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 5092 | Plan | Maintenance | TDA | 144255 | ||
10/04/2004 07:36 | 10/04/2004 12:19 | Covington-Creston SCL No 1 230kV line | 230.0 | L | 13.40 | 283 | Plan | Switching | COV | 144256 | ||
10/04/2004 07:36 | 10/04/2004 12:19 | Covington-White River No 1 230kV line | 230.0 | L | 9.55 | 283 | Plan | Switching | COV | 144257 | ||
10/04/2004 07:36 | 10/04/2004 12:19 | Christopher-Covington section of Tacoma-Covington No 2 230kV line | 230.0 | S | 5.85 | 283 | Plan | Switching | COV | 144258 | ||
10/04/2004 07:36 | 10/04/2004 12:19 | Tacoma-Covington No 2 230kV line | 230.0 | L | G | 15.30 | 283 | Plan | Switching | COV | 144258 | |
10/04/2004 07:36 | 10/04/2004 12:19 | Chehalis-Covington No 1 230kV line | 230.0 | L | G | 69.40 | 283 | Plan | Switching | OLY COV | 144259 | |
10/04/2004 07:36 | 10/04/2004 12:19 | TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line | 230.0 | S | 23.30 | 283 | Plan | Switching | COV | 144259 | ||
10/04/2004 07:42 | 10/06/2004 13:16 | Salem-Albany No 2 115kV line | 115.0 | L | G | 27.85 | 3214 | Plan | Maintenance | SAL EUG | 144283 | |
10/04/2004 07:42 | 10/06/2004 13:16 | Salem-Monmouth section of Salem-Albany No 2 115kV line | 115.0 | S | 9.10 | 3214 | Plan | Maintenance | SAL | 144283 | ||
10/04/2004 07:48 | 10/06/2004 14:54 | Lexington-Cardwell No 1 115kV line | 115.0 | L | G | 11.60 | 3306 | Plan | Foreign Request | LGV OLY | 144260 | |
10/04/2004 07:48 | 10/06/2004 14:33 | Lexington-Shawnee section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 1.30 | 3285 | Plan | Foreign Request | LGV OLY | 144260 | ||
10/04/2004 07:48 | 10/06/2004 14:54 | Shawnee-East Kelso section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 1.70 | 3306 | Plan | Foreign Request | OLY | 144260 | ||
10/04/2004 07:50 | 10/04/2004 12:05 | Raver-Covington No 2 500kV line | 500.0 | L | 10.33 | 255 | Plan | Switching | COV | 144261 | ||
10/04/2004 08:05 | 10/16/2004 07:03 | Grand Coulee Switchyard 230-500kV Tie No 1 500kV line | 500.0 | L | 1.25 | 17218 | Plan | Foreign Request | WEN | 144262 | ||
10/04/2004 08:24 | 10/07/2004 12:40 | Noxon-Camp section of Noxon-Hot Springs No 1 230kV line | 230.0 | S | 0.20 | 4576 | Plan | Foreign Request | KAL | 144293 | ||
10/04/2004 08:24 | 10/07/2004 12:40 | Noxon-Hot Springs No 1 230kV line | 230.0 | L | G | 68.28 | 4576 | Plan | Foreign Request | KAL | 144293 | |
10/04/2004 09:15 | 10/04/2004 15:23 | Ross-St Johns No 1 230kV line | 230.0 | L | 7.26 | 368 | Plan | Maintenance | LGV | 144263 | ||
10/04/2004 09:25 | 10/08/2004 07:32 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 5647 | Plan | Maintenance | IDF | 144309 | ||
10/04/2004 09:38 | 10/04/2004 15:50 | St Johns-PACW St Johns No 1 115kV line | 115.0 | L | 1.60 | 372 | Plan | Maintenance | LGV | 144264 | ||
10/04/2004 10:18 | 10/04/2004 13:51 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 213 | Plan | Maintenance | EUG | 144265 | |
10/04/2004 10:18 | 10/04/2004 13:51 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 213 | Plan | Maintenance | EUG | 144265 | ||
10/04/2004 10:34 | 10/04/2004 13:51 | Alvey-Fairview No 1 230kV line | 230.0 | L | O | 97.46 | 197 | Plan | Maintenance | EUG | 144266 | |
10/04/2004 10:34 | 10/04/2004 13:51 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 197 | Plan | Maintenance | EUG | 144266 | ||
10/04/2004 10:34 | 10/04/2004 13:51 | Martin Creek tap to Alvey-Fairview No 1 230kV line | 230.0 | T | 0.27 | 197 | Plan | Maintenance | EUG | 144266 | ||
10/04/2004 10:34 | 10/04/2004 13:51 | Martin Creek-Green Valley section of Alvey-Fairview No 1 230kV line | 230.0 | S | 27.37 | 197 | Plan | Maintenance | EUG | 144266 | ||
10/04/2004 14:17 | 11/18/2004 08:23 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | G | 22.51 | 64506 | Plan | Normally Out | EUG | 144267 | |
10/04/2004 14:17 | 11/18/2004 08:23 | Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.89 | 64506 | Plan | Normally Out | EUG | 144267 | ||
10/04/2004 15:26 | 10/08/2004 13:56 | Boardman-Ione No 1 69kV line | 69.0 | L | 30.09 | 5670 | Plan | Maintenance | TRI | 144268 | ||
10/05/2004 00:41 | 10/05/2004 05:51 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 310 | Plan | Voltage Control | WEN COV | 144269 | ||
10/05/2004 01:33 | 10/05/2004 05:54 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 261 | Plan | Voltage Control | TRI TDA RED SAL | 144270 | ||
10/05/2004 06:02 | 10/05/2004 13:42 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 460 | Plan | Maintenance | KAL SPK | 144271 | |
10/05/2004 06:02 | 10/05/2004 13:42 | Libby-Libby FEC section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 12.27 | 460 | Plan | Maintenance | KAL | 144271 | ||
10/05/2004 07:30 | 10/05/2004 13:51 | Sno-King-Maple Valley No 1 230kV line | 230.0 | L | 24.84 | 381 | Plan | Switching | SNO COV | 144272 | ||
10/05/2004 07:30 | 10/05/2004 13:41 | Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line | 230.0 | S | 15.65 | 371 | Plan | Switching | COV | 144273 | ||
10/05/2004 07:30 | 10/05/2004 13:41 | Sammamish-Maple Valley No 1 230kV line | 230.0 | L | G | 32.03 | 371 | Plan | Switching | COV | 144273 | |
10/05/2004 07:30 | 10/05/2004 13:40 | Maple Valley-Talbot No 2 230kV line | 230.0 | L | 0.10 | 370 | Plan | Switching | COV | 144274 | ||
10/05/2004 07:30 | 10/05/2004 13:40 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 370 | Plan | Switching | COV | 144275 | ||
10/05/2004 09:25 | 10/05/2004 10:35 | Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line | 115.0 | S | 2.12 | 70 | Auto | Foreign Trouble | Foreign Trouble | EUG | 144276 | |
10/05/2004 09:25 | 10/05/2004 10:35 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 70 | Auto | Foreign Trouble | Foreign Trouble | EUG | 144276 |
10/05/2004 09:52 | 10/06/2004 09:52 | Detroit PH-Detroit No 1 230kV line | 230.0 | L | 0.48 | 1440 | Plan | Foreign Request | SAL | 144277 | ||
10/05/2004 10:34 | 10/06/2004 11:34 | North Camas-Oak Park No 1 115kV line | 115.0 | L | 1.65 | 1500 | Plan | Maintenance | LGV | 144278 | ||
10/05/2004 13:09 | 10/05/2004 15:07 | Dworshak PH-Dworshak No 1 500kV line | 500.0 | L | 3.67 | 118 | Plan | Foreign Request | TRI SPK | 144279 | ||
10/05/2004 13:10 | 10/05/2004 13:16 | Maple Valley-Massachusetts No 1 230kV line | 230.0 | L | 12.14 | 6 | Auto | Unknown | Unknown | COV | 144280 | |
10/06/2004 02:04 | 10/06/2004 02:11 | Monroe-Sammamish No 1 230kV line | 230.0 | L | 27.18 | 7 | Plan | Foreign Request | SNO COV | 144281 | ||
10/06/2004 12:42 | 10/06/2004 13:33 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 51 | Auto | Foreign Trouble | Foreign Trouble | OLY | 144284 | |
10/06/2004 12:42 | 10/06/2004 19:30 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 408 | Auto | Foreign Trouble | Foreign Trouble | OLY | 144284 | |
10/06/2004 12:42 | 10/06/2004 13:33 | Paul-Big Hanaford section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.54 | 51 | Auto | Foreign Trouble | Foreign Trouble | OLY | 144284 | |
10/06/2004 12:42 | 10/06/2004 19:30 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 408 | Auto | Foreign Trouble | Foreign Trouble | OLY | 144284 |
10/06/2004 13:58 | 10/06/2004 14:17 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 19 | Plan | Switching | KAL | 144285 | ||
10/06/2004 15:25 | 10/06/2004 16:40 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 75 | Plan | Foreign Request | OLY | 144286 | ||
10/06/2004 15:25 | 10/06/2004 16:40 | Paul-Big Hanaford section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.54 | 75 | Plan | Foreign Request | OLY | 144286 | ||
10/06/2004 15:25 | 10/06/2004 16:40 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | O | 0.78 | 75 | Plan | Foreign Request | OLY | 144286 | |
10/06/2004 18:35 | 10/06/2004 18:40 | Chief Joseph PH-Chief Joseph No 1 230kV line | 230.0 | L | 1.09 | 5 | Plan | Testing | WEN | 144287 | ||
10/06/2004 18:48 | 10/06/2004 18:50 | Chief Joseph PH-Chief Joseph No 1 230kV line | 230.0 | L | 1.09 | 2 | Plan | Testing | WEN | 144288 | ||
10/07/2004 02:25 | 10/07/2004 02:27 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 2 | Auto | Unknown | Unknown | TRI TDA RED SAL | 144289 | |
10/07/2004 02:28 | 10/07/2004 05:49 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 201 | Plan | Voltage Control | TRI TDA RED SAL | 144290 | ||
10/07/2004 07:20 | 10/07/2004 17:25 | Snohomish-Murray No 1 230kV line | 230.0 | L | 17.38 | 605 | Plan | Switching | SNO | 144294 | ||
10/07/2004 07:20 | 10/07/2004 17:30 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 610 | Plan | Switching | SNO | 144295 | |
10/07/2004 07:20 | 10/07/2004 17:30 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 610 | Plan | Switching | SNO | 144295 | ||
10/07/2004 08:29 | 10/07/2004 15:50 | McNary-Boardman No 1 230kV line | 230.0 | L | 18.18 | 441 | Plan | Maintenance | TRI | 144296 | ||
10/07/2004 11:49 | 10/07/2004 12:10 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 21 | Plan | Switching | KAL | 144297 | ||
10/08/2004 00:50 | 10/08/2004 09:42 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 532 | Plan | Construction | KAL SPK | 144298 | ||
10/08/2004 01:54 | 10/08/2004 01:55 | Lower Monumental-Ashe No 1 500kV line | 500.0 | L | 39.58 | 1 | Auto | Unknown | Unknown | TRI | 144299 | |
10/08/2004 02:21 | 10/08/2004 04:51 | Schultz-Raver No 4 500kV line | 500.0 | L | 77.43 | 150 | Plan | Voltage Control | WEN COV | 144300 | ||
10/08/2004 03:00 | 10/08/2004 05:05 | McNary-Santiam No 2 230kV line | 230.0 | L | O | 200.43 | 125 | Plan | Maintenance | TRI TDA RED SAL | 144301 | |
10/08/2004 03:00 | 10/08/2004 05:05 | Tumble Creek tap to McNary-Santiam No 2 230kV line | 230.0 | T | 0.10 | 125 | Plan | Maintenance | SAL | 144301 | ||
10/08/2004 03:00 | 10/08/2004 05:05 | Tumble Creek-Santiam section of McNary-Santiam No 2 230kV line | 230.0 | S | 27.95 | 125 | Plan | Maintenance | SAL | 144301 | ||
10/08/2004 06:46 | 10/08/2004 20:18 | Covington-Creston SCL No 1 230kV line | 230.0 | L | 13.40 | 812 | Plan | Construction | COV | 144310 | ||
10/08/2004 07:33 | 10/08/2004 13:41 | Christopher-Covington section of Tacoma-Covington No 2 230kV line | 230.0 | S | 5.85 | 368 | Plan | Switching | COV | 144311 | ||
10/08/2004 07:33 | 10/08/2004 13:41 | Tacoma-Covington No 2 230kV line | 230.0 | L | G | 15.30 | 368 | Plan | Switching | COV | 144311 | |
10/08/2004 07:33 | 10/08/2004 13:42 | Covington-White River No 1 230kV line | 230.0 | L | 9.55 | 369 | Plan | Switching | COV | 144312 | ||
10/08/2004 07:34 | 10/08/2004 13:41 | Raver-Covington No 2 500kV line | 500.0 | L | 10.33 | 367 | Plan | Switching | COV | 144313 | ||
10/08/2004 07:34 | 10/08/2004 13:41 | Chehalis-Covington No 1 230kV line | 230.0 | L | G | 69.40 | 367 | Plan | Switching | OLY COV | 144314 | |
10/08/2004 07:34 | 10/08/2004 13:41 | TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line | 230.0 | S | 23.30 | 367 | Plan | Switching | COV | 144314 | ||
10/08/2004 09:07 | 10/08/2004 11:09 | Midway-Priest Rapids No 2 230kV line | 230.0 | L | 7.50 | 122 | Plan | Foreign Request | TRI | 144315 | ||
10/08/2004 09:39 | 10/08/2004 11:17 | Minidoka PH-Canal section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 12.52 | 98 | Plan | Foreign Request | IDF | 144316 | ||
10/08/2004 09:39 | 10/08/2004 11:17 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | G | 24.91 | 98 | Plan | Foreign Request | IDF | 144316 | |
10/08/2004 09:44 | 10/08/2004 11:15 | Adelaide-Minidoka PH No 1 138kV line | 138.0 | L | 11.90 | 91 | Plan | Foreign Request | IDF | 144317 | ||
10/08/2004 09:45 | 10/08/2004 11:17 | Idahome-Bridge section of Minidoka PH-Bridge No 1 138kV line | 138.0 | S | G | 20.40 | 92 | Plan | Foreign Request | IDF | 144318 | |
10/08/2004 09:45 | 10/08/2004 11:17 | Minidoka PH-Bridge No 1 138kV line | 138.0 | L | 40.90 | 92 | Plan | Foreign Request | IDF | 144318 | ||
10/08/2004 09:45 | 10/08/2004 11:17 | Minidoka PH-Idahome section of Minidoka PH-Bridge No 1 138kV line | 138.0 | S | G | 20.50 | 92 | Plan | Foreign Request | IDF | 144318 | |
10/08/2004 12:20 | 10/08/2004 12:58 | Bonneville PH 1-North Bonneville No 2 230kV line | 230.0 | L | 0.83 | 38 | Auto | Foreign Trouble | Foreign Trouble | LGV | 144763 | |
10/08/2004 13:56 | 10/12/2004 13:04 | Boardman-Ione No 1 69kV line | 69.0 | L | 30.09 | 5708 | Plan | Foreign Request | TRI | 144320 | ||
10/08/2004 14:27 | 10/08/2004 14:29 | Dayton-Shelton section of Olympia-Shelton No 1 115kV line | 115.0 | S | G | 1.78 | 2 | Auto | Unknown | Unknown | OLY | 144321 |
10/08/2004 14:27 | 10/08/2004 14:29 | Olympia-Dayton section of Olympia-Shelton No 1 115kV line | 115.0 | S | G | 17.95 | 2 | Auto | Unknown | Unknown | OLY | 144321 |
10/08/2004 14:27 | 10/08/2004 14:29 | Olympia-Shelton No 1 115kV line | 115.0 | L | 19.73 | 2 | Auto | Unknown | Unknown | OLY | 144321 | |
10/08/2004 14:33 | 10/08/2004 14:33 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 0 | Auto | Unknown | Unknown | TRI TDA RED SAL | 144322 | |
10/08/2004 17:14 | 10/08/2004 17:45 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 31 | Plan | Construction | KAL SPK | 144323 | ||
10/09/2004 01:54 | 10/09/2004 10:52 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 538 | Plan | Voltage Control | SAL EUG | 144324 | ||
10/09/2004 08:45 | 10/09/2004 11:14 | Grand Coulee-B212 section of Grand Coulee-Creston No 1 115kV line | 115.0 | S | 1.59 | 149 | Plan | Foreign Request | WEN | 144325 | ||
10/09/2004 08:45 | 10/09/2004 11:14 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | G | 28.27 | 149 | Plan | Foreign Request | WEN SPK | 144325 | |
10/09/2004 09:03 | 10/09/2004 14:30 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | T | 41.05 | 327 | Plan | Foreign Request | WEN | 144326 | |
10/09/2004 09:03 | 10/09/2004 14:30 | Nespelem tap to Grand Coulee-Okanogan No 2 115kV line | 115.0 | T | 10.20 | 327 | Plan | Foreign Request | WEN | 144326 | ||
10/09/2004 09:07 | 10/09/2004 13:36 | Dworshak-Taft No 1 500kV line | 500.0 | L | 90.38 | 269 | Plan | Maintenance | SPK KAL | 144327 | ||
10/09/2004 09:25 | 10/09/2004 10:17 | Garrison-Taft No 2 500kV line | 500.0 | L | 159.38 | 52 | Plan | Voltage Control | KAL | 144328 | ||
10/09/2004 23:41 | 10/10/2004 08:33 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 532 | Plan | Voltage Control | SAL EUG | 144329 | ||
10/10/2004 01:17 | 10/10/2004 07:31 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 374 | Plan | Voltage Control | RED | 144330 | ||
10/10/2004 03:22 | 10/10/2004 03:22 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 0 | Auto | Unknown | Unknown | TRI TDA RED SAL | 144331 | |
10/10/2004 05:07 | 10/10/2004 05:07 | Midway-Rocky Ford No 1 230kV line | 230.0 | L | 47.57 | 0 | Auto | Unknown | Unknown | TRI WEN | 144332 | |
10/10/2004 09:21 | 10/10/2004 09:21 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144333 | |
10/10/2004 14:42 | 10/10/2004 15:04 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 22 | Plan | Voltage Control | RED | 144334 | ||
10/10/2004 23:05 | 10/11/2004 06:54 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 469 | Plan | Voltage Control | SAL EUG | 144335 | ||
10/11/2004 00:15 | 10/11/2004 05:48 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 333 | Plan | Voltage Control | RED | 144339 | ||
10/11/2004 07:48 | 10/22/2004 16:55 | Tacoma-TPWR Northeast No 3 230kV line | 230.0 | L | 0.10 | 16387 | Plan | Foreign Request | COV | 144340 | ||
10/11/2004 11:37 | 10/11/2004 13:31 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 114 | Plan | Voltage Control | KAL | 144341 | ||
10/12/2004 01:17 | 10/12/2004 05:51 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 274 | Plan | Voltage Control | SAL EUG | 144342 | ||
10/12/2004 03:02 | 10/12/2004 05:46 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 164 | Plan | Voltage Control | TDA RED SAL | 144343 | ||
10/12/2004 04:03 | 10/13/2004 15:31 | Dworshak PH-Dworshak No 1 500kV line | 500.0 | L | 3.67 | 2128 | Plan | Foreign Request | TRI SPK | 144344 | ||
10/12/2004 06:34 | 10/12/2004 18:02 | Covington-Creston SCL No 1 230kV line | 230.0 | L | 13.40 | 688 | Plan | Switching | COV | 144347 | ||
10/12/2004 06:57 | 10/12/2004 10:33 | Kitsap-Valley Junction No 2 115kV line | 115.0 | L | 11.20 | 216 | Plan | Foreign Request | OLY | 144348 | ||
10/12/2004 07:04 | 10/19/2004 13:56 | Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line | 230.0 | S | 15.65 | 10492 | Plan | Maintenance | COV | 144349 | ||
10/12/2004 07:04 | 10/19/2004 13:56 | Sammamish-Maple Valley No 1 230kV line | 230.0 | L | G | 32.03 | 10492 | Plan | Maintenance | COV | 144349 | |
10/12/2004 07:13 | 10/12/2004 15:57 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 524 | Plan | Maintenance | TDA | 144350 | ||
10/12/2004 07:13 | 10/12/2004 15:57 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 524 | Plan | Maintenance | TDA LGV | 144350 | |
10/12/2004 07:13 | 10/12/2004 15:58 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 525 | Plan | Maintenance | TDA | 144351 | ||
10/12/2004 07:14 | 10/12/2004 15:56 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 522 | Plan | Maintenance | TDA | 144352 | ||
10/12/2004 07:31 | 10/12/2004 12:04 | Hatwai-AVA North Lewiston No 1 230kV line | 230.0 | L | 7.00 | 273 | Plan | Maintenance | SPK | 144353 | ||
10/12/2004 07:37 | 10/12/2004 16:43 | Sno-King-Maple Valley No 1 230kV line | 230.0 | L | 24.84 | 546 | Plan | Switching | SNO COV | 144354 | ||
10/12/2004 07:50 | 10/12/2004 16:43 | Maple Valley-Talbot No 2 230kV line | 230.0 | L | 0.10 | 533 | Plan | Switching | COV | 144355 | ||
10/12/2004 07:50 | 10/12/2004 16:43 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 533 | Plan | Switching | COV | 144356 | ||
10/12/2004 07:59 | 10/12/2004 15:37 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 458 | Plan | Fiber Optic Work | WEN SPK | 144357 | |
10/12/2004 07:59 | 10/12/2004 15:37 | Springhill-Bell section of Creston-Bell No 1 115kV line | 115.0 | S | 9.92 | 458 | Plan | Fiber Optic Work | SPK | 144357 | ||
10/12/2004 08:03 | 10/20/2004 14:16 | John Day-Big Eddy No 1 500kV line | 500.0 | L | 18.94 | 11893 | Plan | Maintenance | TDA | 144358 | ||
10/12/2004 08:04 | 10/15/2004 13:31 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 4647 | Plan | Maintenance | SAL | 144359 | |
10/12/2004 08:04 | 10/15/2004 13:31 | Thatcher Junction-Timber section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 8.04 | 4647 | Plan | Maintenance | SAL | 144359 | ||
10/12/2004 08:08 | 10/12/2004 15:45 | Keeler-Tillamook No 1 115kV line | 115.0 | L | T | 57.81 | 457 | Plan | Maintenance | SAL | 144360 | |
10/12/2004 08:08 | 10/12/2004 15:45 | Timber tap to Keeler-Tillamook No 1 115kV line | 115.0 | T | 11.21 | 457 | Plan | Maintenance | SAL | 144360 | ||
10/12/2004 08:50 | 10/12/2004 14:15 | Keeler-Tillamook No 1 115kV line | 115.0 | L | O | 57.81 | 325 | Plan | Maintenance | SAL | 144361 | |
10/12/2004 08:50 | 10/12/2004 14:15 | Timber-South Fork section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 12.20 | 325 | Plan | Maintenance | SAL | 144361 | ||
10/12/2004 08:58 | 10/21/2004 15:38 | Tacoma-Raver No 1&2 500kV line | 500.0 | L | 33.06 | 13360 | Plan | Maintenance | COV | 144362 | ||
10/13/2004 00:39 | 10/13/2004 05:46 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 307 | Plan | Voltage Control | SAL EUG | 144363 | ||
10/13/2004 06:36 | 10/13/2004 19:23 | Station H-Station FG No 1 115kV line | 115.0 | L | 1.08 | 767 | Plan | Foreign Request | OLY | 144367 | ||
10/13/2004 07:15 | 10/13/2004 14:42 | Bell-Bigelow section of Bell-Trentwood No 2 115kV line | 115.0 | S | 6.60 | 447 | Plan | Maintenance | SPK | 144368 | ||
10/13/2004 07:15 | 10/13/2004 14:42 | Bell-Trentwood No 2 115kV line | 115.0 | L | G | 11.30 | 447 | Plan | Maintenance | SPK | 144368 | |
10/13/2004 07:39 | 10/13/2004 17:46 | Longview-Allston No 2 230kV line | 230.0 | L | 4.87 | 607 | Plan | Maintenance | LGV | 144369 | ||
10/13/2004 08:00 | 10/13/2004 15:00 | Keeler-Tillamook No 1 115kV line | 115.0 | L | T | 57.81 | 420 | Plan | Maintenance | SAL | 144370 | |
10/13/2004 08:00 | 10/13/2004 15:00 | Timber tap to Keeler-Tillamook No 1 115kV line | 115.0 | T | 11.21 | 420 | Plan | Maintenance | SAL | 144370 | ||
10/13/2004 08:04 | 10/13/2004 13:43 | Wendson-Berrydale section of Wendson-Tahkenitch No 1 115kV line | 115.0 | S | 6.36 | 339 | Plan | Maintenance | EUG | 144371 | ||
10/13/2004 08:04 | 10/13/2004 13:43 | Wendson-Tahkenitch No 1 115kV line | 115.0 | L | G | 20.34 | 339 | Plan | Maintenance | EUG | 144371 | |
10/13/2004 08:34 | 10/13/2004 16:00 | Bell-AVA Beacon No 1 115kV line | 115.0 | L | 6.60 | 446 | Plan | Maintenance | SPK | 144372 | ||
10/13/2004 08:38 | 10/13/2004 14:43 | Bell-AVA Northeast No 3 115kV line | 115.0 | L | 1.60 | 365 | Plan | Maintenance | SPK | 144373 | ||
10/13/2004 10:19 | 10/13/2004 10:21 | South Tacoma-White River No 1 230kV line | 230.0 | L | 14.95 | 2 | Plan | Foreign Request | COV | 144374 | ||
10/13/2004 10:24 | 10/13/2004 10:28 | Covington-White River No 1 230kV line | 230.0 | L | 9.55 | 4 | Plan | Foreign Request | COV | 144375 | ||
10/13/2004 10:30 | 10/13/2004 10:30 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144376 | |
10/13/2004 10:32 | 10/13/2004 10:35 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 3 | Plan | Foreign Request | COV | 144377 | ||
10/13/2004 13:58 | Cowlitz-LaGrande No 1,2 115kV lines | 115.0 | L | T | 25.69 | still out | Plan | Normally Out | COV | 144378 | ||
10/13/2004 13:58 | McCullough tap to Cowlitz-LaGrande No 1,2 115kV lines | 115.0 | T | 2.18 | still out | Plan | Normally Out | COV | 144378 | |||
10/14/2004 01:10 | 10/14/2004 05:16 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 246 | Plan | Voltage Control | SAL EUG | 144379 | ||
10/14/2004 03:22 | 10/14/2004 05:37 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 135 | Plan | Voltage Control | TDA RED SAL | 144380 | ||
10/14/2004 07:22 | 10/15/2004 14:38 | Wendson-Berrydale section of Wendson-Tahkenitch No 1 115kV line | 115.0 | S | 6.36 | 1876 | Plan | Switching | EUG | 144383 | ||
10/14/2004 07:22 | 10/15/2004 14:38 | Wendson-Tahkenitch No 1 115kV line | 115.0 | L | G | 20.34 | 1876 | Plan | Switching | EUG | 144383 | |
10/14/2004 07:30 | 10/14/2004 16:13 | Midway-Priest Rapids No 2 230kV line | 230.0 | L | 7.50 | 523 | Plan | Foreign Request | TRI | 144384 | ||
10/14/2004 07:40 | 10/14/2004 15:48 | Keeler-Tillamook No 1 115kV line | 115.0 | L | T | 57.81 | 488 | Plan | Maintenance | SAL | 144385 | |
10/14/2004 07:40 | 10/14/2004 15:48 | Timber tap to Keeler-Tillamook No 1 115kV line | 115.0 | T | 11.21 | 488 | Plan | Maintenance | SAL | 144385 | ||
10/14/2004 08:00 | 10/14/2004 13:18 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 318 | Plan | Foreign Request | RED | 144386 | |
10/14/2004 08:00 | 10/14/2004 13:18 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 318 | Plan | Foreign Request | IDF RED | 144386 | |
10/14/2004 08:00 | 10/14/2004 13:18 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 318 | Plan | Foreign Request | IDF RED | 144386 | ||
10/14/2004 08:00 | 10/15/2004 14:47 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 1847 | Plan | Maintenance | WEN SPK | 144387 | |
10/14/2004 08:00 | 10/15/2004 14:47 | Springhill-Bell section of Creston-Bell No 1 115kV line | 115.0 | S | 9.92 | 1847 | Plan | Maintenance | SPK | 144387 | ||
10/14/2004 08:20 | 10/14/2004 13:33 | City View-Richland section of Red Mountain-Richland No 1 115kV line | 115.0 | S | 1.38 | 313 | Plan | Maintenance | TRI | 144388 | ||
10/14/2004 08:20 | 10/14/2004 13:33 | Red Mountain-Richland No 1 115kV line | 115.0 | L | G | 6.00 | 313 | Plan | Maintenance | TRI | 144388 | |
10/15/2004 01:26 | 10/15/2004 05:44 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 258 | Plan | Voltage Control | SAL EUG | 144393 | ||
10/15/2004 07:15 | 10/15/2004 16:08 | Big Eddy 500/230kV Tie No 1 500kV line | 500.0 | L | 0.57 | 533 | Plan | Switching | TDA | 144394 | ||
10/15/2004 07:15 | 10/15/2004 16:09 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 534 | Plan | Construction | TDA | 144395 | ||
10/15/2004 07:15 | 10/15/2004 16:09 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 534 | Plan | Construction | TDA | 144396 | ||
10/15/2004 07:15 | 10/15/2004 16:09 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 534 | Plan | Construction | TDA LGV | 144396 | |
10/15/2004 07:20 | 10/15/2004 16:08 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 528 | Plan | Construction | TDA | 144397 | ||
10/15/2004 07:44 | 10/15/2004 15:50 | Keeler-Tillamook No 1 115kV line | 115.0 | L | T | 57.81 | 486 | Plan | Maintenance | SAL | 144398 | |
10/15/2004 07:44 | 10/15/2004 15:50 | Timber tap to Keeler-Tillamook No 1 115kV line | 115.0 | T | 11.21 | 486 | Plan | Maintenance | SAL | 144398 | ||
10/16/2004 01:22 | 10/16/2004 11:17 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 595 | Plan | Voltage Control | SAL EUG | 144399 | ||
10/16/2004 02:22 | 10/16/2004 02:22 | Captain Jack-Klamath Cogen No 1 500kV line | 500.0 | L | 26.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | RED | 144401 | |
10/16/2004 07:04 | 10/17/2004 16:18 | Sedro Woolley-Bellingham No 1 230kV line | 230.0 | L | 25.02 | 1994 | Plan | Foreign Request | SNO | 144402 | ||
10/16/2004 09:02 | 10/16/2004 16:57 | Grand Coulee-Okanogan No 2 115kV line | 115.0 | L | T | 41.05 | 475 | Plan | Foreign Request | WEN | 144403 | |
10/16/2004 09:02 | 10/16/2004 16:57 | Nespelem tap to Grand Coulee-Okanogan No 2 115kV line | 115.0 | T | 10.20 | 475 | Plan | Foreign Request | WEN | 144403 | ||
10/16/2004 13:20 | 10/16/2004 13:42 | Fairview-PACW Coquille No 1 115kV line | 115.0 | L | 6.00 | 22 | Auto | Foreign Trouble | Foreign Trouble | EUG | 144404 | |
10/17/2004 00:20 | 10/17/2004 17:46 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 1046 | Plan | Voltage Control | TRI TDA RED SAL | 144405 | ||
10/17/2004 09:07 | 10/17/2004 10:11 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | O | 22.51 | 64 | Auto | Tree | Tree blown | EUG | 144409 |
10/17/2004 09:07 | 10/17/2004 13:38 | Dorena tap to Alvey-Martin Creek No 1 115kV line | 115.0 | T | 4.67 | 271 | Auto | Tree | Tree blown | EUG | 144409 | |
10/17/2004 09:07 | 10/17/2004 10:11 | Dorena-Latham section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 3.71 | 64 | Auto | Tree | Tree blown | EUG | 144409 | |
10/17/2004 09:07 | 10/17/2004 10:11 | Latham tap to Alvey-Martin Creek No 1 115kV line | 115.0 | T | 2.06 | 64 | Auto | Tree | Tree blown | EUG | 144409 | |
10/17/2004 09:07 | 10/17/2004 10:11 | Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.03 | 64 | Auto | Tree | Tree blown | EUG | 144409 | |
10/17/2004 15:49 | 10/17/2004 15:49 | Potholes-Sand Dunes No 1 230kV line | 230.0 | L | 14.00 | 0 | Auto | Lightning | Lightning | WEN | 144410 | |
10/17/2004 17:20 | 10/17/2004 17:22 | Grand Coulee-Chief Joseph No 2 230kV line | 230.0 | L | 32.59 | 2 | Auto | Lightning | Lightning | WEN | 144411 | |
10/18/2004 00:12 | 10/18/2004 05:57 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 345 | Plan | Voltage Control | SAL EUG | 144416 | ||
10/18/2004 04:32 | 10/20/2004 14:18 | Dworshak PH-Dworshak No 1 500kV line | 500.0 | L | 3.67 | 3466 | Plan | Foreign Request | TRI SPK | 144417 | ||
10/18/2004 06:07 | 10/18/2004 06:14 | McNary PH-McNary 3&4 No 3 230kV line | 230.0 | L | 1.18 | 7 | Plan | Foreign Request | TRI | 144418 | ||
10/18/2004 06:07 | 10/18/2004 06:14 | McNary PH-McNary 3&4 No 4 230kV line | 230.0 | L | 1.00 | 7 | Plan | Foreign Request | TRI | 144419 | ||
10/18/2004 06:35 | 10/18/2004 06:35 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144420 | |
10/18/2004 06:35 | 10/18/2004 06:35 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144420 | |
10/18/2004 06:35 | 10/18/2004 06:35 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144420 | ||
10/18/2004 07:01 | 10/29/2004 17:26 | Vantage-Schultz No 1 500kV line | 500.0 | L | 34.65 | 16465 | Plan | Construction | WEN | 144421 | ||
10/18/2004 07:17 | 10/18/2004 15:49 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 512 | Plan | Maintenance | TDA | 144422 | ||
10/18/2004 07:18 | 10/18/2004 15:49 | Big Eddy 500/230kV Tie No 1 500kV line | 500.0 | L | 0.57 | 511 | Plan | Switching | TDA | 144423 | ||
10/18/2004 07:18 | 10/18/2004 16:42 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 564 | Plan | Maintenance | TDA | 144424 | ||
10/18/2004 07:18 | 10/18/2004 16:42 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 564 | Plan | Maintenance | TDA LGV | 144424 | |
10/18/2004 07:20 | 10/18/2004 15:47 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 507 | Plan | Maintenance | TDA | 144425 | ||
10/18/2004 08:03 | 10/19/2004 18:41 | Hat Rock-PACW Wallula section of McNary-Wallula 230kV line | 230.0 | S | 18.00 | 2078 | Plan | Foreign Request | TRI | 144426 | ||
10/18/2004 08:03 | 10/19/2004 18:41 | McNary-Wallula 230kV line | 230.0 | L | G | 30.70 | 2078 | Plan | Foreign Request | TRI | 144426 | |
10/18/2004 08:11 | 10/22/2004 08:12 | John Day PH-John Day No 1 500kV line | 500.0 | L | 3.48 | 5761 | Plan | Foreign Request | TDA | 144427 | ||
10/18/2004 08:17 | 10/20/2004 10:52 | Elmo-Kerr section of Kalispell-Kerr No 1 115kV line | 115.0 | S | 12.80 | 3035 | Plan | Maintenance | KAL | 144466 | ||
10/18/2004 08:17 | 10/20/2004 10:52 | Kalispell-Kerr No 1 115kV line | 115.0 | L | G | 41.39 | 3035 | Plan | Maintenance | KAL | 144466 | |
10/18/2004 08:56 | 10/18/2004 17:07 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 491 | Plan | Foreign Request | SNO | 144428 | ||
10/18/2004 09:36 | 10/21/2004 12:59 | Walla Walla-North Lewiston No 1 115kV line | 115.0 | L | G | 80.80 | 4523 | Plan | Maintenance | TRI | 144429 | |
10/18/2004 09:36 | 10/21/2004 12:59 | Walla Walla-Pomeroy section of Walla Walla-North Lewiston No 1 115kV line | 115.0 | S | 53.10 | 4523 | Plan | Maintenance | TRI | 144429 | ||
10/18/2004 15:43 | 11/02/2004 21:18 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 21995 | Plan | Switching | TDA | 144430 | ||
10/19/2004 05:00 | 10/19/2004 05:00 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144435 | |
10/19/2004 05:00 | 10/19/2004 05:00 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144435 | |
10/19/2004 05:00 | 10/19/2004 05:00 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144435 | ||
10/19/2004 05:37 | 10/19/2004 19:33 | Covington-Creston SCL No 1 230kV line | 230.0 | L | 13.40 | 836 | Plan | Switching | COV | 144436 | ||
10/19/2004 06:12 | 10/21/2004 12:35 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 3263 | Plan | Maintenance | IDF | 144437 | ||
10/19/2004 06:51 | 10/19/2004 13:33 | Maple Valley-Talbot No 2 230kV line | 230.0 | L | 0.10 | 402 | Plan | Switching | COV | 144438 | ||
10/19/2004 06:52 | 10/19/2004 13:33 | Sno-King-Maple Valley No 1 230kV line | 230.0 | L | 24.84 | 401 | Plan | Switching | SNO COV | 144439 | ||
10/19/2004 06:52 | 10/19/2004 13:33 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 401 | Plan | Switching | COV | 144440 | ||
10/19/2004 07:21 | 10/19/2004 16:55 | La Grande-IPC Brownlee No 1 230kV line | 230.0 | L | 79.30 | 574 | Plan | Maintenance | TRI | 144441 | ||
10/19/2004 07:21 | 10/19/2004 16:55 | Quartz tap to La Grande-IPC Brownlee No 1 230kV line | 230.0 | T | G | 10.30 | 574 | Plan | Maintenance | TRI | 144441 | |
10/19/2004 07:54 | 10/19/2004 13:09 | Allston-Astoria No 1 115kV line | 115.0 | L | G | 41.98 | 315 | Plan | Maintenance | LGV | 144442 | |
10/19/2004 07:54 | 10/19/2004 13:09 | Mist-Naselle section of Allston-Astoria No 1 115kV line | 115.0 | S | 7.90 | 315 | Plan | Maintenance | LGV | 144442 | ||
10/19/2004 08:05 | 10/19/2004 17:40 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 575 | Plan | Foreign Request | SNO | 144443 | ||
10/19/2004 08:27 | 10/21/2004 15:01 | McLoughlin-Sherwood No 1 230kV line | 230.0 | L | T | 16.24 | 3274 | Plan | Construction | LGV SAL | 144444 | |
10/19/2004 08:27 | 10/21/2004 15:01 | Pearl tap to McLoughlin-Sherwood No 1 230kV line | 230.0 | T | 0.26 | 3274 | Plan | Construction | LGV SAL | 144444 | ||
10/19/2004 08:28 | 10/19/2004 20:40 | Pearl-Sherwood No 1&2 230kV line | 230.0 | L | 9.67 | 732 | Plan | Construction | SAL | 144445 | ||
10/19/2004 08:50 | 10/21/2004 09:43 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 2933 | Plan | Maintenance | TDA LGV | 144446 | |
10/19/2004 08:50 | 10/21/2004 09:43 | Parkdale-Troutdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 53.99 | 2933 | Plan | Maintenance | TDA LGV | 144446 | ||
10/19/2004 12:24 | 10/19/2004 13:24 | Potholes-Grand Coulee No 1 230kV line | 230.0 | L | 65.66 | 60 | Plan | Emergency | WEN SPK | 144447 | ||
10/19/2004 12:25 | 10/19/2004 12:30 | Potholes-Sand Dunes No 1 230kV line | 230.0 | L | 14.00 | 5 | Plan | Emergency | WEN | 144448 | ||
10/19/2004 12:25 | 10/19/2004 12:29 | Midway-Potholes No 1 230kV line | 230.0 | L | 36.87 | 4 | Plan | Emergency | TRI WEN | 144449 | ||
10/19/2004 14:10 | 10/19/2004 19:34 | Covington-White River No 1 230kV line | 230.0 | L | 9.55 | 324 | Plan | Switching | COV | 144450 | ||
10/19/2004 14:11 | 10/19/2004 19:34 | Christopher-Covington section of Tacoma-Covington No 2 230kV line | 230.0 | S | 5.85 | 323 | Plan | Switching | COV | 144451 | ||
10/19/2004 14:11 | 10/19/2004 19:34 | Tacoma-Covington No 2 230kV line | 230.0 | L | G | 15.30 | 323 | Plan | Switching | COV | 144451 | |
10/19/2004 14:11 | 10/19/2004 19:57 | Chehalis-Covington No 1 230kV line | 230.0 | L | G | 69.40 | 346 | Plan | Switching | OLY COV | 144452 | |
10/19/2004 14:11 | 10/19/2004 19:57 | TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line | 230.0 | S | 23.30 | 346 | Plan | Switching | COV | 144452 | ||
10/19/2004 14:11 | 10/19/2004 19:32 | Raver-Covington No 2 500kV line | 500.0 | L | 10.33 | 321 | Plan | Switching | COV | 144453 | ||
10/19/2004 15:50 | 10/19/2004 15:52 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 2 | Auto | Unknown | Unknown | SAL | 144454 | |
10/19/2004 16:23 | 10/19/2004 16:29 | Potholes-Sand Dunes No 1 230kV line | 230.0 | L | 14.00 | 6 | Plan | Switching | WEN | 144455 | ||
10/19/2004 16:26 | 10/19/2004 16:28 | Midway-Potholes No 1 230kV line | 230.0 | L | 36.87 | 2 | Plan | Switching | TRI WEN | 144456 | ||
10/19/2004 16:26 | 10/19/2004 16:50 | Potholes-Grand Coulee No 1 230kV line | 230.0 | L | 65.66 | 24 | Plan | Switching | WEN SPK | 144457 | ||
10/20/2004 02:43 | 10/20/2004 02:43 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144458 | |
10/20/2004 03:10 | 10/20/2004 06:02 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | T | 17.88 | 172 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144467 |
10/20/2004 03:10 | 10/20/2004 06:02 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 172 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144467 | |
10/20/2004 06:10 | 10/20/2004 20:34 | McLoughlin-Pearl section of McLoughlin-Sherwood No 1 230kV line | 230.0 | S | 11.67 | 864 | Plan | Maintenance | LGV SAL | 144468 | ||
10/20/2004 06:10 | 10/20/2004 20:34 | McLoughlin-Sherwood No 1 230kV line | 230.0 | L | G | 16.24 | 864 | Plan | Maintenance | LGV SAL | 144468 | |
10/20/2004 06:10 | 10/20/2004 20:34 | Pearl-Sherwood section of McLoughlin-Sherwood No 1 230kV line | 230.0 | S | 4.57 | 864 | Plan | Maintenance | SAL | 144468 | ||
10/20/2004 06:30 | 10/20/2004 17:40 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 670 | Plan | Maintenance | TDA RED | 144469 | |
10/20/2004 06:30 | 10/20/2004 17:40 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 670 | Plan | Maintenance | TDA RED | 144469 | ||
10/20/2004 07:09 | 10/20/2004 15:23 | Fairview-Bandon No 2 115kV line | 115.0 | L | 19.73 | 494 | Plan | Maintenance | EUG | 144470 | ||
10/20/2004 07:19 | 10/20/2004 07:44 | Chehalis-Covington No 1 230kV line | 230.0 | L | T | 69.40 | 25 | Plan | Switching | OLY COV | 144471 | |
10/20/2004 07:19 | 10/20/2004 07:44 | Cowlitz tap to Chehalis-Covington No 1 230kV line | 230.0 | T | 6.30 | 25 | Plan | Switching | COV | 144471 | ||
10/20/2004 07:25 | 10/20/2004 07:47 | Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line | 230.0 | S | 35.80 | 22 | Plan | Switching | OLY COV | 144472 | ||
10/20/2004 07:25 | 10/20/2004 07:47 | Chehalis-Covington No 1 230kV line | 230.0 | L | G | 69.40 | 22 | Plan | Switching | OLY COV | 144472 | |
10/20/2004 07:25 | 10/26/2004 18:33 | Chehalis-Covington No 1 230kV line | 230.0 | L | O | 69.40 | 9308 | Plan | Maintenance | OLY COV | 144473 | |
10/20/2004 07:25 | 10/26/2004 18:33 | TPWR Cowlitz-Covington section of Chehalis-Covington No 1 230kV line | 230.0 | S | 23.30 | 9308 | Plan | Maintenance | COV | 144473 | ||
10/20/2004 07:35 | 10/20/2004 16:11 | Roundup-LaGrande No 1 230kV line | 230.0 | L | 45.02 | 516 | Plan | Maintenance | TRI | 144474 | ||
10/20/2004 07:36 | 10/22/2004 13:05 | Salem-Albany No 1 115kV line | 115.0 | L | 23.90 | 3209 | Plan | Maintenance | SAL EUG | 144494 | ||
10/20/2004 07:45 | 10/20/2004 14:39 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 414 | Plan | Maintenance | SPK | 144475 | |
10/20/2004 07:45 | 10/20/2004 14:39 | Loon Lake-Addy section of Bell-Addy No 1 115kV line | 115.0 | S | 22.34 | 414 | Plan | Maintenance | SPK | 144475 | ||
10/20/2004 07:53 | 10/20/2004 15:31 | Midway-Priest Rapids No 1 230kV line | 230.0 | L | 7.00 | 458 | Plan | Foreign Request | TRI | 144476 | ||
10/20/2004 08:16 | 10/20/2004 17:01 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 525 | Plan | Foreign Request | SNO | 144477 | ||
10/20/2004 08:19 | 10/20/2004 14:02 | Bell-Addy section of Bell-Boundary No 3 230kV line | 230.0 | S | 50.34 | 343 | Plan | Maintenance | SPK | 144478 | ||
10/20/2004 08:19 | 10/20/2004 14:02 | Bell-Boundary No 3 230kV line | 230.0 | L | G | 108.07 | 343 | Plan | Maintenance | SPK | 144478 | |
10/20/2004 08:47 | 10/20/2004 14:02 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | 0.02 | 315 | Plan | Maintenance | SPK | 144479 | ||
10/20/2004 08:47 | 10/20/2004 14:02 | Addy-Boundary section of Bell-Boundary No 3 230kV line | 230.0 | S | 57.73 | 315 | Plan | Maintenance | SPK | 144479 | ||
10/20/2004 08:47 | 10/20/2004 14:02 | Bell-Boundary No 3 230kV line | 230.0 | L | O | 108.07 | 315 | Plan | Maintenance | SPK | 144479 | |
10/20/2004 08:59 | 10/20/2004 13:30 | Hilltop-Warner No 1 230kV line | 230.0 | L | 8.77 | 271 | Plan | Maintenance | RED | 144480 | ||
10/20/2004 11:21 | 10/20/2004 12:07 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 46 | Plan | Emergency | LGV | 144481 | ||
10/20/2004 11:51 | 10/20/2004 11:58 | Macks Inn-Madison No 1 115kV line | 115.0 | L | 17.12 | 7 | Auto | Unknown | Unknown | IDF | 144482 | |
10/20/2004 15:41 | 10/21/2004 12:09 | John Day-Big Eddy No 1 500kV line | 500.0 | L | 18.94 | 1228 | Plan | Maintenance | TDA | 144483 | ||
10/21/2004 06:39 | 10/21/2004 16:16 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 577 | Plan | Maintenance | TDA RED | 144486 | |
10/21/2004 06:39 | 10/21/2004 16:16 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 577 | Plan | Maintenance | TDA RED | 144486 | ||
10/21/2004 07:19 | 10/21/2004 14:45 | Fairview-Bandon No 2 115kV line | 115.0 | L | 19.73 | 446 | Plan | Maintenance | EUG | 144487 | ||
10/21/2004 07:28 | 10/21/2004 13:37 | North Bonneville-Troutdale No 1 230kV line | 230.0 | L | 27.74 | 369 | Plan | Maintenance | LGV | 144488 | ||
10/21/2004 07:41 | 10/21/2004 15:55 | La Grande-IPC Brownlee No 1 230kV line | 230.0 | L | 79.30 | 494 | Plan | Maintenance | TRI | 144489 | ||
10/21/2004 07:41 | 10/21/2004 15:55 | Quartz tap to La Grande-IPC Brownlee No 1 230kV line | 230.0 | T | G | 10.30 | 494 | Plan | Maintenance | TRI | 144489 | |
10/21/2004 08:14 | 10/21/2004 17:21 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 547 | Plan | Foreign Request | SNO | 144490 | ||
10/21/2004 10:42 | 10/21/2004 11:14 | Hines-Harney No 1 115kV line | 115.0 | L | 3.40 | 32 | Auto | Foreign Trouble | Foreign Trouble | RED | 144491 | |
10/22/2004 06:19 | 10/22/2004 14:40 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 501 | Plan | Construction | TDA | 144495 | ||
10/22/2004 06:19 | 10/22/2004 14:40 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 501 | Plan | Construction | TDA LGV | 144495 | |
10/22/2004 06:26 | 10/22/2004 14:45 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 499 | Plan | Foreign Request | TDA RED | 144496 | ||
10/22/2004 06:26 | 10/22/2004 14:45 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 499 | Plan | Foreign Request | TDA | 144496 | ||
10/22/2004 06:26 | 10/22/2004 14:45 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 499 | Plan | Forced | TDA | 144497 | ||
10/22/2004 07:10 | 10/22/2004 16:59 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 589 | Plan | Maintenance | TDA RED | 144498 | |
10/22/2004 07:10 | 10/22/2004 16:59 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 589 | Plan | Maintenance | TDA RED | 144498 | ||
10/22/2004 07:17 | 10/22/2004 14:40 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 443 | Plan | Construction | TDA | 144499 | ||
10/22/2004 07:18 | 10/22/2004 14:38 | Big Eddy 500/230kV Tie No 1 500kV line | 500.0 | L | 0.57 | 440 | Plan | Switching | TDA | 144500 | ||
10/22/2004 07:19 | 10/22/2004 14:39 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 440 | Plan | Construction | TDA | 144501 | ||
10/22/2004 08:25 | 10/22/2004 15:15 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 410 | Plan | Foreign Request | SNO | 144502 | ||
10/22/2004 12:40 | 10/22/2004 15:25 | Murray-Custer No 1 230kV line | 230.0 | L | 63.39 | 165 | Plan | Emergency | SNO | 144503 | ||
10/22/2004 12:40 | 10/22/2004 15:25 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | G | 25.67 | 165 | Plan | Emergency | SNO | 144503 | |
10/22/2004 12:40 | 10/22/2004 15:25 | Sedro Woolley tap to Murray-Custer No 1 230kV line | 230.0 | T | G | 0.17 | 165 | Plan | Emergency | SNO | 144503 | |
10/22/2004 12:40 | 10/22/2004 15:25 | Sedro Woolley-Custer section of Murray-Custer No 1 230kV line | 230.0 | S | G | 37.72 | 165 | Plan | Emergency | SNO | 144503 | |
10/22/2004 21:27 | 10/23/2004 08:07 | Alvey-Lane No 1 230kV line | 230.0 | L | 13.41 | 640 | Plan | Foreign Request | EUG | 144504 | ||
10/23/2004 03:03 | 10/23/2004 06:42 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 219 | Plan | Voltage Control | TDA RED SAL | 144505 | ||
10/23/2004 04:56 | 12/22/2004 12:40 | Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | L | 17.88 | 86924 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144509 | |
10/23/2004 04:56 | 12/22/2004 12:40 | Dixie tap to Anderson Ranch-Mountain Home No 1 115kV line | 115.0 | T | 0.10 | 86924 | Auto | Foreign Trouble | Foreign Trouble | IDF | 144509 | |
10/23/2004 07:08 | 10/23/2004 16:19 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 551 | Plan | Maintenance | TDA RED | 144510 | |
10/23/2004 07:08 | 10/23/2004 16:19 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 551 | Plan | Maintenance | TDA RED | 144510 | ||
10/23/2004 12:18 | 10/23/2004 12:28 | John Day PH-John Day No 1 500kV line | 500.0 | L | 3.48 | 10 | Plan | Foreign Request | TDA | 144511 | ||
10/24/2004 00:27 | 10/24/2004 08:34 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 487 | Plan | Voltage Control | SAL EUG | 144512 | ||
10/24/2004 07:11 | 10/24/2004 13:47 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 396 | Plan | Maintenance | TDA RED | 144513 | |
10/24/2004 07:11 | 10/24/2004 13:47 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 396 | Plan | Maintenance | TDA RED | 144513 | ||
10/25/2004 00:21 | 10/25/2004 05:02 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 281 | Plan | Voltage Control | TRI TDA RED SAL | 144514 | ||
10/25/2004 07:30 | 10/25/2004 14:46 | Olympia-Dayton section of Olympia-Shelton No 1 115kV line | 115.0 | S | 17.95 | 436 | Plan | Maintenance | OLY | 144521 | ||
10/25/2004 07:30 | 10/25/2004 14:46 | Olympia-Shelton No 1 115kV line | 115.0 | L | G | 19.73 | 436 | Plan | Maintenance | OLY | 144521 | |
10/25/2004 07:47 | 10/25/2004 11:49 | Maple Valley-Talbot No 2 230kV line | 230.0 | L | 0.10 | 242 | Plan | Switching | COV | 144522 | ||
10/25/2004 07:47 | 10/25/2004 11:48 | Klahanie-Maple Valley section of Sammamish-Maple Valley No 1 230kV line | 230.0 | S | 15.65 | 241 | Plan | Switching | COV | 144523 | ||
10/25/2004 07:47 | 10/25/2004 11:48 | Sammamish-Maple Valley No 1 230kV line | 230.0 | L | G | 32.03 | 241 | Plan | Switching | COV | 144523 | |
10/25/2004 07:47 | 10/25/2004 11:49 | Echo Lake-Maple Valley No 1&2 500kV line | 500.0 | L | 31.51 | 242 | Plan | Switching | COV | 144524 | ||
10/25/2004 07:48 | 10/25/2004 11:48 | Sno-King-Maple Valley No 1 230kV line | 230.0 | L | 24.84 | 240 | Plan | Switching | SNO COV | 144525 | ||
10/25/2004 08:02 | 10/29/2004 14:54 | John Day-Marion No 1 500kV line | 500.0 | L | 127.51 | 6172 | Plan | Maintenance | TDA RED SAL | 144526 | ||
10/25/2004 08:03 | 10/25/2004 08:03 | Chenoweth-Goldendale No 1 115kV line | 115.0 | L | O | 24.08 | 0 | Auto | Weather | Weather | TDA | 144527 |
10/25/2004 08:03 | 10/25/2004 08:03 | Chenoweth-Spearfish section of Chenoweth-Goldendale No 1 115kV line | 115.0 | S | 3.84 | 0 | Auto | Weather | Weather | TDA | 144527 | |
10/25/2004 08:03 | 10/25/2004 08:03 | Spearfish tap to Chenoweth-Goldendale No 1 115kV line | 115.0 | T | 3.22 | 0 | Auto | Weather | Weather | TDA | 144527 | |
10/25/2004 08:08 | 10/25/2004 12:40 | Custer-Ingledow No 1 500kV line | 500.0 | L | 22.55 | 272 | Plan | Foreign Request | SNO | 144528 | ||
10/25/2004 08:18 | 10/29/2004 09:03 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 5805 | Plan | Maintenance | TDA | 144529 | ||
10/25/2004 08:18 | 10/29/2004 09:03 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 5805 | Plan | Maintenance | TDA LGV | 144529 | |
10/25/2004 10:37 | 10/25/2004 15:25 | Midway-Benton No 2 230kV line | 230.0 | L | 29.02 | 288 | Plan | Maintenance | TRI | 144530 | ||
10/25/2004 11:34 | 10/25/2004 11:35 | Cosmopolis-Aberdeen No 1 115kV line | 115.0 | L | 6.79 | 1 | Plan | Testing | OLY | 144531 | ||
10/25/2004 12:04 | 10/25/2004 12:05 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 1 | Auto | Tree cut | Tree cut | EUG | 144532 | |
10/25/2004 12:14 | 10/25/2004 19:55 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 461 | Plan | Switching | WEN COV | 144533 | ||
10/25/2004 13:05 | 10/25/2004 19:29 | Covington-Maple Valley No 2 230kV line | 230.0 | L | 16.22 | 384 | Plan | Switching | COV | 144534 | ||
10/25/2004 13:06 | 10/25/2004 19:29 | Maple Valley-East Pine No 1 230kV line | 230.0 | L | 14.08 | 383 | Plan | Switching | COV | 144535 | ||
10/25/2004 13:06 | 10/25/2004 19:29 | Maple Valley-Talbot No 1 230kV line | 230.0 | L | 0.20 | 383 | Plan | Switching | COV | 144536 | ||
10/25/2004 13:06 | 10/25/2004 19:28 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 382 | Plan | Switching | SNO COV | 144537 | ||
10/25/2004 16:03 | 10/25/2004 17:13 | Midway-Priest Rapids No 3 230kV line | 230.0 | L | 7.20 | 70 | Auto | Foreign Trouble | Foreign Trouble | TRI | 144538 | |
10/26/2004 06:57 | 10/26/2004 13:15 | McNary PH-McNary No 2 230kV line | 230.0 | L | 1.06 | 378 | Plan | Foreign Request | TRI | 144542 | ||
10/26/2004 07:24 | 10/26/2004 14:02 | Olympia-Dayton section of Olympia-Shelton No 1 115kV line | 115.0 | S | 17.95 | 398 | Plan | Maintenance | OLY | 144543 | ||
10/26/2004 07:24 | 10/26/2004 14:02 | Olympia-Shelton No 1 115kV line | 115.0 | L | G | 19.73 | 398 | Plan | Maintenance | OLY | 144543 | |
10/26/2004 07:34 | 10/26/2004 11:49 | Snohomish-Beverly Park No 4 115kV line | 115.0 | L | 5.00 | 255 | Plan | PCS Cellular Work | SNO | 144544 | ||
10/26/2004 07:47 | 10/26/2004 13:41 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 354 | Plan | Maintenance | KAL | 144545 | ||
10/26/2004 07:56 | 10/26/2004 14:32 | Bell-Addy No 1 115kV line | 115.0 | L | G | 51.18 | 396 | Plan | Maintenance | SPK | 144546 | |
10/26/2004 07:56 | 10/26/2004 14:32 | Clayton tap to Bell-Addy No 1 115kV line | 115.0 | T | 0.10 | 396 | Plan | Maintenance | SPK | 144546 | ||
10/26/2004 07:56 | 10/26/2004 14:32 | Clayton-Loon Lake section of Bell-Addy No 1 115kV line | 115.0 | S | 6.27 | 396 | Plan | Maintenance | SPK | 144546 | ||
10/26/2004 07:56 | 10/26/2004 14:32 | Deer Park-Clayton section of Bell-Addy No 1 115kV line | 115.0 | S | 5.19 | 396 | Plan | Maintenance | SPK | 144546 | ||
10/26/2004 07:59 | 10/26/2004 16:56 | Snyder-Stevens Drive section of White Bluffs-Stevens Drive No 2 115kV line | 115.0 | S | 5.00 | 537 | Plan | Maintenance | TRI | 144547 | ||
10/26/2004 07:59 | 10/26/2004 16:56 | White Bluffs-Stevens Drive No 2 115kV line | 115.0 | L | G | 6.90 | 537 | Plan | Maintenance | TRI | 144547 | |
10/26/2004 08:04 | 10/26/2004 14:05 | McNary-B-1345 section of McNary-Badger Canyon No 1 115kV line | 115.0 | S | 2.53 | 361 | Plan | Maintenance | TRI | 144548 | ||
10/26/2004 08:04 | 10/26/2004 14:05 | McNary-Badger Canyon No 1 115kV line | 115.0 | L | G | 28.40 | 361 | Plan | Maintenance | TRI | 144548 | |
10/26/2004 08:26 | 10/26/2004 13:20 | Walla Walla-PACW Walla Walla No 1 69kV line | 69.0 | L | 1.40 | 294 | Plan | Maintenance | TRI | 144549 | ||
10/26/2004 08:40 | 10/26/2004 09:33 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 53 | Plan | Switching | TDA | 144550 | ||
10/26/2004 09:05 | 10/26/2004 16:21 | Custer-Ingledow No 2 500kV line | 500.0 | L | 22.65 | 436 | Plan | Foreign Request | SNO | 144551 | ||
10/26/2004 12:37 | 10/26/2004 17:30 | Raver-Covington No 2 500kV line | 500.0 | L | 10.33 | 293 | Plan | Switching | COV | 144552 | ||
10/26/2004 12:37 | 10/26/2004 17:31 | Covington-Creston SCL No 1 230kV line | 230.0 | L | 13.40 | 294 | Plan | Switching | COV | 144553 | ||
10/26/2004 12:37 | 10/26/2004 17:32 | Covington-White River No 1 230kV line | 230.0 | L | 9.55 | 295 | Plan | Switching | COV | 144554 | ||
10/26/2004 12:37 | 10/26/2004 17:31 | Christopher-Covington section of Tacoma-Covington No 2 230kV line | 230.0 | S | 5.85 | 294 | Plan | Switching | COV | 144555 | ||
10/26/2004 12:37 | 10/26/2004 17:31 | Tacoma-Covington No 2 230kV line | 230.0 | L | G | 15.30 | 294 | Plan | Switching | COV | 144555 | |
10/26/2004 17:39 | 10/26/2004 18:46 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | T | 103.37 | 67 | Plan | Emergency | RED | 144556 | |
10/26/2004 17:39 | 10/26/2004 18:46 | Ponderosa tap to Grizzly-Summer Lake No 1 500kV line | 500.0 | T | 0.01 | 67 | Plan | Emergency | RED | 144556 | ||
10/26/2004 18:03 | 10/26/2004 18:49 | Centralia Switching Station-TPWR Cowlitz section of Chehalis-Covington No 1 230kV line | 230.0 | S | 35.80 | 46 | Plan | Switching | OLY COV | 144557 | ||
10/26/2004 18:03 | 10/26/2004 18:49 | Chehalis-Covington No 1 230kV line | 230.0 | L | O | 69.40 | 46 | Plan | Switching | OLY COV | 144557 | |
10/26/2004 18:03 | 10/26/2004 18:45 | Cowlitz tap to Chehalis-Covington No 1 230kV line | 230.0 | T | 6.30 | 42 | Plan | Switching | COV | 144557 | ||
10/26/2004 20:33 | 10/26/2004 20:33 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 0 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144558 | |
10/27/2004 06:44 | 10/27/2004 15:23 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 519 | Plan | Switching | COV | 144563 | ||
10/27/2004 06:44 | 10/27/2004 15:24 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 520 | Plan | Switching | COV | 144564 | ||
10/27/2004 06:45 | 10/27/2004 15:47 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 542 | Plan | Switching | COV | 144565 | ||
10/27/2004 06:45 | 10/27/2004 15:23 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 518 | Plan | Switching | COV | 144566 | ||
10/27/2004 06:45 | 10/27/2004 15:25 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 520 | Plan | Switching | COV | 144567 | ||
10/27/2004 07:02 | 10/28/2004 15:34 | First Street-Stevens Drive section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 2.68 | 1952 | Plan | Maintenance | TRI | 144568 | ||
10/27/2004 07:02 | 10/28/2004 15:34 | White Bluffs-Richland No 1 115kV line | 115.0 | L | G | 11.02 | 1952 | Plan | Maintenance | TRI | 144568 | |
10/27/2004 07:08 | 10/27/2004 07:59 | Chief Joseph-Snohomish No 3 345kV line | 345.0 | L | 133.05 | 51 | Plan | Switching | WEN SNO | 144569 | ||
10/27/2004 07:40 | 10/27/2004 12:58 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 318 | Plan | Maintenance | KAL | 144570 | ||
10/27/2004 08:04 | 10/27/2004 15:15 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 431 | Plan | Maintenance | EUG | 144571 | ||
10/27/2004 08:29 | 10/27/2004 08:39 | Hilltop-Bordertown No 1 345kV line | 345.0 | L | 147.00 | 10 | Plan | Foreign Request | RED | 144572 | ||
10/27/2004 13:37 | 10/27/2004 13:56 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 19 | Plan | Foreign Request | TDA | 144573 | ||
10/28/2004 06:00 | 10/28/2004 06:00 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Unknown | RED | 144579 |
10/28/2004 06:00 | 10/28/2004 06:00 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 144579 |
10/28/2004 06:00 | 10/28/2004 06:00 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Unknown | RED | 144579 |
10/28/2004 06:00 | 10/28/2004 06:00 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Unknown | RED | 144579 |
10/28/2004 06:00 | 10/28/2004 06:00 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Unknown | RED | 144579 | |
10/28/2004 06:00 | 10/28/2004 06:00 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 144579 |
10/28/2004 06:00 | 10/28/2004 06:00 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Unknown | RED | 144579 |
10/28/2004 07:49 | 10/28/2004 14:58 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 429 | Plan | Maintenance | IDF | 144580 | ||
10/28/2004 07:58 | 10/28/2004 09:01 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 63 | Plan | Switching | TDA | 144581 | ||
10/28/2004 09:08 | 10/28/2004 11:16 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 128 | Plan | Construction | OLY | 144582 | |
10/28/2004 09:08 | 10/28/2004 11:16 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 128 | Plan | Construction | OLY | 144582 | ||
10/28/2004 09:08 | 10/28/2004 11:16 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 128 | Plan | Construction | OLY | 144582 | |
10/28/2004 09:08 | 10/28/2004 11:16 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 128 | Plan | Construction | OLY | 144582 | |
10/28/2004 11:23 | 10/28/2004 11:48 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 25 | Plan | Emergency | OLY | 144583 | |
10/28/2004 11:23 | 10/28/2004 11:48 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 25 | Plan | Emergency | OLY | 144583 | ||
10/28/2004 11:23 | 10/28/2004 11:48 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 25 | Plan | Emergency | OLY | 144583 | |
10/28/2004 11:23 | 10/28/2004 11:48 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 25 | Plan | Emergency | OLY | 144583 | |
10/28/2004 11:31 | 10/28/2004 11:33 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | G | 13.30 | 2 | Auto | Tree | Tree cut | SPK | 144584 |
10/28/2004 11:31 | 10/28/2004 11:33 | Colville-Republic No 1 115kV line | 115.0 | L | 44.47 | 2 | Auto | Tree | Tree cut | SPK | 144584 | |
10/28/2004 11:31 | 10/28/2004 11:33 | Kettle Falls-Republic section of Colville-Republic No 1 115kV line | 115.0 | S | G | 31.17 | 2 | Auto | Tree | Tree cut | SPK | 144584 |
10/28/2004 11:31 | 10/28/2004 11:33 | Colville-Boundary No 1 115kV line | 115.0 | L | O | 43.06 | 2 | Auto | Unknown | Tree cut | SPK | 144585 |
10/28/2004 11:31 | 10/28/2004 11:33 | Colville-Spirit section of Colville-Boundary No 1 115kV line | 115.0 | S | 17.42 | 2 | Auto | Unknown | Tree cut | SPK | 144585 | |
10/28/2004 11:31 | 10/28/2004 11:33 | Addy-Colville No 1 115kV line | 115.0 | L | 15.22 | 2 | Auto | Unknown | Tree cut | SPK | 144586 | |
10/28/2004 14:07 | 10/28/2004 18:45 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | 13.30 | 278 | Plan | Emergency | SPK | 144587 | ||
10/28/2004 14:07 | 10/28/2004 18:45 | Colville-Republic No 1 115kV line | 115.0 | L | G | 44.47 | 278 | Plan | Emergency | SPK | 144587 | |
10/28/2004 15:36 | 10/28/2004 15:40 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 4 | Plan | Switching | KAL | 144588 | ||
10/28/2004 15:55 | White Bluffs-Richland No 1 115kV line | 115.0 | L | G | 11.02 | still out | Plan | Normally Out | TRI | 144589 | ||
10/28/2004 15:55 | White Bluffs-Sand Hill Crane section of White Bluffs-Richland No 1 115kV line | 115.0 | S | 4.30 | still out | Plan | Normally Out | TRI | 144589 | |||
10/29/2004 06:02 | 10/29/2004 20:21 | Chief Joseph PH-Chief Joseph No 6 500kV line | 500.0 | L | 0.74 | 859 | Plan | Foreign Request | WEN | 144593 | ||
10/29/2004 07:46 | 10/29/2004 10:59 | Chief Joseph-Snohomish No 3 345kV line | 345.0 | L | 133.05 | 193 | Plan | Switching | WEN SNO | 144594 | ||
10/29/2004 10:02 | 10/29/2004 13:48 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | 13.30 | 226 | Plan | Maintenance | SPK | 144595 | ||
10/29/2004 10:02 | 10/29/2004 13:48 | Colville-Republic No 1 115kV line | 115.0 | L | G | 44.47 | 226 | Plan | Maintenance | SPK | 144595 | |
10/29/2004 10:03 | 10/29/2004 13:06 | Custer-Ingledow No 2 500kV line | 500.0 | L | 22.65 | 183 | Plan | Maintenance | SNO | 144596 | ||
10/29/2004 10:51 | 10/29/2004 10:53 | Chemawa-Read section of Chemawa-Salem Alumina No 1 115kV line | 115.0 | S | G | 2.60 | 2 | Auto | Unknown | Unknown | SAL | 144597 |
10/29/2004 10:51 | 10/29/2004 10:53 | Chemawa-Salem Alumina No 1 115kV line | 115.0 | L | 3.30 | 2 | Auto | Unknown | Unknown | SAL | 144597 | |
10/29/2004 10:51 | 10/29/2004 10:53 | Read tap to Chemawa-Salem Alumina No 1 115kV line | 115.0 | T | G | 1.00 | 2 | Auto | Unknown | Unknown | SAL | 144597 |
10/29/2004 10:51 | 10/29/2004 10:53 | Read-University section of Chemawa-Salem Alumina No 1 115kV line | 115.0 | S | G | 0.52 | 2 | Auto | Unknown | Unknown | SAL | 144597 |
10/29/2004 10:51 | 10/29/2004 10:53 | University-Salem Alumina section of Chemawa-Salem Alumina No 1 115kV line | 115.0 | S | G | 0.17 | 2 | Auto | Unknown | Unknown | SAL | 144597 |
10/29/2004 14:17 | 11/01/2004 13:51 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 4354 | Plan | Maintenance | WEN SPK | 144598 | |
10/29/2004 14:17 | 11/01/2004 13:51 | Springhill-Bell section of Creston-Bell No 1 115kV line | 115.0 | S | 9.92 | 4354 | Plan | Maintenance | SPK | 144598 | ||
10/29/2004 16:05 | 10/29/2004 16:26 | Hilltop-Bordertown No 1 345kV line | 345.0 | L | 147.00 | 21 | Plan | Foreign Request | RED | 144599 | ||
10/29/2004 19:59 | 10/29/2004 19:59 | Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line | 115.0 | S | G | 4.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 144600 |
10/29/2004 19:59 | 10/29/2004 19:59 | Naselle-Hagen section of Naselle-Tarlett No 2 115kV line | 115.0 | S | G | 13.00 | 0 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 144600 |
10/29/2004 19:59 | 10/29/2004 19:59 | Naselle-Tarlett No 2 115kV line | 115.0 | L | 17.30 | 0 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 144600 | |
10/29/2004 22:48 | 10/29/2004 22:48 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 29.39 | 0 | Auto | Unknown | Unknown | TDA | 144601 |
10/29/2004 22:48 | 10/29/2004 22:48 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | 97.46 | 0 | Auto | Unknown | Unknown | TDA RED | 144601 | |
10/29/2004 22:48 | 10/29/2004 22:48 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | G | 68.07 | 0 | Auto | Unknown | Unknown | TDA RED | 144601 |
10/29/2004 23:06 | 10/30/2004 02:35 | Canal-East Hills section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 6.42 | 209 | Plan | Switching | IDF | 144602 | ||
10/29/2004 23:06 | 10/30/2004 02:35 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | G | 24.91 | 209 | Plan | Switching | IDF | 144602 | |
10/30/2004 00:01 | 10/30/2004 02:02 | East Hills tap to Minidoka PH-Unity No 1 138kV line | 138.0 | T | 0.10 | 121 | Plan | Maintenance | IDF | 144603 | ||
10/30/2004 00:01 | 10/30/2004 02:02 | East Hills-Unity section of Minidoka PH-Unity No 1 138kV line | 138.0 | S | 5.97 | 121 | Plan | Maintenance | IDF | 144603 | ||
10/30/2004 00:01 | 10/30/2004 02:02 | Minidoka PH-Unity No 1 138kV line | 138.0 | L | O | 24.91 | 121 | Plan | Maintenance | IDF | 144603 | |
10/30/2004 03:01 | 10/30/2004 06:52 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 231 | Plan | Voltage Control | SAL EUG | 144604 | ||
10/30/2004 06:34 | 10/30/2004 06:34 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144606 | |
10/30/2004 06:34 | 10/30/2004 06:34 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144606 | |
10/30/2004 06:34 | 10/30/2004 06:34 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144606 | ||
10/31/2004 01:19 | 10/31/2004 05:56 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 337 | Plan | Voltage Control | SAL EUG | 144607 | ||
11/01/2004 04:20 | 11/01/2004 04:20 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144608 | |
11/01/2004 04:20 | 11/01/2004 04:20 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144608 | |
11/01/2004 04:20 | 11/01/2004 04:20 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144608 | ||
11/01/2004 06:01 | 11/04/2004 16:22 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 4941 | Plan | Foreign Request | WEN TRI | 144613 | ||
11/01/2004 07:06 | 11/01/2004 17:52 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 646 | Plan | Maintenance | WEN COV | 144614 | ||
11/01/2004 07:25 | 11/01/2004 14:36 | Lexington-Cardwell No 1 115kV line | 115.0 | L | G | 11.60 | 431 | Plan | Foreign Request | LGV OLY | 144615 | |
11/01/2004 07:25 | 11/01/2004 14:36 | South Kelso-Carrolls section of Lexington-Cardwell No 1 115kV line | 115.0 | S | 3.50 | 431 | Plan | Foreign Request | OLY | 144615 | ||
11/01/2004 07:36 | 11/05/2004 14:45 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 6189 | Plan | Maintenance | TDA | 144616 | ||
11/01/2004 08:14 | 11/01/2004 17:26 | Covington-Maple Valley No 2 230kV line | 230.0 | L | 16.22 | 552 | Plan | Switching | COV | 144617 | ||
11/01/2004 08:15 | 11/01/2004 17:45 | Maple Valley-East Pine No 1 230kV line | 230.0 | L | 14.08 | 570 | Plan | Switching | COV | 144618 | ||
11/01/2004 08:15 | 11/01/2004 17:26 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 551 | Plan | Switching | SNO COV | 144619 | ||
11/01/2004 08:15 | 11/01/2004 17:26 | Maple Valley-Talbot No 1 230kV line | 230.0 | L | 0.20 | 551 | Plan | Switching | COV | 144620 | ||
11/01/2004 08:17 | 11/05/2004 16:18 | John Day-Grizzly No 2 500kV line | 500.0 | L | 88.59 | 6241 | Plan | Maintenance | TDA RED | 144621 | ||
11/01/2004 08:27 | 11/01/2004 14:38 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 371 | Plan | Maintenance | EUG | 144622 | |
11/01/2004 08:27 | 11/01/2004 14:38 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 371 | Plan | Maintenance | EUG | 144622 | ||
11/01/2004 10:42 | 11/01/2004 17:20 | Fidalgo-Lopez Island No 5 69kV line | 69.0 | L | 8.49 | 398 | Plan | Forced | SNO | 144623 | ||
11/01/2004 11:07 | 11/03/2004 21:19 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 3492 | Plan | Foreign Request | OLY | 144624 | ||
11/01/2004 11:07 | 11/03/2004 21:19 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 3492 | Plan | Foreign Request | OLY | 144624 | |
11/01/2004 12:38 | 11/02/2004 14:32 | Benton-Scooteney No 1 115kV line | 115.0 | L | T | 20.32 | 1554 | Plan | Maintenance | TRI | 144625 | |
11/01/2004 12:38 | 11/02/2004 14:32 | Hatton tap to Connell tap to Benton-Scooteney No 1 115kV line | 115.0 | TT | 15.35 | 1554 | Plan | Maintenance | TRI | 144625 | ||
11/01/2004 12:38 | 11/02/2004 14:32 | Shano tap to Connell tap to Benton-Scooteney No 1 115kV line | 115.0 | TT | 3.10 | 1554 | Plan | Maintenance | TRI | 144625 | ||
11/01/2004 14:42 | 11/05/2004 14:01 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 5719 | Plan | Maintenance | WEN SPK | 144626 | |
11/01/2004 14:42 | 11/05/2004 14:01 | Larene-Springhill section of Creston-Bell No 1 115kV line | 115.0 | S | 27.16 | 5719 | Plan | Maintenance | SPK | 144626 | ||
11/02/2004 02:02 | 11/02/2004 02:02 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 31.20 | 0 | Auto | Unknown | Unknown | RED | 144627 |
11/02/2004 02:02 | 11/02/2004 02:02 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Unknown | RED | 144627 |
11/02/2004 02:02 | 11/02/2004 02:02 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 144627 |
11/02/2004 02:02 | 11/02/2004 02:02 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Unknown | RED | 144627 |
11/02/2004 02:02 | 11/02/2004 02:02 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Unknown | RED | 144627 |
11/02/2004 02:02 | 11/02/2004 02:02 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Unknown | RED | 144627 | |
11/02/2004 02:02 | 11/02/2004 02:02 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 144627 |
11/02/2004 02:02 | 11/02/2004 02:02 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Unknown | RED | 144627 |
11/02/2004 03:07 | 11/02/2004 13:55 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 31.20 | 648 | Auto | Foreign Trouble | RED | 144633 | ||
11/02/2004 03:07 | 11/02/2004 13:55 | Redmond-Harney No 1 115kV line | 115.0 | L | T | 125.40 | 648 | Auto | Foreign Trouble | RED | 144633 | |
11/02/2004 07:01 | 11/03/2004 12:15 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 1754 | Plan | Maintenance | COV | 144634 | ||
11/02/2004 07:32 | 11/02/2004 15:36 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 484 | Plan | Construction | LGV | 144635 | ||
11/02/2004 08:04 | 11/02/2004 17:41 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 577 | Plan | Construction | COV | 144636 | ||
11/02/2004 08:07 | 11/02/2004 14:28 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 381 | Plan | Maintenance | EUG | 144637 | |
11/02/2004 08:07 | 11/02/2004 14:28 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 381 | Plan | Maintenance | EUG | 144637 | ||
11/02/2004 08:17 | 11/02/2004 18:29 | Bell-AVA Beacon No 1 115kV line | 115.0 | L | 6.60 | 612 | Plan | Foreign Request | SPK | 144638 | ||
11/02/2004 08:24 | 11/02/2004 12:07 | Ashe-White Bluffs No 1 230kV line | 230.0 | L | 9.52 | 223 | Plan | Maintenance | TRI | 144639 | ||
11/02/2004 08:28 | 11/02/2004 17:42 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 554 | Plan | Construction | COV | 144640 | ||
11/02/2004 08:28 | 11/02/2004 17:44 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 556 | Plan | Construction | COV | 144641 | ||
11/02/2004 08:29 | 11/02/2004 17:39 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 550 | Plan | Construction | COV | 144642 | ||
11/02/2004 11:23 | 11/02/2004 11:58 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 35 | Plan | Foreign Request | OLY | 144643 | ||
11/02/2004 11:23 | 11/02/2004 11:58 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 35 | Plan | Foreign Request | OLY | 144643 | |
11/02/2004 13:25 | 11/02/2004 14:10 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 45 | Plan | Foreign Request | OLY | 144644 | ||
11/02/2004 13:25 | 11/02/2004 14:10 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 45 | Plan | Foreign Request | OLY | 144644 | |
11/02/2004 16:51 | 11/02/2004 17:03 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 12 | Auto | Foreign Trouble | Foreign Trouble | TDA | 144645 | |
11/02/2004 19:19 | 11/02/2004 19:19 | Albeni Falls-Sand Creek No 1 115kV line | 115.0 | L | G | 29.67 | 0 | Auto | Unknown | Unknown | SPK | 144646 |
11/02/2004 19:19 | 11/02/2004 19:19 | Sandpoint-Sand Creek section of Albeni Falls-Sand Creek No 1 115kV line | 115.0 | S | 7.26 | 0 | Auto | Unknown | Unknown | SPK | 144646 | |
11/02/2004 21:02 | 11/05/2004 11:33 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 3751 | Plan | Switching | TDA | 144647 | ||
11/02/2004 21:02 | 11/05/2004 11:33 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 3751 | Plan | Foreign Request | TDA RED | 144648 | ||
11/02/2004 21:02 | 11/05/2004 11:33 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 3751 | Plan | Foreign Request | TDA | 144648 | |||
11/03/2004 06:00 | 11/03/2004 16:59 | Chief Joseph-Monroe No 1 500kV line | 500.0 | L | 121.60 | 659 | Plan | Maintenance | WEN SNO | 144649 | ||
11/03/2004 06:29 | 11/03/2004 06:39 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 10 | Plan | Foreign Request | TDA | 144650 | ||
11/03/2004 07:00 | 11/03/2004 16:42 | Lower Monumental-McNary No 1 500kV line | 500.0 | L | 64.75 | 582 | Plan | Maintenance | TRI | 144651 | ||
11/03/2004 07:00 | 11/03/2004 16:42 | Lower Monumental-Sacajawea section of Lower Monumental-McNary No 1 500kV line | 500.0 | S | G | 26.64 | 582 | Plan | Maintenance | TRI | 144651 | |
11/03/2004 07:00 | 11/03/2004 16:42 | Sacajawea tap to Lower Monumental-McNary No 1 500kV line | 500.0 | T | G | 6.07 | 582 | Plan | Maintenance | TRI | 144651 | |
11/03/2004 07:00 | 11/03/2004 16:42 | Sacajawea-McNary section of Lower Monumental-McNary No 1 500kV line | 500.0 | S | G | 38.11 | 582 | Plan | Maintenance | TRI | 144651 | |
11/03/2004 07:32 | 11/03/2004 15:20 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 468 | Plan | Maintenance | LGV | 144652 | ||
11/03/2004 07:53 | 11/04/2004 15:03 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 1870 | Plan | Maintenance | EUG | 144653 | ||
11/03/2004 08:09 | 11/16/2004 13:35 | Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line | 115.0 | T | G | 14.58 | 19046 | Plan | Maintenance | OLY | 144654 | |
11/03/2004 08:09 | 11/16/2004 13:35 | Aberdeen tap-Cosmopolis section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | G | 9.22 | 19046 | Plan | Maintenance | OLY | 144654 | |
11/03/2004 08:09 | 11/16/2004 13:35 | Satsop Park-Aberdeen tap section of Satsop Park-Cosmopolis No 1 115kV line | 115.0 | S | G | 6.10 | 19046 | Plan | Maintenance | OLY | 144654 | |
11/03/2004 08:09 | 11/16/2004 13:35 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | 15.32 | 19046 | Plan | Maintenance | OLY | 144654 | ||
11/03/2004 08:09 | 11/03/2004 14:54 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 405 | Plan | Maintenance | EUG | 144655 | |
11/03/2004 08:09 | 11/03/2004 14:54 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 405 | Plan | Maintenance | EUG | 144655 | ||
11/03/2004 08:16 | 11/03/2004 11:58 | Broadview-Garrison No 2 500kV line | 500.0 | L | 224.71 | 222 | Plan | Maintenance | KAL | 144656 | ||
11/03/2004 09:09 | 11/03/2004 10:07 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | 13.30 | 58 | Plan | Maintenance | SPK | 144657 | ||
11/03/2004 09:09 | 11/03/2004 10:07 | Colville-Republic No 1 115kV line | 115.0 | L | G | 44.47 | 58 | Plan | Maintenance | SPK | 144657 | |
11/03/2004 09:11 | 11/03/2004 09:50 | Swan Valley-Teton No 1 115kV line | 115.0 | L | T | 35.47 | 39 | Plan | Switching | IDF | 144658 | |
11/03/2004 09:11 | 11/03/2004 09:50 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | 10.94 | 39 | Plan | Switching | IDF | 144658 | ||
11/03/2004 09:13 | 11/03/2004 09:43 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 30 | Plan | Switching | IDF | 144659 | ||
11/03/2004 09:13 | 11/03/2004 09:43 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 30 | Plan | Switching | IDF | 144659 | |
11/03/2004 09:13 | 11/03/2004 13:52 | Swan Valley-Teton No 1 115kV line | 115.0 | L | O | 35.47 | 279 | Plan | Maintenance | IDF | 144660 | |
11/03/2004 09:13 | 11/03/2004 13:52 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.99 | 279 | Plan | Maintenance | IDF | 144660 | ||
11/03/2004 13:24 | 11/03/2004 13:26 | Fairmount-Happy Valley section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 11.60 | 2 | Plan | Switching | OLY | 144661 | |
11/03/2004 13:24 | 11/03/2004 13:26 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | 26.79 | 2 | Plan | Switching | OLY | 144661 | ||
11/03/2004 13:24 | 11/03/2004 13:26 | Happy Valley tap to Fairmount-Port Angeles No 2 230kV line | 230.0 | T | G | 0.10 | 2 | Plan | Switching | OLY | 144661 | |
11/03/2004 13:24 | 11/03/2004 13:26 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | G | 15.19 | 2 | Plan | Switching | OLY | 144661 | |
11/03/2004 13:35 | 11/03/2004 13:44 | Chief Joseph PH-Chief Joseph No 6 500kV line | 500.0 | L | 0.74 | 9 | Auto | Foreign Trouble | Foreign Trouble | WEN | 144662 | |
11/03/2004 13:39 | 11/03/2004 13:51 | The Dalles PH-Big Eddy No 6 230kV line | 230.0 | L | 0.95 | 12 | Plan | Foreign Request | TDA | 144663 | ||
11/03/2004 14:33 | 11/04/2004 17:33 | Ostrander-McLoughlin No 1 230kV line | 230.0 | L | 8.82 | 1620 | Plan | Emergency | LGV | 144664 | ||
11/03/2004 19:02 | 11/04/2004 04:47 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 585 | Plan | Testing | KAL | 144665 | ||
11/04/2004 06:01 | 11/04/2004 17:01 | Chief Joseph-Monroe No 1 500kV line | 500.0 | L | 121.60 | 660 | Plan | Maintenance | WEN SNO | 144666 | ||
11/04/2004 07:38 | 11/04/2004 17:23 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 585 | Plan | Maintenance | LGV | 144667 | ||
11/04/2004 08:18 | 11/04/2004 14:47 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 389 | Plan | Maintenance | EUG | 144668 | |
11/04/2004 08:18 | 11/04/2004 14:47 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 389 | Plan | Maintenance | EUG | 144668 | ||
11/04/2004 09:10 | 11/04/2004 11:12 | Hines-Harney No 1 115kV line | 115.0 | L | 3.40 | 122 | Plan | Foreign Request | RED | 144669 | ||
11/04/2004 09:22 | 11/04/2004 13:46 | Keeler-Tillamook No 1 115kV line | 115.0 | L | G | 57.81 | 264 | Plan | Maintenance | SAL | 144670 | |
11/04/2004 09:22 | 11/04/2004 13:46 | Timber-South Fork section of Keeler-Tillamook No 1 115kV line | 115.0 | S | 12.20 | 264 | Plan | Maintenance | SAL | 144670 | ||
11/05/2004 01:46 | 11/05/2004 01:46 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144671 | |
11/05/2004 01:46 | 11/05/2004 01:46 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144671 | |
11/05/2004 01:46 | 11/05/2004 01:46 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144671 | ||
11/05/2004 01:49 | 11/05/2004 01:53 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 4 | Auto | Foreign Trouble | RED | 144672 | |
11/05/2004 01:49 | 11/05/2004 01:53 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 4 | Auto | Foreign Trouble | IDF RED | 144672 | |
11/05/2004 01:49 | 11/05/2004 01:53 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 4 | Auto | Foreign Trouble | IDF RED | 144672 | ||
11/05/2004 06:00 | 11/05/2004 17:49 | Chief Joseph-Monroe No 1 500kV line | 500.0 | L | 121.60 | 709 | Plan | Maintenance | WEN SNO | 144674 | ||
11/05/2004 07:31 | 11/05/2004 16:33 | Longview-Cowlitz No 1 115kV line | 115.0 | L | 3.61 | 542 | Plan | Maintenance | LGV | 144675 | ||
11/05/2004 07:58 | 11/05/2004 20:30 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 752 | Plan | Maintenance | TDA RED | 144676 | |
11/05/2004 07:58 | 11/05/2004 20:30 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 752 | Plan | Maintenance | TDA | 144676 | |||
11/05/2004 08:00 | 11/05/2004 14:19 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 379 | Plan | Maintenance | EUG | 144677 | |
11/05/2004 08:00 | 11/05/2004 14:19 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 379 | Plan | Maintenance | EUG | 144677 | ||
11/05/2004 08:10 | 11/05/2004 14:43 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 393 | Plan | Maintenance | EUG | 144678 | |
11/05/2004 08:10 | 11/05/2004 14:43 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 393 | Plan | Maintenance | EUG | 144678 | ||
11/05/2004 08:25 | 11/05/2004 16:41 | Malin-Round Mountain No 1 500kV line | 500.0 | L | 94.50 | 496 | Plan | Foreign Request | RED | 144679 | ||
11/05/2004 11:29 | 11/05/2004 18:37 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 428 | Plan | Switching | TDA | 144680 | ||
11/05/2004 11:33 | 11/05/2004 19:05 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 452 | Plan | Foreign Request | TDA RED | 144681 | ||
11/05/2004 11:33 | 11/05/2004 19:05 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 452 | Plan | Testing | TDA RED | 144682 | |
11/05/2004 11:33 | 11/05/2004 19:05 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 452 | Plan | Testing | TDA | 144682 | |||
11/05/2004 11:33 | 11/05/2004 20:30 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 537 | Plan | Maintenance | TDA RED | 144683 | |
11/05/2004 11:33 | 11/05/2004 20:30 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 537 | Plan | Maintenance | TDA | 144683 | |||
11/05/2004 11:33 | 11/05/2004 20:30 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 537 | Plan | Maintenance | TDA | 144683 | |||
11/05/2004 11:33 | 11/05/2004 20:30 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 537 | Plan | Maintenance | TDA | 144683 | |||
11/05/2004 15:42 | 11/05/2004 17:06 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 84 | Plan | Switching | TDA | 144684 | ||
11/05/2004 18:24 | 11/11/2004 05:20 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 7856 | Plan | Switching | TDA | 144685 | ||
11/05/2004 18:37 | 11/11/2004 05:22 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 7845 | Plan | Forced | TDA RED | 144733 | ||
11/05/2004 18:37 | 11/11/2004 05:22 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 7845 | Plan | Forced | TDA | 144733 | |||
11/05/2004 18:37 | 11/11/2004 05:22 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 7845 | Plan | Forced | TDA | 144733 | |||
11/05/2004 18:37 | 11/11/2004 05:22 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 7845 | Plan | Forced | TDA | 144733 | |||
11/05/2004 18:37 | 11/11/2004 05:22 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 7845 | Plan | Forced | TDA | 144733 | |||
11/05/2004 18:37 | 11/11/2004 05:22 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 7845 | Plan | Forced | TDA | 144733 | |||
11/05/2004 22:12 | 11/05/2004 22:44 | Palisades-Goshen No 1 115kV line | 115.0 | L | 51.71 | 32 | Auto | Unknown | Unknown | IDF | 144687 | |
11/06/2004 14:25 | 11/06/2004 15:58 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 93 | Auto | Equipment/Miscellaneous | TDA RED | 144690 | |
11/06/2004 14:25 | 11/06/2004 15:58 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 93 | Auto | Equipment/Miscellaneous | TDA | 144690 | |||
11/06/2004 14:25 | 11/06/2004 15:58 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 93 | Auto | Equipment/Miscellaneous | TDA | 144690 | |||
11/06/2004 14:25 | 11/06/2004 15:58 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 93 | Auto | Equipment/Miscellaneous | TDA | 144690 | |||
11/06/2004 14:25 | 11/06/2004 15:58 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 93 | Auto | Equipment/Miscellaneous | TDA | 144690 | |||
11/07/2004 00:24 | 11/07/2004 07:28 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 424 | Plan | Voltage Control | SAL EUG | 144691 | ||
11/07/2004 08:48 | 11/07/2004 08:48 | Ashe-Slatt No 1 500kV line | 500.0 | L | 72.24 | 0 | Auto | Unknown | Unknown | TRI TDA | 144693 | |
11/08/2004 00:50 | 11/08/2004 00:50 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144694 | |
11/08/2004 00:50 | 11/08/2004 00:50 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144694 | |
11/08/2004 00:50 | 11/08/2004 00:50 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144694 | ||
11/08/2004 04:01 | 11/08/2004 17:06 | Covington-Maple Valley No 2 230kV line | 230.0 | L | 16.22 | 785 | Plan | Maintenance | COV | 144695 | ||
11/08/2004 04:30 | 11/08/2004 11:55 | Maple Valley-East Pine No 1 230kV line | 230.0 | L | 14.08 | 445 | Plan | Switching | COV | 144696 | ||
11/08/2004 04:53 | 11/08/2004 11:54 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 421 | Plan | Switching | SNO COV | 144697 | ||
11/08/2004 04:53 | 11/08/2004 11:54 | Maple Valley-Talbot No 1 230kV line | 230.0 | L | 0.20 | 421 | Plan | Switching | COV | 144698 | ||
11/08/2004 04:53 | 11/08/2004 11:55 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 422 | Plan | Switching | WEN COV | 144699 | ||
11/08/2004 06:00 | 11/08/2004 19:08 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 788 | Plan | Maintenance | WEN SNO | 144703 | ||
11/08/2004 06:32 | 11/08/2004 16:18 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 586 | Plan | Maintenance | TDA | 144704 | ||
11/08/2004 06:33 | 11/08/2004 07:55 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 82 | Plan | Foreign Request | TDA | 144705 | ||
11/08/2004 06:34 | 11/08/2004 15:32 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 538 | Plan | Switching | TDA | 144706 | ||
11/08/2004 07:21 | 11/08/2004 15:20 | Big Eddy 500/230kV Tie No 1 500kV line | 500.0 | L | 0.57 | 479 | Plan | Switching | TDA | 144707 | ||
11/08/2004 07:21 | 11/08/2004 15:21 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 480 | Plan | Maintenance | TDA | 144708 | ||
11/08/2004 07:21 | 11/08/2004 15:21 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 480 | Plan | Maintenance | TDA LGV | 144708 | |
11/08/2004 07:21 | 11/08/2004 15:21 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 480 | Plan | Maintenance | TDA | 144709 | ||
11/08/2004 07:40 | 11/08/2004 16:19 | Longview-Allston No 2 230kV line | 230.0 | L | 4.87 | 519 | Plan | Maintenance | LGV | 144710 | ||
11/08/2004 12:30 | 11/17/2004 22:01 | Sickler-Douglas Switchyard No 1 230kV line | 230.0 | L | 0.58 | 13531 | Plan | Maintenance | WEN | 144711 | ||
11/08/2004 14:34 | 11/08/2004 17:07 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 153 | Plan | Emergency | RED | 144712 | ||
11/08/2004 17:49 | 11/08/2004 17:56 | Chief Joseph PH-Chief Joseph No 3 230kV line | 230.0 | L | 0.95 | 7 | Auto | Forced (Configuration) | Forced (Configuration) | WEN | 144713 | |
11/08/2004 17:49 | 11/08/2004 17:51 | Grand Coulee-Chief Joseph No 1 230kV line | 230.0 | L | 32.73 | 2 | Auto | Forced (Configuration) | Forced (Configuration) | WEN | 144714 | |
11/08/2004 17:49 | 11/08/2004 17:56 | Chief Joseph PH-Chief Joseph No 4 230kV line | 230.0 | L | 0.90 | 7 | Auto | Forced (Configuration) | Forced (Configuration) | WEN | 144715 | |
11/09/2004 06:01 | 11/09/2004 17:58 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 717 | Plan | Maintenance | WEN SNO | 144716 | ||
11/09/2004 07:16 | 11/09/2004 12:53 | Bonneville PH 1-Hood River No 1 115kV line | 115.0 | L | G | 22.61 | 337 | Plan | Maintenance | LGV TDA | 144718 | |
11/09/2004 07:16 | 11/09/2004 12:53 | Cascade Locks-Hood River section of Bonneville PH 1-Hood River No 1 115kV line | 115.0 | S | 16.64 | 337 | Plan | Maintenance | TDA | 144718 | ||
11/09/2004 07:28 | 11/09/2004 18:40 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 672 | Plan | Switching | COV | 144719 | ||
11/09/2004 07:34 | 11/09/2004 19:11 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 697 | Plan | Switching | COV | 144720 | ||
11/09/2004 07:42 | 11/09/2004 16:54 | Carmen Smith tap to Cougar-Thurston No 1 115kV line | 115.0 | T | 18.00 | 552 | Plan | Maintenance | EUG | 144721 | ||
11/09/2004 07:42 | 11/09/2004 16:54 | Carmen Smith-Blue River section of Cougar-Thurston No 1 115kV line | 115.0 | S | 3.63 | 552 | Plan | Maintenance | EUG | 144721 | ||
11/09/2004 07:42 | 11/09/2004 16:54 | Cougar-Carmen Smith section of Cougar-Thurston No 1 115kV line | 115.0 | S | 2.12 | 552 | Plan | Maintenance | EUG | 144721 | ||
11/09/2004 07:42 | 11/09/2004 16:54 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 552 | Plan | Maintenance | EUG | 144721 | |
11/09/2004 07:50 | 11/09/2004 14:24 | Tahkenitch-Reedsport No 1 115kV line | 115.0 | L | 4.38 | 394 | Plan | Maintenance | EUG | 144722 | ||
11/09/2004 08:06 | 11/09/2004 18:40 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 634 | Plan | Switching | COV | 144723 | ||
11/09/2004 08:06 | 11/09/2004 18:42 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 636 | Plan | Switching | COV | 144724 | ||
11/09/2004 08:07 | 11/09/2004 18:39 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 632 | Plan | Switching | COV | 144725 | ||
11/09/2004 08:09 | 11/09/2004 14:45 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 396 | Plan | Maintenance | EUG | 144726 | |
11/09/2004 08:09 | 11/09/2004 14:45 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 396 | Plan | Maintenance | EUG | 144726 | ||
11/09/2004 14:03 | 11/09/2004 14:27 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 24 | Auto | Equipment/Miscellaneous | Equipment/Miscellaneous | TDA | 144727 | |
11/09/2004 14:03 | 11/09/2004 14:27 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 24 | Auto | Equipment/Miscellaneous | TDA RED | 144728 | |
11/09/2004 14:03 | 11/09/2004 14:27 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 24 | Auto | Equipment/Miscellaneous | TDA | 144728 | |||
11/10/2004 06:08 | 11/10/2004 17:40 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 692 | Plan | Maintenance | WEN SNO | 144734 | ||
11/10/2004 06:30 | 11/10/2004 13:27 | McNary PH-McNary 3&4 No 3 230kV line | 230.0 | L | 1.18 | 417 | Plan | Foreign Request | TRI | 144735 | ||
11/10/2004 07:05 | 11/10/2004 15:18 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 493 | Plan | Switching | TDA | 144736 | ||
11/10/2004 07:14 | 11/10/2004 15:07 | The Dalles PH-Big Eddy No 3 230kV line | 230.0 | L | 0.84 | 473 | Plan | Maintenance | TDA | 144737 | ||
11/10/2004 08:08 | 11/10/2004 14:34 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 386 | Plan | Maintenance | EUG | 144738 | |
11/10/2004 08:08 | 11/10/2004 14:34 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 386 | Plan | Maintenance | EUG | 144738 | ||
11/10/2004 08:17 | 11/10/2004 15:02 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 405 | Plan | Maintenance | TDA | 144739 | ||
11/10/2004 08:17 | 11/10/2004 15:02 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 405 | Plan | Maintenance | TDA LGV | 144739 | |
11/10/2004 08:17 | 11/10/2004 15:02 | Big Eddy-Chenoweth No 2 230kV line | 230.0 | L | 6.52 | 405 | Plan | Maintenance | TDA | 144740 | ||
11/10/2004 08:18 | 11/10/2004 15:01 | Big Eddy 500/230kV Tie No 1 500kV line | 500.0 | L | 0.57 | 403 | Plan | Switching | TDA | 144741 | ||
11/10/2004 09:08 | 11/10/2004 09:19 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 11 | Plan | Foreign Request | OLY | 144742 | ||
11/10/2004 09:08 | 11/10/2004 09:19 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 11 | Plan | Foreign Request | OLY | 144742 | |
11/10/2004 12:56 | 11/10/2004 13:08 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 12 | Plan | Foreign Request | OLY | 144743 | ||
11/10/2004 12:56 | 11/10/2004 13:08 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 12 | Plan | Foreign Request | OLY | 144743 | |
11/11/2004 01:23 | 11/11/2004 01:23 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Foreign Trouble | TDA RED | 144744 | ||
11/11/2004 01:23 | 11/11/2004 01:23 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144744 | ||
11/11/2004 01:23 | 11/11/2004 01:23 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144744 | ||
11/11/2004 01:23 | 11/11/2004 01:23 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144744 | ||
11/11/2004 01:23 | 11/11/2004 01:23 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144744 | ||
11/11/2004 01:23 | 11/11/2004 01:23 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Foreign Trouble | TDA | 144744 | ||
11/11/2004 05:04 | 11/13/2004 01:23 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 2659 | Plan | Foreign Request | TDA RED | 144745 | ||
11/11/2004 05:04 | 11/13/2004 01:23 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2659 | Plan | Foreign Request | TDA | 144745 | ||
11/11/2004 05:04 | 11/13/2004 01:23 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2659 | Plan | Foreign Request | TDA | 144745 | ||
11/11/2004 05:04 | 11/13/2004 01:23 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2659 | Plan | Foreign Request | TDA | 144745 | ||
11/11/2004 05:04 | 11/13/2004 01:23 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2659 | Plan | Foreign Request | TDA | 144745 | ||
11/11/2004 05:04 | 11/13/2004 01:23 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 2659 | Plan | Foreign Request | TDA | 144745 | ||
11/11/2004 05:06 | 11/13/2004 01:23 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 2657 | Plan | Switching | TDA | 144746 | ||
11/11/2004 06:37 | 11/11/2004 06:48 | McNary PH-McNary No 5 230kV line | 230.0 | L | 1.28 | 11 | Plan | Foreign Request | TRI | 144747 | ||
11/12/2004 06:00 | 11/12/2004 14:48 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 528 | Plan | Maintenance | WEN SNO | 144749 | ||
11/12/2004 06:56 | 11/12/2004 06:56 | Pearl-Sherwood No 1&2 230kV line | 230.0 | L | 9.67 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 144750 | |
11/12/2004 07:47 | 11/12/2004 13:48 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 361 | Plan | Maintenance | EUG | 144751 | ||
11/12/2004 07:57 | 11/12/2004 14:56 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 419 | Plan | Maintenance | OLY LGV | 144752 | |
11/12/2004 07:57 | 11/12/2004 14:56 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 419 | Plan | Maintenance | OLY LGV | 144752 | ||
11/12/2004 08:23 | 11/12/2004 13:14 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 291 | Plan | Maintenance | TDA RED | 144753 | |
11/12/2004 08:23 | 11/12/2004 13:14 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 291 | Plan | Maintenance | TDA | 144753 | |||
11/12/2004 08:25 | 11/12/2004 20:20 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 715 | Plan | Switching | TDA | 144754 | ||
11/12/2004 08:25 | 11/12/2004 20:20 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 715 | Plan | Switching | TDA | 144755 | ||
11/13/2004 01:18 | 11/13/2004 21:12 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 1194 | Plan | Switching | TDA | 144756 | ||
11/13/2004 01:18 | 11/13/2004 21:16 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 1198 | Plan | Foreign Request | TDA RED | 144762 | ||
11/13/2004 01:18 | 11/13/2004 21:16 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1198 | Plan | Foreign Request | TDA | 144762 | ||
11/13/2004 01:18 | 11/13/2004 21:16 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1198 | Plan | Foreign Request | TDA | 144762 | ||
11/13/2004 01:18 | 11/13/2004 21:16 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1198 | Plan | Foreign Request | TDA | 144762 | ||
11/13/2004 01:18 | 11/13/2004 21:16 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1198 | Plan | Foreign Request | TDA | 144762 | ||
11/13/2004 01:18 | 11/13/2004 21:16 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 1198 | Plan | Foreign Request | TDA | 144762 | ||
11/13/2004 05:30 | 11/13/2004 05:35 | Broadview-Garrison No 1 500kV line | 500.0 | L | 224.71 | 5 | Auto | Foreign Trouble | Foreign Trouble | KAL | 144757 | |
11/13/2004 19:30 | 11/13/2004 21:56 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 146 | Plan | Switching | TDA | 144759 | ||
11/13/2004 19:30 | 11/13/2004 21:56 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 146 | Plan | Switching | TDA | 144760 | ||
11/13/2004 21:07 | 11/13/2004 21:12 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 5 | Plan | Switching | TDA | 144761 | ||
11/15/2004 06:00 | 11/15/2004 16:33 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 633 | Plan | Maintenance | WEN SNO | 144767 | ||
11/15/2004 07:36 | 11/15/2004 14:19 | Ross-Alcoa No 2&4 115kV line | 115.0 | L | 8.23 | 403 | Plan | Maintenance | LGV | 144768 | ||
11/15/2004 07:38 | 11/15/2004 14:58 | Chehalis-Pe Ell section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 18.35 | 440 | Plan | Maintenance | OLY | 144769 | ||
11/15/2004 07:38 | 11/15/2004 14:58 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 440 | Plan | Maintenance | OLY | 144769 | |
11/15/2004 08:12 | 11/15/2004 14:24 | Buckley-Grizzly No 1 500kV line | 500.0 | L | 53.60 | 372 | Plan | Maintenance | TDA RED | 144770 | ||
11/15/2004 08:36 | 11/19/2004 19:05 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 6389 | Plan | Maintenance | TDA | 144771 | ||
11/15/2004 08:36 | 11/19/2004 19:05 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 6389 | Plan | Maintenance | TDA RED | 144771 | |
11/15/2004 10:42 | 11/15/2004 10:42 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 0 | Plan | Testing | IDF | 144772 | ||
11/15/2004 10:42 | 11/15/2004 10:42 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 0 | Plan | Testing | IDF | 144772 | |
11/15/2004 11:45 | 11/18/2004 10:58 | Canal-Jackson section of Canal-Second Lift No 1 34.5kV line | 34.5 | S | 0.00 | 4273 | Plan | Maintenance | IDF | 144773 | ||
11/15/2004 11:45 | 11/18/2004 10:58 | Canal-Second Lift No 1 34.5kV line | 34.5 | L | O | 1.00 | 4273 | Plan | Maintenance | IDF | 144773 | |
11/15/2004 11:45 | 11/18/2004 10:58 | Jackson tap to Canal-Second Lift No 1 34.5kV line | 34.5 | T | 5.50 | 4273 | Plan | Maintenance | IDF | 144773 | ||
11/15/2004 11:45 | 11/18/2004 10:58 | Jackson tap-Newcomb section of Jackson tap to Canal-Second Lift No 1 34.5kV line | 34.5 | TS | T | 4.20 | 4273 | Plan | Maintenance | IDF | 144773 | |
11/15/2004 11:45 | 11/18/2004 10:58 | Newcomb tap to Jackson tap to Canal-Second Lift No 1 34.5kV line | 34.5 | TT | T | 0.10 | 4273 | Plan | Maintenance | IDF | 144773 | |
11/15/2004 11:45 | 11/18/2004 10:58 | Newcomb-Jackson section of Jackson tap to Canal-Second Lift No 1 34.5kV line | 34.5 | TS | T | 1.30 | 4273 | Plan | Maintenance | IDF | 144773 | |
11/15/2004 12:24 | 11/18/2004 15:47 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 4523 | Plan | Maintenance | WEN SPK | 144774 | |
11/15/2004 12:24 | 11/18/2004 15:47 | Larene-Springhill section of Creston-Bell No 1 115kV line | 115.0 | S | 27.16 | 4523 | Plan | Maintenance | SPK | 144774 | ||
11/16/2004 06:00 | 11/16/2004 16:13 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 613 | Plan | Maintenance | WEN SNO | 144778 | ||
11/16/2004 07:01 | 11/16/2004 17:55 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 654 | Plan | Maintenance | COV | 144779 | ||
11/16/2004 07:02 | 11/16/2004 17:37 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 635 | Plan | Maintenance | COV | 144780 | ||
11/16/2004 07:26 | 11/16/2004 17:36 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 610 | Plan | Switching | COV | 144781 | ||
11/16/2004 07:26 | 11/16/2004 17:36 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 610 | Plan | Switching | COV | 144782 | ||
11/16/2004 07:27 | 11/16/2004 17:36 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 609 | Plan | Switching | COV | 144783 | ||
11/16/2004 07:38 | 11/16/2004 14:37 | Foster tap-Lebanon section of Green Peter-Lebanon No 1 115kV line | 115.0 | S | 11.78 | 419 | Plan | Maintenance | EUG | 144784 | ||
11/16/2004 07:38 | 11/16/2004 14:37 | Green Peter-Lebanon No 1 115kV line | 115.0 | L | G | 18.09 | 419 | Plan | Maintenance | EUG | 144784 | |
11/16/2004 07:59 | 11/16/2004 14:18 | Holcomb-Naselle No 1 115kV line | 115.0 | L | G | 21.09 | 379 | Plan | Maintenance | OLY LGV | 144785 | |
11/16/2004 07:59 | 11/16/2004 14:18 | Oxbow-Naselle section of Holcomb-Naselle No 1 115kV line | 115.0 | S | 19.61 | 379 | Plan | Maintenance | OLY LGV | 144785 | ||
11/16/2004 08:00 | 11/17/2004 14:18 | Lower Monumental-McNary No 1 500kV line | 500.0 | L | T | 64.75 | 1818 | Plan | Maintenance | TRI | 144786 | |
11/16/2004 08:00 | 11/17/2004 14:18 | Sacajawea tap to Lower Monumental-McNary No 1 500kV line | 500.0 | T | 6.07 | 1818 | Plan | Maintenance | TRI | 144786 | ||
11/16/2004 08:09 | Midway-Vantage No 1 230kV line | 230.0 | L | 19.76 | still out | Plan | Construction | TRI WEN | 144787 | |||
11/16/2004 08:26 | 11/16/2004 15:13 | Buckley-Grizzly No 1 500kV line | 500.0 | L | 53.60 | 407 | Plan | Maintenance | TDA RED | 144788 | ||
11/16/2004 08:29 | 11/17/2004 13:19 | Satsop-Aberdeen No 3 230kV line | 230.0 | L | 20.51 | 1730 | Plan | Maintenance | OLY | 144789 | ||
11/16/2004 09:38 | 11/24/2004 09:40 | Grand Coulee-Creston No 1 115kV line | 115.0 | L | T | 28.27 | 11522 | Plan | Maintenance | WEN SPK | 144790 | |
11/16/2004 09:38 | 11/24/2004 09:40 | Wagner Lake tap to Wilbur tap to Grand Coulee-Creston No 1 115kV line | 115.0 | TT | 10.63 | 11522 | Plan | Maintenance | WEN | 144790 | ||
11/16/2004 09:47 | 11/16/2004 10:35 | Heyburn-Adelaide No 1 138kV line | 138.0 | L | G | 12.35 | 48 | Plan | Maintenance | IDF | 144791 | |
11/16/2004 09:47 | 11/16/2004 10:35 | Heyburn-Hay Mill section of Heyburn-Adelaide No 1 138kV line | 138.0 | S | 4.51 | 48 | Plan | Maintenance | IDF | 144791 | ||
11/17/2004 00:29 | 11/17/2004 00:29 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Terminal Equipment Failure | TDA RED | 144793 | ||
11/17/2004 00:29 | 11/17/2004 00:29 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Terminal Equipment Failure | TDA | 144793 | ||
11/17/2004 00:29 | 11/17/2004 14:15 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 826 | Auto | Terminal Equipment Failure | TDA | 144793 | |||
11/17/2004 00:29 | 11/17/2004 14:15 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 826 | Auto | Terminal Equipment Failure | TDA | 144793 | |||
11/17/2004 00:29 | 11/17/2004 14:15 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 826 | Auto | Terminal Equipment Failure | TDA | 144793 | |||
11/17/2004 00:29 | 11/17/2004 14:15 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 826 | Auto | Terminal Equipment Failure | TDA | 144793 | |||
11/17/2004 06:00 | 11/17/2004 17:51 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 711 | Plan | Maintenance | WEN SNO | 144797 | ||
11/17/2004 08:08 | 11/17/2004 14:43 | Buckley-Grizzly No 1 500kV line | 500.0 | L | 53.60 | 395 | Plan | Maintenance | TDA RED | 144798 | ||
11/17/2004 08:24 | 11/18/2004 14:53 | Cosmopolis-Aberdeen No 1 115kV line | 115.0 | L | 6.79 | 1829 | Plan | Construction | OLY | 144799 | ||
11/17/2004 08:26 | 11/18/2004 14:26 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 1800 | Plan | Foreign Request | RED | 144800 | ||
11/17/2004 12:12 | 11/17/2004 12:56 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 44 | Plan | Maintenance | IDF | 144801 | ||
11/17/2004 12:12 | 11/17/2004 12:56 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 44 | Plan | Maintenance | IDF | 144801 | |
11/18/2004 06:00 | 11/18/2004 16:13 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 613 | Plan | Maintenance | WEN SNO | 144806 | ||
11/18/2004 07:01 | 11/18/2004 16:16 | Covington-Maple Valley No 2 230kV line | 230.0 | L | 16.22 | 555 | Plan | Switching | COV | 144807 | ||
11/18/2004 07:25 | 11/19/2004 14:56 | Oregon City-Chemawa No 2 115kV line | 115.0 | L | G | 25.20 | 1891 | Plan | Maintenance | SAL | 144808 | |
11/18/2004 07:25 | 11/19/2004 14:56 | Oregon City-Fargo section of Oregon City-Chemawa No 2 115kV line | 115.0 | S | 6.70 | 1891 | Plan | Maintenance | SAL | 144808 | ||
11/18/2004 07:37 | 11/18/2004 16:09 | Maple Valley-Talbot No 1 230kV line | 230.0 | L | 0.20 | 512 | Plan | Switching | COV | 144809 | ||
11/18/2004 07:37 | 11/18/2004 17:01 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 564 | Plan | Switching | WEN COV | 144810 | ||
11/18/2004 07:37 | 11/18/2004 16:19 | Maple Valley-East Pine No 1 230kV line | 230.0 | L | 14.08 | 522 | Plan | Switching | COV | 144811 | ||
11/18/2004 07:37 | 11/18/2004 16:09 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 512 | Plan | Switching | SNO COV | 144812 | ||
11/18/2004 07:51 | 11/18/2004 15:16 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 445 | Plan | Switching | EUG | 144813 | ||
11/18/2004 08:27 | 11/18/2004 14:43 | Buckley-Grizzly No 1 500kV line | 500.0 | L | 53.60 | 376 | Plan | Maintenance | TDA RED | 144814 | ||
11/18/2004 08:28 | 11/18/2004 16:19 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | G | 22.51 | 471 | Plan | Switching | EUG | 144815 | |
11/18/2004 08:28 | 11/18/2004 16:19 | Latham-Martin Creek section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.03 | 471 | Plan | Switching | EUG | 144815 | ||
11/18/2004 08:32 | 11/18/2004 15:08 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 396 | Plan | Maintenance | EUG | 144816 | |
11/18/2004 08:32 | 11/18/2004 15:08 | Alvey-Martin Creek section of Alvey-Fairview No 1 230kV line | 230.0 | S | 19.14 | 396 | Plan | Maintenance | EUG | 144816 | ||
11/18/2004 08:32 | 11/18/2004 15:08 | Martin Creek tap to Alvey-Fairview No 1 230kV line | 230.0 | T | 0.27 | 396 | Plan | Maintenance | EUG | 144816 | ||
11/18/2004 11:55 | Canal-Second Lift No 2 34.5kV line | 34.5 | L | T | 1.00 | still out | Plan | Normally Out | IDF | 144817 | ||
11/18/2004 11:55 | Jackson tap to Canal-Second Lift No 2 34.5kV line | 34.5 | T | 5.50 | still out | Plan | Normally Out | IDF | 144817 | |||
11/18/2004 12:08 | 11/18/2004 12:33 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 25 | Plan | Maintenance | TDA | 144818 | ||
11/18/2004 16:19 | Alvey-Martin Creek No 1 115kV line | 115.0 | L | G | 22.51 | still out | Plan | Normally Out | EUG | 144819 | ||
11/18/2004 16:19 | Village Green-Dorena section of Alvey-Martin Creek No 1 115kV line | 115.0 | S | 1.89 | still out | Plan | Normally Out | EUG | 144819 | |||
11/19/2004 01:00 | 11/19/2004 01:05 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Switching | TDA | 144820 | ||
11/19/2004 01:00 | 11/19/2004 12:04 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 664 | Plan | Switching | TDA | 144821 | ||
11/19/2004 01:00 | 11/19/2004 12:04 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 664 | Plan | Foreign Request | TDA RED | 144826 | ||
11/19/2004 01:00 | 11/19/2004 12:04 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 664 | Plan | Foreign Request | TDA | 144826 | ||
11/19/2004 06:00 | 11/19/2004 15:34 | Chief Joseph-Snohomish No 4 345kV line | 345.0 | L | 133.07 | 574 | Plan | Maintenance | WEN SNO | 144827 | ||
11/19/2004 07:29 | 11/19/2004 11:55 | Libby FEC-Troy section of Libby-Bonners Ferry No 1 115kV line | 115.0 | S | 17.09 | 266 | Plan | Maintenance | KAL | 144828 | ||
11/19/2004 07:29 | 11/19/2004 11:55 | Libby-Bonners Ferry No 1 115kV line | 115.0 | L | G | 59.58 | 266 | Plan | Maintenance | KAL SPK | 144828 | |
11/19/2004 08:02 | 11/19/2004 14:33 | Buckley-Grizzly No 1 500kV line | 500.0 | L | 53.60 | 391 | Plan | Maintenance | TDA RED | 144829 | ||
11/19/2004 08:29 | 11/19/2004 13:23 | Martin Creek-Drain No 1 115kV line | 115.0 | L | 12.47 | 294 | Plan | Switching | EUG | 144830 | ||
11/19/2004 08:40 | 11/19/2004 13:01 | Hood River-The Dalles No 1 115kV line | 115.0 | L | 16.02 | 261 | Plan | Maintenance | TDA | 144831 | ||
11/19/2004 11:57 | 11/19/2004 17:47 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 350 | Plan | Switching | TDA | 144832 | ||
11/19/2004 12:04 | 11/19/2004 17:47 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 343 | Plan | Foreign Request | TDA RED | 144833 | ||
11/19/2004 12:04 | 11/19/2004 17:47 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 343 | Plan | Foreign Request | TDA | 144833 | ||
11/19/2004 12:04 | 11/19/2004 17:47 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 343 | Plan | Foreign Request | TDA | 144833 | ||
11/19/2004 12:04 | 11/19/2004 17:47 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 343 | Plan | Foreign Request | TDA | 144833 | ||
11/19/2004 12:04 | 11/19/2004 17:47 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 343 | Plan | Foreign Request | TDA | 144833 | ||
11/19/2004 12:04 | 11/19/2004 17:47 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 343 | Plan | Foreign Request | TDA | 144833 | ||
11/19/2004 12:36 | 11/22/2004 10:38 | Moxee-Roza No 1 115kV line | 115.0 | L | 5.30 | 4202 | Plan | Foreign Request | TRI WEN | 144834 | ||
11/19/2004 17:39 | 11/19/2004 17:45 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 6 | Plan | Switching | TDA | 144835 | ||
11/19/2004 18:32 | 11/20/2004 22:15 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 1663 | Plan | Foreign Request | OLY | 144836 | ||
11/22/2004 06:00 | 11/22/2004 13:45 | Grand Coulee-Chief Joseph No 3 500kV line | 500.0 | L | 31.81 | 465 | Plan | Foreign Request | WEN | 144843 | ||
11/22/2004 06:37 | 11/22/2004 14:28 | Maple Valley-East Pine No 1 230kV line | 230.0 | L | 14.08 | 471 | Plan | Switching | COV | 144844 | ||
11/22/2004 06:52 | 11/22/2004 07:01 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 9 | Auto | Equipment/Miscellaneous | Equipment/Miscellaneous | TDA | 144845 | |
11/22/2004 06:52 | 11/22/2004 07:01 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 9 | Auto | Equipment/Miscellaneous | TDA RED | 144846 | |
11/22/2004 06:52 | 11/22/2004 07:01 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 9 | Auto | Equipment/Miscellaneous | TDA | 144846 | |||
11/22/2004 06:57 | 11/22/2004 20:39 | Big Eddy-Chemawa No 1 230kV line | 230.0 | L | 116.41 | 822 | Plan | Maintenance | TDA LGV SAL | 144847 | ||
11/22/2004 06:57 | 11/22/2004 20:29 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 812 | Plan | Maintenance | TDA | 144848 | ||
11/22/2004 06:57 | 11/22/2004 20:29 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 812 | Plan | Maintenance | TDA RED | 144848 | |
11/22/2004 06:58 | 11/22/2004 20:29 | The Dalles PH-Big Eddy No 4 230kV line | 230.0 | L | 0.91 | 811 | Plan | Maintenance | TDA | 144849 | ||
11/22/2004 07:45 | 11/22/2004 16:36 | Aberdeen tap to Satsop Park-Cosmopolis No 1 115kV line | 115.0 | T | 14.58 | 531 | Plan | Maintenance | OLY | 144850 | ||
11/22/2004 07:45 | 11/22/2004 16:36 | Satsop Park-Cosmopolis No 1 115kV line | 115.0 | L | T | 15.32 | 531 | Plan | Maintenance | OLY | 144850 | |
11/22/2004 07:47 | 11/22/2004 12:18 | Maple Valley-Talbot No 1 230kV line | 230.0 | L | 0.20 | 271 | Plan | Switching | COV | 144851 | ||
11/22/2004 07:48 | 11/22/2004 12:17 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 269 | Plan | Switching | WEN COV | 144852 | ||
11/22/2004 07:48 | 11/22/2004 12:16 | Covington-Maple Valley No 2 230kV line | 230.0 | L | 16.22 | 268 | Plan | Switching | COV | 144853 | ||
11/22/2004 07:48 | 11/22/2004 12:18 | Sno-King-Maple Valley No 2 230kV line | 230.0 | L | 24.91 | 270 | Plan | Switching | SNO COV | 144854 | ||
11/22/2004 08:01 | 11/22/2004 15:00 | John Day-Grizzly No 1 500kV line | 500.0 | L | 88.41 | 419 | Plan | Maintenance | TDA RED | 144855 | ||
11/22/2004 08:17 | 11/22/2004 15:44 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 447 | Plan | Maintenance | EUG | 144856 | |
11/22/2004 08:17 | 11/22/2004 15:44 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 447 | Plan | Maintenance | EUG | 144856 | ||
11/22/2004 08:25 | 11/22/2004 08:43 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 18 | Auto | Equipment/Miscellaneous | Equipment/Miscellaneous | TDA | 144857 | |
11/22/2004 08:25 | 11/22/2004 08:43 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 18 | Auto | Equipment/Miscellaneous | TDA RED | 144858 | |
11/22/2004 08:25 | 11/22/2004 08:43 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 18 | Auto | Equipment/Miscellaneous | TDA | 144858 | |||
11/22/2004 08:25 | 11/22/2004 10:29 | Bonneville PH 1-Hood River No 1 115kV line | 115.0 | L | G | 22.61 | 124 | Plan | Maintenance | LGV TDA | 144859 | |
11/22/2004 08:25 | 11/22/2004 10:29 | Cascade Locks-Hood River section of Bonneville PH 1-Hood River No 1 115kV line | 115.0 | S | 16.64 | 124 | Plan | Maintenance | TDA | 144859 | ||
11/22/2004 09:31 | 11/22/2004 12:28 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 177 | Plan | Maintenance | IDF | 144860 | ||
11/22/2004 09:36 | 11/22/2004 09:36 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 0 | Auto | Unknown | Unknown | IDF | 144861 | |
11/22/2004 10:51 | 12/20/2004 12:29 | Fidalgo-Lopez Island No 5 69kV line | 69.0 | L | 8.49 | 40418 | Plan | Switching | SNO | 144862 | ||
11/22/2004 11:59 | 11/22/2004 13:55 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | O | 97.46 | 116 | Auto | Equipment/Miscellaneous | Terminal Equipment Failure | TDA RED | 144863 |
11/22/2004 11:59 | 11/22/2004 13:55 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 116 | Auto | Equipment/Miscellaneous | Terminal Equipment Failure | TDA RED | 144863 | |
11/22/2004 17:17 | 11/22/2004 17:21 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | O | 97.46 | 4 | Auto | Unknown | Human Element | TDA RED | 144864 |
11/22/2004 17:17 | 11/22/2004 17:21 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 4 | Auto | Unknown | Human Element | TDA RED | 144864 | |
11/23/2004 05:45 | 11/23/2004 17:27 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 702 | Plan | Switching | COV | 144876 | ||
11/23/2004 05:54 | 11/23/2004 17:25 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 691 | Plan | Switching | COV | 144877 | ||
11/23/2004 05:58 | 12/03/2004 18:28 | Covington-Columbia No 3 230kV line | 230.0 | L | 110.00 | 15150 | Plan | Construction | COV WEN | 144878 | ||
11/23/2004 06:02 | 11/23/2004 17:28 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 686 | Plan | Switching | COV | 144879 | ||
11/23/2004 06:03 | 11/23/2004 17:23 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 680 | Plan | Switching | COV | 144880 | ||
11/23/2004 06:04 | 11/23/2004 17:29 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 685 | Plan | Switching | COV | 144881 | ||
11/23/2004 08:06 | 11/23/2004 13:45 | Rivergate-Keeler No 1&2 230kV line | 230.0 | L | 9.48 | 339 | Plan | Maintenance | LGV SAL | 144882 | ||
11/23/2004 08:06 | 11/23/2004 13:42 | Kitsap-Station X No 1 115kV line | 115.0 | L | 3.63 | 336 | Plan | Maintenance | OLY | 144883 | ||
11/23/2004 08:07 | 11/23/2004 15:54 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 467 | Plan | Maintenance | EUG | 144884 | |
11/23/2004 08:07 | 11/23/2004 15:54 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 467 | Plan | Maintenance | EUG | 144884 | ||
11/23/2004 08:09 | 11/23/2004 13:12 | Benton-451B No 1 115kV line | 115.0 | L | G | 4.75 | 303 | Plan | Maintenance | TRI | 144885 | |
11/23/2004 08:09 | 11/23/2004 13:12 | Benton-Hanford 2 Construction section of Benton-451B No 1 115kV line | 115.0 | S | 1.78 | 303 | Plan | Maintenance | TRI | 144885 | ||
11/23/2004 08:12 | 11/23/2004 15:08 | John Day-Grizzly No 1 500kV line | 500.0 | L | 88.41 | 416 | Plan | Maintenance | TDA RED | 144886 | ||
11/23/2004 08:14 | 11/23/2004 10:24 | Chehalis-Centralia No 2 69kV line | 69.0 | L | G | 15.26 | 130 | Plan | Maintenance | OLY | 144887 | |
11/23/2004 08:14 | 11/23/2004 10:24 | Chehalis-Fords Prairie section of Chehalis-Centralia No 2 69kV line | 69.0 | S | 11.79 | 130 | Plan | Maintenance | OLY | 144887 | ||
11/23/2004 08:16 | 11/23/2004 12:30 | Big Eddy 500/230kV Tie No 1 500kV line | 500.0 | L | 0.57 | 254 | Plan | Maintenance | TDA | 144888 | ||
11/23/2004 11:45 | 11/23/2004 11:53 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 8 | Auto | Maintenance | Human Element | TDA RED | 144889 |
11/23/2004 11:45 | 11/23/2004 11:53 | Maupin-Redmond section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 68.07 | 8 | Auto | Maintenance | Human Element | TDA RED | 144889 | |
11/23/2004 16:50 | 11/23/2004 16:50 | Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 14.02 | 0 | Auto | Unknown | Tree cut | EUG | 144890 | |
11/23/2004 16:50 | 11/23/2004 16:50 | Hauser tap to Reedsport-Fairview No 1 115kV line | 115.0 | T | 1.27 | 0 | Auto | Unknown | Tree cut | EUG | 144890 | |
11/23/2004 16:50 | 11/23/2004 19:45 | Hauser-Glasgow section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 5.81 | 175 | Auto | Unknown | Tree cut | EUG | 144890 | |
11/23/2004 16:50 | 11/23/2004 16:50 | Lakeside-Hauser section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 3.94 | 0 | Auto | Unknown | Tree cut | EUG | 144890 | |
11/23/2004 16:50 | 11/23/2004 19:45 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 175 | Auto | Unknown | Tree cut | EUG | 144890 |
11/23/2004 16:50 | 11/23/2004 16:50 | Reedsport-Lakeside section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 9.35 | 0 | Auto | Unknown | Tree cut | EUG | 144890 | |
11/23/2004 16:50 | 11/23/2004 16:50 | Sumner-Fairview section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 5.36 | 0 | Auto | Unknown | Tree cut | EUG | 144890 | |
11/23/2004 16:51 | 11/23/2004 16:55 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 4 | Auto | Unknown | Improper Relaying | EUG | 144891 | |
11/23/2004 17:52 | 11/23/2004 18:00 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 8 | Auto | Foreign Trouble | TDA RED | 144892 | ||
11/23/2004 17:52 | 11/23/2004 18:00 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 8 | Auto | Foreign Trouble | TDA | 144892 | ||
11/24/2004 02:32 | 11/24/2004 02:32 | Captain Jack-Malin No 2 500kV line | 500.0 | L | 6.90 | 0 | Auto | Unknown | Unknown | RED | 144893 | |
11/24/2004 02:32 | 11/24/2004 02:32 | Captain Jack-Klamath Cogen No 1 500kV line | 500.0 | L | 26.30 | 0 | Auto | Unknown | Unknown | RED | 144894 | |
11/24/2004 06:50 | 11/24/2004 06:50 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 31.20 | 0 | Auto | Unknown | Unknown | RED | 144903 |
11/24/2004 06:50 | 11/24/2004 06:50 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Unknown | RED | 144903 |
11/24/2004 06:50 | 11/24/2004 06:50 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 144903 |
11/24/2004 06:50 | 11/24/2004 06:50 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Unknown | RED | 144903 |
11/24/2004 06:50 | 11/24/2004 06:50 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Unknown | RED | 144903 |
11/24/2004 06:50 | 11/24/2004 06:50 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Unknown | RED | 144903 | |
11/24/2004 06:50 | 11/24/2004 06:50 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 144903 |
11/24/2004 06:50 | 11/24/2004 06:50 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Unknown | RED | 144903 |
11/24/2004 07:21 | 11/24/2004 12:33 | The Dalles PH-Big Eddy No 4 230kV line | 230.0 | L | 0.91 | 312 | Plan | Maintenance | TDA | 144904 | ||
11/24/2004 07:22 | 11/24/2004 12:32 | Big Eddy-Maupin section of Big Eddy-Redmond No 1 230kV line | 230.0 | S | 29.39 | 310 | Plan | Maintenance | TDA | 144905 | ||
11/24/2004 07:22 | 11/24/2004 12:32 | Big Eddy-Redmond No 1 230kV line | 230.0 | L | G | 97.46 | 310 | Plan | Maintenance | TDA RED | 144905 | |
11/24/2004 07:22 | 11/24/2004 12:32 | Big Eddy-Chemawa No 1 230kV line | 230.0 | L | 116.41 | 310 | Plan | Maintenance | TDA LGV SAL | 144906 | ||
11/24/2004 07:54 | 11/24/2004 13:09 | Hills Creek-Lookout Point No 1 115kV line | 115.0 | L | G | 24.80 | 315 | Plan | Maintenance | EUG | 144907 | |
11/24/2004 07:54 | 11/24/2004 13:09 | Oakridge-Lookout Point section of Hills Creek-Lookout Point No 1 115kV line | 115.0 | S | 20.00 | 315 | Plan | Maintenance | EUG | 144907 | ||
11/24/2004 09:08 | 11/24/2004 10:18 | Raymond-Cosmopolis No 1 115kV line | 115.0 | L | 18.36 | 70 | Plan | Maintenance | OLY | 144908 | ||
11/25/2004 02:55 | 11/25/2004 10:29 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 454 | Plan | Voltage Control | SAL EUG | 144909 | ||
11/25/2004 14:48 | 11/25/2004 14:48 | Bell-Usk No 1 230kV line | 230.0 | L | 47.48 | 0 | Auto | Lightning | Lightning | SPK | 144910 | |
11/25/2004 19:11 | 11/25/2004 19:42 | Palisades-Goshen No 1 115kV line | 115.0 | L | 51.71 | 31 | Auto | Unknown | Unknown | IDF | 144911 | |
11/26/2004 02:04 | 11/26/2004 05:37 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 213 | Plan | Voltage Control | TRI TDA RED SAL | 144912 | ||
11/26/2004 06:17 | 11/27/2004 15:33 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 1996 | Plan | Maintenance | TDA | 144913 | ||
11/26/2004 06:18 | 11/27/2004 15:33 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 1995 | Plan | Maintenance | TDA | 144914 | ||
11/27/2004 08:07 | 11/27/2004 08:07 | Santiam-Toledo No 1 230kV line | 230.0 | L | 67.62 | 0 | Auto | Unknown | Unknown | SAL EUG | 144916 | |
11/27/2004 08:07 | 11/27/2004 08:07 | Santiam-Wren section of Santiam-Toledo No 1 230kV line | 230.0 | S | G | 41.94 | 0 | Auto | Unknown | Unknown | SAL EUG | 144916 |
11/27/2004 08:07 | 11/27/2004 08:07 | Wren tap to Santiam-Toledo No 1 230kV line | 230.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | EUG | 144916 |
11/27/2004 08:07 | 11/27/2004 08:07 | Wren-Toledo section of Santiam-Toledo No 1 230kV line | 230.0 | S | G | 25.68 | 0 | Auto | Unknown | Unknown | EUG | 144916 |
11/29/2004 07:02 | 11/29/2004 07:02 | Albany-Eugene No 1 115kV line | 115.0 | L | O | 39.80 | 0 | Auto | Unknown | Unknown | EUG | 144921 |
11/29/2004 07:02 | 11/29/2004 07:02 | Alderwood-Junction City section of Albany-Eugene No 1 115kV line | 115.0 | S | 2.04 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:02 | 11/29/2004 07:02 | Greenberry tap to Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | TT | 19.00 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:02 | 11/29/2004 07:02 | Greenberry-Harrisburg section of Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | TS | 0.02 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:02 | 11/29/2004 07:02 | Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | T | 0.04 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:02 | 11/29/2004 07:02 | Harrisburg tap-Greenberry section of Harrisburg tap to Albany-Eugene No 1 115kV line | 115.0 | TS | 0.02 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:02 | 11/29/2004 07:02 | Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line | 115.0 | S | 8.28 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:02 | 11/29/2004 07:02 | Junction City tap to Albany-Eugene No 1 115kV line | 115.0 | T | 0.05 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:02 | 11/29/2004 07:02 | Junction City-Eugene section of Albany-Eugene No 1 115kV line | 115.0 | S | 6.86 | 0 | Auto | Unknown | Unknown | EUG | 144921 | |
11/29/2004 07:27 | 11/29/2004 15:44 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 497 | Plan | Maintenance | OLY | 144922 | ||
11/29/2004 07:39 | 12/03/2004 17:08 | Big Eddy-Chemawa No 1 230kV line | 230.0 | L | 116.41 | 6329 | Plan | Maintenance | TDA LGV SAL | 144923 | ||
11/29/2004 07:59 | 11/29/2004 15:43 | Wendson-Tahkenitch No 2 230kV line | 230.0 | L | 19.99 | 464 | Plan | Maintenance | EUG | 144924 | ||
11/29/2004 08:11 | 12/01/2004 11:35 | Marion-Alvey No 1 500kV line | 500.0 | L | 64.88 | 3084 | Plan | Maintenance | SAL EUG | 144925 | ||
11/29/2004 09:25 | 11/29/2004 09:34 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 9 | Plan | Switching | WEN COV | 144926 | ||
11/29/2004 09:55 | 11/29/2004 11:43 | Moxee-Union Gap No 1 115kV line | 115.0 | L | 6.50 | 108 | Plan | Foreign Request | TRI | 144927 | ||
11/29/2004 10:18 | 12/01/2004 13:15 | Canal-Jackson section of Canal-Second Lift No 2 34.5kV line | 34.5 | S | 0.00 | 3057 | Plan | Maintenance | IDF | 144928 | ||
11/29/2004 10:18 | 12/01/2004 13:15 | Canal-Second Lift No 2 34.5kV line | 34.5 | L | G | 1.00 | 3057 | Plan | Maintenance | IDF | 144928 | |
11/29/2004 14:17 | 11/29/2004 22:26 | Grand Coulee-Schultz No 1 500kV line | 500.0 | L | 97.01 | 489 | Plan | Testing | WEN | 144929 | ||
11/30/2004 00:59 | 11/30/2004 01:08 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 9 | Auto | Foreign Trouble | Foreign Trouble | TDA | 144930 | |
11/30/2004 07:14 | 12/03/2004 18:13 | Alvey-Fairview No 1 230kV line | 230.0 | L | G | 97.46 | 4979 | Plan | Construction | EUG | 144932 | |
11/30/2004 07:14 | 12/03/2004 18:13 | Green Valley-Fairview section of Alvey-Fairview No 1 230kV line | 230.0 | S | 50.95 | 4979 | Plan | Construction | EUG | 144932 | ||
11/30/2004 07:22 | 11/30/2004 14:56 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 454 | Plan | Maintenance | OLY | 144933 | ||
11/30/2004 08:40 | 11/30/2004 15:53 | Hilltop-Bordertown No 1 345kV line | 345.0 | L | 147.00 | 433 | Plan | Foreign Request | RED | 144934 | ||
11/30/2004 10:26 | 11/30/2004 10:39 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 13 | Plan | Switching | WEN COV | 144935 | ||
11/30/2004 11:51 | 12/10/2004 11:50 | Moxee-Union Gap No 1 115kV line | 115.0 | L | 6.50 | 14399 | Plan | Foreign Request | TRI | 144936 | ||
12/01/2004 07:04 | 12/01/2004 13:26 | Snohomish-Bothell No 1 230kV line | 230.0 | L | 7.64 | 382 | Plan | Maintenance | SNO | 144938 | ||
12/01/2004 07:35 | 12/01/2004 14:18 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 403 | Plan | Maintenance | OLY | 144939 | ||
12/01/2004 12:56 | 12/01/2004 13:12 | Troutdale-PACW Gresham No 2 230kV line | 230.0 | L | 6.94 | 16 | Plan | Foreign Request | LGV | 144940 | ||
12/02/2004 00:20 | 12/02/2004 00:20 | Burns-Summer Lake section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 110.40 | 0 | Auto | Foreign Trouble | RED | 144941 | |
12/02/2004 00:20 | 12/02/2004 00:20 | Midpoint-Burns section of Midpoint-Summer Lake No 1 500kV line | 500.0 | S | G | 260.40 | 0 | Auto | Foreign Trouble | IDF RED | 144941 | |
12/02/2004 00:20 | 12/02/2004 00:20 | Midpoint-Summer Lake No 1 500kV line | 500.0 | L | 370.80 | 0 | Auto | Foreign Trouble | IDF RED | 144941 | ||
12/02/2004 07:17 | 12/02/2004 13:27 | McNary PH-McNary No 5 230kV line | 230.0 | L | 1.28 | 370 | Plan | Foreign Request | TRI | 144945 | ||
12/02/2004 07:32 | 12/02/2004 14:41 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 429 | Plan | Maintenance | OLY | 144946 | ||
12/02/2004 08:00 | 12/03/2004 14:33 | Salem-Grand Ronde No 1 115kV line | 115.0 | L | 27.80 | 1833 | Plan | Maintenance | SAL | 144947 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 427 | Plan | Foreign Request | TDA RED | 144948 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 427 | Plan | Foreign Request | TDA | 144948 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 427 | Plan | Foreign Request | TDA | 144948 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 427 | Plan | Foreign Request | TDA | 144948 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 427 | Plan | Foreign Request | TDA | 144948 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 427 | Plan | Foreign Request | TDA | 144948 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 427 | Plan | Foreign Request | TDA RED | 144949 | ||
12/02/2004 09:08 | 12/02/2004 16:15 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 427 | Plan | Foreign Request | TDA | 144949 | ||
12/02/2004 19:44 | 12/02/2004 19:44 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Staged Test | TDA RED | 144950 | ||
12/02/2004 19:44 | 12/02/2004 19:44 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144950 | ||
12/02/2004 20:18 | 12/02/2004 20:18 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Staged Test | TDA RED | 144951 | ||
12/02/2004 20:18 | 12/02/2004 20:18 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144951 | ||
12/02/2004 20:18 | 12/02/2004 20:18 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144951 | ||
12/02/2004 20:18 | 12/02/2004 20:18 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144951 | ||
12/02/2004 20:18 | 12/02/2004 20:18 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144951 | ||
12/02/2004 20:18 | 12/02/2004 20:18 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144951 | ||
12/02/2004 23:41 | 12/02/2004 23:41 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Staged Test | TDA RED | 144952 | ||
12/02/2004 23:41 | 12/02/2004 23:41 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144952 | ||
12/03/2004 00:37 | 12/04/2004 04:59 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 1702 | Plan | Foreign Request | OLY | 144953 | ||
12/03/2004 00:37 | 12/04/2004 04:59 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 1702 | Plan | Foreign Request | OLY | 144953 | |
12/03/2004 06:27 | 12/03/2004 06:40 | McNary PH-McNary No 6 115kV line | 115.0 | L | 1.39 | 13 | Plan | Foreign Request | TRI | 144956 | ||
12/03/2004 07:23 | 12/03/2004 14:55 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 452 | Plan | Maintenance | OLY | 144957 | ||
12/03/2004 08:16 | 12/03/2004 13:55 | Big Hanaford tap to Paul-Centralia Thermal PH No 1 500kV line | 500.0 | T | 0.09 | 339 | Plan | Foreign Request | OLY | 144958 | ||
12/03/2004 08:16 | 12/03/2004 13:55 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | T | 0.78 | 339 | Plan | Foreign Request | OLY | 144958 | |
12/03/2004 08:28 | 12/03/2004 14:45 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 377 | Plan | Testing | TDA | 144959 | ||
12/03/2004 08:32 | 12/03/2004 18:18 | Tacoma-Covington No 4 230kV line | 230.0 | L | 15.10 | 586 | Plan | Switching | COV | 144960 | ||
12/03/2004 08:32 | 12/03/2004 18:16 | Tacoma-Covington No 3 230kV line | 230.0 | L | 15.14 | 584 | Plan | Switching | COV | 144961 | ||
12/03/2004 08:33 | 12/03/2004 18:29 | Covington-Duwamish No 1 230kV line | 230.0 | L | 15.82 | 596 | Plan | Switching | COV | 144962 | ||
12/03/2004 08:33 | 12/03/2004 18:30 | Covington-White River No 2 230kV line | 230.0 | L | 9.25 | 597 | Plan | Switching | COV | 144963 | ||
12/03/2004 08:33 | 12/03/2004 20:48 | Raver-Covington No 1 500kV line | 500.0 | L | 10.28 | 735 | Plan | Switching | COV | 144964 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 365 | Plan | Testing | TDA RED | 144965 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 365 | Plan | Testing | TDA | 144965 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 365 | Plan | Testing | TDA RED | 144966 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 365 | Plan | Testing | TDA | 144966 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 365 | Plan | Testing | TDA | 144966 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 365 | Plan | Testing | TDA | 144966 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 365 | Plan | Testing | TDA | 144966 | ||
12/03/2004 08:40 | 12/03/2004 14:45 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 365 | Plan | Testing | TDA | 144966 | ||
12/03/2004 17:16 | 12/03/2004 17:26 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 10 | Plan | Foreign Request | TDA | 144967 | ||
12/03/2004 17:18 | 12/03/2004 19:45 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 147 | Plan | Foreign Request | TDA | 144968 | ||
12/03/2004 17:18 | 12/03/2004 19:51 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 153 | Plan | Foreign Request | TDA RED | 144969 | ||
12/03/2004 17:18 | 12/03/2004 19:51 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 153 | Plan | Foreign Request | TDA | 144969 | ||
12/03/2004 18:57 | 12/03/2004 22:59 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 242 | Plan | Testing | TDA RED | 144970 | |
12/03/2004 18:57 | 12/03/2004 22:59 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 242 | Plan | Testing | TDA | 144970 | |||
12/03/2004 19:40 | 12/03/2004 19:44 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 4 | Plan | Foreign Request | TDA | 144971 | ||
12/03/2004 21:00 | 12/03/2004 21:00 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Staged Test | TDA RED | 144972 | ||
12/03/2004 21:00 | 12/03/2004 21:00 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144972 | ||
12/03/2004 21:00 | 12/03/2004 21:00 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144972 | ||
12/03/2004 21:00 | 12/03/2004 21:00 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144972 | ||
12/03/2004 21:00 | 12/03/2004 21:00 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144972 | ||
12/03/2004 21:00 | 12/03/2004 21:00 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144972 | ||
12/03/2004 22:45 | 12/03/2004 22:45 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Staged Test | TDA RED | 144973 | ||
12/03/2004 22:45 | 12/03/2004 22:45 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144973 | ||
12/03/2004 22:45 | 12/03/2004 22:45 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144973 | ||
12/03/2004 22:45 | 12/03/2004 22:45 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144973 | ||
12/03/2004 22:45 | 12/03/2004 22:45 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144973 | ||
12/03/2004 22:45 | 12/03/2004 22:45 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144973 | ||
12/04/2004 00:01 | 12/04/2004 01:58 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 117 | Auto | Staged Test | Staged Test | TDA | 144974 | |
12/04/2004 00:01 | 12/04/2004 02:00 | Big Eddy-Celilo No 4 230kV line | 230.0 | L | 0.96 | 119 | Auto | Staged Test | Terminal Equipment Failure | TDA | 144975 | |
12/04/2004 00:01 | 12/04/2004 02:00 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 119 | Plan | Testing | TDA RED | 144976 | |
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 119 | Plan | Testing | TDA | 144976 | |||
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 119 | Plan | Testing | TDA | 144976 | |||
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 119 | Plan | Testing | TDA | 144976 | |||
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 119 | Plan | Testing | TDA | 144976 | |||
12/04/2004 00:01 | 12/04/2004 02:00 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 119 | Auto | Staged Test | TDA RED | 144990 | |
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 119 | Auto | Staged Test | TDA | 144990 | |||
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 119 | Auto | Staged Test | TDA | 144990 | |||
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 119 | Auto | Staged Test | TDA | 144990 | |||
12/04/2004 00:01 | 12/04/2004 02:00 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 119 | Auto | Staged Test | TDA | 144990 | |||
12/04/2004 02:30 | 12/04/2004 02:30 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 0 | Auto | Staged Test | TDA RED | 144977 | ||
12/04/2004 02:30 | 12/04/2004 02:30 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 0 | Auto | Staged Test | TDA | 144977 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 872 | Plan | Testing | TDA RED | 144978 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144978 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144978 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144978 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144978 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144978 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 872 | Plan | Testing | TDA RED | 144979 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144979 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144979 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144979 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144979 | ||
12/04/2004 02:47 | 12/04/2004 17:19 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 872 | Plan | Testing | TDA | 144979 | ||
12/04/2004 02:57 | 12/04/2004 06:47 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 230 | Plan | Testing | TDA | 144980 | ||
12/04/2004 06:32 | 12/04/2004 06:37 | McNary PH-McNary No 1 230kV line | 230.0 | L | 1.05 | 5 | Plan | Foreign Request | TRI | 144981 | ||
12/04/2004 07:36 | 12/04/2004 10:08 | McNary PH-McNary No 6 115kV line | 115.0 | L | 1.39 | 152 | Auto | Foreign Utility | Foreign Utility | TRI | 144982 | |
12/04/2004 08:00 | 12/04/2004 13:15 | Captain Jack-Klamath Cogen No 1 500kV line | 500.0 | L | 26.30 | 315 | Plan | Foreign Request | RED | 144983 | ||
12/04/2004 08:28 | 12/04/2004 09:30 | Grand Coulee-Hanford No 1 500kV line | 500.0 | L | 96.03 | 62 | Auto | Unknown | Unknown | WEN TRI | 144984 | |
12/04/2004 11:15 | 12/06/2004 06:28 | Hatwai-AVA North Lewiston No 1 230kV line | 230.0 | L | 7.00 | 2593 | Auto | Foreign Trouble | Foreign Trouble | SPK | 144985 | |
12/05/2004 09:01 | 12/05/2004 11:11 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | T | 103.37 | 130 | Plan | Maintenance | RED | 144986 | |
12/05/2004 09:01 | 12/05/2004 11:11 | Ponderosa tap to Grizzly-Summer Lake No 1 500kV line | 500.0 | T | 0.01 | 130 | Plan | Maintenance | RED | 144986 | ||
12/05/2004 09:05 | 12/05/2004 11:08 | Grizzly-Ponderosa section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | 18.26 | 123 | Plan | Switching | RED | 144987 | ||
12/05/2004 09:05 | 12/05/2004 11:08 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | G | 103.37 | 123 | Plan | Switching | RED | 144987 | |
12/05/2004 09:05 | 12/05/2004 11:08 | Grizzly-Summer Lake No 1 500kV line | 500.0 | L | O | 103.37 | 123 | Plan | Maintenance | RED | 144988 | |
12/05/2004 09:05 | 12/05/2004 11:08 | Ponderosa-Summer Lake section of Grizzly-Summer Lake No 1 500kV line | 500.0 | S | 85.11 | 123 | Plan | Maintenance | RED | 144988 | ||
12/06/2004 02:38 | 12/14/2004 10:58 | Paul-Centralia Thermal PH No 2 500kV line | 500.0 | L | 0.68 | 12020 | Auto | Foreign Trouble | Foreign Trouble | OLY | 144989 | |
12/06/2004 06:13 | 12/06/2004 08:46 | Captain Jack-Malin No 2 500kV line | 500.0 | L | 6.90 | 153 | Auto | Foreign Trouble | Foreign Trouble | RED | 144992 | |
12/06/2004 07:00 | 12/06/2004 07:08 | Rocky Reach-Columbia No 2 230kV line | 230.0 | L | G | 21.30 | 8 | Plan | Foreign Request | WEN | 144993 | |
12/06/2004 07:00 | 12/06/2004 07:08 | Rocky Reach-McKenzie section of Rocky Reach-Columbia No 2 230kV line | 230.0 | S | 15.80 | 8 | Plan | Foreign Request | WEN | 144993 | ||
12/06/2004 07:25 | 12/17/2004 16:10 | Ross-Rivergate No 1 230kV line | 230.0 | L | 7.49 | 16365 | Plan | Construction | LGV | 144994 | ||
12/06/2004 08:03 | 12/06/2004 10:37 | Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line | 230.0 | S | 71.70 | 154 | Plan | Switching | TDA TRI | 144995 | ||
12/06/2004 08:03 | 12/06/2004 10:37 | Big Eddy-Midway No 1 230kV line | 230.0 | L | G | 102.80 | 154 | Plan | Switching | TDA TRI | 144995 | |
12/06/2004 08:03 | 12/06/2004 08:06 | Mabton tap to Big Eddy-Midway No 1 230kV line | 230.0 | T | 0.10 | 3 | Plan | Switching | TRI | 144995 | ||
12/06/2004 08:03 | 12/17/2004 14:30 | Big Eddy-Midway No 1 230kV line | 230.0 | L | O | 102.80 | 16227 | Plan | Maintenance | TDA TRI | 144996 | |
12/06/2004 08:03 | 12/17/2004 14:30 | Mabton-Midway section of Big Eddy-Midway No 1 230kV line | 230.0 | S | 31.10 | 16227 | Plan | Maintenance | TRI | 144996 | ||
12/06/2004 08:37 | 12/09/2004 13:25 | Chief Joseph-East Omak No 1 230kV line | 230.0 | L | 33.99 | 4608 | Plan | Maintenance | WEN | 144997 | ||
12/06/2004 08:40 | 12/06/2004 10:57 | Chehalis-Mayfield No 1 230kV line | 230.0 | L | G | 21.37 | 137 | Plan | Maintenance | OLY | 144998 | |
12/06/2004 08:40 | 12/06/2004 10:57 | Silver Creek-Mayfield section of Chehalis-Mayfield No 1 230kV line | 230.0 | S | 1.17 | 137 | Plan | Maintenance | OLY | 144998 | ||
12/06/2004 10:01 | 12/14/2004 11:02 | John Day-Big Eddy No 2 500kV line | 500.0 | L | 18.96 | 11581 | Plan | Maintenance | TDA | 144999 | ||
12/06/2004 10:03 | 12/06/2004 15:17 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 314 | Plan | Maintenance | EUG | 145000 | ||
12/06/2004 10:03 | 12/06/2004 15:17 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 314 | Plan | Maintenance | EUG | 145000 | |
12/06/2004 11:26 | 12/06/2004 11:26 | Snohomish-Murray No 1 230kV line | 230.0 | L | 17.38 | 0 | Auto | Human Element | Human Element | SNO | 145001 | |
12/07/2004 03:38 | 12/07/2004 03:40 | Lower Monumental-Ashe No 1 500kV line | 500.0 | L | 39.58 | 2 | Auto | Unknown | Unknown | TRI | 145002 | |
12/07/2004 07:04 | 12/07/2004 15:21 | Covington-White River No 1 230kV line | 230.0 | L | 9.55 | 497 | Plan | Switching | COV | 145008 | ||
12/07/2004 08:03 | 12/07/2004 08:29 | Rocky Reach-Columbia No 2 230kV line | 230.0 | L | G | 21.30 | 26 | Plan | Foreign Request | WEN | 145009 | |
12/07/2004 08:03 | 12/07/2004 08:29 | Rocky Reach-McKenzie section of Rocky Reach-Columbia No 2 230kV line | 230.0 | S | 15.80 | 26 | Plan | Foreign Request | WEN | 145009 | ||
12/07/2004 08:05 | 12/11/2004 14:08 | McKenzie-Columbia section of Rocky Reach-Columbia No 2 230kV line | 230.0 | S | 5.50 | 6123 | Plan | Foreign Request | WEN | 145010 | ||
12/07/2004 08:05 | 12/11/2004 14:08 | Rocky Reach-Columbia No 2 230kV line | 230.0 | L | O | 21.30 | 6123 | Plan | Foreign Request | WEN | 145010 | |
12/07/2004 08:43 | 12/07/2004 13:10 | Grandview-Prosser section of Grandview-Red Mountain No 1 115kV line | 115.0 | S | 5.47 | 267 | Plan | Maintenance | TRI WEN | 145011 | ||
12/07/2004 08:43 | 12/07/2004 13:10 | Grandview-Red Mountain No 1 115kV line | 115.0 | L | G | 22.80 | 267 | Plan | Maintenance | TRI WEN | 145011 | |
12/07/2004 08:56 | 12/07/2004 14:48 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 352 | Plan | Maintenance | EUG | 145012 | ||
12/07/2004 08:56 | 12/07/2004 14:48 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 352 | Plan | Maintenance | EUG | 145012 | |
12/08/2004 00:20 | 12/08/2004 15:56 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 936 | Auto | Forced (Configuration) | EUG | 145013 | ||
12/08/2004 00:20 | 12/08/2004 15:56 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 936 | Auto | Wind | Tree cut | EUG | 145022 | |
12/08/2004 00:25 | 12/08/2004 13:08 | Fairview-Bandon No 1 115kV line | 115.0 | L | G | 25.16 | 763 | Auto | Tree blown | Tree blown | EUG | 145014 |
12/08/2004 00:25 | 12/08/2004 13:08 | Fairview-Norway section of Fairview-Bandon No 1 115kV line | 115.0 | S | 12.59 | 763 | Auto | Tree blown | Tree blown | EUG | 145014 | |
12/08/2004 00:25 | 12/08/2004 01:35 | Morrison tap to Fairview-Bandon No 1 115kV line | 115.0 | T | 0.10 | 70 | Auto | Tree blown | Tree blown | EUG | 145014 | |
12/08/2004 00:25 | 12/08/2004 01:35 | Morrison-Bandon section of Fairview-Bandon No 1 115kV line | 115.0 | S | 2.31 | 70 | Auto | Tree blown | Tree blown | EUG | 145014 | |
12/08/2004 00:25 | 12/08/2004 01:35 | Norway tap to Fairview-Bandon No 1 115kV line | 115.0 | T | 0.01 | 70 | Auto | Tree blown | Tree blown | EUG | 145014 | |
12/08/2004 00:25 | 12/08/2004 01:35 | Norway-Morrison section of Fairview-Bandon No 1 115kV line | 115.0 | S | 10.26 | 70 | Auto | Tree blown | Tree blown | EUG | 145014 | |
12/08/2004 05:37 | 12/08/2004 07:21 | Addy-AVA Gifford No 1 115kV line | 115.0 | L | 20.70 | 104 | Auto | Foreign Trouble | Foreign Trouble | SPK | 145024 | |
12/08/2004 06:47 | 12/08/2004 07:03 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 16 | Auto | Foreign Trouble | TDA RED | 145025 | ||
12/08/2004 06:47 | 12/08/2004 07:03 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 145025 | ||
12/08/2004 06:47 | 12/08/2004 07:03 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 145025 | ||
12/08/2004 06:47 | 12/08/2004 07:03 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 145025 | ||
12/08/2004 06:47 | 12/08/2004 07:03 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 145025 | ||
12/08/2004 06:47 | 12/08/2004 07:03 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 16 | Auto | Foreign Trouble | TDA | 145025 | ||
12/08/2004 07:05 | 12/08/2004 20:39 | Colville-Kettle Falls section of Colville-Republic No 1 115kV line | 115.0 | S | G | 13.30 | 814 | Auto | Weather | Weather | SPK | 145026 |
12/08/2004 07:05 | 12/08/2004 20:39 | Colville-Republic No 1 115kV line | 115.0 | L | 44.47 | 814 | Auto | Weather | Weather | SPK | 145026 | |
12/08/2004 07:05 | 12/08/2004 20:39 | Kettle Falls-Republic section of Colville-Republic No 1 115kV line | 115.0 | S | G | 31.17 | 814 | Auto | Weather | Weather | SPK | 145026 |
12/08/2004 07:29 | 12/08/2004 14:21 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 412 | Plan | Maintenance | OLY | 145027 | ||
12/08/2004 08:36 | 12/08/2004 08:36 | East Omak-Oroville No 1 115kV line | 115.0 | L | 39.01 | 0 | Auto | Foreign Trouble | Foreign Trouble | WEN | 145028 | |
12/08/2004 08:36 | 12/08/2004 08:36 | East Omak-Tonasket section of East Omak-Oroville No 1 115kV line | 115.0 | S | G | 20.20 | 0 | Auto | Foreign Trouble | Foreign Trouble | WEN | 145028 |
12/08/2004 08:36 | 12/08/2004 13:05 | Midway-Grandview No 1 115kV line | 115.0 | L | G | 25.07 | 269 | Plan | Maintenance | TRI WEN | 145029 | |
12/08/2004 08:36 | 12/08/2004 13:05 | Sunnyside Port-Grandview section of Midway-Grandview No 1 115kV line | 115.0 | S | 0.06 | 269 | Plan | Maintenance | WEN TRI | 145029 | ||
12/08/2004 09:15 | 12/08/2004 09:16 | Addy-AVA Devils Gap No 1 115kV line | 115.0 | L | 43.30 | 1 | Auto | Foreign Trouble | Foreign Trouble | SPK | 145030 | |
12/08/2004 09:20 | 12/08/2004 09:25 | La Pine-Chiloquin No 1 230kV line | 230.0 | L | 81.02 | 5 | Auto | Weather | Ice | RED | 145031 | |
12/08/2004 09:41 | 12/08/2004 14:48 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 307 | Plan | Maintenance | EUG | 145032 | ||
12/08/2004 09:41 | 12/08/2004 14:48 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 307 | Plan | Maintenance | EUG | 145032 | |
12/08/2004 10:01 | 12/08/2004 10:01 | Addy-AVA Gifford No 1 115kV line | 115.0 | L | 20.70 | 0 | Auto | Foreign Trouble | Foreign Trouble | SPK | 145033 | |
12/08/2004 10:34 | 12/08/2004 12:39 | Addy-AVA Gifford No 1 115kV line | 115.0 | L | 20.70 | 125 | Auto | Foreign Trouble | Foreign Trouble | SPK | 145034 | |
12/08/2004 10:52 | 12/08/2004 14:20 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 208 | Plan | Emergency | WEN COV | 145035 | ||
12/08/2004 13:27 | 12/16/2004 12:12 | Rogue-Gold Beach No 2 115kV line | 115.0 | L | 5.49 | 11445 | Plan | Foreign Request | EUG | 145036 | ||
12/08/2004 14:40 | 12/08/2004 16:30 | Olympia-Grand Coulee No 1 287kV line | 287.0 | L | 229.12 | 110 | Auto | Foreign Trouble | Foreign Trouble | OLY COV WEN | 145037 | |
12/09/2004 07:31 | 12/09/2004 15:05 | Chehalis-Raymond No 1 115kV line | 115.0 | L | G | 45.44 | 454 | Plan | Maintenance | OLY | 145047 | |
12/09/2004 07:31 | 12/09/2004 15:05 | Holcomb-Raymond section of Chehalis-Raymond No 1 115kV line | 115.0 | S | 12.18 | 454 | Plan | Maintenance | OLY | 145047 | ||
12/09/2004 08:48 | 12/09/2004 11:28 | Fairview-Rogue No 1 230kV line | 230.0 | L | 65.28 | 160 | Plan | Maintenance | EUG | 145048 | ||
12/09/2004 09:24 | 12/09/2004 14:38 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 314 | Plan | Maintenance | EUG | 145049 | ||
12/09/2004 09:24 | 12/09/2004 14:38 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 314 | Plan | Maintenance | EUG | 145049 | |
12/09/2004 10:21 | 12/09/2004 10:34 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 31.20 | 13 | Plan | Switching | RED | 145050 | ||
12/09/2004 10:21 | 12/09/2004 10:34 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 13 | Plan | Switching | RED | 145050 | ||
12/09/2004 10:21 | 12/09/2004 10:34 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 13 | Plan | Switching | RED | 145050 | |
12/09/2004 11:27 | 12/09/2004 11:27 | City View-Richland section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 1.38 | 0 | Auto | Unknown | Unknown | TRI | 145051 |
12/09/2004 11:27 | 12/09/2004 11:27 | Kennedy-Ledbeder section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 2.03 | 0 | Auto | Unknown | Unknown | TRI | 145051 |
12/09/2004 11:27 | 12/09/2004 11:27 | Ledbeder tap to Red Mountain-Richland No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 145051 |
12/09/2004 11:27 | 12/09/2004 11:27 | Ledbeder-City View section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 1.82 | 0 | Auto | Unknown | Unknown | TRI | 145051 |
12/09/2004 11:27 | 12/09/2004 11:27 | Red Mountain-Kennedy section of Red Mountain-Richland No 1 115kV line | 115.0 | S | G | 0.77 | 0 | Auto | Unknown | Unknown | TRI | 145051 |
12/09/2004 11:27 | 12/09/2004 11:27 | Red Mountain-Richland No 1 115kV line | 115.0 | L | 6.00 | 0 | Auto | Unknown | Unknown | TRI | 145051 | |
12/09/2004 11:27 | 12/09/2004 11:27 | Horn Rapids tap to Red Mountain-White Bluffs No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | TRI | 145052 |
12/09/2004 11:27 | 12/09/2004 11:27 | Horn Rapids-White Bluffs section of Red Mountain-White Bluffs No 1 115kV line | 115.0 | S | G | 5.76 | 0 | Auto | Unknown | Unknown | TRI | 145052 |
12/09/2004 11:27 | 12/09/2004 11:27 | Red Mountain-Horn Rapids section of Red Mountain-White Bluffs No 1 115kV line | 115.0 | S | G | 4.05 | 0 | Auto | Unknown | Unknown | TRI | 145052 |
12/09/2004 11:27 | 12/09/2004 11:27 | Red Mountain-White Bluffs No 1 115kV line | 115.0 | L | 9.81 | 0 | Auto | Unknown | Unknown | TRI | 145052 | |
12/09/2004 12:18 | 12/09/2004 13:30 | Swan Valley-Teton No 1 115kV line | 115.0 | L | T | 35.47 | 72 | Plan | Maintenance | IDF | 145053 | |
12/09/2004 12:18 | 12/09/2004 13:30 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | 10.94 | 72 | Plan | Maintenance | IDF | 145053 | ||
12/09/2004 12:20 | 12/09/2004 13:35 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 75 | Plan | Maintenance | IDF | 145054 | ||
12/09/2004 15:51 | 12/09/2004 15:51 | Murray-Custer No 1 230kV line | 230.0 | L | G | 63.39 | 0 | Plan | Switching | SNO | 145055 | |
12/09/2004 15:51 | 12/09/2004 15:51 | Murray-Sedro Woolley section of Murray-Custer No 1 230kV line | 230.0 | S | 25.67 | 0 | Plan | Switching | SNO | 145055 | ||
12/10/2004 00:01 | 12/10/2004 15:25 | North Mountain-Snohomish No 1 230kV line | 230.0 | L | 40.28 | 924 | Auto | Foreign Trouble | Foreign Trouble | SNO | 145056 | |
12/10/2004 02:01 | 12/10/2004 02:27 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 26 | Auto | Foreign Trouble | Foreign Trouble | TDA | 145057 | |
12/10/2004 07:05 | 12/10/2004 15:38 | Fairview-Bandon No 2 115kV line | 115.0 | L | 19.73 | 513 | Plan | Maintenance | EUG | 145062 | ||
12/10/2004 08:40 | 12/10/2004 14:27 | Blue River-Thurston section of Cougar-Thurston No 1 115kV line | 115.0 | S | 34.24 | 347 | Plan | Maintenance | EUG | 145063 | ||
12/10/2004 08:40 | 12/10/2004 14:27 | Cougar-Thurston No 1 115kV line | 115.0 | L | G | 39.99 | 347 | Plan | Maintenance | EUG | 145063 | |
12/10/2004 09:16 | 12/16/2004 11:12 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 8756 | Auto | Ice | Ice | IDF | 145064 | |
12/10/2004 09:18 | 12/10/2004 16:18 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 420 | Auto | Unknown | Terminal Equipment Failure | IDF | 145065 | |
12/10/2004 09:18 | 12/10/2004 16:18 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 420 | Auto | Unknown | Terminal Equipment Failure | IDF | 145065 |
12/10/2004 09:18 | 12/10/2004 16:45 | Palisades-Swan Valley No 1 115kV line | 115.0 | L | 12.40 | 447 | Auto | Unknown | Terminal Equipment Failure | IDF | 145066 | |
12/10/2004 09:18 | 12/10/2004 14:04 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 286 | Auto | Unknown | Terminal Equipment Failure | IDF | 145067 | |
12/10/2004 09:50 | 12/10/2004 09:52 | Swan Valley-Teton No 1 115kV line | 115.0 | L | O | 35.47 | 2 | Auto | Unknown | Unknown | IDF | 145068 |
12/10/2004 09:50 | 12/10/2004 09:52 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | 10.94 | 2 | Auto | Unknown | Unknown | IDF | 145068 | |
12/10/2004 09:50 | 12/10/2004 09:52 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.99 | 2 | Auto | Unknown | Unknown | IDF | 145068 | |
12/10/2004 09:50 | 12/10/2004 09:50 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 0 | Auto | Unknown | Forced (Configuration) | IDF | 145069 | |
12/10/2004 10:24 | 12/10/2004 15:14 | Fairmount-Port Angeles No 2 230kV line | 230.0 | L | G | 26.79 | 290 | Plan | Maintenance | OLY | 145070 | |
12/10/2004 10:24 | 12/10/2004 15:14 | Happy Valley-Port Angeles section of Fairmount-Port Angeles No 2 230kV line | 230.0 | S | 15.19 | 290 | Plan | Maintenance | OLY | 145070 | ||
12/10/2004 13:15 | 12/10/2004 17:45 | Captain Jack-Olinda No 1 500kV line | 500.0 | L | 148.86 | 270 | Plan | Foreign Request | RED | 145071 | ||
12/10/2004 16:31 | 12/10/2004 16:40 | Swan Valley-Goshen No 1 161kV line | 161.0 | L | 46.46 | 9 | Plan | Switching | IDF | 145072 | ||
12/10/2004 23:35 | 12/10/2004 23:51 | Chief Joseph PH-Chief Joseph No 5 500kV line | 500.0 | L | 0.80 | 16 | Plan | Foreign Request | WEN | 145073 | ||
12/11/2004 03:14 | 12/11/2004 06:05 | Ashe-Marion No 2 500kV line | 500.0 | L | 224.01 | 171 | Plan | Voltage Control | TRI TDA RED SAL | 145074 | ||
12/11/2004 16:02 | 12/13/2004 15:41 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 2859 | Auto | Terminal Equipment Failure | TDA RED | 145075 | |
12/11/2004 16:02 | 12/13/2004 15:41 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 2859 | Auto | Terminal Equipment Failure | TDA | 145075 | |||
12/11/2004 16:02 | 12/13/2004 15:27 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 2845 | Auto | Terminal Equipment Failure | Terminal Equipment Failure | TDA | 145076 | |
12/12/2004 00:56 | 12/12/2004 01:06 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 10 | Auto | Foreign Trouble | Foreign Trouble | TDA | 145077 | |
12/12/2004 11:39 | 12/12/2004 14:53 | Ross-Lexington No 1 230kV line | 230.0 | L | G | 41.21 | 194 | Auto | Tree blown | Tree blown | LGV | 145085 |
12/12/2004 11:39 | 12/12/2004 14:53 | Ross-Woodland section of Ross-Lexington No 1 230kV line | 230.0 | S | 19.85 | 194 | Auto | Tree blown | Tree blown | LGV | 145085 | |
12/12/2004 11:39 | 12/12/2004 13:19 | Swift tap to Ross-Lexington No 1 230kV line | 230.0 | T | 26.06 | 100 | Auto | Tree blown | Tree blown | LGV | 145085 | |
12/12/2004 11:39 | 12/12/2004 13:19 | Woodland-Lexington section of Ross-Lexington No 1 230kV line | 230.0 | S | 21.36 | 100 | Auto | Tree blown | Tree blown | LGV | 145085 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Bald Mountain tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.38 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 13:26 | Bald Mountain tap-Underwood section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.99 | 93 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:58 | Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | L | G | 45.05 | 5 | Auto | Wind | Wind | LGV | 145086 |
12/12/2004 11:53 | 12/12/2004 11:58 | Bonneville-Underwood section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 0.93 | 5 | Auto | Wind | Wind | LGV | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Carson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 1.24 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Carson-Bald Mountain tap section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 15.35 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | North Bonneville Annex tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | North Bonneville Annex-Stevenson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 5.30 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Stevenson tap to Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TT | 0.10 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Stevenson-Carson section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 3.60 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | T | 25.00 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Underwood tap-North Bonneville Annex section of Underwood tap to Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | TS | 0.10 | 4 | Auto | Wind | Wind | LGV TDA | 145086 | |
12/12/2004 11:53 | 12/12/2004 11:57 | Underwood-Alcoa section of Bonneville PH 1-Alcoa No 1&2 115kV line | 115.0 | S | 40.44 | 4 | Auto | Wind | Wind | LGV | 145086 | |
12/12/2004 12:23 | 12/12/2004 12:27 | McNary PH-McNary No 1 230kV line | 230.0 | L | 1.05 | 4 | Plan | Foreign Request | TRI | 145087 | ||
12/12/2004 13:51 | 12/12/2004 14:24 | Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 4.30 | 33 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 145088 | |
12/12/2004 13:51 | 12/12/2004 14:24 | Naselle-Hagen section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 13.00 | 33 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 145088 | |
12/12/2004 13:51 | 12/12/2004 14:24 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 33 | Auto | Foreign Trouble | Foreign Trouble | LGV OLY | 145088 |
12/12/2004 14:10 | 12/13/2004 00:22 | Covington-Columbia No 3 230kV line | 230.0 | L | 110.00 | 612 | Auto | Tree blown | Tree | COV WEN | 145089 | |
12/12/2004 15:24 | 12/12/2004 20:53 | North Bonneville-Troutdale No 2 230kV line | 230.0 | L | 27.77 | 329 | Auto | Tree blown | Wind | LGV | 145090 | |
12/12/2004 16:59 | 12/12/2004 19:01 | Dutch Canyon-Warren section of St Johns-St Helens No 1 115kV line | 115.0 | S | 5.37 | 122 | Auto | Tree blown | Tree blown | LGV | 145091 | |
12/12/2004 16:59 | 12/12/2004 22:21 | St Johns-Dutch Canyon section of St Johns-St Helens No 1 115kV line | 115.0 | S | 12.82 | 322 | Auto | Tree blown | Tree blown | LGV | 145091 | |
12/12/2004 16:59 | 12/12/2004 22:21 | St Johns-St Helens No 1 115kV line | 115.0 | L | G | 23.27 | 322 | Auto | Tree blown | Tree blown | LGV | 145091 |
12/12/2004 16:59 | 12/12/2004 16:59 | Warren-St Helens section of St Johns-St Helens No 1 115kV line | 115.0 | S | 5.08 | 0 | Auto | Tree blown | Tree blown | LGV | 145091 | |
12/13/2004 02:47 | 12/13/2004 02:52 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 5 | Plan | Switching | TDA | 145092 | ||
12/13/2004 02:47 | 12/13/2004 08:29 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 342 | Plan | Foreign Request | TDA RED | 145093 | ||
12/13/2004 02:47 | 12/13/2004 08:29 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 342 | Plan | Foreign Request | TDA | 145093 | ||
12/13/2004 02:47 | 12/13/2004 08:29 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 342 | Plan | Foreign Request | TDA | 145093 | ||
12/13/2004 02:47 | 12/13/2004 08:29 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 342 | Plan | Foreign Request | TDA | 145093 | ||
12/13/2004 02:47 | 12/13/2004 08:29 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 342 | Plan | Foreign Request | TDA | 145093 | ||
12/13/2004 02:47 | 12/13/2004 08:29 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 342 | Plan | Foreign Request | TDA | 145093 | ||
12/13/2004 07:07 | 12/16/2004 14:50 | Sickler-Douglas Switchyard No 1 230kV line | 230.0 | L | 0.58 | 4783 | Plan | Maintenance | WEN | 145100 | ||
12/13/2004 07:20 | 12/13/2004 07:32 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 12 | Auto | Foreign Trouble | Foreign Trouble | TDA | 145101 | |
12/13/2004 07:20 | 12/13/2004 07:32 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 12 | Auto | Foreign Trouble | TDA RED | 145102 | |
12/13/2004 07:20 | 12/13/2004 07:32 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 12 | Auto | Foreign Trouble | TDA | 145102 | |||
12/13/2004 07:33 | 12/17/2004 10:47 | Keeler-Oregon City No 2 115kV line | 115.0 | L | 21.43 | 5954 | Plan | Maintenance | SAL LGV | 145103 | ||
12/13/2004 08:01 | 12/16/2004 09:20 | Chief Joseph-East Omak No 1 230kV line | 230.0 | L | 33.99 | 4399 | Plan | Maintenance | WEN | 145104 | ||
12/13/2004 08:22 | 12/13/2004 08:25 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 3 | Plan | Switching | TDA | 145105 | ||
12/13/2004 08:28 | 12/13/2004 15:45 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 437 | Plan | Forced | EUG | 145106 | ||
12/13/2004 08:30 | 12/13/2004 15:45 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 435 | Plan | Maintenance | EUG | 145107 | ||
12/13/2004 08:43 | 12/13/2004 14:40 | Albany-Eugene No 1 115kV line | 115.0 | L | G | 39.80 | 357 | Plan | Maintenance | EUG | 145108 | |
12/13/2004 08:43 | 12/13/2004 14:40 | Alderwood-Junction City section of Albany-Eugene No 1 115kV line | 115.0 | S | 2.04 | 357 | Plan | Maintenance | EUG | 145108 | ||
12/13/2004 08:43 | 12/13/2004 14:40 | Harrisburg-Alderwood section of Albany-Eugene No 1 115kV line | 115.0 | S | 8.28 | 357 | Plan | Maintenance | EUG | 145108 | ||
12/13/2004 09:01 | 12/16/2004 10:07 | Angus tap to Franklin-Badger Canyon No 2 115kV line | 115.0 | T | 1.60 | 4386 | Plan | Construction | TRI | 145109 | ||
12/13/2004 09:01 | 12/16/2004 10:07 | Franklin-Badger Canyon No 2 115kV line | 115.0 | L | T | 13.35 | 4386 | Plan | Construction | TRI | 145109 | |
12/13/2004 10:08 | 12/13/2004 13:12 | Unity-Heyburn No 1 138kV line | 138.0 | L | 6.56 | 184 | Plan | Maintenance | IDF | 145110 | ||
12/13/2004 13:39 | 12/13/2004 13:42 | Albany-Eugene No 1 115kV line | 115.0 | L | O | 39.80 | 3 | Auto | Arc while switching | Arc while switching | EUG | 145111 |
12/13/2004 13:39 | 12/13/2004 13:42 | Junction City tap to Albany-Eugene No 1 115kV line | 115.0 | T | 0.05 | 3 | Auto | Arc while switching | Arc while switching | EUG | 145111 | |
12/13/2004 13:39 | 12/13/2004 13:42 | Junction City-Eugene section of Albany-Eugene No 1 115kV line | 115.0 | S | 6.86 | 3 | Auto | Arc while switching | Arc while switching | EUG | 145111 | |
12/13/2004 13:41 | West Burley-Burley section of West Burley-Heyburn No 1 138kV line | 138.0 | S | 2.22 | still out | Plan | Normally Out | IDF | 145112 | |||
12/13/2004 13:41 | West Burley-Heyburn No 1 138kV line | 138.0 | L | G | 4.43 | still out | Plan | Normally Out | IDF | 145112 | ||
12/13/2004 14:54 | Albany-Eugene No 1 115kV line | 115.0 | L | G | 39.80 | still out | Plan | Normally Out | EUG | 145113 | ||
12/13/2004 14:54 | Halsey Mill-Harrisburg section of Albany-Eugene No 1 115kV line | 115.0 | S | 5.53 | still out | Plan | Normally Out | EUG | 145113 | |||
12/13/2004 16:20 | 12/13/2004 16:20 | Cannon Beach-Seaside section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | G | 8.60 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/13/2004 16:20 | 12/13/2004 16:20 | Garibaldi tap to Tillamook-PACW Astoria No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/13/2004 16:20 | 12/13/2004 16:20 | Garibaldi-Mohler section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | G | 10.90 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/13/2004 16:20 | 12/13/2004 16:20 | Mohler-Nehalem section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | G | 2.50 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/13/2004 16:20 | 12/13/2004 16:20 | Nehalem-Cannon Beach section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | G | 11.60 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/13/2004 16:20 | 12/13/2004 16:20 | Seaside-Warrenton section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | G | 12.80 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/13/2004 16:20 | 12/13/2004 16:20 | Tillamook-Garibaldi section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | G | 8.60 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/13/2004 16:20 | 12/13/2004 16:20 | Tillamook-PACW Astoria No 1 115kV line | 115.0 | L | 57.70 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 | |
12/13/2004 16:20 | 12/13/2004 16:20 | Warrenton-PACW Astoria section of Tillamook-PACW Astoria No 1 115kV line | 115.0 | S | G | 2.70 | 0 | Auto | Foreign Trouble | Foreign Trouble | SAL | 145114 |
12/14/2004 05:36 | 12/14/2004 05:36 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 0 | Auto | Unknown | Tree cut | EUG | 145119 | |
12/14/2004 07:36 | 12/15/2004 14:54 | Fairview-Bandon No 1 115kV line | 115.0 | L | G | 25.16 | 1878 | Plan | Maintenance | EUG | 145120 | |
12/14/2004 07:36 | 12/15/2004 14:54 | Fairview-Norway section of Fairview-Bandon No 1 115kV line | 115.0 | S | 12.59 | 1878 | Plan | Maintenance | EUG | 145120 | ||
12/14/2004 07:37 | 12/14/2004 15:04 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 447 | Plan | Switching | EUG | 145121 | ||
12/14/2004 07:37 | 12/14/2004 15:04 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 447 | Plan | Maintenance | EUG | 145122 | ||
12/14/2004 07:39 | 12/14/2004 13:09 | Addy tap to Bell-Boundary No 3 230kV line | 230.0 | T | 0.02 | 330 | Plan | Construction | SPK | 145123 | ||
12/14/2004 07:39 | 12/14/2004 13:09 | Bell-Boundary No 3 230kV line | 230.0 | L | T | 108.07 | 330 | Plan | Construction | SPK | 145123 | |
12/14/2004 08:03 | 12/14/2004 13:12 | Fern Ridge-Noti Creek section of Lane-Wendson No 1 115kV line | 115.0 | S | 2.82 | 309 | Plan | Maintenance | EUG | 145124 | ||
12/14/2004 08:03 | 12/14/2004 13:12 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 309 | Plan | Maintenance | EUG | 145124 | |
12/14/2004 08:10 | 12/14/2004 15:32 | Carlton-Tillamook No 1 230kV line | 230.0 | L | 40.96 | 442 | Plan | Switching | SAL | 145125 | ||
12/14/2004 08:10 | 12/14/2004 15:32 | Carlton-Cascade Steel section of Carlton-Sherwood No 1 230kV line | 230.0 | S | G | 8.94 | 442 | Plan | Foreign Request | SAL | 145126 | |
12/14/2004 08:10 | 12/14/2004 15:32 | Carlton-Sherwood No 1 230kV line | 230.0 | L | 17.92 | 442 | Plan | Foreign Request | SAL | 145126 | ||
12/14/2004 08:10 | 12/14/2004 15:32 | Cascade Steel tap to Carlton-Sherwood No 1 230kV line | 230.0 | T | G | 12.67 | 442 | Plan | Foreign Request | SAL | 145126 | |
12/14/2004 08:10 | 12/14/2004 15:32 | Cascade Steel-Sherwood section of Carlton-Sherwood No 1 230kV line | 230.0 | S | G | 8.98 | 442 | Plan | Foreign Request | SAL | 145126 | |
12/15/2004 06:47 | 12/15/2004 17:48 | Hatwai-AVA North Lewiston No 1 230kV line | 230.0 | L | 7.00 | 661 | Plan | Foreign Request | SPK | 145134 | ||
12/15/2004 07:17 | 12/15/2004 15:49 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 512 | Plan | Switching | EUG | 145135 | ||
12/15/2004 07:19 | 12/15/2004 15:50 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 511 | Plan | Maintenance | EUG | 145136 | ||
12/15/2004 07:38 | 12/15/2004 14:41 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 423 | Plan | Maintenance | EUG | 145137 | |
12/15/2004 07:38 | 12/15/2004 14:41 | Walton-Mapleton section of Lane-Wendson No 1 115kV line | 115.0 | S | 14.62 | 423 | Plan | Maintenance | EUG | 145137 | ||
12/15/2004 08:05 | 12/16/2004 14:47 | North Bonneville-Troutdale No 2 230kV line | 230.0 | L | 27.77 | 1842 | Plan | Maintenance | LGV | 145138 | ||
12/15/2004 08:13 | 12/15/2004 15:59 | Grizzly-Captain Jack No 1 500kV line | 500.0 | L | 174.50 | 466 | Plan | Maintenance | RED | 145139 | ||
12/15/2004 09:15 | 12/15/2004 11:07 | McNary PH-McNary No 1 230kV line | 230.0 | L | 1.05 | 112 | Plan | Foreign Request | TRI | 145140 | ||
12/15/2004 10:00 | 12/15/2004 10:00 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.48 | 0 | Auto | Unknown | Unknown | IDF | 145141 |
12/15/2004 10:00 | 12/15/2004 10:00 | Swan Valley-Teton No 1 115kV line | 115.0 | L | 35.47 | 0 | Auto | Unknown | Unknown | IDF | 145141 | |
12/15/2004 10:00 | 12/15/2004 10:00 | Targhee tap to Swan Valley-Teton No 1 115kV line | 115.0 | T | G | 10.94 | 0 | Auto | Unknown | Unknown | IDF | 145141 |
12/15/2004 10:00 | 12/15/2004 10:00 | Targhee-Teton section of Swan Valley-Teton No 1 115kV line | 115.0 | S | G | 17.99 | 0 | Auto | Unknown | Unknown | IDF | 145141 |
12/15/2004 10:10 | 12/15/2004 17:16 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | 844.15 | 426 | Plan | Foreign Request | TDA RED | 145142 | ||
12/15/2004 10:10 | 12/15/2004 17:16 | Converter 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 426 | Plan | Foreign Request | TDA | 145142 | ||
12/15/2004 10:10 | 12/15/2004 17:16 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 426 | Plan | Foreign Request | TDA | 145142 | ||
12/15/2004 10:10 | 12/15/2004 17:16 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 426 | Plan | Foreign Request | TDA | 145142 | ||
12/15/2004 10:10 | 12/15/2004 17:16 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 426 | Plan | Foreign Request | TDA | 145142 | ||
12/15/2004 10:10 | 12/15/2004 17:16 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | G | 426 | Plan | Foreign Request | TDA | 145142 | ||
12/15/2004 10:10 | 12/15/2004 12:00 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 110 | Plan | Foreign Request | TDA RED | 145143 | ||
12/15/2004 10:10 | 12/15/2004 12:00 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 110 | Plan | Foreign Request | TDA | 145143 | ||
12/15/2004 10:10 | 12/15/2004 12:00 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 110 | Plan | Foreign Request | TDA | 145143 | ||
12/15/2004 10:10 | 12/15/2004 12:00 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 110 | Plan | Foreign Request | TDA | 145143 | ||
12/15/2004 10:10 | 12/15/2004 12:00 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 110 | Plan | Foreign Request | TDA | 145143 | ||
12/15/2004 10:10 | 12/15/2004 12:00 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 110 | Plan | Foreign Request | TDA | 145143 | ||
12/15/2004 10:13 | 12/15/2004 10:18 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 5 | Plan | Switching | TDA | 145144 | ||
12/15/2004 10:13 | 12/15/2004 17:05 | Big Eddy-Celilo No 2 500kV line | 500.0 | L | 0.62 | 412 | Plan | Switching | TDA | 145145 | ||
12/15/2004 13:28 | 12/15/2004 13:38 | Bonneville PH 2-North Bonneville No 3 230kV line | 230.0 | L | 1.36 | 10 | Plan | Foreign Request | LGV | 145146 | ||
12/15/2004 17:02 | 12/15/2004 17:05 | Big Eddy-Celilo No 1 500kV line | 500.0 | L | 0.72 | 3 | Plan | Switching | TDA | 145147 | ||
12/15/2004 17:02 | 12/15/2004 17:16 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 14 | Plan | Foreign Request | TDA RED | 145148 | ||
12/15/2004 17:02 | 12/15/2004 17:16 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 145148 | ||
12/15/2004 17:02 | 12/15/2004 17:16 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 145148 | ||
12/15/2004 17:02 | 12/15/2004 17:16 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 145148 | ||
12/15/2004 17:02 | 12/15/2004 17:16 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 145148 | ||
12/15/2004 17:02 | 12/15/2004 17:16 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 14 | Plan | Foreign Request | TDA | 145148 | ||
12/15/2004 21:06 | 12/15/2004 21:06 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 0 | Auto | Staged Test | Staged Test | KAL SPK | 145149 | |
12/15/2004 21:06 | 12/15/2004 21:16 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 10 | Auto | Staged Test | WEN SPK | 145150 | ||
12/15/2004 21:06 | 12/15/2004 21:06 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 0 | Auto | Staged Test | Staged Test | WEN SPK | 145151 |
12/15/2004 21:06 | 12/15/2004 21:06 | Creston-Larene section of Creston-Bell No 1 115kV line | 115.0 | S | 16.73 | 0 | Auto | Staged Test | Staged Test | WEN | 145151 | |
12/15/2004 22:16 | 12/15/2004 23:50 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 94 | Plan | Testing | WEN SPK | 145152 | ||
12/16/2004 00:02 | 12/16/2004 00:15 | Grand Coulee-Bell No 6 500kV line | 500.0 | L | 82.75 | 13 | Plan | Switching | WEN SPK | 145153 | ||
12/16/2004 00:06 | 12/16/2004 00:15 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 9 | Auto | Staged Test | Staged Test | KAL SPK | 145154 | |
12/16/2004 02:21 | 12/16/2004 02:21 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 0 | Auto | Staged Test | Staged Test | KAL SPK | 145155 | |
12/16/2004 07:05 | 12/16/2004 16:10 | Cosmopolis-Aberdeen No 1 115kV line | 115.0 | L | 6.79 | 545 | Plan | Foreign Request | OLY | 145159 | ||
12/16/2004 07:25 | 12/16/2004 15:00 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 455 | Plan | Switching | EUG | 145160 | ||
12/16/2004 07:27 | 12/16/2004 15:01 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 454 | Plan | Maintenance | EUG | 145161 | ||
12/16/2004 07:43 | 12/16/2004 15:08 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 445 | Plan | Maintenance | EUG | 145162 | |
12/16/2004 07:43 | 12/16/2004 15:08 | Walton-Mapleton section of Lane-Wendson No 1 115kV line | 115.0 | S | 14.62 | 445 | Plan | Maintenance | EUG | 145162 | ||
12/16/2004 08:44 | 12/16/2004 16:19 | North Bonneville-Ross No 1 230kV line | 230.0 | L | G | 36.32 | 455 | Plan | Forced | LGV | 145163 | |
12/16/2004 08:44 | 12/16/2004 16:19 | Sifton-Ross section of North Bonneville-Ross No 1 230kV line | 230.0 | S | 8.67 | 455 | Plan | Forced | LGV | 145163 | ||
12/16/2004 08:53 | 12/16/2004 13:07 | Hagen-Tarlett section of Naselle-Tarlett No 2 115kV line | 115.0 | S | 4.30 | 254 | Plan | Maintenance | LGV OLY | 145164 | ||
12/16/2004 08:53 | 12/16/2004 13:07 | Naselle-Tarlett No 2 115kV line | 115.0 | L | G | 17.30 | 254 | Plan | Maintenance | LGV OLY | 145164 | |
12/16/2004 10:36 | 12/23/2004 19:02 | Swan Valley-Targhee section of Swan Valley-Teton No 1 115kV line | 115.0 | S | 17.48 | 10586 | Plan | Switching | IDF | 145165 | ||
12/16/2004 10:36 | 12/23/2004 19:02 | Swan Valley-Teton No 1 115kV line | 115.0 | L | G | 35.47 | 10586 | Plan | Switching | IDF | 145165 | |
12/16/2004 21:12 | 12/16/2004 21:12 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 0 | Auto | Staged Test | Staged Test | KAL SPK | 145166 | |
12/16/2004 21:48 | 12/16/2004 21:48 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 0 | Auto | Staged Test | Staged Test | KAL SPK | 145167 | |
12/16/2004 22:21 | 12/16/2004 22:22 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 1 | Auto | Staged Test | Staged Test | KAL SPK | 145168 | |
12/16/2004 22:21 | 12/16/2004 22:21 | Creston-Bell No 1 115kV line | 115.0 | L | G | 53.80 | 0 | Auto | Staged Test | Staged Test | WEN SPK | 145169 |
12/16/2004 22:21 | 12/16/2004 22:21 | Creston-Larene section of Creston-Bell No 1 115kV line | 115.0 | S | 16.73 | 0 | Auto | Staged Test | Staged Test | WEN | 145169 | |
12/17/2004 00:12 | 12/17/2004 00:12 | Taft-Bell No 1 500kV line | 500.0 | L | 96.44 | 0 | Auto | Staged Test | Staged Test | KAL SPK | 145170 | |
12/17/2004 00:12 | 12/17/2004 00:19 | Grand Coulee-Westside AVA No 1 230kV line | 230.0 | L | 77.32 | 7 | Auto | Staged Test | WEN SPK | 145172 | ||
12/17/2004 00:25 | 12/17/2004 11:05 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 640 | Auto | Unknown | Unknown | IDF | 145173 | |
12/17/2004 07:16 | 12/17/2004 14:43 | Dixonville PACW-Reston No 1 230kV line | 230.0 | L | 17.40 | 447 | Plan | Switching | EUG | 145174 | ||
12/17/2004 07:17 | 12/17/2004 14:44 | Reston-Fairview No 2 230kV line | 230.0 | L | 29.47 | 447 | Plan | Maintenance | EUG | 145175 | ||
12/17/2004 08:10 | 12/17/2004 14:37 | Lane-Wendson No 1 115kV line | 115.0 | L | G | 41.39 | 387 | Plan | Maintenance | EUG | 145176 | |
12/17/2004 08:10 | 12/17/2004 14:37 | Noti Creek-Walton section of Lane-Wendson No 1 115kV line | 115.0 | S | 9.52 | 387 | Plan | Maintenance | EUG | 145176 | ||
12/17/2004 14:30 | 12/17/2004 14:30 | Big Eddy-Mabton section of Big Eddy-Midway No 1 230kV line | 230.0 | S | 71.70 | 0 | Plan | Switching | TDA TRI | 145177 | ||
12/17/2004 14:30 | 12/17/2004 14:30 | Big Eddy-Midway No 1 230kV line | 230.0 | L | G | 102.80 | 0 | Plan | Switching | TDA TRI | 145177 | |
12/17/2004 14:30 | 12/17/2004 14:30 | Mabton tap to Big Eddy-Midway No 1 230kV line | 230.0 | T | 0.10 | 0 | Plan | Switching | TRI | 145177 | ||
12/19/2004 09:51 | 12/19/2004 09:54 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | 844.15 | 3 | Auto | Foreign Trouble | TDA RED | 145178 | ||
12/19/2004 09:51 | 12/19/2004 09:54 | Converter 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 3 | Auto | Foreign Trouble | TDA | 145178 | ||
12/19/2004 09:51 | 12/19/2004 09:54 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 3 | Auto | Foreign Trouble | TDA | 145178 | ||
12/19/2004 09:51 | 12/19/2004 09:54 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 3 | Auto | Foreign Trouble | TDA | 145178 | ||
12/19/2004 09:51 | 12/19/2004 09:54 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 3 | Auto | Foreign Trouble | TDA | 145178 | ||
12/19/2004 09:51 | 12/19/2004 09:54 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | G | 3 | Auto | Foreign Trouble | TDA | 145178 | ||
12/19/2004 13:29 | 12/19/2004 13:29 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | 54.70 | 0 | Auto | Unknown | Unknown | RED | 145179 | |
12/19/2004 13:29 | 12/19/2004 13:29 | Redmond-Harney No 1 115kV line | 115.0 | L | G | 125.40 | 0 | Auto | Unknown | Unknown | RED | 145179 |
12/19/2004 23:58 | 12/22/2004 12:56 | Kitsap-South Bremerton No 1 115kV line | 115.0 | L | 0.70 | 3658 | Plan | Maintenance | OLY | 145180 | ||
12/20/2004 07:19 | 12/20/2004 17:01 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 582 | Auto | Line Material Failure | Wind | KAL | 145182 | |
12/20/2004 08:42 | 12/23/2004 09:10 | Bell-Lancaster No 1 230kV line | 230.0 | L | 23.52 | 4348 | Plan | Maintenance | SPK | 145183 | ||
12/21/2004 07:24 | 12/21/2004 14:25 | Big Eddy-Parkdale section of Big Eddy-Troutdale No 1 230kV line | 230.0 | S | 23.44 | 421 | Plan | Maintenance | TDA | 145188 | ||
12/21/2004 07:24 | 12/21/2004 14:25 | Big Eddy-Troutdale No 1 230kV line | 230.0 | L | G | 77.43 | 421 | Plan | Maintenance | TDA LGV | 145188 | |
12/21/2004 08:23 | 12/21/2004 08:54 | Longview-Chehalis 1&3 No 3 230kV line | 230.0 | L | 31.13 | 31 | Plan | Emergency | LGV OLY | 145189 | ||
12/21/2004 08:23 | 12/21/2004 08:54 | Longview-Chehalis 1&3 No 1 230kV line | 230.0 | L | 34.94 | 31 | Plan | Emergency | LGV OLY | 145190 | ||
12/21/2004 09:14 | 12/21/2004 14:13 | Grand Avenue tap to Ross-Vancouver Shipyard No 1 115kV line | 115.0 | T | 0.10 | 299 | Plan | Maintenance | LGV | 145191 | ||
12/21/2004 09:14 | 12/21/2004 14:13 | Ross-Mill Plain section of Ross-Vancouver Shipyard No 1 115kV line | 115.0 | S | 3.66 | 299 | Plan | Maintenance | LGV | 145191 | ||
12/21/2004 09:14 | 12/21/2004 14:13 | Ross-Vancouver Shipyard No 1 115kV line | 115.0 | L | G | 4.73 | 299 | Plan | Maintenance | LGV | 145191 | |
12/21/2004 12:12 | Christmas Valley tap to Redmond-Harney No 1 115kV line | 115.0 | T | 31.20 | still out | Plan | Foreign Request | RED | 145192 | |||
12/21/2004 12:12 | Redmond-Harney No 1 115kV line | 115.0 | L | T | 125.40 | still out | Plan | Foreign Request | RED | 145192 | ||
12/22/2004 07:59 | 12/22/2004 10:24 | Chehalis-Centralia No 1 69kV line | 69.0 | L | 11.05 | 145 | Plan | Maintenance | OLY | 145193 | ||
12/22/2004 08:18 | 12/22/2004 11:17 | Hot Springs-Dixon section of Hot Springs-Rattlesnake No 1 230kV line | 230.0 | S | 25.06 | 179 | Plan | Emergency | KAL | 145194 | ||
12/22/2004 08:18 | 12/22/2004 11:17 | Hot Springs-Rattlesnake No 1 230kV line | 230.0 | L | G | 58.91 | 179 | Plan | Emergency | KAL | 145194 | |
12/22/2004 11:05 | 12/22/2004 11:18 | John Day-Big Eddy No 2 500kV line | 500.0 | L | 18.96 | 13 | Auto | Improper Relaying | Terminal Equipment Failure | TDA | 145195 | |
12/22/2004 15:56 | 12/22/2004 16:00 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 4 | Plan | Switching | WEN COV | 145196 | ||
12/23/2004 06:23 | 12/23/2004 06:35 | The Dalles PH-Big Eddy No 5 230kV line | 230.0 | L | 0.92 | 12 | Auto | Foreign Trouble | Foreign Trouble | TDA | 145198 | |
12/23/2004 07:51 | 12/23/2004 11:46 | Glasgow-Sumner section of Reedsport-Fairview No 1 115kV line | 115.0 | S | 14.02 | 235 | Plan | Maintenance | EUG | 145199 | ||
12/23/2004 07:51 | 12/23/2004 11:46 | Reedsport-Fairview No 1 115kV line | 115.0 | L | G | 38.48 | 235 | Plan | Maintenance | EUG | 145199 | |
12/23/2004 09:03 | 12/23/2004 09:26 | John Day-Big Eddy No 2 500kV line | 500.0 | L | 18.96 | 23 | Plan | Maintenance | TDA | 145200 | ||
12/23/2004 11:44 | 12/23/2004 11:44 | Ostrander-McLoughlin No 1 230kV line | 230.0 | L | 8.82 | 0 | Auto | Equipment/Miscellaneous | Equipment/Miscellaneous | LGV | 145201 | |
12/23/2004 11:55 | 12/23/2004 12:31 | Rocky Reach-Maple Valley No 1 345kV line | 345.0 | L | 128.87 | 36 | Plan | Switching | WEN COV | 145202 | ||
12/23/2004 13:53 | 12/23/2004 15:01 | Big Eddy-Celilo No 3 230kV line | 230.0 | L | 1.09 | 68 | Auto | Equipment/Miscellaneous | Improper Relaying | TDA | 145203 | |
12/23/2004 13:53 | 12/23/2004 15:01 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 68 | Auto | Forced (Configuration) | TDA RED | 145204 | |
12/23/2004 13:53 | 12/23/2004 15:01 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 68 | Auto | Forced (Configuration) | TDA | 145204 | |||
12/23/2004 13:53 | 12/23/2004 15:01 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 68 | Auto | Forced (Configuration) | TDA | 145204 | |||
12/23/2004 13:53 | 12/23/2004 15:01 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 68 | Auto | Forced (Configuration) | TDA | 145204 | |||
12/23/2004 13:53 | 12/23/2004 15:01 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 68 | Auto | Forced (Configuration) | TDA | 145204 | |||
12/23/2004 15:42 | 12/23/2004 15:54 | Swan Valley-Teton No 2 115kV line | 115.0 | L | 35.41 | 12 | Plan | Switching | IDF | 145205 | ||
12/24/2004 01:52 | 12/24/2004 03:23 | Black Canyon-Emmett No 1 69kV line | 69.0 | L | 4.50 | 91 | Auto | Unknown | IDF | 145206 | ||
12/24/2004 19:53 | 12/24/2004 20:07 | Chief Joseph PH-Chief Joseph No 5 500kV line | 500.0 | L | 0.80 | 14 | Plan | Foreign Request | WEN | 145207 | ||
12/26/2004 02:01 | 12/26/2004 06:49 | Marion-Lane No 1 500kV line | 500.0 | L | 68.97 | 288 | Plan | Voltage Control | SAL EUG | 145208 | ||
12/26/2004 17:14 | 12/27/2004 14:20 | North Mountain-Snohomish No 1 230kV line | 230.0 | L | 40.28 | 1266 | Auto | Foreign Trouble | Foreign Trouble | SNO | 145212 | |
12/26/2004 22:17 | 12/26/2004 22:17 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 0 | Auto | Unknown | Line Material Failure | IDF | 145210 | |
12/27/2004 23:16 | 12/29/2004 09:53 | Big Hanaford-Centralia section of Paul-Centralia Thermal PH No 1 500kV line | 500.0 | S | 0.24 | 2077 | Plan | Foreign Request | OLY | 145213 | ||
12/27/2004 23:16 | 12/29/2004 09:53 | Paul-Centralia Thermal PH No 1 500kV line | 500.0 | L | G | 0.78 | 2077 | Plan | Foreign Request | OLY | 145213 | |
12/28/2004 07:01 | 12/28/2004 14:11 | Grand Coulee-Schultz No 1 500kV line | 500.0 | L | 97.01 | 430 | Plan | Maintenance | WEN | 145221 | ||
12/28/2004 08:11 | 12/28/2004 16:19 | Tacoma-Raver No 1&2 500kV line | 500.0 | L | 33.06 | 488 | Plan | Maintenance | COV | 145222 | ||
12/28/2004 09:12 | 12/28/2004 09:23 | Chief Joseph PH-Chief Joseph No 5 500kV line | 500.0 | L | 0.80 | 11 | Plan | Foreign Request | WEN | 145223 | ||
12/28/2004 13:20 | 12/28/2004 13:54 | Longview-Chehalis 1&3 No 1 230kV line | 230.0 | L | 34.94 | 34 | Plan | Maintenance | LGV OLY | 145224 | ||
12/28/2004 20:25 | 12/28/2004 20:25 | Idahome-Bridge section of Minidoka PH-Bridge No 1 138kV line | 138.0 | S | G | 20.40 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 145225 |
12/28/2004 20:25 | 12/28/2004 20:25 | Minidoka PH-Bridge No 1 138kV line | 138.0 | L | 40.90 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 145225 | |
12/28/2004 20:25 | 12/28/2004 20:25 | Minidoka PH-Idahome section of Minidoka PH-Bridge No 1 138kV line | 138.0 | S | G | 20.50 | 0 | Auto | Foreign Trouble | Foreign Trouble | IDF | 145225 |
12/29/2004 06:58 | 12/29/2004 08:32 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 94 | Auto | Equipment/Miscellaneous | TDA RED | 145231 | |
12/29/2004 06:58 | 12/29/2004 08:32 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 94 | Auto | Equipment/Miscellaneous | TDA | 145231 | |||
12/29/2004 06:58 | 12/29/2004 08:32 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 94 | Auto | Equipment/Miscellaneous | TDA | 145231 | |||
12/29/2004 06:58 | 12/29/2004 08:32 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 94 | Auto | Equipment/Miscellaneous | TDA | 145231 | |||
12/29/2004 06:58 | 12/29/2004 08:32 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 94 | Auto | Equipment/Miscellaneous | TDA | 145231 | |||
12/29/2004 07:28 | 12/29/2004 12:37 | Garrison-Anaconda No 1 230kV line | 230.0 | L | 31.31 | 309 | Plan | Maintenance | KAL | 145232 | ||
12/29/2004 07:42 | 12/29/2004 16:26 | Tacoma-Raver No 1&2 500kV line | 500.0 | L | 33.06 | 524 | Plan | Maintenance | COV | 145233 | ||
12/29/2004 08:41 | 12/29/2004 09:12 | Bellingham-PSE Bellingham No 3 115kV line | 115.0 | L | 3.60 | 31 | Auto | Foreign Trouble | Foreign Trouble | SNO | 145234 | |
12/29/2004 08:59 | 12/29/2004 13:06 | Targhee-Drummond No 1 115kV line | 115.0 | L | 26.80 | 247 | Plan | Maintenance | IDF | 145235 | ||
12/29/2004 09:42 | 12/29/2004 15:21 | Lower Granite-Hatwai No 1 500kV line | 500.0 | L | 32.87 | 339 | Plan | Emergency | SPK TRI | 145236 | ||
12/29/2004 10:47 | 12/29/2004 11:21 | Palisades-Swan Valley No 1 115kV line | 115.0 | L | 12.40 | 34 | Plan | Maintenance | IDF | 145237 | ||
12/30/2004 07:31 | 12/30/2004 16:01 | Tacoma-Raver No 1&2 500kV line | 500.0 | L | 33.06 | 510 | Plan | PCS Cellular Work | COV | 145243 | ||
12/30/2004 07:53 | 12/30/2004 17:00 | Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | L | T | 844.15 | 547 | Plan | Maintenance | TDA RED | 145244 | |
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 1 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145244 | |||
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 3 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145244 | |||
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 5 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145244 | |||
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 7 tap to Celilo-Sylmar Pole No 3 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145244 | |||
12/30/2004 07:53 | 12/30/2004 17:00 | Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | L | T | 844.15 | 547 | Plan | Maintenance | TDA RED | 145245 | |
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 2 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145245 | |||
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 4 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145245 | |||
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 6 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145245 | |||
12/30/2004 07:53 | 12/30/2004 17:00 | Valve Group 8 tap to Celilo-Sylmar Pole No 4 1000kV line | 1000.0 | T | 547 | Plan | Maintenance | TDA | 145245 | |||
12/30/2004 13:06 | 12/30/2004 13:12 | Badger Canyon-Richland No 1 115kV line | 115.0 | L | T | 5.51 | 6 | Plan | Foreign Request | TRI | 145246 | |
12/30/2004 13:06 | 12/30/2004 13:12 | City of Richland tap to Badger Canyon-Richland No 1 115kV line | 115.0 | T | 0.10 | 6 | Plan | Foreign Request | TRI | 145246 | ||
12/31/2004 02:03 | 12/31/2004 02:03 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Unknown | RED | 145247 |
12/31/2004 02:03 | 12/31/2004 02:03 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 145247 |
12/31/2004 02:03 | 12/31/2004 02:03 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Unknown | RED | 145247 |
12/31/2004 02:03 | 12/31/2004 02:03 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Unknown | RED | 145247 |
12/31/2004 02:03 | 12/31/2004 02:03 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Unknown | RED | 145247 | |
12/31/2004 02:03 | 12/31/2004 02:03 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 145247 |
12/31/2004 02:03 | 12/31/2004 02:03 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Unknown | RED | 145247 |
12/31/2004 19:04 | 12/31/2004 19:04 | Christmas Valley-Hampton section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 2.40 | 0 | Auto | Unknown | Unknown | RED | 145250 |
12/31/2004 19:04 | 12/31/2004 19:04 | Hampton tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 145250 |
12/31/2004 19:04 | 12/31/2004 19:04 | Hampton-Riley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 46.50 | 0 | Auto | Unknown | Unknown | RED | 145250 |
12/31/2004 19:04 | 12/31/2004 19:04 | Redmond-Christmas Valley section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 54.70 | 0 | Auto | Unknown | Unknown | RED | 145250 |
12/31/2004 19:04 | 12/31/2004 19:04 | Redmond-Harney No 1 115kV line | 115.0 | L | 125.40 | 0 | Auto | Unknown | Unknown | RED | 145250 | |
12/31/2004 19:04 | 12/31/2004 19:04 | Riley tap to Redmond-Harney No 1 115kV line | 115.0 | T | G | 0.10 | 0 | Auto | Unknown | Unknown | RED | 145250 |
12/31/2004 19:04 | 12/31/2004 19:04 | Riley-Harney section of Redmond-Harney No 1 115kV line | 115.0 | S | G | 21.80 | 0 | Auto | Unknown | Unknown | RED | 145250 |